Loading...
HomeMy WebLinkAbout20210344 Ver 1_Meeting Request Review Doc Attachment_20210213(Version 2.07; Released October 2016) 17.BP.11.R.131 TIP No.:SF-040122 County(ies):Ashe Page 1 of 1 TIP Number:Date: Phone:Phone: Email:Email: County(ies): CAMA County? No Design/Future:Year:2016 Existing:Year: Aquatic T&E Species?No Comments: Yes N/A No N/A Deck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative)(If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative) ac. One approx. 15'-20' gravel roadway with 1' unpaved shoulders 200 jwhittington@rkk.com Project Includes Bridge Spanning Water Body?Deck Drains Discharge Over Buffer?Dissipator Pads Provided in Buffer? NRTR Stream ID: Annual Avg Daily Traffic (veh/hr/day): Existing Site Project Length (lin. miles or feet): ac. Surface Water Body (1): Class CNCDWR Surface Water Classification for Water Body N/ABuffer Rules in Effect: None 200 2-lanes at 10' each with 3' unpaved shoulders Waterbody Information 2016 NCDWR Stream Index No.: 17.BP.11.R.131 Impairments: Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.) This project replaces existing bridge #040122: 1@19’-7”, 1@20’-9”, 4@45’-0”, 1@21’-10”, 1@18’-6”, for an overall length of 260’-8”. The bridge consists of a timber floor on steel girder floor beams, and is 12.17’ wide out-to-out. The proposed bridge will a 270’ long bridge with a span arrangement of 3@90’ utilizing 33” box beams, with spill through abutments, and 30' wide out to out. No deck drains will be required. Runoff from the bridge will be captured and discharged onto Class B rip rap outlet pads. There is a slight increase in the impervious area of the project, however there is no significant increase in the discharge from the roadway runoff. 900 Ridgefield Drive North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTS Project Type: 1590 Mail Service Center Address: General Project Information SF-040122 WBS Element: Bridge ReplacementWBS Element: RK&K - Jonathan Whittington, PENCDOT Contact: 919-707-6751 Suite 350 Raleigh, NC 27609 Contractor / Designer: 919-878-9560 mshown@ncdot.gov Address: 12/13/2016 AsheWeavers Ford Marc Shown, PE Raleigh, NC 27699-1590 River Basin(s): City/Town: 0.3 Typical Cross Section Description: Surrounding Land Use: General Project Narrative: (Description of Minimization of Water Quality Impacts) No Rural North Fork New River 10-2-(21.5) 0.3 635 ft. (0.120 mi.) Project Description Proposed Project New None Supplemental Classification: Outstanding Resource Waters (ORW) Wetlands within Project Limits? Bridge 122 Wi l l ieBrownRdFredPughRdL e gr a RdL u c y B e llR dGarveyBridgeRdE ast W e a v er F o r d Rd Deer w o odRdF a rmRdGr a ssyCreekR d SR#1359H owardColvardRdWayside Ln E d na Pe rryRd Deac o n R d P edr o sR dRo u n d H o useRdRiver C o u n t r y R d N e wRiverRdI s abelWay S R #1 5 59RedHi l l RdRi ver Mt n DrMic hel l eWayTri State Knoll S R #1 5 3 5K ingsC r R d W ayne Arnold R d Miara m W a y H a p p y R id ge Rd SR#1546 S c e n i c V i ew P l SR#1311 Happy Land RdD eerwoo d RdPedros Rd D e e r w o o d R dGras syCreek R d SouthForkNewR ive r Grassy Creek N ort h F o r k N e w R i v e rNewRiver(North C arolina Portion) BRIDGE 122 ASHE COUNTY NORTH CAROLINA SHEET 1 0 2,000 4,000 Feet Express Design - Build Bridge Program Division 11 NCDOT Division of Highways WILKES SURRY ASHE CALDWELL AVERY WATAUGA MITCHELL ALEXANDER ALLEGHANY BRUNSWICK VICINITY MAP HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1 -L- 10+66 to 12+45Causeway 0.47 135 -L- 11+21 and 12+11 Bridge < 0.01 6 -L- 10+64 and 12+48 Bank Stabilization 0.03 < 0.01 127 40 TOTALS*: 0.03 0.47 133 175 0*Rounded totals are sum of actual impactsNOTES:Revised September 2014 SHEET 2OF 9Temporary SW Impacts due to Causeway are for Phases I, II, III, and IVPermanent SW Impacts due to Bridge are 3' diameter drilled shafts, 3 shafts per bentTemporary and Permanent SW Impacts due to placement of Bank Stabilization after removal of Causeway WETLAND PERMIT IMPACT SUMMARYWETLAND IMPACTSSURFACE WATER IMPACTSAshe County17.BP.11.R.131SF-040122NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS8/31/2017 SHEET 3 OF 9 DIVISION OF HIGHWAYS NCDOT TEMPORARY WORK PAD DETAIL 1.5:11.5:1 CLASS B RIP RAP CLASS II RIP RAP CHANNEL BED NOT TO SCALE 8/31/2017 CLASS II RIP RAP ASHE COUNTY PROJECT: 17.BP.11.R.131 (040122) WIDTH OF PROP. BENT CAP + 5’ EACH END FABRIC GEOTEXTILE FLOW INTERIOR BENT C OF PROPOSEDL NATURAL GROUND 1.0’1.5:1 FABRIC GEOTEXTILE VARIES PER PHASE) (QUANTITY AND PLACEMENT 72"X44" CSP ARCHES CLASS B RIP RAP FLOWAPPROX. EL. = 2,470.0’ CHANNEL BOTTOM =2473.4’ NWS EL. NWS EL.=2473.4’ BRIDGE NO. 122 OVER NORTH FORK NEW RIVER ON SR 1549 (GARVEY BRIDGE RD) PHASE IV=2475.5’ PHASE III=2480.5’ PHASE II=2475.5’ PHASE I=2482.5’ CAUSEWAY TOP ELEV. T 15" CMP 1122-1 48" WD48" WW & 1SBW4SBW4SBW4S B W18" CMP15" CMPINV=2485.33’ INV=2486.66’ WOODSGRAVEL 10’ GRAVELGATE MTL WE AVE R ’S F OR D1.45 MILE S +/- LUCY BELL RD. TO SR 1559 0.74 MILES +/- DOUBLE B R A N C H R D.TO SR 1546 1.39 MILES +/- S R 15 5 0 E . WE AVE R ’S F OR D R D. 10’ GR AVE L SR 1549 GARVEY BRIDGE RD. 15’ G R A V E L 15’ GRAVEL S R 1549 G A R VE Y B RID GE R D.11’ GRAVELRV CAMPSITE GRAVEL INV=2484.67’ INV=2478.45’ #107-32 SKYLINE PED E XISTIN G R/WE XISTI N G R/W30.00’ EXISTING R/W EXISTING R/W30.00’15’ R BM1 1 EXISTING R/W #107-32 SKYLINE PED LH&E PROPERTIES, LLC DB 436 PG 482 PB 4 PG 305A S 8000’05" W227.29’ RICKY A. & JOEVELYN S. ROOP DB 199 PG 2198 PB 4 PG 37 JAMES A. & MARGARET B. CHRISTENBURY DB 305 PG 343 PB 4 PG 37 JAY G. D. REID DB 370 PG 178 PB 4 PG 37 STUMP FINANCIAL CORPORATION DB 124 PG 1 STUMP FINANCIAL CORPORATION N 8355’27" E104.68’ N 0524’33" W 72.71’N 4943’44" E24.84’N 18 2 4’3 3" W2 6 0.9 8’ UNKNOWN OWNERSHIP S 5217’05" W205.95’S 4954’27" W216.89’N 6139’05" E165.06’UNKNOWN OWNERSHIP 3’-11"10’ R R=22’8:18:1 8:1.00.06 .01.05 .02.04 .03 .02 .03 .02 .04 .02 .025.025.03.02 .02511’8’8’ EXIST EXIST.03.0216’ .025 .02 .04 12’ EXIST 10’10’SBGP R OP..02510’11’S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY WETLAND AND SURFACE WATER IMPACTS PERMIT NC GRID NAD 83 NA 2011NEW RIVERNORTH FORK1"=30’ SCALE 1"=30’ SCALE 1"=30’ SCALE 1"=30’ SCALE SHAFTS (TYP.) DUE TO DRILLED WATER IMPACTS PERMANENT SURFACE TO CAUSEWAY WATER IMPACTS DUE TEMPORARY SURFACE TO BANK STABILIZATION WATER IMPACTS DUE PERMANENT SURFACE TO BANK STABILIZATION WATER IMPACTS DUE PERMANENT SURFACE TO BANK STABILIZATION WATER IMPACTS DUE TEMPORAY SURFACE TO BANK STABILIZATION WATER IMPACTS DUE TEMPORAY SURFACE TO CAUSEWAY WATER IMPACTS DUE TEMPORARY SURFACE DUE TO BANK STABILIZATION TEMPORAY SURFACE WATER IMPACTS DUE TO BANK STABILIZATION PERMANENT SURFACE WATER IMPACTS TO CAUSEWAY WATER IMPACTS DUE TEMPORARY SURFACE DUE TO BANK STABILIZATION TEMPORAY SURFACE WATER IMPACTS DUE TO BANK STABILIZATION PERMANENT SURFACE WATER IMPACTS TO CAUSEWAY WATER IMPACTS DUE TEMPORARY SURFACE SHEET 4 OF 9 PERMIT DRAWING8/17/999/11/2017R:\Hydraulics\PERMITS_Environmental\Drawings\4-040122_Hyd_per_wet_nocon.dgnjwhittington ALLOWING FOR CONSTRUCTION OF 18’ PROPOSED PAVEMENT.*WHERE PROPOSED PAVEMENT OVERLAPS EXISTING PAVEMENT USED AS DETOUR, A TEMPORARY FILL SLOPE WILL BE CONSTRUCTED SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. 0 0 0 PROFILE (HORIZONTAL) GRAPHIC SCALES PLANS PROFILE (VERTICAL) 0 00 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 60 60 30 3030 30 1266 040122 ADT = 70 (2000) DESIGN SPEED = 20 MPH TO BE EXCAVATED PLANS PREPARED BY : 900 RIDGEFIELD DRIVE SUITE 350 RALEIGH, NORTH CAROLINA 27609-3960 RUMMEL, KLEPPER & KAHL, LLP NC LICENSE NO. F-0112 (919) 878-9560 -L- PC Sta. 13+12.42 END APPROACH SLAB-L- PC Sta. 10+20.00 BEGIN APPROACH SLAB ASHE #122 04 TO DRAIN GRADE SEE DETAIL A STANDARD V DITCH 2GI 2GI TB 2GI TB 2GI TB 2GI TB 2GI TB 2GI TB 2GI TB w/MH JB 15" CSP15" CSP 1 5" CS P REMOVE RETAIN CSP18"18" RCP-IVRCP-IV18"15" RCP- I V15" R C P-I V 15" RCP-IV15" RCP-IVRCP-IV15" CLASS II RIP RAP RIP RAP CLASS II SEE DETAIL B SPECIAL CUT V DITCH 2GI TB CSP 18" 15" RCP-IV REMOVE DETAIL C STREAM BANK STABILIZATION Type of Liner= CL II Rip-Rap, W/Geotextile Fabric Rt. Bank: 80 tons CL II Rip-Rap, 85 sy Geotextile Fabric Lt. Bank: 145 tons CL II Rip-Rap, 150 sy Geotextile Fabric SEE DETAIL C BANK STABILIZATION SEE DETAIL C BANK STABILIZATION -Y- PRC Sta. 11+90.29 -Y- PRC Sta. 12+68.40 -Y- PCC Sta. 13+68.99 -L- STA. 14+10.00 END PROJECT 040122 -Y- STA. 11+90.00 BEGIN CONSTRUCTION -Y- PT Sta. 16+26.56 -Y- POC Sta. 13+26.04 -L- STA. 10+00.00 = BEGIN PROJECT 040122 -L- POT Sta. 15+28.84 -L- PT Sta. 14+72.08 -L- PC Sta. 13+64.26 -L- PC Sta. 12+97.79 -DR1- STA. 10+15.00 BEGIN CONSTRUCTION -DR1- POT Sta. 10+74.53 =-L- POC Sta. 13+24.76 -DR1- POT Sta. 10+00.00 -DR1- PC Sta. 10+30.86 -DR1- PT Sta. 10+53.63 -Y- STA 14+15.00 END CONSTRUCTION 10+00 15+0010+0015+00-L- PT Sta. 13+53.58 F F F F F F F C F C C F F C C C C C RIGHT-OF-WAY AREAS OWNERSHIP UNKNOWN ROOP, RICKY A. & JOEVELYN STUMP FINANCIAL CORPORATION 0.126 Ac. 1 3 2 0.003 Ac. GRAU 350 TL-2 C CSP 18" F DETAIL C CL II RIP RAP 2’ THK. OR FLATTER SLOPE=1.5:1 GROUND NATURAL ( Not to Scale) STREAM BANK STABILIZATION Type of Liner= CL II Rip-Rap, W/Geotextile Fabric Rt. Bank: 80 tons CL II Rip-Rap, 85 sy Geotextile Fabric Fabric (TYP.) Geotextile Lt. Bank: 145 tons CL II Rip-Rap, 150 sy Geotextile Fabric 24702470247524752475247524752475 247524752475 2475248024802480248024802480 2480248024802480 248524852485248524852485 248524852485249024902490249024902490 249024902 4 9 0 24902 4 9 0 2490 2490 24902495249524952495 24952 4 9 5 24952500250025002500 25002 5 0 0 2 5 0 0 2500250525052505250525052 5 0 5251025102510251025102 5 1 0251525152515251 52515 25202520 2 5 2 0 2520 2520252525252 5 2 52525 2 5 3 025302530 2530 253525352535 2535 254025402 5 4 525452550247524802490 24752480248524902475248024852475T 15" CMP 1122-1 48" WD48" WW & 1SBW4SBW4SBW4S B W18" CMP15" CMPINV=2485.33’ INV=2486.66’ WOODSGRAVEL 10’ GRAVELGATE MTL WE AVE R ’S F OR D1.45 MILE S +/- LUCY BELL RD. TO SR 1559 0.74 MILES +/- DOUBLE B R A N C H R D.TO SR 1546 1.39 MILES +/- S R 15 5 0 E . WE AVE R ’S F OR D R D. 10’ GR AVE L SR 1549 GARVEY BRIDGE RD. 15’ G R A V E L 15’ GRAVEL S R 1549 G A R VE Y B RID GE R D.11’ GRAVELRV CAMPSITE GRAVEL INV=2484.67’ INV=2478.45’ #107-32 SKYLINE PED E XISTIN G R/WE XISTI N G R/W30.00’ EXISTING R/W EXISTING R/W30.00’15’ R BM1 1 EXISTING R/W #107-32 SKYLINE PED LH&E PROPERTIES, LLC DB 436 PG 482 PB 4 PG 305A S 8000’05" W227.29’ RICKY A. & JOEVELYN S. ROOP DB 199 PG 2198 PB 4 PG 37 JAMES A. & MARGARET B. CHRISTENBURY DB 305 PG 343 PB 4 PG 37 JAY G. D. REID DB 370 PG 178 PB 4 PG 37 STUMP FINANCIAL CORPORATION DB 124 PG 1 STUMP FINANCIAL CORPORATION N 8355’27" E104.68’ N 0524’33" W 72.71’N 4943’44" E24.84’N 18 2 4’3 3" W2 6 0.9 8’ UNKNOWN OWNERSHIP S 5217’05" W205.95’S 4954’27" W216.89’N 6139’05" E165.06’UNKNOWN OWNERSHIP 3’-11"10’ R R=22’8:18:1 8:1.00.06 .01.05 .02.04 .03 .02 .03 .02 .04 .02 .025.025.03.02 .02511’8’8’ EXIST EXIST.03.0216’ .025 .02 .04 12’ EXIST 10’10’SBGP R OP..02510’11’S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY WETLAND AND SURFACE WATER IMPACTS PERMIT NC GRID NAD 83 NA 2011NEW RIVERNORTH FORK1"=30’ SCALE 1"=30’ SCALE 1"=30’ SCALE 1"=30’ SCALE SHAFTS (TYP.) DUE TO DRILLED WATER IMPACTS PERMANENT SURFACE TO CAUSEWAY WATER IMPACTS DUE TEMPORARY SURFACE TO BANK STABILIZATION WATER IMPACTS DUE PERMANENT SURFACE TO BANK STABILIZATION WATER IMPACTS DUE PERMANENT SURFACE TO BANK STABILIZATION WATER IMPACTS DUE TEMPORAY SURFACE TO BANK STABILIZATION WATER IMPACTS DUE TEMPORAY SURFACE TO CAUSEWAY WATER IMPACTS DUE TEMPORARY SURFACE DUE TO BANK STABILIZATION TEMPORAY SURFACE WATER IMPACTS DUE TO BANK STABILIZATION PERMANENT SURFACE WATER IMPACTS TO CAUSEWAY WATER IMPACTS DUE TEMPORARY SURFACE DUE TO BANK STABILIZATION TEMPORAY SURFACE WATER IMPACTS DUE TO BANK STABILIZATION PERMANENT SURFACE WATER IMPACTS TO CAUSEWAY WATER IMPACTS DUE TEMPORARY SURFACE SHEET 5 OF 9 PERMIT DRAWING8/17/999/11/2017R:\Hydraulics\PERMITS_Environmental\Drawings\5-040122_Hyd_per_wet_con.dgnjwhittington ALLOWING FOR CONSTRUCTION OF 18’ PROPOSED PAVEMENT.*WHERE PROPOSED PAVEMENT OVERLAPS EXISTING PAVEMENT USED AS DETOUR, A TEMPORARY FILL SLOPE WILL BE CONSTRUCTED SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. 0 0 0 PROFILE (HORIZONTAL) GRAPHIC SCALES PLANS PROFILE (VERTICAL) 0 00 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 60 60 30 3030 30 1266 040122 ADT = 70 (2000) DESIGN SPEED = 20 MPH TO BE EXCAVATED PLANS PREPARED BY : 900 RIDGEFIELD DRIVE SUITE 350 RALEIGH, NORTH CAROLINA 27609-3960 RUMMEL, KLEPPER & KAHL, LLP NC LICENSE NO. F-0112 (919) 878-9560 -L- PC Sta. 13+12.42 END APPROACH SLAB-L- PC Sta. 10+20.00 BEGIN APPROACH SLAB ASHE #122 04 TO DRAIN GRADE SEE DETAIL A STANDARD V DITCH 2GI 2GI TB 2GI TB 2GI TB 2GI TB 2GI TB 2GI TB 2GI TB w/MH JB 15" CSP15" CSP 1 5" CS P REMOVE RETAIN CSP18"18" RCP-IVRCP-IV18"15" RCP- I V15" R C P-I V 15" RCP-IV15" RCP-IVRCP-IV15"SEE DETAIL B SPECIAL CUT V DITCH 2GI TB CSP 18" 15" RCP-IV REMOVE DETAIL C STREAM BANK STABILIZATION Type of Liner= CL II Rip-Rap, W/Geotextile Fabric Rt. Bank: 80 tons CL II Rip-Rap, 85 sy Geotextile Fabric Lt. Bank: 145 tons CL II Rip-Rap, 150 sy Geotextile Fabric -Y- PRC Sta. 11+90.29 -Y- PRC Sta. 12+68.40 -Y- PCC Sta. 13+68.99 -L- STA. 14+10.00 END PROJECT 040122 -Y- STA. 11+90.00 BEGIN CONSTRUCTION -Y- PT Sta. 16+26.56 -Y- POC Sta. 13+26.04 -L- STA. 10+00.00 = BEGIN PROJECT 040122 -L- POT Sta. 15+28.84 -L- PT Sta. 14+72.08 -L- PC Sta. 13+64.26 -L- PC Sta. 12+97.79 -DR1- STA. 10+15.00 BEGIN CONSTRUCTION -DR1- POT Sta. 10+74.53 =-L- POC Sta. 13+24.76 -DR1- POT Sta. 10+00.00 -DR1- PC Sta. 10+30.86 -DR1- PT Sta. 10+53.63 -Y- STA 14+15.00 END CONSTRUCTION 10+00 15+0010+0015+00-L- PT Sta. 13+53.58 F F F F F F F C F C C F F C C C C C RIGHT-OF-WAY AREAS OWNERSHIP UNKNOWN ROOP, RICKY A. & JOEVELYN STUMP FINANCIAL CORPORATION 0.126 Ac. 1 3 2 0.003 Ac. GRAU 350 TL-2 C CSP 18" F DETAIL C CL II RIP RAP 2’ THK. OR FLATTER SLOPE=1.5:1 GROUND NATURAL ( Not to Scale) STREAM BANK STABILIZATION Type of Liner= CL II Rip-Rap, W/Geotextile Fabric Rt. Bank: 80 tons CL II Rip-Rap, 85 sy Geotextile Fabric Fabric (TYP.) Geotextile Lt. Bank: 145 tons CL II Rip-Rap, 150 sy Geotextile Fabric 24702470247524752475247524752475 24752475247524802480248024802480 2480 24802480248024802480 248524852485248524852485 248524852485 24852485249024902490249024902490 249024902 4 9 0 24902 4 9 0 2490 2490 24902495249524952495 24952 4 9 5 24952500250025002500 25002 5 0 0 2 5 0 0 2500250525052505250525052 5 0 5251025102510251025102 5 1 025152515 2515 25152515 25152515 2520252025202520 2 5 2 0 2520 25202525252525252 5 2 52525 25302 5 3 025302530 2530 2535 253525352535 2535 2540 25402540 2 5 4 5 2 5 4 525452550 255025552555 2560 T REBAR REBAR48" WD48" WW & 1SBW FOOTBRIDGE WD4SBW4 S BW18" CMP WOODS WOODS WOODS GRAVEL10’ GRAVELS S ROCK WALL STACKED GATE MTL WD WE AVE R ’S F OR D1.45 MILE S +/- LUCY BELL RD. TO SR 1559 0.74 MILES +/- S R 15 5 0 E . WE AVE R’S F ORD R D. 10’ GR AVE L SR 1549 GARVEY BRIDGE RD. 15’ G R A V E L 15’ GRAVEL S R 1549 G A R VE Y B RID GE R D.11’ GRAVELRV CAMPSITE GRAVEL 1SFDNEW RIVERNORTH FORK#107-32 SKYLINE PED E XISTIN G R/W30.00’ EXISTING R/W EXISTING R/W30.00’15’ R BM1 LH&E PROPERTIES, LLC RICKY A. & JOEVELYN S. ROOP JAMES A. & MARGARET B. CHRISTENBURY JAY G. D. REID STUMP FINANCIAL CORPORATION UNKNOWN OWNERSHIP INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION SHEET 6 OF 9 PERMIT DRAWING 9/11/2017R:\Hydraulics\PERMITS_Environmental\Drawings\6-040122_Causeway Phase_I.dgnjwhittingtonSHEET NO.PROJECT REFERENCE NO. R/W SHEET NO. 0 0 0 PROFILE (HORIZONTAL) GRAPHIC SCALES PLANS PROFILE (VERTICAL) 0 00 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 60 60 30 3030 30 1266 040122 ASHE #122 BENT ACCESS MAIN CAUSEWAY 1.5:1 SLOPE (TYP.) CLASS II RIP RAP CLASS B RIP RAP 1.0’ GEOTEXTILE FABRIC (TYP.) 15’ 20’ BENT ACCESS MAIN CAUSEWAY STREAM BED CLASS II RIP RAP CLASS B RIP RAP 1.0’ GEOTEXTILE FABRIC (TYP.) 15’ 20’ CAUSEWAY CONSTRUCTION SEQUENCE PLAN OF CAUSEWAY - PHASE I TOP OF CAUSEWAY EL. = 2482.5’ (SURVEYED 4/14/2016) NWS EL. 2473.4’ NC GRID NAD 83 NA 2011 PLANS PREPARED BY : 900 RIDGEFIELD DRIVE SUITE 350 RALEIGH, NORTH CAROLINA 27609-3960 RUMMEL, KLEPPER & KAHL, LLP NC LICENSE NO. F-0112 (919) 878-9560 CAUSEWAY. INSTALL BANK STABILIZATION AFTER REMOVING8. OF PHASE I. REMOVE CAUSEWAY UPON COMPLETION 7. & INTERIOR BENT 1 FROM CAUSEWAY. INSTALL 33" BOX BEAMS OVER END BENT 16. REMOVE BENT ACCESS PORTION OF CAUSEWAY. AFTER COMPLETION OF BENT CONSTRUCTION, 5. BENT 1. CONSTRUCT END BENT 1 AND INTERIOR 4. DETERMINED IN THE FIELD.)TO BE REMOVE REMNANT CONCRETE PIERS (LOCATIONS3. DURING PHASE I CONSTRUCTION HALF OF THE STREAM SHALL BE BLOCKED PIPES AS SHOWN ON PLAN. NO MORE THAN CONSTRUCT CAUSEWAY, WITH FLOW THROUGH 2. PLAN. CONSTRUCT GRAVEL ACCESS, AS SHOWN ON 1. DETAIL OF CAUSEWAYNEW RI VERNORTH FORKEC-1A N.T.S. RIGHT-OF-WAY AREAS STUMP FINANCIAL CORPORATION 1 3 2 DETAIL C OR FLATTER SLOPE=1.5:1 STREAM BANK STABILIZATION Type of Liner= CL II Rip-Rap, W/Geotextile Fabric Rt. Bank: 80 tons CL II Rip-Rap, 85 sy Geotextile Fabric Lt. Bank: 145 tons CL II Rip-Rap, 150 sy Geotextile Fabric GRAVEL ACCESS (4)-72"x44" CSP ARCHES PHASE I & III STAGING AREA 24702470247524752475247524752475 24752475247524802480248024802480 2480 24802480248024802480 248524852485248524852485 248524852485 24852485249024902490249024902490 249024902 4 9 0 24902 4 9 0 2490 2490 24902495249524952495 24952 4 9 5 24952500250025002500 25002 5 0 0 2 5 0 0 2500250525052505250525052 5 0 5251025102510251025102 5 1 025152515 2515 25152515 25152515 2520252025202520 2 5 2 0 2520 25202525252525252 5 2 52525 25302 5 3 025302530 2530 2535 253525352535 2535 2540 25402540 2 5 4 5 2 5 4 525452550 255025552555 2560 T REBAR REBAR48" WD48" WW & 1SBW FOOTBRIDGE WD4SBW4 S BW18" CMP WOODS WOODS WOODS GRAVEL10’ GRAVELS S ROCK WALL STACKED GATE MTL WD WE AVE R ’S F OR D1.45 MILE S +/- LUCY BELL RD. TO SR 1559 0.74 MILES +/- S R 15 5 0 E . WE AVE R’S F ORD R D. 10’ GR AVE L SR 1549 GARVEY BRIDGE RD. 15’ G R A V E L 15’ GRAVEL S R 1549 G A R VE Y B RID GE R D.11’ GRAVELRV CAMPSITE GRAVEL 1SFDNEW RIVERNORTH FORK#107-32 SKYLINE PED E XISTIN G R/W30.00’ EXISTING R/W EXISTING R/W30.00’15’ R BM1 LH&E PROPERTIES, LLC RICKY A. & JOEVELYN S. ROOP JAMES A. & MARGARET B. CHRISTENBURY JAY G. D. REID STUMP FINANCIAL CORPORATION UNKNOWN OWNERSHIP INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION SHEET 7 OF 9 PERMIT DRAWING 9/11/2017R:\Hydraulics\PERMITS_Environmental\Drawings\7-040122_Causeway Phase_II.dgnjwhittingtonPLANS PREPARED BY : 900 RIDGEFIELD DRIVE SUITE 350 RALEIGH, NORTH CAROLINA 27609-3960 RUMMEL, KLEPPER & KAHL, LLP NC LICENSE NO. F-0112 (919) 878-9560 SHEET NO.PROJECT REFERENCE NO. R/W SHEET NO. 0 0 0 PROFILE (HORIZONTAL) GRAPHIC SCALES PLANS PROFILE (VERTICAL) 0 00 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 60 60 30 3030 30 1266 040122 ASHE #122 BENT ACCESS MAIN CAUSEWAY 1.5:1 SLOPE (TYP.) CLASS II RIP RAP CLASS B RIP RAP 1.0’ GEOTEXTILE FABRIC (TYP.) 15’ 20’ BENT ACCESS MAIN CAUSEWAY STREAM BED CLASS II RIP RAP CLASS B RIP RAP 1.0’ GEOTEXTILE FABRIC (TYP.) 15’ 20’ CAUSEWAY CONSTRUCTION SEQUENCE TOP OF CAUSEWAY EL. = 2475.5’ (SURVEYED 4/14/2016) NWS EL. 2473.4’ PLAN OF CAUSEWAY - PHASE II NC GRID NAD 83 NA 2011 EC-1B NEW RI VERNORTH FORKCAUSEWAY. INSTALL BANK STABILIZATION AFTER REMOVING9. PHASE II. REMOVE CAUSEWAY UPON COMPLETION OF 8. & END BENT 2 FROM CAUSEWAY. INSTALL 33" BOX BEAMS OVER INTERIOR BENT 27. & INTERIOR BENT 2 FROM CAUSEWAY. INSTALL 33" BOX BEAMS OVER INTERIOR BENT 16. REMOVE BENT ACCESS PORTION OF CAUSEWAY. AFTER COMPLETION OF BENT CONSTRUCTION, 5. CONSTRUCT END BENT 2 AND INTERIOR BENT 2. 4. TO BE DETERMINED IN THE FIELD.) REMOVE REMNANT CONCRETE PIERS (LOCATIONS 3. DURING PHASE II CONSTRUCTION. HALF OF THE STREAM SHALL BE BLOCKED PIPES AS SHOWN ON PLAN. NO MORE THAN CONSTRUCT CAUSEWAY, WITH FLOW THROUGH 2. PLAN. CONSTRUCT GRAVEL ACCESS, AS SHOWN ON 1. N.T.S. DETAIL OF CAUSEWAY RIGHT-OF-WAY AREAS ROOP, RICKY A. & JOEVELYN STUMP FINANCIAL CORPORATION 1 3 2 F F F F F F F C F C C F F C C C C C STREAM BANK STABILIZATION Type of Liner= CL II Rip-Rap, W/Geotextile Fabric Rt. Bank: 80 tons CL II Rip-Rap, 85 sy Geotextile Fabric Lt. Bank: 145 tons CL II Rip-Rap, 150 sy Geotextile Fabric GRAVEL ACCESS PHASE I CONSTRUCTED UNDER PROP. BRIDGE BENT (2)-72"x44" CSP ARCHES PHASE II & IV STAGING AREA 24702470247524752475247524752475 24752475247524802480248024802480 2480 24802480248024802480 248524852485248524852485 248524852485 24852485249024902490249024902490 249024902 4 9 0 24902 4 9 0 2490 2490 24902495249524952495 24952 4 9 5 24952500250025002500 25002 5 0 0 2 5 0 0 2500250525052505250525052 5 0 5251025102510251025102 5 1 025152515 2515 25152515 25152515 2520252025202520 2 5 2 0 2520 25202525252525252 5 2 52525 25302 5 3 025302530 2530 2535 253525352535 2535 2540 25402540 2 5 4 5 2 5 4 525452550 255025552555 2560 T REBAR REBAR48" WD48" WW & 1SBW FOOTBRIDGE WD4SBW4 S BW18" CMP WOODS WOODS WOODS GRAVEL10’ GRAVELS S ROCK WALL STACKED GATE MTL WD WE AVE R ’S F OR D1.45 MILE S +/- LUCY BELL RD. TO SR 1559 0.74 MILES +/- S R 15 5 0 E . WE AVE R’S F ORD R D. 10’ GR AVE L SR 1549 GARVEY BRIDGE RD. 15’ G R A V E L 15’ GRAVEL S R 1549 G A R VE Y B RID GE R D.11’ GRAVELRV CAMPSITE GRAVEL 1SFDNEW RIVERNORTH FORK#107-32 SKYLINE PED E XISTIN G R/W30.00’ EXISTING R/W EXISTING R/W30.00’15’ R BM1 LH&E PROPERTIES, LLC RICKY A. & JOEVELYN S. ROOP JAMES A. & MARGARET B. CHRISTENBURY JAY G. D. REID STUMP FINANCIAL CORPORATION UNKNOWN OWNERSHIP INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION SHEET 8 OF 9 PERMIT DRAWING 9/11/2017R:\Hydraulics\PERMITS_Environmental\Drawings\8-040122_Causeway Phase_III.dgnjwhittingtonPLANS PREPARED BY : 900 RIDGEFIELD DRIVE SUITE 350 RALEIGH, NORTH CAROLINA 27609-3960 RUMMEL, KLEPPER & KAHL, LLP NC LICENSE NO. F-0112 (919) 878-9560 SHEET NO.PROJECT REFERENCE NO. R/W SHEET NO. 0 0 0 PROFILE (HORIZONTAL) GRAPHIC SCALES PLANS PROFILE (VERTICAL) 0 00 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 60 60 30 3030 30 1266 040122 ASHE #122 BENT ACCESS MAIN CAUSEWAY 1.5:1 SLOPE (TYP.) CLASS II RIP RAP CLASS B RIP RAP 1.0’ GEOTEXTILE FABRIC (TYP.) 15’ 20’ BENT ACCESS MAIN CAUSEWAY STREAM BED CLASS II RIP RAP CLASS B RIP RAP 1.0’ GEOTEXTILE FABRIC (TYP.) 15’ 20’ CAUSEWAY CONSTRUCTION SEQUENCE TOP OF CAUSEWAY EL. = 2480.5’ (SURVEYED 4/14/2016) NWS EL. 2473.4’ PLAN OF CAUSEWAY - PHASE III NC GRID NAD 83 NA 2011 EC-1C NEW RI VERNORTH FORKCAUSEWAY. INSTALL BANK STABILIZATION AFTER REMOVING 5. PHASE III. REMOVE CAUSEWAY UPON COMPLETION OF4. BENTS 1, 2, & 3. REMOVE EXISTING END BENT 1 & INTERIOR 3. DURING PHASE III CONSTRUCTION. HALF OF THE STREAM SHALL BE BLOCKED PIPES AS SHOWN ON PLAN. NO MORE THAN CONSTRUCT CAUSEWAY, WITH FLOW THROUGH 2. PLAN. CONSTRUCT GRAVEL ACCESS AS SHOWN ON 1. N.T.S. DETAIL OF CAUSEWAY RIGHT-OF-WAY AREAS OWNERSHIP UNKNOWN ROOP, RICKY A. & JOEVELYN STUMP FINANCIAL CORPORATION 1 3 2 0.003 Ac. F F F F F F F C F C C F F C C C C C DETAIL C STREAM BANK STABILIZATION Type of Liner= CL II Rip-Rap, W/Geotextile Fabric Rt. Bank: 80 tons CL II Rip-Rap, 85 sy Geotextile Fabric Lt. Bank: 145 tons CL II Rip-Rap, 150 sy Geotextile Fabric GRAVEL ACCESS (5)-72"x44" CSP ARCHES PHASE I & III STAGING AREA 24702470247524752475247524752475 24752475247524802480248024802480 2480 24802480248024802480 248524852485248524852485 248524852485 24852485249024902490249024902490 249024902 4 9 0 24902 4 9 0 2490 2490 24902495249524952495 24952 4 9 5 24952500250025002500 25002 5 0 0 2 5 0 0 2500250525052505250525052 5 0 5251025102510251025102 5 1 025152515 2515 25152515 25152515 2520252025202520 2 5 2 0 2520 25202525252525252 5 2 52525 25302 5 3 025302530 2530 2535 253525352535 2535 2540 25402540 2 5 4 5 2 5 4 525452550 255025552555 2560 T REBAR REBAR48" WD48" WW & 1SBW FOOTBRIDGE WD4SBW4 S BW18" CMP WOODS WOODS WOODS GRAVEL10’ GRAVELS S ROCK WALL STACKED GATE MTL WD WE AVE R ’S F OR D1.45 MILE S +/- LUCY BELL RD. TO SR 1559 0.74 MILES +/- S R 15 5 0 E . WE AVE R’S F ORD R D. 10’ GR AVE L SR 1549 GARVEY BRIDGE RD. 15’ G R A V E L 15’ GRAVEL S R 1549 G A R VE Y B RID GE R D.11’ GRAVELRV CAMPSITE GRAVEL 1SFDNEW RIVERNORTH FORK#107-32 SKYLINE PED E XISTIN G R/W30.00’ EXISTING R/W EXISTING R/W30.00’15’ R BM1 LH&E PROPERTIES, LLC RICKY A. & JOEVELYN S. ROOP JAMES A. & MARGARET B. CHRISTENBURY JAY G. D. REID STUMP FINANCIAL CORPORATION UNKNOWN OWNERSHIP INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION SHEET 9 OF 9 PERMIT DRAWING 9/11/2017R:\Hydraulics\PERMITS_Environmental\Drawings\9-040122_Causeway Phase_IV.dgnjwhittingtonPLANS PREPARED BY : 900 RIDGEFIELD DRIVE SUITE 350 RALEIGH, NORTH CAROLINA 27609-3960 RUMMEL, KLEPPER & KAHL, LLP NC LICENSE NO. F-0112 (919) 878-9560 SHEET NO.PROJECT REFERENCE NO. R/W SHEET NO. 0 0 0 PROFILE (HORIZONTAL) GRAPHIC SCALES PLANS PROFILE (VERTICAL) 0 00 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 60 60 30 3030 30 1266 040122 ASHE #122 BENT ACCESS MAIN CAUSEWAY 1.5:1 SLOPE (TYP.) CLASS II RIP RAP CLASS B RIP RAP 1.0’ GEOTEXTILE FABRIC (TYP.) 15’ 20’ BENT ACCESS MAIN CAUSEWAY STREAM BED CLASS II RIP RAP CLASS B RIP RAP 1.0’ GEOTEXTILE FABRIC (TYP.) 15’ 20’ CAUSEWAY CONSTRUCTION SEQUENCE TOP OF CAUSEWAY EL. = 2475.5’ (SURVEYED 4/14/2016) NWS EL. 2473.4’ PLAN OF CAUSEWAY - PHASE IV NC GRID NAD 83 NA 2011 EC-1D CAUSEWAY. INSTALL BANK STABILIZATION AFTER REMOVING5. PHASE IV. REMOVE CAUSEWAY UPON COMPLETION OF 4. & END BENT 2. REMOVE EXISTING INTERIOR BENTS 4, 5, 6, & 7;3. DURING PHASE IV CONSTRUCTION. HALF OF THE STREAM SHALL BE BLOCKED PIPES AS SHOWN ON PLAN. NO MORE THAN CONSTRUCT CAUSEWAY, WITH FLOW THRU 2. PLAN. CONSTRUCT GRAVEL ACCESS AS SHOWN ON 1.NEW RI VERNORTH FORKN.T.S. DETAIL OF CAUSEWAY RIGHT-OF-WAY AREAS ROOP, RICKY A. & JOEVELYN STUMP FINANCIAL CORPORATION 1 3 2 F F F F F F F C F C C F F C C C C C DETAIL C STREAM BANK STABILIZATION Type of Liner= CL II Rip-Rap, W/Geotextile Fabric Rt. Bank: 80 tons CL II Rip-Rap, 85 sy Geotextile Fabric Lt. Bank: 145 tons CL II Rip-Rap, 150 sy Geotextile Fabric