Loading...
HomeMy WebLinkAbout20210347 Ver 1_Riparian Buffer Authorization Request_20210215 Action History (UTC-05:00) Eastern Time(US&Canada) Submit by Anonymous User 2/15/2021 9:33:34 AM(Start) Approve by Carpenter,Kristi 2/15/2021 7:31:20 PM(DOT- Initial Review) • The task was assigned to Carpenter,Kristi 2/15/2021 9:37 AM Buffer Authorization Application Form IC ENVIRONMENTAL Water Resources QUALITY 15ANCAC 02B.0233(8)(b),.0243(8)(b),.0250(11)(b),.0259(8)(b),.0267(11)(c),.0607(e)(2)Buffer Authorization Online Fo Update 10/23/2018 Original Submittal 2/15/2021 A. Owner/Applicant Information General Information A Primary Contact Email:* emma.radford@kimley-horn.com Rease list the contact person's email for questions or payrrent on this project if needed. Who is submitting the application?* r Owner ✓ Applicant other than Owner rJ Agent 1. Property Owner Information: 1a.Name on Recorded Deed:* Town of Chapel Hill lb.Responsible Party: Jim Orr (for Corporations) 1c.Mailing Address:* Street Address 200 Plant Road Address Line 2 City State/Rovince/Region Chapel Hill NC Fbstal/Zip Code Country 27514 US Id.Telephone:* 9193603777 le.Email Address:* jorr@townofchapelhill.org 3. Agent Information: 3a.Name: 3b.Company Affiliation: 3c.Mailing Address: Street Address Address Line 2 City State/Rovince/Region Fbstal/Zip Code Country 3d.Telephone: 3e.Email Address: 3f.Attach a signed and dated copy of the agent aickthe upload button or drag and drop files here to attach docunant authorization form. FDFCnly B. Project Information and Prior Project History 1. Project Information 1a. Name of Project:* STIP#EB-5721 Fordham Blvd (Subdivision,facility,or establishment narre) lb.Is this a publicly-funded transportation project?* r Yes ✓ No 1c.TIP# EB-5721 1d.Subdivision Name: le.Nearest Chapel Hill Municipality: If.Property Size: 14.20 acres 1g.County(or Counties)where the project is located:* Orange 1h.Property ID# Date of Purchase Tax RN or Parcel id 1 i.Deed Information Type of Book Book# Page# Deed Map 1j.Attach a copy of the recorded map that indicates when the lot was last platted. aick the upload button or drag and drop files here to attach document RJF only 1k.How would you like to provide the Latitude and Longitude information?* ✓ Address Lookup r Manually Latitude* 35.926214 Longitude* -79.024609 11.Is the project located in any of North Carolina's twenty coastal counties?* ✓ Yes C•No 2. Surface Waters ................................................................................... 2a.Name of the nearest body of water to proposed project:* Bolin Creek 2b.Water Quality Classification of nearest receiving water:* WS-IV, NSW 2c.List the total estimated linear feet of all existing streams(intermittent and perennial)on the property:* 1,402 (linear feet only) 3. Project Description: ................................................................................................................. 3a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The project vicinity consists of moderately dense single-family residential areas, retail centers,and municipal parks with pockets of undeveloped,forested land surrounding riparian corridors. 3b.Attach an 8'/2 x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. aick the upload button or drag and drop files here to attach docurrent Fig 2_USGS Map.pdf 1.14MB FEE only 3c.Attach an 8 1/2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. aick the upload button or drag and drop files here to attach docurrent Fig 4_NRCS.pdf 1.33MB FEE only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used:* The project proposes to construct a multiluse path along Fordham Boulevard(US 151501)from Cleland Road to Willow Drive in Chapel Hill,Orange County, NC (STIP#EB15721).The existing multiluse path from Cleland Road to Ridgefield Road (approximately 1,700 linear feet)will be upgraded to meet the NC Bicycle Program and AASHTO standards.The multiluse path will be extended as a 101wide asphalt path in new location from Ridgefield Road to Willow Drive(approximately 1,800 linear feet)and will be constructed in coordination with NC Department of Transportation(NCDOT). The purpose of the project is to improve pedestrian connectivity and to upgrade the existing Fordham Boulevard multi-use path to meet the North Carolina Bicycle Program and American Association of State Highway and Transportation Officials (AASHTO)standards. Attach a site plan as applicable to the project: aick the upload button or drag and drop files here to attach docurrent 07_90%SitePlans.pdf 1.29MB FEE only 5.Jurisdictional Determinations 5a.Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project(including all prior phases)in the past?* r Yes f No 5b.Who did the determination on the jurisdictional areas? Who did the determination? List name if known Date Attach Corps Samantha 03/23/2018 Dailey 04_USACE_P... 94.86.. (Nave if known) pdf only State Vanessa Manuel 04/02/2018 (Narre if known) 05_Buffer_De... 4.63M. EB-5721 Fordham Blvd.pdf Pdf only ***Please include the date of the determination and upload a copy of the determination. Comments: Samantha Dailey of the USAGE confirmed the EB-5721 (SAWI2018100558) delineation in an email for received on March 23,2018 and official documentation is still pending.Additionally,a site visit was conducted by Vanessa Manuel of the NCDWR on March 29,2018,and a buffer determination letter was issued on April 2, 2018(CPFRRO#18-098). 6. Project History ................................................................................... 6a.Have permits or certifications been requested or obtained for this project(including all prior phases)in the past?* ✓ Yes C No 7. Future Project Plans ............................................................................................................... 7a.Is this project a phased project?* r Yes C' No C. Proposed Impacts Inventory ................................................................................................................................... .. .. .. ............. .. ............... .. ............. .. ............... ............... .. ............. .. ............... .. ............. .. ............... .. ............. .. ............... ............. Buffer Impacts Project is in which protected Basin?* ✓ Neuse River Basin(15A NCAC 02B.0233) ✓ Catawba River Basin(15A NCAC 02B.0243) ✓ Randleman Lake Watershed(15A NCAC 02B.0250) ✓ Tar-Pamlico River Basin(15A NCAC 02B.0259) r Jordan Lake Watershed(15A NCAC 02B.0267) ✓ Goose Creek Watershed(15A NCAC 02B.0606&15A NCAC 02B.0607) Individually list all buffer impacts below. If any impacts require mitigation,then you MUST fill out Section D of this form. Site#-Reason Stream Name Buffer Impact* Impact Type* Zone 1 Zone 2 Site 1 - Bolin Creek Temporary Allowable 1,629. 1,029. Construction (T) 00 00 Access FermorTerrp Square Square Map label(e.g.Road Feet Feet Crossing 1) Site 1 - Bolin Creek Permanent Allowable 859.00 1,031. Greenway/Hiking (P) Square 00 Trail Form orTerrp Feet Square Ntap label(e.g.Finad Feet Crossing 1) Total Zone 1 Impacts: 2,488.00 Total Zone 2 Impacts: 2,060.00 Total Buffer Impacts: 4,548.00 Comments: Unavoidable permanent impacts to the protected riparian buffer associated with Bolin Creek will result from the necessary paving and grading to widen and extend the existing multi-use path.Temporary impacts to the riparian buffer of Bolin Creek will result from the temporary construction access areas necessary to construct the project. Riparian buffer impacts resulting from greenway construction in Buffer Zone 1 and Zone 2 are"Allowable"under the Jordan Lake Watershed Basin Buffer Rules Table of Uses. Greenways/hiking trails designed,constructed and maintained to maximize nutrient removal and erosion protection,minimize adverse effects on aquatic life and habitat, and protect water quality to the maximum extent practical are"Allowable"under the Jordan Lake Watershed Basin Buffer Rules Table of Uses;therefore,no compensatory buffer mitigation is proposed as part of this application. D. Impact Justification and Mitigation 1.Avoidance and Minimization .......................................................................................................................................................... 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.* Impacts to riparian buffers have been avoided and minimized to the extent practical. The proposed multi-use path has been designed along existing cleared/maintained greenway easement.Additionally,this project has been designed to avoid new impacts to all streams and wetlands due to the alignment of the multi-use path. lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.* Impacts to streams,wetlands,and protected riparian buffers within the corridor and its vicinity will be minimized to the extent practical throughout the construction process by avoiding these features with equipment,materials,and access corridors where practicable.Where feasible,staging and construction access routes will be located in upland areas throughout the corridor.Silt fencing will be installed around the limits of disturbance to help ensure that all construction equipment will remain within the project area throughout the construction process.Sediment control measures will be used to reduce stormwater impacts to receiving waters and minimize runoff from the construction sites. E. Diffuse Flow Plan ................................................................................................. 1a.What type of SCM are you providing?* ✓ Level Spreader ✓ Vegetated Conveyance(lower SHWT) r Wetland Swale(higher SHWT) 17 Proposed project will not create concentrated stormwater flow through the buffer r Other SCM that removed minimum of 30%nitrogen 1c. Diffuse Flow Documentation* aick the upload button or drag and drop files here to attach docunent 08_EB-5721 EC.pdf 9.36MB F0F only F.Supplementary Information .......................................... .................................................................................................................................................................................................................................................................................................................................................................................................................................................... Environmental Documentation 1a. Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land? C' Yes ✓ No lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)Environmental Policy Act(NEPA/SEPA)? ✓ Yes ✓ No 1c. If you answered"yes"to the above,has the document been finalized by the State Clearing House? r Id.Attach a copy of the NEPAor SEPAfinal approval letter. Dick the upload button or drag and drop files here to attach docurrent FDF only Violations 2a. Is the site in violation of DWR Wetland Rules(15A NCAC 02H.0500), Isolated Wetland Rules(15A NCAC 02H.1300),DWR Surface Water or Wetland Standards,or Riparian Buffer Rules(15A NCAC 02B.0200)? 2b.Is this an after-the-fact buffer authorization application? C Yes w: No G.Additional Information .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Please upload any additional information you would like the Division to consider during application review. Additional Attachments: nick the upload button or drag and drop files here to attach docurrent 06_EB-5721_Permit Drawings_(2021-1-11).pdf 2.8MB 00_EB-5721_CoverLetter.pdf 582.5KB 04_USACE_PreJD_Email.pdf 94.86KB 05_Buffer_Determination EB-5721 Fordham Blvd.pdf 4.63MB Fig 3_Aerial Map.pdf 3.02MB FDF only Additional Comments: A Categorical Exclusion has been submitted and is pending review by the NCDOT. H. Sign and Submit By digitally signing below,I certify that: • I have given true,accurate,and complete information on this form; o I agree that submission of this form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the "Uniform Electronic Transactions Act") o I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the "Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND o I intend to electronically sign and submit the application form." Print Name:* Emma Radford,WPIT Signature Submission Date: 02/15/2021 (Auto populated field) Initial Review Is this accepted into the review process?* C Yes r No Is this project a public transportation C' Yes project?* r No ID#* 20210347 Version:* 1 Select Reviewer: Dave Wanucha:eads\djwanucha Select Reviewing Office* Winston-Salem Regional Office-(336)776-9800 Has payment been received?* (' No Payment Needed C Fee Received r Need Fee-send electronic notification