Loading...
HomeMy WebLinkAbout20210344 Ver 1_Meeting Request Review_20210213 tie R•.'. DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnYlmnal2nlrtl Qua fay ID#* 20210344 Version* 1 Regional Office* Winston-Salem Regional Office-(336)776-9800 Reviewer List* Dave Wanucha Pre-Filing Meeting Request submitted 2/13/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* NCDOT-Kevin Hining, Div 11 DEO Contact Email Address* kjhining@ncdot.gov Project Name* Ashe Bridge 122 Project Owner* NCDOT Project County* Ashe Owner Address: Street Address 801 Statesville Road Address Line 2 City State/Rovince/Region North Wilkesboro NC Fbstal/Zip Code Country 28659 United States Is this a transportation project?* (' Yes r No Type(s)of approval sought from the DWR: rJ 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express • Individual Permit I— Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Dave Wanucha Please give a brief project description below.* Replacement of Ashe bridge 122. Located at the intersection of Garvey Bridge Rd (SR1549)and East Weaver Ford Road (SR1550), at coordinates 36.542688,-81.352118 Dave-No meeting needed unless you would like to meet.We are finalizing the permit drawings(attached below), so I hope to have the PCN completed soon. Please give a couple of dates you are available for a meeting. 2/22/2021 3/2/2021 Please attach the documentation you would like to have the meeting about. 040122 Preliminary Permit Drawings and 4.99MB impact summary.pdf pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. . I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature Submittal Date 2/13/2021 Reviewer Meeting Request Decision ................. Has a meeting been scheduled?* C Yes a No