Loading...
HomeMy WebLinkAbout20202021 Ver 1_ePCN Application_20210211DWR mrlslon of Water Resources Pre -Construction Notification (PCN) Form October 26, 2020 Ver 3.3 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* C Yes r No Change only if needed. BIMS # Assigned 20202021 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Reviewing Office * Asheville Regional Office - (828) 296-4500 Information for Initial Review 1a. Name of project: Reynold's School Road Landfill 1a. Who is the Primary Contact?* Matthew Burnette 1b. Primary Contact Email:* mburnette@daa.com Date Submitted 2/11/2021 Nearest Body of Water Pigeon River Basin French Broad Water Classification C Site Coordinates Latitude: Longitude: 35.526083-82.825483 Pre -Filing Meeting Information ID# 20202021 Pre -fling Meeting or Request Date* 12/23/2020 Attach documentation of Pre -Filing Meeting Request here:* 20202021 Ver 1_Meeting Request Review 20201223.pdf Version#* 1 What amout is owed?* IT $240.00 r $570.00 Select Project Reviewer* Amy Annino:eads\amannino 1c. Primary Contact Phone:* (919)827-8132 Version 1 83.87MB A. Processing Information C^U County (or Counties) where the project is located: Haywood Is this a NCDMS Project r Yes r No Is this project a public transportation project?* r Yes r No la. Type(s) of approval sought from the Corps: * Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* r Yes r No 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: 38 - Hazrnat Clean -Up NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit le. Is this notification solely for the record because written approval is not required? For the record only for DWR401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - E)press r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? r Owner W Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: William McDowell 2b. Deed book and page no.: BK: RB 859 / PG: 1199-1201 2c. Responsible party: 2d.Address * r Yes r No r Yes r No Street Address 3221 Lamirda Avenue Address tine 2 city Las Vegas Postal / Zip Code 89120 2e. Telephone Number: (702)525-8510 2g. Email Address:* fortuneandmind@gmail.com 3. Applicant Information (if different from owner) 3a. Name: Jason Kam 3b. Business Name: NCDEQ, Division of Waste Management, Pre -Regulatory Landfill Unit 3c.Address Street Address 217 West Jones Street Address tine 2 1646 Mail Service Center City Raleigh Postal / Zip Code 27603 3d. Telephone Number: (919)508-7249 3f. Email Address:* Jason.Kam@ncdenr.gov 4. Agent/Consultant (if applicable) 4a. Name: Matthew Burnette 4b. Business Name: Draper Aden Associates 4c.Address Street Address 114 Edinburgh South Drive, Suite 200 Address tine 2 aty Cary Postal / Zip Code 27511 State / Rovince / Ifgion Nevada Country United States 2f. Fax Number: State / Rovince / Region North Carolina Country United States 3e. Fax Number: State / Province / Region North Carolina Country United States 4d. Telephone Number: 4e. Fax Number: (919)827-0864 4f. Email Address:* mburnette@daa.com Agent Authorization Letter* 20180201_RA_Permission_Forms_Signed_McDovell.pdf 64.72KB C. Project Information and Prior Project History U 1. Project Information 1b. Subdivision name: (d appropriate) 1c. Nearest municipality I town: Canton 2. Project Identification 2a. Property Identification Number: 8666-28-0297 2c. Project Address Street Address 262 Reynold's School Road Address Line 2 Qty Canton Rstal / Zip Code 28716 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Pigeon River 3b. Water Resources Classification of nearest receiving water:* 3c. What river basin(s) is your project located in?* French Broad 3d. Please provide the 12-digit HUC in which the project is located. 060101060104 4. Project Description and History 2b. Property size: 6.4 State / Rovime / Region North Carolina Country United States 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The majority of the Reynold's School Road Landfill (Landfill) is covered by scrub grass. Wooded areas cover portions of the northern edge and western extreme of the site. The Landfill can be accessed directly from Reynold's School Road and from a former school entrance easement off Holtzclaw Road north of the site. A former school building is located adjacent to the southern edge of the site. The areas adjacent to the Landfill are residential and wooded. The landfill operated from about 1948 and stopped receiving waste in the 1960s. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) USGS_Figure.pdf 2.98MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) NRCS_Figure.pdf 797.64KB 4f. List the total estimated acreage of all existing wetlands on the property: 0.05 4g. List the total estimated linear feet of all existing streams on the property: 77 4h. Explain the purpose of the proposed project:* The Reynolds School Road Landfill (Landfill) is located on Reynold's School Road in Canton, Haywood County, North Carolina. The Landfill began disposal activities in about 1948 and was closed in the late 1960s. The waste disposal area is an approximate 1.8- acre pre-1983 unlined landfill. Buried waste includes plastic sheeting, glass, rubber, asphalt, shingles, concrete, cloth, metal, tile, brick, paper/ newspaper, and burnt wood within a matrix of soils of variable composition. The purpose of the project is to consolidate waste onto a single parcel, limit direct exposure to waste materials, limit future land and groundwater use, and protect public health and safety. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* A soil cover system has been designed to cover the waste and isolate it from exposure, to promote storm water drainage, and to resist erosion. The design goal is to provide a consistent thickness of soil cover on top of the waste disposal area as opposed to achieving a specified finished grade. The soil cover system will consist of an 18-inch thick soil layer in areas flatter than 3:1 (H:V) comprised of 6 inches of suitable soil, a visual marker, 6 inches of suitable soil, and 6 inches of topsoil followed by permanent seeding. Areas steeper than that will receive a 3-inch geocell system and backfilled with a four - inch vegetative support layer followed by permanent seeding. Finally, a sewer line currently serves the site, but this underground utility is located within the waste. NCDEQ has adopted a policy that utilities will be removed from waste areas where possible to facilitate future repair work while minimizing human exposure to the waste mass. A clean corridor will be established by excavating a 25-foot wide swath in the area of the existing sewer lateral to a depth of three feet below the sewer line or to native ground, whichever is shallowest, removing the existing sewer line, backfilling with clean soil to bedding depth, replacing the sewer line, and backfilling along this corridor. In the areas where the waste mass is deeper than three feet below the sewer line, an orange geotextile will be used to demarcate the waste. The Landfill drains to one small intermittent stream, an unnamed tributary to Pigeon River, which runs along the northern portion of the Landfill. There is one sensitive area totaling 0.05 acres in size that was identified as a wetland and is within the waste disposal area. The wetland is connected to the unnamed tributary to Pigeon River (onsite stream) via a culvert. A portion of the wetland appears to intersect the eastern edge of the landfill. The wetland will be filled as part of the soil cover system installation. The stream will be conveyed inside an underground rock channel or rock drain with an 8" HDPE pipe. No offsite impacts to surface waters are anticipated. Equipment will consist of tracked and wheeled excavators, loaders, skid steers, dump trucks, etc. 4j. Please upload project drawings for the proposed project. Reynolds _Schoo I_Road_Landfil I_CDs. pdf 5.51 MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* IT Yes r No r Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown f N/A Corps AID Number: SAW-2016-00774 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Charles Benton Agency/Consultant Company: URS Corporation - North Carolina Other: 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR July 12, 2017 5dt. Jurisdictional determination upload PRLF813_20170802_DP-6 Report.pdf 8.71MB 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed projector related activity? No D. Proposed Impacts Inventory u 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): W Wetlands W Streams -tributaries r Buffers r Open Waters F Pond Construction 2. Wetland Impacts 2al Reason (?) 2b. Impact type * (?) 2c. Type of W.* 2d. W. name * 2e. Forested * 2f. Type of 2g. Impact Jurisdicition*(?) area* t:=� Fill P ffUnknownBothNo 0.050 (acres) 2g. Total Temporary Wetland Impact 0.000 2g. Total Wetland Impact 0.050 2h. Comments: 3. Stream Impacts 2g. Total Permanent Wetland Impact 0.050 ❑ 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name * 3e. Stream Type* 3f. Type of 3g. S. width * 3h. Impact M Jurisdiction* length* S1 Culvert/Drain Permanent Culvert JSA Intermittent ]Corp.]�;Jn�rfest)] s p 31. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 77 3i. Total stream and ditch impacts: 77 3i. Total temporary stream impacts: 0 3j. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The design specifically investigated means to reduce the impact to the existing wetlands and streams. Additional measures for stormwater control were employed in the design to minimize the impact to the stream features to the east of the landfill property. These items included subsurface piping and concrete structures instead of a normal grass or riprap lined open swale that would have disturbed significant amount of the stream. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Construction sequencing, including the installation of erosion and sediment control structures, will be implemented to minimize the limits of disturbance and impact to jurisdictional surface water features. Multiple diversion berms, unique sediment basins, and subsurface stormwater conveyances will be constructed to avoid and minimize surface water impacts to the fullest extent possible. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: The impacts are to less than 1/10 acre of wetlands and 150 LF of stream. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: The project is not located in a watershed with riparian buffer rules or protected riparian buffers. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15ANCAC 02H .1003(2)? r Yes r No Comments: Project includes no "built upon area" and is not development. EGSupplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * r Yes Comments:* r No This project is funded through designated funds from the State of North Carolina as administered by the NCDEQ Division of Waste Management. While not technically a NEPA/SEPA, the State issues a Remedial Action Plan (RAP) that details the history, environmental impacts, a detailed description of remedial alternatives, and the selected remedial action. The RAP is released for public review and comment prior to being finalized. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 21-1.1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No I Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. The project does not include development or subsequent phases. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor NIA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes IT No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* r Yes IT No 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?' r Yes IT No r Unknown 51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Prior evaluation by the USFWS Asheville Field Office. Consultation Documentation Upload 21 0127 USFWS Correspondence. pdf 88.79KB 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA Essential Fish Habitat Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* Prior evaluation by the USFWS Asheville Field Office. 7c. Historic or Prehistoric Information Upload NC SHPO Review.pdf 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-yearflood plain? * r Yes IT No 8c. What source(s) did you use to make the floodplain determination?* NC FRIS, FEMA DFIRM Panel 8666 Miscellaneous Comments 68.11 KB U Miscellaneous attachments not previously requested. Signature ® By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request Within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: MatthewC. Burnette Signature Date 2/11 /2021 Waste Management ENVIRONMENTAL QUALITY REMEDIAL ACTION PROPERTY ACCESS PERMISSION Reynold's School Road Canton, Haywood County ID# NONCD0000813 William McDowell 262 Reynold's School Road Canton, Haywood County PIN # 8666280297 ROY COOPER Governor MICHAEL S. REGAN Secretary MICHAEL SCOTT Director I/We own the above referenced property and are authorized to make decisions about the property. I/We hereby grant permission to the State and the State's representatives access to my/our property to conduct cleanup actions of an imminent hazard resulting from past operations of a landfill that ceased operation prior to January 1, 1983. I/We hereby agree to concurrently record a Plat Notice and a Declaration of Perpetual Land Use Restrictions. The Division and its contractors shall attempt to perform any activities at the Property in a manner that minimizes interference with use of the Property. On conclusion of all activities, the Division and its contractors shall, to the extent practicable, restore the Property to the original condition prior to any activities conducted by the Division or its contractors. The Division will make reasonable attempts to notify the Property owner at least 48 hours prior to entering the Property for any purpose. In situations tha# Division determines to be of an emergency nature, the Division or its contractof shall have immed' to a: cess to the property. Signed Name (Print) tJ i Date` State of North Carolina I Environmental Quality I Waste Management 1646 Mail Service Center 1 217 West Jones Street I Raleigh, NC 27699-1646 919 707 9200 Telephone '. I 2800 o �yF a F R p S P9� t o w z � a ! o a ti0 CL CD o 0LLJ o ��O hy�\pq U o ZI NST P /ocF yAl, 5A, i gip_ �54 z �SNILLRD 3 1 Of wElf o`' 5 Q t Canton ? $ 1400 _ li — %��. UELs P �3 m m o Y \Q� RK'51 PppI i s, M SPR1N ey 64 NUT -MOUNTAIN RD h w U pENNSYLVANIAAVE pG 0 ZaoD SITE \ol �1 Elf w Q am w O HOLr j ZCL'AW- / � � ��1 ./oHNs pN S/ j1 T 15 Gi i ontown o� / q. Elf� a SUB TATION RD pISGAH SCHOOL RD 110 HAYwo LAKEVIEW p� O t5RAE1 \ (/ 1�a- RHODA. TOE —LEN N O I � KUyh La. !Z h _ LL Q O J Q O 0 Q pep �' t o N D W Morning $ , A Star C7 O � J / Fishers Lake v /� � ~ C MINUTE L � TOPOGRAPHIC MAP CANTON, NORTH CAROLINA2016 v � ��$ i � 3000 O 0 0 2000 4000 SCALE IN FEET J a Draper Aden Associates LOCATION MAP FIGURE Engineering . Surveying . Environmental Services REYNOLD'S SCHOOL ROAD LANDFILL NONCD0000813 1 1101 Nowell Road Richmond, VA Hampton Roads, VA Fayett, INC Raleigh, NC 27607 Blacksburg, VA NorthernllleVirginia 262 REYNOLDS SCHOOL ROAD 919-873-1060 Fax: 919-873-1074 Charlottesville, VA Virginia Beach, VA CANTON, HAYWOOD COUNTY, NC P:\2018\1811\0100\18110122\18110122-050701 Reynold School Road ..- .._..._u a , ,xeynolds School Road.dwg D2 t - hr - r -1 H L2 lb OL .19 9k _er O IL I OC2 a HaD21 ; •• e'er HeD — 42 r DSC —9L. -M6 9fr S Or, z 0' H&D2 Hec•� NC OneMap, NC Center fbr a gr phi IIII ti n n n ,y I , NC 91f1 B r Ulm Reynold's School Road Background Assessment Haywood County, NC Legend Study Area Source: NRCS Soil Survey for Haywood County, NC 1997 N Feet 0 125 250 681�lw r Haywood County French Broad River Basin HUC 06010106 Figure 4 NRCS Soil Survey May 2017 NAD83 NC StatePlane This map is for reference only- PROJECT INFORMATION NAME OF PROJECT: REYNOLDS SCHOOL ROAD LANDFILL ENGINEER: DRAPER ADEN ASSOCIATES 114 EDINBURGH SOUTH DRIVE, SUITE 200 CARY, NC 27511 919-827-0864 PIN AND DEED REFERENCE: 8666-28-0297 8666-28-0735 8666-18-9711 8666-18-6455 DEED REFERENCE: ZONE CLASSIFICATION: FLOOD ZONE CLASS: WATERSHED CLASSIFICATION: SITE AREA: DB 859 PG 1199 DB: 859/PG: 1199 DB: 438/PG: 1285 DB: 636/PG: 1175 DB: 129/PG: 144 COMMERCIAL PRIMARY, OPENLAND ZONE X, FIRM 3700866600J, UPDATED 2012 UPPER PIGEON WATERSHED 6.5 ACRES REYNOLDS SCHOOL ROAD LANDFILL CANTON, HAYWOOD COUNTY, NORTH CAROLI NA BID SET - OCTO B E R 2020 HOLTZCLAW ST PROJECT ACCESS PROJECT SITE REYNOLDS SCHOOL C2 ROAD REYNOLDS SCHOOL VICINITY MAP NOT TO SCALE THE DESIGN INCLUDES CONSOLIDATING AND RECAPPING WASTE AT AN INACTIVE PRE -REGULATORY LANDFILL IN CANTON, NORTH CAROLINA. lily One -Call Center Know wnan below. Call before you dig. Sheet List Table Sheet Number Sheet Title C1.0 COVER C2.0 NOTES C3.0 EXISTING CONDITIONS PLAN C4.0 DEMOLITION PLAN C5.0 ESC PLAN C6.0 GRADING PLAN C7.0 UTILITY PLAN C8.0 SECTIONS C9.0 ESC DETAILS C9.1 ESC DETAILS C10.0 SITE DETAILS C11.0 NCGO1 NOTES DRAPER ADEN ASSOCIATES REVIEW THESE PLANS HAVE BEEN SUBJECTED TO TECHNICAL AND QUALITY REVIEWS BY: NAME: ANDREW P. MERICLE, P.E. PROJECT DESIGNER SIGNATURE DATE NAME: MICHAEL W. BRANSON, PG PROJECT MANAGER SIGNATURE DATE NAME: C. TYRUS CLAYTON JR., P.E. QUALITY REVIEWER SIGNATURE DATE H 0 Z a 0 rr 0 WE R REVISIONS 11.10.20 ADD 1 DESIGNED BY: APM DRAWN BY: MWB CHECKED BY: CTC JR SCALE: NONE DATE: 10.7.20 PROJECT NUMBER: 18110122-05 C1.0 EROSION CONTROL NOTES 1. THE CONTRACTOR SHALL INSTALL ALL EROSION AND SEDIMENT CONTROL DEVICES AS REQUIRED DURING CONSTRUCTION IN ACCORDANCE WITH THE CURRENT EDITION OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL MANUAL. ALL DEVICES REFERRED TO IN THESE PLANS CAN BE FOUND IN THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL MANUAL. 2. ALL DISTURBED AREAS SHALL BE PERMANENTLY SEEDED AND MULCHED PER THE NCDEQ SCHEDULE AFTER REACHING FINAL GRADE. AREAS WHICH HAVE BEEN DISTURBED AND HAVE NOT REACHED FINAL GRADE, BUT WHICH ARE TO REMAIN UNDISTURBED FOR LONGER THAN 14 DAYS ARE TO BE TEMPORARILY SEEDED AND MULCHED PER THE NCDEQ SCHEDULE. AS UPSTREAM AREAS ARE STABILIZED WITH PERMANENT GROUND COVER, DOWNSTREAM TEMPORARY DEVICES ARE TO BE REMOVED. CONTRACTOR SHALL FOLLOW THE STABILIZATION TIME TABLE INCLUDED IN THIS SET OF DRAWINGS. 3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PERIODICALLY INSPECT ALL SEDIMENT AND EROSION CONTROL DEVICES AND ENSURE THAT THEY ARE IN GOOD WORKING ORDER. AT A MINIMUM, ALL DEVICES SHALL BE INSPECTED DAILY AND AFTER MAJOR RAINFALL EVENTS. ANY DEVICE NEEDING REPAIRS SHALL BE REPAIRED WITHIN 24 HOURS. 4. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION AND SEDIMENT CONTROL DEVICES IF DURING THE COURSE OF CONSTRUCTION THE ENGINEER OR NCDEQ INSPECTOR DETERMINES THAT THEY ARE REQUIRED. 5. SILT SHALL BE REMOVED FROM SILT FENCES WHEN THE SILT REACHES APPROXIMATELY ONE-THIRD (1 /3) THE HEIGHT OF THE BARRIER. 6. THE CONTRACTOR SHALL PERIODICALLY TOP DRESS THE CONSTRUCTION ENTRANCE WITH CLEAN STONE. IF THE CONSTRUCTION ENTRANCE FAILS TO REMOVE DIRT FROM THE TIRES OF VEHICLES ENTERING A PUBLIC RIGHT-OF-WAY A WASH RACK SHALL BE INSTALLED AND THE TIRES WASHED. THE CONTRACTOR SHALL BE REQUIRED TO PROVIDE ANY REQUIRED WATER FOR THE WASHING OF TIRES. DIRT TRACKED ONTO THE PUBLIC RIGHT-OF-WAY SHALL BE REMOVED IMMEDIATELY BY THE CONTRACTOR. 7. ALL EROSION AND SILTATION MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN GRADING. 8. ALL STORM AND UTILITY LINES NOT IN STREETS ARE TO BE MULCHED AND SEEDED PER THE NCDEQ SCHEDULE AFTER BACKFILL. NO MORE THAN FIVE HUNDRED FEET OF TRENCH IS TO BE OPEN AT ONE TIME. 9. ALL TEMPORARY EARTH BERMS, DIVERSIONS, AND CHECK DAMS ARE TO BE MULCHED AND SEEDED FOR VEGETATIVE COVER IMMEDIATELY AFTER GRADING. STRAW OR HAY MULCH IS REQUIRED. ADDITIONALLY ALL DIVERSION SWALES WILL BE PROTECTED AGAINST HIGH VELOCITY RUNOFF WITH EROSION CONTROL MEASURES AS DENOTED ON THESE PLANS. THE SAME APPLIES TO STOCKPILES ON SITE AS WELL AS SOIL (INTENTIONALLY) TRANSPORTED FROM THE PROJECT SITE. 10. ANY DISTURBED AREA NOT PAVED, SODDED, OR BUILT UPON, IS TO BE SEEDED PER THE TEMPORARY AND PERMANENT SEEDING SCHEDULE INCLUDED IN THESE DRAWINGS. MODIFY AS APPLICABLE DEPENDING ON PROPOSED TIME OF CONSTRUCTION. 11. CONTRACTOR STAGING AREA(S) SHALL BE RETURNED TO BETTER THAN ORIGINAL CONDITIONS AT THE COMPLETION OF THE WORK. 12. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 13. A PRE -CONSTRUCTION MEETING IS REQUIRED PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT. THE CONTRACTOR SHALL SCHEDULE THE MEETING WITH THE NCDEQ INSPECTOR ASSIGNED TO THE PROJECT. 14. ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF NCDEQ EROSION AND SEDIMENT CONTROL MANUAL AND THE NORTH CAROLINA SEDIMENTATION POLLUTION CONTROL ACT OF 1973. 15. AS A CONDITION OF NPDES PERMIT NO. NCG 010000, PERMANENT GROUNDCOVER SHOULD BE PROVIDED FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING THE COMPLETION OF CONSTRUCTION OR DEVELOPMENT. EROSION CONTROL NARRATIVE PROJECT DESCRIPTION THE PROJECT CONSISTS OF CONSOLIDATING AND CAPPING WASTE MATERIAL AT AN INACTIVE LANDFILL IN HAYWOOD COUNTY, NC. NO MORE THAN 3.0 ACRES WILL BE DISTURBED DURING CONSTRUCTION. NO SIGNIFICANT CHANGES TO THE EXISTING DRAINAGE AND HYDROLOGIC PATTERNS ARE PROPOSED. EXISTING CONDITIONS THE EXISTING SITE IS A GRASSY HILLSIDE SURROUNDED BY TREE COVER ON ALL SIDES AND HAS TREES DISPERSED THROUGHOUT. THERE IS A WETLAND BOUNDARY IN THE CENTER OF THE SITE WITH A RISER AND A DRAINAGE PIPE. REYNOLDS ROAD IS ALONG THE EASTERN PORTION OF THE SITE AND THERE ARE SEVERAL LARGE HEMLOCK TREES THAT WILL REMAIN UNDISTURBED. ACCESS TO THE SITE WILL BE THROUGH AN ACCESS ROAD ON THE NORTH SIDE OF THE PROPERTY OFF OF HOLTZCLAW RD. THE SITE DRAINS TO AN EXISTING STREAM ON THE WESTERN SIDE. DEVELOPMENT IMPACTS THE DEVELOPMENT IMPACTS TO THE TOPOGRAPHY, SOILS, HYDROLOGY, AND GEOLOGY WILL BE MINOR. SOILS THE SITE IS A MIXTURE OF DILLSBORO-URBAN LAND COMPLEX, HAYESVILLE CLAY LOAM, AND HAYESVILLE-URBAN LAND COMPLEX. CRITICAL EROSION AREAS 1. CARE MUST BE TAKEN TO PREVENT SEDIMENT FROM BEING TRACKED ONTO ADJACENT ROADWAYS. 2. CARE MUST BE TAKEN TO PREVENT SEDIMENT FROM EXITING THE PROJECT SITE AREA. 3. CARE MUST BE TAKEN TO PREVENT RUNOFF IN CONTACT WITH WASTE MATERIALS FROM EXITING THE PROJECT SITE AREA. STOCKPILING TOPSOIL STOCKPILING IS ANTICIPATED ON -SITE. STRUCTURAL PRACTICES CONSTRUCTION ENTRANCE SILT FENCE SILT FENCE OUTLETS CULVERT OUTLET PROTECTION SEDIMENT BASIN DIVERSION SWALES CHECK DAM VEGETATIVE PRACTICES TOPSOILING TEMPORARY SEEDING PERMANENT SEEDING MULCHING MANAGEMENT STRATEGIES 1. CONSTRUCTION WILL BE SEQUENCED SO THAT GRADING OPERATIONS CAN BEGIN AND END AS QUICKLY AS POSSIBLE. 2. SEDIMENT TRAPPING MEASURES WILL BE INSTALLED AS A FIRST STEP IN GRADING. 3. THE JOB SUPERINTENDENT SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL PRACTICES. 4. AFTER ACHIEVING ADEQUATE STABILIZATION AND UPON APPROVAL OF THE NCDEQ INSPECTOR, THE TEMPORARY E&S CONTROLS WILL BE CLEANED UP AND REMOVED. 5. THE SILT FENCE BARRIER WILL BE CHECKED REGULARLY FOR UNDERMINING OR DETERIORATION OF THE FABRIC. SEDIMENT SHALL BE REMOVED WHEN THE LEVEL OF SEDIMENT DEPOSITION REACHES ONE-THIRD (1 /3) THE HEIGHT OF THE BARRIER. 6. SEDIMENT BASINS WILL BE INSPECTED REGULARLY AND AT MINIMUM AFTER EACH RAINFALL EVENT FOR STRUCTURAL/FUNCTIONAL DEGRADATION. SEDIMENT SHALL BE REMOVED WHEN THE LEVEL OF SEDIMENT REACHES 1 /3 OF THE DESIGN VOLUME AS STATED ON THESE PLANS OR IF FUNCTION OF THE BASIN IS IMPACTED, WHICHEVER IS SOONER. PERMANENT STABILIZATION THE DISTURBED AREAS WILL BE PERMANENTLY STABILIZED THROUGH THE USE OF EROSION CONTROL MATTING, CHANNEL ARMORING, AND PERMANENT SEEDING AND PLUNGE POOLS. CONSTRUCTION SEQUENCE 1. INSTALL CONSTRUCTION ENTRANCE, AND LAYDOWN AREA. 2. INSTALL SILT FENCE AND CLEAN WATER DIVERSIONS. 3. INSTALL DOWNSTREAM JUNCTION BOX AND PIPES UP TO EACH FIRST MANHOLE. 4. CONSTRUCT SEDIMENT BASINS AS SHOWN ON PLANS. 5. INSTALL GRAVEL DRAIN FROM EAST OF ACCESS ROAD BELOW SANITARY LINE AND THEN EXCAVATING WASTE FROM AROUND THE SANITARY LINE, REINSTALL SANITARY SEWER LINE WITH SUITABLE BACKFILL MATERIAL. 6. BEGIN EXCAVATING WASTE TO BE MOVED ON THE INTERIOR OF THE LANDFILL AND RING WITH SILT FENCE ON DOWNSTREAM SIDE. 7. AFTER WASTE OUTSIDE FUTURE LANDFILL LIMITS HAS BEEN REMOVED, INSTALL DIVERSION BERMS AND DIRECT SEDIMENT LADEN RUNOFF INTO ACTIVE SEDIMENT BASINS. OFF -SITE DRAINAGE SHALL BE DIVERTED AROUND THE SITE/SEDIMENT BASINS THROUGH THE USE OF CLEAN WATER DIVERSION SWALE 8. BEGIN INSTALLATION OF SWALES ON THE NORTH AND SOUTH OF THE LANDFILL AND WORK BACK TO EXCAVATION ON THE EASTERN SIDE OF THE FUTURE LANDFILL LIMITS, STABILIZING AS FINAL GRADES ARE REACHED. 9. STRIP TOPSOIL FROM AREAS DENOTED ON PLANS AND STOCKPILE IN APPROPRIATE AREAS. EXCAVATE WASTE UNTIL CLEAN SOILS ARE FOUND AND DISTRIBUTE WASTE IN WASTE CONSOLIDATION AREAS AS SHOWN ON PLANS. AT THE END OF EACH WORKING DAY ENSURE EXPOSED WASTE IS COVERED WITH A MINIMUM COVER OF 6" OF TOPSOIL OR TARP & SANDBAG SYSTEM. BACKFILL EXCAVATED AREAS TO PROPOSED GRADE WITH CLEAN BACKFILL IN ACCORDANCE WITH THE GEOTECHNICAL NOTES ON THIS SHEET. 10. REMOVE WASTE FROM AREA DESIGNATED FOR WASTE REMOVAL AND RELOCATE IN WASTE CONSOLIDATION AREA AS SHOWN ON PLANS. 11. CAP WASTE PER DETAIL ON SHEET C10.0. WASTE VOLUMES ARE ESTIMATED FROM BORING LOGS PROVIDED BY ESP. ACTUAL WASTE VOLUMES MAY VARY. ENGINEER SHALL PROVIDE ADDITIONAL DIRECTION AS NECESSARY. 12. INSTALL PERMANENT DRAINAGE PIPES AND EROSION CONTROL PRODUCTS AS DENOTED ON THESE PLANS AS CONSTRUCTION PROGRESSES. 13. SEED AND MULCH DENUDED AREAS IN ACCORDANCE WITH THE NOTES AND DETAILS IN THESE PLANS AS WELL AS THE SPECIFICATIONS. 14. REMOVE TEMPORARY EROSION CONTROL MEASURES ONCE VEGETATIVE COVER HAS BEEN ACHIEVED. GENERAL NOTES 1. THIS PROJECT, AS CURRENTLY DESIGNED, MAY NOT INLCUDE ALL COMPONENTS ADDRESSED IN THE VARIOUS GENERAL NOTES. REVIEW PLANS FOR APPLICABILITY. 2. THE CONTRACTOR SHALL SECURE ALL NECESSARY PERMITS FOR THIS PROJECT FROM THE LOCAL AND STATE AGENCIES. 3. ANY PERMITS WHICH MUST BE OBTAINED SHALL BE THE CONTRACTOR'S RESPONSIBILITY AND AT HIS EXPENSE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ABIDING BY ALL CONDITIONS AND REQUIREMENTS OF THE PERMITS. 4. ALL PAVING MATERIALS AND DRAINAGE STRUCTURES SHALL BE BUILT AND INSTALLED IN ACCORDANCE WITH NORTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARDS AND SPECIFICATIONS. 5. THE LOCATION OF EXISTING SEWER, WATER OR TELEPHONE LINES, CONDUITS OR OTHER STRUCTURES ACROSS, UNDERNEATH, OR OTHERWISE ALONG THE LINE OF PROPOSED WORK ARE NOT NECESSARILY SHOWN ON THE PLANS, AND IF SHOWN ARE ONLY APPROXIMATE. CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES SHOWN ON THE PLANS IN AREAS OF CONSTRUCTION PRIOR TO STARTING WORK. CONTACT ENGINEER IMMEDIATELY IF LOCATION OR ELEVATION IS DIFFERENT FROM THAT SHOWN ON THE PLANS, IF THERE APPEARS TO BE A CONFLICT, OR UPON DISCOVERY OF ANY UTILITY NOT SHOWN ON THE PLANS. FOR ASSISTANCE IN LOCATING EXISTING UTILITIES CALL "NC ONE CALL", DIAL 811. 6. WHERE PAVEMENT IS BEING REMOVED, THE CONTRACTOR SHALL REMOVE AGGREGATE BASE MATERIAL TO SUB -GRADE. 7. DAMAGE TO UTILITIES (INCLUDING UNDERGROUND) OR PROPERTY OF OTHERS BY CONTRACTOR DURING CONSTRUCTION SHALL BE REPAIRED TO PRE -CONSTRUCTION CONDITIONS BY CONTRACTOR AT NO COST TO OWNER. 8. EXISTING PAVEMENT AND OTHER SURFACES DISTURBED BY CONTRACTOR (WHICH ARE NOT TO BE REMOVED) SHALL BE REPAIRED TO LIKE -NEW CONDITION. 9. THE CONTRACTOR IS REQUIRED TO MAINTAIN ALL DITCHES, PIPES, AND OTHER DRAINAGE STRUCTURES FREE FROM OBSTRUCTION UNTIL WORK IS ACCEPTED BY THE OWNER. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGES CAUSED BY FAILURE TO MAINTAIN DRAINAGE STRUCTURES IN OPERABLE CONDITION. 10. THE OWNER SHALL HAVE A SET OF APPROVED PLANS AVAILABLE AT THE SITE AT ALL TIMES WHEN WORK IS BEING PERFORMED. A DESIGNATED RESPONSIBLE EMPLOYEE SHALL BE AVAILABLE FOR CONTACT BY INSPECTORS. 11. THE CONTRACTOR SHALL NOTIFY ALL APPLICABLE REGULATORY AGENCIES AND THE ENGINEER AT LEAST 24 HOURS PRIOR TO STARTING WORK ON THIS PROJECT. 12. UNLESS OTHERWISE NOTED, ALL CONCRETE PIPE SHALL BE REINFORCED CONCRETE PIPE, CLASS III. 13. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR PART 1926). 14. VERIFY THE PROPOSED LAYOUT WITH ITS RELATIONSHIP TO THE EXISTING SITE SURVEY. ALSO VERIFY ALL DIMENSIONS, SITE CONDITIONS, AND MATERIAL SPECIFICATIONS AND NOTIFY THE OWNER AND ENGINEER OF ANY ERRORS, OMISSIONS, OR DISCREPANCIES BEFORE COMMENCING OR PROCEEDING WITH WORK. 15. DEVIATIONS FROM, OR CHANGES TO THESE PLANS WILL NOT BE ALLOWED. 16. MAKE EXPLORATORY EXCAVATIONS AND LOCATE EXISTING UTILITIES SUFFICIENTLY AHEAD OF CONSTRUCTION TO PERMIT REVISIONS TO THE PLANS IF NECESSARY. THE EXISTENCE AND/OR LOCATION OF UTILITIES SHOWN ON THESE PLANS MAY BE ONLY APPROXIMATELY CORRECT. TAKE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN HEREON AND ANY OTHER EXISTING UTILITIES NOT OF RECORD OR NOT SHOWN ON THESE PLANS. REPAIR AT YOUR OWN EXPENSE, ANY EXISTING UTILITIES DAMAGED DURING CONSTRUCTION. IF A UTILITY IS DAMAGED DURING CONSTRUCTION, STOP WORK IMMEDIATELY AND NOTIFY THE ENGINEER. 17. PROPERLY SECURE THE CONSTRUCTION AREA AT ALL TIMES AGAINST UNAUTHORIZED ENTRY AND ADEQUATELY PROTECT EQUIPMENT, MATERIALS, AND COMPLETED WORK FROM THEFT AND VANDALISM. THE OWNER IS NOT RESPONSIBLE FOR THE LOSS OF ANY MATERIAL STORED AT THE SITE. GENERAL CONSTRUCTION AND GEOTECHNICAL NOTES ENGINEERED FILL 1. ALL CONTROLLED FILL ZONES ARE TO BE MONITORED BY A FULL TIME GEOTECHNICAL ENGINEERING SERVICES FIRM. 2. ENGINEERED FILLS SHALL BE PROPERLY PLACED ACCORDING TO THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER. 3. ALL SUMMARY REPORTS, IF AVAILABLE FROM THE GEOTECHNICAL ENGINEER REPRESENTING THE PROJECT MUST STATE HIS PROFESSIONAL OPINION ON THE SATISFACTORILY COMPLETED PHASES OF CONSTRUCTION SUCH AS; SLOPE CUTS, SUBDRAINAGE SYSTEMS, PREPARATION OF SUBGRADES AND COMPACTION OF EARTH FILLS. 4. NO FILLS SHALL HAVE ZONES THAT EXCEED TWO (2) FEET IN ELEVATION WITHOUT CONDUCTING COMPACTION TEST AND OBTAINING RESULTS OF 95% OR GREATER. 5. THE GEOTECHNICAL ENGINEER MUST SUBMIT A DETAILED ANALYSIS, ITEMIZING THE FIELD DENSITY TEST RESULTS. THIS REPORT SHALL BE ACCOMPANIED WITH A COPY OF THE SITE PLAN SHEET AND INDICATE THE TEST LOCATIONS AND ELEVATIONS. THE GEOTECHNICAL ENGINEER MUST PROVIDE ENOUGH DESIGNATED TESTING IN ALL FILL ZONES TO ADEQUATELY EXAMINE AND CERTIFY THE INTEGRITY OF THE FILL. 6. THE GEOTECHNICAL ENGINEER MUST SUBMIT A CERTIFIED BUILDING PAD REPORT FOR EACH FILL PAD LOCATION. THIS REPORT SHALL PROFILE THE FILL MATERIAL PLACEMENT AND PROVIDE THE COMPACTION TEST RESULTS. ALL REPORTS WILL BE ACCOMPANIED BY THE SITE PLAN, INDICATING THE TEST LOCATIONS AND ELEVATIONS. 7. NO BUILDING PADS IN FILL ZONES WILL HAVE STRATUMS EXCEEDING TWO (2) FEET IN ELEVATION WITHOUT TEST VERIFYING DENSITY. 8. THESE GEOTECHNICAL NOTES SHALL IN NO WAY LESSEN THE REQUIREMENTS OF THE SUBMITTED SOILS REPORT. ROAD SUBGRADE 1. INSPECTION AND APPROVAL OF THE SUBGRADE WILL BE REQUIRED PRIOR TO THE PLACEMENT OF THE APPROVED PAVEMENT SECTION MATERIAL. 2. ANY CLAY DEPOSITS IN THE TOP TWO FEET OF THE SUBGRADE MUST BE REMOVED OR ADDRESSED AS RECOMMENDED BY THE GEOTECHNICAL ENGINEER. 3. SUBGRADE APPROVAL SHALL BE ACCOMPANIED BY THE SUPPORTING DOCUMENTATION VERIFYING DENSITY TEST RESULTS OF 95% OR GREATER. 4. THE ENTIRE SUBGRADE WILL HAVE BEEN PROOF -ROLLED IN THE PRESENCE OF THE SITE INSPECTOR AND GEOTECHNICAL REPRESENTATIVE. PROOF -ROLLING SHALL BE A RUBBER TIRE VEHICLE SUCH AS A LOADED TEN (10) TON TRUCK OF APPROVED COMPACTION EQUIPMENT. 5. THE FINAL SUBGRADE SHALL BE APPROVED BY THE GEOTECHNICAL ENGINEER AND SITE INSPECTOR BEFORE PLACEMENT OF PAVEMENT SECTION MATERIALS. NPDES Stormwater Discharge Permit for Construction Activities (NCG01) NCDENR1Division of Water Quality NEW STABILIZATION TIMEFRAMES (Effective Aug. 3, 2011) SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS Perimeter dikes, swales, ditches, slopes 7 days None High Quality Water (HQW) Zones J 7 days None Slopes steeper than 3:1 7 days If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed. Slopes 3:1 or flatter 14 days 7 days for slopes than 50' in length. greater All other areas with slopes flatter than 4:1 14 days None, except for perimeters and HQW Zones. GENERAL UTILITY NOTES 1. THE ENGINEER MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA; EITHER IN SERVICE OR ABANDONED. THE ENGINEER FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES ARE IN THE EXACT LOCATION AS INDICATED. ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM THE INFORMATION AVAILABLE. 2. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO CONSTRUCTION SO THAT CONTRACTOR IS FAMILIAR AND UNDERSTANDS EXISTING CONDITIONS. 3. FIELD CHANGES MAY BE NECESSARY DUE TO EXISTING UTILITY LOCATIONS. THE ENGINEER SHALL BE CONTACTED BEFORE MAKING THESE CHANGES. U 0 W 4. N •N T I > a > E Y o = U M m U 0 CD w ^ O N M LL O n T 0 N U R R c 0 LL � COi �0 3_j L) 3 E M LL c °^° z W 0; LL 0 Z a 0 Ir 0 0 2 U REVISIONS 11.10.20 ADD 1 DESIGNED BY: CGD DRAWN BY: JAJ CHECKED BY: WCK SCALE: NONE DATE: 10.7.20 PROJECT NUMBER: 18110122-05 r 1� '- EDGE OF PAVEMENT ANGLE NOTES/ IRON 1. EXISTING CONDITIONS ARE TAKEN FROM SURVEY PROVIDED BY TURNER / 1"EIP LAND SURVEY, DATED JULY 2018. HOLT CLA S I TLS# NL ' // - I NC R#1 40_ 1 I_ i -ti - 3/4"EIP 1 I 5.56' SW \ 3 /4„ OF 1 "EIP \ S89 23'54 E ErP N89 40'04'E 290.10' 100.00' C _ S89 2354'E f 113.34' 2"ERB /CAP 34.58' - CP - - - - 255.52' - - - - - - CID 710/F 12"EIR 81.16' >////CP0SOUTH LINE EXISTING I �u / 1EXISTING o to 2-STY PER WOOD LLIIGFRAME I f/ l\ 2720- 2-STYDWEO L NGFRAME oo' I \ D.B.LIN636, PG. 1175 / I ^ \ \\ \ = o X \ \\\ ��-__ 4.8' W OF LINE \ \ WALKER, /OMEBA D ROCK ,�\ I/ \ _ �\ ` - N/F N/F \ \ `\ \ \ \\ D.B. 636, PG. 1175 WALLS \ \ HOWELL, BARBARA JOANNA kEASANT GROVE BAPTIST CHURC \ \ `\ \�69 P.I.N.: 8666-18-9711 \ \ `\ D.B. 438, PG. 1285 1 \ D.B. 326, PG. 142 P.I.N.: 8666-28-0735 \ \ \ �\ P.I.N.: 8666 �8-1716 \ SHED \ S89 23'S4'E 172.53' \\ \ \ \ - - \ -?>p6\ ` / \\ \�� _\ _2>t4-_ /�____----2724----i�i i mil \ -27 _ _ / --��� \ ���� GATE _ \ \\ \ _---- i / / i SMH w/CONC. LID \ \ \ \ \ \ \ \ = _ �. �� \` I -,\ \ \ \- - _ _ \ \ \ \ \ \` _ 120 / TOP=2 10.68 \ \ \ .P \ \ \ \ - - _ \ \ \ \ / \ \ \ 27to _� \ \ \ \ \ / / / 1� / ' j 10 8"TERACOTTA - - LL \M1I _S!3 49 IN=2706.35 \ \\ \ \ rn _ EIR OUT 2706.10 ERVI / 8 \ \ \ \ \ \ fari-- ---' �� / /� - 4 PVC SERVICE \ � � \ \ � \ \ \ \ \ \ I a 3" ' / � � � � � I \ \ \ co In � � - � �. � j IN=2706.87 # / \_� SMH \ \ s_�`I'-c� w COLLAPSED' \ \ \\ \\ \ \\ `\ \\� \�� \\ \ \ \ \ \\'II I _ �__ CONC. LID \ -, / _ _ \ \ SMH w CONGiLID� \ \\ \\ �\ \ \\\\\ f III `\ \ \\ Ilil10�� -` \ _ -� �,/2 \� \��-�,\ 1� __ FILLED TOP- 40 � � 1 � � � � \ � � � \ � C � __-SMH w/GONG. LID „ Ss \ \ \ s s\ \ APPROX. \ ` ` \ \ \ I \ \ 1 1 1 0 _ _ \ \ \ �2> �\ \ 1�2"EIP _ ` _< _ _OUT=2701.00 / 8"TERRACOTTA \ \ \ 8 N XT TO, - - _ ��" \ \ DIR OF 8"CPP \ \ \ \ \` \ \\\ \ \ \ \ \ 1 I�2100 \ \ \ _ - - _ - _ TOP=2705.70 \ 3(ZHICKORY - _ _ _ _ _ / IN=2701.45 24 END NOT FOUND \ \ \ \ \ \ \ \ _ \ M \ \\\ \\ \\ \II �// / I� `\` \\ °p \\ �! 1 = \ �\�\� Oa�3(1"H1e - �/ //' OUT=2701_37 SS \ / ? \ \ \ \ \ M 8"CPP .2s, , \TLS#1o1V1\ 0. Of ----_ `\���\����\24"PECAN -� \\ \\\ \ \ I i l 111 \ \ S8916.024E I I I \ 1\ W // 2>p�l _ --- ---_- --- �/TLS \//\_�\I- -Q--__\�-2703 - --�1, / I ISS ~-� �8„ Ss 8„ 43"OAK \ 1 \ 98. \\26s7_ SMH \\ _ \ _ - iiRul-02.89 \ 1 SMH SMH I I ( �/ ��_�\ - \'�� / -�~\ \\ \ WILL DAVIS HEIRS \ 1 1 \ \ I 8"PVC \ I _ _\ / F _ \ - I \ \ \ \ \ I I I RIM=2680.51 \ I �' _ \ \ / - - - - .� / _ _ _ ` \ \ �fi `'s X \ \1 1 I 8"PVC RIM=2696.85 APPROXIMATE EDGE OF----- ^ \ \ T \ ` - N P2697.65 \ ` _ \ 1 \ \ v 'C \I+ 1 I I IN=2675.39 IN(1)=2687.57 1 I I I // \ WASTE DRAWIN FROM - _ = _ _ _ - _ \ \ OUT=2697.55 `\ ` D.B. 59, PG. 105 \ \ p 1 2 \ \ LOTS 1-5 & 17-21 s / I 8"TERRACOTTA IN(2)=2688.27 I ss BORING LOGS \ \ ` / 1 1 OUT=2675.16 OUT=2687.50 I I ' B ` HC WILSON PROPERTY /^ \_______-�" \\ I d \ \\ \ MAP CABINET B, PG. W3 UNKNOWN WELL \ ` [or CABB, PG. 41 (W3)] 1 \ 1 I / I I \ / 1 \ / \ ( N \ (Less and excepting property \ \`--_---- \ �\�/ IIIII// I I I \� \ / I \ III \\ \ \ I I I \ O 1 1 �\ conveyed b D.B. 165, PG. 181 \ / `--- `-- \ III III ^�\ 1 I) N I I I I \ 9s\ / \\ 1^ \ Y Y ) I I \ 1 I i / \ 1 \ P.I.N.: 8666-28-2408 - UNKNOWN WELL ---2672- 1 �\L \ \ rn 1 la I I _ _ 111� / \ �. �\�\ I�I I 1 1 p /�IIII11 /x 24"PINEI 1 1 0 l I I 1 I I I \\ I 1 1 I / 1 I ----- � _ -_--_- \�\\\\\\ III I 1 1 \`` --2676---- _ \ \\ ry6 \ \\\A 1 I \ 1 \ �'6 \ I I \ / 269 --- --- _ ��--\���' fir / \ I I / \\ \ ` \ \ o� \ / \ \ / �/ I \ 1 \ L� \\\\\\ \ _ / ' / Il/ I I I I \ \ \ 1 I \ / \ / I \ \ l I / TLS#11N1/'-------- _-- \\\\\\�--%/i^ �\ ll I I II/// /)\\ \ \ \`\�\ `\ I l / -�/ l I ` I / l I I , \ / I \ \ 1 I I N /---------� \\\� �_ i/ ` \ l \\ / / \ \ / / I 1 v CENTER WIDE) 0 ------ -� ---2680- i -__ \ \ \\\III / //i���1 I f \��/ /I f l\\ /' \ ' 9,r\\ ///- / J c0 1 \` / /' / \\ I _ \ \ 3 1 \\ III \ / /��� \ \ _ J I I \ / / w \ I \ PARTIALLY FILLED 24"PINE \\ \ \ \ \` J/ /��� 36"MAPLE �� \ \ _ _ _ \ (\ \ / I 1 / \ \ / / .� �26 / I / / I `'o \ / / / I I a� �RB 24"CMP - / / / I R \ r / M I N I ITLS 3NL CHANNEL INV=2666.98 1 \ // /i / �l // _ _ /01 \\ \ PIPE INV=2666.37 \\\ \ / \\ l/ N F _ 24"CMP I t I�fi�LIE SEECE-Y- _ INV=2668.08 D.B. 1i PG. 144 / 18"CMP - - - - � ,ES-TATE FILE (9El PG. 485 - _ _ � \ \ \ /324"PIN \ 1 �j� // / INV=2687.08 / / 1 1^ - � \ � /269�/ P'I:N 8666-18-6455_ _ \ / 1/4"EIR CINDER BLOCK RISER-18"CMP INV=2688.61 36"MAPLE / / / \ / / / / / / I I �� \ -' / I I ^j p N/F \ \ \ 3 I I 24"ASH / // /' - _ _ - - / / / / / I 1 \ / J / I d o MAGNOLIA B. THOMAS �\\ / J / / / // /, / / // // / \ / I / Sno D.B. 386, PG. 1209 APPROXIMATE EDGE OF 1 / / / / / - I S6" I 0045 LOTS 27-29 WASTE DRAWIN FROM 1 I / / / / /' �' / - - - - i / / , / / / / / I J \ /'9O¢ F I _ ^ PLAT CAB. B, PG. W3 I - _ \ / / / / �l rn _ / / / M or CABB, PG. 41 W3 BORING LOGS / / / / , / I / APPROXIMATE EDGE OF 2)) I 1 I i / / /' ' / / / / WASTE DRAWIN FROM "HEMLOC 8s- / s! I I.N.: 8666-28-444 24"ASH / / �_ _ 9t+' / /�GK-_ I 1 BORING LOGS \ 30 0 \ �� / / BOO y/ 4' K / I CID �� OCK Rp APPROXIMATE LOCATION OF WATER LINE I \ 32'11LOCK TLS#T2fyL DRAWIN \\ �\ \ \/ // / / / / EXISTING 8" SANITARY SEWER // / I \ \ E I ` - / TO BE REPLACED WITH 8" PVC oo / / / / /SP FROM SKETCH PROVIDED BY I / /1 \ 1 0"HEMLOCK IN, /}C094, --- - '/ // // / \\ MLOCK _-_ I I I I 1 /�� /// / l l 1 2"ERB \ TBED �-0"POP 1011Eco _ X_ �� WV - / I / I BASKETBALL GOAL M ---2699-------'/ BASE W_ \\ \\ \\ \ I 1 \ �'� / M LISTING SMH (TO REMAIN I 6.57 ACRESt / ti M RIM=2699P.V13 / LUSIVEAREA OF NDERLAP \ \ 1 I I / / \ / / OUT=26 /' / EXCLUSIVE OF OVERLAP / / AREAS AND 15.9' RW / l I M / FROM HOLTZCLAW RD. \� ✓/I\ // // / / FH / I - -'------------ - - _ �// SHELTER N/F WILLIAM McDOWELL / // _ _� D.B. 859, PG. 1199 - - - - - P.I.N.: 8666-28-0297 /////�I/�#1 RBC - 21t3- - _ - - - - - 27t2_ _ (also known as Reynolds School Property) ` _ 04, CC BRICK BUILDING OLD REYNOLDS SCHOOL STRUCTURE / TLS12Mf 8 \ GRAPHIC SCALE 30 D 60 ( IN FEET) 1 inch = 30ft. 0 I REYNOLDS-,-' / / SCHOOL RD. I 0 CONCRETE WELL O I I CID 6� / 6 5�09 ;P / I CID > > U C z >� N L ° 20 U :° 2 LL Z > > a> at > r 0 7 N E Y O L) t o 0 N � w • � v LL ti Onrn Eou a/ OzLL� t�i m p eve 3 E M L) O0 � rn w rn J J U- 0 z J O z Ir J J �O O Z = O U 0 z (n O p CU J o O Z z z ~ >_O ' ' I F- X or W U REVISIONS 11.10.20 ADD 1 DESIGNED BY: DRAWN BY: JAJ CHECKED BY: WCK SCALE: 1"=30' DATE: 10.7.20 PROJECT NUMBER: 18110122-05 C3.0 11`\ \ WALKER, OMEBA D ROCK\\ '� \\ `\ N/F N/F \\\ \\ �\ \ ` I D.B. 636, PG. 1175 WALLS \ \ `\ HOWELL, BARBARA JOANNA \ CA LEASANT GROVE BAPTIST CHURC NOTES N CAR ` \ �6 P.I.N.: 8666-18-9711 ` \ D.B. 438, PG. 1285 \ Ess \ \ \ \ \ I - \ ` \ \ \ D.B. 326, PG. 142 Qom,"oF 6' \ - \ ` ` P.I.N.: 8666-28-0735 \ \ \I \ P.I.N.: 8666 8-1716 1. CONTRACTOR SHALL VERIFY DEPTH AND LOCATION OF ALL UTILITIES = _�' e� 40 q' \ ` \ \ \ • 1 III ' - \ - \ ` \\` \ I v PRIOR TO EXCAVATION. ANY DAMAGE TO UTILITIES WILL BE REPAIRED TO _ �S*A()\\�� \2726------'' ORIGINAL CONDITION AT NO COST TO THE OWNER.SHED \ ` \\ ` `\\\ \\ ��� ` \ _- ----- -27 \ \ \ \ \\ �� ` \ \ \ \ V \ \ _ _ 0ff 1\ \ \ \ \ 2. WASTE QUANTITIES ARE BASED ON BORING LOGS PROVIDED BY ESP. \ \\ \ 2 \ \ \\ 5892354 E 172.53 \ \ ` -- "1<v 1 \ \ \ \ \ ACTUAL WASTE VOLUMES MAY VARY. ENGINEER WILL GIVE ADDITIONAL 'L \„ �_-------------- --__ INSTRUCTION AS NECESSARY. I N� . \v �\ -------Z724-- �•''' P \ \ \ -27 _ — _, \ \ \ �1<i D `\ �\ \ -__-_'_, \ `\ E-IR1\ \ os-•L1_3.3�"� - --__° __ 1 _,n722-_ / ,/' a \ E \ _ _ \ CP/ 20 / > i i tC 3�\PI \ \ \ \ \ \ �\ �\ \ �\ \ \ --_ 2710� _ - ` \ \ \ `\ \ ` \� \_.' I U O_ —N,� �NL �� _ ��' n`\QJ0A , z L `\ \ �� \\ `�-` \ \\ �� `\ \\ \ `\ `\ --_\ �\ \ `\ `\ `� `\\`\\Y /�\ _ �2% \ �� �� 2 \ `\ `\ �\ ` \-- --- ��-- / / i�J_✓ 1/2 EIR N \ _ \ CL \ \ \ \ \ 2 \ \ \ \ / / / \ \ , \ \ 1 / ` \ \ I I N / � � \ `\ � � SMH \ 6_ \ �`\ � / / i , � 2 LL z �\ `\ \``\\ \ \ \\ J \ \ \ \\ 1 I I k w/COLLAPSED \ \ \ `1 1 \ \ r \ I III CONC. LID I \ \ / / SMH w CONC.-EICT FILLED �� /2 \\ \� _,TOP 0 / > \ \ \ \ \ 1 2 EIP_� `-_ \ -- OUT=2701.00 / 8 TERRACOTTA S \ \ �26 \ \ \ \\ \ `. \ \ \ ` _ 8 °'PVC / SMH w/CONC. LID o a \ \ \ I \ \ 1 ) _ \ \ \ \ \ ` / S4. \ `\ \ 6�\ `\ APPROX. `. \ `\ `� �\ \ `\ \ \ \\\ I `\ ` \ I I I \11 --- �\ \ \ \� \ \\ \\ 2% \ � _- ��/ $ N > \ \ \\ \ \ \ \ \ \\ \\ I 2 p/ — \ \ \ ,�8`,'`,rN XT TO�, _ TOP=2705.70 \ \ -- _-' IN=2701.45 W ° o \ \ DIR OF 8 CPP 30 HIC ORY / � \ \ \ \ \ 1\ \ \ \ END NOT FOUND \ \\ REMOVE ALL WASTE `\ �� \ \ I I 1 \ \ `\ \ \ - - - 708' ` \ \ ACROSS ADJACENT \ \ \ o�. \ - ------ ---- -\ M \ \ \ �� \ \ -- \ \ \ \ \ �\ ` 111 111 \ \ \` \` \� \ \ \ � \\ �T'I�I�I49I� / / ` — OUT=2701.37 $' S E Y L \ M \\ \\ \ PROPERTY LINES TO \ \ \\ I I 1 I \ \ `?�0 , \ » ``\ \ `` -`2699-- - /"— \ \ \ M 8 CPP - - WITHIN 5.0 OF I I \\TLS 10 I = \\ \\\ \ \\ SUBJECT PARCEL \ # -- REMOVE FENCE \ \ \ \ '\ • 1 I \ I I \ 11 / `\ \-- \ �� _ - 1 AS NECESSARY \\ \ \\ \ \III 111 \ \ I \\ I I I I // 26 VE TREELINE \ \\ _______/' S5 _ _\ 27iO4.00 \ \ - \--\ 1 \ III 1\\ \ \1 \ \ _ --2698- -�/ `\\ ` -- ------ i'�� \\ \ o 1 i » -- - \ \\ �\ \\ I / I I I 1 -- _ --- - — — ABANDON ��� \ 2 o _ \ -� 24 PECAN \ \ r - ----- _------- MONITORING WELL s 2698 WASTE - _ - - -- _/��— _— � \ \\\ '/ S \�\ 2702 27Q3 \ \ ° \ \`\—__�/' � � 0 n T O *k \\`\\� \ \ \ _ — \ \ \ \I \I I 1 SS $,r / Q 8„ S �8" S \ \ \\REMOVE TREE'----- \ 2701 LS 4 ----- / » \ 3 1 I \ I I I \ 1 2698\ I 12700 3.8 ``------------- c z LL 43 OAK \ \ XI \ I 9 rn / / o \I\I_ ^ \ I \\ \ \\ 1 I I M I \ I \ i ' \ by7 I \ / _ 2703 2704 L'U 3 E �n 3 2702 \ \ I I \ WEE 9 � 8 P C \ 01 Lu 5 3 I I I I ,/ �\ _ - \ \ ' / / �69 - - - '\\ \ \ \ 269 - 1 plfil HC WILSON PROP o --- ` --- REMOVE PIPE I / REMOVE ALL WASTE , / 1 1 I 1 0 - 7 6 I 8 B N N \ \ - ---- - \ \ C N �P / ACROSS ADJACENT \ I 1 I , / o ED N MAP CABINET B PG. 3 ,,mot- J ,' I I I 1 I I \ 1 / 0 0 G EL / \ \ - `�\ \ 2 0�^ , FINIS f0 pRA1N [or CABB, PG. 41 I i 1 PROPERTY LINES TO I 11 I 11 \ I I I /DE 0� 6g ------ II // 1 \ I I I / �s I \ \ N GRA IM M 3' \ (Less and excepting pr p r y o \\ \ 26 I / / I I WITHIN 5.0 OF I \ \ I / CON TRUC L \ conveyed b D.B. 165 P 1 1 N I \\ R 0 � I � 1 I \ 9 ^ \ \ o `\ AX Y Y � \ - - - - - - - \ / III I SUBJECT PARCEL \ °� / I I / -,_ \ ., III// 1 I , / I I � \ i / SEE �6��:I�O C 1 ` I \ \ P.I.N.: 8666-28-24 \ I I 1 AND AS NECESSARY I rn I K I `'6' ` --- \ II � 1 / \ I 1 I 1 \ 1 — \ / REMOVE ALL WASTE \ _ __ \ r Ilil / TO CONSTRUCT' / \ TOE DRAINS ) I o f I 1 I \ 1 \ j\ _ (\ \ \ ���� 1 I I I REM VE ACCES RPAD \ I / ------------ --- -\\\\\\\. I .' ,, iy / \ I I I / I \ \J6� \\ b /' \ / ACROSS ADJACENT \ \\ o % REMOVE EELINE \\,/ �� , , / ` \ I I I REMOVE TREES \ I I AS ECESSAR So I / / PROPERTY LINES TO \ \ I _ -__ ----------_��\\\\`�\\ 'L ' \ \ \ \ \\ \ ` WITHIN 5.0 SUBJECT PARCEL \I � I \ \\I J 0-4 LL 00All - I I '\i \`_ f \ \ \ \ / REMOVE SER AND \ PIPE PARTIALLY FILLED 24 PINE 24 OAK 24 CMP . \ - ( �\a 1 / \ \ / I 69 5Q \ CHANNEL INV=2666.98 REMOVE PIPE - ------ ` - \ PIPE INV=2666.37,' V _ » N%`F '�-_ 24 CMP / I / \ 1 i i l I\ I\ // GR 'DE ON / T/ N>��LIE SEECE�=-__ INV=2668.08 / , 1 I \/ \ \ \ J , / \ \ \ I M TO ON ----- D.B. 1`2.9, PG. 144 ---_ \ 3 2 "PI / / M , I / I - /�I �� , / I \\ \\ r.- - Xl VM ORgIN ESTATE FILE 2aG5E, PG. 485 / / REM VE PIPE / \_ \\ 6g� , / I \ / 3. P I�N...� 8666-18--6455•_, REMOVE ALL WASTE �/" \ / / V --- - ACROSS ADJACENT REMO E TREES �/� �/I\I /' \ PROPERTY LINES TO - \ / / / / / I ER BLOC l / I l I / \ �� IS R-18"CM \\ /i / / / I — —/ % 1 / % \ \ WITHIN 5.0' OF �� \ , /� / I i i i / \ I `� 1 \ J - SUBJECT PARCEL /' \ / ; I I / / I �� V=2688.E AND AS NECESSARY \ I / / \ \ TO CONSTRUCT ' \\ TOE DRAINS _ \ / / ,� _ EMOVE TREE LINE \ // % 36 MAPLE - \ 1-1 I , \ 16,2 - \\ LIMITS -OF WAS v % /� , �� 26g6 \\\ '\I I �/ / ,,,-- �,'� �,E ISTING WATERLINE I I �� 69`3�0 i 1 i --\ / IZE UNKN WN i LIMITS OF WASTE �� X / 7 T BE REROUTED, �o /r'HEMLO K 8S, kx� 11 / Q U) / 1 I \ / J \--___ -26g�i // /' A ANDON I PLACE /� 14--_ / / \\ _ M TREES 1-1 �,' ITHIN WASTE ARE / 3 1� 0 \ , REMOVE FENCE AS NECESSARY ` I / /' ' -'26g �/ / kl 24 C \ kk\k l l Z 25 CORRIDOR(BOTTOM WIDTH) / / 24 H MOCK k� O J \2690 \\'�,\\- �// / ,-'� / \ — / TO BE EXCA ATED TO CCOMMO ATE— \ UTLITY CONSTRUCTION. SEE DET IL / I `\ \ �� 31 8" SANITARY SEWER ON C10.0 \\ \\ 32 M€ LOCK % X / — O U PLACED WI H 8 PVC 7 VE WASTE AS NECESSARY TO / / J z Z \ \\ \\\ _ I / / �/� i C NSTRUCT PERMANENT SWALES. �� ,,' " \ 0 HE O Z 26 ` ` ' / EE DETAIL ON C10.0 / �' `� 1 C 0 01 W Q Q � •' � I REVISIONS ' I 11.10.20 ADD 1 �'POPL \ / `\ REMOVE ALL WASTE _ _ ACROSS ADJACENT- - 9a 2 g8 , DO NOT DISTURB `PROPERTY LINES TO 2697 BASKETBALL COURT �\ WITHIN 5.0' OF - ------ -- _ - 269E 0• AND GRASS AREA �� \\ SUBJECT PARCEL - - - REMOVE WATERLINE AND u) / FIRE HYDRANT OUTSIDE \\\ 00\`\ h �\ / , OF WASTE AREA I ;v M / / /' REMOVE WASTE AS NECESSARY 1 W / \ , M TO CONSTRUCT PERMANENT 6.57 ACRES± l 1 1 0, / ST NG SMH TO EM9.12 / 0 � / / RIM- 699.1 SWALES. lI�CLUSII/E OF UNDERLAP , r\ / / LIMITS OF WASTE / / M SEE DETAIL ON C10.0 / AREA /l VC / EXCLUSIVE OF OVERLAP I N/ OUT=26 _ — / / / / AREAS AND 15.9' RW /l _ _ FROM HOL TZCLA W RD. / /FH GRAPHIC SCALE--- 20 0 10 20 40 ( IN FEET) / / / / _-'----------- -- __-- -- / 1 inch = 20ft. // /�- ---------------- _-_ WILLIAM McDOWELL - �/ ;,------------- D.B. 859, PG. 1199 -__27 --__ P.I.N.: 8666-28-0297 TI 5 # 1 R B C -------12_ --- (also known as Reynolds School Proper4-if ----- BASKETBALL GOAL w/CONC. BASE I I / / / / / / / / / SHELTER I I / / / / / DESIGNED BY: CGD DRAWN BY: JAJ CHECKED BY: WCK SCALE: 1"=20' DATE: 10.7.20 PROJECT NUMBER: 18110122-05 i 2-STY WOOD FRAME ; \ \\ 2720---\ 2-STY WOOD FRAME EROSION &SEDIMENT CONTROL LEGEND LINE PER DWELLING _, ' \ x \ DWELLING HOLT7CLAW S 1 TLS#1NL 1 1 ( D.B. 636, PG. 1175 o \`\` NCR#1$40 I I I I _Ln N /F I WALKER, OMEBA D ROCK ,�\ \ \\ `\ N/F " / `" `�—� " D.B. 636, PG. 1175 WALLS \ »» _ \`\ HOWELL, BARBARA JOANNA P.I.N.: 8666-18-9711 \\ D.B. 438, PG. 1285 \ �- , \\ \\ ;� \ __—� \ `\ ` 2 P.I.N.: 8666-28-0735 S8923'S4"E ohp I '\-----______ \`\\ \` p / \x \\`\ ` �/8. - IV , - - -2�08__ \58923'54"E 172.5 / \NN /2"EIR 81.16' / /' / /� \\`\ \\\` �\ �� \\ `\- 0 SOUTH - - 2 - --_ --; / , / , \ � \` \\\\\\\ i " _ � fps QD F LINE \ E — - CE N I `\ \\ \\---- ~\\\� CONSTRUCTION,.` \ _—2710,— I I \ \ \_ ENTRANCE EXTENDED \ `\` TO HOLTZCLAW ROAD 11 \ \ F2- TING / ( OD FRAME _ / \2�20- \ \ \ DIVERT SEDIMENT LADEN RUNOFF 1 i i I \ _ LLING , \ \\ \ \ i I 11 INTO SEDIMENT BASIN 1 1 I I 2� -_ TITLE KEY SYMBOL TEMPORARY STONE CONSTRUCTION ENTRANCE CE o o SILT FENCE SF CLEAN WATER DIVERSION�— TEMPORARY SEDIMENT BASIN SB SILT FENCE OUTLET SFO RIPRAP RR \ xCE PG. ° o \ \ `\ \ \ 1 1 1 \ `\ \ 1 1 ` 2�' INSTALL THREE BAFFLES - — _ \ OUR` ` \ \ ` ` ` \\ / 1 \ ` \ 1 1 1 1 \ PER DETAIL ON SHEET C9.0 \ - \ \\\ \\ \\ \\ NN \ \ \ \ 1 \ - TITLE KEY SYMBOL ROCK CHECK DAM CD ' DEWATERING STRUCTURE DS TEMPORARY SEEDING TS TS PERMANENT SEEDING PS PS SEDIMENT DIVERSION�— TREE PRESERVATION AND PROTECTION TP TP LIMITS OF DISTURBANCE A D ROCK - \ I I 1 1 \ `moo -`-_ __ ;, - - . , '\` \\ � �� \�� \ \ \ \` \� � I \` \\ 1 1 11 700 `\\ \� `\ \ ��\ �� 8�, �`\ „NEXT TO�, `� H CLEAN WATER \ \ \ 1 \ \ `\\ - - — IN=2701.45 1175 WALLS \ \ \ \\ \. \ \ '30 HIC ORY,y--- _ / _ -9711 \\ \ \� DIVERSION SWALE ` CD �0' \\--__ _ _ ,2�08� ss '0 olt\ \ \ ��3Q''II�I491 - -- _---_ ,, - OUT_ 2701_37 \\ \ M 8"CPP - \`\ \`\ \ 'LIMITS OF WASTE '� \I ���� 11 1 I 1-.2699-------\ \ i 2. \ --- -- -__--- �7, \ _ `\ \ \ \ I \ \ A /I� \%�F-�( \ // —� `\\ CLEAN WATER �,_- ----- _ _ --21p6/ a s \ \� \\ \ \ \ 1 1 i I � \ \\ \\ DIVERSION SWALE _ -- --- I fq MOURN_ `\\\ \\ ��\ \\, SD \ \ \ I I 1 1 �� 24"PECAN .. F� CW ��� /�/- - »---_-___, --- _ ��� \\ - --_ \\ \`\ l ' l I \ 116.02' I I •\ �r w CD F��� i / i� -�'- _ _ _ CD --------- \I \ N\ - - ----- _ ----- \ I I r 1 \ U --- ' 1 / 2703--- \ \ ss— NN\ \ \\`\ \\\ \\ \\\\\ �' j �— \ » ` \ \ \1 11 I 18' SS I 8„' :S • 8" gg �S �L — =S� • \\1 \ _ / I \��"` • • • �L \\ \ 11 1 - 4 1 1 1 ' 1 J� I f \I 1 • I P \ / / \ \ \ �� — -•� ` .-.- e•W y �„ �,, �,�_ 11 1/2 TON CLASS B RIP RAP \ I � �0 1 fC`• \ SMH26 \ `�-� \=2702.89 / / /•\` ' \ `. 1 \ 1 I ` \ \ I I 1 �M=268U.n I I _ \ \ / \ \ _ 8 PVC \ N F � —+ s— \ \ 1 I I ,� I 1 / ` \ \ \ WILL DAVIS HEIRS -2667- \\\\`\^ _\ \ \ �\ \ 1 11 \ 11 1 \ N \ \ I 1 8 PVC I 9 SB1 I i 1 I 1 , \\ LIMITS OF WASTE \, `\ I\ \ D.B. 59 PG. 105 \ \ \ 1 \ \ IN=2697.65 \ 1 / \ \\\ \ N. \ I I I IN=2675.39 1 I 1 , \ \ \ OUT=2697.55 \ - \ ` LOTS 1-5 & 17-21 \\v EMERGENCY SPILLWAY 3 \ \ ��111 I 1 I 8"TERRACOTTA / IN I 1 i ,� ____---___ I\\ \ \ \ HC WILSON PROPERTY TO BE OPEN BOX AT ELEVATION 2672.0 `� ` 1 �, 1 1 I 1 1 PS / r- - ,\ \ \ �\ ` \ // / 1 I I T=2675.16 1 I , \ I \ \ \ ` MAP CABINET B, PG. W3 / , / 6� 1 I 1 I 1 I . \ , \\11I� JI I r/ r / / �� \ ` 1 X \ I 1 1 I11 • / 1 I / / \ \ DS cN\ `\ \\^\� \ O \\ (Less and andBex excepting propPG. 41 erty \ r ,I I I , / UNKNOWN WELL \ ` , TS / �2 \ Cp \ \ \ \ / 1.50 SKIMMER, \ 1 69 / \ \ \ \ \ g \ \ conveyed b D.B. 165, PG. 181 " I \ 1 I \ /--_ `S\ // I \ ` \ 1 \ \ y y ) \ I 1 ORIFICE DIAMETER = 0.75 I N 1 1 I \ / r \"\ �i \ 1 \\ 1 1 I \\ \ P.I.N.: 8666-28-2408 1/ 1 /— �\ IV \\ 11 I l 11 l /_� -�_� , I I \I N 11 \ rn 1 I cc . 11 11 I10) \ l 1 6Q SFO ' I , I I 1 co , ' I � 1 1 I 0, RR `\ 1 11= 11 \ \—��' I I \ 1 I - DEWATERING BAG 1 1 1 ' I I I I 1 1 I \ `\ I /\ I \ \\ \ \\�\ PINE \ \ 1 I I I I I \ I �/ TO BE PLACED rr \ I 1 LIMITS OF WASTE AS NECESSARY FOR \ � I / 1 \ \ 1 I 1 I I \ DIVERT SEDIMENT LADEN RUNOFF DEWATERING \ 9 �\\ / / I / / I / - ` \ o I I INTO SEDIMENT BASIN , EXCAVATIONS 1 / -- --_ -- - \ \ I / 1 SEE DETAIL / I L 1.50 SKIMMER 'ice'' - -' EMERGENCY SPILLWAY \ \ \ / \ SF •\ \ ` I i i / --'/ j N �\'\\'\\\`\\\ `\ \ I�i 1\ - 1\ ON SHEET C9,.0/� - ----- ORIFICE DIAMETER ` 0.4 / » \ \ \ I I �// /-01, _�,!\\ \\ �/ / / 31 \\ I \ \\I \\'1/''l///�/ire"\ \`-/ I I/ "// SD \ 1/\1\ // \\ i'�/ R\\ /' .� �// / N ' \/ \I - \\ ------'- —= ----»'.� 36"MAPLE' // - \ PARTIALLY FILLED 24 PINE \\ \ _= �/ ,'y\/N\` \ \"�''/\�/ > 'i \\ \ \ 1 M 1 \" 1 /, ' 00 \ I \ �- - 24 CMP. ----- \ \ ���� � �� ` \\ \` ,/i 1 1 0, 6'/ /../ .\ // ---'� / r \ \ i" / \ ^1 / 9 I / o \ \ 1 \ LIMITS OF WASTE �,---' 7- \ \ % \ \ I ti� / '' / `\ / / 1 \ \ // 0 \ \ CHANNEL INV=2666.98 1 1 •\ �, - / -rt "________ _, �. _ - //. PIPE INV=2666.37 N \ \ -N-_--___ 24"CMP NE LIE SEECEY---_ INV=2668.08 1 ,� /� ' / / / �' / \ D.B. 1`29, PG. 144 - \ / / , 18 CMP / 1 1 / I - ,/1 ,� / I \\ \\ I\\ ry/��� /3 / , �� I I \ I 1`STATE FILE �6C E� PG. 485 -- �\ \ J / / INV=2687.08 SD P:I-N.� 8666-18--6-45& _ _ \ - I \\ / / , \ 1/4 EIR I / LIMITS OF WASTE CINDER BLOCK RISER-18"CMP / — — 011_ INV=2688.61 U) \ . / / / 1 / \ � 36 MAPLE ly PS "1\SH // ��/� LIMITS OF WASTE ,__,---- /// ,//�/1 i ' I PS • ' y� i / / 1 / -- 1/2 TON CLASS B RIP RAP \\\\ I / TS �',,\ ,/' �'� ,'' i / / TS / \�¢}� XX\ ��. i CW 11L i l ` / / / / 41 X / HEMLO 8 TP 1.50" SKIMMER ' / /'� ,' TS /' /' / / 3 0 ORIFICE DIAMETER =0.75' �� ,' -26 / 24 % / � / — / PS / / �C / 1 24"H MI`OCKkk` J 1 ' EMERGENCY SPILLWAY , 6 XISTING 8 SANITARY SEWER / / \\\ \\ ILOCK / X \ N, / 0 REPLACED WITH 8" PVC coC\N I �/I M TP \ \ �� % 0"HEMLOCK - \\\91\\\ \\\ \ \` -,'�I� / / CLEAN WATER DIVERSION SWALE \\ `\ `\ \ ,f I , _----___ ,' LIMITS OF WASTE i / \\ MLO( 00 `\\ \ \ \\ `\ CD 2698. � ,,� LIMITS OF DISTURBANCE � / 3.0 ACRES -34,P0PL \ \\\\ \ \ \\ \\\ \/ CW I 1 �/' / \ 3\\ \ \ \ \ \ ' / INSTALL THREE BAFFLES 98, � , � / PER DETAIL ON SHEET C9.0 ,, 26 �,/ \\ \ \ --- - -_- _ _ I GRASS FIELD I ` \ _ ' I DO NOT DISTURB r BASKETBALL \ 0.\ i GOAL ONC. __--2699--- I BASE ISTING SMH TO W9N 6.57 ACRES±0 \ — �� i RIM=2Y)CL USl VE OF UNDERLAP 1 / / AREA i \'�N� \\ \\ Ii 1 1 N, /i \ \ / PVC \\\ \ \ I 1 1 1 ram, 1 / I \ �� / , OUT-26 » . / EXCLUSIVE OF OVERLAP AREAS AND 15.9 RW � \\ \` \` \` �\ /� / i \``� '� �� � /" M `� ---- FROM HOLTZCLAW RD. /IN,/ GRAPHIC SCALE ,' / ------------------------- / / I INNER -- - - - - - - - - __ ( IN FEET) --- --___ — ___ --__` �/ / 1 inch= 20ft. / --- ----------------- SHELTER CAR O Es s��� �S�A G 0 _ r"t <v Jill 1111"", > `° > z O �"> m L N 0 m • r� E >. r- at UM° i i C 0 N w •� O N M Onrn Off# N V U R R c OZLL� COi co 6" J ed 3 E M LL O0 z a a, W 0 z J 0 O O O 1 �U^ V ) V ) 0 z J O Q J z z O C) L z L v REVISIONS 11.10.20 ADD 1 DESIGNED BY: CGD DRAWN BY: JAJ CHECKED BY: WCK SCALE: 1"=20' DATE: 10.7.20 PROJECT NUMBER: 18110122-05 I'f I� e WALKER, OMEBA D ROCK_ \ `� N F NOTES \ �\ ` �`\\ `� \\`� I D.B. 636, PG. 1175 WALLS I \ -,\\ _\ \\ HOWELL, BARBARA JOANNA \ ` LEASANT GROVE BAPTIST CHURC I P.I.N.: 8666-18-9711 I \ \ D.B. 438, PG. 1285 \ \ \ D.B. 326, PG. 142 1. THE CONTRACTOR SHALL MAINTAIN A MINIMUM OF A 1.00% SLOPE IN ALL ` \\ ` \\ ` ` \ ,6'\ \\ _-\ \ \ ` P.I.N.: 8666-28-0735 \ \ \I \ \ \ \ \ \ \ P.I.N.: 8666-28-1716 ROCK DRAIN PIPING AND ENCOMPASS PIPES TD-2 AND TD-3 PER ROCK �\ � \ \ 1 \ \ I\ \ \ FILTER DETAIL ON SHEET C10.0. 2. CONTRACTOR SHALL VERIFY DEPTH AND LOCATION OF ALL UTILITIES \\ \ SHED \ '-___-` ` \ \ \ \ \ \ I co PRIOR TO EXCAVATION. ANY DAMAGE TO UTILITIES WILL BE REPAIRED TO S89 2354"E 172.53' ORIGINAL CONDITION AT NO COST TO THE OWNER. 3. CONTRACTOR SHALL MAINTAIN A MINIMUM OF 5.00% SLOPE ON ANY AREA 2724--- THAT IS TO CAP WASTE MATERIAL TO ENSURE PROPER DRAINAGE AND `\ ALLOW FOR FUTURE SETTLEMENT. .\ `\\ `� \\ \ `\ `\\ `\\ `\\\\\ ' \ `\ \\\\ _ _ / , \ \ \ -,2�0 - `�; ; _ _ - _- _ _ ------ 4. CONTRACTOR SHALL MAINTAIN A MINIMUM OF 0.30% SLOPE > \ \\ \ \ SDI D \\ \�� �- \\� �\ I GATE \ \\ s-113,3�'`\ \ \,\ - --- ----_ ------ 2 z p /�, \ \ �1� ,2�2 LONGITUDINALLY IN ALL DIVERSION SWALE. \\�'�;��;\ \ I G�k \ \�'--�_ -\ \ \ \, - 5. FINAL GRADES MAY VARY BASED ON ACTUAL WASTE VOLUME EXCAVATED. Q� c 3L\PI \ \ \ �\ .` . '27 - \ \ \ \ _-- ai \ \ \ \ ` / RIPRAP INLET �o_ - \ \\� \ I ENGINEER WILL GIVE ADDITIONAL INSTRUCTION AS NECESSARY. - > m PROTECTION -_ \ \ , - v o ' 0 ` \ `_ \ \ \ ` \ \ . \ \ \\ \I \ \ \ \ \ Q) o _ 3CL \ 26 \ \ INV.: 2696.0 \ \ o�, �o \ \ \ \ _ t • E at \ \ SLOPE DRAIN AND \ \ ,2 o \ \ \ 1 \ \ \ I , \ \ \ \ \ �O \ 24 RCP PIPE _ z • ` DIVERSION I ` \ 2> _ o 'NORTHERN SWALE TO BE \ i � _\ \� `� �'� - `,` �\\��;-;�-, SMH \\ \ \ /s'-_ -�. `\ \�� " LINED WITH NAG SC250 O � 4 MANHOLE, \ I 02 �� '- -EROSION CONTROL MATTING \ \ \ \ \ \ 1 1 1 \ \ \ \ \ \ \ \ , \ \ , -2 \ \ \ \ \ \ \ - \ \ N, \ \ ` \ TOP:2695.0 \ I I 1 w COLLAPSED I _- \ \ \ \ t \ I I --_ I SMH w CONC.�ICr" _, - `\ INV.IN:2685.0 `\ \ \\ I \ �o�"� �,,` ,`, �� ,__-__--_ _ � CONC. LID \\ '�, I�� \ \ �.,��,� W = 16' \ \ \ \ 4. 24 RCP PIPE \ I I 2 - -_ ? �2 \\ \ ___-TOP y��•�+0 // o \ \ _ FI LLED > \ I INV.OUT:2679.0 \ II I I W _ - _ \ \ \2, �// „ g \ 68'rVC 'SMH w/CONC. LID \\ \ 6,\ \\ \� \\ \ \ \\ \ \ \ \\ I o - \ \\ \, \, \ ,, ,, ,, -_, _�_`__ OUT=2701.00 8 TERRACOTTA a � APPROX. \\ 1 \ I II - \ 2> \ \ \ \ o -� 08 \ __-- __- TOP=2705.70 W \ \ DIR OF 8 CPP \ ` \ \ ` ` ` 1 \ I `� \ \ \ _ / END NOT FCN iNin `\ \ \ \ \ ��, \ \ I I \ ,p `\ `\ \ \ _ 108.E s ` `\ \ �\ \ / / ' I \ \\ ��, `\ III / \ ?�\\ _ --- - 2 _ - OUT=2701.37 M \ \ \ _ „ \ 1 \ \ \ I \\ \ '3Q FCIEfE913 -------- PERFORATED ___---- ROCK DRAIN WITH \ , \ 01 *^ l bq \ \ 8 HDPE. \ \ \ \ \ r III \� \ `\\ 2�0 \ \ ----- \\\ M \ \ S-E_E ROCK FILTER DETAIL\\ I \♦ \ I I\1 --2699-------, ,3L \ \\ ----- \M 8"CPP ON C10.0 'O 27104.00 ` RIP RAP BARRIER \\ 1 / I I 1 II \ \ \ \ `\ I I �► I I / 2696.0 TOP ELEVATION = 2675.20 s�� -.1 \ \ \ \ I I I I 9s - `-'!% 24"PECAN `\\- N �\\�-------- ------ TOP: 4' MANHOLE \\ �\ ; r \ 116. 98 _ -- - ,----- \ TOP: 2673.0 \ \ \ \ I \ \ / / r 2703 \ \ 270 \ \-- .. \ \ 8 s 701 INV.IN:2669.0 `\ 1 I I I sI ss 8" _-- -- INV.OUT: 2668.1 \ I \ I I r I I r g------------- 01 2704 �..� 2703 24" RCP PIPE: \I I \ \ \ I I / \ �� \ \ \ \\ \ \ I 2701 24 RCP FES \ \ I 1 `\ \ I 1 I I 5 3 I i I°D= I , \ _ _ \\ ` _ 7.65 2700 , INV.OUT: 2668.0 \ \ ` I I lip I ADJUST RIM ELEVATION �� - _--- \ 2698 I I \ �� 3 R T 27 I , I I s \ \ \ HC WILSON PROP 1 0 -----_,,,--�;� _,-- I / / \ \ �� I __ TO 2697.60 6' - \ \ \ _ ---- - / I 26 50 INV.:2698.5 ` ^\ CpNDITION MAP CABINET B PG. 3 N - 12 THICK CLASS B I \ \ FIN O D [or CABB, PG. 41 ( 3 ] 15 THICK CLASS B RIP RAP ��� I I I \ � � � I �\ ,�\ ISH RA PROTECT FILL SLOPE WITH / \ 269\6\90 T / RIPRAP PADg_____ 1 1 I I I \ I 1-� \\ 1 N GRADE 3.OD% Less and excepting r r o --- r10 1 r / i / ` �3 GEOCELL. SEE DETAIL / �69XIMUM ` ( p 9 p p y r 20 LENGTH FROM 24 r 111 / I r `, I \ o rn r / \ I I \ \ MA ,� \ conveyed by D.B. 165, P 1 1 N \ / --\ / \ P.I.N.: 8666-28-24 / --- rrll � i I I I ( ` \I I ` \ u i I ° ON C10.0 / / \ I \ I \\ I \ PIPE ENDS 1 / I I I I _ �\ 1 I I \ i N \ \ I I I / r "6, \ / 2699.519 --26,� 22 WIDE AT BOTTOM Irii t \ ��.�'/;__ \\`\\\ I I I I 1 I \ I I I II = I \ / III ROCK DRAIN 8\ 1 I �' `\ \\ I\ I I 1 o Ik SOLID HDPE'- Al. \ I I I r I I \ \ \\ \6 \ 0 11 1 CAR O A 'I 0 V uuuuuN� v > a 0 CD N le ate+ n •� O N M N V U R c �OZLL 3 V 6 CDJ V O 32� E M LL W Z W l rn ON ROCK DRAIN_------- 24 RCP FES s-__ s7-'OUTLET = 2267.72 ___ INV.OUT:2668.0 ' / \ \ \ `J 4I \ / �6 24" RCP PIPE ;/ 1 / \ \ \ \ \ `\ \ 1 1 \\ / i \ / i I\ I ` o \ -------____� ----- 4' MANHOLE I \ --------\ --__ TOP: 2673.5 �_- \� r 1 r �' ---- ,l 6 / / r \ \\ \\\ --- INV.IN: 2669.0 --_ ; / \ / - \ ) ,' ��\\ �'' �\ 2s9 � INV.OUT:2668.1_- '--�\L __ I / ` / r I\ ` ' - __ \ \\\\ \ \I\\ /' PROTECT FILL SLOPE WITH \ o RIP RAP BARRIER - \ � SOUTHERN SWALE TO BE N I \ \ \ __ \ ` ' 3 GEOCELL. SEE DETAIL / LINED WITH NAG SC150 TOP ELEVATION = 2675.20 �� I I / - - \ 24"OAK -\ L4 C MP. -- ROCK DR N WITH - ( , ` `\` 'i III I o,� `769 ON C10.0- ,'-, \ / "� / / EROSION CONTROL MATTING o J `\\ 3HANNEL INV=2666.98 PERFORATED 8" HDPE. , ' ; \ _=_ -_ -' \ ! \\\\\ i �� \\ / /� :�\ / \ / W = 16' PIPE INV=2666.37 SEE ROC FILTER , / / _ _ / / Q ---- DETAIL C10.0 / - �\ \ I. ,'/ ' \\ / \\ \\ N SWALE CENTERLINE _ \ _ r \ _ \ ENSURE LONGITUDINAL N/F\ '--___ 24"CMP,� I / , II i = / i �� \ I / / / \ ` \\ SLOPE IS = 0.30% G ISNEO C \ I \ \ 1 \ Q NE�LIE SEECE�= INV=2668.08 �,� / / r I r `\� r 1 \l�l \\ I \\✓ / \\ \ `\ RADE r'OND/T/0i\� \\ r\ \ r ---- D.B. 1`29, PG. 144\\ \ 3 �� \ I r / 1 --\ ,�I �� , I \\ `\ MAXIMUM DRAIN \ l `\ \ \ \ O 'ESTATE FILE 2DO-5E,, PG. 485 - \ �/ \ / / r ,/ r \. -'^\\\ 69� / I I 3.Op \ r I \ P I�-9.i 8666-18--6-455•_\\ I % / , / / /� �/ / \ %�.2 ,-\ % /, / - PROTECT FILL SLOPE WITH 3" GEOCELL. SEE DETAIL / \ / ON C10.0 ,A z 36"MAPLE \�'2 % / UNDERGROUND ROCK CHANN / \ SEE DETAIL ON C10 24 RCP PIPE / ,,' /-6 %- // /,'' /,'"HEMLO¢ BS _ �' 14 _ \ i �r z rn Cj 4 ENCASE PROPOSED SANITARY ' / 1 \ 24"H MLOCKkX \\ \\2690 3 \\\ _,�,% �,i_,, /� SEWER IN CONCRETE ALONG EXCAVATED AREA FOR 20 L.F. 1 \ 'ti, kk�\Xk\ / l z U SLOPE DRAIN AND ' ' // / / / r \ 32 LOCK / X / _ z Z \ / , / , / / (SANITARY CROWN AT ' \ `\ DIVERSION \ r / / / �1 Jam/ y CROSSING 2694.25') I /1 I \ i / 0"HEM 0 0 (CHANNEL DEPTH a 2695.50') 77 \ ` \ ,, / INV.: \ / / 00 2698 \ LIMI \ \\ \\ \ �; // / / y TS OF DISTURBANCE � \ �4 PE "PO \\\\\ \\ / 0"0- i 1 \ ` \ \ / I - / SOUTHERN SWALE TO BE \\\ \\ '\\\ \� \\\ \\` I %- I � 1 ( l 2 9 / LINED NI TH CONTROL CMATTING \ \ 4 MANHOLE / _ 2697 / \ \\\ TOP: 2697.0 _ ----- ----- 20.0 2696 , W = 16 1 I \ INV.IN:2685.0 WV icy / I ^/ BASKETBALL \ \2,o INV.OUT:2684.9 �/ GOAL \ ,' �� � 1 / w/GONG. BASE M ' , - - 6.57 ACRES± / o 0) / \ �o`/ / IST NG SMH (TO EMA ) `� II)CLUSIVE OF UNDERLAP RIM= 69 24 1 " RCP PIPE M " VC / AREA / INV. IN = 2695.50' / EXCLUSIVE OF OVERLAP \\ \ \ I \ I 1 ram, I I I \ 24 RCP PIPE OUT=26 AREAS AND 15.9 RW EL310' OF TEMPORARY 6' / TALL CHAIN LINK FENCING WITH "NO -- ` ENTRY" SIGN EVERY 50' GRAPHIC SCALE RIPRAP INLET PROTECTION _ ___ ____--- / IN FEET) I �/'/ i'i j� �=------------ ---___ -- ---___�-�_,�' / l REPLACE EXISTING MANHOLE TO ,',','/ _,- _______ ------ - ----- ---- SHELTER 1 inch= 2ott. MATCH EXISTING DIMENSIONS. ',','�'����'---'-_----_---- N/F ------ WILLIAM McDOWELL _ /r SERVICE FROM BUILDING TO BE, ' /' ' ' /��--------- --- _- '/ ' ','/' -'------- ---- - _ D.B. 859, PG. 1199 REINSTALLED TO MANHOLE �� / ����, , /�/;,,'' - ___27--__ P.I.N.: 8666-28-0297 -��'''2; _2713 __- - 12 (also known as Reynolds School Property) 4\ Q W a C� U REVISIONS 11.10.20 ADD 1 DESIGNED BY: CGD DRAWN BY: JAJ CHECKED BY: WCK SCALE: 1"=20' DATE: 10.7.20 PROJECT NUMBER: 18110122-05 MI / - \ \ ���� C A ', \ Nr rrr N, NOTES \\ SHED\ S892354 E 172.53 \\ — — — — — — — O, e° 0�°q` /--___ 1. CONTRACTOR SHALL REPLACE EXISTING SANITARY SEWER WITH AN 8 PVC ___'- \ 2>os, I/ \ `\ \ `,;\2j \ `; - I \` \ \\--_------- _ _ - 2724--- LINE. MATCH EXISTING INVERTS. �SA V \ \ \� \\ \\ \\�.\_� -/ \ �\ \ \ 7 — — \ , --___; \�; jam_ , 2. CONTRACTOR SHALL FURNISH ALL UTILITIES IN ACCORDANCE WITH THE \\ \ \ \\ \ \ __-` -_ \ _ -, -------------- SPECIFICATIONS. 0 --�c SHZD o \ \; ,\`; \ /`, \ --_ - � 1� 2722- 3. CONTRACTOR SHALL TAKE EXTRA CARE WHEN EXCAVATING AROUND "=, v�rr,``!e \ GAT _ _ _� --\ \ UTILITIES. ANY DAMAGE TO EXISTING STRUCTURES SHALL BE REPAIRED TO - \\ \\ \ \ ,_`,,`\ \\` / _,,/o__ \ `\ \ I _ --- A LIKE NEW CONDITION AT NO ADDITIONAL COST TO THE OWNER. M \ 4. CONTRACTOR SHALL EXCAVATE AREA AROUND PROPOSED UTILITIES AS V ` \ \ \ `\ _ o o SHOWN ON SHEET C10.0 AND BACKFILL WITH CLEAN STRUCTURAL a Q4\\-------- \\\ \\ \ \ \ \I ,2 _ BACKFILL. IF NO CLEAN SOILS ARE REACHED AT A DEPTH OF THREE r� �_ \ \ \ \ _ _ \ \ 2> _ FEET (3) UNDERNEATH THE BOTTOM OF PIPE CONTRACTOR SHALL \\ \x \\ `\I \\ \\ i / \\ \\ \ \\ \\ I I I \ �'/ `�\\�`\SMH \ 76` \` \� z t� \ \ \ \ \ FURNISH ORANGE COLORED IDENTIFICATION GEOTEXTILE AND BACKFILL IN o L w/COLLAPSED --- ACCORDANCE WITH THE SPECIFICATIONS. m \ \\ \\ \ \ \ ( `� \ \ 11 I I �� -__--_ ` \\I 1 \ SMH w CONC._EI N C a) L 0 \ \ r I \ \ \ 1 1 I ' \ \ _ CONC. LID \ / as •? \ \�\ \� ---_-TOP- 40 • r"� CL 'at \FILLED \ �2 \--- m m c r_ LL \ \ 6. \ \ \ \ ` IN,`--\ \ e5 — -- ? \� OUT=2701.00 \ \ 1 0 \ IN=2701.45 DIR OF 8"CPP o \ \ \ -- - _--- - \ \ \ \ END NOT FOUND \ \ 1 1 1 ,p z \ \ \ - -- 2IOB' ,-'_ SS Q \ \ 1 0 OUT 2701 37 a muft M / `\ I 1 \� f J \\ \\ \\ \\ Sr.\ \ ��\\ ,IE}49F3 - _� / /--______-- \ O > N ,' 1 I I I I \ I ' 269------_\ \ /� _ `\ 2\ \�\\ `-- ---- �L ,' Sg I a N \ \ M 8 CPP `� \'� \ \\ \ \\\ \ \ ' \ `\ I I ' 7p6'' I - - - - - - _-- - ' I W tin O \ \\ M110, EXCAVATE AREA TO CLEAN \ \ 1 1 \ I \ III 1 \ 1 / `\ \ — — \ \ , I E Y L \ I \ 1 1 \ I 11 \ - EXCAVATE AREA TO CLEAN -------_____/ \ \ \ \ SOILS IN ACCORDANCE WITH \ 1 1 1 1 \ \ I I I I 1 \ , s5 \ I SOILS IN ACCORDANCE WITH ------ DETAIL _ ON C10.0 DETAIL ON C10.0 --- — — `� 24"PECAN- .. �. \ \ \ 11 \ \ ``` 26 g- \ /'� '/ �� _`- -,`\� � - - --- - -----� � °�' ------- ----- ------ \ ` ` ' I I j / \ 16. 2' \ /' 9 ,� r` -ss - __2703 27 -- --\ \\\\\\\\\ `\ `-- — \ \ \I \I I 18' s ss / 8» s 8„ SS 8„ s \\ _' 2701 �\ \� \ --- N n _ / o » 2698 I 2CD 700 `��_ \------------- , • c N 43 OAK --- tt _ �ri v \\\\ \`-_',- - - _,�. \ -� \ I \ y - \ / _ 1 2703 2704 Z "� LL I --- \ \ I \ \ 1 \ \ \ I I I 2 1 \ 8 1 - — _ \\ I \ �— \ `--- ` -- �'--2667- \\\\\\ I\ \ \ \ \ 1 1 \ N 1 I I 8 P I \ \ \ 8"PVC \ 2701 N V ! \ ` �7r7 \ 7.65 2700 c z ,T 1 \\ \ 53 6 I r I - 11 ADJUST RIM ELEVATION \ 2 CONTRACTOR TO REROUTE WATER _ _ - \\ \ _ _ 1 b4 3 I s _ \ 2698 0 3 R C T / 88.27 I 1 TO 2697.60 9 LINE AROUND PROPOSED CULVERT - \ \ ` HC WILSON PROP o ` 0 - 7 6 2687.50 I I �'\ \ \ \ \ W M LL I I 1 MATCH EXISTING INVER , AS NECESSARY 1 \ \ ` MAP CABINET B, PG.ly 3 N 1 I \ ` 1 / I I I \ N\ `\ \ ,� \\ \\ [or CABB, PG. 41 ( 3 ] W z \ \ \ \ 1 / — ` (Less and excepting pr p r y o \ �� ` 1 \ � `\ \ \ J \\ \\ r \ \ , v rn conveyed by D.B. 165, P \ \ 1 \ \ \ I \ \ ` P.I.N.: 8666-28-24 8 / \ ` 1 \ I \ I \ \ 1 \ ( \ /;-'-�```\\1\ I I 1 I I rn I \\ 1 1 1 / I 6L9 \ / ` 1 I / \�/ \ \ _ \\ 2> \\ /01 // ---- / 010 ------- _\ -_`-_-__-- \�\� \� / /( I I I I / I / 1 \ \ \ XX ` \ \\ \� / l l \ ,/ �\`- , / \I N \ I / / I �\ \ I \^ I \ \ I / \ \ / / / / \ / I N ----\`. \ - / 1 1 00 / 000 UTILITY EASEMENT ` A 1 / r I \ J _ / \ C\j� \ � \ \ / \ PARTIALLY FILLED \\ \ /l \ \ - \ _ 1 i \ / /-- 4"OAK -� 24"CMP------`\ \ \\ \� �� ( / / \��\V 11 °' `�69 1 r'-,�' ram' \ / r r� // r \\ /� Q~ l 1 LL \ \ CHANNEL INV=2666.98 I Q ` PIPE INV=2666.37 \ I \ '� / / - — _ �' / / _ , \ \\ \ N%F 24"CMP \ NE. LIE SEELEY -_- INV=2668.08 / / / , / / / o, 1 I \ I / I \� ALIGNMENT XX \ `\/ / \ \ ` \ I /�\ AL G E� XX D.B. 1-29, PG. 144 \ , \ / / / / 1 / I - -' ---- - ESTATE FILE 20,0-5., PG. 485 \ � /3 /' / / , / / r / / / /' ' / / \- -'-�` 9� P:I�N..i 8666-18--6455-__ \\ / 6 EXCAVATE AREA TO CLEAN v BELOW\ O '` \ SOILS OR THREE (3) \',_ \\ 3 / i / I i `• LINE IN ACCORDANCE WITH '� / ' / / \ 1 I 1 \\ `_,_- 262LF 8 SDR 35 DETAIL ON C10.0 // /' ' / 0000 36 MAPLE - \ \ \ - / / / / / r PVC SANITARY _-- 110, \ - / / / �, SEWER MAIN -- // 2666. \ \ I \I j / / / / , / , - - 10 \`\ Z O / // \\\\```-- _269�/// // /// /// / �t'I / „H EM LO1f\ / 1 I / 24 C \ 24"H MCo V J 000, k / l �� � \\ 32 � LOCKS �i / /' l ,I M \ I / O HEM Q \ \ \2694 \ \\ I J �i i / ENCASE PROPOSED SANITARY ' O `\\ \\ \ \\ \ \_ SEWER IN CONCRETE ALONG 3 I �/ EXCAVATED AREA FOR 20 L.F. z (SANITARY INV. AT CROSSING _ _ ,' , /� / �/ / ` z 2693.50') - - ' �/� o / / / / �1 \ w 269 \ \\ \ / / (CHANNEL DEPTH 2695.50) - / / 2� // / J 8 `\ ' ' �/ l I Z ' �„POPE \ \ I � / Q 2698 ,/ / LIMITS OF ,/ \\ REVISIONS --- --- _ 0.0 2696 2697 // '/ DISTURBANCE % / i 11.10.20 ADD 1 WV ` /I � I i I BASKETBALL \\\ �j00 `\ \\ \\\ \\ \\ N �' /l �— / / I I N / GOAL I /� , w/CONC. I / BASE M ' / 6. 57 ACRESf ST NG SMH (TO EMAIN) / — — � i RIM- 699.18 II�CLUSII/E OF UNDERLAP I N I /` / M „ 1- / AREA VC z ' / EXCLUSIVE VE OF OVERLAP OUT=26 LiAREAS AND / / / I FROM HOL TZCLA W RD. / l I DESIGNED BY: GRAPHIC SCALE -__- --------------- -- / CGD 20 0 10 20 ao / ,//�---_ /--_ --- _ - -- --____ �/ r DRAWN BY: JAJ (IN FEET) /'/ /////'i /'/ __---------- - — CHECKED BY: 1 inch = 20ft. I '---'------------------------ ' ---- `-__ ___-- WCK - _ - _ - SHELTER ' — WILLIAM McDOWELL SCALE: -'' ----__------------- D.B. 859, PG. 1199 - DATE: -------- P.I.N.: 8666-28-0297 ` -27 10.7.20 (also known -as Reynolds School Property) ` __\ �\ 04\\;;``` PROJECT NUMBER: 18110122-05 2715 2710 2705 2700 2695 2690 2685 2675 2670 2665 2660 I I •25 FINISHED GRADE EXISTING GRADE \ — — UTILITY TRENCH TO BE BACKFIL WITH CLEAN STRUCTURAL FILL SOILS PER SHEET C10.0 CAP WASTE PER DETAIL ON SHEETI C10.0 COVER FILL SLOPES IN ACCORDANCE I WASTE CONSOLIDATION AREA WITH DETAILS ON C10.0 EXCAVATE ALL WASTE TO 5' WITHIN PROPERTY LINE AND REPLACE WITH CLEAN BACKFILL PROPOSED GRADE --'STRUCTURAL EXCAVATE ALL WASTE TO 5 WITHIN PROPERTY LINE AND REPLACE WITH CLEAN STRUCTURAL BACKFILL 12'f 1 PROPERTY LINE EXCAVATE ALL WASTE TO AND WITHIN REPLACEWITHWITHYCLEAN STRUCTURAL BACKFILL 12" #57 STONE ON FACE OF RIP RAP 24" CLASS B RIP RAP _ ELEVATION = 2675.20 SWALE TO BE LINED WITH W/ NAG S150 OR zzzz APPROVED EQUAL I 5.0 APPROXIMATE EXISTING 8" I SANITARY SEWER REPLACE WITH 8" PVC I ESTIMATED WASTE LINE DRAWN FROM SOIL BORINGS (ACTUAL DEPTH MAY VARY) I SEE NOTE 7 I I ESTIMATED WASTE LINE DRAWN FROM SOIL BORINGS 5 0 (ACTUAL DEPTH MAY VARY) EXCAVATE ALL WASTE TO 5' WITHIN PROPERTY LINE AND REPLACE WITH CLEAN STRUCTURAL BACKFILL 2' X 2' ROCK DRAIN SEE DETAIL ON C10.0 SEE DETAIL FOR ON I I i PROPERTY LINE I I ROCK DRAIN SHEET C10.0 50.00 LF 8" HDPE ® 3.00%— I I 30.00 LF _ 42.50 LF 811 HDPE �" HDPE 3.00% ® 3.00% _ I I 8" HDPE OUTLET INV = 2667.72 � 0+00 0+50 ALIGNMENT XX PROFILE (1) 2715 2710 2705 2700 2695 2685 2680 2675 1 +00 1+50 Scale: H : 1 99 2+00 30', V: 5.00:1 2+50 3+00 3+50 4+00 4+50 DETAIL ON SHEET CAP WASTE PER SWALE TO BE LINED WITH W/ NAG S150 OR APPROVED EQUAL FINISHED GRADE C10.0 ,LOPE --SLOP_ WASTE CONSOLIDATION AREA EXISTING GRADE SWALE TO BE LINED WITH W/ NAG P550 OR APPROVED EQUAL NOTE 7 SEE ESTIMATED WASTE LINE DRAWN FROM SOIL BORINGS (ACTUAL DEPTH MAY VARY) SEE NOTE 7 0+00 0+50 ALIGNMENT YY PROFILE (1) 1 +00 1+50 Scale: H: 1 "=30', 2+00 V: 5.00: 1 2+50 3+00 2715 2710 2705 2700 2695 2690 2685 2680 2675 3+50 5+00 5+50 2715 2710 CA O s��� #tS, A G 0 ( • /////111111111`` 2 > � U o ct M N 20 • r� E 7m U =u-z> 2705 � o W 2700 • ESTIMATED WASTE MASS ^o 2695 WASTE MASS TO BE EXCAVATED AND REPLACED WITH STRUCTURAL FILL • 2690 2685 2680 2675 2670 2665 2660 5+75 NOTES 1. CONTRACTOR SHALL VERIFY DEPTH AND LOCATION OF ALL UTILITIES PRIOR TO EXCAVATION. ANY DAMAGE TO UTILITIES WILL BE REPAIRED TO ORIGINAL CONDITION AT NO COST TO THE OWNER. 2. CONTRACTOR SHALL MAINTAIN A MINIMUM OF 5.00% SLOPE ON ANY AREA THAT IS TO CAP WASTE MATERIAL TO ENSURE PROPER DRAINAGE AND ALLOW FOR FUTURE SETTLEMENT. 3. ALL FILL SLOPES ARE 3:1 H: V UNLESS OTHERWISE NOTED. 4. CONTRACTOR SHALL MAINTAIN A MINIMUM OF 0.30% SLOPE LONGITUDINALLY IN ALL DRAINAGE SWALES. 5. FINAL GRADES MAY VARY BASED ON ACTUAL WASTE VOLUME EXCAVATED. ENGINEER WILL GIVE ADDITIONAL INSTRUCTION AS NECESSARY. 6. DIVERSION SWALES SHALL BE PROTECTED AGAINST EROSION AT ALL TIMES AND BE LINED WITH SPECIFIED EROSION CONTROL PRODUCTS IMMEDIATELY AFTER FINAL GRADES ARE ESTABLISHED. SEE C6.0 FOR LOCATION AND TYPES OF EROSION CONTROL PRODUCTS. 7. WHERE WASTE IS DISCOVERED BELOW ANY PORTION OF THE PERIMETER SWALES, WASTE SHALL BE REMOVED TO NATURAL MATERIAL AND BACKFILLED WITH STRUCTURAL FILL, PER PROJECT SPECIFICATIONS. p CD N le w ^ O N 7 ai�a^o LL Oral 0 N V � o' z LL 3 0 cn p J V O 2�3 M LL Co Z 15 In W 0 Z 0 0 rr J 0 0 1 U U) V ) 0 J z 0 0 7 Z U 0 w w z C%) v REVISIONS 11.10.20 ADDII DESIGNED BY: CGD DRAWN BY: JAJ CHECKED BY: WCK SCALE: 1"=30' DATE: 10.7.20 PROJECT NUMBER: 18110122-05 A PERSPECTIVE VIEW PVC ELBOW PVC END CAP WATER SURFACE PVC END CAP PVC PIPE PVC PIPE 1/2" HOLES IN PVC TEE UNDERSIDE FLEXIBLE PVC PIPE HOSE BAFFLE (TYPICAL) TOP OF BERM SPILLWAY FLOATING 5' SPILLWAY 2 DEPTH DEPTH SKIMMER WIDTH 2 13 SECTION A -A SECTION B-B SPECIFICATIONS 1. CLEAR, GRUB, AND STRIP THE AREA UNDER THE EMBANKMENT OF ALL VEGETATION AND ROOT MAT. REMOVE ALL SURFACE SOIL CONTAINING HIGH AMOUNTS OF ORGANIC MATTER, AND STOCKPILE OR DISPOSE OF IT PROPERLY. HAUL ALL OBJECTIONABLE MATERIAL TO THE DESIGNATED DISPOSAL AREA. 2. ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS, WOODY VEGETATION, ORGANIC MATTER, AND OTHER OBJECTIONABLE MATERIAL. PLACE THE FILL IN LIFTS NOT TO EXCEED 9 INCHES, AND MACHINE COMPACT IT. OVER FILL THE EMBANKMENT 6 INCHES TO ALLOW FOR SETTLEMENT. 3. SHAPE THE BASIN TO THE SPECIFIED DIMENSIONS. PREVENT THE SKIMMING DEVICE FROM SETTLING INTO THE MUD BY EXCAVATING A SHALLOW PIT UNDER THE SKIMMER OR PROVIDING A LOW SUPPORT UDER THE SKIMMER OF STONE OR TIMBER. 4. PLACE THE BARREL (TYPICALLY 4-INCH SCHEDULE 40 PVC PIPE) ON A FIRM, SMOOTH FOUNDATION OF IMPERVIOUS SOIL. DO NOT USE PERVIOUS MATERIAL SUCH AS SAND, GRAVEL, OR CRUSHED STONE AS BACKFILL AROUND THE PIPE. PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4-INCH LAYERS AND COMPACT IT UNDER AND AROUND THE PIPE TO AT LEAST THE SAME DENSITY AS THE ADJACENT EMBANKMENT. CARE MUST BE TAKEN NOT TO RAISE THE PIPE FROM THE FIRM CONTACT WITH ITS FOUNDATION WHEN COMPACTING UNDER THE PIPE HAUNCHES. PLACE A MINIMUM DEPTH OF 2 FEET OF COMPACTED BACKFILL OVER THE PIPE SPILLWAY BEFORE CROSSING IT WITH CONSTRUCTION EQUIPMENT. IN NO CASE SHOULD THE PIPE CONDUIT BE INSTALLED BY CUTTING A TRENCH THROUGH THE DAM AFTER THE EMBANKMENT IS COMPLETE. 5. ASSEMBLE THE SKIMMER FOLLOWING THE MANUFACTURER'S INSTRUCTIONS, OR AS DESIGNED. 6. LAY THE ASSEMBLED SKIMMER ON THE BOTTOM OF THE BASIN WITH THE FLEXIBLE JOINT AT THE INLET OF THE BARREL PIPE. ATTACH THE FLEXIBLE JOINT TO THE BARREL PIPE AND POSITION THE SKIMMER OVER THE EXCAVATED PIT OR SUPPORT. BE SURE TO ATTACH A ROPE TO THE SKIMMER AND ANCHOR IT TO THE SIDE OF THE BASIN. THIS WILL BE USED TO PULL THE SKIMMER TO THE SIDE FOR MAINTENANCE. 7. EARTHEN SPILLWAYS - INSTALL THE SPILLWAY IN UNDISTURBED SOIL TO THE GREATEST EXTENT POSSIBLE. THE ACHIEVEMENT OF PLANNED ELEVATIONS, GRADE, DESIGN WIDTH, AND ENTRANCE AND EXIT CHANNEL SLOPES ARE CRITICAL TO THE SUCCESSFUL OPERATION OF THE SPILLWAY. THE SPILLWAY SHOULD BE LINED WITH LAMINATED PLASTIC OR IMPERMEABLE GEOTEXTILE FABRIC. THE FABRIC MUST BE WIDE AND LONG ENOUGH TO COVER THE BOTTOM AND SIDES AND EXTEND ONTO THE TOP OF THE DAM FOR ANCHORING IN A TRENCH. THE EDGES MAY BE SECURED WITH 8-INCH STAPLES OR PINS. THE FABRIC MUST BE LONG ENOUGH TO EXTEND DOWN THE SLOPE AND EXIT ONTO STABLE GROUND. THE WIDTH OF THE FABRIC MUST BE ONE PIECE, NOT JOINED OR SPLICED; OTHERWISE WATER CAN GET UNDER THE FABRIC. IF THE LENGTH OF THE FABRIC IS INSUFFICIENT FOR THE ENTIRE LENGTH OF THE SPILLWAY, MULTIPLE SECTIONS, SPANNING THE COMPLETE WIDTH MAY BE USED. THE UPPER SECTIONS) SHOULD OVERLAP THE LOWER SECTIONS) SO THAT WATER CANNOT FLOW UNDER THE FABRIC. SECURE THE UPPER EDGE AND SIDES OF THE FABRIC IN A TRENCH WITH STAPLES OR PINS. 8. INLETS - DISCHARGE WATER INTO THE BASIN IN A MANNER TO PREVENT EROSION. USE TEMPORARY SLOPE DRAINS OR DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT -LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE BASIN TRAP EFFICIENCY. 9. EROSION CONTROL - CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED. DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE EMBANKMENT BEFORE THE AREA IS CLEARED. STABILIZE THE EMERGENCY SPILLWAY, EMBANKMENT AND ALL OTHER AREAS ABOVE THE CREST OF THE SPILLWAY IMMEDIATELY AFTER CONSTRUCTION. MAINTENANCE INSPECT SKIMMER SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1h INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT, AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE HEIGHT OF THE FIRST BAFFLE. PULL THE SKIMMER TO ONE SIDE SO THAT THE SEDIMENT UNDERNEATH IT CAN BE EXCAVATED. EXCAVATE THE SEDIMENT FROM THE ENTIRE BASIN, NOT JUST AROUND THE SKIMMER OR THE FIRST CELL. MAKE SURE VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE SKIMMER. REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE -ANCHOR THE BAFFLES IF WATER IS FLOWING UNDERNEATH OR AROUND THEM. IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE BASIN, USUALLY JERKING ON THE ROPE WILL MAKE THE SKIMMER BOB UP AND DOWN AND DISLODGE THE DEBRIS AND RESTORE FLOW. IF THIS DOES NOT WORK, PULL THE SKIMMER OVER TO THE SIDE OF THE BASIN AND REMOVE THE DEBRIS. ALSO CHECK THE ORIFICE INSIDE THE SKIMMER TO SEE IF IT IS CLOGGED IF SO REMOVE THE DEBRIS. IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE REMOVED AND THE OBSTRUCTION CLEARED WITH A PLUMBER'S SNAKE OR BY FLUSHING WITH WATER. BE SURE TO REPLACE THE ORIFICE BEFORE REPOSITIONING THE SKIMMER. CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE SKIMMER AND POOL AREAS. FREEZING WEATHER CAN RESULT IN ICE FORMING IN THE BASIN. SOME SPECIAL PRECAUTIONS SHOULD BE TAKEN IN THE WINTER TO PREVENT THE SKIMMER FROM PLUGGING WITH ICE. S SKIMMER SEDIMENT BASIN DETAIL NOT TO SCALE END VIEW PVC VENT PIPE FRONT VIEW SKIMMER DETAIL NOT TO SCALE PVC TEE ORIFICE PLATE SEDIMENT BASIN DIMENSIONS NUMBER BOTTOM WIDTH (FT) BOTTOM LENGTH (FT) DEPTH (FT) MAXIMUM SEDIMENT DEPTH (FT) SPILLWAY DEPTH (FT) SPILLWAY WIDTH (FT) SKIMMER SIZE (IN) ORIFICE DIAMETER (IN) 1 12 52 2.5 1.5 1.0 1 10.0 1.5 1.0 2 12 36 2.5 1.5 1.0 1 5.0 1.5 0.85 iLEEVE FOR PUMP 11SCHARGE HOSE 2'-0" MINIMUM 10'-0" MINIMUM VARIES W/ GROUND SLOPE (2'-0" MIN.) 1:1 (TYPI � yA PLAN VIEW 14'-0" MINIMUM 2'-0" MIN. 2'-0" MIN. SEDIMENT FILTER BAG FILTER FABRIC J USE #57 STONE TO LEVEL BAG FROM NATURAL GROUND LINE SECTION A -A SEDIMENT FILTER BAG GENERAL NOTES: 1. CONTRACTOR SHALL EXERCISE CAUTION NOT TO BURST OR DAMAGE THE SEDIMENT FILTER BAG WHEN PUMPING. 2. THE LENGTH AND WIDTH OF THE TEMPORARY SEDIMENT BAG SHOWN ON THIS DRAWING MAY VARY PER VENDOR SPECIFICATIONS. THE MINIMUM "FOOTPRINT" OF THE BAG SHALL BE 10 x 15 FEET. 3. SEDIMENT FILTER BAGS SHALL BE EQUIPPED WITH A SEWN -IN SLEEVE OF SUFFICIENT SIZE TO ACCEPT A MINIMUM 4 INCH DIAMETER PUMP DISCHARGE HOSE. THE DISCHARGE HOSE SHOULD BE EXTENDED INTO THIS SLEEVE A MINIMUM OF 6 INCHES AND BE TIGHTLY SECURED WITH A HOSE CLAMP OR OTHER SUITABLE MEANS TO PREVENT LEAKAGE. HOSE CONNECTION THROUGH A SLIT IN THE BAG WILL NOT BE ACCEPTABLE. 4. THE PUMP DISCHARGE HOSE CONNECTION SLEEVE SHALL BE SECURELY TIED OFF DURING DISPOSAL OF THE SEDIMENT FILTER BAG IN ORDER TO PREVENT LEAKAGE OF COLLECTED SEDIMENTS. 5. SEDIMENT FILTER BAG SHALL BE MAINTAINED AND REPLACED WHEN ONE HALF FULL OF SEDIMENT OR IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. 0DS SEDIMENT FILTER BAG WITH GRAVEL PAD NOT TO SCALE MATERIALS 1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6461, WHICH IS SHOWN IN PART IN TABLE 6.62B. SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0 TO 1200 F. 2. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33 LB/LINEAR FT STEEL WITH A MINIMUM LENGTH OF 5 FEET. MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC. 3. FOR REINFORCEMENT OF STANDARD STRENGTH FILTER FABRIC, USE WIRE FENCE WITH A MINIMUM 14 GAUGE AND A MAXIMUM MESH SPACING OF 6 INCHES. CONSTRUCTION 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.) 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FEET APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24 INCHES. 6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER (FIGURE 6.62A). 8. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 9. BACKFILL THE TRENCH WITH COMPACTED SOIL PLACED OVER THE FILTER FABRIC. THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 10. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. G F SEDIMENT FENCE DETAIL NOT TO SCALE 01 1 st Cell 2nd Cell 25% of basin 25% of basin surface area surface area TLE Z( 35 o of 15% of basin surface area basin surface area SUPPORT ROPE TO WIRE TO PREVENT SAGGING PLAN VIEW CROSS SECTION SUPPORT POST 24" INTRO BOTTOM OR SIDE COIR MESH OR SIMILAR, STAPLED OR TRENCHED INTO BOTTOM OR SIDE FENCE AIy BURIED R STEEL POST 6"X6" TRENCH, BACKFILLED AND I 2' COMPACTED Li - SECTION VIEW AT OPENING STAKE TO SUPPORT WI SEDIMENT FENCE INSTALLATION USING THE SLICING METHOD INSTEAD OF EXCAVATING A TRENCH, PLACING FABRIC AND THEN BACKFILLING TRENCH, SEDIMENT FENCE MAY BE INSTALLED USING SPECIALLY DESIGNED EQUIPMENT THAT INSERTS THE FABRIC INTO A CUT SLICED IN THE GROUND WITH A DISC. INSTALLATION SPECIFICATIONS 1. THE BASE OF BOTH END POSTS SHOULD BE AT LEAST ONE FOOT HIGHER THAN THE MIDDLE OF THE FENCE. CHECK WITH A LEVEL IF NECESSARY. 2. INSTALL POSTS 4 FEET APART IN CRITICAL AREAS AND 6 FEET APART ON STANDARD APPLICATIONS. 3. INSTALL POSTS 2 FEET DEEP ON THE DOWNSTREAM SIDE OF THE SILT FENCE, AND AS CLOSE AS POSSIBLE TO THE FABRIC, ENABLING POSTS TO SUPPORT THE FABRIC FROM UPSTREAM WATER PRESSURE. 4. INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FABRIC. 5. ATTACH THE FABRIC TO EACH POST WITH THREE TIES, ALL SPACED WITHIN THE TOP 8 INCHES OF THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE AT LEAST 1 INCH VERTICALLY APART. ALSO, EACH TIE SHOULD BE POSITIONED TO HANG ON A POST NIPPLE WHEN TIGHTENED TO PREVENT SAGGING. 6. WRAP APPROXIMATELY 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES. 7. NO MORE THAN 24 INCHES OF A 36 INCH FABRIC IS ALLOWED ABOVE GROUND LEVEL. 8. THE INSTALLATION SHOULD BE CHECKED AND CORRECTED FOR ANY DEVIATIONS BEFORE COMPACTION. 9. COMPACTION IS VITALLY IMPORTANT FOR EFFECTIVE RESULTS. COMPACT THE SOIL IMMEDIATELY NEXT TO THE SILT FENCE FABRIC WITH THE FRONT WHEEL OF THE TRACTOR, SKID STEER, OR ROLLER EXERTING AT LEAST 60 POUNDS PER SQUARE INCH. COMPACT THE UPSTREAM SIDE FIRST, AND THEN EACH SIDE TWICE FOR A TOTAL OF 4 TRIPS. MAINTENANCE 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS ONCE THEY HAVE REACHED ONE-THIRD (1 /3) HEIGHT OF SILT FENCE TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. NOTES: 1. BAFFLE MATERIAL SHOULD BE SECURED AT THE BOTTOM AND SIDES USING STAPLES OR BY TRENCHING AS FOR SILT FENCE. 2. MOST OF THE SEDIMENT WILL ACCUMULATE IN THE 1ST BAY, WHICH SHOULD BE READILY ACCESSIBLE FOR MAINTENANCE. 3. PROVIDE 3 BAFFLES (USE TWO IF LESS THAN 20 FEET IN LENGTH). PROVIDE 5 BAFFLES FOR DRAINAGE AREAS GREATER THAN 10 ACRES. 4. BAFFLE SHALL BE 700 G/M2 COIR EROSION BLANKET. 5. TOPS OF BAFFLES SHOULD BE 2 INCHES LOWER THAN THE TOP OF THE BERMS 6. INSPECT BAFFLES FOR REPAIR ONCE A WEEK AND AFTER EACH RAINFALL CONSTRUCTION 1. GRADE THE BASIN SO THAT THE BOTTOM IS LEVEL FRONT TO BACK AND SIDE TO SIDE. 2. INSTALL POSTS ACROSS THE WIDTH OF THE BASIN. 3. STEEL POSTS SHOULD BE DRIVEN TO A DEPTH OF 24 INCHES, SPACED A MAXIMUM OF 4 FEET APART, AND INSTALLED UP THE SIDES OF THE BASIN AS WELL. THE TOP OF THE FABRIC SHOULD BE 6 INCHES HIGHER THAN THE CREST OF THE SPILLWAY. TOPS OF BAFFLES SHOULD BE 2 INCHES LOWER THAN THE TOP OF THE BERMS. 4. INSTALL AT LEAST THREE ROWS OF BAFFLES BETWEEN THE INLET AND OUTLET DISCHARGE POINT. BASINS LESS THAN 20 FEET IN LENGTH MAY USE 2 BAFFLES. 5. WHEN USING POSTS, ADD A SUPPORT WIRE OR ROPE ACROSS THE TOP OF THE MEASURE TO PREVENT SAGGING. 6. WRAP COIR BLANKET OVER THE TOP WIRE. ATTACH FABRIC TO A ROPE AND A SUPPORT STRUCTURE WITH ZIP TIES, WIRE OR STAPLES. 7. THE BOTTOM AND SIDES OF THE FABRIC SHOULD BE ANCHORED IN A TRENCH OR PINNED WITH 8-INCH EROSION CONTROL MATTING STAPLES. 8. DO NOT SPLICE THE FABRIC, BUT USE A CONTINUOUS PIECE ACROSS THE BASIN. MAINTENANCE 1. INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. BE SURE TO MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC OF A BAFFLE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS WHEN IT REACHES HALF FULL TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE BAFFLES. TAKE CARE TO AVOID DAMAGING THE BAFFLES DURING CLEANOUT. SEDIMENT DEPTH SHOULD NEVER EXCEED HALF THE DESIGNED STORAGE DEPTH. 4. AFTER CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL BAFFLE MATERIALS AND UNSTABLE SEDIMENT DEPOSITS, BRING THE AREA TO GRADE AND STABILIZE IT. Q aSS� 0 CD N le ate+ O N ai�a�o LL Oral Off# N 0 U R R c OZLL� COi co �0 3_j U o 3 E M LL W U_ 0 z _j O Ir J O O 1 CU V ) U) Cl)J 0 Q J O W z z O C) W z W v REVISIONS 11.10.20 ADD 1 DESIGNED BY: DRAWN BY: CHECKED BY: SCALE: NONE DATE: 10.7.20 PROJECT NUMBER: 18110122-05 BAFFLE DETAIL NOT TO SCALE Awl W - 2' MIN 2' z in COMPACTED EARTH BERM (WHERE REQURED) 10 NOTE: SLOPES TO BE STABILIZED WITHIN 7 DAYS. DITCHES TO BE LINED WITH EROSION CONTROL BLANKETS RATED FOR 5 FT/SEC VELOCITY - NORTH AMERICAN GREEN S75 OR EQUAL. CONSTRUCTION 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS OR OTHER OBJECTIONABLE MATERIAL. 2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. 3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT. 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT. 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. MAINTENANCE 1. INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. s CW TEMPORARY DIVERSION DITCH/BERM DETAIL NOT TO SCALE PUBL ROAC CONSTRUCTION 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN AREAS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. MAINTENANCE MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY PERIODIC TOPDRESSING WITH 2-3 INCH STONE. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED OR TRACKED ONTO PUBLIC ROADWAYS. TEMPORARY CONSTRUCTION ENTRANCE CE DETAIL NOT TO SCALE 4 MIN. 12" NCDOT #57 CLASS B RIP RAP WASHED STONE UPSTREAM SIDE 2: 2:1 24" MAX. AT CENTER 4 OZ NON -WOVEN FILTER FABRIC SECTION A - A L= THE DISTANCE SUCH THAT POINTS %'A AND B ARE OF EQUAL ELEVATION NOTES: (1) STONE SHOULD BE PLACED OVER THE CHANNEL BANKS TO KEEP WATER FROM CUTTING AROUND THE DAM. (2) STONE CHECK DAMS SHOULD BE SPACED IN A CHANNEL SO THAT THE CREST OF THE DOWNSTREAM DAM IS AT THE SAME ELEVATION OF THE TOE OF UPSTREAM DAM. SPECIFICATIONS 1. PLACE STRUCTURAL STONE (CLASS A) TO THE LINES AND DIMENSIONS SHOWN ON THE PLAN ON A FILTER FABRIC FOUNDATION. THE CREST WIDTH OF THE DAM SHOULD BE A MINIMUM OF 1.5 FEET. 2. KEEP THE CENTER STONE SECTION AT LEAST 6 INCHES BELOW THE END WHERE THE DAM ABUTS THE CHANNEL BANKS. 3. PLACE SEDIMENT CONTROL STONE (#57) ON THE UPSTREAM SIDE OF THE DAM THAT IS A MINIMUM OF 1 FOOT THICK. 4. EXCAVATE SEDIMENT STORAGE AREA TO THE DIMENSIONS SHOWN ON THE PLAN. MAINTENANCE INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1 /2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, AND TO PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. D TYPICAL ROCK CHECK DAM NOT TO SCALE 1. PRIOR TO BEGINNING WORK ON THE PROJECT THE CONTRACTOR SHALL OBTAIN FROM THE OWNER A COPY OF THE "EROSION AND SEDIMENT CONTROL APPROVAL" FROM THE NCDEQ, OR THE LOCAL AUTHORIZED PROGRAM. THE APPROVAL NOTICE MUST BE POSTED ON -SITE DURING ALL GRADING AND CONSTRUCTION ACTIVITIES. 2. INSTALL ALL EROSION CONTROL MEASURES AS REQUIRED BY THE NCDEQ, LAND QUALITY SECTION. ALL EROSION CONTROL MEASURES SHALL BE INSPECTED AT THE END AND BEGINNING OF EACH WORK DAY AND MAINTAINED AS REQUIRED. 3. OBTAIN CERTIFICATE OF COMPLIANCE THROUGH ON -SITE INSPECTION BY A REPRESENTATIVE OF THE NCDEQ. 4. PROCEED WITH GRADING CLEARING AND GRUBBING. NOTE: NO OFF SITE DISPOSAL OF MATERIAL IS ALLOWED UNLESS THE DISPOSAL SITE HAS AN APPROVED EROSION CONTROL PLAN. 5. SEED AND PLACE EROSION CONTROL MATTING ON SLOPES AS SHOWN ON THESE PLANS. 6. SEED AND MULCH DENUDED AREA WITHIN 7 DAYS AFTER FINISHED GRADES ESTABLISHED. SEED AND SOIL AMENDMENTS SHALL BE PLACED ON A PREPARED SEEDBED AT THE FOLLOWING RATES PER ACRES. STRAW MULCH SHALL BE TACKED WITH TACKING AGENT APPLIED BY HYDROSEEDER. LIME 4000 LBS FERTILIZER (10-10-10) 1000 LBS KY-31 FESCUE (POA PRATENSIS) 100 LBS (MOWED AND MAINTAINED AREAS ONLY) OR CREEPING RED FESCUE 100 LBS (NATURAL AREAS AND STREAMBANKS) STRAW MULCH 60-80 BALES FOR SUMMER SEEDING ADD TO THE ABOVE: GERMAN MILLET (SETARIA ITALICA) 40 LBS SMALL -STEMMED SUDAN GRASS 50 LBS (SORGHUM BICOLOR) FOR WINTER SEEDING ADD TO THE ABOVE: RYE GRAIN (SECASE CEREALE) 120 LBS IF HYDROSEEDING, WOOD CELLULOSE MAY BE USED IN ADDITION TO STRAW MULCH AT THE RATE OF 1,000 LBS PER ACRE. ALL SEEDING SHALL BE MAINTAINED, WATERED ETC.., UNTIL A PERMANENT VEGETATIVE GROUND COVER IS ESTABLISHED OVER ALL DISTURBED AREAS. FOR ALL SLOPES 2:1 OR STEEPER ADD TO THE ABOVE: PURE LIVE SEED SWITCH GRASS 4 LBS BROWNTOP MILLET (PENNISETUM GLAUCUM) 8 LBS GRAIN SORGHUM (SORGHUM BICOLOR) 2 LBS s s TEMPORARY AND PERMANENT SEEDING 1 /4" SQUARE MESH, 19 GA. STEEL HARDWARE CLOTH ON WOVEN WIRE FENCE FABRIC NCDOT #57--, STONE 2' SEDIMENT ��I PIT W.P., S. 1.25 LB/FT STEEL FENCE POSTS N SECTION EXTENT OF ARDCLOTH EXTEN[ • OF FENCE FABRIC FENCE I I If AB -------------- poL L L C L L L L C L L L ........................... .. .. .. .. .. .. .. .. .. .. .. .. .. .. 4• 4 � L • i-• L• i • L •.L • i • L • i • L • 4 • 4 � 4 • L. SEDIMENT PIT I1101111 �a10�1_11Its] aI SPECIFICATIONS 1. REFER TO THE APPROVED EROSION CONTROL PLAN FOR LOCATION OF THE OUTLET BEFORE COMPLETING INSTALLATION OF THE SILT FENCE. MAINTENANCE 1. INSPECT THE SEDIMENT FENCE OUTLET AFTER EACH SIGNIFICANT RAINFALL EVENT. REPAIR ANY EROSION AND PIPING HOLES IMMEDIATELY. 2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH; A STAKE SET AT THE CLEANOUT LEVEL IS HELPFUL. 3. CLEAN OR REPLACE STONE IF CLOGGED. REPLACE ANY STONE DISLODGED. 4. AFTER ALL SEDIMENT PRODUCING AREAS HAVE BEEN STABILIZED, INSPECTED, AND APPROVED, REMOVE THE STRUCTURE AND ALL UNSTABLE SEDIMENT. SMOOTH SITE TO BLEND WITH ADJOINING AREAS AND STABILIZE. SFO SEDIMENT FENCE OUTLET DETAIL NOT TO SCALE PIPE OUTLET CONDITIONS A E OUTLET TO FLAT AREA H NO DEFINED CHANNEL IIN.) PIPE OUTLET TO WELL DEFINED CHANNEL a a o_ 0%E � o_ 0%E 0 0 0 0 0 0 0 d/d 5 FILTER CL!0TH SECTION A -A FILTER CLOTH / SECTION A -A KEY IN 6"-9"; RECOMMENDED KEY IN 6"-9"; RECOMMENDED FOR ENTIRE PERIMETER FOR ENTIRE PERIMETER NOTES: 1. APRON LINING MAY BE RIPRAP, GROUTED RIPRAP, GABION BASKET, OR CONCRETE. 2. La IS THE LENGTH OF THE RIPRAP APRON AS SHOWN ON TABLE 3. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT NOT LESS THAN 6 INCHES. 4. CLASS B RIP RAP OUTLET PROTECTION MINIMUM DIMENSIONS DESIGN FLOW (CFS) Do (IN) DEPTH (IN) END WIDTH (FT) LENGTH (FT) 0-10 15 15 9.25 8 30-35 24 15 22 20 OP OUTLET PROTECTION DETAIL NOT TO SCALE LL 0 Z O rr -i O 1 �U^ V ) V ) Jcl) 0 Q F--- J O w 7 Z 0 � O C) w z W v REVISIONS 11.10.20 ADD 1 DESIGNED BY: DRAWN BY: CHECKED BY: SCALE: NONE DATE: 10.7.20 PROJECT NUMBER: 18110122-05 C9.1 STRUCTURAL BACKFILL I EARTH EMBANKMENT i 80Z NON—WOVEN1 FABRIC AT BOTTOM OF TRENCH III 12" WASHED SCREENINGS - 12" #57 STONE EARTH EMBANKMENT a 24" #4 STONE _ ORATED ADS N-12 OR EQUAL, 8" PERF - — HDPE PIPE, PERFORATIONS TO BE 8" HOLES 4" APART IN ALTERNATING PATTERN a 4�1 AROUND THE ENTIRE CIRCUMFERENCE -7.0' 1 9.0 NOTES: 1. EACH INTERMEDIATE FILTER MATERIAL IS TO BE DUMP PLACED TO THE PROPER DEPTH. 2. ENSURE THAT DEPTH OF FILTER MATERIAL IS UNIFORM AT EACH LIFT. ROCK DRAIN DETAIL NOT TO SCALE WASTE PROPOSED GRADE CLEAN STRUCTURAL BACKFILL CONTRACTOR SHALL LAY r BACK SLOPE TO ANGLE OF r REPOSE IN ACCORDANCE WITH r ALL OSHA SAFETY J r r REGULATIONS AND IN J r r ACCORDANCE WITH THE SPECIFICATIONS r r r� �r r, r r DEPTH VARIES PROPOSED 8" P C SANITARY r SEWER WITH T ACER WIRE r (REPLACIN EXISTING r SANITARY SEWER A D MATCH r INVERTS) r r r r r r WASTE r ' 3'— �3' -- r 3' ENSURE CLEAN SOILS UNDERNEATH UTILITY LINES � ORANGE COLORED IDENTIFICATION DEBT ---WASTE MATERIAL NOTES: 1. CONTRACTOR SHALL EXCAVATE TRENCH TO PROPOSED DEPTH IF CLEAN SOILS ARE ENCOUNTERED. IF CLEAN SOILS ARE NOT ENCOUNTERED AT DEPTH OF PIPE CONTRACTOR SHALL EXCAVATE TO A DEPTH OF 3' BELOW BOTTOM OF PIPE, PLACE AN ORANGE COLORED IDENTIFICATION FABRIC AND BACKFILL WITH CLEAN STRUCTURAL BACKFILL. UTILITY TRENCH DETAIL NOT TO SCALE CROSS SECTION 3 III=III=III=III=III=III=III=III=III=III=III=III=III=III=III=III=III=III= ;» I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I �' III—IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 11III=III=III=III=III=III=III=III=III=III=III=III=III=III=III=III=III=III PTH RIES IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII—III III=IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII=III= r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r PTH R I E S r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r GRADE VARIES WASTE CAP DETAIL NOT TO SCALE I� 6.0, - - 4.0' -I - 6.0, LINE DIVERSION SWALES AS NOTED ON SHEET C7.0 - -VARIES III III III III NOT TO SCALE PERMANENT AND TEMPORARY SEEDING �6" VEGETATIVE SUPPORT LAYER --6" FILL CAP LAYER ORANGE COLORED FABRIC �6" FILL BASE LAYER ADDITIONAL SOIL (DEPTH VARIES AS NEEDED) WASTE MATERIAL (DEPTH VARIES) 3" GEOWEB WITH SOIL INFILL. STAKE GEOWEB IN PLACE USING MANUFACTURER RECOMMENDED STAKES GRADE VARIES BACKFILL DIVERSION SWALES WITH CLEAN STRUCTURAL BACKFILL AFTER WASTE REMOVAL SWALE DESIGN FLOW (CFS) SLOPE FT EROSION CONTROLFT PRODUCT SOUTHERN 33.50 .0032 NORTH AMERICAN GREEN SC150 NORTHERN 34.24 .0385 NORTH AMERICAN GREEN SC250 PERIMETER SWALE DETAIL NOT TO SCALE FINISHED GRADE 4' 3 3 3 1 1 �1 12" CPP =1 I 1 — SPECIFICATIONS A COMMON FAILURE OF SLOPE DRAINS IS CAUSED BY WATER SATURATING THE SOIL AND SEEPING ALONG THE PIPE. THIS CREATES VOIDS FROM CONSOLIDATION AND PIPING AND CAUSES WASHOUTS. PROPER BACKFILLING AROUND AND UNDER THE PIPE "HAUNCHES" WITH STABLE SOIL MATERIAL AND HAND COMPACTING IN 6-INCH LIFTS TO ACHIEVE FIRM CONTACT BETWEEN THE PIPE AND THE SOIL AT ALL POINTS WILL ELIMINATE THIS TYPE OF FAILURE. i��A_[y�y�i7���]:L\I►I,Y•]►1�1►1�]1,���1:7 3��>�Yi]Isi]:a�JI���K•]►�il�_[•�:��l�l��_�r�iZ•7_�:[•]►ly_1►1�7����%�:[•]►l,�y:[•��Jl►[•]►r::I��A_1► 2. SLIGHTLY SLOPE THE SECTION OF PIPE UNDER THE DIKE TOWARD ITS OUTLET. 3. HAND TAMP THE SOIL UNDER AND AROUND THE ENTRANCE SECTION IN LIFTS NOT TO EXCEED 6 INCHES 4. ENSURE THAT ALL SLOPE DRAIN CONNECTIONS ARE WATERTIGHT. BERM TO ACHIEVE 1' OF COVER ON TOP OF SLOPE DRAIN AND MAT UPSTREAM SIDE OF BERM TO PROTECT AGAINST EROSION LONGITUDINAL SECTION PROVIDE STAKES EACH SIDE @ 10, 0. C. 5. ENSURE THAT ALL FILL MATERIAL IS WELL COMPACTED. 6. ADEQUATELY PROTECT THE DRAIN OUTLET FROM EROSION. 7. MAKE THE SETTLED, COMPACTED DIKE RIDGE NO LESS THAN ONE FOOT ABOVE THE TOP OF THE PIPE AT EVERY POINT. 8. IMMEDIATELY STABILIZE ALL DISTURBED AREAS FOLLOWING CONSTRUCTION. 2. 0' • 1�I�I�1�-'1 DEARTH/WASTE MATERIAL 6" PERFORATED ADS N-12 N5 40Z STONE NON— OR EQUAL, HDPE PIPE TO GEOTEXTILE TIE INTO 8" ROCK DRAIN PIPE WITH TEE GRAVEL DRAIN DETAIL NOT TO SCALE NOTES: 1. INSTALL GRAVEL DRAIN AS SHOWN ON C7.1. FILL ANCHOR TRENCH WITH STRUCTURAL FILL L TRANSITION TO 18" CAP 5.0' MINI H / —M — i —III I I I I1 I III— r 11 r r r 1 11 III r r r 'DEPTH VARIES' r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r 3" FILL BASE LAYER MANHOLE SET ABOVE PROPOSED GRADE CONNECT TO PROPOSED MANHOLE WASTE MATERIAL (DEPTH VARIES) SLOPE SIDE H L NORTH 3 3 EAST 3 3 SOUTH 3 3 WEST 5 10 ANCHOR TRENCH DETAIL NOT TO SCALE 3" GEOWEB WITH SOIL INFILL ORANGE COLORED FABRIC Y FILL BASE LAYER WASTE CAP DETAIL (SLOPES >_ 3:1) NOT TO SCALE THOROUGHLY TAMPED BACKFIL CAREFULL l COMPACTED SELEC BACKFIL O COMPACTE GRANOLA MATERIA 1/4 Bc (6" MIN.) MAINTENANCE INSPECT THE SLOPE DRAIN AND SUPPORTING DIVERSION AFTER EVERY RAINFALL, AND PROMPTLY MAKE NECESSARY REPAIRS. WHEN THE PROTECTED AREA HAS BEEN PERMANENTLY STABILIZED, TEMPORARY MEASURES MAY BE REMOVED, MATERIALS DISPOSED OF PROPERLY, AND ALL DISTURBED AREAS STABILIZED APPROPRIATELY. SD SLOPE DRAIN DETAIL SCALE: 1 /4" = V-0" CLASS "B" LOAD FACTOR = 1.9 PIPE BEDDING DETAIL NOT TO SCALE Q w 0 w p N ate-• co O N n M � ou N V N U R R c OzLL� t� V O 32� M LL O0 Z W Z z O F— Z U REVISIONS 11.10.20 ADDII DESIGNED BY: DRAWN BY: CHECKED BY: SCALE: NONE DATE: 10.7.20 PROJECT NUMBER: 18110122-05 ci 0.0 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION SELF -INSPECTIONS ARE REQUIRED DURING NORMAL BUSINESS HOURS IN ACCORDANCE WITH THE TABLE BELOW. WHEN ADVERSE WEATHER OR SITE CONDITIONS WOULD CAUSE THE SAFETY OF THE INSPECTION PERSONNELTO BE IN JEOPARDY, THE INSPECTION MAY BE DELAYED UNTIL THE NEXT BUSINESS DAY ON WHICH IT IS SAFE TO PERFORM THE INSPECTION. IN ADDITION, WHEN A STORM EVENT OF EQUAL TO OR GREATER THAN 1.0 INCH OCCURS OUTSIDE OF NORMAL BUSINESS HOURS, THE SELF -INSPECTION SHALL BE PERFORMED UPON THE COMMENCEMENT OF THE NEXT BUSINESS DAY. ANYTIME WHEN INSPECTIONS WERE DELAYED SHALL BE NOTED IN THE INSPECTION RECORD. FREQUENCY (DURING INSPECT NORMAL INSPECTION RECORDS MUST INCLUDE: BUSINESS HOURS) DAILY RAINFALL AMOUNTS. IF NO DAILY RAIN GAUGE OBSERVATIONS ARE MADE (1) RAIN DURING WEEKEND OR HOLIDAY PERIODS, AND NO GAUGE INDIVIDUAL -DAY RAINFALL INFORMATION IS AVAILABLE, MAINTAINED DAILY RECORD THE CUMULATIVE RAIN MEASUREMENT FOR IN GOOD THOSE UN -ATTENDED DAYS (AND THIS WILL DETERMINE IF A WORKING SITE INSPECTION IS NEEDED). DAYS ON WHICH NO ORDER RAINFALL OCCURRED SHALL BE RECORDED AS "ZERO." THE PERMITTEE MAY USE ANOTHER RAIN -MONITORING DEVICE APPROVED BY THE DIVISION. 1. IDENTIFICATION OF THE MEASURES INSPECTED, AT LEAST ONCE 2. DATE AND TIME OF THE INSPECTION, PER 7 3. NAME OF THE PERSON PERFORMING THE INSPECTION, CALENDAR DAYS 4. INDICATION OF WHETHER THE MEASURES WERE (2) E&SC AND WITHIN 24 MEASURES HOURS OF A OPERATING PROPERLY, 5. DESCRIPTION OF MAINTENANCE NEEDS FOR THE RAIN EVENT > 1.0 INCH IN 24 MEASURE, HOURS 6. DESCRIPTION, EVIDENCE, AND DATE OF CORRECTIVE ACTIONS TAKEN. 1. IDENTIFICATION OF THE DISCHARGE OUTFALLS AT LEAST ONCE INSPECTED, (3) PER 7 2. DATE AND TIME OF THE INSPECTION, STORMWATER CALENDAR DAYS 3. NAME OF THE PERSON PERFORMING THE INSPECTION, DISCHARGE AND WITHIN 24 4. EVIDENCE OF INDICATORS OF STORMWATER POLLUTION OUTFALLS HOURS OF A SUCH AS OIL SHEEN, FLOATING OR SUSPENDED SOLIDS OR (SDOS) RAIN EVENT > 1.0 DISCOLORATION, INCH IN 24 5. INDICATION OF VISIBLE SEDIMENT LEAVING THE SITE, HOURS 6. DESCRIPTION, EVIDENCE, AND DATE OF CORRECTIVE ACTIONS TAKEN. AT LEAST ONCE IF VISIBLE SEDIMENTATION IS FOUND OUTSIDE SITE LIMITS, PER 7 THEN A RECORD OF THE FOLLOWING SHALL BE MADE: CALENDAR DAYS 1. ACTIONS TAKEN TO CLEAN UP OR STABILIZE THE (4) AND WITHIN 24 SEDIMENT THAT HAS LEFT THE SITE LIMITS, PERIMETER HOURS OF A 2. DESCRIPTION, EVIDENCE, AND DATE OF CORRECTIVE OF SITE RAIN EVENT > 1.0 ACTIONS TAKEN, AND INCH IN 24 3. AN EXPLANATION AS TO THE ACTIONS TAKEN TO HOURS CONTROL FUTURE RELEASES. IF THE STREAM OR WETLAND HAS INCREASED VISIBLE (5) AT LEAST ONCE SEDIMENTATION OR A STREAM HAS VISIBLE INCREASED STREAMS PER 7 TURBIDITY FROM THE CONSTRUCTION ACTIVITY, THEN A OR CALENDAR DAYS RECORD OF THE FOLLOWING SHALL BE MADE: WETLANDS AND WITHIN 24 1. DESCRIPTION, EVIDENCE AND DATE OF CORRECTIVE ONSITE OR HOURS OF A ACTIONS TAKEN, AND OFFSITE RAIN EVENT > 1.0 2 RECORDS OF THE REQUIRED REPORTS TO THE (WHERE (WHERE INCH IN 24 APPROPRIATE DIVISION REGIONAL OFFICE PER PART III, ACCESSIBLE) HOURS SECTION C, ITEM (2)(A) OF THIS PERMIT. 1. THE PHASE OF GRADING (INSTALLATION OF PERIMETER E&SC MEASURES, CLEARING AND GRUBBING, INSTALLATION (6) GROUND OF STORM DRAINAGE FACILITIES, COMPLETION OF ALL (6) STABILIZATION LAND -DISTURBING ACTIVITY, CONSTRUCTION OR GROUND STABILIZATION MEASURESAFTER REDEVELOPMENT, PERMANENT GROUND COVER). EACH PHASE OF 2. DOCUMENTATION THAT THE REQUIRED GROUND MEASURES GRADING STABILIZATION MEASURES HAVE BEEN PROVIDED WITHIN THE REQUIRED TIMEFRAME OR AN ASSURANCE THAT THEY WILL BE PROVIDED AS SOON AS POSSIBLE. NOTE: THE RAIN INSPECTION RESETS THE REQUIRED 7 CALENDAR DAY INSPECTION REQUIREMENT. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC PLAN DOCUMENTATION THE APPROVED E&SC PLAN AS WELL AS ANY APPROVED DEVIATION SHALL BE KEPT ON THE SITE. THE APPROVED E&SC PLAN MUST BE KEPT UP-TO-DATE THROUGHOUT THE COVERAGE UNDER THIS PERMIT. THE FOLLOWING ITEMS PERTAINING TO THE E&SC PLAN SHALL BE KEPT ON SITE AND AVAILABLE FOR INSPECTION AT ALL TIMES DURING NORMAL BUSINESS HOURS. ITEM TO DOCUMENT DOCUMENTATION REQUIREMENTS (A) EACH E&SC MEASURE HAS BEEN INSTALLED INITIAL AND DATE EACH E&SC MEASURE ON A COPY OF THE AND DOES NOT APPROVED E&SC PLAN OR COMPLETE, DATE AND SIGN AN SIGNIFICANTLY DEVIATE INSPECTION REPORT THAT LISTS EACH E&SC MEASURE FROM THE LOCATIONS, SHOWN ON THE APPROVED E&SC PLAN. THIS DIMENSIONS AND DOCUMENTATION IS REQUIRED UPON THE INITIAL RELATIVE ELEVATIONS INSTALLATION OF THE E&SC MEASURES OR IF THE E&SC SHOWN ON THE MEASURES ARE MODIFIED AFTER INITIAL INSTALLATION. APPROVED E&SC PLAN. INITIAL AND DATE A COPY OF THE APPROVED E&SC PLAN OR (B) A PHASE OF GRADING COMPLETE, DATE AND SIGN AN INSPECTION REPORT TO HAS BEEN COMPLETED. INDICATE COMPLETION OF THE CONSTRUCTION PHASE. C GROUND COVER IS INITIAL AND DATE A COPY OF THE APPROVED E&SC PLAN OR LOCATED AND INSTALLED COMPLETE, DATE AND SIGN AN INSPECTION REPORT TO IN ACCORDANCE WITH INDICATE COMPLIANCE WITH APPROVED GROUND COVER THE APPROVED E&SC SPECIFICATIONS. PLAN. (D) THE MAINTENANCE AND REPAIR REQUIREMENTS FOR ALL COMPLETE, DATE AND SIGN AN INSPECTION REPORT. E&SC MEASURES HAVE BEEN PERFORMED. (E) CORRECTIVE INITIAL AND DATE A COPY OF THE APPROVED E&SC PLAN OR ACTIONS HAVE BEEN COMPLETE, DATE AND SIGN AN INSPECTION REPORT TO TAKEN TO E&SC INDICATE THE COMPLETION OF THE CORRECTIVE ACTION. MEASURES. 2. DOCUMENTATION TO BE RETAINED FOR THREE YEARS ALL DATA USED TO COMPLETE THE E-NOI AND ALL INSPECTION RECORDS SHALL BE MAINTAINED FOR A PERIOD OF THREE YEARS AFTER PROJECT COMPLETION AND MADE AVAILABLE UPON REQUEST. [40 CFR 122.411 3. ADDITIONAL DOCUMENTATION TO BE KEPT ON SITE IN ADDITION TO THE E&SC PLAN DOCUMENTS ABOVE, THE FOLLOWING ITEMS SHALL BE KEPT ON THE SITE AND AVAILABLE FOR INSPECTORS AT ALL TIMES DURING NORMAL BUSINESS HOURS, UNLESS THE DIVISION PROVIDES A SITE -SPECIFIC EXEMPTION BASED ON UNIQUE SITE CONDITIONS THAT MAKE THIS REQUIREMENT NOT PRACTICAL: (a) THIS GENERAL PERMIT AS WELL AS THE CERTIFICATE OF COVERAGE, AFTER IT IS RECEIVED. (b) RECORDS OF INSPECTIONS MADE DURING THE PREVIOUS TWELVE MONTHS. THE PERMITTEE SHALL RECORD THE REQUIRED OBSERVATIONS ON THE INSPECTION RECORD FORM PROVIDED BY THE DIVISION OR A SIMILAR INSPECTION FORM THAT INCLUDES ALLTHE REQUIRED ELEMENTS. USE OF ELECTRONICALLY -AVAILABLE RECORDS IN LIEU OF THE REQUIRED PAPER COPIES WILL BE ALLOWED IF SHOWN TO PROVIDE EQUAL ACCESS AND UTILITY AS THE HARD -COPY RECORDS. PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT SEDIMENT BASINS AND TRAPS THAT RECEIVE RUNOFF FROM DRAINAGE AREAS OF ONE ACRE OR MORE SHALL USE OUTLET STRUCTURES THAT WITHDRAW WATER FROM THE SURFACE WHEN THESE DEVICES NEED TO BE DRAWN DOWN FOR MAINTENANCE OR CLOSE OUT UNLESS THIS IS INFEASIBLE. THE CIRCUMSTANCES IN WHICH IT IS NOT FEASIBLE TO WITHDRAW WATER FROM THE SURFACE SHALL BE RARE (FOR EXAMPLE, TIMES WITH EXTENDED COLD WEATHER). NON -SURFACE WITHDRAWALS FROM SEDIMENT BASINS SHALL BE ALLOWED ONLY WHEN ALL OF THE FOLLOWING CRITERIA HAVE BEEN MET: (a) THE E&SC PLAN AUTHORITY HAS BEEN PROVIDED WITH DOCUMENTATION OF THE NON -SURFACE WITHDRAWAL AND THE SPECIFIC TIME PERIODS OR CONDITIONS IN WHICH IT WILL OCCUR. THE NON -SURFACE WITHDRAWAL SHALL NOT COMMENCE UNTIL THE E&SC PLAN AUTHORITY HAS APPROVED THESE ITEMS, (b) THE NON -SURFACE WITHDRAWAL HAS BEEN REPORTED AS AN ANTICIPATED BYPASS IN ACCORDANCE WITH PART III, SECTION C, ITEM (2)(C) AND (D) OF THIS PERMIT, (c) DEWATERING DISCHARGES ARE TREATED WITH CONTROLS TO MINIMIZE DISCHARGES OF POLLUTANTS FROM STORMWATER THAT IS REMOVED FROM THE SEDIMENT BASIN. EXAMPLES OF APPROPRIATE CONTROLS INCLUDE PROPERLY SITED, DESIGNED AND MAINTAINED DEWATERING TANKS, WEIR TANKS, AND FILTRATION SYSTEMS, (d) VEGETATED, UPLAND AREAS OF THE SITES OR A PROPERLY DESIGNED STONE PAD IS USED TO THE EXTENT FEASIBLE AT THE OUTLET OF THE DEWATERING TREATMENT DEVICES DESCRIBED IN ITEM (C) ABOVE, (e) VELOCITY DISSIPATION DEVICES SUCH AS CHECK DAMS, SEDIMENT TRAPS, AND RIPRAP ARE PROVIDED AT THE DISCHARGE POINTS OF ALL DEWATERING DEVICES, AND (f) SEDIMENT REMOVED FROM THE DEWATERING TREATMENT DEVICES DESCRIBED IN ITEM (C) ABOVE IS DISPOSED OF IN A MANNER THAT DOES NOT CAUSE DEPOSITION OF SEDIMENT INTO WATERS OF THE UNITED STATES. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. NEVER BURY OR BURN WASTE. PLACE LITTER AND DEBRIS IN APPROVED WASTE CONTAINERS. 2. PROVIDE A SUFFICIENT NUMBER AND SIZE OF WASTE CONTAINERS (E.G DUMPSTER, TRASH RECEPTACLE) ON SITE TO CONTAIN CONSTRUCTION AND DOMESTIC WASTES. 3. LOCATE WASTE CONTAINERS AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS UNLESS NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE. 4. LOCATE WASTE CONTAINERS ON AREAS THAT DO NOT RECEIVE SUBSTANTIAL AMOUNTS OF RUNOFF FROM UPLAND AREAS AND DOES NOT DRAIN DIRECTLY TO A STORM DRAIN, STREAM OR WETLAND. 5. COVER WASTE CONTAINERS AT THE END OF EACH WORKDAY AND BEFORE STORM EVENTS OR PROVIDE SECONDARY CONTAINMENT. REPAIR OR REPLACE DAMAGED WASTE CONTAINERS. 6. ANCHOR ALL LIGHTWEIGHT ITEMS IN WASTE CONTAINERS DURING TIMES OF HIGH WINDS. 7. EMPTY WASTE CONTAINERS AS NEEDED TO PREVENT OVERFLOW. CLEAN UP IMMEDIATELY IF CONTAINERS OVERFLOW. 8. DISPOSE WASTE OFF -SITE AT AN APPROVED DISPOSAL FACILITY. 9. ON BUSINESS DAYS, CLEAN UP AND DISPOSE OF WASTE IN DESIGNATED WASTE CONTAINERS. HAZARDOUS AND TOXIC WASTE 1. CREATE DESIGNATED HAZARDOUS WASTE COLLECTION AREAS ON -SITE. 2. PLACE HAZARDOUS WASTE CONTAINERS UNDER COVER OR IN SECONDARY CONTAINMENT. 3. DO NOT STORE HAZARDOUS CHEMICALS, DRUMS OR BAGGED MATERIALS DIRECTLY ON THE GROUND. POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. SELECT FLOCCULANTS THAT ARE APPROPRIATE FOR THE SOILS BEING EXPOSED DURING CONSTRUCTION, SELECTING FROM THE NC DWR LIST OF APPROVED PAMS/FLOCCULANTS. 2. APPLY FLOCCULANTS AT OR BEFORE THE INLETS TO EROSION AND SEDIMENT CONTROL MEASURES. 3. APPLY FLOCCULANTS AT THE CONCENTRATIONS SPECIFIED IN THE NC DWR LIST OFAPPROVED PAMS/FLOCCULANTS AND IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. 4. PROVIDE PONDING AREA FOR CONTAINMENT OF TREATED STORMWATER BEFORE DISCHARGING OFFSITE. 5. STORE FLOCCULANTS IN LEAK -PROOF CONTAINERS THAT ARE KEPT UNDER STORM -RESISTANT COVER OR SURROUNDED BY SECONDARY CONTAINMENT STRUCTURES. EQUIPMENT AND VEHICLE MAINTENANCE 1. MAINTAIN VEHICLES AND EQUIPMENT TO PREVENT DISCHARGE OF FLUIDS. 2. PROVIDE DRIP PANS UNDER ANY STORED EQUIPMENT. 3. IDENTIFY LEAKS AND REPAIR AS SOON AS FEASIBLE, OR REMOVE LEAKING EQUIPMENT FROM THE PROJECT. 4. COLLECT ALL SPENT FLUIDS, STORE IN SEPARATE CONTAINERS AND PROPERLY DISPOSE AS HAZARDOUS WASTE (RECYCLE WHEN POSSIBLE). 5. REMOVE LEAKING VEHICLES AND CONSTRUCTION EQUIPMENT FROM SERVICE UNTIL THE PROBLEM HAS BEEN CORRECTED. 6. BRING USED FUELS, LUBRICANTS, COOLANTS, HYDRAULIC FLUIDS AND OTHER PETROLEUM PRODUCTS TO A RECYCLING OR DISPOSAL CENTER THAT HANDLES THESE MATERIALS. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. OCCURRENCES THAT MUST BE REPORTED PERMITTEES SHALL REPORTTHE FOLLOWING OCCURRENCES: (a) VISIBLE SEDIMENT DEPOSITION IN A STREAM OR WETLAND. (b) OIL SPILLS IF: • THEY ARE 25 GALLONS OR MORE, • THEY ARE LESS THAN 25 GALLONS BUT CANNOT BE CLEANED UP WITHIN 24 HOURS, • THEY CAUSE SHEEN ON SURFACE WATERS (REGARDLESS OF VOLUME), OR • THEY ARE WITHIN 100 FEET OF SURFACE WATERS (REGARDLESS OF VOLUME). (C) RELEASES OF HAZARDOUS SUBSTANCES IN EXCESS OF REPORTABLE QUANTITIES UNDER SECTION 311 OF THE CLEAN WATER ACT (REF: 40 CFR 110.3 AND 40 CFR 117.3) OR SECTION 102 OF CERCLA (REF: 40 CFR 302.4) OR G.S. 143-215.85. (d) ANTICIPATED BYPASSES AND UNANTICIPATED BYPASSES. e NONCOMPLIANCE WITH THE CONDITIONS OF THIS PERMIT THAT MAY ENDANGER HEALTH OR THE ENVIRONMENT. 2. REPORTING TIMEFRAMES AND OTHER REQUIREMENTS AFTER A PERMITTEE BECOMES AWARE OF AN OCCURRENCE THAT MUST BE REPORTED, HE SHALL CONTACT THE APPROPRIATE DIVISION REGIONAL OFFICE WITHIN THE TIMEFRAMES AND IN ACCORDANCE WITH THE OTHER REQUIREMENTS LISTED BELOW. OCCURRENCES OUTSIDE NORMAL BUSINESS HOURS MAY ALSO BE REPORTED TO THE DEPARTMENT'S ENVIRONMENTAL EMERGENCY CENTER PERSONNEL AT (800) 858-0368. REPORTING TIMEFRAMES (AFTER DISCOVERY) AND OCCURRENCE OTHER REQUIREMENT WITHIN 24 HOURS, AN ORAL OR ELECTRONIC NOTIFICATION. WITHIN 7 CALENDAR DAYS, A REPORT THAT CONTAINS A DESCRIPTION OF THE SEDIMENT AND ACTIONS TAKEN TO ADDRESS (A) VISIBLE THE CAUSE OF THE DEPOSITION. DIVISION STAFF MAY WAIVE THE SEDIMENT REQUIREMENT FOR A WRITTEN REPORT ON A CASE -BY -CASE BASIS. DEPOSITION IN . IF THE STREAM IS NAMED ON THE NC 303(D) LIST AS IMPAIRED FOR A STREAM OR SEDIMENT -RELATED CAUSES, THE PERMITTEE MAY BE REQUIRED TO WETLAND PERFORM ADDITIONAL MONITORING, INSPECTIONS OR APPLY MORE STRINGENT PRACTICES IF STAFF DETERMINE THAT ADDITIONAL REQUIREMENTS ARE NEEDED TO ASSURE COMPLIANCE WITH THE FEDERAL OR STATE IMPAIRED -WATERS CONDITIONS. (B) OIL SPILLS AND RELEASE OF HAZARDOUS WITHIN 24 HOURS, AN ORAL OR ELECTRONIC NOTIFICATION. THE SUBSTANCES NOTIFICATION SHALL INCLUDE INFORMATION ABOUT THE DATE, PER ITEM TIME, NATURE, VOLUME AND LOCATION OF THE SPILL OR RELEASE. 1(B)-(C) ABOVE (C) ANTICIPATED A REPORT AT LEAST TEN DAYS BEFORE THE DATE OF THE BYPASSES [40 BYPASS, IFPOSSIBLE. THE REPORT SHALL INCLUDE AN EVALUATION CFR OF THE ANTICIPATED QUALITY AND EFFECT OF THE BYPASS. 122.41(M)(3)] (D) UNANTICIPATED WITHIN 24 HOURS, AN ORAL OR ELECTRONIC NOTIFICATION. BYPASSES [40 WITHIN 7 CALENDAR DAYS, A REPORT THAT INCLUDES AN CFR EVALUATION OF THE QUALITY AND EFFECT OF THE BYPASS. 122.41(M)(3)] (E) WITHIN 24 HOURS, AN ORAL OR ELECTRONIC NOTIFICATION. NONCOMPLIANCE WITHIN 7 CALENDAR DAYS, A REPORT THAT CONTAINS A WITH THE DESCRIPTION OF THE NONCOMPLIANCE, AND ITS CAUSES; THE CONDITIONS OF PERIOD OF NONCOMPLIANCE, INCLUDING EXACT DATES AND TIMES, THIS PERMIT AND IF THE NONCOMPLIANCE HAS NOT BEEN CORRECTED, THE THAT MAY ANTICIPATED TIME NONCOMPLIANCE IS EXPECTED TO CONTINUE, ENDANGER AND STEPS TAKEN OR PLANNED TO REDUCE, ELIMINATE, AND HEALTH OR THE PREVENT REOCCURRENCE OF THE NONCOMPLIANCE. [40 CFR ENVIRONMENT[40 122.41(L)(6). CFR 122.41(L)(7)] . DIVISION STAFF MAY WAIVE THE REQUIREMENT FOR A WRITTEN REPORT ON A CASE -BY -CASE BASIS. GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and p Y ppY p g the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION REQUIRED GROUND STABILIZATION TIMEFRAMES STABILIZE WITHIN SITE AREA THIS MANY CALENDAR DAYS TIMEFRAME VARIATIONS DESCRIPTION AFTER CEASING LAND DISTURBANCE (A) PERIMETER DIKES, SWALES, 7 NONE DITCHES, AND PERIMETER SLOPES (B) HIGH QUALITY WATER (HQW) 7 NONE ZONES (C) SLOPES IF SLOPES ARE 10' OF LESS IN LENGTH AND ARE STEEPER THAN 3:1 7 NOTE STEEPER THAN 2:1, 14 DAYS ALLOWED -7 DAYS FOR SLOPES GREATER THAN 50' IN (D) SLOPES 3:1 TO LENGTH AND WITH SLOPES STEEPER THAN 4:1 14 -7 DAYS FOR PERIMETER DIKES, SWALES, 4:1 DITCHES, PERIMETER SLOPES AND HQW ZONES -10 DAYS FOR FALLS LAKE WATERSHED -7 DAYS FOR PERIMETER DIKES, SWALES, (E) AREAS WITH DITCHES, PERIMETER SLOPES, AND HQW ZONES SLOPES FLATTER 14 -10 DAYS FOR LAKE WATERSHED UNLESS THERE THAN 4:1 IS ZERO SLOPE NOTE: AFTER THE PERMANENT CESSATION OF CONSTRUCTION ACTIVITIES ANY AREAS WITH TEMPORARY GROUND STABILIZATION SHALL BE CONVERTED TO PERMANENT GROUND STABILIZATION AS SOON AS PRACTICABLE BUT IN NO CASE LONGER THAN 90 CALENDAR DAYS AFTER THE LAST LAND DISTURBING ACTIVITY. TEMPORARY GROUND STABILIZATION SHALL BE MAINTAINED IN A MANNER TO RENDER THE SURFACE STABLE AGAINST ACCELERATED EROSION UNTIL PERMANENT GROUND STABILIZATION IS ACHIEVED. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: TEMPORARY SEEDING PERMANENT STABILIZATION . PERMANENT GRASS SEED COVERED WITH STRAW OR OTHER MULCHES AND TACKIFIERS . GEOTEXTILE FABRICS SUCH AS TEMPORARY GRASS SEED COVERED PERMANENT SOIL REINFORCEMENT WITH STRAW OR OTHER MULCHES MATTING AND TACKIFIERS HYDROSEEDING HYDROSEEDING SHRUBS OR OTHER PERMANENT ROLLED EROSION CONTROL PLANTINGS COVERED WITH MULCH PRODUCTS WITH OR WITHOUT . UNIFORM AND EVENLY DISTRIBUTED TEMPORARY GRASS SEED GROUND COVER SUFFICIENT TO . APPROPRIATELY APPLIED STRAW OR RESTRAIN EROSION OTHER MULCH . STRUCTURAL METHODS SUCH AS PLASTIC SHEETING CONCRETE, ASPHALT OR RETAINING WALLS . ROLLED EROSION CONTROL PRODUCTS WITH GRASS SEED CONCRETE WASHOUTS PAINT AND OTHER LIQUID WASTE 1. DO NOT DUMP PAINT AND OTHER LIQUID WASTE INTO STORM DRAINS, STREAMS OR WETLANDS. 2. LOCATE PAINT WASHOUTS AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS UNLESS NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE. 3. CONTAIN LIQUID WASTES IN A CONTROLLED AREA. 4. CONTAINMENT MUST BE LABELED, SIZED AND PLACED APPROPRIATELY FOR THE NEEDS OF SITE. 5. PREVENT THE DISCHARGE OF SOAPS, SOLVENTS, DETERGENTS AND OTHER LIQUID WASTES FROM CONSTRUCTION SITES. EARTHEN STOCKPILE MANAGEMENT 1. SHOW STOCKPILE LOCATIONS ON PLANS. LOCATE EARTHEN -MATERIAL STOCKPILE AREAS AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS, SEDIMENT BASINS, PERIMETER SEDIMENT CONTROLS AND SURFACE WATERS UNLESS IT CAN BE SHOWN NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE. 2. PROTECT STOCKPILE WITH SILT FENCE INSTALLED ALONG TOE OF SLOPE WITH A MINIMUM OFFSET OF FIVE FEET FROM THE TOE OF STOCKPILE. 3. PROVIDE STABLE STONE ACCESS POINT WHEN FEASIBLE. 4. STABILIZE STOCKPILE WITHIN THE TIMEFRAMES PROVIDED ON THIS SHEET AND IN ACCORDANCE WITH THE APPROVED PLAN AND ANY ADDITIONAL REQUIREMENTS. SOIL STABILIZATION IS DEFINED AS VEGETATIVE, PHYSICAL OR CHEMICAL COVERAGE TECHNIQUES THAT WILL RESTRAIN ACCELERATED EROSION ON DISTURBED SOILS FOR TEMPORARY OR PERMANENT CONTROL NEEDS. HERBICIDES, PESTICIDES AND RODENTICIDES 1. STORE AND APPLY HERBICIDES, PESTICIDES AND RODENTICIDES IN ACCORDANCE WITH LABEL RESTRICTIONS. 2. STORE HERBICIDES, PESTICIDES AND RODENTICIDES IN THEIR ORIGINAL CONTAINERS WITH THE LABEL, WHICH LISTS DIRECTIONS FOR USE, INGREDIENTS AND FIRST AID STEPS IN CASE OF ACCIDENTAL POISONING. 3. DO NOT STORE HERBICIDES, PESTICIDES AND RODENTICIDES IN AREAS WHERE FLOODING IS POSSIBLE OR WHERE THEY MAY SPILL OR LEAK INTO WELLS, STORMWATER DRAINS, GROUND WATER OR SURFACE WATER. IF A SPILL OCCURS, CLEAN AREA IMMEDIATELY. 4. DO NOT STOCKPILE THESE MATERIALS ONSITE. PORTABLE TOILETS 1. INSTALL PORTABLE TOILETS ON LEVEL GROUND, AT LEAST 50 FEET AWAY FROM STORM DRAINS, STREAMS OR WETLANDS UNLESS THERE IS NO ALTERNATIVE REASONABLY AVAILABLE. IF 50 FOOT OFFSET IS NOT ATTAINABLE, PROVIDE RELOCATION OF PORTABLE TOILET BEHIND SILT FENCE OR PLACE ON A GRAVEL PAD AND SURROUND WITH SAND BAGS. 2. PROVIDE STAKING OR ANCHORING OF PORTABLE TOILETS DURING PERIODS OF HIGH WINDS OR IN HIGH FOOT TRAFFIC AREAS. 3. MONITOR PORTABLE TOILETS FOR LEAKING AND PROPERLY DISPOSE OF ANY LEAKED MATERIAL. UTILIZE A LICENSED SANITARY WASTE HAULER TO REMOVE LEAKING PORTABLE TOILETS AND REPLACE WITH PROPERLY OPERATING UNIT. 1. DO NOT DISCHARGE CONCRETE OR CEMENT SLURRY FROM THE SITE. 2. DISPOSE OF, OR RECYCLE SETTLED, HARDENED CONCRETE RESIDUE IN ACCORDANCE WITH LOCAL AND STATE SOLID WASTE REGULATIONS AND AT AN APPROVED FACILITY. 3. MANAGE WASHOUT FROM MORTAR MIXERS IN ACCORDANCE WITH THE ABOVE ITEM AND IN ADDITION PLACE THE MIXER AND ASSOCIATED MATERIALS ON IMPERVIOUS BARRIER AND WITHIN LOT PERIMETER SILT FENCE. 4. INSTALL TEMPORARY CONCRETE WASHOUTS PER LOCAL REQUIREMENTS, WHERE APPLICABLE. IF AN ALTERNATE METHOD OR PRODUCT IS TO BE USED, CONTACT YOUR APPROVAL AUTHORITY FOR REVIEW AND APPROVAL. IF LOCAL STANDARD DETAILS ARE NOT AVAILABLE, USE ONE OF THE TWO TYPES OF TEMPORARY CONCRETE WASHOUTS PROVIDED ON THIS DETAIL. 5. DO NOT USE CONCRETE WASHOUTS FOR DEWATERING OR STORING DEFECTIVE CURB OR SIDEWALK SECTIONS. STORMWATER ACCUMULATED WITHIN THE WASHOUT MAY NOT BE PUMPED INTO OR DISCHARGED TO THE STORM DRAIN SYSTEM OR RECEIVING SURFACE WATERS. LIQUID WASTE MUST BE PUMPED OUT AND REMOVED FROM PROJECT. 6. LOCATE WASHOUTS AT LEAST 50 FEET FROM STORM DRAIN INLETS AND SURFACE WATERS UNLESS IT CAN BE SHOWN THAT NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE. AT A MINIMUM, INSTALL PROTECTION OF STORM DRAIN INLET(S) CLOSEST TO THE WASHOUT WHICH COULD RECEIVE SPILLS OR OVERFLOW. 7. LOCATE WASHOUTS IN AN EASILY ACCESSIBLE AREA, ON LEVEL GROUND AND INSTALL A STONE ENTRANCE PAD IN FRONT OF THE WASHOUT. ADDITIONAL CONTROLS MAY BE REQUIRED BY THE APPROVING AUTHORITY. 8. INSTALL AT LEAST ONE SIGN DIRECTING CONCRETE TRUCKS TO THE WASHOUT WITHIN THE PROJECT LIMITS. POST SIGNAGE ON THE WASHOUT ITSELF TO IDENTIFY THIS LOCATION. 9. REMOVE LEAVINGS FROM THE WASHOUT WHEN AT APPROXIMATELY 75% CAPACITY TO LIMIT OVERFLOW EVENTS. REPLACE THE TARP, SAND BAGS OR OTHER TEMPORARY STRUCTURAL COMPONENTS WHEN NO LONGER FUNCTIONAL. WHEN UTILIZING ALTERNATIVE OR PROPRIETARY PRODUCTS, FOLLOW MANUFACTURER'S INSTRUCTIONS. 10. AT THE COMPLETION OF THE CONCRETE WORK, REMOVE REMAINING LEAVINGS AND DISPOSE OF IN AN APPROVED DISPOSAL FACILITY. FILL PIT, IF APPLICABLE, AND STABILIZE ANY DISTURBANCE CAUSED BY REMOVAL OF WASHOUT. A D o O SANDBAGS (TYP.) O O C O O OR STAPLES 0 SILT FENCE SIDE SLOP O< 0 (TYP.) U 0 CD 0 I` A CLEARLY MARKED SIGNAGE CONCRETE NOTING DEVICE (18"X24" MIN.) WASHOUT PLAN ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER 10' HIGH MIN SANDBAGS (TYP.) COHESIVE & LOW FILTRATION B OR STAPLESHIGH SOIL BERM 10 MIL COHESIVE & CD CD CD PLASTIC TION 10 MIL PLASTICSANDBAGS (TYP.) 0 SIDELINING SLOP (TYP.) SOIL BERM OR STAPLES O O ZCY Z x x 0 CD o s SECTION B-B CD B SECTION A -A NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE NOT TO SCALE SANDBAGS (TYP.) NOTES: OR STAPLES 1. ACTUAL LOCATION DETERMINED IN FIELD CLEARLY MARKED SIGNAGE CONCRETE NOTING DEVICE (18"X24" MIN.) 2. THE CONCRETE WASHOUT WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 PLAN INCHES OF FREEBOARD. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE R ' �N off'' `,�,``�Q• �O E S Sjd �S*AL G 004 (� 0 IN P. M LU 0 Z T 0 U Z J J L.L Z a J 0 rr J 0 0 U U) U) J O z w Ir Z 0 Z U REVISIONS 11.10.20 ADD 1 DESIGNED BY: DRAWN BY: CHECKED BY: SCALE: NONE DATE: 10.7.20 PROJECT NUMBER: 18110122-05 C11.0 United States Department of the Interior FISH AND WILDLIFE SERVICE Asheville Field Office 160 Zillicoa Street Asheville, North Carolina 28801 May 9, 2016 Ms. Nora A. Zirps, PE ESP Associates, P.A. 7011 Albert Pick Road, Ste. E Greensboro, NC 27409 Dear Ms. Zirps: Subject: Site Assessment of Reynolds School Road Landfill, Canton, Haywood County, North Carolina (ESP Project BN12.614.002) In your letter of April 8, 2016 (received via email on that same date), you requested our comments about the subject project. The following comments are provided in accordance with the provisions of the National Environmental Policy Act (42 U.S.C.§ 4321 et seq.) and section 7 of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531-1543) (Act). We have no concerns with the proposed project and, according to our records and a review of the information you provided, no federally listed species or their habitats occur on the subject site. Therefore, we believe the requirements under section 7 of the Act are fulfilled. However, obligations under section 7 of the Act must be reconsidered if. (1) new information reveals impacts of these identified actions that may affect listed species or critical habitat in a manner not previously considered, (2) these actions are subsequently modified in a manner that was not considered in this review, or (3) a new species is listed or critical habitat is determined that may be affected by the identified actions. Thank you for allowing us to comment on this project. Please contact Mr. Allen Ratzlaff of our staff at 828/258-3939, Ext. 229, if you have any questions. In any future correspondence concerning this project, please reference our Log Number 4-2-16-386. Sincerely, - - original signed - - Janet Mizzi Field Supervisor btu. STATE,, North Carolina Department of Natural and Cultural Resources State Historic Preservation Office Ramona M. Bartos, Administrator Governor Pat McCrory Office of Archives and History Secretary Susan Kluttz Deputy Secretary Kevin Cherry May 5, 2016 Nora Zirps ESP Associates, PA 7011 Albert Pick Road, Suite E Greensboro, NC 27409 Re: Reynolds School Road Landfill Remediation, Reynold School Road, Canton, ESP BN12.614.002, Haywood County, ER 16-0638 Dear Ms. Zirps: Thank you for your letter of April 8, 2016, concerning the above project. We have conducted a review of the project and are aware of no historic resources which would be affected by the project. Therefore, we have no comment on the project as proposed. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, contact Renee Gledhill -Earley, environmental review coordinator, at 919-807-6579 or environmental. review(cr,,ncdcr.gov. In all future communication concerning this project, please cite the above referenced tracking number. Sincerely, d 6"'O"Ramona M. Bartos Location: 109 East Jones Street, Raleigh NC 27601 Mailing Address: 4617 Mail Service Center, Raleigh NC 27699-4617 Telephone/Fas: (919) 807-6570/807-6599