HomeMy WebLinkAbout20201094 Ver 1_Approval Letter SAW-2018-00449_20210216REPLY TO ATTENTION OF: Regulatory Division DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 November 30, 2020 Re: NCIRT Review and USACE Approval of the NCDMS Blair Creek Mitigation Site / Clay Co./ SAW-2018-00449/ NCDMS Project # 100047 Mr. Tim Baumgartner North Carolina Division of Mitigation Services 1652 Mail Service Center Raleigh, NC 27699-1652 Dear Mr. Baumgartner: The purpose of this letter is to provide the North Carolina Division of Mitigation Services (NCDMS) with all comments generated by the North Carolina Interagency Review Team (NCIRT) during the 30-day comment period for the Blair Creek Draft Mitigation Plan, which closed on October 11, 2020. These comments are attached for your review. Based on our review of these comments, we have determined that no major concerns have been identified with the Draft Mitigation Plan, which is considered approved with this correspondence. However, several minor issues were identified, as described in the attached comment memo, which must be addressed in the Final Mitigation Plan. The Final Mitigation Plan is to be submitted with the Preconstruction Notification (PCN) Application for Nationwide permit approval of the project along with a copy of this letter. Issues identified above must be addressed in the Final Mitigation Plan. All changes made to the Final Mitigation Plan should be summarized in an errata sheet included at the beginning of the document. If it is determined that the project does not require a Department of the Army permit, you must still provide a copy of the Final Mitigation Plan, along with a copy of this letter, to the USACE Mitigation Office at least 30 days in advance of beginning construction of the project. Please note that this approval does not preclude the inclusion of permit conditions in the permit authorization for the project, particularly if issues mentioned above are not satisfactorily addressed. Additionally, this letter provides initial approval for the Mitigation Plan, but this does not guarantee that the project will generate the requested amount of mitigation credit. As you are aware, unforeseen issues may arise during construction or monitoring of the project that may require maintenance or reconstruction that may lead to reduced credit. Thank you for your prompt attention to this matter, and if you have any questions regarding this letter, the mitigation plan review process, or the requirements of the Mitigation Rule, please call me at 919-554-4884, ext 60. Sincerely, BROWNING.KIMBER Digitally signed by LY.DANIELLE.15276 BROWNING.KIMBERLY.DANILLLL. 1527693510 83510 Date: 2020.11.3015:29:14-05'00' Kim Browning Mitigation Project Manager for Ronnie Smith, Deputy Chief USACE Regulatory Division Enclosures Electronic Copies Furnished: NCIRT Distribution List Matthew Reid, Paul Wiesner—NCDMS Scott King —Michael Baker Engineering Inc.