Loading...
HomeMy WebLinkAbout20210345 Ver 1_Meeting Request Review_20210215 tie R•.'. DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnYlmnal2nlrtl Qua fay ID#* 20210345 Version* 1 Regional Office* Winston-Salem Regional Office-(336)776-9800 Reviewer List* Dave Wanucha Pre-Filing Meeting Request submitted 2/15/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Jeff Hemphill Contact Email Address* jemphill@ncdot.gov Project Name* B-4626 Project Owner* NCDOT Project County* Rowan Owner Address: Street Address 1598 Mail Service Center Address Line 2 City State/Rovince/Region Raleigh NC Fbstal/Zip Code Country 27699-1598 US Is this a transportation project?* r Yes r No Type(s)of approval sought from the DWR: rJ 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below.* The North Carolina Department of Transportation (NCDOT) proposes to replace the superstructure on bridge 0003 and apply deck preservation treatment to Bridge 0008 on NC 8/NC 49 over the Yadkin River (Tuckertown Reservoir) in Davidson, Rowan and Stanly Counties with the same span arrangement on the existing alignment.This action will result in 18 feet of permanent impacts to the Yadkin River from bank stabilization and 0.05 ac of temporary impacts from causeways for bridge construction/rehabilitation. No stream mitigation will be required for this project. Please give a couple of dates you are available for a meeting. 2/17/2021 2/22/2021 2/24/2021 Please attach the documentation you would like to have the meeting about. B-4626 Final Permit Drawings.pdi 11.05MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. . I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature Submittal Date 2/15/2021 Reviewer Meeting Request Decision Has a meeting been scheduled?* ( Yes r No