January 24, 2006
®~~
~~,~p/~
~/J //6{~ ``~
~,yos,~rf~ ~~~~ .~t~°~
~~
~r~
LYNDO TIPPETT
SECRETARY
060208
Ms. Nicole Thomson
N.C. Division of Water Quality
Central Office
2321 Crabtree Blvd., Suite 250
Raleigh, NC 27604
Subject: Courtesy notification of geotechnical drilling in Lake Wheeler for foundation investigations
for the replacement of Bridge 311 over Lake Wheeler on SR 1379 (Penny Rd.), Wake
County, Division 5, WBS 33351.1.1, Federal Aid Project No. BRZ-1379 (1), State Project
No. 8.2408101, T.I.P. No. B-3917.
Dear Ms. Thomson:
The North Carolina Department of Transportation (NCDOT) Geotechnical Engineering Unit intends to
drill 11 borings in the water at Lake Wheeler (Wake County) and 2 borings within the buffer zone for a
foundation investigation for the replacement of Bridge No. 311 on relocated SR 1379 (Penny Rd.). The
borings located in Lake Wheeler would be drilled from a barge.
The project study area is located within the Neuse River Basin subbasin 03-04-02, hydrologic unit
03020201. Lake Wheeler, an impoundment of Swift Creek, is the major surface water in the project
study area. Water resource classifications have not changed since the CE was prepared. Swift Creek has
been assigned a best usage classification of "WS III-NSW". The designation "WS III "are water supply
streams in moderately developed areas. NSW refers to nutrient sensitive waters that require additional
nutrient management to control excessive vegetative and algal growth. Neither High Quality Waters
(HQW) nor Outstanding Resource Waters (ORW) occur within one mile of the Project Study Area.
Swift Creek is included on the Division of Water Quality 303(d) list of impaired water.
The work performed will conform to the conditions set forth in the US Army Corp of Engineers
Nationwide 6 and NCDWQ WQC No. 3494 permits. The boring performed within the buffer zone is
considered for the purpose of scientific study and is therefore designated as exempt and allowed within
the riparian buffer.
MAILING ADDRESS: LOCATION:
NC DEPARTMENT OF TRANSPORTATION TELEPHONE: 919-715-1500 2728 CAPITAL BLVD.
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS FAX: 919-715-1501 PARKER LINCOLN BUILDING, SUITE 168
1598 MAIL SERVICE CENTER WEBSITE: WWW.NCDOT.ORG RALEIGH NC 27604
RALEIGH NC 27699-1598
Attached is apre-construction notice, project vicinity map, and a diagram of the proposed drilling
locations.
If you have any questions or need additional information, please contact Erica McLamb at 715-1521.
Sincerely,
Gregory J. Thorpe, Ph.D.
Environmental Management Director, PDEA
cc: w/attachment
Mr. John Hennessy, NCDWQ (2 Copies)
Dr. David Chang, P.E., Hydraulics
Mr. Mark Staley, Roadside Environmental
Mr. Njoroge W. Wainaina, State Engineering Geologist, P.E., Geotechnical Unit
Mr. Thomas Moorefield, L.G., Project Engineering Geologist, Regional Geologist Office
Mr. Greg Perfetti, P.E., Structure Design
Mr. Jon Nance, P.E. (Division 5}
Mr. Chris Murray (Division 5)
Mr. Jay Bennett, P.E., Roadway Design
John Conforti, P.E., PDEA
Eric Alsmeyer, USAGE, Raleigh Office
2
Office Use Only: Form Version March o5
USAGE Action ID No. DWQ No. 2 ~ ~ 6 ~ 2 O 8
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
I. Processing
1. Check all of the approval(s) requested for this project:
^ Section 404 Permit ^ Riparian or Watershed Buffer Rules
^ Section 10 Permit ^ Isolated Wetland Permit from DWQ
® 401 Water Quality Certification ^ Express 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: Alarte-- ~w
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here:
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP} is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII,
and check here: ^
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ^
II. Applicant Information
1. Owner/Applicant Information
Name: Gregory J. Thorpe, Ph.D., Environmental Management Director
Mailing Address: 1598 Mail Service Center
Raleigh, NC 27689
Telephone Number: (919) 733-3141 Fax Number: (919) 733-9794
E-mail Address:
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: N/A
Company Affiliation:
Mailing Address:
Telephone Number: Fax Number:
E-mail Address:
Page 1 of 9
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps maybe included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of _. any .size. DWQ prefers full-size.....construction ,_ __ .. .
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Geotechnical Borings for foundation investigation involving the
replacement ofbrid~e 311 on SR1379 over Lake Wheeler
2. T.I.P. Project Number or State Project Number (NCDOT Only): B-3917
3. Property Identification Number (Tax PIN): N/A
4. Location
County: Wake Nearest Town: Raleigh
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers/names, landmarks, etc.): ~~~From I-440 take exit 297
heading south on Lake Wheeler Rd. Pass Yates Mill Pond and tum right onto Penny Rd.
5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that
separately lists the coordinates for each crossing of a distinct waterbody.)
Decimal Degrees (6 digits minimum): 35.7006 °N 78.7222°W
6. Property size (acres):
7. Name of nearest receiving body of water: Lake Wheeler
8. River Basin: Neuse River Basin
(Note -this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: The protect area consists of a mixture of commercial,
service, and residential development.
Page 2 of 9
10. Describe the overall project in detail, including the type of equipment to be used: 11
borings will be drilled from a barge. 2 additional borings will be drilled on land within the
buffer zone falling under an exemption for scientific studies.
11. Explain the purpose of the proposed work: For foundation investigation for the replacement
of Bridge 311 on SR1379 (Penn~Rd.) over Lake Wheeler
IV. Prior Project history
......_ ._____._If_jurisdictional...determinations andlor.permits. have__been.requested._and/.or~.obtained:,.for.this_ ,...... _.
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date,-and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules. NA
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
,.r ~ _ ._. __ ._ ..
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. Each impact must be
listed separately in the tables below (e.g., culvert installation should be listed separately from
riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts,
permanent and temporary, must be listed, and must be labeled and clearly identifiable on an
accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems.
Wetland and stream evaluation and delineation forms should be included as appropriate.
Photographs maybe included at the applicant's discretion. If this proposed impact is strictly for
wetland or stream mitigation, list and describe the impact in Section VIII below. If additional
space is needed for listing or description, please attach a separate sheet.
1. Provide a written description of the proposed impacts: There are no jurisdictional impacts
anticipated.
Page 3 of 9
2. Individually list wetland impacts. Types of impacts include, but are not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams,
se arately list impacts due to both structure and flooding.
Wetland Impact
Site Number
(indicate on map)
Type of Impact Type of Wetland
(e.g., forested, marsh,
herbaceous, bog, etc.) Located within
100-year
Floodplain
(yes/no) Distance to
Nearest
Stream
linear feet) Area of
Impact
(acres)
NA
Total Wetland Impact (acres)
3. List the total acreage (estimated) of all existing wetlands on the property: 0 acres
4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary
impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed,
plans and profiles showing the linear footprint for both the original and relocated streams
must be included. To calculate acreage, multi ly length X width, then divide by 43,560.
Stream Impact
Number
mdicate on ma
(~
Stream Name
Type of Impact
Perennial or
Intermittent? Average
Stream Width
Before Im act Impact
Length
(linear feet) Area of
Impact
(acres)
NA
Total Stream Impact (by length and acreage)
Page 4 of 9
5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.). Open water impacts include, but are not limited to
fill, excavation, dredging, flooding, drainage, bulkheads, etc.
Open Water Impact
Site Number
(indicate on ma)
Name of Waterbody
(if applicable)
Type of Impact Type of Waterbody
(lake, pond, estuary, sound, bay,
ocean, etc.) Area of
Impact
(acres)
NA
Total Open Water Impact (acres)
- = --6. - L-ist-the cumulative im act-to alI-Waters of the U.S. resulting-from-the rojeet: ~- - -•x~ ~ - ~ - - - - •-~•• --
Stream Impact (acres): 0
Wetland Impact (acres): 0
Open Water Impact (acres): 0
Total Irri act to Waters of the U.S. (acres) 0
Total Stream Impact (linear feet): 0
7. Isolated Waters
Do any isolated waters exist on the property? ^ Yes ®No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet). Please note that this section only
applies to waters that have specifically been determined to be isolated by the USACE.
8. Pond Creation ,
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands
Describe the method of construction (e.g., dam embankment, excavation, installation of
draw-down valve or spillway, etc.): NA
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Current land use in the vicinity of the pond:
Size of watershed draining to pond: Expected pond surface area:
Page 5 of 9
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It maybe useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts. Drilling will be conducted from
a barge.. The drilling within Lake Wheeler will adhere to all conditions set forth in the USACE
NW6 permit and DWQ permit WQC #3494. Drilling within the buffers is exempt for the
_ ...._.:...,, purpose of scientific studies..... _ .. ..._... ~_ . _ _......... . _ .. _.. ....~, ,..._..
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January 15, 2002, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that maybe appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/ncwetlands/strmgide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
Page 6 of 9
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
Compensatory mitigation is not required.
2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability, and written approval from the NCEEP. indicating
that they are will to accept payment for the mitigation must be attached to this form. For
additional information regarding the application process for the NCEEP, check the NCEEP
website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please
..,..,._ _ ,....~,. check..the..appropriate box on page,.five and provide. the..following,information:....._._ ..._ ....,..__.
Amount of stream mitigation requested (linear feet): NA
Amount of buffer mitigation requested (square feet): NA
Amount of Riparian wetland mitigation requested (acres): NA
Amount ofNon-riparian wetland mitigation requested (acres): NA
Amount of Coastal wetland mitigation requested (acres): NA
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federal/state/local) funds or the use of
public (federal/state) land? Yes ® No ^
2. If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National-or North• E-arcrfina Environmental Policy Act (NEPA/SEPA)~?•
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ® No ^
If yes, has the document review been finalized by the State Clearinghouse? If so, please
attach a copy of the NEPA or SEPA final approval letter. Yes ® No ^
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Page 7 of 9
1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC
2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please
identify )? Yes ® No ^
2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multi Tiers.
Zone* Impact Multiplier Required
s uare feet) Mitigation
1 NA 3 (2 for Catawba)
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an
additiona120 feet from the edge of Zone 1.
3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e.,
Donation of Property, Riparian Buffer Restoration /Enhancement, or Payment into the
Riparian Buffer Restoration Fund). Please attach all appropriate information as identified
within 15A NCAC 2B .0242 or .0244, or .0260. No miti;ation is required
XI. Stormwater (required by DWQ)
Describe. impervious acreage_ (existing and proposed) versus total acreage on_thesite. Discuss.
stormwater controls proposed in order to protect surface waters and wetlands downstream from
the property. If percent impervious surface exceeds 20%, please provide calculations
demonstrating total proposed impervious level. NA
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ^ No
Is this an after-the-fact permit application? Yes ^ No
Page 8 of 9
XIV. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes ^ No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description:
XV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the -application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
None
Applican Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 9 of 9
./
r ~
J N SU
r d. N
Feld aborato
~ ~0
~
~ •
`
o,
a- ~~~ 381.:..
J S
a e+~
~ ;J e- enny
7 J 7
(. ~y~.f
,:::~~J~ 1;: !
f
: ~;;;
~ turfy Llst) ~:,: _ ~~:al
~J/
:•I f
7 ~:•f:~j~; f ,/~
n
~ ..i: f 1 ~ 2 r t 7
•Ijj JjJ •IjJjf if Sl t i
t 1 f J J 2 1 i ..~~\
::j~•jj:::•'f 7 2
' P'~y~ II IM'
•
!
I
:;i•:: ,t ,J 2 ,7, r it. .
{ M~ >.u~
:<;
. SC
~i
S
i~
'A '~
URH
D
ORANG _
~
~='~
CHATHAM, ~ a° ''
'` /
'
, -~
";'~~~. ,
ed
ater Sup ~ tershed
WS- SIN`S
ift Creek (L ke Bens n \: ~'~
' S ~7U i
FRANKLIN '
r
~~ ~~ NASH
-KE~,.
WILSON
:± , ; "1
y. ~,
OHNSTON ~ ~"°-
~~ ,
G~
North Carolina -Department of Transportation
Division of Highways
Project Development and Environmental Analysis Branch
FIGURE 1
VICINITY MAP
REPLACEMENT OF BRIDGE NUMBER 311
ON SR 1379 OVER LAKE W HEELER (SWIFT)
WAKE COUNTY
TIP NO. B-3917
0.5 0 0.5 1 Miles
Vr
0
~~.
\, ~
Y ~ \
~ "'~~
~~ C ~
H
~\
~\
a ~
~ ~
a ~
~ ~ ~~~
~. d -~-°~
.ati~~ ~ t.
n ~~
. ~~~ ~
'', ~~ o ~
9"
~ ~ d~
1
0
ti
0
f t
`
~
'
„"_ t ..~ t
U~
~Z t
~~ \
~A ~~ `
~
`
*' ` f
{
11
~
~ ~
~ ~~
--. ~ ~
~
~ ~ 1
.~
~-• rn •. ~ ~
~ ~ ! ~ ~
~ ~
~,~ ~
~
r
('~ ` ~ i-t
~ , +-
i
~
~ ~, i
~ "'
f ~{
~ ~ ~
' e
~ ~~ ?
~ ~ ~
o ~ ~
~ ~~
~
~
~ ~ ~
1~
n
f~ 1
L_J
~7
U
~ ~
Q
~•
1
~...
~ _,
1 ~~'~.
7
1 /~~ ~~
y
/ / ~.
~i ~
r ~
~ j~' ----~~----~/-
,~ 1
~j
~ ~ ~1
n •s ~ `,
~~
~~ ~ ` ~; ~~
n 1'
~ r ~ ;z
fi ~ ;~
y A
~~ o ~
~~ ~.~ n
~'y/ r
mn ,
e z
s'o
°z
... ~--~ j ' ~ n ~
~ \`
~ b
~.
`1 ~
O
n. rCrAA~
W
V
Q
0
'~/: .