Loading...
HomeMy WebLinkAbout20100818 Ver 1_Certification of Completion_20120409.- a •) .irW -- Certificate of C om p letio DWQ Project No f 0 O8% g Applicant lV Cy T ' 7�>I V I Project Name Ptne ?eAde e M ei A ec , Cou n m y / 4P a�7 � g C'e ✓2l�'��5�,����.��, ���2 n /4v S7Z .2 a8q Date of Issuance of 401 Water Quality Certification OC 0o e r 1Y, -7 01,0 Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules and any subsequent modifications the applicant is required to return this certificate to the 401 /Wetlands Unit North Carolina Division of Water Quality 1621 Mail Service Center Raleigh NC 27699 1621 This form may be returned to DWQ by the applicant the applicant s authorized agent or the project engineer It is not necessary to send certificates from all of these Applicant's Certification I //P L 1�o(U' &— hereby state that to the best of my abilities due care and diligence was used in the observation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules the a d pl s and sp fications anc�o 11er supporting materials ® ''° Signature ,� e Date � -� --�� 9 Agent's Certification I hereby state that to the best of my abilities due care and diligence was used in the observation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and specifications and other supporting materials Signature If this project was designed by a Certified Professional Date I as a duly registered Professional (i e Engineer Landscape Architect Surveyor etc ) in the State of North Carolina having been authorized to observe (periodically weekly full time) the construction of the project for the Permittee hereby state that to the best of my abilities due care and diligence was used in the observation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules the approved plans and specifications and other supporting materials Signature Registration No Date a Pipe Replacement/Secondary Road Paving SR 2289 (Galilee Church Rd) Cleveland County .. �a / T ....• 4V;—'i •:9. Z Upstream Outlet L y� Inlet r � r� `c Downstream -