HomeMy WebLinkAbout20061654 Ver 3_Staff Comments_20120329!l
NU®ENR
North Carolina Department of Environment and Natural Resou
Division of Coastal Management
Beverly Eaves Perdue Braxton C Davis
Governor Director
March 6 2012
MEMORANDUM
TO Linda Lewis
Joanne Steenhuis
Division of Water Quality
FROM Doug Huggett
Mayor Permits Processing Coordinator
SUBJECT CAMA/DREDGE & FILL Permit Application Review
MAR 0 8 2012
Dee Freeman
Secretary
o /esfiI 3
V
Applicant Town of Morehead City (Newport River second pier extension)
Protect Location Carteret County, located on Radio Island along Hwy 70 immediately north of
the Morehead City high rise bridge within Newport River
Proposed Protect Proposes a major modification to Major Permit #214 -06 The applicant
proposes to add a second pier extension and platform to the existing pier
previously authorized
Please indicate below your agency s position or viewpoint on the proposed project and return this form by
March 27 2012 If you have any questions regarding the proposed project please contact
Heather Styron, Permit officer at (252) 808 2808 When appropriate, in depth comments with supporting
data is requested
REPLY This agency has no objection to the protect as proposed
This agency has no comment on the proposed project
This agency approves of the project only if the recommended changes are
incorporated See attached
This agency objects to the project for reasons described in the attached comments
SIGNED DATE 6 5 /So //'.2
—�� One
400 Commerce Ave a ad City NC 28557 Nor 6 ar olna
Phone 252 808 28081 FA 252 247 3330 Internet w nccoastalmanagement net
�a
An Equal Opportunity 1 Affirmative Action Employer