Loading...
HomeMy WebLinkAbout20120345 Ver 1_401 Application_201204122®120345 Environmental Consultants, PA Road Raleigh, North Carohna 27614 Phone (919) 846 -5900 Fax (919) 846 -9467 www SandEC com April 2012 S &EC Project # 11776 P 1 To N C Division of Water Quality WebSCaPe Unit Atm Karen Higgins 512 N Salisbury Street 9`h floor Raleigh NC 27603 From Nicole Thomson Soil & Environmental Consultants P A 11010 Raven Ridge Road Raleigh NC 27614 Re Neuse River Buffer Authorization Woodfield Marshal Park, Raleigh Wake County, NC On behalf of the Owner Mr Mike Underwood please find attached a complete application and supplemental information requesting Neuse River Riparian Buffer Authonzation from the N C Division of Water Quality (DWQ) Please contact me at (919) 846 5900 if you have any questions or require additional information PROJECT SUMMARY Project Name Woodfield Marshal Park Project Type Multi family residential development Owner / Applicant Mr Mike Underwood County Wake Nearest Town Raleigh Waterbody Name House Creek Index Number 27 33 13 Class C NSW USGS Cataloging Unit 03020201 IMPACT SUMMARY Stream Impact (acres) 0 Wetland Impact (acres) 0 Open Water Impact (acres) 0 Total Impact to Waters of the U S (acres) 0 Total Stream Impact (linear feet) 0 Total Neuse River Riparian Buffer Impact (square feet) 2 196 sq ft Zone 1 & 1 215 sq ft Zone 2 Attachments Pre construction Notification (PCN) Application Form Agent Authorization Form Q r-- USGS Topographic Site Vicinity Map tl!/ NRCS Soil Survey Site Vicinity Map DWQ Buffer Determination letters (NBRRO 07 206 & 11 219) Impact Maps (24X36) APR DENR �etfands $H Qt1ALITy 1 •10, 40 E Ir f •r �y( 0 a0F w arFgoc O T Office Use Only Corps action ID no DWQ project no Form Version 13 Dec 10 2008 Page 1 of 13 PCN Form — Version 1 3 December 10 2008 Version Pre - Construction Notification (PCN) Form A Applicant Information 1 Processing 1a Type(s) of approval sought from the Corps ❑Section 404 Permit El Section 10 Permit lb Specify Nationwide Permit (NWP) number or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corpse ❑ Yes ❑ No 1d Type(s) of approval sought from the DWQ (check all that apply) ❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ® Riparian Buffer Authorization le Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit ❑ Yes ❑ No If Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ❑Yes No 1g Is the project located in any of NC s twenty coastal counties If yes answer 1 h below ❑ Yes ® No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC) ❑ Yes ® No 2 Project Information 2a Name of project Woodfield Marshal Park 2b County Wake 2c Nearest municipality / town Raleigh 2d Subdivision name N/A 2e NCDOT only T I P or state project no N/A 3 Owner Information 3a Name(s) on Recorded Deed Woodfield Investment Co LLC 3b Deed Book and Page No 14477/2160 3c Responsible Party (for LLC if applicable) Mr Mike Underwood 3d Street address 11425 Horseman s Ridge 3e City state zip Raleigh NC 27613 3f Telephone no 919 341 3034 3g Fax no N/A 3h Email address N/A Page 1 of 13 PCN Form — Version 1 3 December 10 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ® Other specify Applicant is Owner as listed on the Agent Authorization please copy agent (S &EC) on all correspondence 4b Name Mr Mike Underwood 4c Business name (if applicable) Woodfield Investment Co LLC 4d Street address 11425 Horseman s Ridge 4e City state zip Raleigh NC 27613 4f Telephone no 919 341 3034 4g Fax no N/A 4h Email address N/A 5 Agent/Consultant Information (if applicable) 5a Name Nicole J Thomson 5b Business name (if applicable) Sod & Environmental Consultants PA 5c Street address 11010 Raven Ridge Road 5d City state zip Raleigh NC 27614 5e Telephone no (919) 846 5900 5f Fax no (919) 846 9467 5g Email address NThomson @sandec com Page 2 of 13 B Project Information and Prior Project History 1 Property Identification a 1a Property identification no (tax PIN or parcel ID) 0795473524 & 0795479879 1 b Site coordinates (in decimal degrees) Latitude 35 8314 Longitude 786801 (DD DDDDDD) ( DD DDDDDD) 1 c Property size +/ 12 acres 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to proposed project House Creek 2b Water Quality Classification of nearest receiving water 27 33 13 C NSW 2c River basin Neuse River (USGS Cataloging Unit 03020201) 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application The site is currently forested with an existing raleigh sanitary sewer crossing the property in two locations Surrounding land use consists of a nursing home immediately adjacent to this site (to the north) single family homes to the east and west Interstate 440 (1 -440) immediately adjacent to the site (to the south) and a City of Raleigh greenway trail that is located partially along the properties southern boundary (but north of 1-440) 3b List the total estimated acreage of all existing wetlands on the property 0 acres 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 0 acres House Creek is immediately south of the protect boundary and is not on this property however the Neuse River Riparian Buffer associated with House Creek does overlap the project site 3d Explain the purpose of the proposed project The purpose of the proposed project is to construct multi family housing (i a townhomes and apartments) and the associated parking areas The proposed impacts are solely to the Neuse River Riparian Buffer and are associated with one (1) sewer connection and three (3) stormwater bypass channels (necessary to meet the City of Raleigh Stormwater Management requirements) 3e Describe the overall project in detail including the type of equipment to be used The site will be developed as a multi family residential area but the specific project the applicant is requesting approval for relates to one sanitary sewer connection (the existing manhole is within the Neuse River Riparian Buffer) and the bypass /overflow channels for the required stormwater bio retention cels Equipment typical to stormwater BMP construction will be used including backhoes excavators and dump trucks Page 3 of 13 PCN Form — Version 1 3 December 10 2008 Version B Project Information and Prior Project History 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments ❑ Yes ® No El Unknown S &EC conducted a field reconnaissance in November 2011 and determined that there were no jurisdictional features on the subject property 4b If the Corps made the jurisdictional determination what type El Preliminary ❑ Final of determination was made? 4c If yes who delineated the jurisdictional areas? Agency /Consultant Company Name (if known) Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation On September 18 2007 and January 3 2012 DWQ staff (Ms Lauren Witherspoon and Mr Martin Richmond respectively) and determined the features depicted on the NRCS Wake County Soil Survey maps (sheets 38 & 35) were not present in the field and therefore not subject to the Neuse River Riparian Buffer rules It should be noted no features were depicted on the USGS Topographic Quad Maps (other than House Creek) See attached Buffer Determination letters NBRRO 07 206 & 11 219 5 Project History 5a Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b If yes explain in detail according to help file instructions 6 Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes explain Page 4 of 13 C Proposed Impacts Inventory 1 Impacts Summary 1a Which sections were completed below for your project (check all that apply) ❑ Wetlands ❑ Streams tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of Jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ — non -404 other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 2h Comments There are no wetlands on the property 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of Jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) or intermittent DWQ — non404 width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑ PMT ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 31 Comments There are no streams on the property however House Creek is Just off property and the assoicated 50 foot riparian buffer overlaps onto the subject site Page 5 of 13 PCN Form — Version 1 3 December 10 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then indiv ually list all open water impacts below 4a Open water impact number — Permanent (P) or Temporary T 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 4 Total open water impacts 4g Comments 5 Pond or Lake Construction If pond or take construction proposed then complete the chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes permit ID no 51 Expected pond surface area (acres) 51 Size of pond watershed (acres) 5k Method of construction Page 6 of 13 6 Buffer Impacts (for DWO) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a ® Neuse ❑ Tar Pamlico ❑ Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason for Buffer Zone 1 impact Zone 2 impact Permanent (P) or impact Stream name mitigation f (square feet) (square feet) Temporary T re required? B1 ®P ❑ T Bioretention C bypass House Creek El Yes ® No 531 139 B2 ®P ❑ T Bioretention B bypass House Creek El Yes ® No 596 367 B3 ® P ❑ T Sanitary sewer House Creek ® Yes 596 406 connection s B4 ®P ❑ T Bioretention A bypass House Creek El Yes ❑ No 473 303 6h Total buffer impacts 1 2 196 1 215 61 Comments Impacts 1 2 and 4 are necessary for the construction of the needed stormwater BMPs Impact 3 is required for the sanitary sewer connection as the existing Manhole is within the protected Neuse River Riparian Buffer All of these impacts are listed as allowable within the Neuse River Riparian Buffer Rules Table of Uses Page 7 of 13 D Impact Justification and Mitigation 1 Avoidance and Minimization la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project There are no jurisdictional features (i a streams and /or wetlands) on the subject property House Creek however exists lust off property to the south and therefore the 50 foot protected riparian buffer along House Creek overlaps the subject property The riparian buffer impacts requested in this application are primarily for the purpose of constructing a bypass /overflow channel from the stormwater bio retention cel proposed on site This stormwater BMP is designed to treat all the storm flow that will be generated when this project is completed in compliance with City of Raleigh stormwater requirements thereby ultimately improving water quality despite requiring a minimal amount of buffer impact to achieve it There is also an existing City of Raleigh sanitary sewer line that is within the Neuse River Riparian Buffer that this project must connect to which results in additional riparian buffer impact All impacts are listed as allowable within the Neuse River Riparian Buffer Rules Table of Uses 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques The project will meet with the City of Raleigh requirements for Sediment and Erosion Control practices 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ® No 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan Page 8 of 13 PCN Form — Version 1 3 December 10 2008 Version 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ® No buffer mitigation? 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required 6c 6d 6e Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 15 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) 6h Comments The buffer impacts requested are minimal in nature and required primarily to construct the bypass /overflow channel from the proposed stormwater bio retention cels being built to treat the stormwater generated by this project when completed It is our understanding that from previous meetings the project engineer (Mr Johnny Edwards) had with Ms Annette Lucas ( Stormwater Engineer for NC DWQ Central Office) on similar projects that this proposal is in accordance with DWQ expectations for this BMP device Additionally there is a minor amount of buffer impact associated with a sanitary sewer connection to an existing manhole that is currently within the protected riparian buffer It is also our understanding that these impacts are allowable per the Table of Uses Page 9 of 13 E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified ®Yes ❑ No within one of the NC Riparian Buffer Protection Rules 1 b If yes then is a diffuse flow plan included? If no explain why Comments This project is proposing bio retention cels to capture and treat all stormwater runoff generated by this project upon its completion Bio retention cels are permitted to discharge directly to a surface water and therefore no diffuse flow is required The minor amount of buffer impact requested in this application is ❑ Yes ® No associated with the bypass /overflow channels for these devices The other minor riparian buffer impact is for a sanitary sewer connection which does not require diffuse flow (i a no new impervious surface is associated with the sanitary sewer connection) 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 53% 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan explain why As this project is not requesting DWQ 401 Approval the Stormwater condition within the General Certifications does not apply to this project and therefore no DWQ Stormwater review is required However the City of Raleigh does require stormwater treatment for the proposed development which is why the applicant has chosen to install bio retention cels on the property to handle the stormwater run-off generated by this project at its completion 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local government s jurisdiction is this project'? ❑ Phase II 3b Which of the following locally implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties 4a Which of the following state implemented stormwater management programs apply ❑ HQW ❑ ORW I (check all that apply) ❑ Session Law 2006 246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No Page 10 of 13 PCN Form — Version 1 3 December 10 2008 Version C Stormwater Management and Diffuse Flow Plan (required by DWQ) continued 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 11 of 13 F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the El Yes ® No use of public (federal /state) land? 1 b If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval letter ) ❑ Yes ❑ No Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after the fact permit application? ❑ Yes ® No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑yes No additional development which could impact nearby downstream water quality 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description We have reviewed the DRAFT Internal Policy Cumulative impacts and the 401 Water Quality Certification and Isolated Wetland Programs document prepared by the NC Division of Water Quality on April 10 2004 version 2 1 The draft states that many private development projects including small multifamily developments are unlikely to cause cumulative impacts This project does not meet any of the three criteria of private projects that can clearly result in cumulative impacts The proposed development is relatively small in nature is within a mostly residentially developed landscape bounded by existing residential developments and Interstate 1 440 and therefore the utility infrastructure (i a water and electricity) are already in place to service the proposed development We anticipate that you will advise us if a qualitative or quantitative impact analysis is required 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility This project will tie into the existing City of Raleigh sanitary sewer lines The City will ensure the capacity of their facility is not exceeded Page 12 of 13 PCN Form — Version 1 3 December 10 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or El Yes ®No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act El Yes No impacts? 5c If yes Indicate the USFWS Field Office you have contacted F-1 Raleigh ❑ Asheville 5d What data sources did you use to determine whether your site would Impact Endangered Species or Designated Critical Habitat? As this project is only requesting Neuse River Buffer Riparian Authorization this question is not relevant at this time 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes 0 N 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? The proposed project Is in Raleigh Wake County which is not near any coastal or tidal habitat that would support EFH (i a salt marshes oyster reefs etc ) 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑ No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? As this project is only requesting Neuse River Buffer Riparian Authorization this question is not relevant at this time 8 Flood Zone Designation (Corps Requirement) 8a WIII this project occur in a FEMA designated 100 year floodplain? es ❑ No 8b If yes explain how project meets FEMA requirements The proposed utility work is below ground and the reinforced bypass swales will be keyed in so there will be no above ground fills within the floodplain /floodway Additionally these proposed impacts are to the Neuse River Riparian Buffer and not to House Creek 8c What source(s) did you use to make the floodplain determination? Provided by the Project Engineer on the attached maps Nicole J Thomson ,J / '1/�2— Applicant/Agent s Printed Name Appllc ent s gnature Date (Agent s signature is valid only i an au onzation letter from the applicant is provided Page 13 of 13 Environmental Consultants, AGENT AUTHORIZATION FORM +_ r-x!M'r. • Address dv-Zci /� � /?il/�11 f i r ". Phone Project Name /Desorption 416004 Q4a&P S&EC Project # Date Al AY /4 The Department of the Army US Amy Corps of Engineers Wilmington District P O Bog 1890 Wilmington, NC 28402 Attu. �Abyx 1 f- Field Office L—I Re Wetlands Related Consulting To Whom It May Concern I the current budowner or muoicmal ofbcrol_ hereby designate and authmw Soil & Environmental Consultants PA to act in my behalf as my agent in the wetland and stream verification process to obtain formal approval by the USACE of Soil & Environmental Consultants PA wetland and stream determination for the property described ham from this day forward until revoked by the unders ed n writing The authority granted herein is limited to these nglits The ,L% day of /S�`B z 2 w!/ Thus notification supersedes any previous correspondence concerning the agent for this project NOTICE This authorization, for liability and professional courtesy reasons n valid only for government officials to enter the property when accompanied by S&EC staff You should can S&EC to arrange a site meeting prior to visiting the site .�� (/ti 40mg &16-zopi J ./�lil lip Print Property Owner's or Municipal Official s Name Property Owner's or Municipal Official s Signature cc Ms Karen Higgms cc Mrs Nicole Thomson NCDENR - DWQ WeBSCAN Soil & Environmental Consultants PA Archdale Budding 512 N Salisbury St. 9th Floor Raleigh, NC 27604 0� WA 9 tl shad F Easley Governor 0� OG William G Ross Jr Secretary y North Carolina Department of Environment and Natural Resources ] Cohm Sullins Director O Dlvlslcn of water Quality September 18, 2007 Soil & Envlromflental Consultants Attu. Scan Clark SFF I G J001 11010 haven Ridge Road Raleigh, NC 27614 NBRRO#07 206 wake County BASIN Neuse River X Tar Pamhco (15A NCAC 2B 0233) (15A NCAC 2B 0259) Complaint NOV Buffer Determination X Incident # Appeal Call Project Name Blue Ridge Road Site Location/Duections located east of Blue Ridge Road and west of I-440 Subject Stream UT to House Creek Date of Deterllmnabon 9/11/07 Feattire(s) Not Subject Start @ Stop@ Stream Sod Survey USGS Subject Form Topo Pts A X X Explanation. The feature(s) listed above has or have been located on the Soil Survey of Wake County North Carolina or the most recent copy of the USGS Topographic map at a 124 000 scale Each feature that is checked `Not Subject' has been determined not to be a stream or is not present on the property and is not subject to the buffer rules Features that are checked " Subject" have been located on the property and possess characteristics that qualify it to be a stream and are subject to the buffer rules There may be other streams located on your property that do not show up on the maps referenced above but still may be considered jurisftbonal according to the US Awry Corps of Engineers and/or to the Division of water Quality This on -site determination shall expire five (5) years from the date of this letter Landowners or affected parties that dispute a determination made by the DWQ or Delegated Local Authority that a surface water exists and that it is subject to the buffer rule may request a determination by the Director A request for a determination by the Director shag be referred to the Director in writmg do Cyndi Karoly, , DWQ Wedands/401 Unit, 2321 Crabtree Blvd., Raleigh, NC 27604 -2260 Individuals that dispute a determmation by the DWQ or Delegated Local Authority that "exempts" a surface water from the buffer rule may ask for an ad judicatory bearing You must act within 60 days of the date that you receive this letter Applicants are hereby notified that the 60-day statutory appeal these does not start untd the affected party (including downstream and adjacent landowners) is notified of this decision DWQ recommends that the applicant conduct this notification m order to be certain that ON party appeals are made in a timely manner To ask North Carolina Division of Water Quality Raleigh Regional Office Surtax Water Protection Phone (919) 791 -4200 Cusmrrier Service tnt met h2o env slebenc us 1628 Mail Service Center Raleigh, NC 27699 -1628 FAX (919) 571 -4718 1477 623-6748 An EWW Opporamil)r/A16iniahMe Action Effi* r— 50% Recpdedno% Post Core=rs Paper N0Bhla d� !y Blue Rld9e Road Sde Wake County 9/18/07 Page 2 of 2 for a hearft send a written petition, which conform to Chapter 150B of the North Carolina General Statutes to the Office of Adinintstradve Hearings, 6714 Mail Service Center, Raleigh, N C 27699 -6714 This determination is final and binding unless you ask for a hearing within 60 days. The (owner/fntum owners) should notify the Division of Water Quality (including any other Local, State, and Federal Agencies) of this decision concerning any future eorrespondences regarding the subject property (stated above). This project may require a Section 400401 Permit for the proposed activity Any inquiries should be directed to the Division of Water Quality (Central Office) at (919 )-733 -1786, and the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-876.8441 I� Lauren C Witimspoon Environatm l Senior Specialist CC Wetlands/ Storurwater Branch, 2321 Crabtree Blvd, Suite 250 Raleigh, NC 27604 RRO /SWP File Copy Central Files City of Raleigh, Ben Brown, P O Box 590 Raleigh, NC 27602 d '7,2 North Carolina Dmoon of water Quality Raimgh RfVonal Office surface water Protechon Now (919) 7914200 Cusumner service Inteomet h2ea rsiatemus 1628 Meal Semce Center Raleigh NC 27699-!628 FAX (919) 571 -4718 1- 877 - 623 -6748 An Equal Opporte* /Aff m ve Adorn Employer— 50% Recyde00% Pmt Co dow Paper V, L:.w ZI F.A_ 19 If , e bi PPf M6 lac '77 Al Alf S& EC ' nml-- -M IVA A NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild PE Dee Freeman Governor Director Secretary January 3, 2012 Nikki Thompson Soil & Environmental Consultants 11010 Raven Ridge Rd Raleigh NC 27614 Dear Ms Thompson Subject Surface Water Determination Letter NBRRO# 11 219 Wake County The Raleigh Regional Office of the NC Division of Water Quality/Surface Water Protection Section conducted a site visit at the subject property and is providing the below listed determination pursuant to your request for a formal surface water determination BASIN ® Neuse (15A NCAC 2B 0233) ❑ Tar Pamlico (15A NCAC 2B 0259) ❑ Ephemeral /Intermittent/Perennial Determination ❑ Isolated Wetland Determination Protect Name 3936 Blue Ridge Rd Location/Directions Subject property is an undeveloped tract located on south/east side of Blue Ridge Rd in Raleigh Subject Stream UT to House Creek Date of Determination November 14, 2011 Feature E/I/P* Not Sub ect Subject Start@ Stop@ Stream Form Pts Soil Survey USGS To o A X X LIFF = Epnemerau[ntermittent /Perennial Explanation The feature(s) listed above has or have been located on the Soil Survey of Wake County North Carolina or the most recent copy of the USGS Topographic map at a 1 24 000 scale Each feature that is checked Not Subject has been determined not to be a stream or is not present on the property Features that are checked Subject have been located on the property and possess characteristics that qualify it to be a stream There may be other streams located on your property that do not show up on the maps referenced above but still may be considered jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Quality This on site determination shall expire five (5) years from the date of this letter Landowners or affected parties that dispute a determination made by the DWQ or Delegated Local Authority may request a determination by the oAe hCarohna i ntiiMn / /ii North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Phone (919) 7914200 Customer Service Internet www ncwaterqualdy org 1628 Mail Service Center Raleigh NC 27699 1628 FAX (919) 5714718 1 877 623 6748 An Equal Opportunity/Affirmative Acton Employer — 50 / Recycled /10 / Post Consumer Paper 39 --6 Blue Ridge Rd Wake County January 3 2012 Page 2 of 2 Director An appeal request must be made within sixty (60) days of date of this letter or from the date the affected party (including downstream and /or adjacent owners) is notified of this letter A request for a determination by the Director shall be referred to the Director in writing c/o Ian McMillan, DWQ Wetlands /401 Unit, 1650 Mail Service Center, Raleigh NC 27699 1650 If you dispute the Director s determination you may file a petition for an administrative hearing You must file the petition with the Office of Administrative Hearings within sixty (60) days of the receipt of this notice of decision A petition is considered filed when it is received in the Office of Administrative Hearings during normal office hours The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8 00 am and 5 00 pm, except for official state holidays To request a hearing, send the original and one (1) copy of the petition to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699 6714 The petition may also be faxed to the attention of the Office of Administrative Hearings at (919) 733 3478, provided the original and one (1) copy of the document is received by the Office of Administrative Hearings within five (5) days following the date of the fax transmission A copy of the petition must also be served to the Department of Natural Resources, c/o Mary Penny Thompson, General Counsel, 1601 Mail Service Center, Raleigh NC 27699 1601 This determination is final and binding unless, as detailed above, you ask for a hearing or appeal within sixty (60) days The owner /future owners should notify the Division of Water Quality (including any other Local, State, and Federal Agencies) of this decision concerning any future correspondences regarding the subject property (stated above) This protect may require a Section 404/401 Permit for the proposed activity Any inquiries should be directed to the Division of Water Quality (Central Office) at (919) 807 6301, and the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919) 544 4884 Respectfully Martin Ri and Enviro ental Specialist cc Wetlands/ Stormwater Branch 1650 Mail Service Center Raleigh NC 27699 1650 RRO /SWP File Copy ;IU)21601 q, d6 PAM 0i Ap. Fill Vii. lipil id 11 7A oil A AWL 41( Q,kc m v f r I � CgC2 � �- I l f / CeC2 � � CeC2 ApD O e CgB2 � CeF r )' �) WkE I 'I / CE ApD i' CeF i G2 CgB2 / CeD I lcv Co � WkE CeF ' \ Ce r i � C9C2 ` Wn CeD Co Cm i ,� "�1 CgC i � Co � � � r I CeF Co y CgB2 I �� � o� t t y CkCz / Q ApB2 d� Co / CeC2 ` CeD I CeD I u t,2 / / U Cg('? Ma YC2 CeC2 rn Ce8 C Co \\ e �t � AfA C n� WkF — l CeF 1 A f A cr -- Au A f A Gp62 CeD CgC2 I U Co Wk ApD E /I CgC2 Ma Cm I y \ WkE WkE - / CgC2 Cn i % gB2 CeD / e 1 CeF n CeD CgC2 r I \ WkE Kla CeD CgC2 \ CeC2 rvf <E / 7C m \ e CgB2 I ,� 412 ' CeD 00 �X kE ` rl WkE Cg8? CgC2 G��2 \ / MdD2 I� \ Cr�D ) MdB2 CID / 'r' �\ CeU dE2 - ' 6� % G�G� VO MdU M rl m r f U I MdQ22 \ \ Md(? I Pernik Number (lo be provdad by DWQ) "oF warF9 Y =EW O STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT Ttns form must be fled out pmded and submdted The Required Items am*gst (Part 111) must be pru►ted Md out and submllfed along WM aff of the required mfommtron I. PI1110I Pplect name Belie Ridge Apwtirrents Bbertantiar A Contact name Patrick Perez Phone number 91962&4428 Data 36.2012 Drainage area number Site Charactedstics Drainage area 296 208 fl Impervious area 201,421 fe Percent rmpervnws 680% % Design rainfall depth 10 inch Peak Flow Calculations Is pre/post control of the 1 yr 24-hr peak flow required? n (Y or N) 1 yr 24-hr runoff depth in 1 yr 24-hr intensely inthr Pro-development 1 yr 24-hr peak flaw ft /sec Posbdevet 1 yr 24-hr peak flow ft' /sec Re/Post 1 yr 24-hr peak control ft3 /sec Storage Volume Non-SA Waters Minimum volume required 16 3410 f Volume provided 16 600 0 fti OK Storage Volume SA Waters 15 runoff volume f Pre - development 1 yr 24-hr nm ff ft" Post- development 1 yr 24-hr runoff ff3 Mmimum volume required 0 fI3 Volume provided ft3 Cell Dimensions Ponding depth of water 12 inches OK Ponding depth of water 100 it Surface area of the top of the brorofentron can 16 600 0 tl OK Length 187 it OK Width 106 ft OK -0r Radius fl Media and Sofia Summary Drawdown time ponded volume 6 hr OK Drawdown time to 24 inches below surface 15 hr OK Drawdown time total 21 hr In-du sal Sal permeability 4 00 In/hr OK Plarfing media sal Soil permeability 2 00 in/hr OK Sal composition % Sand (by volume) 85% OK % Fines (by volume) 10% OK % Organic (by volume) 5% OK Ptrgfl°p�' SQgicl (hrn"�ex° c;rrrr%dia Total 100% 20 (unfiess) OK Prins i and 11 resign Summary Pope 1 or 2 Basin BSevatlone Temporary pool elevation Type of bloretenhon cell (anew wr to only one of the two rig questions) Is this a grassed cell? Is this a cell with trees/shrubs? Planting elevation (top of the mulch or grass sod lays Depth of mulch Bottom of the planbrg media soil Planting medla depth Depth of washed sand below Periling media sal Are underdrairw bang installed? 24100 final y (Y or N) n (Y or N) 240 hsl 0 Incomes 23725 hsl 275ft 075ft y (Y or N) How many dean out pipes are being installed? 17 What factor of safety is used for smog the underdrams? (See 2 BMP Manual Section 12 3 6) OK Additional distance between the bottom of the planting media and 1 ft the bottom of the cell to account for underdrams OK Bottom of the cell required 235 5 fmsi SHWT elevation 233 5 fmsl Distance from bottom to SHWT 2 it Internal Water Storage Zone (MS) Does the design include IWS Y (Y or N) Elevation of the top of the mourned elbow fmsl Separation of IWS and Surface T 240 ft Piarong Plan Number of tree spew 0 Number of shrub species Number of herbaceous groundcover species Additional Inkrinaton Does volume in excess of the design volume bypass the y (Y or N) bxmretentlon cell? Does volume in excess of the design volume flaw evenly clOWed ° a N) through a vegetated filter? What in the length of the vegetated filter/ it Does the design use a level spreader to evenly distribute flow? n (Y or N) Is the BMP located at 19M 30 feet from surface waters (50 feet t SA waters)? Is the BMP bcaled at least 100 feet from water supply wells? Are the vegetated side slopes equal to or less than 31? Is the BMP bcated in a proposed drainage easement with access to a public Right of Way (ROW)? Inlet velocity (from beatrrreM gym) Is the area surrounding the cell likely to undergo development in the future? Permd Number (le be provided by DWC) OK Insufficient mulch depth unless installing grassed cell OK OK OK OK Excess volume must pass through finer Show how flow is evenly distributed y (Y or N) OK y (Y or N) OK y (Y or N) OK y (Y or N) OK 1 fl/sec OK n (Y or N) OK Are the dopes draining to the I>maetenhon cell grater than 20%? n (Y or N) OK Is the drainage area permanently stabilized? y (Y or N) OK Pretreatment Used (Indicate Type Used with an )C In the shaded cell) Gravel and grass (Cliches gravel followed by 3-5 ft of grass) Grassed swale OK Forebay _ x Km Form SW401 Bknetenton -Rev e June 25 2010 Pens 1 and 11 DeW Summary Page 2 of 2 STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT Permd Number (m be provided by DWQ) ��OF WATF,9 � O o This form must be filled out prtar►ted and submited The Reqused Items ChwM (Part W) must be panted idled out and submTted along with all of the requued idomobon Pmpd name Blue Ridge Apartments Bioerlenlion B' Contact name Patrick Perez Phone number 9198284428 Date 362012 Drainage area number F n (Y or N) Site Characteristics 1 yr 24-hr runoff depth Drainage area 368 518 ftr Impervious area 173 204 flz Percent impervious 470% % Design rainfall depth 10 Inch Peak Flow Calculations Is Pre/Post control of the 1 yr 24-hr peak flow required? n (Y or N) 1 yr 24-hr runoff depth In 1 yr 24-hr Intensity In/hr Pre- devdopment 1 yr 24-hr peak flow ft' /sec Post -development 1 yr 24-hr peak flow ft' /sec PmFost 1 yr 24-hr peak oontrd f3 /sec Storage Volume Non-SA Webers Minimum volume requm3d 14 526 0 ft Volume Provided 14 809 0 fe OK Storage Volume SA Waters 15 runoff volume ft3 Pre-development 1 yr 24-hr runoff ft3 Post-development 1 yr 24-hr runoff ft3 Minimum volume required 0 ft3 Volume provided ft3 Cell Dimensions Pondng depth of water 12 Inches OK Ponding depth of water 100 ft Surface area of the top of the buetentm cell 14 809 0 ftz OK Length 168 it OK Width 118 it OK -or Radius it Media and Soils Summary Drawdown time ponded volume 6 hr OK Drawdown time to 24 Inches below surface 15 hr OK Drawdown time total 21 hr Insifu sort Sal permeability 4 00 m1hr OK Planting made soli Sal permeability 2.00 Mr OK Sod comPOSd= % Sand (by volume) 85% OK % Fins (by volume) 10% OK % Organic (by volume) 5% OK A J_�R��m Total 100% 20 (undless) OK PeAs I and 11 Design Summary Pepe 1 or 2 Permit Number (to be povwied by TWO) 7717- 7779 Temporary pool elevation 244 00 find OK Type of bxWetention cell (answer or to only one of the two folbwmg quesUaw) y (Y or N) OK Is this a grassed cell? y (Y or N) OK Is this a cell with treesftmbs? n (Y or N) OK Planting elevation (top of the mulch or grass sod la)er) 243 find Depth of mulch 0 moms Insufficient mulch depth unless Installing grassed cell Bottom of the planting mocha sal 240 25 ftnal OK Pia" media depth 2 75 ft Depth of washed sand below plimting media sal 0 75 ft OK Are underdrams being installed? y (Y or N) OK How many clown out pipes are being installed? 15 OK What factor of safety is used for sizing the underdrains? (See 2 OK BMP Manual Section 12 3 6) Additional distance between the bottom of the planting media and 1 ft the bottom of the cell to aooamt for nudmdrft Bottom of the cell required 238 5 final SHWT elevation 235 85 find Distance from bottom to SHWf 2 65 ft OK Internal Mfater Storage Zone (MIS) Does the design include IWS Elevabon of the top of the upturned elbow Separation of IWS and Surface Planting Plan Number of tree species Number of shrub species Number of herbaceous gro udoover species Y (Y or N) fmsl 243 ft 0 Addititmal Information Does volume in excess of the design volume bypass the y (Y or N) OK b oretention call? Does volume In excess of the design volume flow evenly distributed n (Y or N) Excess volume must pass thnaugh filter through a vegetated fitter? What is the length of the vegetated fitter? ft Does the design use a level spreader to evenly distribute flow? n (Y or N) Show how flow is evenly distributed Is the BMP located at bast 30 feet from surface waters (50 feet d y (Y or N) OK SA waters)? Is the BMP locabd at least 100 feet from water supply wells? y (Y or N) OK Are the vegetated side dopes equal to or less than 31? y (Y or N) OK is the BMP bcisted in a proposed drainage easement with access y (Y or N) OK to a public Right of Way (ROW)? Inlet velocity (from treatment system) 1 filsec OK Is the area surrounding the cell likely to undergo development in n (Y or N) OK the fuhue? Are the slopes draining to the boreterdcon call greater than 20%? n (Y or N) OK Is the drainage area permanently stabilized? y (Y or N) OK Pretreatment Used (Indicate Type Used with an )C in the shaded cell) Gravel and grass (81inohes gravel followed by 3-5 ft of grass) Grassed swale OK Forebay x Other Forth SW4014koretention Rev 8 June 25 2010 Parts 1 and 11 Design Summary Page 2 d 2 Permit Number (to be provided by O1MQ) ATA�pf W ATFH O Y NOlENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be fixed out panted and submitted The Required items ambst (Part ill) must be p►mted filled out and submitted a" with al of the required vitro eon Prolect name Blue Ridge Apartrrents Bioertention C Contact name Patrick Perez Phone number 9198281428 Date 3 62012 Drainage area number Site Characteristics Drainage area 185130 fe Impervious area 79 606 le Percent impervious 430% % Design rainfall depth 10 inch Peak Flow Calculations Is pre/post control of the 1 yr 24-hr peak flaw required? n (Y or N) 1 yr 24-hr runoff depth in 1 yr 24-hr intensity in/ hr Pre - development 1 yr 24-hr peak flow ft31sec Post - development 1 yr 24-hr peak flow felsec Pm/Post 1 yr 24-hr peak control fe/sec Storage volume Non-SA Waters Minimum volume required 6 742 0 ft Volume provided 6 750 0 ft3 OK Storage Volume SA Waters 15 runoff volume fe Pre-development 1 yr 24-hr runoff fe Post - development 1 yr 24-hr runoff fe Mimmum volume required 0 ft" Volume provided fe Cell Dimension Ponding depth of water 12 inches OK Ponding depth of crater 100 ft Surface area of the top of the bioretention cell 8 400 0 fez OK Length 117 ft OK Width 62 ft OK -a Radius ft Media and Soils Summery Drawdown time ponded volume 6 hr OK Drawdown time to 24 inches below surface 15 hr OK Drawdown time total 21 hr In-itu soil Soil penneablydy 4 00 inlhr OK Planting media sal Sod pomeabitily 2 00 inthr OK SOD composition % Sand (by volume) 85% OK % Fines (by volume) 10% OK % Organic (by volume) 596 OK PhForrZ 1 Bi�oi�RCr s&la Total 1 20 (unitless) OK Parts 1 and 11 Design Summary Page 1 of 2 Permit Number (to be p.A*d by FWQ 1 Temporary pool elevation 242 80 fmsl Type of baeterttlon cell (answer wr to only one of the two What factor of safety is used for song the undedrains? (See fo mng q ►ns) OK Is this a grassed cell? y (Y or N) OK Is this a can with triees(shrubs? n (Y or N) Planting elevation (top of the mulch or grass sod layer) 242 hsl Depth of mulch 0 inches Insufficient mulch depth unless installing grassed cell Bottom of the planting media soil 239.25 hsl Wanting media depth 2 75 ft Depth of washed sand below plar><ung mocha sal 0751, Are underdrains being mstalled? y (Y or N) How many dean out p1pas are being Installed? 9 OK What factor of safety is used for song the undedrains? (See 2 OK BMP Manual Section 12 3 6) Additional distance between the bottom of the planting media and 1 ft the bottom of the cell to account for underdrains Bottom of the cell required 237 5 fmsl SHWT elevation 235 5 hsl Distance from bottom to SHWT 2 ft OK Intemal Water Storage Zone QWS) Does the design include IWS Y (Y or N) Elevation of the top of the upturned elbow hsl Separation of IWS and Surface 242 ft Planting Plan Number of has spaces 0 Number of shrub species Number of herbaceous groundeover spaces Additional Information Does volume in excess of the design volume bypass the y (Y or N) OK bioretenban ceil? Does volume in excess of the design volume flow evenly distributed n (Y or N) Excess volume must pass through filter through a vegetated filter? What is the length of the vegetated fiW ft Does the design use a level spreader to evenly distribute flow? n (Y or N) Show how flax is evenly distributed Is the BMP located at least 30 feet from surface waters (50 feet d y (Y or N) OK SA waters)? Is the BMP localed at least 100 feet from water supply wells? y (Y or N) OK Are the vegetated sloe slopes equal to or less than 31? y (Y or N) OK Is the BMP located in a pry drainage easement with access y (Y or N) OK to a public Right of Way (ROW)? Inlet velocity (from treatment system) 1 ftlsec OK Is the area sumounding the cell likely to undergo development in n (Y or N) OK the future? Are the sloes draining to the bnomtention cell greater than 20%? n (Y or N) OK Is the drainage area permanently stabilized? y (Y or N) OK Pretreatiment Used (Indicate Type Used with an )C in the shaded o311) Gravel and grass (81mc hes gravel followed by 3-5 ft of grass) Grassed Swale OK Forebay x Other Form SW40141wreteMan -Rev 8 June 25 2010 Parts I and 11 Design Summary Page 2 of 2 f x O m 310- RETENTION AREA „E" DETAIL 810-RETENTION AREA A DETAIL r (NOT TO SCALE) (NOT TO SCALE) RETAINING WALL RIP RAP DISSAPATOR AND BERM ELEV = 244.75' RIP RAP DISSAPATOR AND BERM RETAINING WALL ELEV = 259.7559,75' %` � BIORETENTION MINIMUM GRASS SURFACE \ � AREA = 14,525 SF ~ Z O co MINIMUM STORAGE =14525 CF GRASSED SURFACE MUST BE SOD AREA 16,3 MINIMUM GRASS SURFACE '' HYBRID BERMUDA OR CENTIPEDE ELEV = AREA 18,341 SF \ �� 243;0' MINIMUM STORAGE =16,341 CF HYBRID BERMUDA OR CENTIPEDE ELEV = EX ~ 1\ A W GRASSED SURFACE MUST BE SOD FOREBAY 240.0' DI \ l EX DI ELEV =2415' FOREBAY / f; D1 -34 \% (� \ ELEV =238:5 PP ELEV =243.97,. DI-19 TOP WALL ELEV = 245.00' �f ELEV= 244.0' FES ELEV = 240.97 EDWIN G /BRANDLE ! 01� TOP WALL ELEV 242.00' 184 .\ O ELEV =241.0' DB 2591, PGr 165 INLET PIPE _ 46 4 ,INLET PIPE.' - BM f.980, O, PG - i + PI : 0795.06-148-821 + * RETAINING WALL - + + + + + + + + + ++ ' +i+ + + + + + ++ + + + + + + + + + + + + ++ + RETAINING WALL t W + + r + } _ - + + + + + + + + + + + - ++ ++ FILTER FABRIC ELEV = 240.25 FES -35 „ _ + + + + + + + + + O C + r + + + ! ` _ �. + + .+++++++. + + a a + + + TAIL DITCH B _ + + + + + + + + z y + + + + ++ + J r, 1 ., r . . v + W W + + + GREENWAY TRAIL ELEV =233.0 _ _ _ + + ++ + + + +++ + + ++ + + _ Z + + r \� Y ' `� PROPOSED 10' Tf * + + + ++ + + + .,++++ + N�a + + + + + LENGTH =65 + + + + + + + + + ++ ��w + +�+ + + FILTER FABRIC ELEV = 237.25' + + + + + + + + ++ a_ +, l E� L * + MIN DEPTH =2' T + + + + + + + + a + + + + ++ + F S SLOPE EASEMENT ,o� c r + + + + ++ ++ . +± { +;+ r �y + + + - + + ++ ++ + + + + + + + + ++ N I o + FES -20 Q EX ♦ �\ w " "O f ii + + + O - + +• ++ ++ ELEV 231.0 / ! i { I `'t ♦ ♦♦ Q ' G + + + + + + + + + + + TAIL DITCH "A" j. ` `\� Qi - , l LENGTH =88LF I ( FES • ;\ O { �C01) f j157 STONE 30 RCP OUTLET PIPE MIN DEPTH=?. 7' \;: \ \ a \ Q� F 0 - _ _ = 6" PERFORATED PIPE N5 GRAVEL X57 STONE 30 RCP OUTLET PIPE - JACKET INV ELEV= 239.50' - 61LF 00.5% '�"�� 1 - \ _ I d 6" PERFORATED PIPE N5 GRAVEL Ji I _. l 10078 d JACKET INV ELEV = 236.50' % � / ;% '` i f, � � .- _ _ ` R;i ,.. � � -,.... INV ELE' _ 233.35 - / / �: ♦ f /� %� FiVU ��• �- INV ELEV = 231.31' R T NTION SOIL SPECIFICATION: ato E E `! M 5 -88 % SAND 8 -t2% Fit.ES, 3 -5% ORGANIC ' SANDY LOA (B ) 810RETENTION SOIL SPECIFICATION: _ ..- - � SANDY LOAM (85 -88 %SAND, 8 -12% FINES, 3 -5% ORGANIC) -- f � •' 1. s, \ ` / "'' --:.: LL t N F - `\ 3830 BLUE RIDGE ROAD LLC � / .. - ::•% , • .. ��' . , .. - . , / . . ' _ .. _ :. : ;1. ']`. . ; O 5 G 482 DB 9.52 , P i' i � ' :, �:' -.' ± ' • . f' ' . ~: `� ... -;. � f •% 0. ►` x BM`1987',PG 28 1 ' 0,`. ' o' PIN: 0795.06 -47 -5963 i _ - �s. • C4 0 p- / ._•-- .r ---' � �• off o 1 LL \ � CB / R8 PRIVATE -} \� � A W �m'j } 1 / �� ( .� ..,- �- r Cp , L ` , . DRAINAGE vi 0) DI- CLUB �' R 1 N: EASEMENT > C w "- i RcP : Q r 1 -•- ARE 1 v __ \� yi J l l hVOOD_FtELD r Ex Es \ \ Q 1 ...z ACS __ ----- --"\ .. ,-.. 'cam . • . • �-...- - ,, �. f �'•.' \ � p ;t� Rf �- \ \, ' - ' ! / S �- _ -- o f_ j _ - i �` PAUL E GASTELLOE W Z � LL. MARS _ - ... �,! - _ „ GP `- - .. R P ,:. p K 1 \ x� c, _ / L - R 130 2, �- • .. _ - r/ Z° 1 - _ OB 2 PG 2701 W 1 FZ o _ ,-a 1 � . •� •_ ____ -- _.�--� _ _ -- / - _ ---- --- -. . • - - . . - ' .' - ' " .. - — •', � . 8M 1996 PG 4 4 Q 1 r �OW.N NyES _- • � C r'� •. _. .. �.,, • .. .� - _.�•.' ,.-- ` � _._ - Gr' - PIN: 0795.07 -58 1396 R 6 . ,v __ 1 >! o' - - _ - M - / _ sp 12 1 I -, i P �C FES ____ ... r PRrVATE ... , t CB • ti P`! \ - _- - DRAINAGE EASEMENT - - r ! \ r R EX RIP AP __-' __ -...•- ._--- - - , . , . �' _ _._... -- ' -..- --__ __ .._'_. „_.__ - �,-- � ` ;/ '�'�. ' .: { � ( , . - r ��M \. - -_ �.. � _... � _._ l ._- P _ . • • . • , . • �., X80 _---- .% _ - / \., ' ♦ . / M "lam P \ --- _ i - r A ----^ , 2 III '..LASS 8 RIPRAP C R. \♦ - --'-. .j III t'- a ✓ 24 R II .- ' " • �.' .' • ' - . • -57 MA EXISTING W10TH 270 — --• ......... ... .. .,- \. _- -- _ -_ _ _ ___ , �. �f COURTYARD T II /� !. � .6?; .. .:: .: , --- - Fz .. 6'. .. .- � \ --- _-- :� ,-- .-'� — ---- - _ i. 'r♦.,• PAUL E GASIELLOE I ,- / _ . . • ,,• ; . - • , . _ .�- ---` \. --_ - -- .. - ._-• - ----• / - - - _ ,_- - -_ - r' �- - DB 11257, PG 101.13 - .1 BM 1999, PG 444` A �- '• -.�, .. -... ----. Q . ' ' ". • ' :;�;' .,,_ \ \ °\ ---... _ _ �- --- - - - - -- .PIN: 0795.07 -58 -1396 ' REMOVE EX 4 DIAMETER SS MH_ - v _-- C — CB- -. -_ \ \ \ \ -� - - _.. 6 6 - \ vP.- ARKING . r, _ CO DECK ,- PROPOSED 5 DIAMETER MH U _ - � \ _.. ,.. - _ r e+ _ .i i .._. -- 0 ELATION - _ r � _ - � .,= � ., - _:.. s' DI -19. 1. i .,. -•- J /. 810 E - ... t - ... --._ • < <� �� rte_ _....`J'�• 1"x"1 .. TENTI .. ,, . .. s UNDER .�i . . . . :. . . RAIN . . .. . , . , . j u > . . . . . ... ^. •;�` ,�'•. . _ - - �J - .,_._ .• r ,-: cam, / O - Y Y J , N : ' ` t.; UDR • %r 24 G Cb L� R UNDER p� AREA D- ( 13 - - ' . o { Q�11 k i CB -1 1 0 `1- .J- i 25-8 ..-- d / - 'e N' I D 0 6 2' - - � ' �. _ z ,�teaa \ 1 ZONE ! =r 2 ter? oA" _ i i O P fl I ti U OOBPL 1 •'� AN L A AL_ UA CH AN 1� A N L 1 0 ' i 1 AC : 3 1' MP T 038E W i - lr. f -.� W • . ;- c�. - .. • , . ... , .. .. • , . - - __ -._.. -. 20079500) !~ (sl r FEMA FIRM PANEL 37 ��� r 3 EFFECTIVE DATE: MAY,_2 2006 _ -- w' •� .._ . ___ _ .�..: -- IMP T#4 '� •oF a i -r 256 -- -- -�' n . ' ' ` ' ' - --•:. • .2: • •: r PRrP = BM 2008, PG 2347 \ . --' -'' \• � r°-1 - / - - ' - -- / _ r \ SS _MH _ // �t ' SS MH ..�.:.: .- .. .. �. ZONE 1 - o _ _\ _ _ NSF GL CR - �Y r -� — �- � � IMPACT.• 473SF EE'K \ - .- T � Oc 11129 G 1701 ANK �"� C`�J p.., �i � � � _l E E , Bli!, 2008, PG 2347 CR . EEK .; �. - :.:. ,. � _ .. ... .. N OF BAN IMPACT 139SF OF PIN: 0795.07 -57 -2866 TOP - - - -� IM''I-ACT1 r X80 r t IMPACT• 531SF \ \ �,L ♦ ` : - _ - -PROP T� ��F �--- �_� SS MH CL , r i 'f- 1l ANNUAL CHA,•;CE FLOODPLAIN SON FES -35' ` " t A _ i ' EE 3720079500J' � O TOP - £rT 6 F 7 � EX. SS » � �t � a ��,s �� f ,, R � � J c FEMA .FIRM PAN_._ OF w �"� ' TAIL DITCH B RY SE / t_ / �F EFFEC71 VE DATE MAY 2. 2006 %' - •„ "i . ui . R CRS p MH 1 l SEE DETAIL ".. SANITA s TREE CONSERVATION AREA Fir BM 2008, PG 2287 W SS L 8 � B �_ <., PROP up1E r .,. I 1- ` BM 2008, PG 1808 By qN kiss! ZONE2 SS MH pR� �L _— a cat y CT• 367SF '�'- ,�,_' -= � ` •: "' ..., _ .� � t E< °i{ ,� s 50 NEUSE RIPARIAN BU_ UFF y: fi FLOODWAY BOUNDARY MEASURED FROM TOP OF BANK,. � A E "'. � , _.- + ` .. _ , > 5 ,_ i >�.._ �:�• {:_ }'�,. - � FEMA FIRM PANEL .3720079500) , EACH SIDE Z NE f ��-• �� :`�, ,max :a 3 ,�':. / -r- -j i i EFFECTIVE DATE: MAY 2, 2006 " BM 2008, PG 2347 \ � �.•�„ �.�� �. �- ^� „ � e -�- i _._ ry- >c . EX. SS IMPACT: 596SF 20/yF - V.. V BM 2008, PG 2347 �' MH NR9 2 �-� J� O u / N 0 ca �X.SS \' \, ? ���. �._ MH _\ oc„ � Sq� ZONE2 \\ -- _._ '-�� Op OF �,� ` / 4� NR /v F 7 TgRY SE IMPACT. 406SF J CRE£ \�\ �_ - ' -- sk a - 0 \� 9 CT PROPOSED 20' CITY OF RALEIGH �,� egAlk ' SANITARY SEWER EASEMENT �E �� <, I TAIL DITCH "B" DETAIL zo E 1 I �--_ c� c / I,. n / TAIL DITCH »A" DETAIL ALE IMPACT. 596SF / / � 50' NEUSE RIPARIAN BUFFER '.`L� (NOT TO SCALE) �- �� � � (NOT. TO SCALE) \` ENSS \Ek 30 ti S '' / ., (MEASURED FROM TOP OF BANK, / r X .- - � 17.d qNl 7C _.. �. EACH SIDE) 15.0' _ Q ". w MIN Tq- G , BM 2008, PG 2347 4 '4 MIN RIGHT OF -' .. wfR \ ;,.. ; n m :.. -1: .i. s 7^ • -,�L U. ,LL . 7'ER,�•,T f% EX 30" SANITARY 1 1� r� �� o z SEAxC 1• _ 3: 1 MAX 440' N GRAPHIC SCALE R t Mtn <, k #r t e �, {qy %`� ,' 3: 1 MAX EX. `_ �.� n Y- s a � y� � ^ � (C_.. � SNEET �?z)a{sf SIDE SLOPE SS — �� 3 tG +'FILt t: �r.$.,N. 4 sir rstz =xESr SIDE SLOPE CLASS B EX. SS 0 40 MH : E 1,� +� ... , - CLASS B RIP RAP I f FILTER FABRIC MH RIGHT �� I~ RIP RAP i I OF FfL1ER FABRIC 5.0' FES -35: 232.75' OF WAY TREE CONSERVATION AREA 5.0' FES -53: 231.00' TIE TO CREEK: 231.75' I 3 TAIL DITCH LENGTH.- 65' � IN FEET) BM 2008, PG 1808 TIE TO CREEK: 225:00' 1 inch 40 ft. TAIL DITCH LENGTH: 88' RETAINING WALL FES ELEV=243, 0'7 RETAINING INLET P/PE_ 810-RETE,INTION AREA "C" DETAIL (,,IVOT TO SCALE) RIP RAP DISSAPATOR AND 3ERM ELEV = 243.75' BORETENTION'.WINIMUM GRASS SURFACE f AREA = 8,400 SF MINIMUM STO1. =:AGE -3,062 CF GRASSED SURFACE MUST BE SOD HYBRID BERMUDA OR CENTIPEDE ELEV 242.0' DI 6 ELEV =242.36' TOP WALL ELEV = 244,00' + + + + + N + C;> LQ + + I X + N + + + + + + + + + N + + + + + ,+++X++++++++++++ + + + + + + + +_+ + + + + ++++4+++++++++++++ 4 4 4. + + 4 + + + t + [4 + 4 + + + ++ + + + X #57 STONE 30" 6' PERFORATED PIPE N5 GRAVEL gal ,JACKET INV ELEV=238.50' mm iWV ELEV 233.94' BIORETENTION SOIL SPECIFICATION: SANDY LOAM (85-887. SAND, 8-12X FINES, 3-5% ORGANIC) \ro \ / f / FFE 323.69 FE 24,38 E T24 56 0, FFE `' / 325.24 6 !` AC 309.5 TW r P FFE J I.j bv 98,0 BW 029 RW '298.0 70V /J , i' r / / / F. .... . 326.50 X/ FFE 326.95 HE 327.85 312. 0 FE 070 313.47 " ?gyp f I ; / f FFE 312.9 311.0 C.0 k 3H08E . 99 FFE 307.92 FF 310.0/ X EXIS 77NG -5 CB-51 B-5 HALT D ; -__ Vr 7"0 REA4A,IV 77NG ASPHALT To E&fA/N 13- C, _N_ Rip PAP RETAINING WALL FILTER FABRIC ELEV = 239.25' FES-64 GREENWAY TRAIL ELEV=233.50' F NIF 3830 BLUE RIDGE ROAD LLC DB 9525, PG 482 BM 1987, PG 28 PIN: 0795.06-47-5963 TAIL DITCH " C" DETAIL (NOT TO SCALE) 14.0' MIN 3:1 MAX SIDE SLOPE FILTER FABRIC FES-64: 233.50' TIE TO CREEK: 232.50' TAIL DITCH LENGTH: 44' TAIL DITCH "C" LENGTH=44' MIN DEP77-1=1.5' co Storm Drainage Table Upstream Structure Rim Elevation I (ft) Structure Invert Elevation (ft) Downstream -Structure Pipe Size (in) Pipe Length (ft) Slope (fttft) Invert (Upstream) (ft) Invert (Downstream) (ft) Upstream Inlet C Upstream Inlet Area ',Acres) Upstream Structure Flow (Total Surface) (t./s) Total Flow (fffs) 278.00 274.00 2 12 19 0,005 274.00 273.91 0.61 t106 0.3 0.3 2 280,50 273,91 3 12 78 0.005 273.91 273.50 0.61 O.16 0.7 1.0 3 264.50 273.50 4 15 87 0.005 273.50 273.08 0.61 6'.,28 1.2 2.2 4 289.10 273.08 5 15 123 0.005 273.08 272.50 0.61 C,,22 1.0 3.1 5 288.50 ­702.50 -8 15 80 0.009 272.50 271.77 1 0.61 C.,32 2.8 5,7 6 299.50 289.50 7 18 95 0,058 289.50 284.00 0.61 C-94 4.2 4.2 7 288.00 284;00 8 18 49 0,010 284.00 283,50 0.61 Erl..24 1.1 5.2 8 288.75 271.77 9 16 71 0.010 271.77 271,06 0.61 0194 0.6 11.2 9 287,79 271.06 10 18 14 0.010 271.06 270.92 0.61 0'_23 1.0 12,1 10 280.00 266:00 11 18 24 0.008 266.00 265.80 0.61 C11,00 0.0 12.1 11 270.00 257.32 12 24 97 0,101 257.32 247.50 0.61 :',00 0.0 12.0 12 254;00 241.00 13 24 5 0.000 241.00 241.00 0.61 cl-00 0.0, 12.0 rooTdr-ainage (entire bldg) 267.00 242.00 14 24 65 0.015 242.00 241.00 0.95 •.44 23.8 23.8 15 244.00 242.16 16 12 20 0.005 242.16 242.06 0.61 MO 0.9 0.9 16 244.00 242.06 17 _12 106 0.005 242.06 241.53 0.61 0,20 0.9 1,8 17 255.10 241.63 18 12 102 0.005 241,5_3 241.00 0.61 1 LAO 0.0 1.7 19 240.97 231.31 20 30 1 61 O, 005 231,31 231.00 0.1 L1,38 0,3 0.3 21 278.50 274.50 22 12 23 0.022 274.50 274.00 0.61 0.03 0.1- 0.1 22 277.50 274.00 23 12 201 0.050 274.00 263.90 0.61 f,,,02 _025 0A 0.2 23 267,90T 263.90 24B 12 89 0.134 263.90 252.00 0,61 1.1 1,3_ 24A 256.00 253.00 24B 12 63 0,016 253.00 252.00, 0.61 �0� 0.3 0.3 24B 261.94 251,50 28_ 18 74 0.009 1 251.50 250.82 0.61 G0.11 0.5 2,0 25A 397.00 282-10 25B 15 182 0.099 282,10 264.00 0.25 0,24 0.4, 0.4 25B 268.00 263.25 _26 24 155 0.078 263.25 251.10 0.64 -,-18 14.8 15.0 26 258.00 251.10 27 24 21 0.052 251.10 250.00 0.61 41,86 16.3 30.9 27 260.88 250.00 28 24 28 0,011 250.00 249.70 0,61 0.34, 1.5 32,4 28 260.88, 24_ 4. 1 _0 29 30 6 0.017 244.10 244.00 0.61 0.10 DA 34.1 34 243.97, 233.35 35 30 122 0,005 233.35 232.7_5 0.233 0:46 0.8 0.8 50 311.70 307.00 51 15 33 0.015 307.00 306.50 0, 95 0.08 0.6 0.4 51 312.05 306,50 52B 15 146 0,108 306.50 290.70 0.95 G,08 0.6 0,7 52A 295,40 291.00 52B 15 30 0.010 291,00 290.70 0.82 0,21 1.3 0.7, 52B 295.40 289.40 54 15 74 moo 289.40 282.00 0.95 9,06, 0.4 1.8 53A 293.80 275.00 56A 15 70 0A00 1 275.00 269.05 0.8 01,39 2.3 2,3_ 286.70 28245 54 15 31 0.032 282.45 281.45 0.83 710 0.6 0,6 54 286,70 281.45 55 15 165 0.086 281.45 267,25 0.96 01,03 0.2 2,6 55 270.95, 267.00 58 18 113 0.075 267.00 258.49 0.95 C'.09 0;6.1 4.0 56A 272.20 267,95 56B 15 51 0.010 267.95 267.44 0.52 11,68 16 , 4-9 56B 274.05 267,44 56C 15 7_20 0:010 267.44 266.24 0.58 {',34 1A 6.3 56C 269.50- 266.24 57 15 96 0.075 266.24 259.00 0,58 C,34 1.4 _7,7� 57 264.10 259.00 58 15 26 0.010 259.00 258,74 0.82 0�_412_ 2,5 8.5 58 264.10 255.15 61 18 41 0.012 255.15 254.66 0.95 0A6 0.4 12.8 260.63 257.54 60 15 26 1 0,012 1 257,54 257.23 0.47 G_36 1.2 2,8 :, 60 260.63 257.23 61 15 42 1 0.055 1 257.23 254.91 0,95 0,03 0.2 61 262.75 243;56 62 24 56 1 0.010 1 243.56 243.00 (NIA) (f1A) 0.0 15,7, 1 242.80 233.94 64 24 86 233 �4 0.1 uIs 01 NIF CITY OF RALEIGH GLEN EDEN PARK D8 2691, PG 547 BM 1978, PG 762 PIN: 0795.10-36-6593 LEGEND NIF NOW OR FORMERLY RIW RIGHT OF WAY DB DEED BOOK BM BOOK OF MAPS PG PArF tj 0 -BO�NDARY FLOODWAY l / FEMA FIRM PANEL 3720079500) EFFECTIVE DATE. MAY 2, 2006 BM 2008 PG 23471 50' NEUSE RIPARIAN BUFFER (MEASURED FROM TOP OF BANK, EACH SIDE) BM 2008, PG 2347 Z 0 W W rnnnntnnoupl 0-- A, &A Z 1160 0. n. cl; 2 co E 0 %W 00 0 Z, Cq 0 C4 co 00 C LL IN co W 0�1 Z _j 0 0 0 i / ',.�� 0 Pr 01, Z CLI 0 fn SP-58-2011 A ... /WOODFIELD MARSHAL PARK Z ©PARTMENTS 0 M* Ia� 0 ­ 7Z W ..... ....... �D cy') .'.'�'.'.'.'.'.BIORETENTION B ............. 0 .......... .......... 1% ANN AL CHANCE FLOODPLAIN X TEMA FIRM PANEL 3720079500) W EFFECTIVE DATE, MAY Z 2006 BM 2008, PG 2347 IONIC DI-63 r FIB o fa C� to Lu C� u.1 (y) 0� C\)� 'k S- N W Q\_ to Z W. LI. U_ SHEET 1.39SF 3 IMPACT #1 OF ZONE" I IMPACT: G, SF sp LU (D W -M Co (D FIM r :3 > C X 0 M M CL W Z Z 0 ®r J ..�6� ,... I�I�II }ii ILI ' D Z _j 0 0 0 i / ',.�� 0 Pr 01, Z CLI 0 fn SP-58-2011 A ... /WOODFIELD MARSHAL PARK Z ©PARTMENTS 0 M* Ia� 0 ­ 7Z W ..... ....... �D cy') .'.'�'.'.'.'.'.BIORETENTION B ............. 0 .......... .......... 1% ANN AL CHANCE FLOODPLAIN X TEMA FIRM PANEL 3720079500) W EFFECTIVE DATE, MAY Z 2006 BM 2008, PG 2347 IONIC DI-63 r FIB o fa C� to Lu C� u.1 (y) 0� C\)� 'k S- N W Q\_ to Z W. LI. U_ SHEET 1.39SF 3 IMPACT #1 OF ZONE" I IMPACT: G, SF sp