HomeMy WebLinkAbout20120318 Ver 1_Site Plan_20120329Date.
1/24/12
Scale-
1 ° =80'
Drawn:
AJF
Checked:
AJF
Project No.
225 -05
Computer Dwg. Name
225- 05MASTER-DWG
BUFFER AREA 1
PERMANENT IMPACT ZONE 1
2,162 SF
0-050 AC.
PERMANENT IMPACT ZONE 2
5,064 SF
0.116 AC.
BUFFER AREA 2
PERMANENT IMPACT ZONE 1
669 SF
0.015 AC_
PERMANENT IMPACT ZONE 2
7,835 SF
0.180 AC_
BUFFER AREA 3
TEMPORARY IMPACT ZONE 1
1 651 SF
0.015 AC.
TOTAL (PERMANENT IMPACT ZONE 1 2,831 SF L P 0.065 AC_
e
TOTAL ERMAN ENT IMPACT ZONE 2 12,899SF 0-296AC-
.
TOTAL TEMPORARY IMPACT ZONE 1 651 SF 0.015 AC_
REMOVE TOPSOIL ANG
COMPACT SUBGRADE PRIOR
TO PLACEMENT
CRUSHER RUN SCREENINGS
)MPACTED @ 98% PLACED
NON-WOVEN GEOTEXTILE
PROPEX 401 OR APPROVED EQUAL
GRAVEL PEDESTRIAN PATH
DETAIL (nts)
NORTH
50, 0 50, 100,
SCALE: 1"= 60'(HoCiz-)
Date:
1/24/12
Scale:
1 11=501
Drawn:
AJF
Checked:
AJF
Project No.
225-05
Computer Dwg, Name
225-05MASTER-DWG
DETAIL H
PREFORMED SCOUR HOLE
(NOT TO SCALE)
PLAN VIEW
INSTALL LEVEL AND FLUSH
WITH NATURAL GROUND
A
PIPE #1 d=8"
B= 3'
PIPE #2 d =12"
B= 4'
PIPE #3 d= 8"
B=3'
PIPE #4 d =18" (4 TOTAL)
B=8'
PIPE #5 d=8"
B=3'
PIPE #6 d =12"
B=4'
PIPE #7 d =15"
B=5'
PIPE #8 d =18" (2 TOTAL)
B =12'
_ NATURAL
GROUND
GENERAL CONSTRUCTION AND UTILITY NOTES
1_ EXISTING UNDERGROUND STRUCTURES AND UTILITIES SHOWN
ARE BASED BEST AVAILABLE RECORD DRAWINGS_ THE
CONTRACTOR SHALL FIELD VERIFY CONDITIONS PRIOR TO
STARTING CONSTRUCTION AND NOTIFY THE ENGINEER OF ANY
DISCREPANCIES.
2- THE CONTRACTOR SHALL CONTACT NORTH CAROLINA ONE CALL
AT 1- 800 -632 -4949 FOR ASS (STANCE LOCATING EXISTING
UTILITIES. THE CONTRACTOR SHALL CALL AT LEAST 48 HOURS
PRIOR TO ANY DIGGING_
3_ TOPOGRAPHIC INFORMATION TAKEN FROM NCDOT LIDAR FOR
CHATHAM COUNTY, NORTH CAROLINA__
4. EXISTING PARCEL INFORMATION OBTAIN FROM CHATHAM
COUNTY GIS_
NCDENR SELF- INSPECTION PROGRAM
THE SEDIMENTATION POLLU71ON CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT
PERSONS RESPONSIBLE FOR LAND-DISTURBING ACTIVITIES INSPECT A PROJECT AFTER
EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND
SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED_
RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TAKE EFFECT OCTOBER
1,2010-
THE SELF - INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF - MONITORING
PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE
FOCUS OF THE SELF - INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF
EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED
PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT,
AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED:
EXCERPTS FROM THE NORTH CAROLINA GENERAL STATUES AND THE NORTH CAROLINA
ADMINISTRATIVE CODE CONCERNING SELF - INSPECTIONS ARE ENCLOSED. TO BETTER
EXPLAIN THE REQUIREMENTS, A LIST OF FREQUENTLY ASKED QUESTIONS IS ALSO
ENCLOSED, ALONG WITH A SELF4NSPECTION REPORT FORM_ THE SELF4NSPECTION
REPORT FORM WILL ALSO BE AVAILABLE AS AN EXCEL SPREADSHEET FROM THE LAND
QUALITY WEB SITE,
http://www-dlr-enr.state-ne.us/pages/sedimentatlon-new-htmi
GROUND STABILIZATION *
VV11 H LtVtL 5I'KtAUtK AI'r� 'IV_....,- '-�" ' ! UPtCK: Gl fiSJ 0 YJrKAr
SITE E STABILIZATION STABILIZATION ME
-
SEE AIL SHEET 2- _. o \ '.. _ -� . WITH TYPE 2 FILTER FABRIC
- _
PRr= -FORMS D SCOUR HOLE \ MIN. 1' TUCK DESCRIPTION TIME FRAME FRAME EXCEPTIONS
.... - WITH LEVEL SPREADER APRON `\� \ N /F-
l�0 Perimeter dikes,
— es 7 days None
SEE DETAIL SHEET 2 'I' /�,� \ .
� `� — t1ClQtxl" RQI� Width �t}8 swales, ditches da
_ — BUFFER
IMPACT AREA 3 — 9 MT_ SINAI AM�'CHURCH $O and slopes
.___. TEMP_ IMPACT ZONE' 1 ='651 SF BUFFER'IMPACT AREA 2
PIN X741- S6 -4O5� PSRM -NORTH AMERICAN GREEN P 300 PERMANENT High Quality
- -�� °� \ ` TURF REINFORCEMENT OR APPROVED EQUAL. Water {HOW) 7day� None
PERM. IMPACT ZONE 1= 669 SF (TOTAL) F `' Zones
�:' `'�� CO�UCRETE PLANT''
PERM_ IMPACT ZONE 21 7,835 SF \ "
BRIDGE CROSSING �- `, Slopes steeper 7 days If slopes are 10' or less in length and
than 3:1 are not steeper than 2:1, 14 days allowed
STREAM BANK STABILIZATION ` \
Slopes 3:1 or 14 days 7-days for slopes greater
-- -SHAPE NEW PERMANENT LINED LOCATE TRAIL 30-FEET-FROM flatter than 50 -feet in length
DITCH ALONG EXISTING ERODED TOP OF CREEK BANK MINIMUM N /F :,, u All other areas None
AREA_ D RI41 Z with slopes flatter 14 days (except for perimeters and
_.__B TT M W DTH - 2' MINA N/F
O O I \. HOW Zones)
JU 'ITH O
�� � l than 4:1
SIDES�OPES., -3 :1 CHATHAM BOARD OF EDUCATION
PIN 9 %41'$5 -49Eg * "Extensions of time maybe approved by the permitting authority based on weather
DEPTH -12" MIN_ :�_ 7 RESIDENTIAL', or other site - specific condr�ons that make compliance impracticable_" (Section ILB (2)(b)
NORTH AMERICAN GREEN P300 ` PIN 94 ► 7 �- . X68 \
HORTON MIDDLE SCHOOL
PERMANENT LINER =�
INSTALL TEMPORARY /F
TEMPO o
- - CONSTRUCTION SEQUENCE EROSION CONTROL NOTES
- DO NOT DISTURB STREAM'CHANNEL
SILT FENCE ALONG PORTION t ' RICHARD TAYLOR
RE -SEED DISTURBED AREA W. I \ r�` 1_ SCHEDULE A PRE- CONSTRUCTION CONFERENCE WITH THE ENVIRONMENTAL
RIPARIAN BUFFER MIX MELLOW OF TRAIL CLOSES TO CREEK , ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH STATE AND
! \ PIN 97415-481 ENGINEER, 791-4200. OBTAIN A LAND DISTURBING PERMIT_ LOCAL REQUIREMENTS_
MARSH FARM NURSERY) `d', C \ -1 - 2_ THERE SHOULD BE NO CLEARING OF TREES OR SHRUBS REQUIRED. PATH IS
15 'GPP DRAINAGE PIPE #7 • ' \ -*i ;;.; . .l R ENTIAL
ES ID TO BE INSTALLED ALONG EXISTING CLEARED AREAS ONLY. NOTIFY COUNTY SUFFICIENT EROSION CONTROL PRACTICES MUST BE INSTALLED AND
OR ENGINEER IF ANY CLEARING IS REQUIRED PRIOR TO CONSTRUCTION_ MAINTAINED TO RETAIN SEDIMENT WITHIN THE BOUNDARIES OF THE SITE.
ti. _ GROUND COVER STABILIZATION SHALLL BE IN ACCORDANCE WTIH NPDES
` a \
INSTALL TEMPORARY SILT FENCE ALONG SECTION NEAR CREEK BANK AS PERMIT AND STABILIZATION CHART BELOW_
N/F SHOWN ON THE APPROVED PLAN.
CHARD TAYLC R MAINTENANCE: ALL EROSION AND SEDIMENT CONTROL PRACTICES
RICHARD 3_ CALL 791-4200 FOR AN ON SITE INSPECTION BY THE ENVIRONMENTAL
TO BE INSPECTED WEEKLY AND AFTER EVERY RUNOFF PRODUCING
j, + �_._ ENGINEER TO OBTAIN A CERTIFICATE OF COMPLIANCE. RAINFALL EVENT. NEEDED REPAIRS WILL BE MADE IMMEDIATELY_
PRE- FORMED SCOUR HOLE PIN 9741 -85- 5805
= -`ti —. _ _ 4_ ALL MEASURES SHALL BE INSTALLED AND INSPECTED FOR
+t i WITH LEVEL SPREADER APRON ` t _ . VACANT - _ _ COMPLIANCE PRIOR TO COMMENCEMENT OF ANY PROPOSIED MAXIMUM GRADED SLOPE SHALL NOT EXCEED THREE (3) TO ONE (1).
1, SEE DETAIL SHEET 2 ; CLEARING /GRUBBING- OBTAIN CERTIFICATE OF COMPLIANCE
THROUGH ON -SITE INSPECTION BY ENV RONMENTAL NSPECTOR.
i TOTAL DISTURBED SOIL AREA IS 0.90 ACRES.
A 5. ONCE CERTIFICATE OF COMPLIANCE IS OBTAINED, CONTRACTOR IS TO GRUB
O BOA REMOVE TOPSOIL ONLY FOR THE PORTION OF TRAIL WHICH CAN BE AREA STABILIZED BY IMPERVIOUS SURFACES: 0.54 AC_
I I� N 0 (
' CONSTRUCTED THAT DAY, SUCH THAT NO PORTION OF TRAIL CONSTRUCTION AREA STABILIZED BY VEGETATION: 0.36 Ac.
\; REMAINS IN AN DISTURBED STATE OVER NIGHT_ STABILIZE AND SEED
• - -
�yo
DISTURBED ARE AS UPON COMPLETION OF INSTALLATION. RIVER BASIN. FEAR RIVER ORECIEVING WATER COURSE. ROBES
ON CREEK,
L AREAS � ENDAR DAY
S
• J OF COMPLETION OF ANY PHASE O CONSTRUCTION -
7. WS-IV
7. REQUEST FINAL APPROVAL BY ENVIRONMENTAL INSPECTOR_ IF EROSION CONTROL MAINTENANCE CONTACT:.
THE INSPECTOR IS SATISFIED WITH UPSTREAM PERMANENT MEGAN BOLEJACK (919) 545$442
GROUND COVER, BEGIN REMOVAL OF TEMPOARY SILT FENCE.
F�
Date:
1/24/12
Scale:
1 " =50'
Drawn:
AJF
Checked:
AJF
Project No-
225-05
Computer Dwg- Name
225- 05MASTER.DWG