Loading...
HomeMy WebLinkAbout20200340 Ver 2_ePCN Application_20210215F)� hdrinc.com February 15, 2021 Mr. Alan Johnson N.C. Department of Environmental Quality Mooresville Regional Office 610 East Center Avenue, Suite 301 Mooresville, NC 28115 Subject: Cowans Ford Floating Bulkhead Ramp and Storage Project Lincoln County, North Carolina Dear Mr. Johnson: I am writing on behalf of Duke Energy Carolinas, LLC (Duke Energy) in reference to Division of Water Resources ID Number 20200340, Cowans Ford Floating Bulkhead Ramp and Storage Project, which was verified by Mr. Alan Johnson of the Division of Water Resources in March 2020 (See Attachment 1). Duke Energy proposed to install a launch ramp for a floating bulkhead that will be used for dam inspections for the nearby Cowans Ford Hydroelectric Station. Duke Energy received verification of the Nationwide Permit 36 on March 16, 2020 (SAW-2020-00448), authorizing permanent impacts of 0.14 acre (See Attachment 2) and the approval of 401 Water Quality Certification on March 18, 2020. A portion of this work is already completed, the rip rap and crushed stone base has been installed and a portion of the concrete slab was installed on top. Duke Energy and their construction contractor, Crowder Construction Company (Crowder), originally proposed to install the ramp via a causeway. Crowder proposed to pour the concrete slabs onshore and then push/pull them into place. During the construction process, this method proved not to be feasible. The construction plan was redesigned with a proposed cofferdam system, provided by Portadam. This method will allow construction to be completed in the dry and ensure design compliance for the ramp. (See Attachment 3 — Portadam Example for a simplified example of the installation.) Please note, the de -watering of the work area will not be discharged directly into the lake. The construction sequence will be as follows: • Crowder will install rock past the end of the existing ramp (see Attachment 4 — Revised Impact Figure for additional details). • The cofferdam framework will be preassembled on land, placed in the water using a forklift or excavator, floated to the desired location, and rested on the bottom. • Once in the desired location, heavy-duty netting will be installed on the framework, and then the liner will be floated out and installed over the netting and framework. • Once the liner is installed, the work area will be de -watered. • De -watering will be accomplished with two to three pumps placed inside spill containments onshore (see Attachment 5 — De -watering Plan for additional details): o Rip rap will be placed onshore in an upland area for the pump discharge. o Once the water reaches lower levels, 4-inch pumps will be utilized with sediment bags before discharge onshore. The water from the temporary workspace will be run through sediment bags and then allowed to infiltrate in the upland area or return via overland flow to the lake. o Pumps will be used to keep the work area dry. 440 S Church Street, Suites 900 & 1000, Charlotte, NC 28202-2075 (704) 338-6700 Cowans Ford Floating Bulkhead Ramp and Storage Project February 15, 2021 Page 2 Once the area is de -watered, the launch ramp construction will be completed, by installing the concrete slabs. Once construction is finished, water will be pumped back into the de -watered area. The liner will be removed, the netting will be removed, and finally the framework will be removed and moved onshore. The newly proposed permanent impacts will result from the placement of rip rap at the end of the ramp to facilitate the cofferdam installation. The rip rap will result in approximately 0.02 acre (56 cubic yards) of additional permanent impacts. Total permanent impacts are 0.16 acre (1,513.4 cubic yards) for original and newly proposed work. The de -watered workspace area will result in approximately 0.18 acre of temporary impacts. If you have any questions or require additional information after your review of the enclosed materials, please contact me at (814) 449-7827 or Anthony.Nardoa-hdrinc.com. Respectfully, Tony Nardo Environmental Scientist Attachments: NCDEQ 401 Approval Letter USACE SAW-2020-00448 Verification Letter Portadam Example Figure Revised Impact Figure De -Watering Plan Agent Authorization Form cc: Sarah Gentry, P.E. — HDR Joseph Arcella, P.E., PMP — Duke Energy Carolinas, LLC DWR mrlslon of Water Resources Pre -Construction Notification (PCN) Form October 26, 2020 Ver 3.3 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* C Yes r No Change only if needed. BIMS # Assigned * Version#* 20200340 1 Is a payment required for this project?* r No payment required What amout is owed?* r Fee received IT $240.00 r Fee needed - send electronic notification r $570.00 Reviewing Office * Select Project Reviewer* Mooresville Regional Office - (704) 663-1699 Alan Johnson:eads\adjohnson1 Information for Initial Review 1a. Name of project: Cowans Ford Floating Bulkhead Ramp and Storage Project 1a. Who is the Primary Contact?* Joe Arcella, PE, PMP 1b. Primary Contact Email:* 1c. Primary Contact Phone:* Joseph.arcella@duke-energy.com (704)812-1151 Date Submitted 2/15/2021 Nearest Body of Water Lake Norman Basin Catawba Water Classification WS-N, B, CA Site Coordinates Latitude: Longitude: 35.441845-80.960761 Pre -Filing Meeting Information ID# Version 20200340 2 Pre -fling Meeting or Request Date* 2/13/2021 Attach documentation of Pre -Filing Meeting Request here:* DWR Pre -Filing Meeting Request Form.pdf 51.75KB A. Processing Information C^U County (or Counties) where the project is located: Lincoln Is this a NCDMS Project r Yes r No Is this project a public transportation project?* r Yes r No la. Type(s) of approval sought from the Corps: W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* r Yes r No Please provide the date of the previous submission.* 3/16/2020 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: 36 - Boat Ramps NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: r 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit le. Is this notification solely for the record because written approval is not required? For the record only for DWR401 Certification: For the record only for Corps Permit: P 401 Water Quality Certification - Express P Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? W Owner r Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: Duke Energy Corp; DUKE POWER CO REAL EST DV 2b. Deed book and page no.: 1221-329 2c. Responsible party: Michael Brissie - Duke Energy Carolinas, LLC * r Yes r No r Yes r No 2d.Address Street Address 257 Duke Lane Address Line 2 CKY Stanley Postal / Zip Code 28164 2e. Telephone Number: (704)812-1132 2g. Email Address:* Michael. Brissie@duke-energy.com 4. Agent/Consultant (if applicable) 4a. Name: Tony Nardo 4b. Business Name: HDR Engineering of the Carolinas 4c.Address Street Address 440 South Church Street, Suite 1000 Address Line 2 City Charlotte Postal / Zip Code 28202 4d. Telephone Number: (814)449-7827 4f. Email Address:* Anthony.nardo@hdrinc.com Agent Authorization Letter* Att_6_Signed Agent Cert of Auth Form 03032020.pdf State / Province / legion NC Country USA 2f. Fax Number: State / Province / legion NC Country USA 4e. Fax Number: 20.31 KB C. Project Information and Prior Project History C^U 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/ town: Lowesville Project Identification 2a. Property Identification Number: 2b. Property size: 78530; 56191 45 2c. Project Address Street Address Address Line 2 city State / Province / legion Postal / Zip Code Country 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Lake Norman 3b. Water Resources Classification of nearest receiving water:* WS-IV, B; CA 3c. What river basin(s) is your project located in?* Catawba 3d. Please provide the 12-digit HUC in which the project is located. 030501011204 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinityof the project at the time of this application:* Approbmately 45.0 -acre site comprised of an existing rip rap levee, maintained grass area, and roadside right-of-way. Land use in the vicinity of the proposed Project consists of residential, power generation, and open water/recreational uses. See attached letter for more details. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4c. If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000). DWR# 20-0340, Pre -Filing Meeting Request ID# 20200340, Version 2 SAW-2020-00448 Project History Upload 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) 03_CowansFord_Topo_PCN.pdf 368.2KB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) 04_CowansFord_Soils_PCN.pdf 326.32KB 4f. List the total estimated acreage of all existing wetlands on the property: WA 4g. List the total estimated linear feet of all existing streams on the property: N/A 4h. Explain the purpose of the proposed project:* A concrete storage pad and launch ramp will be installed using conventional construction techniques and equipment. A layer of rip rap will be installed with a layer of crushed stone on top of that to form a base, Concrete slabs Will then be installed on the base for rails to be mounted to. A cofferdam system will be utilized to insure work can performed in the dry. See attached letter for more details. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* See attached letter 4j. Please upload project drawings for the proposed project. Att_4_Revised_Impact_Figure _20210205.pdf 1.29MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No r Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: SAW-2020-00448 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: HDR Engineering of the Carolinas Other: 5d1. Jurisdictional determination upload Att_2_SAW-2020-00448_Verification_Letter.pdf 10.22MB 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed projector related activity? D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): F Wetlands r Streams -tributaries W Open Waters r Pond Construction 4.Open Water Impacts ❑ Buffers 4a. Site # 4a1. Impact Reason 4b. Impact type 4c. Name of waterbody 4d. Activity type :114e. Wate rbody type 4f. Impact area 01 Other P Lake Norman Fill Lake 0.02 02 Other T _11 Lake Norman Dewatering Lake 0.18 4g. Total temporary open water Impacts: 0.18 4g. Total open water impacts: 0.20 4h. Comments: I E. Impact Justification and Mitigation 1. Avoidance and Minimization 4g. Total permanent open water impacts: 0.02 la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Water will be pumped on -shore and filter bags will be utilized to remove sediment. A cofferdam system will be utilized to let construction work be performed in the dry and to minimize impacts to Lake Norman. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Live concrete will not be allowed to enter the waterway and all appropriate erosion and sediment control device Will be installed and maintained throughout the duration of the project. A cofferdam system will be utilized to let construction work be performed in the dry and to minimize impacts to Lake Norman. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: The project does not meet requirements for mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r: Yes r No What type of SCM are you providing? F Level Spreader F Vegetated Conveyance (lower SHWT) F Wetland Swale (higher SHWT) F Other SCM that removes minimum 30 % nitrogen 17 Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r•' No 2b. Does this project meet the requirements for low density projects as defined in 15ANCAC 02H .1003(2)? r Yes r No Comments: G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. Launch ramp will be utilized to inspect the near by dam. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* r Yes r No r Unknown 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?' r Yes r No 51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS IPaC and NC Natural Heritage Database Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes f• No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* EFH Habitat Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* National Park Service NRHP GIS Public Data Set and the NCSHPO HPOWEB GIS Web Service. 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* F Yes C No 8b. If yes, explain how project meets FEMA requirements: A no -rise certification was submitted to Lincoln County. Project Avtivities will not increase base flood elevation. 8c. What source(s) did you use to make the floodplain determination?* FEMA Map Service Center National Flood Hazard Layer; FEMA FIRM Panel 4612K Miscellaneous C^U Comments Other Attachments Cover Letter Att 1 - 401 Verification Letter Att 3 - Example of a cofferdam/Portadam system Att 5 - De -Watering Plan Miscellaneous attachments not previously requested. Att_1_401_Verification_Letter.pdf 820.16KB Att_3_Portadam_Example.pdf 392.3KB Att-5—De-watering Plan_20210205.pdf 138.38KB Cowans_CoverLetter_20210215.pdf 105.35KB Signature FI By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request Within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Tony Nardo Signature Date 2/15/2021 AGENT CERTIFICATION OF AUTHORIZATION I, the undersigned, a duly authorized owner of record of the property/properties identified herein, do authorize representative(s) of the Wilmington District, U.S. Army Corps of Engineers (Corps) to enter upon the property herein described for the purpose of conducting on -site investigations and issuing a determination associated with Waters of the U.S. subject to Federal jurisdictional under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. I, Mr. Joseph Arcella, PE, PMP representing Duke Energy Carolinas, LLC hereby certify that I have authorized Tony Nardo of HDR to act on my behalf and take all actions necessary to the processing, issuance, and acceptance of this request for wetlands determination / permitting and any and all standard and special conditions attached. We hereby certify that the above information submitted in this application is true and accurate to the best of our knowledge. tf )Occk o1 Oa U Date Agent's signature March 3, 2020 Date Completion of this form will allow the agent to sign all future application correspondence. LEGEND ' Er� '" �- M Study Area Topgraphic Quadrangle r -� DATA SOURCE: USGS 24K Topographic Maps: Greek Lake Norman South (1993), USA Topo Map Service © �.� `� � • � i r ti 0 Feet 2,000 r^ I LAKE NORMAN SOUTH f. r island - •r ',. - .74� we r�� r—�--. � } U 4 ��r.S'� : 1+� ,_ice: ■ �+� >, - J! - f ]l� � COWANS FORD FLOATING BULKHEAD RAMP AND STORAGE PROJECT DUKE USGS TOPOGRAPHIC QUADRANGLE ti ENERGY FIGURE 3 PATH: IICLT-SRV021GISIPROJECTSIDUKE_ENERGY110185]2]_CWF_FLOATING_BULKHEAD%].2_WIPIMAP_DOCSIMXDIPERMIT02 COWANSFORO_TOPO.MXD - USER: ANARDO - DATE: 211212020 SECTION 401/404 PCN LEGEND 'P D Study Area Soil Map Unit Hydric Rating CeB2 ) W, DATA SOURCE: USDA NRCS Soils Survey of ' • °- { Lincoln County NC and Mecklenburg Couty fj,<•E; (2019); Bing Hybrid Aerial Imagery r © * .hey A j tl qy 0 Feet 1,000 r AM PeC2 PeC2 %CCBMY� a m � P,aCI , - , 2 a PaD � PeC2 PaD `i `I► ,. LN0602 Gawans FDM Ce132 ` ' DAM DAM Ud , r Aid 3 i CuB YY W On -Site Soils PaQ CeB2 — Cecil sandy clay loam, 2 to 8 percent slopes, moderately eroded PeC2 — Pacolet sandy clay loam, 8 to 15 percent slopes, moderately eroded PeC2 — Pacolet sandy clay loam, 8 to 15 percent slopes, moderately eroded PaE Ud — Udorthents, loamy ChA MQ PaD — Pacolet sandy loam, 15 to 25 percent slopes Mo rc�.c s COWANS FORD FLOATING BULKHEAD RAMP AND STORAGE PROJECT DUKE NRCS SOIL SURVEY OF LINCOLN & MECKLENBURG COUNTIES, NORTH CAROLINA ti ENERGY FIGURE 4 PATH:%%CLT-SRV021GIS%PROJECTS%DUKE_ENERGY%1018572]_CWF_FLOAn NG_BULKHEAD%7.2_WIP%MAP_DOCS%MXD%PERMIT104_COWANSFORD_SOILS.MXD - USER: ANARDG - DATE: 211212D20 SECTION 401/404 PCN ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANI£L SMITH Director Mr. Joseph Arcella Duke Energy Carolinas 257 Duke Lane Stanley, NC 28164 NORTH CAROLINA Environmental Quality March 18, 2020 DWR# 20-0340 Lincoln County Subject: APPROVAL of 401 Water Quality Certification with Additional Conditions Cowans Ford Boat Ramp Dear Mr. Arcella: You have our approval, in accordance with the General Certification and those conditions listed below, for the purpose proposed in your application dated March 4, 2020, and received by the Division of Water Resources (the Division) on March 5, 2020. After reviewing your application, we have determined that this project is covered by Water Quality General Certification Number 4132 and/or 4145 which can be viewed on our web site at https://deg. nc.gov/about/divisions/water-resources/water-resources-permits/wastewater- branch/401-wetlands-buffer-permits/401-401-isolated-wetlands-waters-program The General Certification allows you to use Nationwide Permit Number 36 and/or Regional General Permit 30 once it is issued to you by the U.S. Army Corps of Engineers (COE). Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. The above noted Certification will expire when the associated 404 permit expires unless otherwise specified in the General Certification. It is advised that all conditions of the Certification are reviewed prior to initiation of the project. In addition to the requirements of the Certification, you must also comply with the following conditions: This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us in writing, and you may be required to send us a new application for a new Certification. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 300 linear feet, compensatory mitigation may be required. If the property is sold, the new owner must be given a copy of the Certification and approval letter; and is thereby responsible for complying with all conditions. 15A NCAC 02H .0506 and 15A NCAC 02H .0507 2. The Mooresville Regional Office shall be notified in writing once construction at the approved impact areas has commenced. 15A NCAC 02H .0502 (e) D E Qom, _ North Carolina Department of Environmental Quality I Division of Water Resources wJ�}/� Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 N11H fH (:A�i(1!.INA � 0­O'tore'wml talQ"I 704,663.1699 3. Approved Impacts: Type of Impact Amount Approved Temporary Impact Amount Approved Permanent Impact Open Water (fill) 0 acre 0.14 acre Wetland 0 acre 0 acre 4. Stormwater discharge structures at this site shall be constructed in a manner such that the potential receiving streams (of the discharge) will not be impacted due to sediment accumulations, scouring or erosion of the stream banks. 15A NCAC 02H .0506(b)(5) 5. Use of native vegetation and other soft stream bank stabilization techniques is recommended where practicable instead of riprap or other bank hardening methods. If riprap is necessary, it shall not be placed in the streambed, unless approved by DWR 6. The permittee shall report to the Mooresville Regional Office any noncompliance with this certification, any violation of stream or wetland standards [including but not limited to sediment impacts, and any violation of state regulated riparian buffer rules. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. A written submission shall also be provided within 5 business days of the time the applicant becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, if the noncompliance has not been corrected, the anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The Division may waive the written submission requirement on a case -by -case basis. 15A NCAC 02B .0200 7. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval. 15A NCAC 02H .0507 (c) and 15A NCAC 02H .0506 (b)(2) and (c)(2) 8. Upon completion of the project, the applicant shall complete and return a "Certificate of Completion" form to the 401/Wetlands Branch of the Division using the following link: https://edocs.deq.nc.gov/Forms/Certificate-of-Completion. 15A NCAC 02H .0507(c) This Certification can be contested as provided in Articles 3 and 4 of the General Statute 150B by filing a written petition for an administrative hearing to the Office of the Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/or by calling the OAH Clerk's Office at (919) 431-3000. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday, 8:00 am to 5:00 pm, excluding state holidays). The petitions may be faxed to the OAH at (919) 431-3100, provided the original and one (1) copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS. FedEx, etc.) Office of Administrative Hearings 1711 New Hope Church Rd. Raleigh, NC 27609-6285 One (1) copy of the petition must also be served on DEQ as follows: Mr. Bill Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review by the Division under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Alan Johnson in the Mooresville Regional Office at 704-663-1699. Sincerely, DocuSigned by: A.r44tW H P44,14 for F161FB69A2D84A3... Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office, DEQ Attachment cc: Cathy Janiczak, Army Corps of Engineers, Charlotte, email Tony Nardo, HDR, Anthony.nardo(o)hdrinc.com DWR 401 & Buffer Permitting Branch file MRO, Land Quality CERTIFICATE OF COMPLETION NCDWR Project No.: Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: County: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Wetland & Buffer Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification Date: I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Engineer's Certification Partial Final Date: I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2020-00448 County: Lincoln U.S.G.S. Quad: NC -Lake Norman South GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Duke Energy Carolinas, LLC Joseph Arcella Address: 257 Duke Lane Stanley, NC 28164 Telephone Number: 704-812-1151 E-mail: Joseph.Arcella(a)duke-energv.com Size (acres) 45 Nearest Town Stanley Nearest Waterway Catawba River River Basin Santee USGS HUC 03050101 Coordinates Latitude: 35.441845 Longitude:-80.960761 Location description: The project area is located 100 feet Northeast of the intersection of Club Drive and Ravenwood Lane in Lincoln County. PIN(s): 78530, 56191. Description of projects area and activity: This verification authorizes the permanent impact of 0.14 acres of Lake Norman for a launch ramp. Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 36. Boat Ramps SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated 3/4/2020, and the enclosed plans Figure 9 & Figure 10 dated 1/8/2020. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Catherine M. Janiczak at 704-510-1438 or Catherine.M.Janiczak(a)usace.army.mil. Corps Regulatory Official: ( {�Vj,, L,Date: 03/16/2020 Expiration Date of Verification: 03/18/2022 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Copy furnished: Agent: HDR Engineering of the Carolinas Tony Nardo Address: 440 South Church Street, Suite 900 Charlotte, NC 28202 Telephone Number: 980-337-5004 E-mail: Anthony.nardo(&hdrinc.com Action ID Number: SAW-2020-00448County: Lincoln Permittee: Duke Enemy Carolinas, LLC, Joseph Arcella Project Name: Cowans Ford Floating Bulkhead Ramp and Storage Project Date Verification Issued: 03/16/2020 Project Manager: Catherine M. Janiczak Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Catherine M. Janiczak Charlotte Regulatory Office U.S Army Corps of Engineers 8430 University Executive Park Drive, Suite 615 Charlotte, North Carolina 28262 or Catherine.M.Janiczak@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date in. L 54 x E F G W DWG NO. C F-470-v-0 1 REV. 3 4 5 6 T/STORAGE PAD EL 766.00 ---\ W-191 w 770 L.� o 760 J 750 w 740- 60'-0„ STORAGE PAD WINCH FLOATING BULKHEAD PRELIMINARY NOT FOR CONSTRUCTION i � OR RECORDING PLAN SCALE: 1 "=20' START OF RAMP 1 1 2 1 3 --+- 77 ±0.5% SLOPE STONE BASE SEE SECTION A SECTION B SCALE: 1 "=20' - ISSUED FOR INFORMATION. ISSUED FOR 30% CLIENT REVIEW. REV. I DESCRIPTION 4 220C RAMP 2'-0" FREE FLOATING BOARD FLOAT—\ BULKHEAD PTD 01 /08/2020 DKL 10/19/2019 DRAWN CHKD APPRVD DATE DRAWING REVISIONS 5 6 --�-- 7 8 9 10 DWG NO. C F-470-B-0 1 REV. GENERAL NOTES: 1. FOR GENERAL NOTES SEE CF-470-A-01. 2. 4 INCH #57 STONE INCLUDED TO FACILITATE A SLIDING OF CONCRETE SLAB DURING CONSTRUCTION. THICKNESS OF #57 STONE MAY BE CHANGED AT CONTRACTOR'S DISCRETION. FLOATING BULKHEAD --NNX 15'-0" - - 1'-9 1/2 " B j CL RAIL CL RAIL FLOATING BULKHEAD I STORAGE CART 47i 5' - 0'$ 1s Fw TYP T/RAMP EL VARIES 4"57 STONE IYAI °V. Ua �° °• Concrete Fill = 183.3 cubic yards (SEE NOTE 2) • °.�< . ; 2 000000000000000000000000000000000000000000000000000000000000000000000000000000000000000-00000000000_000000000C-000000000000000000000 2 1 � o � 1 $$A" NCDOT CLASS RIP RAP Rip Rap Fill = 1,111.7 cubic yard SECTION A SCALE: 3/8'$=1'-0" - D B �r d- RAIL STOP RA EXISTING G DE END OF RAMP SZ FULL POND EL 760.00 BULKHEAD LOWER POND LIMIT EL 755.00 T/ RAMP EL 746.47± CONTRACTOR/VENDOR INFORMATION F) Cowans Ford Floating Bulkhead Ramp and Storage Area Project Impacts Figure Figure 9 SFAI HDR Engineering, Inc. of the Carolinas N/A CWF-05206 License Number: F-0116 N/A CWF-05206 440 S Church St., Suite 1000 Charlotte, NC 28202-2075 WO/PR# ACT# THE ABOVE IS RESERVED FOR VENDOR'S LOGO, NAME, ADDRESS, THE ABOVE IS RESERVED FOR TELEPHONE NUMBER AND ANY REQUIRED REFERENCE NUMBERS. ALL PROFESSIONAL ENGINEER SEAL DRAWINGS TO BE PRODUCED IN AUTOCAD RELEASE 2000 OR LATER. USE INK - DO NOT EMBOSS 7 8 9 - 2 1 0 2FT SCALE: 3/8"=1 '-0" 20 0 20 SCALE: FEET E W 1l i CD i 6 i O z (D 0 0 DWG SUB TYPE: m' COWANS FORD HYDROELECTRIC PLANT I DUKE 17FOSSIL HYDRO OPERATIONS ENERGY. FACILITY: UNIT: SYSTEM: CWF 00 N/A TITLE: FLOATING BULKHEAD PROJECT NO: CC NO: W.O. NO: RAMP AND STORAGE AREA CF001259 CWF-05206 N/A GENERAL ARRANGEMENT SIZE: ANSI-D SCALE: PLOT: PLAN AND SECTIONS 34"x 22" AS NOTED 1=1 THIS DRAWING IS THE PROPERTY OF DUKE ENERGY. SHT DWG NO: AND IS NOT TO BE REPRODUCED OR USED FOR ANY PURPOSE !-+ EXCEPT AS SPECIFIED BY DUKE ENERGY. CF-47O-B-0 10 11 12 V w D 0 i CD o� LL U REV: w z w U- F- DWG NO. CF-470-C-07 REV. 0 3 -+- 4 5 6 7 8 9 10 DWG NO. CF-470-C-07 REV. 0 El L 54 I> E F G W .aO . z 0 _z Q 0 Li Li Cn w z U Q CS LLJ . z 0 0 0 0 w Q 6 WATTLE (TYP Q� C-09 r . BUFFERI o pm CRETE WASHOUT AR i LAKE N0RMAN --,-FULL POND EL 760.00 1 SILT FENCE (TYP) C-08 (DOUBLE ROW) CONCRETE_ STORAGE P 750 O ;N- ----� CONCRETE RAMP � SEE NOTE 2 4 TURBIDITY CURTAIN ~ 750-`, D - rc 5 s _ o q f 72 \-_-=\� 1. E GENERAL NOTES: 1. FOR GENERAL NOTES SEE CF-470-A-01. FOR DRAWING INDEX SEE CF-470-A. FOR ABBREVIATIONS SEE CF-470-A-02. 2. CONTRACTOR SHALL NOT ALTER OR DISTURB EXISTING BIRD HOUSES ALONG SHORELINE. IF NEEDED, DUKE ENERGY TO WORK WITH DAVIDSON COLLEGE ON RELOCATION. 3. FOR LIMITS OF DISTURBANCE NORTHING, EASTING COORDINATES SEE CF-470-C-01. LEGEND. 0 i n —SF SILT FENCE 41 4 ----- TC----- TC ----• TURBIDITY CURTAIN C:) i 13 CONSTRUCTION FENCE I O - - - - - - - - P-I II I Prwn 4 PLAN Cowans Ford Floating Bulkhead Ramp and Storage Area Project I SCALE: 1 "=100' 100 0 100 Turbidity Curtain Location Figure M I SCALE: FEET z CD 0 Figure 10 DWG SUB TYPE: 0 U CONTRACTOR/VENDOR INFORMATION SEAL COWANS FORD HYDROELECTRIC PLANT DUKE FOSSIL HYDRO OPERATIONS ENERGY O wl FACILITY: UNIT: SYSTEM: J HDR Engineering, Inc. of the Carolinas License Number: F-0116 440 S Church St., Suite 1000 Charlotte, NC 28202-2075 CWF 00 N/A D 0 o �I LL v TITLE: FLOATING BULKHEAD RAMP AND STORAGE AREA EROSION AND SEDIMENT CONTROL SITE PLAN PROJECT NO: CF001259 CC N0: CWF-05206 W.O. NO: N/A SIZE: ANSI-D 34"x 22" SCALE: AS NOTED PLOT: 1=1 0 ISSUED FOR CONSTRUCTION. RMM N/A CWF-05206 LU w U- REV. DESCRIPTION DRAWN CHKD APPRVD DATE WO/PR# ACT# THE ABOVE IS RESERVED FOR VENDOR'S LOGO, NAME, ADDRESS, TELEPHONE NUMBER AND ANY REQUIRED REFERENCE NUMBERS. ALL DRAWINGS TO BE PRODUCED IN AUTOCAD RELEASE 2000 OR LATER. THE ABOVE IS RESERVED FOR PROFESSIONAL ENGINEER SEAL USE INK - DO NOT EMBOSS THIS DRAWING IS THE PROPERTY OF DUKE ENERGY. AND IS NOT TO BE REPRODUCED OR USED FOR ANY PURPOSE EXCEPT AS SPECIFIED BY DUKE ENERGY. SHT DWG NO: C F-47O-�-+-07 l i REV: O DRAWING REVISIONS 1 2 3 4 5 6 7 8 9 10 11 12 X� PORTADAM' Temporary Cofferdam Solutions STEEL SUPPORT FRAME Index 2 Overview 3 Boathouses, Ramps & Structures 4 Bridges 5 Canals 5 Channelization 6 Dam & Spillway Repairs 7 Environmental Remediation 8 Flume Bypasses 9 Intakes & Outfalls 9 Pipeline Crossings 10 Silt & Sediment Containment 11 Shoreline Stabilization 12 Treatment Facilities 12 Weir Structures RETAINED WATER UP TO 12 FEET DEEP FABRIC MEMBRANE UNOBSTRUCTED WORK AREA IMPERVIOUS FABRIC SEALING LOADING SHEET NATURAL BED MATERIAL INSTALLATION OF FRAMEWORK PLACING MEMBRANE �= �•� ; • =1 �•._I_l! 1• e{ DE -WATERING BY PUMPING For nearly four decades, Portadam has provided superior customer service and product quality in the water diversion, flood protection and temporary water storage industries. Our exceptional service and broad portfolio of engineered solutions deliver advantages in both cost and schedule to our customers, enabling project success. Combining knowledge with innovation, Portadam identifies exactly what is required - customizing our solution to your needs. Our team of experts have executed over 5000 projects in the US and interna- tionally. Let us be your choice for your next water diversion, flood protection or temporary water storage project! Work area dewatered www.portadam.com DocuSign Envelope ID: 89F5DF64-07DD-4FC6-8C29-73F2BB6DAD47 3 4 5 6 7 8 9 10 �-/ F-470—B-01 REV. 1 DWG NO. C F-470-B-01 REV. 1 DWG NO. GENERAL NOTES: N 1. FOR ADDITIONAL GENERAL NOTES SEE CF-470-A-01. A 2. 4 INCH OF 2"/3" STONE INCLUDED TO A FACILITATE PLACEMENT OF CONCRETE SLAB ACCESS AREA DURING CONSTRUCTION. THICKNESS OF • 2"/3" STONE MAY BE INCREASED AT SFSTp 15'-pCONTRACTOR'S DISCRETION. F �RgOF � „ Rq pFLOATING 3. EXTEND STONE A MINIMUM OF 6 INCHES � Mp B�BEYOND THE PERIMETER OF THE FENCE. CL RAMP 02 BULKHEAD 7'-6" CL CART B o N 621843.01 & RAMP B E 141 916.69 Impact 02Temporary Crushed Stone Fill = 162.4 cubic yards ' Work Space 0.09 acre CL RAIL CL RAIL I WINCH i FLOATING BULKHEAD N 621808.73 I CO STORAGE CART J-LnL i N _ E 1415988.97 SFF F�FTF 5 -0 _ _ft TYP I T/RAMP EL VARIES - �� i A \e�p3 - 2"/3" STONE a° Concrete Fill - 183.3 cubic yards C _ (SEE NOTE 2) ° • ° • e - ♦ -I C - 2 � � 2 co ��� 1 a 0 000000000000000000000000000000o0o0o0o0o0o0o0o0o0o0o000000000000000000000000000000000000000000000000000000000000000000000000000000 � 1 GEOFABRIC OVERLAID WITH #57 STONE J \ � � �' �' �' �' �' �' �' N C DOT CLASS "A' RIP RAP Additional Rip Rap Fill = 56 cubic yards FLOATING BULKHEAD / / \ Impact 01Rip Rap Fill SECTION A N 621787.30 / 0.02 acre - D FENCE / E 1416034.15 \ SCALE: 3/8"=1'-0" - D 2 \ Rip Rap Fill 1, 11.7 cubic yards CLASS 1 RIP RAP (2' THK MIN) N 621765.87 \ � Full Pond Elevation = 760 E 141 6079.33 FLOATING Legend BULKHEAD CART RAIL Origionally Permitted Impact Area = 0.14 acre 010 E ^ E Additional Rip Rap Fill = 0.02 acre N 621744.45 F G W J 780- w 770 L.� o 760- Li w 750- 740- T/STORAGE RAMP EL 766.00 --\ 60�AGE RAMP WINCH FLOATING BULKHEAD CART TIE -DOWN 3 —+- 190' CONC RAMP START OF RAMP 7% SLOPE STONE BASE SEE SECTION A SECTION B SCALE: 1 "=20' - 1 REVISED RAMP LENGTH AND STORAGE WIDTH. 0 ISSUED FOR CONSTRUCTION. REV. DESCRIPTION 4 Additional Temporary Work Space Impact = 0.18 acre 2'-0" FREE FLOATING END OF RAMP BOARD FLOAT --\ BULKHEAD ---i RAIL STOP ---I FULL POND EL 760.00 BULKHEAD LOWER POND LIMIT EL 757.00 6ia T/ RAMP t�_44J� MAX EL 748.54MIN EL EXISTING GRADE Cowans Ford Floating Bulkhead Ramp and Storage Area Project Revised Impacts PCR-CWF-002 FigureFigure 1 CONTRACTOR/VENDOR INFORMATION HDR Engineering,Inc. of the Carolinas License Number: F-0116 440 S Church St., Suite 1000 Charlotte, NC 28202-2075 SEAL ,\0"""11//, .�`\\ \N CA Ro //,% �Q��oFEssipN9l�y9%; = SEAL = = 0441��5QQ1 = ✓� U. % °° fiHGINE�`�°°° "''N ..°� �/ /14/200 COWANS FORD HYDROELECTRIC PLANT FOSSIL HYDRO OPERATIONS FACILITY: CWF UNIT: 00 SYSTEM: N/A TITLE: PROJECT NO: CF001259 CC NO: CWF-05206 W.O. NO: N/A PTD DLA SBG 05/13/2020 N/A CWF-05206 SIZE: ANSI-D 34"x 22" SCALE: AS NOTED PLOT: 1=1 PTD DLA SBG 03/23/2020 N/A CWF-05206 DRAWN CHKD APPRVD DATE WO/PR# ACT# THE ABOVE IS RESERVED FOR VENDOR'S LOGO, NAME, ADDRESS, TELEPHONE NUMBER AND ANY REQUIRED REFERENCE NUMBERS. ALL DRAWINGS TO BE PRODUCED IN AUTOCAD RELEASE 2000 OR LATER. THE ABOVE IS RESERVED FOR PROFESSIONAL ENGINEER SEAL USE INK - DO NOT EMBOSS THIS DRAWING IS THE PROPERTY OF DUKE ENERGY. AND IS NOT TO BE REPRODUCED OR USED FOR ANY PURPOSE EXCEPT AS SPECIFIED BY DUKE ENERGY. SHT DRAWING REVISIONS 5 6 7 8 9 10 11 2 1 0 2FT SCALE: 3/8"=1 '-0" 20 0 20 00119 SCALE: FEET C� TI 4 CD 60 O z (D 0 0 DWG SUB TYPE: m' DUKE U_ rl— 17 ENERGY. LL w FLOATING BULKHEAD 0 RAMP AND STORAGE AREA GENERAL ARRANGEMENT o� PLAN AND SECTIONS LLB :�­ DWG NO: CF-470-B-01 12 U REV: LU 1 z w U_ De-Waterine Plan - Cowan's Ford Bulkhead Ra Two to three pumps (minimum of 4") to be used to remove water inside cofferdam. Pumps to be positioned uphill of cofferdam, leveled, and placed inside spill containments. Suction hose with attached suction screens to be set in strategic locations inside cofferdam. Rip Rap to be placed on lake bank for discharge point. Discharge hose will be running to where the water will be discharged onshore onto rip rap to keep water turbulence to a minimum. As the water level lowers, pumps can be moved further down inside cofferdam. Once water conditions warrant, 4" pumps can be used with sediment bags to reduce sediment levels prior to discharging onshore. The sediment bags can be placed on or near rip ra p. Please note -sediment bags can only be used with 4" pumps to avoid blowing out bags. See attached diagram for additional information. Once water is reduced to a desired level- multiple small diameter electric pumps placed in sumps can be used to maintain any cofferdam water leaks. Rain for Rent cannot guarantee a timeline for water removal —unknown water intrusions with cofferdam installation can exist. ID#* 20200340 Version* 2 Regional Office * Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 1/13/2021 Contact Name* Steve Cahoon Contact Email Address* steve.cahoon@duke-energy.com Project Name* Cowan's Ford Boat Ramp Project Owner* Duke Energy, Carolinas, Inc. Project County* Lincoln Owner Address: Street Address 410 S Wilmington St Address Line 2 aty State / Province / Pegion Raleigh NC Postal / Zip axle Country 27601 United States Is this a transportation project?* r Yes (' No Type(s) of approval sought from the DWR: F 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express F- Individual Permit W Modification F Shoreline Stabilization Does this project have an existing project ID#?* r Yes C No Please list all existing project ID's associated with this projects.* DWR#20-0340 Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below.* May need to modify application to reflect additional temporary impacts for use of a porta-dam. No drawings available at this time. Please give a couple of dates you are available for a meeting. 2/1 /2021 2/2/2021 2/3/2021 2/4/2021 2/5/2021 Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. 1 also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 1/13/2021