Loading...
HomeMy WebLinkAbout20201550 Ver 1_EMAIL_USACE Confirmation of Field Verification of Delineation_2020-12-15_20210210From: Hopper, Christopher D CIV (USA) To: Ricci. Alvssa Subject: RE: SAW-2020-00777 - Clayton WWTP Date: Tuesday, December 15, 2020 10:31:18 AM Attachments: SAW-2020-00777 Post -visit Delineation Exhibit.Ddf Dear Alyssa, Reference is made to ORM ID SAW-2020-00777, please reference this number on any correspondence regarding this action. On July 22, 2020, we met at the Town of Clayton's proposed Wastewater Treatment Plant in Clayton, North Carolina to review the boundaries of the aquatic resources delineation you submitted on April 27, 2020. We have reviewed the information provided by you concerning the aquatic resources, and by copy of this e-mail, are confirming that the aquatic resources delineation has been verified by the Corps to be a sufficiently accurate and reliable representation of the location and extent of aquatic resources within the identified review area. The location and extent of these aquatic resources are shown on the delineation map, labeled Approved Wetland Delineation Exhibit and dated July 24, 2020 (attached) without revisions. Regulatory Guidance Letter (RGL) 16-01 hiWS7//usace.contentdm.ocic.org/utils/getfile/collection/p 1602 1 co119/id/l 256 provides guidance for Jurisdictional Determinations (JD) and states "The Corps generally does not issue a JD of any type where no JD has been requested". At this time we are only verifying the delineation. This delineation may be relied upon for use in the permit evaluation process, including determining compensatory mitigation. "This verification does not address nor include any consideration for geographic jurisdiction on aquatic resources and shall not be interpreted as such. This delineation verification is not an Approved Jurisdictional Determination (AJD) and is not an appealable action under the Regulatory Program Administrative Appeal Process (33 CFR Part 331). However, you may request an AJD, which is an appealable action. If you wish to receive a Preliminary Jurisdictional Determination (PJD), or an Approved Jurisdictional Determination (AJD) please respond accordingly, otherwise nothing further is required and we will not provide any additional documentation. The delineation included herein has been conducted to identify the location and extent of the aquatic resource boundaries and/or the jurisdictional status of aquatic resources for purposes of the Clean Water Act for the particular site identified in this request. This delineation may not be valid for the Wetland Conservation Provisions of the Food Security Act of 1985, as amended. If you or your tenant are USDA program participants, or anticipate participation in USDA programs, you should discuss the applicability of a certified wetland determination with the local USDA service center, prior to starting work. Christopher D. Hopper Regulatory Specialist U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 (919) 554-4884, Ext. 35 We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey can be accessed by copying and pasting the following link into your web browser: http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. Thank you for taking the time to visit this site and complete the survey. From: Ricci, Alyssa <aricci@withersravenel.com> Sent: Monday, December 14, 2020 11:49 AM To: Hopper, Christopher D CIV (USA) <Christopher.D.Hopper@usace.army.mil> Subject: [Non-DoD Source] RE: SAW-2020-00777 - Clayton WWTP Hey Chris, Hope all is well. I was just checking on the progress of the concurrence email. Thanks, Alyssa From: Hopper, Christopher D CIV (USA) <Christopher.D.Hopperco�usace.army.mil> Sent: Thursday, September 24, 2020 1:53 PM To: Ricci, Alyssa <ariccina with ersravenel.com> Subject: RE: SAW-2020-00777 - Clayton WWTP Alyssa: I did prepare and send the concurrence email up the chain for review (the course we need to approve boundaries was cancelled in late March, so I need other PMs to approve and sign first) after our last exchange. I've not yet heard back, but did rattle the chains earlier today. I'll stay on top of this and get you the email as soon as possible. Thanks for your patience! Christopher D. Hopper Regulatory Specialist U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 (919) 554-4884, Ext. 35 We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey can be accessed by copying and pasting the following link into your web browser: http://corpsmap u.usace.army.miI/cm_apex/f?p=136:4:0. Thank you for taking the time to visit this site and complete the survey. From: Hopper, Christopher D CIV (USA) Sent: Thursday, September 10, 2020 11:32 AM To: Ricci, Alyssa <aricci @withersravenel.com> Subject: RE: SAW-2020-00777 - Clayton WWTP Hey Alyssa! So sorry for letting this one slip. It's been a rough few weeks. I'll get you an email shortly — just have one thing to clear off my plate first. Christopher D. Hopper Regulatory Specialist U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 (919) 554-4884, Ext. 35 We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey can be accessed by copying and pasting the following link into your web browser:.http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0. Thank you for taking the time to visit this site and complete the survey. From: Ricci, Alyssa <aricci anwithersravenel.com> Sent: Thursday, September 10, 2020 10:15 AM To: Hopper, Christopher D CIV (USA) <Christopher.D.Hopper(@usace.arm)l.mil> Subject: [Non-DoD Source] RE: SAW-2020-00777 - Clayton WWTP Good morning Chris, I'm just following up on the PJD request for Clayton WWTP. Can you respond to my previous email concurring that the delineation was field verified? I understand you have a heavy workload, and it may be awhile before you can issue the JD. Thank you, Alyssa From: Ricci, Alyssa Sent: Friday, July 24, 2020 3:40 PM To: Hopper, Christopher D CIV (USA) <Christopher.D.Hopperl@usace.army.mil> Subject: SAW-2020-00777 - Clayton WWTP Chris, It was nice seeing you on Wednesday. This is a follow-up to our meeting on 07/22/2020 to verify the potentially jurisdictional waters of the US within the Clayton WWTP review area. I've attached an "Approved Wetland Delineation Exhibit" the accurately depicts the limits of potentially jurisdictional waters of the US. I understand due to your current workload, it may be several months before you can issue the JD. Can you please respond to this email concurring that the delineation was field verified on 07/22/2020 as shown in the attached exhibit? Please let me know if you need any more information. Thanks, Alyssa Ricci WithersRavenel I 115 MacKenan Drive I Cary, NC '7511 Office: 919.469.3340 I Direct 919.535.5151 aricciQwithersravenel.com CONFIDENTIALITY AND NONDISCLOSURE GRAPHIC SCALE 0 200 400 1 inch = 400 ft. NERMWS-4 STOP STREAM 2 \ POTENTIAL NON -WETLAND (� WATERS OF US \ t \\w �1611101wwll MIN, c. 3 ,ii rx 04 Nas L� NOTES: 3) DELINEATION AND JURISDICTIONAL STATUS WAS FIELD VERIFIED BY CHRIS HOPPER OF THE USACE ON 07/22/2020 (AID#SAW-2020-00777). 4) WETLAND/STREAM//FEMA LOCATIONS ARE APPROXIMATE, BASED ON GIPS LOCATION, JOHNSTON CO. GIS DATA AND TOPOGRAPHIC INTERPRETATION. CLAYTON WWTP APPROVED WETLAND DELINEATION EXHIBIT 40- WithersRavenel 1/ Engineers I Planners I Surveyors CLAYTONJOHNSTON COUNTY NORTH CAROLINA