Loading...
HomeMy WebLinkAbout20120331 Ver 1_401 Application_201204129 Progress Energy March 26 2012 Ms Karen Higgins North Carolina Division of Water Quality 1650 Mad Service Center Raleigh North Carolina 27699 Re Progress Energy Carolinas Franklinton 11 5k Substation Expansion Franklin County North Carolina 401 Water Quality Certification Dear Ms Higgins 20120331 Ark u "�►�w� v�ill7y We have enclosed the Pre Construction Notification (PCN) for the above referenced project The PCN includes the required form supplemental information and construction site plan Additional information which may not be provided in the form is included in this cover letter The proposed project will expand an existing substation site to accommodate looping of the adjacent transmission line into the substation Two (2) circuit breakers and a line trap will be added within the fenced area of the substation facility The minor expansion (20 south and 30 north) is required in this area of the site due to existing infrastructure and overhead lines limiting available area for the additional equipment Every effort has been made to minimize the project expansion footprint The project area was delineated for wetlands and streams in February 2012 by Environmental Services Inc (Mr Jeff Harbour) The February 15 2012 site meeting with USACOE DWQ ESI and Progress Energy representatives confirmed the Jurisdictional areas including the segments of stream channel which are subject to the Tar Pamlico buffer rules Due to the limited area and physical site constraints the following Impacts are proposed 0 012 acres wetland Impact (permanent due to placement of fill) 60 linear feet of unbuffered stream Impact (due to placement of fill and channel relocation) 410 square feet of Zone 2 Riparian Buffer Impact (temporary disturbance to be re vegetated) Progress Energy Carolinas Inc PO Box 1551 Raleigh NC 27602 J We trust the enclosed information is complete and will allow you to issue approval at an early date Should you have any questions or require additional information please do not hesitate to contact our office Sincerely Richard A Brown General Manager Transmission & Construction Engineering RAB /cts cc USACOE — 404 Mr Martin Richmond NCDWQ Raleigh Regional Ms Sarah Puffer PEC Mr Cliff Sauls PEC ot wArF9OG o � 20120331 Office Use Only Corps action ID no DWQ project no Form Version 1 3 Dec 10 2008 � TH QUAL rr water 6►anch Page 1 of 11 PCN Form - Version 1 3 December 10 2008 Version Pre - Construction Notification PC Form A Applicant Information 1 Processing 1 a Type(s) of approval sought from the Corps ®Section 404 Permit El Section 10 Permit - 1 b Specify Nationwide Permit (NWP) number 12 or General Permit (GP) number 1 c Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification - Regular ❑ Non 404 Jurisdictional General Permit ❑ 401 Water Quality Certification - Express ® Riparian Buffer Authonzation le Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit ❑ Yes N No 1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ❑ Yes ® No 1g Is the project located in any of NC s twenty coastal counties If yes answer 1h below ❑ Yes ® No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Project Information 2a Name of project Progress Energy Carolinas Franklinton 11 5k Substation Expansion 2b County Franklin 2c Nearest municipality / town Franklinton 2d Subdivision name N/A 2e NCDOT only T I P or state project no N/A 3 Owner Information 3a Name(s) on Recorded Deed Carolina Power & Light Co d /b /a Progress Energy Carolinas 3b Deed Book and Page No Not shown on county web site 3c Responsible Party (for LLC if applicable) Richard Brown General Manager Transmission Construction & Engineering 3d Street address 410 South Wilmington Street PEB 2 3e City state zip Raleigh NC 27601 D 3f Telephone no 919 546 3122 F -Zz-t- im 3g Fax no 919 546 7552 APR 3h Email address nchard brown @pgnmad com � TH QUAL rr water 6►anch Page 1 of 11 PCN Form - Version 1 3 December 10 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other specify 4b Name 4c Business name (if applicable) 4d Street address 4e City state zip 4f Telephone no 4g Fax no 4h Email address 5 Agent/Consultant Information (if applicable) 5a Name William (Buzz) Bryson 5b Business name (if applicable) Progress Energy Carolinas Environmental Permitting & Compliance 5c Street address 410 South Wilmington Street TPP 14 5d City state zip Raleigh NC 27601 5e Telephone no 919 546 6637 5f Fax no 5g Email address buzz bryson @pgnmad com Page 2 of 11 PCN Form — Version 1 3 December 10 2008 Version B Project Information and Prior Project History 1 Property Identification la Property identification no (tax PIN or parcel ID) 1855 54 2506 1 b Site coordinates (in decimal degrees) Latitude 36 0968 Longitude 784752 (DD DDDDDD) ( DD DDDDDD) 1c Property size 5 59 acres 2 Surface Waters 2a Name of nearest body of water (stream river etc) to UT to Cedar Creek proposed project 2b Water Quality Classification of nearest receiving water Cedar Creek is WS II HQW NSW 2c River basin Tar 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Existing site is electric substation Site is bounded by road overhead transmission line and undeveloped wooded space from nearest residences 3b List the total estimated acreage of all existing wetlands on the property Less than 0 5 acre 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property -200 feet 3d Explain the purpose of the proposed project The project is an expansion of an existing substation to accommodate looping of the adjacent transmission line into the substation Two circuit breakers and a line trap will be added 3e Describe the overall project in detail including the type of equipment to be used The project involves a minor expansion of fencing to the north and south on the western side of the existing substation to allow the addition of the circuit breakers Because of existing infrastructure and overhead lines the expansion can only occur at these location of the property Every effort has been made to reduce the project footprint 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ® Yes ❑ No ❑ Unknown Comments Both Corps and DWQ made on site determination 4b If the Corps made the jurisdictional determination what type ❑ Preliminary ® Final of determination was made? 4c If yes who delineated the jurisdictional areas? Agency /Consultant Company Environmental Services Name (if known) Jeff Harbour Inc Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation February 15 2012 5 Project History 5a Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all pnor phases) in the past? 5b If yes explain in detail according to help file instructions Page 3 of 11 PCN Form - Version 1 3 December 10 2008 Version 6 Future Project Plans 6a Is this a phased project'? ❑ Yes ® No 6b If yes explain Page 4 of 11 PCN Form — Version 1 3 December 10 2008 Version C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ® Wetlands ® Streams tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ — non 404 other) (acres) Temporary W1 ®P ❑ T Fill ❑ Yes ® No ® Corps ❑ DWQ 0 012 W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P [IT ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 0 012 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) or intermittent DWQ — non 404 width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ❑ T Fill /piping UT to Cedar Cr ❑ PER ® INT ® Corps ❑ DWQ 1 60 S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 60 31 Comments Page 5 of 11 PCN Form — Version 1 3 December 10 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then individually list all open water impacts below 4a Open water impact number — Permanent (P) or Temporary T 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 4f Total open water impacts 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed the complete the chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required? ❑ Yes ❑ No If yes permit ID no 51 Expected pond surface area (acres) 51 Size of pond watershed (acres) 5k Method of construction Page 6 of 11 PCN Form — Version 1 3 December 10 2008 Version 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a ❑ Neuse ®Tar Pamlico El Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) for impact Stream name mitigation (square feet) (square feet) or Temporary required? T 131 ❑ P ®T Substation UT to Cedar Cr ❑ Yes 0 335 expansion ® No 132 ❑P ❑T El Yes ❑ No B3 ❑P ❑T El Yes ❑ No 6h Total buffer impacts 61 Comments D Impact Justification and Mitigation 1 Avoidance and Minimization 1 a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Progress Energy has minimized the footprint of the expansion to the extent possible However the existing substation infrastructure largely dictates the alignment and location of the proposed additional circuit breakers and line trap 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Expansion was limited to minimal amount consistent with safe engineering standards and operation practices 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U S or Waters of the State? 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps ❑ Mitigation bank 2c If yes which mitigation option will be used for this project? ❑ Payment to in lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank N/A 3b Credits Purchased (attach receipt and letter) Type N/A Quantity N/A Page 7 of 11 PCN Form — Version 1 3 December 10 2008 Version 3c Comments Based on field visit both Corps and DWQ s representatives determined that no mitigation was required 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan N/A 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) 6h Comments DWQ made a field determination that the proposed impact was on a non buffered section of stream Page 8 of 11 PCN Form — Version 1 3 December 10 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified ® Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1b If yes then is a diffuse flow plan included? If no explain why ® Yes ❑ No Comments Sheet flow is provided from site 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 358% 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan explain why Below threshold ( <1 0 acre) 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local government s jurisdiction is this project? ❑ Phase II 3b Which of the following locally implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a Which of the following state implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1 3 December 10 2008 Version F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ® No use of public (federal /state) land? lb If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval letter) ❑ Yes ❑ No Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after the fact permit application? ❑ Yes ® No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development which could impact nearby downstream water quality? 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility N/A Page 10 of 11 PCN Form — Version 1 3 December 10 2008 Version 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? El Raleigh 5c If yes indicate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Consultants review of site habitat and species lists 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitats ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? Previously disturbed area 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA designated 100 year floodplain? FEI es ❑ No 8b If yes explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? t- ' " .. ` 6 3/z�3� �, z App ica gen s Signature Applicant/Agents Printed Name Date (Agents signature is valid only if an authorization letter from the applicant is provided Page 11 of 11 PCN Form — Version 1 3 December 10 2008 Version Plan Sheets 1- 6 A v 0 & RTIN 9 POW L EL Din 3 MA ENGINEERS & SURVEYORS Big 11 6415 OLD PLANK RD, HIGH POINT, NC 27265 (336) 886-4821 WWW.DMP-INC.COM LICENSS.E-:F-0245 owns-NORM DMP PROJECT: 120012 r�� 0 hn -AL sr A v Z3 SITE P ..Kvmui\r- RD ii 0 [\i T . .. ........ I 11=,20001 FRANK!- I N, q RIVER RD. ji SA 6 cs ss DRAWING LIST COVER SHEET OVERALL SITE PLAN DIMENSION LAYOUT PLAN GRADING PLAN EROSION CONTROL PLAN EROSION CONTROL DETAILS RDC-601294 SHT I RDC-601299 SHT 2 RDC-601299 at RDC-601299 SHT A RDC-601299 SHT 5 RDC-601299 SHT 6 M OL gr1ro ........... ........... r�� 0 hn -AL sr A v Z3 SITE P ..Kvmui\r- RD ii 0 [\i T . .. ........ I 11=,20001 FRANK!- I N, q RIVER RD. ji SA 6 cs ss DRAWING LIST COVER SHEET OVERALL SITE PLAN DIMENSION LAYOUT PLAN GRADING PLAN EROSION CONTROL PLAN EROSION CONTROL DETAILS RDC-601294 SHT I RDC-601299 SHT 2 RDC-601299 SHT 3 RDC-601299 SHT A RDC-601299 SHT 5 RDC-601299 SHT 6 19 G 110 11F RE i 7--ll--------.-,---.-, APR 2 2012 )ENR .---fMA-7-XR �ii-Ma��iv R DC,- -h0 i 2 S H I SURVEY/BOUNDARY NOTES: 1. TOPO AND BOUNDARY SURVEYED AND MAPPED FOR PROGRESS ENERGY CAROLINAS, INC. BY STANTEC CONSULTING (PROJECT # 170302105-821). 2. LOT AREA BY COORDINATE METHOD. pOCOMOKE RD 3.ALL DISTANCES SHOWN ARE HORIZONTAL GROUND DISTANCE UNLESS OTHERWISE NOTED. 4. NORTH CAROLINA STATE PLANE COORDINATE POSITIONS WERE DETERMINED THROUGH THE USE OF VIRS NETWORK UTILIZING TRIMBLE 5800 S1 TE WITH NAVD88 ELEVATIONS. RECEIVERS. COORDINATES SHOWN ARE NAU83(2007) STR 2 19 5. THE COMBINED GRID FACTOR UTILIZED ON THIS PROJECT I3 0.999967559. Of Ld ry 60' PUBLIC R/W VICINITY MAP t-EVADdI.Oc/ 7" 52.981TOTAL) 7.9, CONCRETE MONUMENT NT If MONUMENT /j- DISTURBED(F) A RESET W/ 45 REBAR vi If * - / / / / . I , 11� A.. . - "i -, 395 0 If j if CIO PDh055-44-7217 Tk*,-IMAS C. ALLEN II 13 797, PG 189 TON-1 OR ^L"^^ ^ '`" '^^ D50 = 12" DEPTH = 27" NOTE: CONTRACTOR SHALL CONSTRUCT DITCH 'CHANNEL DURING DRY �AJE4THER CONDITIONS, RIP-RAP LINING SHALL BE IN3TALLED IMMEDIATELY F8LL0IVING CHANNEL CONS T RUC TlON. RIP'RAP STONE AND PLACEWENT DEPTH SHALL BE OF 5lZE INOICATED. RIP-RAP DITCH LINING (D-2) NT mi ENGINEERS O*t SURVEY, 0415 OLD PLANK RD, HIGH POINT, NC27205 (336) 886-4821 VVVVVVO� DK8P PROJECT: 120O12 I CC, � / 23KV . ' / / � ' / TR4NIF � ��---- 8REET , ����//� `\ / �� /n*m�^onr�� ' `�� / ��' 8' 23KV WETLAND if \\—LIMITS OF f DISTURBANCE if 8A L ST ST j EAST-WE 0 BASELINE I 1__> f It If WH TREAM It If TBM REBAR W/ CAP(S) �21-3j 7J71 LIMITS OF DISTURBANCE WETLANDS: If If TEMP..'ACCES5 -DRIVE' CONCRETE S. FOR GRADING OP T�j MONUMENT If NAD83 (2007) If L If If Ao Tr~ Ai � 40 0 20 40 80 TA 3.k5.40 c215524 .' ` � IXI ` ' � ( ) � ` 'CONCRETE i :MONUMENT | | ------- � cu2-55310.866 | NAD83 (2007 | i (lN REET > 40 NO. DATE ' ^ ' ' ' .—.. ` ` ` EAST 7 PIN: 1855-54-2506 LIGHT COMPANY DB: 65L PG 618 REBAR W/ CAP( N -854305.197 EIP PIN: 1855-44-7217 If i, THOMAS C. ALLEN II DB 797, PG 189 TN-TT�| RE' EASE SITE INFORMATION: 1. TOTAL AREA IN 0T� 5.58 ACRES AREA IN PUBLIC ROAD R/�0.35 ACRES AREA OUTSIDE PUBLIC ROAD R/W:5,23 ACRES PIN. 1855-54-4194 2 CURRENT ZONING: RIMS MARY GRIFFIN TAYLOR ^ TOWN OF FRANKLINT0N ETJ U8 84L PG 348 l PIN 11/055-54-25O6 PARCEL ID. 026422 ADDRESS: 142 P0C0WDKE ROAD 4. PARKING SPACES. 8 PROVIDED (ADEQUATE PARKING AVAILABLE WITHIN SUBSTATION FENCED AREA FOR OPERATION AND MAINTENANCE PERSONNEL) NORMAL TRAFFIC WILL BE 1PICKUP TRUCK ENTERING & EXITING ONCE PER DAY Z EMPLOYEES FOR 2 HOURS PER DAY 5. IMPERVIOUS AREA. EXISTING - 1.69 4C (0N-SITE; droo 1,990 O.4 AC (ROAD R/W) 1.83 AC TOTAL (32.80% ) PROPOSED - D.17 AC (EXPANSION AREA) (4J537 OF REMAINING PERVIOUS AREA) 6. NO WATER SERVICE OR SEWER SERVICE RE8UIRED, 7. NO GARBAGE/SOLID WASTE COLLECTION REOUIRED, 8. SITE IS NOT IN 4 FEWA 00 YR FLOODW4Y. 9. NO HAZARDOUS MATERIALS WILL BE USED OR STORED ON SITE, 0. EXISTING/ PROPOSED USE ELECTRIC TRANSMISSION SUBSTATION 11. PROPERTY OWNER - PROGRESS ENERGY CAROLINAS, INC. P0 80X 1981 RALEIGH, NC 27602 TEL. (919)546-T6G} 12. TOTAL DISTURBED AREA: LESS THAN lACRE (]1,840 S.F.} 13: PERMITTED STREAM/WETLAND IMPACTS: WETLAND AREA: 625 S.F. STREAM (NON-BUFFERED): 60 L.F. STREAM BUFFER: 40 3.F.(IONE 2) � It CD ' � � � � ' | � � ` ` 'CONCRETE i :MONUMENT | | ------- � cu2-55310.866 | NAD83 (2007 | i (lN REET > 40 NO. DATE ' ^ ' ' ' .—.. ` ` ` EAST 7 PIN: 1855-54-2506 LIGHT COMPANY DB: 65L PG 618 REBAR W/ CAP( N -854305.197 EIP PIN: 1855-44-7217 If i, THOMAS C. ALLEN II DB 797, PG 189 TN-TT�| RE' EASE SITE INFORMATION: 1. TOTAL AREA IN 0T� 5.58 ACRES AREA IN PUBLIC ROAD R/�0.35 ACRES AREA OUTSIDE PUBLIC ROAD R/W:5,23 ACRES PIN. 1855-54-4194 2 CURRENT ZONING: RIMS MARY GRIFFIN TAYLOR ^ TOWN OF FRANKLINT0N ETJ U8 84L PG 348 l PIN 11/055-54-25O6 PARCEL ID. 026422 ADDRESS: 142 P0C0WDKE ROAD 4. PARKING SPACES. 8 PROVIDED (ADEQUATE PARKING AVAILABLE WITHIN SUBSTATION FENCED AREA FOR OPERATION AND MAINTENANCE PERSONNEL) NORMAL TRAFFIC WILL BE 1PICKUP TRUCK ENTERING & EXITING ONCE PER DAY Z EMPLOYEES FOR 2 HOURS PER DAY 5. IMPERVIOUS AREA. EXISTING - 1.69 4C (0N-SITE; droo 1,990 O.4 AC (ROAD R/W) 1.83 AC TOTAL (32.80% ) PROPOSED - D.17 AC (EXPANSION AREA) (4J537 OF REMAINING PERVIOUS AREA) 6. NO WATER SERVICE OR SEWER SERVICE RE8UIRED, 7. NO GARBAGE/SOLID WASTE COLLECTION REOUIRED, 8. SITE IS NOT IN 4 FEWA 00 YR FLOODW4Y. 9. NO HAZARDOUS MATERIALS WILL BE USED OR STORED ON SITE, 0. EXISTING/ PROPOSED USE ELECTRIC TRANSMISSION SUBSTATION 11. PROPERTY OWNER - PROGRESS ENERGY CAROLINAS, INC. P0 80X 1981 RALEIGH, NC 27602 TEL. (919)546-T6G} 12. TOTAL DISTURBED AREA: LESS THAN lACRE (]1,840 S.F.} 13: PERMITTED STREAM/WETLAND IMPACTS: WETLAND AREA: 625 S.F. STREAM (NON-BUFFERED): 60 L.F. STREAM BUFFER: 40 3.F.(IONE 2) It CD ` 'CONCRETE i :MONUMENT | | ------- � cu2-55310.866 | NAD83 (2007 | i (lN REET > 40 NO. DATE ' ^ ' ' ' .—.. ` ` ` EAST 7 PIN: 1855-54-2506 LIGHT COMPANY DB: 65L PG 618 REBAR W/ CAP( N -854305.197 EIP PIN: 1855-44-7217 If i, THOMAS C. ALLEN II DB 797, PG 189 TN-TT�| RE' EASE SITE INFORMATION: 1. TOTAL AREA IN 0T� 5.58 ACRES AREA IN PUBLIC ROAD R/�0.35 ACRES AREA OUTSIDE PUBLIC ROAD R/W:5,23 ACRES PIN. 1855-54-4194 2 CURRENT ZONING: RIMS MARY GRIFFIN TAYLOR ^ TOWN OF FRANKLINT0N ETJ U8 84L PG 348 l PIN 11/055-54-25O6 PARCEL ID. 026422 ADDRESS: 142 P0C0WDKE ROAD 4. PARKING SPACES. 8 PROVIDED (ADEQUATE PARKING AVAILABLE WITHIN SUBSTATION FENCED AREA FOR OPERATION AND MAINTENANCE PERSONNEL) NORMAL TRAFFIC WILL BE 1PICKUP TRUCK ENTERING & EXITING ONCE PER DAY Z EMPLOYEES FOR 2 HOURS PER DAY 5. IMPERVIOUS AREA. EXISTING - 1.69 4C (0N-SITE; droo 1,990 O.4 AC (ROAD R/W) 1.83 AC TOTAL (32.80% ) PROPOSED - D.17 AC (EXPANSION AREA) (4J537 OF REMAINING PERVIOUS AREA) 6. NO WATER SERVICE OR SEWER SERVICE RE8UIRED, 7. NO GARBAGE/SOLID WASTE COLLECTION REOUIRED, 8. SITE IS NOT IN 4 FEWA 00 YR FLOODW4Y. 9. NO HAZARDOUS MATERIALS WILL BE USED OR STORED ON SITE, 0. EXISTING/ PROPOSED USE ELECTRIC TRANSMISSION SUBSTATION 11. PROPERTY OWNER - PROGRESS ENERGY CAROLINAS, INC. P0 80X 1981 RALEIGH, NC 27602 TEL. (919)546-T6G} 12. TOTAL DISTURBED AREA: LESS THAN lACRE (]1,840 S.F.} 13: PERMITTED STREAM/WETLAND IMPACTS: WETLAND AREA: 625 S.F. STREAM (NON-BUFFERED): 60 L.F. STREAM BUFFER: 40 3.F.(IONE 2) ` ` ` ` ` '---------'--- ______ _________ '---------- RR 3PD([ -------------------------------------- --__ - __--------- ---------- CONCRETE -------___ ---------------------- MONUMENT - -----___--- ------------ DISTURBED(F) RESET N/ w5 REBAR GPS#I REBAR W/ CAP(S) N:854770.302 _\ E:2155122.072 \ ELEV-401.86 - -------- - _______________ p�����K� �O�O ____ ____________ ' ` '~ '`^ ROAD RR SPIKE ___------------ IN CD #3N +4 N SN #lE / �D�055-44-72D / ' �O�S C. ALLEN � / ' *i / ' )B 797, PG 09 co All is 14is 2S CONCRETE MONUMENT N:85437iD2 E:2154838.69' NA083 (2007 v- ---, +"S EIP \ SPSv2 REBAR 0V CAP(S) N:854385.197 E:2154947.40 ElEY.,380.21 Fit— 512-97,(TOTAL) GRAVEL DR TV,- BASELINE INTERSECTION N'S 5T4. 2+04.O8 E-W 3TA.J+00.40 N;854496."l00 E�2�50�0B TBM R[84R W/ CAP(J) N:85443L923 E:2155UD5.95Z GROPAT� �!�/ E 40 0 20 40 80 w _-68.6y RE84R W/ CAP(S) N'S ST4.1+49.11 N�5444l00 G2155167.171 PIN: 1855-54-2506 CAROLINA POWER & LIGHT COMPANY D8 464, PG 423 D8 65L PG 60 DB 720, PG 213 PIN: 1855-44-7217 THOMAS C. ALLEN II DB 797, PG 189 1G0 _ --------- - - -- �7�� / LIDAR MONUMENT "FRANKLINT0N" N-3 STA.4+46.0 1.5YRT REBAR WVC4RS) N-5 STA.4+29J2 N:854714.071 REB4R 0V CAP(S) E-W ST4.3+65.48 N.854479.609 / ' / / MONUMENT N-854251.232 �215530.8G NAD83 (2007) ([M FE�T � 1 1noh = 40 T- NO. DATE / / ���J7 / -CONCRETE MONUMENT . W/ ALUMINUM CAP(S) co _0N UE� T�T7r�� �EI,�-� PIN. 1855-54-4194 MARY GRIFFIN TAYLOR D8 84L PG 348 REVTS SOIL APPROX. BORING I DEPTH IE 51 2E 51 2N ZZ 6N 5t is 5f 2S 51 4S 51 Fit— 512-97,(TOTAL) GRAVEL DR TV,- BASELINE INTERSECTION N'S 5T4. 2+04.O8 E-W 3TA.J+00.40 N;854496."l00 E�2�50�0B TBM R[84R W/ CAP(J) N:85443L923 E:2155UD5.95Z GROPAT� �!�/ E 40 0 20 40 80 w _-68.6y RE84R W/ CAP(S) N'S ST4.1+49.11 N�5444l00 G2155167.171 PIN: 1855-54-2506 CAROLINA POWER & LIGHT COMPANY D8 464, PG 423 D8 65L PG 60 DB 720, PG 213 PIN: 1855-44-7217 THOMAS C. ALLEN II DB 797, PG 189 1G0 _ --------- - - -- �7�� / LIDAR MONUMENT "FRANKLINT0N" N-3 STA.4+46.0 1.5YRT REBAR WVC4RS) N-5 STA.4+29J2 N:854714.071 REB4R 0V CAP(S) E-W ST4.3+65.48 N.854479.609 / ' / / MONUMENT N-854251.232 �215530.8G NAD83 (2007) ([M FE�T � 1 1noh = 40 T- NO. DATE / / ���J7 / -CONCRETE MONUMENT . W/ ALUMINUM CAP(S) co _0N UE� T�T7r�� �EI,�-� PIN. 1855-54-4194 MARY GRIFFIN TAYLOR D8 84L PG 348 REVTS SOIL APPROX. BORING I DEPTH IE 51 2E 51 2N 51 6N 5t is 5f 2S 51 4S 51 ss 51 9s 51 DIMENSION LAYOUT PLAN LOCATION 142 POCOMOKE ROAD, FRANKLINTON, NC SCALE 4 0' SCALE 'F'ATIO � 1� ) c j l STP, -21 9 t 3 i % - POCOMOKE ROAD NCSR 1127 �- pF `'' 60` PUBLIC R/W / - - /x;03.45 \ EP — �� 398,20 ` / REBAR vd/ /e( / _ --- - - -_ -- _ -_ __ E R/W LIMIT - -- —�-- n.85 7 p� / — RR SPIKE _ ___ - -_ —_ _ __ - -- - g t f �2i55122.07j2 r i' - — \ � - INV; LF V:4ffl 61 — --- 512,98 (TOTAL) 97<97' — _ N86 °50'13` —° — IN V. rrp ,q -- .- - - - =�- � rY. la >��, L��;�r4, ___ -_--- `!`_. o 405.0 - - - - - - - v� - -' -- -- -- - i _____ -- — - _ RR SPIKE I _I', :' — _ �. , 5 i - _ _ _ _ -- - - -- _ -_ (TIE �_ -51297' T _ CONCRETE MONUMENT .. - MIN C - _ as - 186, -I` - - _ - - - - - i L'1C.Y•R MONUMENT QJO.0 (OT � - ,�` `� E` --400.0 N 41` 3 "E ._" c _ �- . d "S" ;i; / ERA !KLINTON" - - =__ -- 315;0 j \ r' -- ---- �INV. �_. j a 6 8/ p. G3_-- N- S STA _ - - -- --R /N! IMIi CONCRETE -- /� ! 397015 I ' �" �' j,;� 1.5i'R.T - - - MONUMENT — 1 I l l . l — — t/ __ - - — — -- - - DISTURBED(F) -- - - - -/ % — - -- --" GRAVE! DRIVE RESET W/ #5 1 ;— __ - -- 395.0- / -- , -- / % �,l - ';--_ - / ,�. ,14p0,p REBAR / l 1 '- - t i / rSTR -460 Q .m �_C,E lrsft':N.r) =�- i ) \ - - A 1;. A,4r29oI? Of 52" 7.7 1� 1 N 3 it, 395 © " t t ----- -- 950 J l l t l ; till! r l „r CROSSROADS- 2 !O/ % � fr pa tom"= {� 394 rjllll l X J // % COLLEGE % _. / - Cr ec Cl�$ x \ ,,rk /'. `°i°�/ 1 TRA,NSF�1RtrEP+ Iii �' STREET /j' LO if 23KV t • l � /' .. - l` i` t ; ( l� (i �~Il 1, l ' !t r, f/� ri ^�� i' (, J l " +• j WETLAND "HA, / r t I I / I + l ' }�' % /l r ! / %• Cry 1,it)^ C jY E(j a Ct (l I 0 +00.00 EAST—'NEST —' • - % -1 D / -� �.� r BA SEL I! E rte` ?IN : 1855 -44 -7217 -)'SOMAS C. ALLEN II DB 797, PG 189 F0.41ZITZIT411 CLEARING LIMIT/ NEW TREE LINE CONCRETE MONUMENT N :854375.172 E :2154838.694 NAD83 (2007) SSTR EAM s '�R iIV1.39`1. 5 / fI S S A 2401008 18 1.019 = _ ••- � It r l ll l �, / o TBM % o REBAR W/ CAP(S) �9S N:854431.923 3« 3.8�_- E:2155085.952 ELEV- 395.95 1I WETLANDS gHJBn rn / �.9 r /• �_ % �, . S T R =218. TO BE �� RENJOVED. sue` 9g8�•� D f #� EIP %" / %' ,;,;: STREA1 ) Jif 1 1 .i "SHB' % f al Iffj; TA 8�2 'Ale 475- GPS #2 p / A� j REBAR W/ CAM( N:854305,197 E :2154947,414 ELEV:390,21 �l 'fit �r K LLu 0 20 80 rIN 'EE 7 ) Inch = d,0 rti 160 -� 3 aIR 'Al '/t rCAP(S) ' r c STAa3 o5. 0 �r PIN: 18-55-5472506 CAROLINA POWER & QREBAR LIGHT COMPANY 4r/. s4P;S; % N ST A.11-49,11 DB� 65L PG ,618 (lF _21_5167.10 so IQ, --- - -�>:� O -t - - - 1 �1:^ - - -- - PIN- 1855-44-7217 THOMAS C. ALLEN II DB 797, PG 189 ." Q> 0 0 V COKRETE 1 MONUMENT I - N :85425L232 j E :2155310.866 I NAD83 (2007) I I I i T_ �3- �� -22Li2 TNITIAL RELEASE NO. DATE NOTES: L ALL BEARINGS AND DISTANCES ARE GRID BEARINGS AND GROUND PIN. 1855-54-4194 DISTANCES UNLESS OTHERWISE NOTED. MARY GRIFFIN TAYLOR DB 84L PG 348 2. TOTAL AREA IN LOT: 5.58 AC IN ROAD R /W: 0,35 AC 3. TOTAL DISTURBED AREA: LESS THAN 1 AC (31,890 SF) 4. EXISTING UNDERGROUND UTILITY LOCATIONS (WHERE SHOWN) WERE TAKEN FROM AVAILABLE INFORMATION AND ARE APPROXIMATE ONLY, CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING UTILIIIES PRIOR TO BEGINNING CONSTRUCTION. ANY UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED IMMEDIATELY WITH NO ADDITIONAL COST TO THE OWNER. CONTRACTOR SHALL NOTIFY THE NC ONE CALL CENTER OR THEIR SUCCESSORS AT 1- 800-632 -4949 PRIOR TO EXCAVATION. CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY IN THE EVENT OF ENCOUNTERING ANY UNDERGROUND OBSTACLE REQUIRING A DEVIATION FROM THE PLANS. 5, EARTHWORK QUANTITIES (TOTAL SITE): CUT: 460 CY A FILL FACTOR OF 1.15 HAS BEEN APPLIED FILL: 470 CY 6. CUT AND FILL SLOPES WILL BE 2:1(H:V) UNLESS OTHERWISE NOTED. COMPACT FILL TO 957, STANDARD PROCTOR MAXIMUM DENSITY (ASTM -698) IN THIN LIFTS. 7. PROPOSED /NEW FENCING TO BE 7' HIGH CHANI -LINK WITH Y BARBED WIRE, 8. CONTRACTOR TO PROVIDE 6 "COMPACTED STONE INSIDE EXPANDED FENCE AREA, EXTENDING 6' OUTSIDE FENCE LINE, oft L r . Ener Progress Energy Carolinas, Inc. Raleigh, NC FRANKLINTON 115124kV SUBSTATION EXPANSION GRADING PLAN LOCA IONI 142 POCOMOKE ROAD, FRANKLINTON, NC SCULL 1" = 40' SCALE RATIO I-I I BAP SFP MVC DRAWN BAP CI -!r;. S F P wpr-)_ MVC REVISION BY CK. I APP. DATE 03 -12 -12 DWG. r10. RDC- 60129, SN 4 OF 6 �r PIN: 18-55-5472506 CAROLINA POWER & LIGHT COMPANY DB: 464, PG 423 DB� 65L PG ,618 DB. 720, PG 213 EIP so IQ, °o PIN- 1855-44-7217 THOMAS C. ALLEN II DB 797, PG 189 ." Q> 0 0 V COKRETE 1 MONUMENT I - N :85425L232 j E :2155310.866 I NAD83 (2007) I I I i T_ �3- �� -22Li2 TNITIAL RELEASE NO. DATE NOTES: L ALL BEARINGS AND DISTANCES ARE GRID BEARINGS AND GROUND PIN. 1855-54-4194 DISTANCES UNLESS OTHERWISE NOTED. MARY GRIFFIN TAYLOR DB 84L PG 348 2. TOTAL AREA IN LOT: 5.58 AC IN ROAD R /W: 0,35 AC 3. TOTAL DISTURBED AREA: LESS THAN 1 AC (31,890 SF) 4. EXISTING UNDERGROUND UTILITY LOCATIONS (WHERE SHOWN) WERE TAKEN FROM AVAILABLE INFORMATION AND ARE APPROXIMATE ONLY, CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING UTILIIIES PRIOR TO BEGINNING CONSTRUCTION. ANY UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED IMMEDIATELY WITH NO ADDITIONAL COST TO THE OWNER. CONTRACTOR SHALL NOTIFY THE NC ONE CALL CENTER OR THEIR SUCCESSORS AT 1- 800-632 -4949 PRIOR TO EXCAVATION. CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY IN THE EVENT OF ENCOUNTERING ANY UNDERGROUND OBSTACLE REQUIRING A DEVIATION FROM THE PLANS. 5, EARTHWORK QUANTITIES (TOTAL SITE): CUT: 460 CY A FILL FACTOR OF 1.15 HAS BEEN APPLIED FILL: 470 CY 6. CUT AND FILL SLOPES WILL BE 2:1(H:V) UNLESS OTHERWISE NOTED. COMPACT FILL TO 957, STANDARD PROCTOR MAXIMUM DENSITY (ASTM -698) IN THIN LIFTS. 7. PROPOSED /NEW FENCING TO BE 7' HIGH CHANI -LINK WITH Y BARBED WIRE, 8. CONTRACTOR TO PROVIDE 6 "COMPACTED STONE INSIDE EXPANDED FENCE AREA, EXTENDING 6' OUTSIDE FENCE LINE, oft L r . Ener Progress Energy Carolinas, Inc. Raleigh, NC FRANKLINTON 115124kV SUBSTATION EXPANSION GRADING PLAN LOCA IONI 142 POCOMOKE ROAD, FRANKLINTON, NC SCULL 1" = 40' SCALE RATIO I-I I BAP SFP MVC DRAWN BAP CI -!r;. S F P wpr-)_ MVC REVISION BY CK. I APP. DATE 03 -12 -12 DWG. r10. RDC- 60129, SN 4 OF 6 NOTE: U CONTRACTOR SHALL CONSTRUCT DTTCH/,HANNEL DURING DRY VIEAITII CONDITIONS,OR UTILIZE TEMPORARY ­`—pA'-_ PUMPING AS NECLESS.� D1 RIP-RAP L Tj\I ING SHALL BE INSTALLED It l•,` L FOLLOWING CHA CONSTRUCTION, RIP-RAP STONE AND PLACE-M.", D;"PTH SHALL BE N S I — E TIN11 D T CATE1 i iL i 11— 1 L T IF -1--v'PORAR), BY-PL.SS Pit 'o.APING IS N --- S R _�_ SHAT 4 T _VU ,.A T Y OWS AROUND T, `7r U S T 7 �f MV j� 'KA ulNTTL CHANNEL HAS DEED �­L AND RIP-RAP QI 1,vll P SHALL DISCHARGE THROUGH DA G` 1 T 0 REMOVE' SHALL vi SEDP%,IEINT TRANSPORT. 1,L.'iJJ I M.1 IXnl D50 = 12" DEPTH = 27" RIP-RAP DITCH LINING (D-2) N TS PREPARED BY: v s 46 DAi@ MA R T I P. ENG"INEERS dgk SURVEYORS 6415 OLD PLANK RD, HIGH POINT, NC 27265 (336) 886-4821 VVWW.DMP-INC.CO DIVIP PROJECT: 120012 ti STR­211 9 TEMPORARY rAfkl(ZT0HrTT0hl DITCH SCHEDULE CHANNEL NO. DRAINAGE AREA acres) INTENSITY 1 n/hr) r) RUNOFIFO COEFF. 10 CF ;S CHANNEL HANNEL SLOPE SLOPE (7) LILNGTH [I�GTH ft) BEGIN ELEV. END ELEV. N" VALUE VELOCITY (f (ft/sec) ' ec) D-1 11.69 5.8 .0.36. 1 24.41 0.023 Ito 395 392.5 0.06 3. 71 D-2 25.81 1 1 0.232 I I : 1, . — — 07078 — F 4.27 OKE ROAD NCSR 1127 ENTRANCE POCOM / / / / 60' PUBLIC R/W /90 INV. GP,_ 4,11 !NV� 398026 1 0 R BAP 403AS EP LIMIJ_� N.85117710 J' 7' RR SPIKE G P6A �R 8 5_11 7 70 J-0, 1 E,2155122.01­ — — — — — — — — — --- — — — — — — — — — _----------------------- R./44' 79 8(TOTAL) t IO �V P N86*50'13'E T, " 7\j, u� 1, IB" R�' — — - ---------- 405.0. C. P, 7 z ---------- �D RR SPIKE --------- ----------- J�L 7�p T ----------- --- Al tTIE V __210 ---- ... ­­ — - - I — - ---- 0­1 CONCRETE MONUMENT _------- - - - - -- P Ll ---- -- 52.97'(T ---- --- W/ ALUMINUM CAP(S) A �,J 1 MEN T, .... 40 ------ L ID AA rp - - - - - - --- -- - - ---- - - -------- • ...... Aoo,o 7. N '�'403 -------- - ---- ---- _O.. FRAI ------ TP(3)_ ` *84,03 f T,'� 4 46418 - - ----- _____pl 7 W_ [I'MITCONCRETE �x 9� 7 -15 j MONUMENT DRIVE DISTURBED(F) --- ---- EL RESET W/ #5 00.0 If /STR-460 REBAR 395.0 -1 ------- -C-, TA-,. A-0-- 14.07; LIMITS OF 77 % -5, DISTURBANCE D-1 S11 95.0 k p l�. MT-, R S, S;R 0 A Lp tD 31/\V Ct 1�r , . 2 NSFOP 0 WETLAND _j 11HAll j EAST-yE., N SA ♦------ L C, 0+00100 EAST EST 0 E d BASS L-11 z C�j FMH 's STREAM RIM� .39F_ 4�7 "SHA", ;!11: 1855 -44 -7217 Y T1.0MAS C. ALLEN II )B 797, PG 189 Cl, X % _j LIMITS OF LIMITS OF DISTURBANCE DISTURBANCE 4 D-2 0-- �� 0 ;; .7. xI ACCESS 4 WETLANDS, : /'l 1, �l c) REA J UTLETx C, —,STONE O IN. (TYP). Wk SILT 7EM FENCE -(TYF)- - - CONCRETE ll MONUMENT N.854375.17 2 E:2154838.694 NAD83 (2007) EIP S T R E kkii I `lSHBT' FON-__ OR "AB-.LC LINING 1-1 R E BA R W// N SI­Ae3 Nk85`10q E,,2155211' K 0 GAPS! J08 At) PIN: 1855-54-2506 CAROLINA POWER & 32,w LIGHT COMPANY D& 4649 PG 423 GPS#2 o V-11 DB 65L PG t18 W - ED A 1) / CAP( DB: 720, PG: 213 N:854305.197 V; J EI E:2154947.414 A % �11\ _2z I S A ELEV:390.21 0. 10 Qz \k\ 771 if 001, f; PIN .-1855 -44 -7217 THOMAS C. ALLEN II DB 797, PG 189 G C_ SCAl_p__ 0 20 4 v 80 1 �z 1-0 )RCRETE MONUMENT N:8 54251.232 E.-2155310 .866 NAD83 (2007) I I I BAS� I ' rfEST J,,�S T vv� IN EET C U TTTAI 1% RELEASE NO. DATE PIN: 1855-54-4194 MARY GRIFFIN TAYLOR DB 84L PG 348 REVISION CD 0 i TEMPORARY LINING IG LINING REQUIRED TYPE EXCEL. MATTING NA GREEN SC150 OR EQUAL RIP-RAP-CLASS 'I' D50=12", 27" DEPTH EROSION CONTROL LEGEND RIP—RAP OUTLET PROTECTION L DROP INLET PROTECTION TEMPORARY SEDIMENT TRAP TEMP. INLET PROTECTION z TEMP. CHECK DAM/STONE OUTLET EXCELSIOR MATTING LIMITS OF DISTURBANCE — — — — — — — — — TEMPORARY EARTH BERM TEMPORARY SILT FENCE R E BA R W// N SI­Ae3 Nk85`10q E,,2155211' K 0 GAPS! J08 At) PIN: 1855-54-2506 CAROLINA POWER & 32,w LIGHT COMPANY D& 4649 PG 423 GPS#2 o V-11 DB 65L PG t18 W - ED A 1) / CAP( DB: 720, PG: 213 N:854305.197 V; J EI E:2154947.414 A % �11\ _2z I S A ELEV:390.21 0. 10 Qz \k\ 771 if 001, f; PIN .-1855 -44 -7217 THOMAS C. ALLEN II DB 797, PG 189 G C_ SCAl_p__ 0 20 4 v 80 1 �z 1-0 )RCRETE MONUMENT N:8 54251.232 E.-2155310 .866 NAD83 (2007) I I I BAS� I ' rfEST J,,�S T vv� IN EET C U TTTAI 1% RELEASE NO. DATE PIN: 1855-54-4194 MARY GRIFFIN TAYLOR DB 84L PG 348 REVISION CD 0 i TEMPORARY LINING IG LINING REQUIRED TYPE EXCEL. MATTING NA GREEN SC150 OR EQUAL RIP-RAP-CLASS 'I' D50=12", 27" DEPTH EROSION CONTROL LEGEND RIP—RAP OUTLET PROTECTION L DROP INLET PROTECTION TEMPORARY SEDIMENT TRAP TEMP. INLET PROTECTION 6�& TEMP. CHECK DAM/STONE OUTLET EXCELSIOR MATTING LIMITS OF DISTURBANCE — — — — — — — — — TEMPORARY EARTH BERM TEMPORARY SILT FENCE TEMPORARY SEEDING SPECIFICATIO�1=15 FOR THE PIEDMONT ESTABLISHING VEGETATION PIEDMONT REGION GENERAL REQUIREMENTS: THE WORK INCLUDES SEEDBED PREPARATION, LIMING, FERTILIZING, SEEDING, AND 11hI CHING OF THE UTILITIES STRIP AND ALL DISTURBED AREAS. MATERIALS: A.LIME SHALL BE DOLOMITIC AGRICULTURAL GROUND LIMESTONE CONTAINING l6(,T LESS THAN TEN PERCENT MAGNESIUM OXIDE. MIX INTO SOIL A MINIMUM OF 4 '. DEPTH. B. FERTILIZER SHALL BE COMMERCIAL PRODUCE OF 10 -10 -10 ANALYSIS. ALL FER -,ILIZER SHALL BE DELIVERED IN BAGS BEARING THE MANUFACTURER'S NAME, THE CHEMICAL ANALYSIS OF THE PROJECT, AND THE WEIGHT. IF NOT USED IMMEDIATELY AFTER DELIVERY, THE FERTILIZER SHALL BE STORED IN A MANNER WHICH WILL NOT ALLOW IT TO HARDEN OR DESTROY ITS EFFECTIVENESS. MIX INTO SOIL A MINIMUM OF 4" DEPTH. C. GRASS SEED SHALL BE AN APPROVED MIXTURE BASED ON REGIONAL AND SEASONAL CONSIDERATIONS. PURITY OF SEED SHALL BE A MINIMUM OF NINETY PERCEI�,'T AND THE GERMINATION SHALL BE A MINIMUM OF EIGHTY -FIVE PERCENT. THE: SEED LABEL SHALL BE A "CERTIFIED SEED "LABEL. D. MULCH SHALL CONSIST OF DRY, SMALL GRAIN STRAW, DRY HAY, AND OTHER -UIT- ABLE AND APPROVED MATERIAL. PREPARATION OF SEEDBED: THE SURFACE SHALL BE MADE SMOOTH AND TRUE TO GRADE. THE AREAS SHALL BE PREPARED BY MEANS OF DISKING TO A MINIMUM DEPTH OF FOUR INCHES. DISKING AND CROSS - DISKING, HARROWING, OR OTHER APPROVED METHODS OF DRE- PARATION SHALL BE CONTINUED UNTIL A FRIABLE AND THOROUGHLY PULVER:_"ZED FOUR-INCH DEEP SEEDBED IS OBTAINED. CARE SHALL BE EXERCISED IN PRE- PARATION OF SEEDBEDS ON SLOPES TO KEEP LOOSE SOIL IN PLACE RATHER, THAN PERMIT IT TO ACCUMULATE AT THE FOOT OF THE SLOPE. SEEDBED SHALL BE APPROVED PRIOR TO PLANTING THE SEED.PRIOR TO THE LAST TILLAGE OPERATION, LIME AND FERTILIZER SHALL BE BROADCAST WITH AN APPROVED SPREADER OVER THE SEEDBED IN ACCORDANCE WiTH THE APPROPRIATE SCHEDULE. SEEDING: AFTER THE SEEDBEDS HAVE BEEN PREPARED AND APPROVED BY THE ENGINEER, THE MIX- TURE OF GRASS SEED, AS SPECIFIED, SHALL BE SOWED BY MEANS OF AN APPROVED SEEDER AT THE APPROPRIATE RATE, THE SEED WORKED INTO THE SOIL TO DEPTH OF APPROXIMATELY 112 INCH AND THEN COMPACTED BY MEANS OF A CULT TACKER ROLLER OR OTHER APPROVED EQUIPMENT. ESTABLISHING PERMANENT VEGETATION: THE PERMANENT SEEDING OF DENUDED AREAS SHALL BE PERFORMED WITHIN 15 WORKING DAYS AFTER FINAL GRADE IS REACHED AND SHALL BE IN ACCORDANCE WITNITHE PREVIOUS SPECIFICATIONS AND THE FOLLOWING APPROPRIATE PERMANENT NEEDING SCHEDULE. PERMANENT SEEDING SCHEDULE FOR LOW MAINTENANCE AREAS IN THE PIEDMONT AREAS ARE AS FOLLOWS: PLANTS & MIXTURES PLANTING RATES PL�',,NTING DATE TALL FESCUE 100 Ibs /ac Aug. %a - Sept. 15 or Feb.:( - Mar. 21 KOBE LESPEDEZA 10 Ibs /oc 10 -10 -10 FERTILIZER 1,000 lbs /ac LIMESTONE 4,000 Ibs /ac IN EASTERN PIEDMONT, ADD 25 Ibs /ac PENSACOLA BAHIAGRASS OR 10 lbs /ac COMMON BERMUDAGRASS. AFTER AUGUST 15, USE UNSCARIFIED SERICEA SEED. MULCHING: MULCH SHALL BE SMALL GRAIN STRAW APPLIED AT THE RATE OF 2.5 TONS PER ACRE TO ALL SEEDED AREAS. MULCH SHALL BE APPLIED UNIFORMLY WITHOUT CLUiOPS OR BUNCHES OF MATERIAL. MULCH SHALL BE APPLIED IMMEDIATELY AFTER SEEDING AND PREFERABLY ON THE SAME WORKING DAY THAT THE SELECTED AREA IS SEEDED. ANCHOR STRAW BY TACKING WITH ASPHALT (APPLICATION RATE OF 436 GAIL /ACRE), ROVING, OR NETTING, OR BY CRIMPING WITH A MULCH ANCHORING TOOL. ON STEEP STEEP SLOPES, NETTING IS PREFERRED. MAINTENANCE AND RESEEDING: THE CONTRACTOR SHALL MAINTAIN ALL SEEDED AREAS, UNTIL ACCEPTANCE OF THE WORK BY WATERING, MOWING, AND WEEDING. ANY AREAS WHICH FAiL TO SHOW A S fISFACTORY STAND FOR ANY REASON WHATSOEVER, SHALL BE RETREATED FOLLOWING THE GRASSING PROCEDURE SPECIFIED HEREIN. DAMAGE RESULTING FROM EROSION, GULL IES,'!TIASHOUTS,OR OTHER CAUSES PRIOR TO ACCEPTANCE SHALL BE REPAIRED BY REFILLING !!WITH TOPSOIL, AND RETREATED FOLLOWING THE GRASSING PROCEDURE SPECIFIED HEREIN. PREPARED BY: DAVI .o MARTIN' 6415 OLD PLANK RD, HiGH POINT, NC 27265 (336) 886 -4821 UVVVVV.D DIVIP PROJECT: 120012 v � SURFACE ROUGHENING NTS WATTLE ROLLS iv':.UST BE PLACED ALONG SLOPE CC�I,ITOURS � \;; � •ice \�� ;� � � ', /,=-� j/ \ � 2 O' i� %; i %� ADJA.CEN' ROLLS S' —1,LL TIGHTLY '431.1, - 1: DRIVE STEEL POST 18" INTO GROUND AND EXCAVATE A 'o" X 6" T R'_ NO UPHILL ALONG THE LINE OF POSTS. n%iAX. 8' BET)ilEEN POSTS, 2. ATTACH WIRE FENCE TO POSTS AND EXTEND THE BOTTOM OF THE FENCE b "INTO THE EXCAVATED TRENCH. ATTACH THE FT_L T' -ABRIC TG THE ''1ViRE FEilCE. AND EXTEND THE BOT T 01vi OF THE FABRIC 6" INTO THE IRENCH, 4. BACKFILL THE TRENCH AND COMPACT THE SOIL FIRMLY TO ANCHOR THE BOTTOM OF THE SILT FENCE SO THAT RUNOFF IS FORCED TO GO i HP IJ HE FENCE AND CANNOT GO UNDER T. SPACING DEPENDS ON SOIL TYPE AND SLOPE STEEPNESS SED11MEN1, ORC N., MAT TER, AND iwAi':?iL SLEDS ARE CAPTURED BEHINb THE ROLLS. _— x2�'... a r r M IA. COIR WATTLE SPACING iI\j (FT) < .. '' Leo J V . ;TER 7t ,A,A.TT1 E INSTALLATION REQUIRES THE PLACE?>,ENi n n- i t n, +^ ..1.;: SECUP,F STAKING �r 1'r:r ROLL IN A TRENCH 3 " -5" (75- 125mm) DEEP L:UG ON CONFOL11 ` RUNOFF MUST MOT BE ALLO'` ED TO RUN U'!'Lc OF AROUND ROLL. SPECIFICATIONS: i00% COIR (COCO�!U -) FIBERS MIN. DIAMETER: 12,: MIN. DENSIi (: 3.5 _8 /SF 10% NET !MATERIAL: COIR FIBER NET OPENINGS: 2" X ?" NET STRENGTH: 90 ") LBS MIN, WEIGHT: 2.6 I Q FT ± 10111 SEQUENCE of CONSTRUCTION 1. Install stabilized constructlion entrance/ mud ramp at all construct lion entrances. 2. Clear site enough to 1nst(all erosion control devices. 3. Install sediment and erosion control devices. 4. Clear and grade site. 5. Protect ail drainage struc -ures. 6. Maintain and clean erosioni control facilities throughout duration of project. 7. Seed, mulch & anchor site. 8. After all areas have been :stabilized, remove all temporary erosion control devices. TEMPORARY SILT FENCE NTS RICH WITH S iL TAMPING TO ]NO. EROSION CONTROL PROCEDURE The contractor shall conform with all requirements of the soil sedimentation and erosion control laws and regulations of the State of North Carolina as established and enforced by the Land Quality Section of the NC Department of Environment and Natural Resources. These requirements shall include but not be limited to the following: 1. All denuded areas are to be seeded and stabilized within the following timetable: Temporary Seeding: 21 calendar days Permanent Seeding: 15 working days / 90 calendar days Upon completion of any slope: 21 calendar days 2. All erosion control improvements shall be maintained, repaired and kept working until acceptance of project. POST META T -POST 5 FEET OR 6 EE- ill HEiG' DEPENDING ON FILL SLOPE, FABRIC -i6 MHES Ifs! 'AVID; H Iv U S 'v E E _ ENO IN E E R S ;pF C.TFICATIONS raft O�IvI CONTROL) T C'° � ;IL T F E1NCE HOG WIRE ,� SEDiMEN T CON IROL STONE SILT- ENCE OVER HOG WIRE I AL FENI,E. POST ,_'.r t rr2inr SIL, -FENCE i OV CROSS SECTION L PREPARE SOIL BEFORE INSTALLING BLANKETS. INCLUDING APPLICATION OF LIME, FERTILIZER, AND SEED. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6 "DEEP X 6 °WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW ON BOTTOM OF CHANNEL. 4. PLACE BLANKETS END OVER END (SHINGLE STYLE)WITH AN 18'OVERLAP. USE A DOUBLE ROW OF STAGGERED STAPLES 4'APART TO SECURE BLANKETS. 5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED IN 6 "DEEP X 6 "WIDE TRENCH, BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. BLANKETS ON SIDE SLOPES MUST BE OVERLAPPED 4'OVER THE CENTER BLANKET AND STAPLED (2 °FOR C350 MATTING). 7. IN HIGH FLOW CHANNEL APPLICATIONS,A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT INTERVALS. USE A ROW OF STAPLES 4" APART OVER ENTIRE WIDTH OF THE CHANNEL. PLACE A SECOND ROW 4 "BELOW THE FIRST ROW IN A STAGGERED PATTERN, 8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED IN A 6" DEEP X 6'WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. INSTALLATION OF NETTING AND MATTING ,I S ?S- 20'1.2 INITIAL RE ASE JO. DATE REVISION ST STRUCi�R' S ONE 4` MINA TOP VIEW SILT -FENCE OVER HOG WIRE FRONT VIEW 11O I E° STRUCTURAL STONE SHALL BE (CLASS "B "STONE FOR EROSION rC tTROL PURPOSES. TEMPORARY SILT FENCE STONE OUTLET ,T.S. 8 wv jl1 t.., EXTENDE�1 �V; "�« THROUGH ROCK - FOLD DOVvIN OVER f -(OCK 3" arse aggregate Washing - If conditions at the site are such that most of the mud and sediment will not be removed by vehicles traveling over the gravel, the tires should be washed. Washing should be done on an area stabilized with crushed stone that drains into a sediment trap or other suitable disposal area. A wash rack may also be used to make washing more convenient and effective. Construction Specifications 1. Clear the entrance and exit area of all vegetation, roots, and other objec- tionable materioland properly grade it. 2. Place the gravel to the specific grade and dimensions shown on the plans, and smooth it. 3. Provide drainage to carry water to a sedment trap or other suitable outlet, 4. Use geotextile fabrics because they improve stability of the foundation in locations subject to seepage or high water table. Maintenance Maintain the gravel pad in a condition to prevent mud or sediment from leav- ing the construction site. This may requuire periodic topdressing with 2 -inch stone, After each rainfall, inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all objectionable materials spilled, washed, or tracked onto public roadways. TEMPORARY CONSTRUCTION ENTRANCE NTS XFT Ear: Energy Progress Energy Carolinas, Inc. Raleigh, NC FRANKLINTON 115 /24kV SUBSTATION EXPANSION EROSION CONTROL DETAILS LOCATION 142 POCOMOKE ROAD, FRANKLINTON, NC SCALE 1" 40' SCALE RATIO 101 CHAP SFP MVC DRAwN BAP CHIK. SFP APP. MVC BY CK. APP, 1 DATE 03- 12 - -12 DAG� No. RDC- 601299 SH 6 OF 6 Applicati,n Rates (lb /ac) Recommended Seeding Dates Species Seed 10 -10 -10 Agriculurai Straw Fertilizer Limestone Rye (grain) 120 Jan, l - May 1 Annual Lespedeza 50 750 2,000 41000 (Kobe) May I - Aug. 15 German Millet 40 750 2,000 4,000 Aug. 15 - Dec. 30 Ryegrain 120 I 1,000 2,000 4,000 ESTABLISHING VEGETATION PIEDMONT REGION GENERAL REQUIREMENTS: THE WORK INCLUDES SEEDBED PREPARATION, LIMING, FERTILIZING, SEEDING, AND 11hI CHING OF THE UTILITIES STRIP AND ALL DISTURBED AREAS. MATERIALS: A.LIME SHALL BE DOLOMITIC AGRICULTURAL GROUND LIMESTONE CONTAINING l6(,T LESS THAN TEN PERCENT MAGNESIUM OXIDE. MIX INTO SOIL A MINIMUM OF 4 '. DEPTH. B. FERTILIZER SHALL BE COMMERCIAL PRODUCE OF 10 -10 -10 ANALYSIS. ALL FER -,ILIZER SHALL BE DELIVERED IN BAGS BEARING THE MANUFACTURER'S NAME, THE CHEMICAL ANALYSIS OF THE PROJECT, AND THE WEIGHT. IF NOT USED IMMEDIATELY AFTER DELIVERY, THE FERTILIZER SHALL BE STORED IN A MANNER WHICH WILL NOT ALLOW IT TO HARDEN OR DESTROY ITS EFFECTIVENESS. MIX INTO SOIL A MINIMUM OF 4" DEPTH. C. GRASS SEED SHALL BE AN APPROVED MIXTURE BASED ON REGIONAL AND SEASONAL CONSIDERATIONS. PURITY OF SEED SHALL BE A MINIMUM OF NINETY PERCEI�,'T AND THE GERMINATION SHALL BE A MINIMUM OF EIGHTY -FIVE PERCENT. THE: SEED LABEL SHALL BE A "CERTIFIED SEED "LABEL. D. MULCH SHALL CONSIST OF DRY, SMALL GRAIN STRAW, DRY HAY, AND OTHER -UIT- ABLE AND APPROVED MATERIAL. PREPARATION OF SEEDBED: THE SURFACE SHALL BE MADE SMOOTH AND TRUE TO GRADE. THE AREAS SHALL BE PREPARED BY MEANS OF DISKING TO A MINIMUM DEPTH OF FOUR INCHES. DISKING AND CROSS - DISKING, HARROWING, OR OTHER APPROVED METHODS OF DRE- PARATION SHALL BE CONTINUED UNTIL A FRIABLE AND THOROUGHLY PULVER:_"ZED FOUR-INCH DEEP SEEDBED IS OBTAINED. CARE SHALL BE EXERCISED IN PRE- PARATION OF SEEDBEDS ON SLOPES TO KEEP LOOSE SOIL IN PLACE RATHER, THAN PERMIT IT TO ACCUMULATE AT THE FOOT OF THE SLOPE. SEEDBED SHALL BE APPROVED PRIOR TO PLANTING THE SEED.PRIOR TO THE LAST TILLAGE OPERATION, LIME AND FERTILIZER SHALL BE BROADCAST WITH AN APPROVED SPREADER OVER THE SEEDBED IN ACCORDANCE WiTH THE APPROPRIATE SCHEDULE. SEEDING: AFTER THE SEEDBEDS HAVE BEEN PREPARED AND APPROVED BY THE ENGINEER, THE MIX- TURE OF GRASS SEED, AS SPECIFIED, SHALL BE SOWED BY MEANS OF AN APPROVED SEEDER AT THE APPROPRIATE RATE, THE SEED WORKED INTO THE SOIL TO DEPTH OF APPROXIMATELY 112 INCH AND THEN COMPACTED BY MEANS OF A CULT TACKER ROLLER OR OTHER APPROVED EQUIPMENT. ESTABLISHING PERMANENT VEGETATION: THE PERMANENT SEEDING OF DENUDED AREAS SHALL BE PERFORMED WITHIN 15 WORKING DAYS AFTER FINAL GRADE IS REACHED AND SHALL BE IN ACCORDANCE WITNITHE PREVIOUS SPECIFICATIONS AND THE FOLLOWING APPROPRIATE PERMANENT NEEDING SCHEDULE. PERMANENT SEEDING SCHEDULE FOR LOW MAINTENANCE AREAS IN THE PIEDMONT AREAS ARE AS FOLLOWS: PLANTS & MIXTURES PLANTING RATES PL�',,NTING DATE TALL FESCUE 100 Ibs /ac Aug. %a - Sept. 15 or Feb.:( - Mar. 21 KOBE LESPEDEZA 10 Ibs /oc 10 -10 -10 FERTILIZER 1,000 lbs /ac LIMESTONE 4,000 Ibs /ac IN EASTERN PIEDMONT, ADD 25 Ibs /ac PENSACOLA BAHIAGRASS OR 10 lbs /ac COMMON BERMUDAGRASS. AFTER AUGUST 15, USE UNSCARIFIED SERICEA SEED. MULCHING: MULCH SHALL BE SMALL GRAIN STRAW APPLIED AT THE RATE OF 2.5 TONS PER ACRE TO ALL SEEDED AREAS. MULCH SHALL BE APPLIED UNIFORMLY WITHOUT CLUiOPS OR BUNCHES OF MATERIAL. MULCH SHALL BE APPLIED IMMEDIATELY AFTER SEEDING AND PREFERABLY ON THE SAME WORKING DAY THAT THE SELECTED AREA IS SEEDED. ANCHOR STRAW BY TACKING WITH ASPHALT (APPLICATION RATE OF 436 GAIL /ACRE), ROVING, OR NETTING, OR BY CRIMPING WITH A MULCH ANCHORING TOOL. ON STEEP STEEP SLOPES, NETTING IS PREFERRED. MAINTENANCE AND RESEEDING: THE CONTRACTOR SHALL MAINTAIN ALL SEEDED AREAS, UNTIL ACCEPTANCE OF THE WORK BY WATERING, MOWING, AND WEEDING. ANY AREAS WHICH FAiL TO SHOW A S fISFACTORY STAND FOR ANY REASON WHATSOEVER, SHALL BE RETREATED FOLLOWING THE GRASSING PROCEDURE SPECIFIED HEREIN. DAMAGE RESULTING FROM EROSION, GULL IES,'!TIASHOUTS,OR OTHER CAUSES PRIOR TO ACCEPTANCE SHALL BE REPAIRED BY REFILLING !!WITH TOPSOIL, AND RETREATED FOLLOWING THE GRASSING PROCEDURE SPECIFIED HEREIN. PREPARED BY: DAVI .o MARTIN' 6415 OLD PLANK RD, HiGH POINT, NC 27265 (336) 886 -4821 UVVVVV.D DIVIP PROJECT: 120012 v � SURFACE ROUGHENING NTS WATTLE ROLLS iv':.UST BE PLACED ALONG SLOPE CC�I,ITOURS � \;; � •ice \�� ;� � � ', /,=-� j/ \ � 2 O' i� %; i %� ADJA.CEN' ROLLS S' —1,LL TIGHTLY '431.1, - 1: DRIVE STEEL POST 18" INTO GROUND AND EXCAVATE A 'o" X 6" T R'_ NO UPHILL ALONG THE LINE OF POSTS. n%iAX. 8' BET)ilEEN POSTS, 2. ATTACH WIRE FENCE TO POSTS AND EXTEND THE BOTTOM OF THE FENCE b "INTO THE EXCAVATED TRENCH. ATTACH THE FT_L T' -ABRIC TG THE ''1ViRE FEilCE. AND EXTEND THE BOT T 01vi OF THE FABRIC 6" INTO THE IRENCH, 4. BACKFILL THE TRENCH AND COMPACT THE SOIL FIRMLY TO ANCHOR THE BOTTOM OF THE SILT FENCE SO THAT RUNOFF IS FORCED TO GO i HP IJ HE FENCE AND CANNOT GO UNDER T. SPACING DEPENDS ON SOIL TYPE AND SLOPE STEEPNESS SED11MEN1, ORC N., MAT TER, AND iwAi':?iL SLEDS ARE CAPTURED BEHINb THE ROLLS. _— x2�'... a r r M IA. COIR WATTLE SPACING iI\j (FT) < .. '' Leo J V . ;TER 7t ,A,A.TT1 E INSTALLATION REQUIRES THE PLACE?>,ENi n n- i t n, +^ ..1.;: SECUP,F STAKING �r 1'r:r ROLL IN A TRENCH 3 " -5" (75- 125mm) DEEP L:UG ON CONFOL11 ` RUNOFF MUST MOT BE ALLO'` ED TO RUN U'!'Lc OF AROUND ROLL. SPECIFICATIONS: i00% COIR (COCO�!U -) FIBERS MIN. DIAMETER: 12,: MIN. DENSIi (: 3.5 _8 /SF 10% NET !MATERIAL: COIR FIBER NET OPENINGS: 2" X ?" NET STRENGTH: 90 ") LBS MIN, WEIGHT: 2.6 I Q FT ± 10111 SEQUENCE of CONSTRUCTION 1. Install stabilized constructlion entrance/ mud ramp at all construct lion entrances. 2. Clear site enough to 1nst(all erosion control devices. 3. Install sediment and erosion control devices. 4. Clear and grade site. 5. Protect ail drainage struc -ures. 6. Maintain and clean erosioni control facilities throughout duration of project. 7. Seed, mulch & anchor site. 8. After all areas have been :stabilized, remove all temporary erosion control devices. TEMPORARY SILT FENCE NTS RICH WITH S iL TAMPING TO ]NO. EROSION CONTROL PROCEDURE The contractor shall conform with all requirements of the soil sedimentation and erosion control laws and regulations of the State of North Carolina as established and enforced by the Land Quality Section of the NC Department of Environment and Natural Resources. These requirements shall include but not be limited to the following: 1. All denuded areas are to be seeded and stabilized within the following timetable: Temporary Seeding: 21 calendar days Permanent Seeding: 15 working days / 90 calendar days Upon completion of any slope: 21 calendar days 2. All erosion control improvements shall be maintained, repaired and kept working until acceptance of project. POST META T -POST 5 FEET OR 6 EE- ill HEiG' DEPENDING ON FILL SLOPE, FABRIC -i6 MHES Ifs! 'AVID; H Iv U S 'v E E _ ENO IN E E R S ;pF C.TFICATIONS raft O�IvI CONTROL) T C'° � ;IL T F E1NCE HOG WIRE ,� SEDiMEN T CON IROL STONE SILT- ENCE OVER HOG WIRE I AL FENI,E. POST ,_'.r t rr2inr SIL, -FENCE i OV CROSS SECTION L PREPARE SOIL BEFORE INSTALLING BLANKETS. INCLUDING APPLICATION OF LIME, FERTILIZER, AND SEED. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6 "DEEP X 6 °WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW ON BOTTOM OF CHANNEL. 4. PLACE BLANKETS END OVER END (SHINGLE STYLE)WITH AN 18'OVERLAP. USE A DOUBLE ROW OF STAGGERED STAPLES 4'APART TO SECURE BLANKETS. 5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED IN 6 "DEEP X 6 "WIDE TRENCH, BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. BLANKETS ON SIDE SLOPES MUST BE OVERLAPPED 4'OVER THE CENTER BLANKET AND STAPLED (2 °FOR C350 MATTING). 7. IN HIGH FLOW CHANNEL APPLICATIONS,A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT INTERVALS. USE A ROW OF STAPLES 4" APART OVER ENTIRE WIDTH OF THE CHANNEL. PLACE A SECOND ROW 4 "BELOW THE FIRST ROW IN A STAGGERED PATTERN, 8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED IN A 6" DEEP X 6'WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. INSTALLATION OF NETTING AND MATTING ,I S ?S- 20'1.2 INITIAL RE ASE JO. DATE REVISION ST STRUCi�R' S ONE 4` MINA TOP VIEW SILT -FENCE OVER HOG WIRE FRONT VIEW 11O I E° STRUCTURAL STONE SHALL BE (CLASS "B "STONE FOR EROSION rC tTROL PURPOSES. TEMPORARY SILT FENCE STONE OUTLET ,T.S. 8 wv jl1 t.., EXTENDE�1 �V; "�« THROUGH ROCK - FOLD DOVvIN OVER f -(OCK 3" arse aggregate Washing - If conditions at the site are such that most of the mud and sediment will not be removed by vehicles traveling over the gravel, the tires should be washed. Washing should be done on an area stabilized with crushed stone that drains into a sediment trap or other suitable disposal area. A wash rack may also be used to make washing more convenient and effective. Construction Specifications 1. Clear the entrance and exit area of all vegetation, roots, and other objec- tionable materioland properly grade it. 2. Place the gravel to the specific grade and dimensions shown on the plans, and smooth it. 3. Provide drainage to carry water to a sedment trap or other suitable outlet, 4. Use geotextile fabrics because they improve stability of the foundation in locations subject to seepage or high water table. Maintenance Maintain the gravel pad in a condition to prevent mud or sediment from leav- ing the construction site. This may requuire periodic topdressing with 2 -inch stone, After each rainfall, inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all objectionable materials spilled, washed, or tracked onto public roadways. TEMPORARY CONSTRUCTION ENTRANCE NTS XFT Ear: Energy Progress Energy Carolinas, Inc. Raleigh, NC FRANKLINTON 115 /24kV SUBSTATION EXPANSION EROSION CONTROL DETAILS LOCATION 142 POCOMOKE ROAD, FRANKLINTON, NC SCALE 1" 40' SCALE RATIO 101 CHAP SFP MVC DRAwN BAP CHIK. SFP APP. MVC BY CK. APP, 1 DATE 03- 12 - -12 DAG� No. RDC- 601299 SH 6 OF 6 Topograhic Survey )C2 @ [Np'F =.APR2 DR _ n WATER QUALITY E VICINITY MAP FFE FINISHED FLOOD ELEVATION ca W o NOT TO SCALE 2 0 4� 2 Z 2- ��FO lu a POCOMOKE ROAD - NCSR 1127 R/W LIMIT 60' PUBLIC R/W Fp INV. _ GPS #1 ---- INV. 403.45 SPIKE( )D EP 398.26 REBAR W/ CAP(S) 5+15.53 / � �- -- �-""- o 10 R/W LIMIT Ni 854770.302 NORTH -SOUTH - E:2155122.072 _ BASELINE """"' INV -�� _ ELEV 401.06 512.98 TOTAL 40 INV. 97.97 P 404.14. M •50'13 "E 18" RCP ---- RAILROAD 0 INV. INV. 400.19 - 405.0 _ --- N >_ EP SPIKE(F) _ _ INV 315.01 398.8 "'- 399.8_3 - - - -- _ "� t"- �-' 00 c� 398.33 -"� -- _ _ - -..._ X24" RCPT r --^.' i o0 _ _ i < l R/W LIMIT c'' 24" RCP 400.0 °= 512.97' {TOTAL )': CONCRETE a 0 " 197.9 MONUMENT W/ �__-' , N86'SQ 13 E -..�" - ,""" UDAR MONUMENT v EP N =S ALUMINUM CAP(S) �,_.-.q.00.0 ,� „-. _N83 41 33 E- -�--�' I "FRANKUNTON" --- _-� - 315.06' 1 ^ ` - -STA.4+84.03i / N -S STA.4 +46.18 \ L 7 NV - \ �� 1.51 RT \ R/W UMIT CONCRETE ` "1 397.15 _. --- MONUMENT ---- -- DISTURBED(F) --�'� - '- -\ "�, 1i �� GRAVEL DRIVE RESET W/ #5 X \ I � . " -' -.. REBAR 395. , <1 4D0 0., , \ PINE TREES ARE THE STR -46 / � - -� , REBAR W/ CAP(S) 3r 0 PROMINENT GROWTH IN 2 N -S STA: 4+29.1 \ 0 THIS WOODED AREA fig^ fh� l/ / / N: 854714.071 E: 2155237.716 'A DOTES: // / o / / .95. Z / os SURVEYED AND MAPPED FOR PROGRESS ENERGY CAROLINAS, //. 1 ^ Q [ p INC !/ �. ^` 1� \ t% / --1 2. SURVEYED AND MAPPED . BY STANTEC CONSULTING \ 1 / / MITCHNERS Cr p Q 3. AREA BY COORDINATE METHOD ^ \ t / ,EROSSROADS \ \ / /// / 4. PROPERTY SUBJECT TO ANY VAUD & ENFORCEABLE / 23KV ` \ \ � o I y . EASEMENTS, RESTRICTIONS AND RIGHTS-OF-WAY OF RECORD. �z3 I moo° 5. ALL DISTANCES SHOWN HEREON ARE HORIZONTAL GROUND ( z / / f _ DISTANCE UNLESS OTHERWISE NOTED. TRANSFORMER ` COLLEGE ; Z LU o ? L / 7. CONTOURS SHOWN HEREON ARE AT 10FOOTI INTERVALS OUTSIDE I STREET � o tt tk � / . I, ! 1 �l 23KV \ .� u, 4 t / a � OF SUBSTATION AND O.iO FOOT INSIDE SUBSTATION FENCE. H / �- -� •� o v 1 r �/ 6. NORTH CAROLINA STATE PLANE COORDINATE POSITIONS WERE HA7 / ' X �, �_ '� / / I / \ [ / I _. DETERMINED THROUGH THE USE OF VRS NETWORK UTILIZING ° a t �,. \ / TRIMBLE 5800 RECEIVERS. COORDINATES SHOWN HEREON ARE NAD83(2007). WITH NAVD88 ELEVATIONS. 395.0 / 9. THE COMBINED GRID FACTOR UTILIZED ON THIS TOP CONC ° / PROJECT IS 0.999967559 / /1 �'S�C 39.53 \ ! U / // 10. STRUCTURES WITH NUMBERS SHOWN HEREON WERE CLEARLY 0 +00.00 / 1 READABLE. STRUCTURES WITHOUT NUMBERS EITHER HAD AB UNREADLE REMNANTS OF NUMBER TAGS OR NONE AT ALL. HAS EAST -WEST FAS / / / / /� I I i �S v n / / A / / �%K / / / 11. WETLANDS AND STREAM LOCATIONS ARE SHOWN FROM FIELD / / PINE TREES ARE THE BASELINE QAS S / J l i`� ° / /( C � �°. /// li I PROMINENT GROWTH IN SURVEY DATED 2 -16 -2012 AS THEY WERE DELINEATED BY t � � 1 / / ti1 1 -I 2 M; t / � / THIS WOODED AREA ENVIRONMENTAL SERVICES, INC. EARLIER IN. FEBRUARY 2012. ,r/ f A TOP CONC:, tom / �� I / THE TAR - PAMUCO RIVER BUFFER IS SHOWN AS BEGINNING AT =l+e ./ 395.87 / • / t \ J ( J / FLAG SHB 4 PER EMAIL RECEIVED ' ON 2 -15 -2012 AND 40 „t H 1 J l / DESCRIBED IN ESI REPORT FOR PROJECT # ER12020.01 DATED \ / I IM: 395.51 c� /// ` 2 -3 -2012. V. ® / _/1-BASEUNE r - iw "'INTERSECTION TOP GONG: "j N -S STA. 2 +04.08 % �h- ) EMH Z w 394.51 E -W STA. 3 +00.40 'h f RIM:395.58 m PIN: 1855 -44 -7217 N:854496.300 / f �'- 1-- 1 AA W / CAP(S) � E: 21581.01 r J 41 SHA2 REB 9 THOMAS C. ALIEN 11 . . PIN: 1855 -54 -4194 DB 797, PG 189 N•85 ,4546.138 MARY GRIFFIN TAYLOR E: 2154992.469 / / ,ygh' r ..� REBAR W/ CAP(S) / DB 841. PG 348 �// \ \ E -W STA.3+65.40 JL_ N: 854479.689 o U) 1 i E 2155243.862 t A 92 �- X^-.c� J TOP CONQ \\ N, -0 - / o \ j `\ k 395.89 C fAS _ Hef J ` \ ` TBM ­,,REBAR W/ CAPS REBAR W/ CAP(S)% v / 1 % N -S STA.1 +49.11 4+88.21 ST R----218 95�...- _N: 854431.923 ,7 f EAST -WEST 1 " AND a � \ O E :2155085.952 ( N: 854443.108 1 t % / 'BASELINE HARDWOOD TREES F/8 �� ti s \ ELEV:395.95 \ E: 2155167.171 / ARE THE PROMINENT I i GROWTH IN THIS ! WOODED AREA ! y ®� cv X- A-----. PIN - 1855 -54 -2506 -CAROLINA POWER &, / / } \\ LIGHT COMPANY / \ DB 464, PG 423 / I , PG 213 CONCRETE � / °� + -� DB 720 \„_,I N: 854375.172 x MONUMENT(F) ' / / + \ o mQ E 2154838.694 NAD83(2007). IR ,,i III i I I o E() ! / 23g , \ I ' �. PINE TREES ARE THE i `N / 1 / l/ 488.1 8'� I I e�` \ ! t ` PROMINENT GROWTH IN 0411 / / ! l %OrAZ \ t THIS WOODED AREA.. 0 +00.00 j I I Il NORTH SOUTH BASEUNE / GPs REBAR W/ C (S) / �\ � t N75'1732- / I 1 / I N:.854305.197 r \ E :2154947.414 ? t t IRON PIPE(F) \ { 1 I ELEV:390.21 ZD r, OF ARE , , 1 OF P* /SOUTH \ 75� �0'� t (I I L. �� g�S�N r'p yin , \ ` t t t w \ CONCRETE <" Gy R�"�Ep y� `�. >> ' , MONUMENT(F) tJ M GO SuR > y o N: 854251.232 E: 2155310.866 <y� V�oP OF yin �NAD83(2007) PIN: 1855 -44- ---7217 THOMAS C. ALLEN 11 DS 797, PG 1189 1 1 2 -20 -2012 NO. I DATE 1 ?_tAH then ?1?i11 ?f]1? In*34,24. AREA INSIDE PUBLIC ROAD R /W: 15,389 S.F.t, 0.353 AC.f AREA OUTSIDE PUBLIC ROAD R /W: 227,532 S.F.t, 5.223 AC.t TOTAL SITE AREA: 242,921 S.F.f, 5.576 AC.t ADDED WETLANDS AS DELINEATED AND SURVEYED REVISION 8 1AR Do APPS 21 10.1 I John P. Scoville III certify that this planimetric drawing was drawn from an acutal survey made under my supervision and was made in accordance with the requirements of the Standards of Practice of Land Surveying in North Carolina, and meets or exceeds the requirements for a class "A" survey as specified therein. Witness rry hand and seal this 1 th d of January, 2012. John P. Scoville, III L -3343 d�giaE % !r ress Ellel ROSE oCL SE L mss' `-33 Progress Energy Carolinas, Inc, Raleigh, NC scl f�al,i €,,,��� FRANKLINTON 11 5K SUBSTATION TOPOGRAPHIC SURVEY PROJECT NUMBER 20072350 LocATION FRANKLINTON, FRANKLIN COUNTY, NC SCALE 1"=401 SCALE RATIO 1 :1 JPS. JPS JPS DRAWN JBH CHIC JPS APP. JPS BY CK. App DATE 1 -18 -12 DWG. NO. , SH 1 OF 1 LEGEND- Stantec Consulting Services, Inc. Oak Plaza Blvd., Suite 200 PROPERTY LINE Winston-Salem, Winston- Salem, NC USA 27105 NE ADJOINING PROPERTY LINE 336.759.7400 Fax: 36.759.7397 NCDOT R/W LINE www.stantec.com MAJOR CONTOUR LINE Rp - - - - - - - - - - MINOR CONTOUR LINE POCOMOKE RD BASELINE The Contractor shall verify and be responsible for all dimeruiians. 00 NOT scale the drawing - any errors or ornimsions shall be reported to X EDGE OF PAVEMENT Sfontee Consuithrg Me. without delay. The copyrights to all designs and drawings are the property of EDGE OF WOODS Inc. haec C ul Consulting for any other than S I E that n � s kignc a � : x x- BARBED WIRE FENCE J� CMP - CORRUGATED METAL PIPE °cr 0 - MONUMENTATION FOUND o• - POLE LOCATION m' o - GUY ANCHOR LOCATION 0 El - CONCRETE MONUMENT .FOUND - CONCRETE MONUMENT SET A - REBAR W/ CAP SET co TP - TELEPHONE PEDESTAL (F) - FOUND (S) - SET �n RCP - REINFORCED CONCRETE PIPE Q STR -219 VICINITY MAP FFE FINISHED FLOOD ELEVATION ca W o NOT TO SCALE 2 0 4� 2 Z 2- ��FO lu a POCOMOKE ROAD - NCSR 1127 R/W LIMIT 60' PUBLIC R/W Fp INV. _ GPS #1 ---- INV. 403.45 SPIKE( )D EP 398.26 REBAR W/ CAP(S) 5+15.53 / � �- -- �-""- o 10 R/W LIMIT Ni 854770.302 NORTH -SOUTH - E:2155122.072 _ BASELINE """"' INV -�� _ ELEV 401.06 512.98 TOTAL 40 INV. 97.97 P 404.14. M •50'13 "E 18" RCP ---- RAILROAD 0 INV. INV. 400.19 - 405.0 _ --- N >_ EP SPIKE(F) _ _ INV 315.01 398.8 "'- 399.8_3 - - - -- _ "� t"- �-' 00 c� 398.33 -"� -- _ _ - -..._ X24" RCPT r --^.' i o0 _ _ i < l R/W LIMIT c'' 24" RCP 400.0 °= 512.97' {TOTAL )': CONCRETE a 0 " 197.9 MONUMENT W/ �__-' , N86'SQ 13 E -..�" - ,""" UDAR MONUMENT v EP N =S ALUMINUM CAP(S) �,_.-.q.00.0 ,� „-. _N83 41 33 E- -�--�' I "FRANKUNTON" --- _-� - 315.06' 1 ^ ` - -STA.4+84.03i / N -S STA.4 +46.18 \ L 7 NV - \ �� 1.51 RT \ R/W UMIT CONCRETE ` "1 397.15 _. --- MONUMENT ---- -- DISTURBED(F) --�'� - '- -\ "�, 1i �� GRAVEL DRIVE RESET W/ #5 X \ I � . " -' -.. REBAR 395. , <1 4D0 0., , \ PINE TREES ARE THE STR -46 / � - -� , REBAR W/ CAP(S) 3r 0 PROMINENT GROWTH IN 2 N -S STA: 4+29.1 \ 0 THIS WOODED AREA fig^ fh� l/ / / N: 854714.071 E: 2155237.716 'A DOTES: // / o / / .95. Z / os SURVEYED AND MAPPED FOR PROGRESS ENERGY CAROLINAS, //. 1 ^ Q [ p INC !/ �. ^` 1� \ t% / --1 2. SURVEYED AND MAPPED . BY STANTEC CONSULTING \ 1 / / MITCHNERS Cr p Q 3. AREA BY COORDINATE METHOD ^ \ t / ,EROSSROADS \ \ / /// / 4. PROPERTY SUBJECT TO ANY VAUD & ENFORCEABLE / 23KV ` \ \ � o I y . EASEMENTS, RESTRICTIONS AND RIGHTS-OF-WAY OF RECORD. �z3 I moo° 5. ALL DISTANCES SHOWN HEREON ARE HORIZONTAL GROUND ( z / / f _ DISTANCE UNLESS OTHERWISE NOTED. TRANSFORMER ` COLLEGE ; Z LU o ? L / 7. CONTOURS SHOWN HEREON ARE AT 10FOOTI INTERVALS OUTSIDE I STREET � o tt tk � / . I, ! 1 �l 23KV \ .� u, 4 t / a � OF SUBSTATION AND O.iO FOOT INSIDE SUBSTATION FENCE. H / �- -� •� o v 1 r �/ 6. NORTH CAROLINA STATE PLANE COORDINATE POSITIONS WERE HA7 / ' X �, �_ '� / / I / \ [ / I _. DETERMINED THROUGH THE USE OF VRS NETWORK UTILIZING ° a t �,. \ / TRIMBLE 5800 RECEIVERS. COORDINATES SHOWN HEREON ARE NAD83(2007). WITH NAVD88 ELEVATIONS. 395.0 / 9. THE COMBINED GRID FACTOR UTILIZED ON THIS TOP CONC ° / PROJECT IS 0.999967559 / /1 �'S�C 39.53 \ ! U / // 10. STRUCTURES WITH NUMBERS SHOWN HEREON WERE CLEARLY 0 +00.00 / 1 READABLE. STRUCTURES WITHOUT NUMBERS EITHER HAD AB UNREADLE REMNANTS OF NUMBER TAGS OR NONE AT ALL. HAS EAST -WEST FAS / / / / /� I I i �S v n / / A / / �%K / / / 11. WETLANDS AND STREAM LOCATIONS ARE SHOWN FROM FIELD / / PINE TREES ARE THE BASELINE QAS S / J l i`� ° / /( C � �°. /// li I PROMINENT GROWTH IN SURVEY DATED 2 -16 -2012 AS THEY WERE DELINEATED BY t � � 1 / / ti1 1 -I 2 M; t / � / THIS WOODED AREA ENVIRONMENTAL SERVICES, INC. EARLIER IN. FEBRUARY 2012. ,r/ f A TOP CONC:, tom / �� I / THE TAR - PAMUCO RIVER BUFFER IS SHOWN AS BEGINNING AT =l+e ./ 395.87 / • / t \ J ( J / FLAG SHB 4 PER EMAIL RECEIVED ' ON 2 -15 -2012 AND 40 „t H 1 J l / DESCRIBED IN ESI REPORT FOR PROJECT # ER12020.01 DATED \ / I IM: 395.51 c� /// ` 2 -3 -2012. V. ® / _/1-BASEUNE r - iw "'INTERSECTION TOP GONG: "j N -S STA. 2 +04.08 % �h- ) EMH Z w 394.51 E -W STA. 3 +00.40 'h f RIM:395.58 m PIN: 1855 -44 -7217 N:854496.300 / f �'- 1-- 1 AA W / CAP(S) � E: 21581.01 r J 41 SHA2 REB 9 THOMAS C. ALIEN 11 . . PIN: 1855 -54 -4194 DB 797, PG 189 N•85 ,4546.138 MARY GRIFFIN TAYLOR E: 2154992.469 / / ,ygh' r ..� REBAR W/ CAP(S) / DB 841. PG 348 �// \ \ E -W STA.3+65.40 JL_ N: 854479.689 o U) 1 i E 2155243.862 t A 92 �- X^-.c� J TOP CONQ \\ N, -0 - / o \ j `\ k 395.89 C fAS _ Hef J ` \ ` TBM ­,,REBAR W/ CAPS REBAR W/ CAP(S)% v / 1 % N -S STA.1 +49.11 4+88.21 ST R----218 95�...- _N: 854431.923 ,7 f EAST -WEST 1 " AND a � \ O E :2155085.952 ( N: 854443.108 1 t % / 'BASELINE HARDWOOD TREES F/8 �� ti s \ ELEV:395.95 \ E: 2155167.171 / ARE THE PROMINENT I i GROWTH IN THIS ! WOODED AREA ! y ®� cv X- A-----. PIN - 1855 -54 -2506 -CAROLINA POWER &, / / } \\ LIGHT COMPANY / \ DB 464, PG 423 / I , PG 213 CONCRETE � / °� + -� DB 720 \„_,I N: 854375.172 x MONUMENT(F) ' / / + \ o mQ E 2154838.694 NAD83(2007). IR ,,i III i I I o E() ! / 23g , \ I ' �. PINE TREES ARE THE i `N / 1 / l/ 488.1 8'� I I e�` \ ! t ` PROMINENT GROWTH IN 0411 / / ! l %OrAZ \ t THIS WOODED AREA.. 0 +00.00 j I I Il NORTH SOUTH BASEUNE / GPs REBAR W/ C (S) / �\ � t N75'1732- / I 1 / I N:.854305.197 r \ E :2154947.414 ? t t IRON PIPE(F) \ { 1 I ELEV:390.21 ZD r, OF ARE , , 1 OF P* /SOUTH \ 75� �0'� t (I I L. �� g�S�N r'p yin , \ ` t t t w \ CONCRETE <" Gy R�"�Ep y� `�. >> ' , MONUMENT(F) tJ M GO SuR > y o N: 854251.232 E: 2155310.866 <y� V�oP OF yin �NAD83(2007) PIN: 1855 -44- ---7217 THOMAS C. ALLEN 11 DS 797, PG 1189 1 1 2 -20 -2012 NO. I DATE 1 ?_tAH then ?1?i11 ?f]1? In*34,24. AREA INSIDE PUBLIC ROAD R /W: 15,389 S.F.t, 0.353 AC.f AREA OUTSIDE PUBLIC ROAD R /W: 227,532 S.F.t, 5.223 AC.t TOTAL SITE AREA: 242,921 S.F.f, 5.576 AC.t ADDED WETLANDS AS DELINEATED AND SURVEYED REVISION 8 1AR Do APPS 21 10.1 I John P. Scoville III certify that this planimetric drawing was drawn from an acutal survey made under my supervision and was made in accordance with the requirements of the Standards of Practice of Land Surveying in North Carolina, and meets or exceeds the requirements for a class "A" survey as specified therein. Witness rry hand and seal this 1 th d of January, 2012. John P. Scoville, III L -3343 d�giaE % !r ress Ellel ROSE oCL SE L mss' `-33 Progress Energy Carolinas, Inc, Raleigh, NC scl f�al,i €,,,��� FRANKLINTON 11 5K SUBSTATION TOPOGRAPHIC SURVEY PROJECT NUMBER 20072350 LocATION FRANKLINTON, FRANKLIN COUNTY, NC SCALE 1"=401 SCALE RATIO 1 :1 JPS. JPS JPS DRAWN JBH CHIC JPS APP. JPS BY CK. App DATE 1 -18 -12 DWG. NO. , SH 1 OF 1 Aerial Site Map ACME, Mapper 2.0 - 1.5 kin WxSW of Franklinton NC Thales Academy The Community School Currently Enrolling for 2012 www.thalesacaden�l:,. AdChoices Q M)VILKFU E'. http : / /mal)per.aeme.com /13/28/2012 1:18:41 1'M I Map I Satellite I Hybrid I Terrain I Topo I DOQ I NEXRAD ACME Mapper 2.0 _O' Print Q Email C--:*D Link to this page N 36.09695 W 78.47440 1.5 km WxSW of Fran linton NC, 8.0 km N of youncisyffle N 13.4 km NxNE of Wake Forest NC, 142 pocomoke rd, franklinton, nc AU= Mum. gym ' ACME Labs Soil Survey m c 0 m U L c r O .0 z m C O U) U c �c Y C Y CU C Q m 0 U) ..99 1 z ,9L ,.z ,sz <9L io „99 lz e9L 0 V N 0 0 10 to N Cl) O O N� 00 N N m Cl) m a m Z 7 ;'O Z (75 7 w — m o� co -00 N O �U C O co z 0 0 N O r o d N� 2 O O N O N w m ma) .. C z� 2U 4 s sz ost Q CJs m c O m U L E O O - Z is T y L 7 (n O C U p c C -Y Y C c @ m LL v CL m O cn N co b O N N N m M d T 0 7 'o Q) iS 7 > C/) w = m O N (n Q L O a) O U m O m Z m U N d U d 3 � O C y O U) R m y 7 � C lC O Z U f O C O) — O. m O T m C) C E N N L n V O C U) m > pw m U U) rn 3 j 0 m C U U U _U ) m N O () N U w N (N a (0 O 0) E Y m z m d m U O cu O U N 4 O O X E N c6 d m N m "0 N 'm0 N is C Z U) O O N N in N E m N N N T aMp y Z L N U E y av 3 w o� E o S N E Q m c� Q o y Z Q r O(N o W p� . o (C m O (D n a) CL m E U. O Z 0 Z L Cl m e N N Q m a m y m U N a) [n L T a) m C N N O Q� LL O Q o m E 3 c p ca') E a) m �LL o Q� ui> a) c0 T > y N O Q 3 O _ U p 0 T N Z Z 1 'N fl @ O N O O U) m d N O a) C C Q U) N E L C o C C m L L Y N .O E U) E Q w m N N m m J N N LL N L C T) Q O N m w E ° Q O m> m 4 Z � E U) = c a) 0 y O N -0 CA m o)E m E C L (D a) T N n m O 6) Q) C r T 0 -0 c �N, Cl a) j, �m No p=p 3 O 7 O O c m�� Q m Q� W N U N = fn O) 41 C U) a) m �, E O �_ O O C p 0 O N N Z Q a) m p m-0 C L "6 7 C/) N C O �'C N +-' N m V "O d N (n a) O 'p_ O N 0 a U) U) m N U M m m 0 9 O N> — t U) E m E w E CL a E in�U rL- .F incn o 1- 0.' o N co b O N N N m M d T 0 7 'o Q) iS 7 > C/) w = m O N (n Q L O a) O U m O m Z m U N d U d 3 � O C y O U) R m y 7 � C lC O Z U f E m C T m n 0 m U r M w a °' m O O = N N a O m O o- m E m N m o (C cr �. 41 N L �L ? 5 p N t ` «. N O '� m U > O c C� L cn O ' U _ U C o� = J N R Q LL m LL Q q W CL - • 0 U) O a i6 3 L t W J aQ o o to a N N j 0_ a0 C 4) o m m m > O o o m Q Q O a 0 0_ N N O O n N ( n ) UO m LL > > m j 'Q C y N Q ' Q m C 'o m m m O U U N m C C > a m um) n U) C Co U) U) O O U) U m C a �.� N ° : Y CL ® X . X ® -c:' -c:' x O O > + U) Q N N co b O N N N m M d T 0 7 'o Q) iS 7 > C/) w = m O N (n Q L O a) O U m O m Z m U N d U d 3 � O C y O U) R m y 7 � C lC O Z U f Soil Map — Franklin County, North Carolina Map Unit Legend Franklinton Substation Franklin County, North Carolina (NC069) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI CeB2 Cecil clay loam, 2 to 6 percent slopes, moderately eroded 1.5 27.2% HeB Helena sandy loam, 2 to 6 percent slopes 0.4 7.8% WeC Wedowee sandy loam, 6 to 10 percent slopes 3.5 65.0% Totals for Area of Interest 5.5 100.0% Natural Resources Web Soil Survey 3/28/2012 Conservation Service National Cooperative Soil Survey Page 3 of 3 Topographic Map ACME Mapper 2.0 - 0.7 kin WRSW of Franklinton NC Map Satellite Hybrid Terrain Topo DOQ NEXRAD Mapnik - r - t +�/'�' - 2 � � �� "r .'�. .�, t i raid ' . � • - r ✓ f . � • wy.��i •.i - s• ter Ij i, t r a ♦• • .• • f •. ubsbl -Ever V i .. • .. / M, � ,, ���,,�-'" � �', to • ti E., y! E j t( q � '` j a i • i • � J i j r • [�j %.VY/LKELI E:A ,1000 G �./O,_,ems • 200 'l� http: / /mapper.acnie.com /[3/28/2012 1:15:20 PM I ACME Mapper 2.0 ij� 6 Print S Email cMo Link to this ' N 36.09835 W 78.46539 1 Me.k !4V 0.7 km WxSW of Franklinton NC, 8.2 kmpN of Youngsville NC, 12.4 km WxNW of Franklin County NC, F1_42 pocomoke rd, franklinton, nc Atms1> Makers r- ACME_Lab�i ArcGIS -