HomeMy WebLinkAbout20070750 Ver 1_Approval Letter_20070514' ~QF W A TF9O Michael F. Easley, Governor
~~ G William G. Ross Jr., Secretary
~ ~ North Carolina Department of Environment and Natural Resources
~ .:.1
~ ~ Alan W. Klimek, P.E. Director
Division of Water Quality
May 7, 2007
DWQ# 07-0750
Catawba County
Mr. Mike Holder, P.E.
NCDOT Division 12
P.O. Box 47
Shelby, NC 28151
APPROVAL of 401 Water Quality Certification with Additional Conditions
Dear Mr. Holder:
You have our approval, in accordance with the attached conditions and those listed below, to permanently
impact 35 linear feet (If) (for riprap inlet/outlet stabilization and floodplain bench construction) and to
temporarily impact 45 If (for a temporary cofferdam) of an unnamed tributary to Hagan Fork Creek, a perennial
stream, to replace a culvert as described in your application received by the Division of Water Quality (DWQ)
on May 2, 2007. The location of the project is State Road 1809 (Love Road) in Catawba County. After
reviewing your application, we have determined that this project is covered by Water Quality General
Certification Number 3627. Please note that you should get any other federal, state or local permits before
proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control,
Non-Discharge, and Water Supply Watershed regulations.
This approval is valid solely for the purpose and design that you described in your application (unless modified
below) and will expire with the associated USACE 404 permit unless otherwise specified in the Water Quality
Certification. Should your project change, you must notify the DWQ in writing and you may be required to
submit a new application. If the property is sold, the new owner must be given a copy of this Certification and
approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project
(now or in the future) exceed one acre, or if total impacts to streams (now or in the future) exceed 150 linear
feet, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h)(6) and (7). For this
approval to remain valid, you must adhere to the conditions in the attached certification and those listed below:
Placement of culverts and other structures in waters, streams, and wetlands shall be placed below the
elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent
of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water
and aquatic life. Design and placement of culverts and other structures, including temporary erosion control
measures, shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or
banks, adjacent to or upstream and downstream of the above structures. The applicant is required to provide
evidence that the equilibrium is being maintained if requested in writing by DWQ. If this condition is unable to
be met due to bedrock or other limiting features encountered during construction, please contact the NCDWQ
for guidance on how to proceed and to determine whether or not a permit modification will be required.
2. Riprap must not interfere with thalweg performance and aquatic life passage during low flow conditions.
Riprap placed for bank stabilization should be limited to the stream bank below the high water mark and
vegetation should be used for stabilization above the high water mark.
North Carolina Division of Water Quality 610 East Center Avenue, Suite 301
IntemeL www.ncwaterc~alitv.org Mooresville, NC 28115
An Equal OpportunitylAtFrmative Action Employer - 50% Recycled110% Post Consumer Paper
Phone (704)663-1699
FAX (704) 663-6040
N ~ehCarolina
C,t, ~-.~~ ,. atura!!
. ; ~/
,•,.
- f C ~/
~ ~ ~t~
(!~
. MAY ~ 4 ~,~~ ._ ~'
~~
Mr. Mike Holder
Page 2
3. Heavy equipment must be operated from the banks rather than in the stream channel, when possible, in
order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream.
4. Temporary dewatering sites must be restored to pre-existing conditions unless more natural geomorphic
conditions can be provided.
5. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures
from the current version of the NCDOT Construction and Maintenance Activities Manual such as sandbags,
rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water.
6. No live or fresh concrete shall come into contact with waters of the state until the concrete has hardened.
7. The dimension, pattern and profile of the stream above and below the crossing should not be modified.
Disturbed floodplains and streams should be restored to natural geomorphic conditions.
8. All mechanized equipment operated near surface waters must be regularly inspected and maintained to
prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials.
9. All work shall be performed during low or normal flow conditions.
10. Discharging hydroseeding mixtures and washing out hydroseeders and other equipment in or adjacent to
surface waters is strictly prohibited.
11. Erosion and sediment control practices must utilize Best Management Practices (BMP) and be in full
compliance with all specifications governing the proper design, installation, and operation and maintenance of
such BMP in order to protect surface water standards:
a. The design, installation, operation, and maintenance of the sediment and erosion control measures
must be such that they equal, or exceed, the requirements specified in the most recent version of
the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all
construction sites, borrow pit sites, and waste pile (spoil) projects, including contractor-owned or
leased borrow pits associated with the project.
b. For borrow pit sites, the erosion and sediment control measures must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina Surface
Mining Manual.
c. The reclamation measures and implementation of these measures must be in accordance with the
requirements of the Sedimentation Pollution Control Act.
12. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent
practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable,
they shall be removed and the natural grade restored within 30 days after the Division of Land Resources has
released the project.
13. The North Carolina Department of Transportation (NCDOT) and its contractors and/or agents shall not
excavate, fill or perform mechanized land clearing at any time in the construction or maintenance of this
project within waters and/or wetlands, except as authorized by this Certification, or any modification to this
Certification (e.g., no work shall occur outside of the footprint of the plans provided). In addition, there shall
be no excavation from or waste disposal into jurisdictional wetlands or waters associated with this
Certification without appropriate modification. If this occurs, compensatory mitigation may be required since it
is a direct impact from road construction activities.
i~
Mr. Mike Holder
Page Three
14. Upon completion of the project, the applicant shall complete and return the enclosed "Certificate of
Completion" form to notify DWQ when all work included in the 401 Certification has been completed. Please
include photographs upstream and downstream of the structure to document correct installation.
15. Continuing Compliance. NCDOT shall conduct its activities in a manner so as not to contravene any state
water quality standard [including any requirements for compliance with section 303(d) of the Clean Water Act]
and any other appropriate requirements of state and federal law. If DWQ determines that such standards or
laws are not being met (including the failure to sustain a designated or achieved use) or that state or federal
law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate
and modify this certification to include conditions appropriate to assure compliance with such standards and
requirements in accordance with 15 A NCAC 2H.0507(d). Before codifying the certification, DWQ shall notify
NCDOT and the USACE, provide public notice in accordance with 15A NCAC 2H.0503, and provide
opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall
be provided to NCDOT in writing, shall be provided to the USACE for reference in any permit issued pursuant
to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must
act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that
conforms to Chapter 1506 of the North Carolina General Statutes to the Office of Administrative Hearings, 6714
Mail Service Center, Raleigh, N.C. 27699-6714. This Certification and its conditions are final and binding unless
you ask for a hearing.
This letter completes the review by the Division of Water Quality under Section 401 of the Clean Water Act. If
you have any questions, please telephone Polly Lespinasse in the Mooresville Regional Office at 704-663-
1699.
~... Sincerely,
forAlan W. Klimek, P.E.
Attachments
cc: Steve Lund, USACE Asheville Field Office
Sonia Gregory, DWQ Wetlands Unit
File Copy