HomeMy WebLinkAbout20120282 Ver 1_Emails_20120329��A
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Charles Wakild P E
Governor Director
March 29 2012
Mr Keith Rudman
1412 W Lexington St
Chicago IL 60607
Subject 401 Water Quality Certification — Approval (Corrected Copy)
Bear Lake Heaven LLC Peninsula
DWQ Project # 12 0282
Jackson County
LTN / Bear Creek Lake (Tuckaseegee River) / 2 79 (5 5) / WS III B Tr
Dear Mr Rudman
Dee Freeman
Secretary
The Division of Water Quality has completed the review of your 401 Water Quality Certification application
associated with the subject project listed above
Approval has been granted to place fill within or otherwise impact approximately 0 16 acres of waters above
full pool and 0 19 acres below full pool [approximately 1400 linear feet of shoreline] for the purpose of
shoreline stabilization at the subject property This approval requires you to follow the conditions listed in
the attached Certification and any additional conditions listed below
Project impacts are covered by General Water Quality Certification Number 3885 This Certification allows
you to use Nationwide Permit 13 when issued by the US Army Corps of Engineers ( USACE) Authorization to
proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as
authorized by this Certification shall expire upon expiration of the corresponding USACE Permit Verification
In addition you should obtain or otherwise comply with any other required federal state or local permits before
you proceed with your project including (but not limited to) Jackson County Erosion and Sediment Control
Water Supply Watershed and Trout Buffer regulations
This approval is for the purpose and design that you described in your application If you change your project
you must notify us and may be required to submit a new application
Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general conditions of
this Certification are met No other impacts are approved including incidental impacts
Location 2090 U S Highway 70 Swannanoa North Carolina 28778
Phone 828 296.45001 FAX 828 299 7043
Internet www ncwaterquallty org
An Equal Opportunity 1 Affirmat ve Act on Employer
NorthCarohna
Naturally
Mr Rudman
March 29 2012
Page 2 of 2
No impacts have been approved without US Army Corp of Engineer approval
Violations of any condition herein set forth may result in revocation of this Certification and may result in
criminal and/or civil penalties
If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream
impacts) you may ask for an adjudicatory hearing - You must act within 60 days of the date that you receive
this letter To ask for a hearing send a written petition which conforms to Chapter 150B of the North Carolina
General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center Raleigh N C 27699
6714 This certification and its conditions are final and binding unless you ask for a hearing
This letter completes the review of your application by the Division of Water Quality under Section 401 of the
Clean Water Act If you have any questions, please contact Susan A Wilson in the Asheville Regional Office
at (828) 296 4665
Sincerely,
J �
' Er Charles Wakild P E Director
CW /saw
cc Tyler Crumbley USACE Asheville Regulatory Field Office
Ian McMillan WBSCPU
Robert Shelton Jackson County Planning
William Owen — Owen Grading
Lisa Leatherman — Duke Energy Lake Services
ARO File Copy
S \SWPUackson \401s\Non DOT\Bear Lake Heaven Pemnsula\APRVL Bear Lake Heaven Peninsula Corrected copy 3
2012 doc
Amount Approved (Units)
Plan Location or Reference
Waters
Appx 0 16 acres above
Application
full pool
Appx 0 19 acres below
full pool
[appx 1400 linear feet]
No impacts have been approved without US Army Corp of Engineer approval
Violations of any condition herein set forth may result in revocation of this Certification and may result in
criminal and/or civil penalties
If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream
impacts) you may ask for an adjudicatory hearing - You must act within 60 days of the date that you receive
this letter To ask for a hearing send a written petition which conforms to Chapter 150B of the North Carolina
General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center Raleigh N C 27699
6714 This certification and its conditions are final and binding unless you ask for a hearing
This letter completes the review of your application by the Division of Water Quality under Section 401 of the
Clean Water Act If you have any questions, please contact Susan A Wilson in the Asheville Regional Office
at (828) 296 4665
Sincerely,
J �
' Er Charles Wakild P E Director
CW /saw
cc Tyler Crumbley USACE Asheville Regulatory Field Office
Ian McMillan WBSCPU
Robert Shelton Jackson County Planning
William Owen — Owen Grading
Lisa Leatherman — Duke Energy Lake Services
ARO File Copy
S \SWPUackson \401s\Non DOT\Bear Lake Heaven Pemnsula\APRVL Bear Lake Heaven Peninsula Corrected copy 3
2012 doc