HomeMy WebLinkAboutNC0000272_2017 Annual BMP Report_20180326 evergree.0 Canon Office
packaging
March 26, 2018
Certified Mail
Return receipt Requested 7008 3230 0002 2595 7838 and 7008 3230 0002 2595 7845
North Carolina Department of Environmental CC: Asheville Regional office
And Natural Resources F$I*Cf�YED 090 US Highway 70
Division of Environmental Quality DMamnatwatoraesoun wannanoa NC 28778
Water Quality Section
ATTENTION: Central Files APR _ 2Attn: Landon Davison PG
1617 Mail Service Center / Regional Supervisor
Raleigh,NC 27699-1617 Z' 1
WaterairoAlyReglontl
AslreviMep Io 00PMc!
RE: NPDES NO. NC0000272
Best Management Practices 2017 Annual Report
Blue Ridge Paper Products Inc. D/b/a Evergreen Packaging
Canton,NC
This Letter report (two copies) is the 2017 summary of Best Management Practices (BMP)
Daily monitoring for the Canton Mill. The report is required on or before March 31 of
Each year by Special Conditions A. (6.) Best Management Practices EA and Section F. 1 of
the mills NPDES Permit No. NC0000272
The BMP action levers established in accordance with Permits and in effect for 2017 are
As follows
Effective Dates: 1 Jan 2017-31 Dec 2017
Action Level Total Influent(TI)Color Action Required
Daily monitoring results
1-day upper action >72,5001bs./dayfor one day Immediate Investigation and
Document corrective action
2 day upper action >59,400 Its./dayfor two Investigate and document
Level(UAL) consecutive day's corrective action
2daylowerAction >55,400 Its./dayfor two Investigate and document
Level(LAL) consecutive days
Daily Records of total influent are maintained in the Mill. These daily color data are
Compared to BMP action levers every morning. Total influent color exceeded BMP
Action levels on the date outline in the following table.
A Brief summary of information for these dates are included as required by permit
conditions A. (6), section EA. The permit-required BMP investigation reports are
maintained at the mill. No of the BMP action level days resulted in disruption to the
Wastewater treatment plant. The Canto mill met all the NPDES average effluent limits
For the period July 12016 to June 30,2017.
Date(s) Total influent color Action Level Summary
June 22, 2017 SE 82,996lbs. per day Mill outage-Boiler/Fiber line
June 23 2017 SE 53, 162 lbs.per day Recovery Boiler# 10 overflowed
June 24, 2017 SE 39,812 lbs.per day Weak wash from the north mud
Washer. CRP had a small leak
Plugged the Swenson evaporator set.
During start up Pine Brown Spill
Tank/ Hardwood fiber line became
Unbalanced and caused color to be
Carried to bleach plant filtrate.
Corresponding Sewer with elevated Color#3AB
Operation personal notified, Chad Dawdle, Brian Farley, Rob Luther
The second BMP event of 2017 was Dec 11, 2017
Date Total influent Color Action Level Summary
12/11/2017 109,528 330 am High color first discovered
Color samples taken every 30
Minutes. Crewleaderswere
Informed at Paper mill and
Recovery. 520am Recovery-
Formal call reported a leak in-
Swenson Liquor into the U-drain.
Leak stopped at 6 am
Color#returned to 275 at 9am
At 11am 171 color test
12/12/2017 51,112 Return to normal
Please find the BMP reports from these two incidents
James Pikul-828-384-5199 cell
Env./Waste Water Manager
Treatment Manager
Canton Mill
Investigative and Corrective Action Documentation
BMP Action Level Exceedance—Form E-2
Canton Mill
*use this form,facsimile or electronic report to document BMP action level exceedances
Date of Report: 7/10/17
Daily Color: 6/22/17 SE 81,996 lbs/day
6/23/17 SE 53,1621bs/day
6/24/17 SE 39,812lbs/day
Date of Color: 6/21/17 - 6/23/17
Investigative Action Required: X Corrective Action Required: X
Person Conductine Investi atiom Nick McCracken
Primary Influent Action Levels:
Upper Action Level=59,400 lbs/day
Lower Action Level =55,400 lbs/day
Out of Control Level=72,500 lbs/day(must initiate Corrective Action after 1 day at this
level)
Dates Lower/Upper Action Levels Exceeded(LAL and UAL)and corresponding color
Note: Investigative and/or Corrective Action must occur after 2 consecutive days at the
respective level.
6/21/17 PI63,2101bs/day
6/22/17 PI 85,900 lbs/day
6/23/17 PI 67,262 lbs/day
Corresponding Sewer Areas with Elevated Color, #3AB
Operations Personnel Notified: Chad Dowdle, Brian Farley,Rob Later, Nick McCracken
Day/Time: 6/21 -23/17; continuous loss during period
Revision 3, 10/1/08
Blue Ridge Paper Products Inc. dba Evergreen Packaging
Cause(s)for exceedance: Multiple sources from outage related activities
BMP related incident X * Primary Cause: Outage related activities and
unbalanced operation
Non-BMP incident ❑
Test Method Interference ❑ New Method= Turbidity=
Secondary Effluent (with one day lag time)_
Outage X
Other ❑
Is Problem ongointz No.
Have efforts been made to mitigate the occurrences Yes.
Is corrective action recommended? Yes.
Corrective Action Implemented- Bring mill back up to steady state; steady loads on
recovery boilers,reestablish green liquor balance and filtrate balance in fiberlines.
*Describe incident in detail including regulated substance (black liquor,turpentine or
soap)that went to the Wastewater Treatment plant:
On Wednesday, 6/21,the#10 Recovery Boiler had a planned outage to wash the cyclones
and address green liquor lines that had become plugged. Weak green liquor overflowed
from the#10 RB dissolving tank and Weak Wash overflowed from the North Mud
Washer to the mill sewer system contributing elevated pH material to wastewater
treatment plant. Sewer generated color was observed in the Primary Effluent color
numbers as a result. Other contributors were a small leak that was observed in the CRP
evaporator feed pump when the seal water became plugged and the condition of the
chevrons in the Swenson evaporator set. The set was not washed during this outage and
will need to be at the next opportunity. Condensates with elevated color can be a result
of increased black liquor scale that accumulates on the chevrons.
During this outage, the Pine f berline also took a scheduled outage. Due to the amount of
material sent from the Pine Brown Spill tank,the Hardwood libertine became unbalanced
and caused color to be carried over into the bleach plant filtrate. When the Pine fiberline
started back, there were imbalances that resulted in excess filtrate being discharged to the
sewer.
Describe any other necessary information
Revision 3, 10/1/08
Blue Ridge Paper Products Inc. dba Evergreen Packaging
Return this form to the Environmental Manager for Record Keeping Requirements
Revision 3, 10/l/08
Blue Ridge Paper Products Inc. dba Evergreen Packaging
Investigative and Corrective Action Documentation
BM?Action Level Exceedance—Form E-2
Canton Mill 711
Date of Report: 12/13/17
Investigative Action Required: Yes Primary influent color reached 109,528 lbs/day on
12/11/17
Corrective Action Required: Yes
Person Conducting Investigation: Jacob Trantham
Primary Influent Action Levels:
Upper Action Level =59,400 lbs/day
Lower Action Level =55,400 lbs/day
Out of Control Level = 72,500 lbs/day(must initiate Corrective Action after 1 day at this
level)
Dates Lower/Upper Action Levels Exceeded(LAL and UAL)and correspondingcolor:
olor•
Note: Investigative and/or Corrective Action must occur after 2 consecutive days at the
respective level.
Corresponding Sewer Areas with Elevated Color: 4
Operations Personnel Notified: Bee Foreman W.Harkins Day/Time: 12/11/17 3:30am
Pulp Mill Foreman Jared Saintsing — 12/11/17 6:OOam
Cause(s) for exceedance:
BMP related incident X * Primary Cause: Black Liquor leak in transfer line of
Swenson 2"d effect.
Non-BMP incident ❑
Test Method Interference ❑ New Method= Turbidity=
Secondary Effluent(with one day lag time)_
Outage ❑
Other ❑
Is problem ongoing?No
Have efforts been made to mitigate the occurrence? Influent flow was diverted into#1
clarifier at 5:15 am so the system didn't take the hit all at once.
Revision 3, 10/1/08
Blue Ridge Paper Products Inc. dba Evergreen Packaging
Is corrective action recommended?Yes
Corrective Action Implemented- Swenson evaporator was taken down and the leak was
repaired.
'Describe incident in detail including regulated substance lack liquor, turpentine, or
soap) that went to the Wastewater Treatment plant
At 3:30am 12-11-17
- High Color was first discovered after a color sample collected by the room runner
at 3:30am came back at 596
- The Crew leader contacted both the Pulp Mill and Recovery Foreman to notify
them of the high color number.
- Nothing was found by either foreman.
- Color samples were then taken about every 30 minutes ranging from in value
from 349-857, from 3:50am-7:OOam
- At 5:20am the Recovery Foreman called back to report a leak from the Swenson
evaporator had breached the bark dam constructed to funnel the leaking black
liquor into a U-drain and back to the Recover wash water tank.
- The bark dam was reconstructed and the leak to#4 sewer was stopped at 6:OOam.
- The decision was made by recovery supervision to take the evaporator down at
8:30.
- Once office maintenance repaired the leaking transfer line on the 2"d effect of the
Swenson evaporator.
- Color numbers returned to normal with the 9:OOam sample reading 275 and the
11:OOam sample reading 173
- Effects from the high PI color level of 109,528 for 12/11/17 were seen the
following day 12-12-17 in the form of a SE color number of 51,112 which is
slightly over the action limit.
Describe any other necessary information:
Revision 3, 10/1/08
Blue Ridge Paper Products Inc. dba Evergreen Packaging
Return this form to the Environmental Manager for Record Keeping Requirements
Revision 3, 10/1/08
Blue Ridge Paper Products Inc. dba Evergreen Packaging