HomeMy WebLinkAbout100021_30 day poa_20210216PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1 2/16/2021
1. Structure Name/Identifier (ID): I Carolina Bay LLC
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
17.0 inches
19.0 inches
2.0 inches
320,946 ft2
400,113 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 422,966 ft3
h. current herd # 4,000 certified herd # 4,000
actual waste produced = current herd # x line g = 422,966 ft'
certified herd #
i. volume of wash water according to structural design Oft3
j. excess rainfall over evaporation according to design 191,625 ft3
k. (lines h + i +j) x 7.48 x 30 days/line f= 766,190 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 12/9/2 1 1.28 Ibs/1000 gal.
m. ((lines e + k)/1000) x line I = 1492.9 Ibs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
Structure 1 Carolina Bay (10-21) PoA30day (2-16-21) Page 1 of 1
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: Carolina Bay LLC
line m = 1492.9
lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n.lines 1+2+3+4+5+6= 1492.9 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
R-WHUMMM11AM
PAN balance
.. -
t. TOTAL PAN
BALANCE FOR
u. application window'
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 3188.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 1492.9 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 3188.0 lb. PAN
y. Overall PAN balance (w - x) _ -1695 lb. PAN
Summary Carolina Bay (10-21) PoA30day (2-16-21) Page 1 of 2
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Waste will be applied as soon as weather permits.
Summary Carolina Bay (10-21) PoA30day (2-16-21) Page 2 of 2