HomeMy WebLinkAbout20201809 Ver 1_20201211_475_PIPELINE_AND_RECEIVER_90_20210211k
4
Tp 0:
CO -`
T
ASH STREET RS
AND 475 M LV 3
UNDER SEPARATE COVER
tip
,0
11
qt�
EXISTING CENTRAL
\ HEIGHTS ROAD RS
LINE 475 RELOCATION PIPELINE
PROJECT 0231540
GOLDSBORO, NC
NOTE: LATITUDE/LONGITUDE TO BE VERIFIED BY AS -BUILT SURVEY.
DRAWING INDEX
DRAWING NUMBER
DRAWING TITLE
REV.
SHEET NO.
PNG-G-025-0001086
COVER / DRAWING INDEX
D
X OF XX
PNG-C-025-0001222
CIVIL GENERAL NOTES, LEGEND & ABBREVIATIONS
D
X OF XX
PNG-C-025-0001223
ACCESS ROUTE PLAN - PIPELINE
D
X OF XX
PNG-C-025-0001224
ACCESS ROUTE PLAN - FALLIN BLVD
C
X OF XX
PNG-C-025-0001225
ES&PC PLAN - LAYDOWN YARD
C
X OF XX
PNG-C-025-0001228
BILL OF MATERIALS
C
X OF XX
PNG-C-025-0001229
ALIGNMENT PLAN AND PROFILE
D
X OF XX
PNG-C-025-0001230
ALIGNMENT PLAN AND PROFILE
D
X OF XX
PNG-C-025-0001231
ALIGNMENT PLAN AND PROFILE
D
X OF XX
PNG-C-025-0001232
ALIGNMENT PLAN AND PROFILE
D
X OF XX
PNG-C-025-0001233
ALIGNMENT PLAN AND PROFILE
D
XX OF XX
PNG-C-025-0001234
ALIGNMENT PLAN AND PROFILE
D
XX OF XX
PNG-C-025-0001235
ALIGNMENT PLAN AND PROFILE
D
XX OF XX
PNG-C-025-0001236
ALIGNMENT PLAN AND PROFILE
D
XX OF XX
PNG-C-025-0001237
ALIGNMENT PLAN AND PROFILE
D
XX OF XX
PNG-C-025-0001238
ALIGNMENT PLAN AND PROFILE
D
XX OF XX
PNG-C-025-0001256
ALIGNMENT PLAN - 4" HPD
D
XX OF XX
PNG-C-025-0001260
LINE 67 TIE IN SITE PLAN
C
XX OF XX
PNG-C-025-0001261
RETIREMENT PLAN - S OAK FORREST RD RS
C
XX OF XX
PNG-C-025-0001270
JAB - GATEWAY DRIVE
B
XX OF XX
PNG-C-025-0001271
JAB - N OAK FORREST RD
C
XX OF XX
PNG-C-025-0001272
HDD PLAN AND PROFILE - RAILROAD
C
XX OF XX
PNG-C-025-0001273
HDD PLAN AND PROFILE - HIGHWAY 70
C
XX OF XX
PNG-C-025-0001274
GEOTECHNICAL BORING LOGS
B
XX OF XX
PNG-C-025-0001275
GEOTECHNICAL BORING LOGS
B
XX OF XX
PNG-C-025-0001280
OVERALL ES&PC PLAN
C
XX OF XX
PNG-C-025-0001281
ES&PC NOTES AND LEGEND
C
XX OF XX
PNG-C-025-0001285
FALLIN BLVD ES&PC PLAN
C
XX OF XX
PNG-C-025-0001286
ES&PC PLAN
C
XX OF XX
BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-1435
DRAWING INDEX
DRAWING NUMBER
DRAWING TITLE
REV.
SHEET NO.
PNG-C-025-0001287
ES&PC PLAN
C
XX OF XX
PNG-C-025-0001288
ES&PC PLAN
C
XX OF XX
PNG-C-025-0001289
ES&PC PLAN
C
XX OF XX
PNG-C-025-0001290
ES&PC DETAILS
C
XX OF XX
PNG-C-025-0001291
ES&PC DETAILS
C
XX OF XX
PNG-C-025-0001292
ES&PC DETAILS
C
XX OF XX
PNG-C-025-0001300
CONSTRUCTION DETAILS
C
XX OF XX
PNG-C-025-0001301
CONSTRUCTION DETAILS
C
XX OF XX
PNG-C-025-0001302
CONSTRUCTION DETAILS
C
XX OF XX
PNG-S-025-0001086
STRUCTURAL NOTES (1 OF 2)
C
XX OF XX
PNG-S-025-0001087
STRUCTURAL NOTES (2 OF 2)
C
XX OF XX
PNG-S-025-0001088
STRUCTURAL FOUNDATION PLAN
C
XX OF XX
PNG-D-025-0001063
PROCESS FLOW DIAGRAM
D
XX OF XX
PNG-D-025-0001064
RECEIVER P&ID
D
XX OF XX
PNG-M-025-0001260
MECHANICAL GENERAL NOTES
C
XX OF XX
PNG-M-025-0001265
KEY PLOT PLAN - RECEIVER SITE
D
XX OF XX
PNG-M-025-0001266
MECHANICAL PIPING & SECTIONS
C
XX OF XX
PNG-M-025-0001281
STATION INLET VALVE
A
XX OF XX
PNG-M-025-0001282
FALLIN BLVD BOX SECTION DETAILS
D
XX OF XX
PNG-M-025-0001283
FALLIN BLVD BOX SECTION DETAILS
D
XX OF XX
REFERENCE DRAWINGS
DRAWING NUMBER
DRAWING TITLE
REV.
SHEET NO.
PNG-G-000-0001132
LAUNCHER/RECEIVER SKID INSTALLED ON SLAB
FOUNDATION STANDARD REST BLOCK DETAILS
1
1 OF 1
PNG-G-000-0002250
P&ID SYMBOLS AND LEGENDS
0
1 OF 3
PNG-G-000-0002250
P&ID SYMBOLS AND LEGENDS
0
2 OF 3
PNG-G-000-0002250
P&ID SYMBOLS AND LEGENDS
0
3 OF 3
GENERALNOTES
1. INSTALLER SHALL FURNISH ALL MATERIALS NOT PROVIDED BY THE COMPANY (UNLESS OTHERWISE
NOTED ON DRAWINGS OR SPECIFICATIONS) INCLUDING EQUIPMENT TRANSPORTATION AND
SERVICES, AND PERFORM ALL NECESSARY WORK AS SHOWN ON THE DRAWINGS AND SPECIFIED
HEREINAFTER.
2. IT SHALL BE THE RESPONSIBILITY OF THE INSTALLER TO VERIFY ALL DIMENSIONS GIVEN ON THE
DRAWINGS. ANY ITEM IN QUESTION SHALL BE BROUGHT TO THE ATTENTION OF THE PROJECT
MANAGER PRIOR TO PROCEEDING WITH THE WORK.
3. INSTALLER SHALL BE RESPONSIBLE FOR PROTECTION OF ALL SURROUNDING AREAS.
4. ALL BELOWGROUND WELDS SHALL BE COATED WITH HBE-95 OR SP-2888 PER PERTINENT DUKE
NATURAL GAS BUSINESS UNIT (NGBU) DESIGN AND CONSTRUCTION STANDARDS.
5. ALL ABOVEGROUND PIPING TO BE BLASTED TO CORRECT SOCIETY FOR PROTECTIVE COATINGS
(SSPC) SURFACE PROFILE. PAINT SYSTEM TO BE UTILIZED SHALL BE PER PERTINENT DUKE NGBU
DESIGN AND CONSTRUCTION STANDARDS.
6. UPON BACKFILLING IN AREAS OF ROCK, BURIED PIPE SHALL HAVE 6" OF SAND PAD FILL PLACED
AROUND THE PIPE'S CIRCUMFERENCE.
7. PRESSURE TESTING SHALL MEET THE REQUIREMENTS OF THE DUKE NGBU'S PRESSURE TESTING
STANDARD, PER PERTINENT DUKE NGBU DESIGN AND CONSTRUCTION STANDARDS.
8. INSTALLER SHALL DEWATER ALL HYDROSTATICALLY TESTED PIPING, USING CLEANING PIGS AS
REQUIRED, AND DRY TO A DEWPOINT OF -40 °F PER PERTINENT DUKE NGBU DESIGN AND
CONSTRUCTION STANDARDS.
CONSTRUCTION NOTES
1. EXISTING OVERHEAD AND BELOWGROUND FACILITIES MAY BE IN THE WORK AREA VICINITY.
INSTALLER IS RESPONSIBLE FOR HAVING SUCH FACILITIES LOCATED AND IS RESPONSIBLE FOR
MAINTENANCE AND PRESERVATION OF THESE FACILITIES.
2. PER PERTINENT DUKE NGBU DESIGN AND CONSTRUCTION STANDARDS, INSTALLER IS REQUIRED TO
CALL 811 FOR UTILITY LOCATES A MINIMUM OF 72 HOURS PRIOR TO COMMENCEMENT OF WORK. NO
EXTRA COMPENSATION WILL BE ALLOWED FOR DELAYS FROM ANY WORK PROVIDED BY OTHER
UTILITIES.
3. IF EXISTING UTILITIES OF ANY TYPE ARE ENCOUNTERED IN THE FIELD AND DEEMED TO BE IN
CONFLICT WITH INSTALLATION OF FACILITIES, INSTALLER SHALL NOTIFY THE PROJECT MANAGER
IMMEDIATELY SO THE CONFLICT MAY BE RESOLVED.
4. WHEN EXISTING DRAINAGE FACILITIES ARE DISTURBED, INSTALLER SHALL PROVIDE AND MAINTAIN
TEMPORARY OUTLETS AND CONNECTIONS FOR PRIVATE DRAINS OR SEWERS. RESTORATION OF
THESE FACILITIES IS TO BE PERFORMED ONCE CONSTRUCTION IS COMPLETE AND ARE CONSIDERED
INCIDENTAL COSTS OF THE PROJECT.
5. ALL DRAWING MEASUREMENTS ARE TO BE TAKEN FROM EXISTING GRADE. FINAL GRADE SHALL BE
MATCHED TO SURROUNDING GRADE AS PER PERTINENT DUKE NGBU DESIGN AND CONSTRUCTION
STANDARDS.
6. INSTALLER IS TO REMAIN WITHIN CONSTRUCTION WORKING LIMITS. ACCESS TO AREAS OUTSIDE
WORKING LIMITS MUST BE COORDINATED WITH THE OWNER OR DUKE NGBU PROJECT MANAGER.
7. ALL EXCESS EXCAVATION, CONSTRUCTION DEMOLITION DEBRIS AND UNSUITABLE MATERIALS THAT
DO NOT CONTAIN ASBESTOS SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED.
8. STANDARD SPECIFICATIONS REFERENCED ON THIS SHEET AND CONSTRUCTION PLANS ARE
CONSIDERED AS PART OF THE CONTRACT DOCUMENTS. INCIDENTAL ITEMS OR ACCESSORIES
NECESSARY TO COMPLETE THIS WORK MAY NOT BE SPECIFICALLY NOTED, BUT ARE CONSIDERED
TO BE A PART OF THIS CONTRACT.
9. BEFORE ACCEPTANCE BY THE OWNER AND FINAL PAYMENT, ALL WORK SHALL BE INSPECTED AND
APPROVED BY DUKE NGBU OR COMPANY REPRESENTATIVE. FINAL PAYMENT SHALL BE MADE AFTER
ALL OF THE INSTALLER'S WORK HAS BEEN ACCEPTED AND APPROVED AND IN ACCORDANCE WITH
THE CONTRACT DOCUMENTS.
10. DURING CONSTRUCTION, ALL LOOSE MATERIAL THAT ARE DEPOSITED IN THE FLOW LINE OF
GUTTERS, DRAINAGE STRUCTURES, DITCHES, ETC. SUCH THAT THE NATURAL FLOW LINE OF WATER
IS OBSTRUCTED, SHALL BE REMOVED AT THE END OF EACH WORK DAY.
11. ALL FIELD TILE ENCOUNTERED DURING CONSTRUCTION SHALL BE EXTENDED TO OUTLET INTO AN
EXISTING DRAINAGE WAY. A RECORD OF ALL FIELD TILE FOR ONSITE DRAIN PIPE ENCOUNTERED
SHALL BE KEPT BY THE INSTALLER AND TURNED OVER TO THE PROJECT MANAGER UPON
COMPLETION OF THE PROJECT.
12. INSTALLER IS REQUIRED TO MAINTAIN A SET OF ISSUED FOR CONSTRUCTION DRAWINGS AND ALL
PERMITS AT THE JOB SITE. ANY MODIFICATIONS OR ALTERATIONS TO THE PLANS OR
SPECIFICATIONS SHALL BE APPROVED BY THE PROJECT MANAGER.
13. INSTALLER IS SOLELY RESPONSIBLE FOR EXECUTION OF HISIHER WORK IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS AND SPECIFICATIONS. INSTALLER IS RESPONSIBLE FOR THE
CONSTRUCTION METHODS AND TECHNIQUES, SEQUENCES, TIME OF PERFORMANCE ALL SAFETY
PRECAUTIONS.
14. MINIMUM DEPTH OF BURIAL SHALL BE PER PERTINENT DUKE NGBU DESIGN AND CONSTRUCTION
STANDARDS.
15. ALL PIPELINES BEING CROSSED ARE TO BE PROTECTED WITH A MINIMUM OF (3) 4 FEET X 18 FEET
WOODEN MATS.
16. PER PERTINENT DUKE NGBU DESIGN AND CONSTRUCTION STANDARDS, FOR OPEN DITCH
EXCAVATION, A MINIMUM OF TWO FEET OF SEPARATION SHALL BE MAINTAINED BETWEEN ALL
CROSSING STRUCTURES. SEPARATION BETWEEN CROSSING STRUCTURES AND PIPELINES THAT
ARE INSTALLED VIA DIRECTIONAL DRILLING METHODS IS AT THE DISCRETION OF ENGINEERING.
17. DURING BACKFILLING, A SIX INCH CROWN SHALL BE PLACED ON ALL DISTURBED AREAS.
COMPACTION REQUIREMENTS SHALL BE PER PERTINENT DUKE NGBU DESIGN AND CONSTRUCTION
STANDARDS.
18. BOLTS FOR FLANGES TO BE TORQUED PER PERTINENT DUKE NGBU DESIGN AND CONSTRUCTION
STANDARDS.
CIVIL AND STRUCTURAL NOTES
1. ADDITIONAL EXCAVATIONS BELOW FOOTINGS MAY BE NECESSARY TO REACH UNDISTURBED SOIL.
SHOULD THIS OCCUR, THE EXCAVATION SHALL BE BROUGHT TO THE BOTTOM OF THE FOOTING
ELEVATION WITH COMPACTED SAND FILL MEETING THE REQUIREMENTS OF MODIFIED PROCTOR
COMPACTION TEST (ASTM D1557) TO 95% IN SIX INCH LIFTS.
2. ALL EXPOSED CONCRETE EDGES SHALL HAVE A 1" X 1" 450 CHAMFER.
3. CONCRETE SHALL BE MIXED AND POURED PER PERTINENT DUKE NGBU DESIGN AND CONSTRUCTION
STANDARDS. TESTING SHALL CONFORM TO ACI 318. INSTALLER TO SUPPLY ALL CONCRETE AND
TESTING.
4. ALL STRUCTURAL STEEL SHALL CONFORM TO ASTM A36 SPECIFICATION. STEEL REINFORCING BAR
SHALL CONFORM TO ASTM A615 GRADE 60 AND WELDED WIRE FABRIC SHALL CONFORM TO ASTM
A185. TIE WIRE SHALL CONFORM TO ASTM A82.
5. UNSUITABLE OR EXCESS EARTH SPOIL SHALL BE DISPOSED OF AT AN APPROVED WASTE LOCATION.
SOIL BEING TRANSPORTED ONTO THE JOB SITE SHALL BE APPROVED BY EITHER THE PROJECT
MANAGER OR CONSTRUCTION MANAGER.
6. ROCKSHIELD OR SIMILAR COMPANY APPROVED PRODUCT MUST BE INSTALLED BETWEEN ALL PIPE
AND FITTINGS THAT COME INTO CONTACT WITH CONCRETE. A LAYER OF NON ABRASIVE MATERIAL
SUCH AS FRP SHALL BE INSTALLED BETWEEN ALL PIPE SUPPORTS AND PIPING.
7. ALL FIELD BENDING OF REBAR SHALL BE DONE COLD.
SOIL EROSION AND SEDIMENT CONTROL NOTES
1. INSTALLER IS TO CONSTRUCT ALL SOIL EROSION AND SEDIMENT CONTROL MEASURES AT THE
COMMENCEMENT OF THE PROJECT, PROVIDE MAINTENANCE AND ASSURE EFFECTIVENESS
THROUGHOUT THE DURATION OF THE PROJECT.
2. CARE SHALL BE TAKEN TO MINIMIZE DOWNSTREAM SILTATION. RAW BANKS MAY BE SEEDED AND
MULCHED TO PREVENT EROSION.
3. ALL SPOILS INCLUDING ORGANIC SOILS, VEGETATION AND DEBRIS SHALL BE REMOVED FROM THE
SITE AND PROPERLY DISPOSED OF IN SUCH A MANNER AS TO NOT ERODE INTO ANY BODY OF
WATER OR WETLAND.
4. SILT FENCING SHALL BE PLACED WHERE NECESSARY TO PREVENT SEDIMENT FROM LEAVING THE
WORK AREA.
5. CATCH ALL INLET FILTERS ARE REQUIRED AT ALL SEWER INLETS, GRATES AND MANHOLES FOR
SEDIMENT CONTROL.
6. WETLAND AREAS SHALL HAVE SILT FENCING AND ONE LAYER OF STRAW LOG INSTALLED NO
CLOSER THAN 50 FEET FROM POINT OF WETLAND DELINEATION.
7. TOPSOIL STOCKPILES SHALL BE LOCATED TO AVOID EROSION OF SAID STOCKPILE ONTO OFFSITE
AREAS.
8. ALL ENVIRONMENTAL MEASURES SHALL BE PER PERTINENT DUKE NGBU DESIGN AND
CONSTRUCTION STANDARDS.
BURNS
N&MMONNELL
CONSULTANTS, INC.
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 2001
CLAUDE A McMULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL047852
NO.1
DATE
REVISION(S) DESCRIPTION
A
04-24-2020
30% DESIGN SUBMITTAL
B
08-11-2020
60% DESIGN SUBMITTAL
C
10-02-2020
90% DESIGN SUBMITTAL
D
12-11-2020
REVISED 90% DESIGN SUBMITTAL
PROFESSIONAL ENG/ARCH STAMP
BY CHK I APPD DESCRIPTION
MJD CNS CAM AREA CODE
MJD CNS CAM ACCOUNT NUMBER
JJM CNS CAM PROJECT NUMBER 0231540
MJD CNS CAM DRAWING BY I MJD
STATION IDI 84-T-91-G LD-6733
CHECKER INITIALS I CNS
APPROVALS
DATE
INITIALS
REGIONAL
ENGINEER
DATE
INITIALS
MGR TECH
REC & STD
DATE
INITIALS
PRINCIPAL
12/11/2020
CAM
ENGINEER
LINE 475 DOT RELOCATION - PIPELINE
cnDUE r6livatural Piedmont COVER SHEET
GOLDSBORO, NORTH CAROLI NA
COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
SHEET(S) X OF X I DWG SCALE NOT TO SCALE
DWG DATE 04/22/2020 SUPERSEDED
DRAWING NUMBER REVISIC
PNG-G-025-0001086 D
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
LEGEND:
RAN
--- SS-----
SS-----
SS---
G
G
G
W
W
W
-- E-----
E -
- - --
E--
FO
FO
FO
cnry
cnry
T
T
T
--
SSFM -
- - -
- SSFM--
UNK
UNK
OH
OH
OH
o�
i-
L---- J L--�
BORE PIT RECEIVING PIT
�' d
ENTRY PIPE STRING AREA
T +
9+00 8+00
Q
BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-1435
ROAD ASPHALT
ROAD CONCRETE
ROAD CURB
ROAD DIRT
ROAD GRAVEL
ROAD CENTERLINE
DRIVEWAY ASPHALT
DRIVEWAY GRAVEL
DRIVEWAY CONCRETE
PAVEMENT ASPHALT
DITCH BOTTOM
DITCH/STREAM CENTERLINE
DITCH TOP
TOE OF SLOPE
TOP OF BANK
SIDEWALK
WALL
RETAINING WALL
BUILDING OUTLINE
BUILDING OVERHEAD
PROPERTY LINE SURVEYED
PROPERTY RIGHT OF WAY LINE
EASEMENT PNG LINE
EASEMENT ACCESS LINE
EASEMENT SANITARY SEWER LINE
EASEMENT UTILITY LINE
FENCE
GUARDRAIL
TREELINE
SANITARY SEWER LINE
GAS LINE
WATER LINE
POWER LINE
FIBER OPTIC LINE
TRAFFIC CONTROL LINE
CABLE TV LINE
TELEPHONE LINE
SANITARY FORCE MAIN LINE
UNKNOWN UTILITY LINE
OVERHEAD WIRE
STORM LINE
TEMPORARY SILT FENCE
PROPOSED CHAIN LINK SECURITY FENCE
DEMOLISH & REMOVE LINEAR SITE FEATURE
PROPOSED CHAIN LINK MANUAL SWING GATE
PROPOSED GRAVEL SURFACE COURSE
WETLANDS
CONTRACTOR HAUL ROUTE
JACK AND BORE
HDD
PROPOSED PIPELINE
PROPOSED PERMANENT EASEMENT
PROPOSED TEMPORARY WORKSPACE
CATHODIC PROTECTION TEST STATION
GEOTECHNICAL BORING LOCATION
GENERAL NOTES:
1. THE EXISTING SITE UTILITIES AND FEATURES SHOWN ARE BASED ON A FIELD RUN TOPOGRAPHIC
SURVEY PERFORMED BY SGC SURVEYING IN APRIL, 2020.
2. ALL DIMENSIONS, ELEVATIONS, AND STATIONS ARE IN FEET, UNLESS INDICATED OTHERWISE.
3. CALLOUTS, COORDINATES, AND DIMENSIONS ARE POINTED TO OR MEASURED TO STRUCTURE
CENTER, EDGE OF PAVEMENT, BACK OF CURB, OR OUTSIDE FACE OF FOUNDATION WALL, UNLESS
INDICATED OTHERWISE.
4. ALL WORK SHALL BE SUBJECT TO INSPECTION BY AUTHORIZED PERSONNEL OF LOCAL AND
GOVERNMENT REGULATORY AGENCIES AND THE CLIENT REPRESENTATIVE.
5. SEE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) DESIGN STANDARDS FOR
REFERENCES TO NCDOT STANDARD DRAWINGS. ALL SUBSEQUENT SPECIFICATIONS AND STANDARDS
SHALL APPLY.
6. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS AND LOCAL
AND GOVERNMENT CODES, ORDINANCES, AND REGULATIONS. IN CASE OF CONTRADICTION OR
DISCREPANCY BETWEEN REQUIREMENTS, CONTRACTOR SHALL INCORPORATE WHICHEVER IS MOST
STRINGENT. WHERE A QUESTION REMAINS ON WHICH REQUIREMENT IS MOST STRINGENT,
CONTRACTOR SHALL SUBMIT ISSUE TO THE CLIENT REPRESENTATIVE IN WRITING. THE DECISION OF
THE CLIENT REPRESENTATIVE SHALL BE CONSIDERED FINAL.
7. ALL WORK SHALL BE CONDUCTED IN A PROFESSIONAL WORKMANSHIP MANNER USING USING QUALITY
MATERIALS. WORK SHALL CONFORM TO THESE DRAWINGS, UNLESS INDICATED OTHERWISE OR AS
DIRECTED BY THE CLIENT REPRESENTATIVE.
8. CONTRACTOR SHALL CONFINE ALL WORK TO BE WITHIN THE PERMANENT AND TEMPORARY
EASEMENTS.
9. ALL GRADING, PAVEMENT WORK, AND ANY OTHER MISCELLANEOUS WORK SHALL BE PERFORMED IN
ACCORDANCE WITH THE CURRENT NCDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE
CONSTRUCTION AND SUPPLEMENTAL SPECIFICATIONS.
10. CONTRACTOR SHALL TAKE CARE TO MAINTAIN THE SITE AND ADJACENT AREAS IN AS CLEAN A
CONDITION AS POSSIBLE. ANY DEBRIS, DIRT, MUD, ETC. SHALL BE CLEANED DAILY, OR AS THE CLIENT
REPRESENTATIVE DIRECTS, FROM ANY ADJOINING STREETS OR PROPERTIES BY THE CONTRACTOR
AS A PART OF THE PRIMARY CONSTRUCTION WORK. THIS SHALL BE AT NO ADDITIONAL
COMPENSATION TO THE CONTRACTOR.
CONSTRUCTION DRAWING NOTES:
1. CONTRACTOR SHALL MAINTAIN UPDATED CONSTRUCTION DRAWINGS AT ALL TIMES THROUGH THE
DURATION OF THE PROJECT. CONSTRUCTION RECORD DRAWINGS SHALL BE SUBMITTED TO THE
CLIENT REPRESENTATIVE.
2. DURING CONSTRUCTION OF THE PROJECT, CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING
TRACK OF ANY CLIENT REPRESENTATIVE -APPROVED FIELD CONSTRUCTION REVISIONS TO THE
DESIGN DEPICTED ON APPROVED CONSTRUCTION DRAWINGS.
3. ALL VARIATIONS IN PROJECT CONDITIONS, LOCATIONS, AND CONFIGURATIONS, AND ANY OTHER
CHANGES OR DEVIATIONS FROM THE INFORMATION PRESENTED ON THE ORIGINAL, APPROVED
CONSTRUCTION DRAWINGS SHALL BE NOTED. THIS INCLUDES BURIED OR CONCEALED
CONSTRUCTION AND UTILITY FEATURES THAT WERE REVEALED DURING CONSTRUCTION.
4. THE CLIENT REPRESENTATIVE SHALL REVIEW COMPLETENESS, ACCURACY, AND FORMAT OF
SUBMITTED CONSTRUCTION DRAWINGS. IF THE CONSTRUCTION DRAWINGS ARE CONSIDERED
UNACCEPTABLE, THEY SHALL BE RETURNED TO THE CONTRACTOR FOR CORRECTION AND
RESUBMISSION. THIS SHALL BE AT NO ADDITIONAL COMPENSATION TO THE CONTRACTOR.
COORDINATION AND COMMUNICATION
1. CONTRACTOR SHALL APPOINT A PRIMARY CONSTRUCTION SUPERINTENDENT, SUBJECT TO THE
APPROVAL OF THE CLIENT REPRESENTATIVE, WHO SHALL BE PRESENT ON THE CONSTRUCTION SITE
AT ALL TIMES DURING WORKING HOURS AND ACCESSIBLE AT ALL TIMES WHILE WORK IS IN PROGRESS.
THE PRIMARY CONSTRUCTION SUPERINTENDENT SHALL BE DESIGNATED THE RESPONSIBLE
CONTRACTOR'S REPRESENTATIVE WHO SHALL BE AVAILABLE ON A 24-HOUR BASIS. WHEN THE
CONTRACTOR'S PRIMARY CONSTRUCTION REPRESENTATIVE IS NOT AVAILABLE ON THE
CONSTRUCTION SITE, AN ALTERNATE REPRESENTATIVE SHALL BE PROVIDED. CONTRACTOR SHALL
PROVIDE NAMES AND CONTACT INFORMATION OF REPRESENTATIVES TO THE CLIENT
REPRESENTATIVE PRIOR TO THE START OF CONSTRUCTION ACTIVITIES.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING CONSTANT COORDINATION BETWEEN ANY
SUBCONTRACTORS AND THE CLIENT REPRESENTATIVE. ALL CONSTRUCTION ACTIVITIES PLANNED BY
THE CONTRACTOR SHALL BE REVIEWED AND APPROVED BY THE CLIENT REPRESENTATIVE.
3. THE FOLLOWING CONTACT INFORMATION IS PROVIDED FOR CONTRACTOR'S USE IN CASE OF AN
EMERGENCY:
a. EMERGENCY 911
b. XXXXX XXXXX XXX-XXX-XXXX
c. OTHER CONTACTS AS DIRECTED AT PRE -CONSTRUCTION MEETING
EXCAVATION AND TRENCHES
1. CONTRACTOR SHALL COMPLY WITH THE MOST CURRENT EDITION OF OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION (OSHA) REGULATIONS AND THE STATE OF NORTH CAROLINA LAWS
CONCERNING EXCAVATION.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ALL EXCAVATION, TRENCHING AND
SHORING ARE PERFORMED IN A MANNER THAT COMPLIES WITH LOCAL REGULATIONS AND OSHA
REGULATIONS FOR CONSTRUCTION.
3. OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION SITE SHALL BE PROMINENTLY MARKED
WITH ORANGE BARRICADES AS ACCEPTABLE TO THE CLIENT REPRESENTATIVE.
4. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 48 HOURS TO THE CLIENT REPRESENTATIVE
AND ASSOCIATED UTILITY COMPANIES AND AGENCIES BEFORE PROCEEDING WITH ANY EXCAVATION.
5. DEWATERING OF UTILITY TRENCHES AND OTHER EXCAVATIONS MAY BE REQUIRED.
6. OPEN ONLY THOSE TRENCHES FOR WHICH MATERIAL IS ON -HAND AND READY FOR PLACING THEREIN.
AS SOON AS POSSIBLE AFTER THE MATERIAL HAS BEEN PLACED AND WORK APPROVED, BACKFILL
AND COMPACT TRENCHES AS SPECIFIED.
7. NO SPECIAL PROVISIONS WILL BE MADE FOR ROCK EXCAVATION, ANY BOULDERS ENCOUNTERED
SHALL BE REMOVED AND DISPOSED OF OFF SITE.
8. ALL TOPSOIL SHALL BE REMOVED FROM AREAS TO BE GRADED. ALL USEABLE TOPSOIL SHALL BE
STOCKPILED DURING GRADING AND REAPPLIED IN 3" LAYERS TO ALL SLOPES IMMEDIATELY AFTER
GRADING IS COMPLETE.
OTHER SAFETY REQUIREMENTS
1. CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES THAT CONFORM TO OSHA REGULATIONS.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN AND PAY FOR ALL APPLICABLE PERMITS,
FEES AND LICENSES FOR CONSTRUCTION AND EQUIPMENT.
3. THE CONTRACTOR SHALL PERFORM ON -SITE INSPECTIONS THROUGHOUT THE PROJECT AND REMEDY
ANY SAFETY CONCERNS IMMEDIATELY.
4. THERE SHALL BE NO PERMANENT WASTE SITES ON SITE PROPERTY. ANY TEMPORARY WASTE AREA
SHALL BE APPROVED BY THE CLIENT REPRESENTATIVE AND SHALL BE KEPT IN AN ORDERLY
CONDITION. REMOVAL OF WASTE THAT IS NOT PROPERLY MAINTAINED IS SUBJECT TO THE DIRECTION
OF THE CLIENT REPRESENTATIVE.
5. EROSION CONTROL DEVICES SHALL BE USED FOR THE ACCESS AND HAUL ROUTES, STAGING AREA,
AND ANY MATERIAL STOCKPILES WHEN NECESSARY TO CONTROL EROSION AND STORM WATER
RUNOFF. SEE DRAWINGS X-XXX-XXXXXXX - X-XXX-XXXXXXX FOR EROSION AND SEDIMENT CONTROL
REQUIREMENTS.
6. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT MOVEMENT RESULTING
FROM WIND CONDITIONS.
7. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO LIMIT DUST CAUSED BY CONSTRUCTION
ACTIVITIES TO A LIMIT ACCEPTABLE TO PROJECT SITE OPERATIONS. THE CONTRACTOR SHALL
CONTROL BLOWING DUST ON THE PROJECT SITE FROM ANY HAUL ROUTE OR WORK AREA
REGARDLESS OF SOURCE.
8. WILDLIFE ATTRACTANTS, SUCH AS TRASH AND FOOD SCRAPS, FROM CONSTRUCTION PERSONNEL
AND ACTIVITIES SHALL BE REMOVED FROM THE PROJECT LIMITS.
9. GASOLINE, DIESEL FUEL, OIL, AND HAZARDOUS WASTE RESULTING FROM CONTRACTOR'S
OPERATIONS OR ACTIVITIES SHALL BE PROPERLY DISPOSED OF IN ACCORDANCE WITH THE
SPECIFICATIONS AND LOCAL REGULATORY REQUIREMENTS AND PROPERLY REMOVED FROM THE
PROJECT PROPERTY. IF HAZARDOUS MATERIALS ARE ENCOUNTERED OR UNCOVERED DURING
CONSTRUCTION ACTIVITIES, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CLIENT
REPRESENTATIVE.
10. FAILURE TO COMPLY WITH THE CLIENT REPRESENTATIVE SAFETY REQUIREMENTS SHALL RESULT IN
THE SUSPENSION OF CONSTRUCTION ACTIVITIES UNTIL ALL SAFETY CONCERNS ARE ADDRESSED BY
THE CONTRACTOR TO THE SATISFACTION OF THE CLIENT REPRESENTATIVE.
11. ANY WORKERS AND EQUIPMENT NOT IN COMPLIANCE WITH SAFETY PLAN SHALL IMMEDIATELY BE
REMOVED FROM THE WORK AREA.
12. THE CONTRACTOR SHALL NOT BURN OR BURY DEBRIS WITHOUT PERMISSION FROM THE SITE
INSPECTOR.
SURVEY AND SUBSURFACE INVESTIGATION NOTES:
1. SURVEY CONTROL POINTS WILL BE PROVIDED PRIOR TO CONSTRUCTION. IF THE CONTRACTOR
SHOULD NEED TO DISTURB THE CONTROL POINTS DURING CONSTRUCTION, REQUEST SHALL BE GIVEN
TO THE SURVEYOR TO HAVE THE CONTROL POINTS RESET.
2. IF BENCHMARKS SHOWN ARE IN AREAS THAT REQUIRE DEMOLITION, OTHER BENCHMARKS SHALL BE
ESTABLISHED BEFORE DEMOLITION AND CONSTRUCTION WORK BEGINS. CONTRACTOR SHALL GIVE
REQUEST TO THE SURVEYOR.
3. HORIZONTAL CONTROL IS BASED ON NAD 83 NORTH CAROLINA STATE PLANE, US FOOT.
4. VERTICAL CONTROL IS BASED ON NAVD 88.
EXISTING CONDITIONS NOTES:
1. THE LOCATIONS OF STRUCTURES AND UNDERGROUND UTILITIES AS INDICATED HAVE BEEN OBTAINED
FROM EXISTING RECORDS AND FIELD SURVEYS. UNDERGROUND STRUCTURES AND UTILITIES MAY BE
PRESENT WHICH ARE NOT DOCUMENTED OR LOCATED.
2. THE CONTRACTOR SHALL FIELD -CHECK ALL EXISTING CONDITIONS AND BE THOROUGHLY FAMILIAR
WITH THE SITE BEFORE ANY WORK COMMENCES. ANY DISCREPANCIES IN THE DRAWINGS SHALL BE
IMMEDIATELY REPORTED TO THE CLIENT REPRESENTATIVE BEFORE ANY FURTHER WORK
COMMENCES.
3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD -VERIFY EXISTING STRUCTURES, UTILITIES,
AND SURVEY INFORMATION, AND TO TAKE NECESSARY PRECAUTIONS DURING DEMOLITION AND
CONSTRUCTION. CONTRACTOR SHALL VERIFY EXISTENCE AND MARK LOCATIONS OF ALL UTILITIES,
INCLUDING SERVICE CONNECTIONS TO UNDERGROUND UTILITIES, PRIOR TO BEGINNING WORK.
CONTRACTOR SHALL CONTACT THE CLIENT REPRESENTATIVE AND ALL ASSOCATED UTILITY
COMPANIES AND AGENCIES TO IDENTIFY THE LOCATION OF UTILITIES. THERE IS NO GUARANTEE,
EITHER EXPRESSED OR IMPLIED, THAT THE LOCATIONS, SIZE AND TYPE OF MATERIAL OF EXISTING
UNDERGROUND UTILITIES INDICATED ARE REPRESENTATIVE OF THOSE TO BE ENCOUNTERED DURING
CONSTRUCTION.
4. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE CLIENT REPRESENTATIVE OF
OPERATIONAL PLANS. IN THE EVENT AN UNEXPECTED UTILITY OR STRUCTURE INTERFERENCE OR
CONFLICT IS ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY
THE CLIENT REPRESENTATIVE. ANY UTILITY SERVICES OR STRUCTURES DISTURBED BY THE
CONTRACTOR'S OPERATIONS SHALL BE RESTORED IMMEDIATELY AT CONTRACTOR'S EXPENSE TO
THE SATISFACTION OF THE OWNER.
5. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ITEMS NOT TO BE DAMAGED DURING
DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE DAMAGED OR
DISTURBED ITEMS TO THE SATISFACTION OF THE CLIENT REPRESENTATIVE.
GENERAL GRADING NOTES
1. ALL GRADING, PAVEMENT WORK, AND ANY OTHER MISCELLANEOUS WORK SHALL BE PERFORMED IN
ACCORDANCE WITH THE CURRENT NC DOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE
CONSTRUCTION AND SUPPLEMENTAL SPECIFICATIONS.
2. THE GRAVEL SURFACE COURSE SHALL BE CONSTRUCTED IN ACCORDANCE WITH SECTION 520 OF THE NC DOT
STANDARD SPECIFICATIONS.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR GRADING INCLUDING EXCAVATION, EMBANKMENT,
AND BACKFILLING AS NECESSARY TO CONSTRUCT ALL AGGREGATE ACCESS ROADS, AS OUTLINED IN
THESE TECHNICAL SPECIAL PROVISIONS AND AS DIRECTED BY THE CLIENT REPRESENTATIVE.
4. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY DAMAGE DONE TO STORM MANHOLES OR
OTHER UTILITIES DURING GRADING.
5. DISTRIBUTE EXCESS SOIL ON SITE AT THE DIRECTION OF THE CLIENT REPRESENTATIVE. DO NOT
ALTER DIRECTION OF SURFACE DRAINAGE PATTERNS.
6. THE TOLERANCE OF THIS WORK SHALL BE TO WITHIN TO 0.1 FT OF THE EXISTING GROUND SURFACE
ELEVATIONS.
7. THE ACCESS ROAD SUBGRADE SHALL HAVE SUFFICIENT STABILITY TO ACCOMMODATE
CONSTRUCTION TRAFFIC WITHOUT EXCESSIVE SUBRADE RUTTING OR SHOVING. AT THE TIME OF
PLACEMENT OF THE PAVEMENT, THE IN SITU SUBGRADE SHALL HAVE A CALIFORNIA BEARING RATIO
(CBR) OF AT LEAST 6 PERCENT IN THE TOP 12 INCHES OF SUBGRADE. THE CBR PERCENTAGE WILL BE
ASCERTAINED BY THE CONTRACTOR.
8. IF SOFT SPOTS ARE IDENTIFIED IN THE SUBGRADE SOIL, THE SUBGRADE SHALL BE SCARIFIED AND
PROOF -ROLLED TO THE DEPTHS REQUIRED BY THE OWNER'S CONSTRUCTION INSPECTOR TO
COMPACT AREAS TO THE DENSITY REQUIREMENTS OF THIS DOCUMENT. IF THE SOFT AREAS CANNOT
BE ADEQUATELY COMPACTED, THE SOFT SOIL SHALL BE REMOVED AND REPLACED PER THE DESIGN
PLANS WITH SUITABLE SOIL MATERIAL AND COMPACTED TO THE DENSITY REQUIREMENTS IN
ACCORDANCE WITH THIS DOCUMENT.
9. THE QUALITY OF THE SOIL TO BE USED AS FILL MATERIAL SHALL BE AS SPECIFIED IN THIS DOCUMENT.
ALL BACKFILL SHALL BE SPREAD IN LOOSE LIFTS NOT EXCEEDING 8" INCHES IN THICKNESS WHEN
SELF-PROPELLED EQUIPMENT IS USED AND NOT EXCEEDING 6" WHEN HAND GUIDED EQUIPMENT IS
USED. ALL ROOTS, WOOD, AND VEGETATION SHALL BE REMOVED FROM THE LAYER OF FILL PRIOR TO
COMPACTION. ALL FILL AND EXPOSED SOIL IN CUT AREAS SHALL BE COMPACTED AS SPECIFIED IN
THIS DOCUMENT. SOIL COMPACTION TESTS WILL BE REQUESTED BY THE OWNER AT APPROPRIATE
INTERVALS DURING GRADING OPERATIONS.
10. ALL HAUL -IN MATERIAL SHALL BE FREE OF ROCKS 3" IN DIAMETER AND LARGER. THE OWNER'S
CONSTRUCTION INSPECTOR SHALL APPROVE ALL HAUL -IN MATERIAL TO ENSURE THE QUALITY AND
THE ABSENCE OF ENVIRONMENTAL HAZARDS.
11. THE FILL AREA SHALL BE CONSTRUCTED TO THE LINES AND GRADES SHOWN ON THE DESIGN
DRAWINGS WITH MATERIAL SPECIFIED IN THIS DOCUMENT. THE CONTRACTOR SHALL LAY OUT ALL
LINES AND GRADES FOR THE BACKFILL AREAS. ANY PROPOSED CHANGES TO THE SLOPES AND
GRADES SHALL REQUIRE THE APPROVAL OF THE OWNER'S CONSTRUCTION INSPECTOR IN ADVANCE.
THE CONTRACTOR SHALL BE REQUIRED TO REMOVE, AT HIS OWN EXPENSE, ANY COMPACTED
MATERIAL PLACED OUTSIDE OF THE APPROVED LINES OR GRADES.
12. SPOIL MATERIAL SHALL BE TOPSOIL AND OTHER SOIL MATERIALS CONTAINING GREATER THAN 5
PERCENT ORGANIC MATERIAL, SOIL WHICH IS TOO WET, SOIL WHICH DOES NOT MEET THE PLASTICITY
AND/OR GRADATION LIMITS FOR SELECT MATERIAL AS SPECIFIED IN THIS DOCUMENT, OR OTHER SOIL
MATERIAL DESIGNATED BY THE OWNER'S CONSTRUCTION INSPECTOR TO BE UNSUITABLE FOR
SELECT MATERIAL.
13. SELECT SOIL MATERIAL SHALL BE THAT MATERIAL CLASSIFIED AS SM, SP, SC, SW AND CL, OR SW AND
SC IN ACCORDANCE WITH ASTM D2487, AND SHALL HAVE A MAXIMUM LIQUID LIMIT OF 30, A MAXIMUM
PLASTICITY INDEX OF 8, AND A MAXIMUM OF 35 PERCENT PASSING THE #200 SIEVE.
14. THE TOP SURFACE OF EACH LIFT OF BACKFILL SHALL BE PROTECTED FROM PUMPING, PONDING, AND
GULLYING.
15. COMPACTION TESTING WILL BE PROVIDED AT THE EXPENSE OF THE CONTRACTOR. COMPACTION
REQUIREMENTS OF SOIL BACKFILL SHALL BE AS INDICATED IN THE FOLLOWING TABLE:
LOCATION OF FILL MINIMUM REQUIRED COMPACTION
LEVEL STANDARD PROCTOR
A. GENERAL YARD AREA 98%(ASTM D698)
B. UPPER 18 INCHES OF SOIL TO BE USED AS 98%(ASTM D698)
ROAD SUBGRADE MATERIAL AND EXTENDING
A MINIMUM OF 5 FEET BEYOND THE EDGE OF
DEFINED ROADWAYS (IMMEDIATELY UNDER
BASE MATERIAL)
15. CRUSHED STONE IN DRIVE AREAS SHALL BE COMPACTED WITH A STATIC STEEL DRUM ROLLER
(APPROXIMATELY 8 TONS). IF A VIBRATORY COMPACTOR IS USED, NO MORE THAN FOUR (4) PASSES
SHALL BE ALLOWED.
16. APPROVAL SHALL BE RECEIVED FROM THE CLIENT REPRESENTATIVE FOR EACH FILL TYPE TO BE USED
PRIOR TO PROCEEDING WITH BACKFILL OPERATIONS WITH THE MATERIAL IN QUESTION.
17. BACKFILL TO BE IMPORTED SHALL BE TESTED IN ACCORDANCE WITH THIS DOCUMENT AND APPROVED
BY THE PROJECT MANAGER PRIOR TO DELIVERY OF MATERIAL TO THE SITE. THE OWNER'S
CONSTRUCTION INSPECTOR ACCEPTS NO LIABILITY FOR ANY OUT OF SPECIFICATION MATERIAL
ACCEPTED AND STOCKPILED BY THE CONTRACTOR
18. INSPECTION AND TESTING OF MATERIAL SHALL BE PERFORMED AS REQUIRED BY THIS DOCUMENT AT
THE EXPENSE OF THE CONTRACTOR.
19. TESTS AND ANALYSIS OF MATERIAL SHALL BE PERFORMED IN ACCORDANCE WITH THE APPLICABLE
STANDARDS REFERENCED IN THIS DOCUMENT FOR THE SPECIFIC TEST. FIELD INSPECTION SHALL BE
PERFORMED AS REQUIRED BY THIS DOCUMENT.
20. THE BACKFILL AND EXPOSED SOIL IN CUT AREAS SHALL BE COMPACTED AS SPECIFIED ON THIS
DOCUMENT. FIELD DENSITY TESTS SHALL BE PERFORMED BY THE CONTRACTOR TO VERIFY
COMPACTION REQUIREMENTS HAVE BEEN ACHIEVED. IN -PLACE FIELD DENSITY TESTING OF THE
COMPACTED BACKFILL SHALL BE CONDUCTED ACCORDING TO THE PROCEDURES OF THE SAND CONE
METHOD (ASTM 1556), NUCLEAR METHOD (ASTM D3017), OR ACCORDING TO THE PROVISIONS OF THIS
DOCUMENT. TEST RESULTS REPORTED SHALL INCLUDE BOTH THE MOISTURE CONTENT AND DRY
DENSITY, ALONG WITH OTHER PERTINENT DATA SUCH AS LOCATION, ELEVATION, PROCTOR CURVE
USED FOR COMPARISON, ETC. THE TESTING FREQUENCY SHALL BE ONE TEST FOR EACH 5,000
SQUARE FEET OF LIFT AREA OR PORTION THEREOF FOR EACH LIFT. IN ISOLATED AREAS OF LESS
THAN 5,000 SQUARE FEET, TEST AT LEAST EVERY THIRD LIFT. WHEN BACKFILL OPERATIONS ARE
CONCENTRATED IN SMALL AREAS USING LIGHT MANUALLY -GUIDED EQUIPMENT AND RELATIVELY THIN
LIFTS, THE FREQUENCY OF DENSITY TESTING MAY BE REVISED AS DIRECTED BY THE OWNER'S
CONSTRUCTION INSPECTOR. TEST LOCATION SHALL BE THE WEAKEST APPEARING AREA OF THE TOP
LIFT DETERMINED BY TRACKING ACTION OF THE EQUIPMENT.
21. SUITABILITY OF SOIL MATERIAL FOR USE AS BACKFILL SHALL BE DETERMINED FOR EACH FILL TYPE BY
THE RESULTS OF THE FOLLOWING TESTS:
A. LIQUID LIMIT IN ACCORDANCE WITH ASTM D4318.
B. PARTICLE SIZE ANALYSIS IN ACCORDANCE WITH ASTM D422.
C. MOISTURE -DENSITY RELATIONS (STANDARD PROCTOR) IN ACCORDANCE WITH ASTM D698.
D. MOISTURE CONTENT IN ACCORDANCE WITH ASTM D2216.
E. SAMPLING OF SOIL SHALL BE IN ACCORDANCE WITH ASTM D2216.
F. SOIL SHALL BE CLASSIFIED IN ACCORDANCE WITH ASTM D2487.
22. FREQUENCY OF TESTS: TESTS OF MATERIALS TO BE USED IN THE OPERATIONS COVERED IN THIS
DOCUMENT SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS GIVEN IN THIS DOCUMENT.
FREQUENCIES OF IN -PLACE DENSITY TESTS SHALL BE AS STATED IN THIS DOCUMENT.
23. IF QUESTIONABLE COMPACTION RESULTS ARE OBTAINED, THE CLIENT REPRESENTATIVE MAY
REQUIRE THE CONTRACTOR TO PERFORM PROCTOR CHECKS (ON DRY SIDE OF OPTIMUM) TO VERIFY
THAT THE PROPER PROCTOR CURVE IS BEING REFERENCED. IF NOT, A NEW PROCTOR CURVE
DETERMINED BY A FIVE -POINT TEST SHALL BE REQUIRED. IF THE COMPACTION REQUIREMENTS FOR A
LIFT HAVE NOT BEEN ACHIEVED, THE LIFT SHALL BE REWORKED OR REPLACED AT THE
CONTRACTOR'S EXPENSE.
24. TESTING OF IN -PLACE DENSITY AND MOISTURE CONTENT BY NUCLEAR METHODS IN ACCORDANCE
WITH ASTM D2922 AND ASTM D3017, RESPECTIVELY, WILL BE ALLOWED PROVIDED:
A. ACCEPTABLE CORRELATION WITH SAND CONE DENSITY AND LABORATORY DETERMINED MOISTURE
CONTENT TEST RESULTS CAN BE OBTAINED ACCORDING TO THE GUIDELINES OF "CALIBRATION"
SECTIONS OF ASTM D2922 AND ASTM D3017.
B. THE INITIAL CORRELATION RESULTS ARE REVIEWED AND USE OF THE NUCLEAR DEVICE IS APPROVED
BY THE OWNER'S CONSTRUCTION INSPECTOR.
C. THE CONTRACTOR INSURES THAT THE REPRESENTATIVE FROM THE TESTING AGENCY OPERATING
THE NUCLEAR DENSITY TESTING HAS THE NECESSARY STATE AND/OR FEDERAL LICENSES TO
OPERATE THE DEVICE AND CARRY A NUCLEAR ENERGY SOURCE.
EMBANKMENT FILL NOTES:
1. EMBANKMENT FILL SHALL CONSIT OF AN INORGANIC, NON -PLASTIC, GRANULAR SOIL CONTAINING
LESS THAN 10% MATERIAL PASSING THE NO.200 MESH SIEVE WITH UNIFIED SOIL CLASSIFICATION OF
SP, SP-SC, OR SP-SM. EMBANKMENT FILL SHALL BE PLACED IN LIFTS NOT EXCEEDING 8 INCHES WHEN
USING A STATIC DRUM ROLLER WITH A MINIMUM OPERATING WEIGHT OF 5 TONS WITH A DRUM
DIAMETER OF 3 TO 4 FEET. WHERE LIGHTWEIGHT VIBRATORY COMPACTION METHODS ARE UTIILIZED
MAXIMUM LOOSE LIFT THICKNESS SHALL BE 6 INCHES. COMPACTION TO MEET A MAXIMUM DRY
DENSITY OF 98% STANDARD PROCTOR DRY DENSITY.
2. ANY GRADING TO CORRECT SLOPES SHALL BE COMPACTED PER THIS DOCUMENT.
GENERAL EXCAVATION REQUIRED FOR CONSTRUCTION
1. THIS ITEM SHALL CONSIST OF FURNISHING ALL LABOR, MATERIALS, MACHINERY, TOOLS, AND SUPERVISION
FOR EXCAVATION AND GRADING REQUIRED TO PREPARE THE ROADWAY, AND GRADING REQUIRED TO
COMPLETE THE FINAL GRADING OF AREAS ADJACENT TO THE ROADWAY AS SHOWN ON THE PLANS IN
ACCORDANCE WITH THE PROVISIONS OF SECTION 225 OF THE NC DOT STANDARD SPECIFICATIONS INSOFAR AS
THEY ARE NOT AMENDED BY THE PLANS AND THESE SPECIAL PROVISIONS, AND IN ACCORDANCE WITH THE
FOLLOWING SPECIAL PROVISIONS,
SUBGRADE COMPACTION VERIFICATION
1. THE CONTRACTOR SHALL EMPLOY AN INDEPENDENT CONSTRUCTION MATERIAL ENGINEERING TESTING FIRM
TO MONITOR THE PROOFROLLING OF THE SITE AFTER THE STRIPPINGS HAVE BEEN REMOVED TO INSPECT AND
TEST THE COMPACTED FILL AREAS IN THE ACCESS ROAD AREAS AS INDICATED ON THE BID DOCUMENTS
AND/OR AS SPECIFIED BY THE OWNER'S DESIGNATED REPRESENTATIVE. COPIES OF THE TEST RESULTS SHALL BE
FURNISHED TO THE OWNER'S DESIGNATED REPRESENTATIVE AND OTHERS AS INDICATED BY OWNER'S
DESIGNATED REPRESENTATIVE, THE OWNER'S DESIGNATED REPRESENTATIVE MUST APPROVE THE
INDEPENDENT CONSTRUCTION MATERIAL ENGINEERING TESTING FIRM. INCLUDED WITH THIS BID PROPOSAL,
THE CONTRACTOR SHALL FURNISH THE NAME, ADDRESS AND A PHONE NUMBER OF THE INDEPENDENT
CONSTRUCTION MATERIAL ENGINEERING TESTING FIRM FOR APPROVAL.
ABBREVIATIONS:
ASTM
AMERICAN SOCIETY FOR TESTING AND MATERIALS
BOC
BACK OF CURB
CB
CATCH BASIN
CBR
CALIFORNIA BEARING RATIO
C/L
CENTERLINE
COMB
COMBINATION BEND (VERT. & HOR. DIRECTIONAL CHANGE)
CONC
CONCRETE
CI
CURB INLET
CMP
CORRUGATED METAIL PIPE
DB
DEED BOOK
DI
DROP INLET
DR
DRIVE
ELEC
ELECTRICAL
EOP
EDGE OF PAYMENT
EX
EXISTING
FT
FEET
FTG
FITTING
JAB
JACK AND BORE
GIS
GEOGRAPHIC INFORMATION SYSTEM
LL
LAND LOT
MAX
MAXIMUM
MIN
MINIMUM
MISC
MISCELLANEOUS
NTS
NOT TO SCALE
PG
PAGE
PVC
POLYVINYL PLASTIC PIPE
NCDEQ
NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY
NCDOT
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
N/F
NOW OR FORMERLY
NPDES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
NTS
NOT TO SCALE
OSHA
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
PC
POINT OF CURVATURE
P/L
PROPERTY LINE
PT
POINT OF TANGENCY
RCP
REINFORCED CONCRETE PIPE
R/W
RIGHT OF WAY
SAG
SAG (PIPE DIRECTION UP)
SBL
SIDE BEND LEFT
SBR
SIDE BEND RIGHT
SSMH
SANITARY SEWER MANHOLE
STMH
STORM MANHOLE
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDEA McMULLAN
NO.1
DATE
REVISION(S) DESCRIPTION
BY
I CHK
APPD
I DESCRIPTION
APPROVALS
IFC SUBMITTAL DATE
NORTH CAROLINA
A
04-24-2020
30% DESIGN SUBMITTAL
MJD
CNS
CAM
AREA CODE
-
DATE
N/A
INITIALS
NIA
REGIONAL
ENGINEER
B
08-11-2020
60% DESIGN SUBMITTAL
MJD
CNS
CAM
ACCOUNT NUMBER
-
SEAL047852
C
10-02-2020
90% DESIGN SUBMITTAL
JJM
CNS
CAM
PROJECT NUMBER
0231540
DATE
N/A
INITIALS
N/A
MGR TECH
REC & STD
r DUKE
'� ENERGY,:
D
12-11-2020
REVISED 90% DESIGN SUBMITTAL
MJD
CNS
CAM
DRAWING BY
MJD
PROFESSIONALENG/ARCH STAMP
STATION ID
DATE
12/11/2020
INITIALS
CAM
PRINCIPAL
ENGINEER
CHECKER INITIALS
CNS
LINE 475 DOT RELOCATION - PIPELINE
r6ll�
Piedmont CIVIL GENERAL NOTES, LEGENDS, & ABBREVIATIONS
Natural Gas
GOLDSBORO, NORTH CAROLINA
COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
SHEET(S) X OF X I DWG SCALE
DWG DATE 04/22/2020 ISUPERSEDED
DRAWING NUMBER
PNG-C-025-0001222
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
NONE
REVISION
D
ACCESS AND STAGING
REPLACEMENT FOR i \ �� I _ L _ • • r A a . ' 111
FALLIN BLVD EXPANSION 1 I — �I =N.J '.
L
L
i FALLINSUEMARY i a FALLINSUEMARY i %•
3519957239 L_ J 3529055055 EXISTING CENTRAL ' � •° • L - 1
BOOK3468 PAGE 180 180 HEIGHTS ROAD L '
i REGULATOR STATION. i •�f
• _ I 118 I � •� � �
MARY SUE I 102 NEWTON HOMES, LLC (SUE)
FALLINSUEMARY FALL BOOK2617PAGE783 '
3519947685 3529045688 3529141303 w - — -
Fi�h r • • BOOK3468PAGE 180 BOOK 46 I �'
=180
SR 1709— -=` MARVSUEFALLIN
a a —°—a
•� CENTRAL HEIGHT Rp 3529048073
101 101 BODK741 PAGE�3
D L TEMPORARY ACCESS
DOUTHWESTINVESTORS GROUP , LLC � `—�`
' 01111K2842 PAGE 135 (NAME CHANGE 104
■ '~ DUKE ENERGY _ • _ � 3529137763 -SOUTHEASTINVESTORS \
• •� r k \� PROGRESS LLC y BOOK 1800, PAGE 184 GROUP, LLC
TCE (TCE) a/ 3529235463
'1
ti ' 1' '• ' ti s rp■G �� 3529130782 BOOK2842, PAGE 135
•s r �_� - ''•� PROPOSED LAYDOWN YARD �`�e / (NAME CHANGE)
BOOK 1800, PAGE 184
_ APPROX. 6 ACRES / �_� / EXCEPTION ],
f r _ , r �` BOOK 1175PAGE 78
. x /
A `
1 � 11 / 1 T 7 •
4 - -
f:r ti ! _ _ �� • �e
_ _�d A
' co �PDNC,LLC �e
' CHENEY BROS.
INC rirLE
!P.
3529124586
• - RETIRE GATEWAY DRIVE / a BOOK3289, / UN �e
G '�
� PAGE 669 / COUNTY �
,..�tifti.,T •tip , L ��. N O� N. OAK FOREST RD (MERGER) j OFWAYNE
y = REGULATOR STATION BOOK3248, Lo 13
r
PAGE215 / BOOK 1309,
f PAGE 859 1
v \ /
r 106
64
A
0
3r_
A
9f
■• - ��� �/� � - - - 1 - �' � � � ' _ram _ 1 �
JL
FALLINSUEMARY f_ f Ir 1
f \ 3529053511 _ _ � r ■ '
'f '
PROPOSED BOX SECTION ' � i •' 'i +1
�a. �\ BOOK PAGE 1ao EXISTING PNG LINE 67r• '
1
R`
ti
Oyq � r V t• �' ' �
is'
�e
�e
A/,
HDD ENTRY
• �a GATEWAYRE, LLC 105 �
3529113872 � COUNTY OF WAYNE \ems
BOOK2394 , PAGE 646 Al 3529211787
'�'' _ • - 1 ti' " _� i �a JACK AND BOR LorS BOOK1309, PAGE859
r n ?�` ��°�°� GATEWAY DRIV GI
�, •'� �e '\> /gyp 103.06 ���� i'�
t ,�, �ea<, ��: WAYNE COUNTY DEVELOPMENT Q /
ALLIANCE, INC.
3519915801
BOOK3280, PAGE381
• BOOK3280, PAGE 376
' RETIRE SUMMIT ROAD �� %�`+���a �
REGULATOR STATION D� �\ ��OT22C
\ DEED BOOK2567, \;\
PAGE 523 �0.y
r
EASTERN WAYNE � /`- '� � � TR. 2 -• �,
SANITARYDISTRICTETA �� �a �a
4. 3518898643
BOOK2878, PAGE 134 \\ r • /'
JACK AND BORE BOOK2878, PAGE 134
N OAK FOREST ROAD (CORRECTED AFFIDAVIT) �� / \ \
475 MLV 3 UNDER SEPARATE COVER EASEMENT BOOK3025, \ \ y
SOUTHERN DISTRICT �'� lHETHREE JSINC �I
�C BOOK3025, PAGE / 3519904104
CONVOCATION-GOLDSBORO -�,— BOOK2977, PAGE306
ASH ST SJAFB REGULATOR STATION OF THE UNITED HOLY �Q —,—a BOOK 3486,PAG1i"
CHURCH OFAMERICA INC /O If111 �` \ •'
UNDER SEPARATE COVER / 3518793598 BENJAMINFRANKLIN PROPOSED 8" STEEL �a '
BOOK 3341, PAGE 711 / / MOZINGO AND / / VIRGINIAMOZINGO
RETIRE EXISTING ASH STREET \ TRANSMISSION LINE i
LINDSEY •9
REGULATOR STATION BOOK252 PAGE228 _ \ \ HDD EXIT HARRY&&OlE, LLC �d
A �< 35199054592 AND �
35199054591
BOOK2811, PAGE413
* ESS
�� EASEMENTS
� S&ENTRY ,. \ BOOK2135, PAGE432
- BOOK 1206, PAGE206
BOOK 823, PAGE 626
P.
1\a J C HEIRS BOOK 828, PAGE 694
ADRIS P. \ 3518797453 /
ANDERSON \ � \ 4" STEEL HIGH PRESSURE TCE (TCE) �' ° °E271 CONTRACTOR HAUL ROUTE
/ \� \
3518791353
DISTRIBUTION (HPD) PIPELINE BOOK2852 / \
SEE PNG-C-025-0001256 PA�88
� � \
RETIRE EXISTING SJAFB ,� 7/I \
REGULATOR STATION /,/�"\
1. ACCESS AND HAUL ROUTES FOR ALL CONTRACTOR PERSONNEL, VEHICLES,
EQUIPMENT, AND DELIVERIES ARE ILLUSTRATED ON THIS DRAWING AND ARE
SUBJECT TO THE APPROVAL OF THE CLIENT REPRESENTATIVE. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO COORDINATE OFF -SITE HAUL ROUTES WITH
THE APPROPRIATE OWNER WHO HAS JURISDICTION OVER THE AFFECTED ROUTE.
ACCESS ROUTES AND HAUL ROUTES ARE SUBJECT TO CHANGE AT THE
DIRECTION OF THE CLIENT REPRESENTATIVE AND MAY CHANGE BASED ON
OPERATIONAL REQUIREMENTS OF THE SITE.
2. CONTRACTOR SHALL COORDINATE ACTIVITIES AND MAINTAIN ALL ACCESS AND
HAUL ROUTES IN A MANNER THAT ALLOWS UNOBSTRUCTED EMERGENCY ACCESS
TO ALL PROJECT AREAS AND EXISTING ROADWAYS AT ALL TIMES WITHOUT DELAY
TO EMERGENCY AND SECURITY VEHICLE RESPONSE TIME.
3. IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO CONSTRUCTION
ACTIVITIES, CONTRACTOR SHALL NOTIFY THE CLIENT REPRESENTATIVE, POLICE,
LOCAL FIRE AUTHORITY, AND ALL OTHER EMERGENCY SERVICES OF THE
CLOSURE.
4. CONTRACTOR SHALL MAINTAIN ACCESS AND HAUL ROUTES TO BE FREE FROM
DEBRIS CAUSED FROM CONSTRUCTION ACTIVITIES ON A DAILY BASIS.
5. CONTRACTOR SHALL RESTRICT ALL OPERATIONS TO AREAS WITHIN THE
CONSTRUCTION LIMITS UNLESS COORDINATED OTHERWISE WITH THE CLIENT
REPRESENTATIVE.
6. CONTRACTOR SHALL PROVIDE TEMPORARY CONSTRUCTION FENCING AROUND
THE ENTIRE SITE DURING CONSTRUCTION.
7. CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING A STAGING AND STOCKPILE
AREA FOR MATERIALS AND EQUIPMENT. LOCATION OF CONTRACTOR'S STAGING
SHALL BE AS ILLUSTRATED ON THIS DRAWING, AND IS SUBJECT TO THE
APPROVAL OF THE CLIENT REPRESENTATIVE. CONTRACTOR MAY SUBMIT
ALTERNATIVES TO THE STAGING AREA LOCATIONS AS SHOWN. CONTRACTOR'S
STAGING AREA IS SUBJECT TO CHANGE AT THE DIRECTION OF THE CLIENT
REPRESENTATIVE AND MAY CHANGE BASED ON OPERATIONAL REQUIREMENTS
OF THE PROJECT SITE.
8. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES, CONTRACTOR'S EQUIPMENT
AND VEHICLES SHALL BE PARKED IN THE STAGING AREA.
9. ACCESS POINTS, HAUL ROUTES, STAGING AREA, AND ANY OTHER AREAS
DISTURBED BY THE CONTRACTOR SHALL BE RESTORED TO THEIR ORIGINAL
CONDITION OR BETTER TO THE SATISFACTION OF THE CLIENT REPRESENTATIVE.
10. CONTRACTOR SHALL IMPROVE THE EXISTING ACCESS ROAD AS REQUIRED AND
AS DIRECTED BY AND APPROVED BY OWNER. ROAD SHALL BE 6" GRAVEL
SURFACE COURSE OVER 12" COMPACTED SUBGRADE AND AT LEAST 12' IN WIDTH.
TRAFFIC CONTROL
1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CORDON OFF THE
CONSTRUCTION WORK AREA AND ASSOCIATED ROADWAYS BY USING
BARRICADES APPROVED BY THE CLIENT REPRESENTATIVE.
2. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE MARKED WITH
COMPANY DESIGNS, INSIGNIAS, OR OTHER MARKINGS, WHICH ARE CLEARLY
VISIBLE.
3. CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC SIGNALING DEVICES TO
SOUND AN ALARM WHEN MOVING IN REVERSE.
4. NO PEDESTRIAN TRAFFIC SHALL BE ALLOWED INSIDE THE CONSTRUCTION LIMITS.
5. ANY DAMAGE TO ROADS AND PAVEMENTS -TO -REMAIN DUE TO CONSTRUCTION
EQUIPMENT OR TRAFFIC SHALL BE REPAIRED TO RESTORE THE ROADS AND
PAVEMENTS TO THEIR ORIGINAL CONDITION TO THE SATISFACTION OF THE
CLIENT REPRESENTATIVE.
BURNS&McDONNELLCONSULTANTS, INC. I PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
STATE LICENSE # C-1435
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDEA McMULLAN
NO.1
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
I DESCRIPTION
APPROVALS
IFC SUBMITTAL DATE
NORTH CAROLINA
A
04-24-2020
30% DESIGN SUBMITTAL
MJD
CNS
CAM
AREA CODE
-
DATE
N/A
INITIALS
NIA
REGIONAL
ENGINEER
B
08-11-2020
60% DESIGN SUBMITTAL
MJD
CNS
CAM
ACCOUNT NUMBER
-
SEAL047852
C
10-02-2020
90% DESIGN SUBMITTAL
JJM
CNS
CAM
PROJECT NUMBER
0231540
DATE
N/A
INITIALS
N/A
MGR TECH
REC & STD
r
r�DUKE
ENERGY,:
D
12-11-2020
REVISED 90% DESIGN SUBMITTAL
MJD
CNS
CAM
DRAWING BY
MJD
PROFESSIONALENG/ARCH STAMP
STATION ID
DATE
12/11/2020
INITIALS
CAM
PRINCIPAL
ENGINEER
CHECKER INITIALS
CNS
LINE 475 DOT RELOCATION - PIPELINE
r6ll�
Piedmont ACCESS ROUTE PLAN - PIPELINE
Natural Gas
GOLDSBORO, NORTH CAROLI NA
COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
0 500 1000 PRELIMINARY - NOT
I IN — 50OFT FOR CONSTRUCTION
90% DESIGN SUBMITTAL
SHEET(S) X OF X I DWG SCALE AS NOTED
DWG DATE 04/22/2020 SUPERSEDED
DRAWING NUMBER REVISION
PNG-C-025-0001223 D
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
_d��
BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-1435
CLAUDE A McMULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL 047852
PROFESSIONAL ENG/ARCH STAMP
FALLIN SUE MARY
J6/A0117M
WaY JIBE PAGE 1W
PLAT M-PJI
N/T
FALLIN SUE MARY
JI MBNI71111rr
BiOClilf JIBB PAGE IM
PLAT M-2ff
\ WETLAND 3
\
\
\ 0
°
\ y�
\
\
PROPOSED TEMPORARY
WORKSPACE (TYP)
ACCESS ROAD TO BE MATTED AS REQUIRED
BASED ON FIELD CONDITIONS (SEE DETAIL 3
DRAWING PNG-C-025-0001291)
rUDLIU KVVV
CONTRACTOR
HAUL ROUTE
�I
12' TRAVEL LANE
IGHTS RD
STREAM2
�S—
PROPOSED BOX SECTION
REPLACEMENT FOR FALLIN
BLVD EXPANSION
SEE DRAWING
PNG-M-025-0001282
EXISTING CAROLINA
POWER AND LIGHT
EASEMENT
Aw
FALLIN SUE MARY
JU29GB6M
OW JIBE PAGE IW
PLAr m-YSr
EXISTING PNG
PERMANENT EASEMENT
EXISTING PNG LINE 67
J \
\ \ter
y�
MARY SUE FALLIN
11&00 A \ \
WCK JIBE PAGE IW \
PLAT M-2FJ
oy \ \
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE \ \
(SEE DETAIL 1 DRAWING PNG-C-025-0001290) \ \
LOHw
1709 �_�__-------
77777
-- — L� G
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
1w ACCESS AND STAGING
1. ACCESS AND HAUL ROUTES FOR ALL CONTRACTOR PERSONNEL, VEHICLES,
EQUIPMENT, AND DELIVERIES ARE ILLUSTRATED ON THIS DRAWING AND ARE
SUBJECT TO THE APPROVAL OF THE CLIENT REPRESENTATIVE. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO COORDINATE OFF -SITE HAUL ROUTES WITH
THE APPROPRIATE OWNER WHO HAS JURISDICTION OVER THE AFFECTED ROUTE.
ACCESS ROUTES AND HAUL ROUTES ARE SUBJECT TO CHANGE AT THE
DIRECTION OF THE CLIENT REPRESENTATIVE AND MAY CHANGE BASED ON
OPERATIONAL REQUIREMENTS OF THE SITE.
2. CONTRACTOR SHALL COORDINATE ACTIVITIES AND MAINTAIN ALL ACCESS AND
HAUL ROUTES IN A MANNER THAT ALLOWS UNOBSTRUCTED EMERGENCY ACCESS
TO ALL PROJECT AREAS AND EXISTING ROADWAYS AT ALL TIMES WITHOUT DELAY
TO EMERGENCY AND SECURITY VEHICLE RESPONSE TIME.
3. IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO CONSTRUCTION
ACTIVITIES, CONTRACTOR SHALL NOTIFY THE CLIENT REPRESENTATIVE, POLICE,
LOCAL FIRE AUTHORITY, AND ALL OTHER EMERGENCY SERVICES OF THE
CLOSURE.
4. CONTRACTOR SHALL MAINTAIN ACCESS AND HAUL ROUTES TO BE FREE FROM
DEBRIS CAUSED FROM CONSTRUCTION ACTIVITIES ON A DAILY BASIS.
5. CONTRACTOR SHALL RESTRICT ALL OPERATIONS TO AREAS WITHIN THE
CONSTRUCTION LIMITS UNLESS COORDINATED OTHERWISE WITH THE CLIENT
REPRESENTATIVE.
6. CONTRACTOR SHALL PROVIDE TEMPORARY CONSTRUCTION FENCING AROUND
THE ENTIRE SITE DURING CONSTRUCTION.
7. CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING A STAGING AND STOCKPILE
AREA FOR MATERIALS AND EQUIPMENT. LOCATION OF CONTRACTOR'S STAGING
SHALL BE AS ILLUSTRATED ON THIS DRAWING, AND IS SUBJECT TO THE
APPROVAL OF THE CLIENT REPRESENTATIVE. CONTRACTOR MAY SUBMIT
ALTERNATIVES TO THE STAGING AREA LOCATIONS AS SHOWN. CONTRACTOR'S
STAGING AREA IS SUBJECT TO CHANGE AT THE DIRECTION OF THE CLIENT
REPRESENTATIVE AND MAY CHANGE BASED ON OPERATIONAL REQUIREMENTS
OF THE PROJECT SITE.
8. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES, CONTRACTOR'S EQUIPMENT
AND VEHICLES SHALL BE PARKED IN THE STAGING AREA.
9. ACCESS POINTS, HAUL ROUTES, STAGING AREA, AND ANY OTHER AREAS
DISTURBED BY THE CONTRACTOR SHALL BE RESTORED TO THEIR ORIGINAL
CONDITION OR BETTER TO THE SATISFACTION OF THE CLIENT REPRESENTATIVE.
10. CONTRACTOR SHALL IMPROVE THE EXISTING ACCESS ROAD AS REQUIRED AND
AS DIRECTED BY AND APPROVED BY OWNER. ROAD SHALL BE 6" GRAVEL
SURFACE COURSE OVER 12" COMPACTED SUBGRADE AND AT LEAST 12' IN WIDTH.
TRAFFIC CONTROL
1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CORDON OFF THE
CONSTRUCTION WORK AREA AND ASSOCIATED ROADWAYS BY USING
BARRICADES APPROVED BY THE CLIENT REPRESENTATIVE.
2. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE MARKED WITH
COMPANY DESIGNS, INSIGNIAS, OR OTHER MARKINGS, WHICH ARE CLEARLY
VISIBLE.
3. CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC SIGNALING DEVICES TO
SOUND AN ALARM WHEN MOVING IN REVERSE.
4. NO PEDESTRIAN TRAFFIC SHALL BE ALLOWED INSIDE THE CONSTRUCTION LIMITS.
5. ANY DAMAGE TO ROADS AND PAVEMENTS -TO -REMAIN DUE TO CONSTRUCTION
EQUIPMENT OR TRAFFIC SHALL BE REPAIRED TO RESTORE THE ROADS AND
PAVEMENTS TO THEIR ORIGINAL CONDITION TO THE SATISFACTION OF THE
CLIENT REPRESENTATIVE.
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE* TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
NO.
DATE
REVISION(S) DESCRIPTION
BY
I CHK
APPD
I DESCRIPTION
APPROVALS
Piedmont
I DUKE 0111
4 ENERGY_-. Natural Gas
COPYRIGHT 2018
LINE 475 DOT RELOCATION — PIPELINE
FALLIN BLVD ACCESS PLAN
GOLDSBORO, NORTH CAROLINA
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
A
08-11-2020
60% DESIGN SUBMITTAL
HEC
CDWCAM
AREA CODE
-
DATE
N/A
INITIALS
N/A
REGIONAL
ENGINEER
B
10-02-2020
90% DESIGN SUBMITTAL
JJM
CDWCAM
ACCOUNT NUMBER
-
C
12-11-2020
REVISED 90% DESIGN SUBMITTAL
MJD
CNS
CAM
PROJECT NUMBER
0231540
DATE
N/A
INITIALS
N/A
MGR TECH
REC & STD
DRAWING BY
-
STATION ID
I
DATE
12/11/2020
INITIALS
CAM
PRINCIPAL
ENGINEER
CHECKER INITIALS
CDW
NOTES:
1. CONTRACTOR SHALL MAT OVER LIVE LINES
BEFORE DRIVING OR WORKING OVER.
2. CONTRACTOR SHALL REMOVE GRAVEL
CONSTRUCTION ENTRANCE UPON COMPLETION
OF WORK.
0 60 120 PRELIMINARY -NOT
1IN=60FT FOR CONSTRUCTION
90% DESIGN SUBMITTAL
REF. DWG(S) PNG-G-025-0001086
PNG-C-025-0001223
SHEET(S) X OF X DWG SCALE AS NOTED
DWG DATE 04/14/2020 SUPERSEDED
DRAWING NUMBER REVISION
PNG—C-025-0001224 C
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
s D�'
"_In
i501 \��s
5
o
CONSTRUCTION ENTRANCE, SEE DETAIL 1 ON
SHEET PNG-C-025-0001290
RCP LpUCP�p
ENp j5111 8
\� HAUL ROAD
ROCK PIPE INLET PROTECTION
---
��-
� \•\ ry \. pyJ p„,
110/
\.\ BpO� � 44)_ \ \ pH pH„
0 HHj
py \
�%y. 1 1
PIPELINE ES&PC PLAN,
\ ° 1 DER SEPARATE PERMIT
I
CONSTRUCTION ENTRANCE WITH 12"
\ \ 1 CULVERT, SEE DETAILS 1 AND 5 ON SHEET
\ HAUL ROAD PNG-C-025-0001290
0 /
114 — — — — — — �
PLAT LL401 B OK 741 _PA GE 2 3SFWB v
-------------
2 SFWB
0 0 '
\ o 0 o O
v \ 0000000c
SILT FENCE, TYP
NON -JURISDICTIONAL O�O�
\ DITCH17
AM
\ \ SFWB
41P \ 10I
\ I
L_
BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-1435
CLAUDE A McMULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL 047852
�_ o
NON -JURISDICTIONAL DITCH
AA3
o SILT FENCE, TYP
FL \ \ FLGD z�F I L� D 0-0D�
SILT FENCE, TYP o`oJ0�0�0�0�0�0 C�D°�° o I I
- 1
Oo�oo�oo�oo�oo�oo�oo�oo�oo�oo�oo�oo�oo�o oo�o � �� I
JOcOcOcOcOcOcOcOcOcOcOcOcOcO�
\oo�oo�oo�oo�oo�oo�oo�oo�oo�oo�oo�oo�oo�oo�o IIII
C\O�O�O�O�O�O�O�O�O�O�O�O�O�O�O �III,I
��9 9O�O�O�O�O�O�O�O�O�O�O�O� I/ 1
SFWB III 1
Oo�oo�oo�oo�oo�oo�oo�oo�oo�o 0 ' D sD o IIII 1
JOcOcOcOcOcOcOcOcO cOcO�cOcO I
NON JURISDICTIONAL
DITCH
JOcOco�� ° cOcOcOcOcO� cOcOcO� III
Oo�oo�oo O O�o�o�o�o� o�oo�oo�oo�o _.
"IV�� IIII SILT FENCE, TYP
Oo�oo�oo�oo�oo�oo�oo�oo�oo�o o�oo�oo�o�-o -� \ /
JOcOcOcOcOcOcOcOcOcO� cOcOcO II l
t!
JOcOcOcOcOcOcOcOcOcO cOcOcO � II II
2_�U�140
�OAO�O�O�O<O�O�O SFWB III
JOcOcOcOcOcOcOcOcOcO cOcOcO III
�O�O�O�O�O�O�O�O�O�O
.<Oy
/0 III
0 0 0 0 0 0 0 0 0 0�0 0 0 IIII\
III
II
E
1/2HBO&FRG PpE
/ II P�UMkvo*
12
+` I/ a EeB
SILT FENCE, TYP
TOPSOIL STOCKPILE AREA,
STABILIZE WITH TEMPORARY / / / ✓
l SEEDING AS REQUIRED — _ / _ / _ _ _ —I\ I
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
NOTES:
1. ALL DIMENSIONS SHOWN ARE IN FEET UNLESS NOTED OTHERWISE.
2. CONTRACTOR SHALL MAINTAIN GROUND COVER STABILIZATION AT ALL TIMES
VIA TEMPORARY SEEDING OR GRAVEL.
3. CONTRACTOR SHALL KEEP ADJACENT ROADS AND DRIVEWAYS CLEAN OF
SEDIMENT AND CONSTRUCTION DEBRIS. HWY SHALL BE SWEPT CLEAN DAILY.
4. ONSITE SOILS ARE SANDY LOAM, 0-2% SLOPES, HYDROLOGIC SOIL GROUP B
AND C.
5. WETLANDS, SURFACE WATERS, OR OTHER JURISDICTIONAL WATERS ARE NOT
WITHIN THE LAYDOWN YARD LIMITS OF DISTURBANCE.
LAYDOWN YARD CONSTRUCTION SEQUENCE:
1. INSTALL TEMPORARY CONSTRUCTION ENTRANCES AND ASSOCIATED
TEMPORARY CULVERTS.
2. INSTALL PERIMETER EROSION CONTROL DEVICES.
3. STRIP THE PROPOSED LAYDOWN AREA OF TOPSOIL AND STOCKPILE IN
LOCATIONS SHOWN.
4. INSTALL PERIMETER EROSION CONTROL AROUND TOPSOIL STOCKPILES AS
SHOWN.
5. STABILIZE TOPSOIL STOCKPILES WITH TEMPORARY SEEDING IN ACCORDANCE
WITH DETAIL 1, SHEET PNG-C-025-0001291.
6. INSTALL LAYDOWN YARD GRAVEL AS SHOWN.
7. ALL NON -GRAVELED AREAS SHALL BE MULCHED AND TEMPORARILY SEEDED
IN ACCORDANCE WITH NORTH CAROLINA EROSION AND SEDIMENT CONTROL
PLANNING AND DESIGN MANUAL SECTIONS 6.10 AND 6.14. SEE DETAIL 1, SHEET
C-025-0001291.
8. INSPECT AND MAINTAIN ALL EROSION CONTROL DEVICES THROUGHOUT
CONSTRUCTION.
9. UPON CONSTRUCTION COMPLETION, REMOVE AND HAUL OFF ALL GRAVEL
AND ASSOCIATED MATERIALS.
10. REPLACE THE STOCKPILED TOPSOIL EVENLY ACROSS THE AREAS IT WAS
STRIPPED FROM.
11. STABILIZE ALL DISTURBED AREAS OUTSIDE OF THE CULTIVATED FIELD WITH
PERMANENT SEEDING IN ACCORDANCE WITH DETAIL 2, SHEET
PNG-C-025-0001291.
12. ALL OTHER DISTURBED AREAS SHALL BE RESTORED TO ORIGINAL
CONDITIONS AS A CULTIVATED FIELD. PERMANENT SEEDING WILL NOT BE
UTILIZED.
13. UPON NCDEQ APPROVAL, REMOVE ALL EROSION AND SEDIMENT CONTROL
DEVICES.
LEGEND:
— — LOD — — LIMITS OF DISTURBANCE
EXISTING CONTOUR
- — — ....... DITCH
PROPOSED 4" #57 STONE OVER WOVEN
O O GEOTEXTILE, MIRAFI HP370 OR APPROVED EQUAL
SILT FENCE
C-025-0001290
SFWB SILT FENCE WATTLE BREAK 3
C-025-0001290
J ROCK PIPE INLET PROTECTION 4
v C-025-0001290
N__�
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
NO.1
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
I DESCRIPTION
APPROVALS
+r�DUKE Piedmont
ied Natural Gas
ENERGY,
COPYRIGHT 2018
LINE 475 DOT RELOCATION - PIPELINE
ES&PC PLAN - LAYDOWN YARD
GOLDSBORO NORTH CAROLINA
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
A
09-23-2020
90% DESIGN SUBMITTAL
ABR
JTG
CAM
AREA CODE
-
DATE
N/A
INITIALS
N/A
REGIONAL
ENGINEER
B
12-11-2020
REVISED 90% DESIGN SUBMITTAL
LLO
JTG
CAM
ACCOUNT NUMBER
-
PROJECT NUMBER
0231540
DATE
N/A
INITIALS
N/A
MGR TECH
REC&STD
DRAWING BY
ABR
STATION ID
I
DATE
12/11/2020
INITIALS
CAM
PRINCIPAL
ENGINEER
CHECKER INITIALS
JTG
LIMITS OF DISTURBED AREA
CONTRACTOR LAYDOWN
AREA & HAUL ROAD: 6.00 AC
POINT OF CONTACT (MAINTENANCE):
DENNIS ROBERTSON 803-917-6577
PRELIMINARY - NOT
0 20' 40' 80' FOR CONSTRUCTION
SCALE IN FEET 90% DESIGN SUBMITTAL
REF. DWG(S)
SHEET(S) X OF X DWG SCALE AS NOTED
DWG DATE 12/11/2020 SUPERSEDED
DRAWING NUMBER REVISION
PNG-C-025-0001225 B
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-1435
BOM #
Legacy Number
Maximo Part #
Data Sheet?
Source System
Qty
Retired?
Description
Ordering Instructions
Ordering Specifications
Manuf
Model
Manuf Part #
LINE PIPE
1
16360
1551341
PNG
8800
PIPE, 8" NPS X 0.322" WALL THK, DBL RANDOM LG, BEVELED ENDS, ELECTRIC RESISTANCE WELD, SCH 40, STL, API 5L PSL-2, GR X52, NO JOINTERS,
FUSION BONDED EPDXY COATED
INCLUDES 10% CONTINGENCY
UNKNOWN,
1551341
2
16563
1568434
PNG
2040
PIPE, 8", DBL RANDOM LG, BEVELED ENDS, ELECTRIC RESISTANCE WELD, SCH 40, CS, API 5L PSL-2, GR X52, 0.322" WALL THK, ASME B31.8 APPENDIX
I, FIG 1-4, W/ FUSION BONDED EPDXY COATING, THIN FILM (12-14 MILS) W/ 40 MILS (+12/-3 MILS) OF POWER CRETE APPLIED TO EXTERIOR, MIN
AVERAGE SET OF 3 SHEAR FRACTURE AREA F/ EA PIPE BODY TEST SHALL BE AT LEAST 85% @ 32 DEG F, MULTIPLE GR STENCILED PIPE IS NOT
ACCEPTABLE
INCLUDES 10% CONTINGENCY
IPSCOINC,
1568434
3
1593272
1593272
ALL
50
COATING, ABRASION RESISTANT OVERCOAT, 10" X 30', CANUSA SCAR -GUARD, JOINT COATING
FOR HDD GIRTH WELDS
CANUSACPS
SCAR GUARD
SYS1030
4
17228
1575278
PNG
5
TOOL, ARO, CANUSA SCAR -GUARD, PERFORATION TOOL
FOR USE WITH WRAPIDSHIELD XL ABRASION SLEEVE KITS
(PNG CAT#'s 17215-17226).
CANUSACPS,
CPSPERFTL
FITTINGS
10
16565
1552933
PNG
19
ELBOW,PIPE, 8" NPS X 0.322 W.T., BW, 45 DEG, 3D RADIUS, STL, MSS SP-75, GR Y52, FULLY SEGMENTABLE, PAINTED PREFERRED, BARE
ACCEPTABLE., MACHINE BEVEL ENDS PER ASME B31.8 APPENDIX 1, FIG 1-4
INCLUDES 4 CONTINGENCY
UNKNOWN,
1552933
11
16562
1552912
PNG
10
ELBOW,PIPE, 8" NPS X 0.322 W.T., BW, 90 DEG, 3D RADIUS, STL, MSS SP-75, GR Y52, FULLY SEGMENTABLE, PAINTED PREFERRED, BARE
ACCEPTABLE., MACHINE BEVEL ENDS PER ASME B31.8 APPENDIX 1, FIG 1-4
INCLUDES 4 CONTINGENCY
UNKNOWN,
1552912
LINE 67 TIE-IN
20A
1572402
1572402
PNG
1
TEE,PIPE, 4", WELD, 600 LB, STL, 3-WAY SPHERICAL, W/ LOCK-O-RING FLG, MUST ORDER LOCK-O-RING COMPLETION PLUG & BLIND FLG KIT
SEPERATELY
LINE 67 TIE IN
TDWILLIAMSON,
26-1863-0460-00
20B
1572540
1572540
PNG
1
PLUG,PIPE, 4", STL, LOCK-O-RING, COMPLETION PLUG, 4" PLUG F/ 4" SPHERICAL TEE, W/ GUIDE BARS
LINE 67 TIE IN
TDWILLIAMSON,
07-1945-0017-00
20C
1572590
1572590
PNG
1
KIT, FLG, (1) 4" 600 LB RF BLIND FLG, (1) GASKET, BOLTS & NUTS
Same blind flange is used on 4 Tee as is used on 3 Tee (3
Tee has 4 flange) 3 Spherical Tee uses 4 flange so
Lock-O-Ring can be used
LINE 67 TIE IN
TDWILLIAMSON,
06-8041-0460-00
21
14151
1553338
PNG
1
FITTING, THREAD-O-RING, 2" X 30-6" NPS WE, STL, ASTM A333 GR. 6 ASME B31.8,, BARE, NIPPLE, ASTM A333. CAP, ASTM A105. PLUG, ASTM B-16
YELLOW BRASS. VITON O-RING
TDWILLIAMSON,
TR-0000-0002-00
22
16773
1554282
PNG
1
FITTING, THREAD-O-RING, 1", STL, W/ASTM A105 CAP, BACK UP RING, BUNA-N O-RING, ASTM B16 BRASS PLUG, ASME SA-333 GR 6 NIPPLE
TDW
THREAD-O-RING (TOR)
T1-0000-0001-00
23
17405
1554011
PNG
1
REDUCER,PIPE, CONCENTRIC, 8" NPS X 0.322 W.T. X 4" NPS X 0.237 W.T., WELD, STL, MSS SP-75, GR Y52, PAINTED PREFERRED, BARE
ACCEPTABLE., MACHINE BEVEL ENDS PER ASME B31.8 APPENDIX 1, FIG 1-4
HACKNEYLADIS,
1554011
24
16784
1557209
PNG
1
INSULATOR, MONOLITHIC, WELD, 4" NPS, FORGED STL, ASTM A105, CLASS 600, ASME B16.11, PIPE PUP STYLE, API 5L PSL-2, GR X52, 0.237" W.T. PIPE
PUPS WELDED ON EACH END. BEVEL ENDS 30 - 35 DEG WITH 1/16" LANDING.
SYPRISTECHOL,
2000369681
MLV TO PIG RECEIVER
30
13113
1552817
PNG
160
PIPE, 8" NPS X 0.322 W.T., DBL RANDOM LG, BEVELED ENDS, ELECTRIC RESISTANCE WELD, BARE, STL, API 5L PSL-2, GR X52, NO JOINTERS
UNKNOWN,
1552817
31
16360
1551341
PNG
120
PIPE, 8" NPS X 0.322" WALL THK, DBL RANDOM LG, BEVELED ENDS, ELECTRIC RESISTANCE WELD, SCH 40, STL, API 5L PSL-2, GR X52, NO JOINTERS,
FUSION BONDED EPDXY COATED
UNKNOWN,
1551341
32
17248
1551490
PNG
1
FLANGE,PIPE, WN, RF, 8" NPS, CLASS 600, FORGED STL, ASTM A694, ASME B16.5, GR F52, MSS SP-44, 125-250 MICRO INCHES AARH
RECEIVER CONNECTION
UNKNOWN
1551490
33
14997
1557056
PNG
1
GASKET,SPIRAL WOUND, 8" NPS, CLASS 600, 1/8" THK, SS INNER RING, CS OUTER RING, ASME B16.20, TYPE E, MSS SP-44, SPIRAL WOUND GRAPHITE
WITH 304 SS RIBBON AND 304 SS BACKING RING
RECEIVER CONNECTION
FLEXITALLICI,
1557056
34
17263
1553050
PNG
12
STUD,ALL-THREAD, 1-1/8" DIA, 8 UNC, 8" LG, STL, ASTM A193, GR B7,
RECEIVER CONNECTION
HIGHLANDTHRE
24713141
35
12942
1553433
PNG
24
NUT,HEX, 1-1/8" DIA, STL, ASTM A194 GR 2H
RECEIVER CONNECTION
UNKNOWN,
1553433
36
16565
1552933
PNG
2
ELBOW,PIPE, 8" NPS X 0.322 W.T., BW, 45 DEG, 3D RADIUS, STL, MSS SP-75, GR Y52, FULLY SEGMENTABLE, PAINTED PREFERRED, BARE
ACCEPTABLE., MACHINE BEVEL ENDS PER ASME B31.8 APPENDIX 1, FIG 1-4
OVERBEND/SAG BEND FOR RECEIVER
UNKNOWN,
1552933
37
16052
1557947
PNG
1
TEE,PIPE REDUCING, 8" NPS X 8" NPS RUN, 6" NPS BRANCH, WELD, STL, MSS SP-75, GR Y52, BBT, PAINTED PREFERRED, BARE ACCEPTABLE.,
MACHINE BEVEL ENDS PER ASME B31.8 APPENDIX 1, FIG 1-4
BYPASS
HACKNEYLADIS,
1557947
38
11103
1557605
PNG
1
INSULATOR, MONOLITHIC, WELD, 8" NPS, FORGED STL, ASTM A105, CLASS 600, ASME B16.11, W STYLE, MACHINED TO MATCH API 5L PSL-2, X52, PIPE
WITH 0.322" W.T, BEVEL ENDS 30 - 35 DEG WITH 1/16" LANDING.
ISOLATION FROM RECEIVER
SYPRISTECHOL,
1000114067
39
NOT USED
SJAFB BYPASS AND RETIREMENT
40
14093
1551335
PNG
39+41 FT
PIPE, 4" NPS X 0.237 W.T., DBL RANDOM LG, BEVELED ENDS, ELECTRIC RESISTANCE WELD, FBE, STL, API 5L PSL-2, GR X52, NO JOINTERS
PERMANENT PIPING
WHEATLANDTUB,
1551335
41
14048
1552805
PNG
70+10 FT
PIPE, 4" NPS X 0.237 W.T., DBL RANDOM LG, BEVELED ENDS, ELECTRIC RESISTANCE WELD, BARE, STL, API 5L PSL-2, GR X52, NO JOINTERS
BYPASS
UNKNOWN,
1552805
42
13037
1552204
PNG
2
FLANGE,PIPE, WN, RF, 4" NPS, CLASS 600, FORGED STL, MSS SP-44, ASTM A694 GR F52, ASSME B16.5, 125 - 250 MICRO INCHES AARH
BYPASS
UNKNOWN,
1552204
43
14979
1557072
PNG
2
GASKET,SPIRAL WOUND, 4" NPS, CLASS 600, 1/8" THK, 304 SS RIBBON WITH GRAPHITE FILLER, SS INNER RING, CS OUTER RING, ASME B16.20, TYPE
E, TO SUIT MSS SP-44 FLANGE
BYPASS
FLEXITALLICI,
1557072
44
11331
1551246
PNG
16
BOLT, STUD, 7/8" DIA, 6" LG, STL, ASTM A193 GR B7, HARD STEEL STUD
BYPASS
HIGHLANDTHRE,
1551246
45
10508
1553484
PNG
32
NUT,HEX, 7/8" DIA, STL, ASTM A194 GR 2H
BYPASS
UNKNOWN,
1553484
46
17355
1571439
PNG
6
ELBOW,PIPE, 4" NPS X 0.237 W.T., BW, 90 DEG, 1.5D RADIUS, STL, MSS SP-75, GR Y52, FULLY SEGMENTABLE, PAINTED PREFERRED, BARE
ACCEPTABLE., MACHINE BEVEL ENDS PER ASME B31.8 APPENDIX 1, FIG 1-4
BYPASS AND PERMANENT PIPING
HACKNEYLADIS,
1571439
47
16773
1554282
PNG
4
FITTING, THREAD-O-RING, 1", STL, W/ ASTM A105 CAP, BACK UP RING, BUNA-N O-RING, ASTM B16 BRASS PLUG, ASME SA-333 GR 6 NIPPLE
TDW
THREAD-O-RING (TOR)
T1-0000-0001-00
48
1567849
1567849
PNG
2
KIT, STOPPLE, 4" STL, WELD, CLASS 600, 1480 MWP @ 0.72 DESIGN FACTOR, STOPPLE PLUS TEE, LOCK-O-RING PLUS W/ SCARFED NIPPLE, BLIND
FLG, PRO SERIES STOPPLE PLUS SYSTEM
TDWILLIAMSON,
PRO SERIES PLUS
12334643
FALLIN BLVD BOXED SECTION PIPELINE LOWERING
50
14093
1551335
PNG
210+30 FT
PIPE, 4" NPS X 0.237 W.T., DBL RANDOM LG, BEVELED ENDS, ELECTRIC RESISTANCE WELD, FBE, STL, API 5L PSL-2, GR X52, NO JOINTERS
WHEATLANDTUB,
1551335
51
14048
1552805
PNG
210+30 FT
PIPE, 4" NPS X 0.237 W.T., DBL RANDOM LG, BEVELED ENDS, ELECTRIC RESISTANCE WELD, BARE, STL, API 5L PSL-2, GR X52, NO JOINTERS
UNKNOWN,
1552805
52
13037
1552204
PNG
2
FLANGE,PIPE, WN, RF, 4" NPS, CLASS 600, FORGED STL, MSS SP-44, ASTM A694 GR F52, ASSME B16.5, 125 - 250 MICRO INCHES AARH
UNKNOWN,
1552204
53
14979
1557072
PNG
2
GASKET,SPIRAL WOUND, 4" NPS, CLASS 600, 1/8" THK, 304 SS RIBBON WITH GRAPHITE FILLER, SS INNER RING, CS OUTER RING, ASME B16.20, TYPE
E, TO SUIT MSS SP-44 FLANGE
FLEXITALLICI,
1557072
54
11331
1551246
PNG
16
BOLT, STUD, 7/8" DIA, 6" LG, STL, ASTM A193 GR B7, HARD STEEL STUD
HIGHLANDTHRE,
1551246
55
10508
1553484
PNG
32
NUT,HEX, 7/8" DIA, STL, ASTM A194 GR 2H
UNKNOWN,
1553484
56
16768
1552976
PNG
4
ELBOW,PIPE, 4" NPS X 0.237 W.T., BW, 45 DEG, 5D RADIUS, STL, MSS SP-75, GR Y52, FULLY SEGMENTABLE, PAINTED PREFERRED, BARE
ACCEPTABLE., MACHINE BEVEL ENDS PER ASME B31.8 APPENDIX 1, FIG 1-4
UNKNOWN,
1552976
57
17355
1571439
PNG
4
ELBOW,PIPE, 4" NPS X 0.237 W.T., BW, 90 DEG, 1.5D RADIUS, STL, MSS SP-75, GR Y52, FULLY SEGMENTABLE, PAINTED PREFERRED, BARE
ACCEPTABLE., MACHINE BEVEL ENDS PER ASME B31.8 APPENDIX 1, FIG 1-4
HACKNEYLADIS,
1571439
58
16773
1554282
PNG
4
FITTING, THREAD-O-RING, 1", STL, W/ ASTM A105 CAP, BACK UP RING, BUNA-N O-RING, ASTM B16 BRASS PLUG, ASME SA-333 GR 6 NIPPLE
TDW
THREAD-O-RING (TOR)
T1-0000-0001-00
59
1567849
1567849
PNG
2
KIT, STOPPLE, 4" STL, WELD, CLASS 600, 1480 MWP @ 0.72 DESIGN FACTOR, STOPPLE PLUS TEE, LOCK-O-RING PLUS W/ SCARFED NIPPLE, BLIND
FLG, PRO SERIES STOPPLE PLUS SYSTEM
TDWILLIAMSON,
PRO SERIES PLUS
12334643
STATION INLET VALVE
60
11850
1556113
PNG
1
VALVE,BALL, TRUNNION, 8" NPS, CLASS 600, FULL PORT, WELD X WELD, 2" SO NUT GEAR OPERATED, CS BODY, STD TRIM, API 6D, BODY DRAIN &
SEALANT PORTS TO BE FACTORY PIPED UP TO THE OPERATOR
SPECIFY THE FOLLOWING: WALL THK & MATERIAL YIELD
STRENGTH OF MATING PIPE, IF PIPE PUPS ARE REQUIRED
FOR CONNECTION TO 8" NPS, 0.322" WT,
API 5L-PSL2, GRADE X52 PIPE, INCLUDE
PIPE PUPS OF 1.5*OD, INCLUDE
OPERATOR STEM EXTENSION OF 5.OFT
AS MEASURED FROM PIPE CENTERLINE
TO SQUARE NUT
CAMERON,
8" NPS 800602-23-1
61
16943
1555046
PNG
1
HOUSING, VALVE BOX, 18" ID X 36" DP, CORRUGATED PLASTIC, "GAS" MARKING ON CAP, W/ CI TOP, PLASTIC TELESCOPING SHAFT & PLASTIC BASE
BINGHAMTAYLO,
MMP1824/
CULF18018/IFL1806
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 2001
CLAUDE A. McMULLAN
NO.
DATE
REVISION(S) DESCRIPTION
IFC SUBMITTAL DATE
A
08-11-2020
60% DESIGN SUBMITTAL
NORTH CAROLINA
B
1
10-02-2020
90% DESIGN SUBMITTAL
SEAL047852
C
12/11/2020
REVISED 90% DESIGN SUBMITTAL
PROFESSIONAL ENG/ARCH STAMP
BY CHK APPD DESCRIPTION
MJD CNS CAM AREA CODE -
JJM CNS CAM ACCOUNT NUMBER -
MJD CNS CAM PROJECT NUMBER 0231540
DRAWING BY -
STATION ID
CHECKER INITIALS CNS
APPROVALS
DATE
INITIALS
N/A
NIA
REGIONAL
ENGINEER
DATE
INITIALS
MGR TECH
N/A
NIA
REC & STD
DATE
INITIALS
PRINCIPAL
12/11/2020
CAM
ENGINEER
LINE 475 DOT RELOCATION - PIPELINE
<
� N E Y, 011 Pied ont BILL OF MATERIALS
GOLDSBORO, NORTH CAROLI NA
COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
SHEET(S) X OF X DWG SCALE NOT TO SCALE
DWG DATE 08/11/2020 SUPERSEDED
DRAWING NUMBER REVISIO
PNG-C-025-0001228 C
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
101.00
(ED
OWNERSHIP
MARY SUE FALLIN
SOUTHWEST INVESTORS GROUP, LLC
Q
i�:
0
741 / 283
BOOK2842 PAGE 135 (NAME CHANGE), BOOK 1800, PAGE 184
0
ACREAGE
c�
Of
EASEMENTS
REF. DWG. NO.
PNG-C-025-0001260
z
z
z
0
z
0
U
TEST STATION # 1 INSTALL (3) BLACK STRANDED #12 THHN WIRES 103.00
ONTO LINE 475 AND BRING WIRES UP INTO BIG FINK ABOVE GRADE 101.00
NIF
TEST STATION. INSTALL BORIN AC-20 STELTH7 REFERENCE N/F SOUTHWEST INVESTORS GROUP
ELECTRODE AT PIPE LEVEL ACCORDING TO MANUFACTURER'S MARY sUE FALL LLC
c
SPECIFICATIONS AND BRING WIRE UP INTO SAME FINK TEST STATION. 0100 (101,00) oGoo (1o76J
3529048073 3529137763
�� PROPOSED 30 ADDITIONAL
0
BOOK 3468 PACE 18 BOOK 2842 PACE 155 (NAME
PLACE TEST STATION IN A CATTLE GUARD OUTSIDE STATION FENCE. i R- TEMPORARY WORKSPACE PLAT L-40i CHANCE)
PLAT K-25F BOOK 1800, PACE 184
' " PROPOSED 30' TEMPORARY WORKSPACE EASEMENT BOOK 741 PACE - PLAT I-294
e
/
CENTRAL HEIGHTS ROAD ���■■■■A■■■r■■
6iL
W
�
REGULATOR STATION / // // / �'�� �■■■■■■■ o PLAT e-94
� �������� co PROPOSED 8" PIPELINE NO EASEMENT ON L T
o
LINE 67 TIE-IN REFER TO / �J,��
N
/// (�D4,■■■■■■ L
`■■■■■■!! ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ii■■I■I■■■■■■■■■■■■■■■5
PNG-C-025-0001260 s / /
__`�`�c�1-,(
ION
No
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■� n
NIx
/ / %p i ��1��1r'�■■■�
=
EXISTING PNG LINE 67 / 0+00 fC� 1 +00 •�� 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11 +00 r
z
171
cri
O
MENEM NO RECORD INFORMA ION FOUND
MENEM
OR PROVIDED FOR CP&L EASEMENT
EXISTING CAROLINA POWER ■���EM
N THIS AREA
AND LIGHT COMPANY PROPOSED 50' ■■■■■ co'co' cd cd
EASEMENT 70' WIDE / 60 �PERMANENT EASEMENT ������ co'co' co'
CAROLINA POWER AND LIGHT COMPANY EASEMENT NONE
70' WIDE ■■■■
PLAT L-40I !■!■
ED
NNo
SUEFALLIN 101.00 ■!! ACCESS FROM
t3�-
/ o0 1 1 `—
/ CAROLINA POWER AND LIGHT COMPANY EASEMENT LAYDOWN YARD
45' WIDE 552904807J ■■■
BOOK 3468
PLAT L-40% BOOK 741 PAGE 283 PAGE 180
PLAT L-401; PLAT K-25, EASEMENT BOOK 741 PAGE 283
x
C�
z
z
� o
J01w
o <
I I
.. LENGTH .�
o
Ji
t5 t5
a
0
0
130
130
o
II
e
125
125
120
EXISTING GRADE
PROPOSED
8" PIPELINE
120
cn
a
CENTRAL HEIGHTS
N
115
ROAD REGULATOR
----
----------
----
-----
----
----
-----
----
----
-----
----
----
-----
- z
---
----
----- ---- ----
-----
----
----
-----
--------- -----
--
----
-----
----
----
--
---
----
----
-----
----
----
-----
----
o
STATION / LINE 67
TIE-IN REFER TO
U_
0
110
--
---
---
--
--
---
---
---
--
--
---
---
--
--
-
---
---
--
--
---
---
---
--110
U_
0
PNG-C-025-0001260
aC4a
0
105
105
II
e
100
100
0
95
95
PRELIMINARY - NOT
W
90 90 FOR CONSTRUCTION
-1+00 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 90% DESIGN SUBMITTAL
0
MATERIAL
1150'
1
CONST. METHOD
OPEN CUT
CLASS / MAOP
CLASS 3 / 1000 PSIG
BURNS& MCDONNELL CONSULTANTS, INC.
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
REF. DWG(S) PNG-C-025-0001260
STATE LICENSE # C-14W
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDEA MCMULLAN
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
SHEET(S) X OF X
DWG SCALE AS NOTED
IFC SUBMITTAL DATE
LINE 475 DOT RELOCATION - PIPELINE
A
04-24-2020
30% DESIGN SUBMITTAL
MJD
CNS
CAM
AREA CODE
-
DATE
NITIALS
REGIONAL
NORTH CAROLINA
NIA
N/A
ENGINEER
DWG DATE 04124/2020
SUPERSEDED —
B
08-11-2020
60% DESIGN SUBMITTAL
JJM
CNS
CAM
ACCOUNT NUMBER
-
SEAL047852
�' DUKE Piedmont
ALIGNMENT PLAN AND PROFILE
p
0231540
DATE INITIALS
C
10-02-2020
90 /o DESIGN SUBMITTAL
JJM
CNS
CAM
PROJECT NUMBER
MGR TECH
0111
ENERGY. Natural Gas
DRAWING NUMBER
REVISION
D
12-11-2020
p
REVISED 90%DESIGN SUBMITTAL
MJD
CNS
CAM
DRAWING BY
MJD
NIA
N/A
REC & STD
GOLDSBORO, NORTH CAROLINA
PNG -C-025-0001 229
D
DATE INITIALS
STATION ID
PRINCIPAL
PROFESSIONAL ENG/ARCHSTAMP
12/11/2020
CAM
ENGINEER
COPYRIGHT 2018
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
CHECKER INITIALS
CNS
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
103.00
104.00
OWNERSHIP
SOUTHWEST INVESTORS GROUP, LLC
SOUTHEAST INVESTORS GROUP, LLC
Q
i�:
0
2842 / 135
2842 / 135, 1800 / 184, 1175 / 78
0
ACREAGE
CD
O
EASEMENTS
REF. DWG. NO.
z
z z
z
�
� �
M
O N
ON
Q Q
H H
Cn Cn
1
PROPOSED ADDITIONAL
TEMPORARY WORKSPACE ■■■■■`
■■■■■■■■■11111.1
103.00 PROPOSED 30' TEMPORARY WORKSPACE 104.00 ■■■■■■■■■■■■■■I
■■ICE
■■■■■■■■■■■■■■■■MMMMMMMMMMMMMMMMMMM
MMMMMMMMMMMMMMMMMMMM
,a
■■■■■■■■■■■■■■■■■■■■■■■■■■■■ Z
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ m
II
■■■■■■■■■■■■■M■w�—----_
N/E PROPOSED 50' PERMANENT EASEMENT ■■■■■■■■■■■■■�■�% 21+00
SOUTHWEST INVESTORS GROUP, LLC � ............... �- o}oo i
+
90500 )10500) ■■■■■■■■■■■■■■� ci
■■ Wes■■■■■■■■■■ 0
0
5529157765
cn
BOOK 2842 PAGE 135 NAME CHANGE ■■■■■■ �■ ■■■■��
BOOK 1800, PAGE 184 )■■������MMM �■
0
5
PLAT 1-294 ■■■■■■■■■■■■■■■ ��
PLAT B-94 im-�
Ix
NO EASEMENT ON LTC _ ■■■■■■ ■■■■■■■�■�—! p0
�$
0
0 ■■■■ Fe ■■■■■■■■■ ■■■■■ p W
x
10 ■■■■■■■■■■■ ■■■■■■■■■■■■■ ■ �� _�Lp
0�
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■/
Z �12+p0 --
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■ �.
�3+pp --.■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■� — !6+0o PROPOSED 8" PIPELINE
2
1— 14+00----■■■■■p
SOUTHEAST INVESTORS
z
r GROUP LLC
15+00
a
104.00 )104.00)
3529235465
BOOK 2842, PAGE IJ5
WETLAND 2 )NAME CHANGE)
pr BOOK 1800, PAGE 184
EXCEPTION BOOK 1175
PAGE 78
PLAT B-94
i
NO EASEMENT ON L TO
' NO RECORD INFORMA TION FOUND
- oH„ ---- OR PROVIDED FOR CP&L EASEMENT
ohw
— y, IN THIS AREA
G
r^
V
z
Z
o
JOINT
o <
I ENGTH I
.. L.�
o
Ji
t5 t5
a
0
0
130
130
o
II
e
125
125
N
120
EXISTING GRADE
PROPOSED
8" PIPELINE
120
a
a
115
----------
115
N
-------
----
----
----
--------------
—
at
z
w
x
0
110
110
w
u-
c
105
105
II
e
100
100
o
95
95
PRELIMINARY - NOT
W
90
90 FOR CONSTRUCTION
90% DESIGN SUBMITTAL
12+00
13+00
14+00
15+00
16+00 17+00
18+00
19+00
20+00
21+00
c
MATERIAL
1100,
10 0 10
CONST. METHOD
OPEN CUT
CLASS / MAOP
CLASS 3 / 1000 PSIG
BURNS& McDONNELL CONSULTANTS, INC.
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
REF. DWG(S)
STATE LICENSE # C-14W
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDEA MCMULLAN
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
SHEET(S) X OF X
DWG SCALE AS NOTED
IFC SUBMITTAL DATE
LINE 475 DOT RELOCATION - PIPELINE
A
04-24-2020
30% DESIGN SUBMITTAL
MJD
CNS
CAM
AREA CODE
-
DATE
NITIALS
REGIONAL
NORTH CAROLINA
NIA
NIA
ENGINEER
DWG DATE 04124/2020
SUPERSEDED —
B
08-11-2020
60% DESIGN SUBMITTAL
JJM
CNS
CAM
ACCOUNT NUMBER
-
SEAL047852
�' DUKE Piedmont
ALIGNMENT PLAN AND PROFILEC
0
0231540
DATE
INITIALS
10-02-2020
90 /o DESIGN SUBMITTAL
JJM
CNS
CAM
PROJECT NUMBER
MGR TECH
011INatural
ENERGYa Gas
DRAWING NUMBER
REVISION
D
12-11-2020
oNIA
REVISED 90% DESIGN SUBMITTAL
MJD
CNS
CAM
DRAWING BY
MJD
NIA
REC &STD
GOLDSBORO, NORTH CAROLI NA
PNG —C-025-0001 230
D
DATE
INITIALS
STATION ID
PRINCIPAL
PROFESSIONAL ENG/ARCHSTAMP
12/11/2020
CAM
ENGINEER
COPYRIGHT 2018
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
CHECKER INITIALS
CNS
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
OWNERSHIP
104.00
SOUTHEAST INVESTORS GROUP, LLC
2842 / 135, 1800 / 184, 1175 / 78
ATLANTIC NORTH
CAROLI NA RAILROAD
105.00
COUNTY OF WAYNE
BOOK 1309, PAGE 859
Q
ILL
c?
Of
z
g
a
ACREAGE
EASEMENTS
REF. DWG. NO.
z
z
o
JOINT
o <
I
LENGTH
I
w U)
a w
..
a
.�
a
a a
O
J
Cn
9
9
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
PNG-C-025-0001223
EASEMENT ACQUISITION FOR
FUTURE 475 PROJECT
SEE PNG-C-025-0001223
m
A=qdmL
HDD PULL STRING
APPROX. 411', (2 STRINGS)
130
125
120
115
110
105
100
95
90
H
Q
1--
X
w
2
0
L()
t
N
N
Q
Cn
NIF
SOUTHEAST INVESTORS
GROUP, LLC
104,00 (104, 00)
3529235463
BOOK 2842, PAGE 135
(NAME CHANGE)
BOOK 1800, PAGE 184
EXCEPTION BOOK 1175
PAGE 78
PLAT B-94
HDD EXIT B-5
o
15' 1■135'
SIM
104.00
0
NMill
PROPOSED
8" PIPELINE
MATCH LINE 21+50
0
0
of
O U
U <
E
� J
Z U
N co
m (7)
t t
M �
N N
Q Q
C) co
EXISTING ATLANTIC NORTH
CAROLI NA RAILROAD
R/W 200' WIDE
jj.4t
PROPOSED HDD
APPROX. 816'
24+00 W 25+00
HDD PLAN AND
PROFILE - RAILROAD
PNG-C-025-0001272
I30' EASEMENT
PNG-C-025-0001272
z
w
�' cC
O W
0 U)
W
Cr W
O Q
Of
z
U
Z 0
m O
m M
t t
� O
N N
Q Q
U) Cn
I \1,
I V I I
I VI
_ o
PROPOSED 50'
PERMANENT EASEMENT
!9�
■■■■■■■■ rw,■■■■■■■1
MENOMONEE I o Ioommomm1
COUNTY OF WAYNE
(105 00)
BOOK 1309, PAGE 859
PLAT L -37E
LOT 6
PROPOSED 30'
TEMPORARY
WORKSPACE
29+00
05.00
30+00
300'
Q
ILL
CD
Of
c�
z
= N
w
c�
Z Q
_
W
CD
� ~
W Z
z
O
O 0
w
�
~
N
CD co
CO
M
O O
N
M M
co
Q Q
Q
U) Cn
Cn
- EXISTING UTILITY
EASEMENT 30' WIDE
RAINAGE EASE
; oo L PG 37E
DRAINAGE EASEME
HDD ENTRY MPLAT L PC
31 +00j§ j§ j§I 32+0111111111BONN as I a I
105.00
PROPOSED ADDITIONAL
TEMPORARY WORKSPACE
STA:24+96
C/L TRACK
HDD EXIT AT 10'
STA:22+50
ELA 14.9'
EXISTING
GRADE
HDD ENTRY AT 12'
STA:30+66
ELA 13.2- -F
-
--_
----
----
----
--
---
------
/
PROPOSED
8" PIPELINE
-
HDD PLAN AND
PROFILE - RAILROAD
PNG-C-025-0001272
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31 +00
32+00
MATERIAL
99,
816'
O
11
O
10
CONST. METHOD
OPEN CUT
HDD
CLASS / MAOP
CLASS 3 / 1000 PSIG
v BURNS& McDONNELL CONSULTANTS, INC.
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED *
DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
v STATE LICENSE # C-14W
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE *
TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
r CLAUDE A MCMULLAN
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
IFCSUBMITTALDATE
LINE 475 DOT RELOCATION -PIPELINE
A
04-24-2020
30% DESIGN SUBMITTAL
MJD
CNS
CAM
AREA CODE
-
DATE
INITIALS
REGIONAL
NORTH CAROLINA
SEAL047852
NIA
N/A
ENGINEER
�� DUKE Piedmont
ALIGNMENT PLAN AND PROFILE
B
08-11-2020
60% DESIGN SUBMITTAL
JJM
CNS
CAM
ACCOUNT NUMBER
-
0231540
DATE
INITIALS
C
10-02-2020
90% DESIGN SUBMITTAL
JJM
CNS
CAM
PROJECT NUMBER
MGR TECH
ENERGY. 0111
D
12-11-2020
REVISED 90% DESIGN SUBMITTAL
MJD
CNS
CAM
DRAWING BY
MJD
NIA
N/A
REC & STD
GOLDSBORO, NORTH CAROLI NA
STATION ID
DATE
INITIALS
PRINCIPAL
_ PROFESSIONAL ENG/ARCHSTAMP
J
12/11/2020
CAM
ENGINEER
COPYRIGHT 2018
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
CHECKER INITIALS
CNS
33+00
130
125
120
115
110
105
100
95
90
0
w
a
a
284'
10 O
OPEN CUT
REF. DWG(S) PNG-C-025-0001223
PNG-C-025-0001272
SHEET(S) X OF X
DWG SCALE AS NOTED
DWG DATE 04/24/2020
SUPERSEDED
DRAWING NUMBER
PNG-C-025-0001231
REVISION
D
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
105.00
(ED
(EED
}
OWNERSHIP
COUNTY OF WAYNE
COUNTY OF WAYNE
GATEWAY RE, LLC
i�:
o
BOOK 1309, PAGE 859
BOOK 1309, PAGE 859
BOOK 2394, PAGE 646
0
ACREAGE
CD
EASEMENTS
(2) 30' EASEMENTS
30' EASEMENT
REF. DWG. NO.
oz z w o o
o ow
z
_ �cw/) m mG co
w w �7 (D w w w w w
z 0 w 0 0 z
z
o
w c¢n c¢n w w
oQ o oo o Q a ¢
z z
0
wz w wz w wLz
�< u- w
a� o 0 & o
~
co
v oo
co
I� O O N (O co 00 O L()
+ + + + + + + + + + +
"t co co co co co coN
co M M M M M M V
Q Q Q Q Q Q Q Q Q Q Q
cn Cn cn Cn U) cn C) cn cn to cn
GArEwAY RE LLc vv \ MATCH LINE 4 50
106,00 vvv v 2}
(LINE LIST),106 02 (TITLE),
/ 106.01 (SOURCE DEED) v v I
/ 50
BOOK 2394 PAGE 646 .
,� v
35291IJ872 �� �v �_— 106.00 t30,
c
o
l PLAT N-20% PLAT L-37E
l
/ LOT 5
/ PROPOSED ADDITIONAL 30' WIDE DRAINAGE EASEMENT
W
PLAT L-37E ..,
TEMPORARY WORKSPACE
/ R ���
Q I 70' PROPOSED 8" PIPELINE 30' WIDE DRAINAGE ����`�' --a--<__cy
I 0' WIDE DRAINAGE EASED T PROPOSED 50 PERMANENT EASEMENT EASEMENT PLAT L-37E
�I.♦�.
T L- 37 E Ilk-
0
��
�♦::.���
x
35+00 36+00 37+00 38+00
o
R
����•���• PROPOSED 30' TEMPORARY WORKSPACE 105.00
N/E
105.00 Q P-NC— LL c
w,,, CHENEY BROS INC (TITLE)
COUNTY OF WAYNE �� 1i� BOOK 3289, PAGE0669 (MERGER)
(105, 00) - BOOK J24A PAGE 215
USX
BOOK 1509, PAGE 859 Q 5529124586
S� PLAT L -57E PLAT L -37E
LOT 6 o PLAT L-57
�o
r•
x
C�
z
z
o
JOINT
M <
Ji
I I
.. LENGTH .�
o
a
t5 t5
0
0
o
130
130
II
125
125
120
EXISTING GRADE
120
STA: 41 +82
J
(2) EX 48" CMP
N
115
INV = 107.2
115
at----
0----
110
-----
---
---
----
----------------------------------------------------
110
0
-
---
----
----------
----
0
dN
0
---------
---
---
--
--
---
---
---------
---
-
II
105
105
/.
_—_
_
_
—_
--_
•
z
0 J
100
100
N
PROPOSED 8" PIPELINE
95
95
PRELIMINARY - NOT
FOR CONSTRUCTION
c
90
90 90% DESIGN SUBMITTAL
34+00
35+00
36+00
37+00
38+00
39+00 40+00
41+00
42+00
MATERIAL
900,
10 0 11
CONNT. METHOD
OPEN CUT
CLASS / MAOP
CLASS 3 / 1000 PSIG
BURNS& McDONNELL CONSULTANTS, INC.
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
REF. DWG(S) PNG-C-025-0001272
STATE LICENSE # C-14W
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDEA MCMULLAN
IFCSUBMITTAL DATE
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
LINE 475 DOT RELOCATION PIPELINE
SHEET(S) X OF X
DWG SCALE AS NOTED
A
04-24-2020
30% DESIGN SUBMITTAL
MJD
CNS
CAM
AREA CODE
-
DATE
NITIALS
REGIONAL
-
NORTH CAROLINA
SEAL047852
NIA
NIA
ENGINEER
�' DUKE Piedmont
ALIGNMENT PLAN AND PROFILEC
DWG DATE 04124/2020
SUPERSEDED —
B
08-11-2020
60% DESIGN SUBMITTAL
JJM
CNS
CAM
ACCOUNT NUMBER
-
0
0231540
DATE
INITIALS
10-02-2020
90 /o DESIGN SUBMITTAL
JJM
CNS
CAM
PROJECT NUMBER
MGR TECH
011INatural
ENERGYa Gas
DRAWING NUMBER
REVISION
D
12-11-2020
oNIA
REVISED 90% DESIGN SUBMITTAL
MJD
CNS
CAM
DRAWING BY
MJD
NIA
REC &STD
GOLDSBORO, NORTH CAROLI NA
PNG —C-025-0001 232
D
DATE
INITIALS
STATION ID
PRINCIPAL
PROFESSIONAL ENG/ARCHSTAMP
12/11/2020
CAM
ENGINEER
COPYRIGHT 2018
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
CHECKER INITIALS
CNS
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
aD
(ED
OWNERSHIP
GATEWAY RE, LLC
GATEWAY DR
WAYNE COUNTY DEVELOPMENT ALLIANCE, INC
Q
i�:
0
2394 / 646
3280 / 381
0
ACREAGE
CD
O
EASEMENTS
�20'EASEMENT�
REF. DWG. NO.
z � z
w _ w
of CD � �
z
w z w
~ 0
z
z
o
w
CD
w ¢ w
z
o
� U) =
cnco
in
00 o co �
ti 00 00
v v v v
Q Q Q Q
� � � U)
EXISTING UTILITY EASEMENT 20' WIDE EXISTING GATEWAY DR R/W 90' WIDE
N/F
CATEWAY RE, LLC I I
106.00 106,00 (LINE LIST) I I TEST STATION # 2 INSTALL (3) BLACK STRANDED #12 THHN WIRES
106,02 (TITLE) ONTO LINE 475 AND BRING WIRES UP INTO BIG FINK ABOVE GRADE
O
c
106,01 (SOURCE DEED)
BOOK 2T94 ,PACE 646 c I� TEST STATION. INSTALL BORIN AC-20 STELTH7 REFERENCE
35291IJ872 I� ELECTRODE AT PIPE LEVEL ACCORDING TO MANUFACTURER'S
t°
PROPOSED 50' PERMANENT EASEMENT PET N-3 E�, SPECIFICATIONS AND BRING WIRE UP INTO SAME FINK TEST STATION.
I I I S-
LOT 5 9), PLACE TEST STATION IN A CATTLE GUARD
W
b cn
I PEI
'04 0 x
N
I I ■■■■■■� O� O
I■■■■■ ■
7+00
+00 M�4+00 5+■■■■■■■■ ■0 �00 +00
4ill 8+00I1
z
_
0
v � i
MEN ,TS ■■■■■■■■■■■■ ■
Z 10I I I ■■■■■■■■■■■■■ ■
i■■■■■ iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii MMMMMMMMMMMir it�r_ I I �■�■ p"■■■■■■■■■■■■■■■r
N 30' WIDE DRAINAGE E A S E M E N T■■F 1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■��F�l�■!!�1 ;� �� I I ��`� !A' !■■■■■■■■■■■■■r PROPOSED ADDITIONAL
+ PLAT L-37E ��0 I
I■■■■■■
LL I I o-�
�' il�■�■�■■■■■■■■■■■■■■■■■■
'P-P-1I TEMPORARY WORKSPACE
Elm
�c-� �� =��m �.� --- =��_= _ il!■■■■■■■■■■■■I
20' WIDE UTILITY EASEMENT I I■■ ■■■■■■■■■■■■r
z
PLAT L-37E I I ��� �������MM•r
�
I I 85' N/E
WAYNE COUNTY
DEAEL PMENT INc.
ALLIANCPROPOSED
30' TEMPORARY WORKSPACE I I 10700 10306)
- JAB - GATEWAY DRIVE BOOK 3280, PACE 381
EXISTING DRAINAGE EASEMENT 30' WIDE PNG-C-025-0001270 BOOKL0PA E 52-F6
TRACT
PLAT M PAGE56-D
EXISTING UTILITY EASEMENT 20' WIDE PROPOSED 8" PIPELINE 107.00 T519915801
z
z
o
JOINT
o <
I I
.. LENGTH .�
o
Ji
t5 t5
a
0
0
130
130
>
STA:47+53
STA:48+11
II
125
0
o
125
Q
EX ELEC
a
EX
COMM
STA:47+46
STA:48+30
120
120
c�
N
EXISTING GRADE
EX COMM
EX COMM
J
co
c
rn
115
STA:47+34
STA:48+32
115
0
ni
EX ELEC
EX COMM
-
uo
z_
----
---------
---
-�
Lli
J
O-----
c
110
_--,-
110
Lu
J
0
o
in
I
d
C4
d
100
100
O J
JAB - GATEWAY DRIVE
STA: 48+36
v
PROPOSED 8" PIPELINE
STA:
47+56
95
PNG-C-025-0001270
EX
12" PVC
EX WATER
95
PRELIMINARY - NOT
>
90
90 FOR CONSTRUCTION
43+00
44+00
45+00
46+00
47+00
48+00
49+00
90% DESIGN SUBMITTAL
c
MATERIAL
450'
161'
89'
0
10 0 10
0
CONST. METHOD
OPEN CUT
OPEN CUT
JAB
CLASS /MAOP
BURNS& McDONNELL CONSULTANTS, INC.
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
REF. DWG(S) PNG-C-025-0001270
STATE LICENSE # C-14W
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDEA MCMULLAN
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
SHEET(S) X OF X
DWG SCALE AS NOTED
IFCSUBMITTAL DATE
LINE 475 DOT RELOCATION - PIPELINE
A
04-24-2020
30% DESIGN SUBMITTAL
MJD
CNS
CAM
AREA CODE
-
DATE
NITIALS
REGIONAL
NORTH CAROLINA
NIA
NIA
ENGINEER
DWG DATE 04124/2020
SUPERSEDED —
B
08-11-2020
60% DESIGN SUBMITTAL
JJM
CNS
CAM
ACCOUNT NUMBER
-
SEAL047852
❑UKE Piedmont
ALIGNMENT PLAN AND PROFILEC
p
0231540
DATE INITIALS
10-02-2020
90 /o DESIGN SUBMITTAL
JJM
CNS
CAM
PROJECT NUMBER
MGR TECH
4nENERGY.011INaturalGas
DRAWING NUMBER
REVISION
D
12-11-2020
pNIA
REVISED 90% DESIGN SUBMITTAL
MJD
CNS
CAM
DRAWING BY
MJD
NIA
REC &STD
GOLDSBORO, NORTH CAROLI NA
PNG -C-025-0001233
D
DATE INITIALS
STATION ID
PRINCIPAL
PROFESSIONAL ENG/ARCHSTAMP
12/11/2020
CAM
ENGINEER
COPYRIGHT 2018
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
CHECKER INITIALS
CNS
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
107.00
CE)
OWNERSHIP
WAYNE COUNTY DEVELOPMENT ALLIANCE, INC
WAYNE COUNTY DEVELOPMENT ALLIANCE, INC
Q
i�:
0
3280 / 376 & 381
2567 / 523
0
ACREAGE
CD
O
EASEMENTS
REF. DWG. NO.
c�
z
u-
= o 0 o z o
CD w w w w
z
z
0
z m m m Lo �
o 0 0 _¢ _ j
w w w
z
0
�
H
co
w = U) = 0
u= u= u=
in ZD in o in
v v ti M v rn v
�
H
cq
rn 00 L0 � ti w 00
+ + + + + + + +
o � co co aO oo rn rn
U) U) � U) � U) � U)
NIF
AAR MANUFACTURING INC
LOT
ra la 'aBOOK3529102806 2414 ACE447 PLAT SLIDE M2PAGE 56-D
' y - PLAT L-38B DEED BOOK 2567, PAGE 523
FUTURE ROAD BY OTHERS LOT - TRACT No. 2 NOTE:
o
g7E
- 1. PIPELINE COVER INCREASED IN 70' EASEMENT TO
n
- APPRoxi 6o+pp ACCOMMODATE FUTURE ROAD DEVELOPMENT.
LocArroN PROPOSED 8" PIPELINE GD
E E
PLAGE 23470' wrDEASEMENT
PROPOSED 50' PERMANENT EASEMENT
e
o W
N
, - h
� . � ��♦♦♦�♦ram 6��pp c°
51+00� 52+00 53+00 54+00 55+0
56+pp ♦♦♦♦♦♦♦♦♦♦♦♦♦®♦�
N
i♦ f
Pop -
po ,•♦♦♦♦♦♦♦ ♦ ♦ ♦♦♦♦♦♦♦♦♦♦♦♦ ♦
Ix
V
♦ ♦ ♦ ♦ ♦♦ ♦♦ ♦♦ ♦♦ ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦:♦♦:♦♦♦♦♦♦♦♦♦♦:♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦:♦♦:♦♦♦♦♦♦♦♦♦♦:♦♦:♦♦♦♦♦♦♦♦♦♦•♦♦ ♦ ♦� J ®♦♦♦♦♦♦♦♦♦♦♦♦ A ♦♦ ♦♦ ♦♦ ♦♦ Q
♦♦♦♦♦♦♦♦♦♦♦♦®♦♦♦®♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦ ♦ ♦ ♦ ♦ 58+pp r� rn / ♦ ♦ ♦ �� ♦♦♦♦
Q
o
PROPOSED 50' PER MAN E NT EASEMENT♦
, �D CO
- � ♦ ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦ �♦ ♦ ���T
♦♦
����
J
a
�� Tom
♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦ � � � ��
♦ ♦ ♦ ♦ ♦ ♦.♦.♦♦ ♦♦ ♦♦ ♦♦♦♦♦♦♦♦♦♦ ♦♦ ♦ .i •♦ ♦� ♦♦♦♦ ♦ AST
x IV N MA
22C ��♦�♦♦♦♦♦♦♦♦♦I,M , ♦♦♦♦♦ �♦♦♦♦♦ ♦♦♦
sow♦�♦♦�♦♦�♦♦�♦��♦����'
♦ ♦ ♦ ♦ ♦ ♦
L o r 22c♦♦� ♦� ♦� ♦��� j� j�♦
z♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦.�
�
♦ ♦ ♦ ♦ ♦ ♦�� PLAT SLIDE M PAGE 56-D � ♦ ♦
�.�� ��♦�♦�♦�♦�♦�♦♦♦� DEED BOOK 2567, PAGE 523♦♦♦♦♦♦♦♦♦♦♦
a
♦ ♦ ♦ ♦ ♦ ♦ TRACT N0. 2♦♦♦♦♦♦♦♦♦♦
may`/ ♦♦♦ ♦♦��♦♦�♦♦�♦♦�♦♦��� 107.00 , ♦♦♦♦♦♦.
�
,L� ♦♦♦♦ .d'p♦♦♦♦♦♦♦♦♦♦�♦ N/E PROPOSED 30' TEMPORARY WORKSPACE♦' SEE NOTE 1
AYNE COUNTY DEVELOPMENT
♦♦♦♦♦♦
9 ♦♦♦ ♦♦♦♦�� ALLIANCE INC.
xs� ♦♦♦ ♦♦♦� 10700 )103.06)
♦♦ BOOK J280, PAGE 381
♦♦
BOOK 3280 PAGE 376
PLAT 0 PAGE 52-F
TRACT 2B
PROPOSED 80' TEMPORARY WORKSPACE PLAT M PAGE 56-D
J519915801
x
C�
z
z
o
I JOINT I
o <
Ji
ENGTH
.. L.
t5 t5
o
a
0
0
130
130
o
II
125
125
e
N
120
120
J
Q
N
115
EXISTING GRADE
PROPOSED 8"
PIPELINE
115
w
0
110
----
----
-------------- -----
110
w
----
----
----
-----
----
0
d
0
C4
z
o
d
105
--
_
--
--
---
---
---
--
--
---
---
--
--
---
-
---
-
---
"'
0
105
_
II
e
100
--
--
---
---
100
0
�
cn
95
95
PRELIMINARY - NOT
W
90 90
FOR CONSTRUCTION
0
50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00
90% DESIGN SUBMITTAL
MATERIAL
1200'
10 O 00 00
CONST. METHOD
OPEN CUT
CLASS / MAOP
CLASS 3 / 1000 PSIG
BURNS& McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-14W
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
REF. DWG(S)
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDEA MCMULLAN
IFC SUBMITTAL DATE
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
LINE 475 DOT RELOCATION - PIPELINE
SHEET(S) X OF X
DWG SCALE AS NOTED
A
04-24-2020
30% DESIGN SUBMITTAL
MJD
CNS
CAM
AREA CODE
-
DATE
NITIALS
NIA
NIA
REGIONAL
DWG DATE 04124/2020
SUPERSEDED
NORTH CAROLINA
SEAL047852
B
08-11-2020
60% DESIGN SUBMITTAL
JJM
CNS
CAM
ACCOUNT NUMBER
-
ENGINEER
❑UKE Piedmont
ALIGNMENT PLAN AND PROFILEC
—
0
0231540
DATE
INITIALS
10-02-2020
90 /o DESIGN SUBMITTAL
JJM
CNS
CAM
PROJECT NUMBER
NIA
MGR TECH
4nENERGY.011INaturalGas
DRAWING NUMBER
REVISION
D
12-11-2020
oNIA
REVISED 90% DESIGN SUBMITTAL
MJD
CNS
CAM
DRAWING BY
MJD
REC &STD
GOLDSBORO, NORTH CAROLI NA
PNG -C-025-0001234
D
DATE
INITIALS
PROFESSIONAL ENG/ARCHSTAMP
STATION ID
12/11/2020
CAM
PRINCIPAL
ENGINEER
COPYRIGHT 2018
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
CHECKER INITIALS
CNS
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
CE)
aD
OWNERSHIP
WAYNE COUNTY DEVELOPMENT ALLIANCE, INC
HARRY & MOLLIE, LLC
Q
i�:
0
2567 / 523
2811 / 413
0
ACREAGE
CD
O
EASEMENTS
REF. DWG. NO.
_ _
0
z
w
0
z
w
0 0 0
z z z
w w w
z
m
m
m m m
z
z
0
0
J
0
J
0 0 0
J J J
z
0
Q
LL.
LL
LL. LL. LL.
Q
I_H
(n
o0
rn
rn rn V
(n
M
Lf> O�
Q
Cn
Q
Cn
Q Q Q
Cn (n co
PROPOSED 50' PERMANENT EASEMENT 108.00
NIF
HARRY N MoLuE «c
108 (108, 00)
35199054592 AND J5199054591 H D D PULL STRING
PROPOSED 8" PIPELINE
—
e00K 2811, PAGE 413 APPROX. 760',
L A T ✓-254 (REMAINDER of TRACT 3)
EASEMENTS (1 STRING)
n
BOOK 2135, PA GE 432
II
66+00
BOOK 1206, PAGE 206
e
Fjrj+00 67+Q� �..
BOOK 823, PAGE 626
BOOK 828, PAGE 694
O
N
64+pp ■■NONE 68}00"'
■■■■■■■■■■■■■■■■■■■■■■■■■■NONE■
i PROPOSED 50' PERMANENT EASEMENT
-
■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■
—
690p
o
p
■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■ MEN LJ■■ -Al
■■■■■■■■■■■■■■■■ ■■■■■■■■■■R■■■■■■
N Ix
63k0
■■■■■■■■■■■■■■
■■■■■vwNMMNM■■■■
O
■■■■■■■■■■■■
R r
�0MMMMMMMMMMM
_
777
Q
bo
�1
p p
■■■■■■■■■■
.��s
■■■■ NONE■
62JA■■■■■■■■■■
6 ' _
No ■■■■IlllIe■■
Z
■■■■■■■■■■■■
EVq F ��■*�■■■■■■■■■�r�■■� '���
r_
■■■■■■■■■■■■
■■■■■■■■■■■■■
RiGHr Y ` 2
PROPOSED 30' TEMPORARY WORKSPACE PArP_ / -� ■■■■■■■■■■■�- ■■ �-����
m
■■■■■■■■■■■■■
■■■■■■M ■NOON■■ _ Z
■■■■■■■■■
s�
■■■■■■■■■■■■■■■-
z
+
n
■■■■■
■
_
PROPOSED ROAD BY OTHERS �?�Q
■■■■■■■■■■■�
R ■■■■■ME
z�
o
22C
o h
�a ���
APp40X/
AT '�
LOCK2
E 0/V
--
x
z
z
o
JOINT
o <
I I
.. LENGTH .�
o
Ji
t5 t5
a
0
0
o
130
130
II
125
125
_T
rn
120
120
-
a
EXISTING GRADE
PROPOSED 8" PIPELINE
N
115
115
O
----
----
--- -
_-
_
W
J
x
O
w
J
O
z
Of
d
C4
0'
O
105
105
e
J
100
100
0
cn
95
95
PRELIMINARY - NOT
FOR CONSTRUCTION
90
90
90% DESIGN SUBMITTAL
c
62+00
63+00
64+00
65+00 66+00
67+00
68+00
69+00
70+00
71+00
MATERIAL
1000,
CONST. METHOD
OPEN
EN CUT
CLASS / MAOP
CLASS 3 / 1000 PSIG
BURNS& McDONNELL CONSULTANTS, INC.
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
REF. DWG(S)
STATE LICENSE # C-14W
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDEA MCMULLAN
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
SHEET(S) X OF X
DWG SCALE AS NOTED
IFC SUBMITTAL DATE
LINE 475 DOT RELOCATION - PIPELINE
A
04-24-2020
30% DESIGN SUBMITTAL
MJD
CNS
CAM
AREA CODE
-
DATE
NITIALS
REGIONAL
NORTH CAROLINA
NIA
NIA
ENGINEER
DWG DATE 04124/2020
SUPERSEDED —
B
08-11-2020
60% DESIGN SUBMITTAL
JJM
CNS
CAM
ACCOUNT NUMBER
-
SEAL047852
❑UKE Piedmont
ALIGNMENT PLAN AND PROFILEC
0
0231540
DATE
INITIALS
10-02-2020
90 /o DESIGN SUBMITTAL
JJM
CNS
CAM
PROJECT NUMBER
MGR TECH
4nENERGY.011INaturalGas
DRAWING NUMBER
REVISION
D
12-11-2020
oNIA
REVISED 90% DESIGN SUBMITTAL
MJD
CNS
CAM
DRAWING BY
MJD
NIA
REC &STD
GOLDSBORO, NORTH CAROLI NA
PNG -C-025-0001235
D
DATE
INITIALS
STATION ID
PRINCIPAL
PROFESSIONAL ENG/ARCHSTAMP
12/11/2020
CAM
ENGINEER
COPYRIGHT 2018
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
CHECKER INITIALS
CNS
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
GED
GED
IED
}
OWNERSHIP
HARRY & MOLLIE, LLC
HIGHWAY 70
EASTERN WAYNE SANITARY DISTRICT
BENJAMIN FRANKLIN MOZINGO AND VIRGINIA MOZINGO LINDSEY
i�:
0
2811 / 413
2878 / 134
252 / 228
0
ACREAGE
CD
Of
Of
EASEMENTS
REF. DWG. NO.
PNG-C-025-0001273
n
II
w
b g
cn
0
N
Ix
Q
a
z
z
� o
J0Iw
M <
I
LENGTH
I
WCL U)
W
..
.�
a CL
�.
..
O
J
Cn
9
9
^III 1 130
II
125
cn
120
Q
N
115
0
W
x
U-
110
0
Cr
d
c
N11
II
105
3
r
J
100
95
90
MATERIAL
CONST. METHOD
PROPOSED 50'
TEMPORARY
WORKSPACE
PROPOSED 50' -
PERMANENT
EASEMENT
PROPOSED-
8" PIPELINE
73+00
10� 8. 00)
N/F
HARRY & MOLLIE LLC
108 (108 00)
55199054592 AND 35199054591
BOOK 2811, PAGE 413
PLAT J-234 (REMAINDER OF TRACT 5)
EASEMENTS
BOOK 2135, PACE 452
BOOK 1206, PACE 206
BOOK 823, PACE 626
BOOK 828, PACE 694
300'
r�J
�n
74+00 co
LO
c�
z
U-
0 0
� Z
Q W
m
H
W
W �>
O
� o
2
M 1—
V I—
+ +
ti r-
Cn U)
TEST STATION # 3 INSTALL (3) BLACK STRANDED #12 THHN
WIRES ONTO LINE 475 AT HDD EXIT, TRENCH BACK TO MCCLAIN
ST AND BRING WIRES UP INTO BIG FINK ABOVE GRADE TEST
STATION. INSTALL BORIN AC-20 STELTH7 REFERENCE
ELECTRODE AT PIPE LEVEL ACCORDING TO MANUFACTURER'S
o
SPECIFICATIONS AT HDD EXIT, TRENCH BACK TO MCCLAIN ST
AND BRING WIRE UP INTO SAME FINK TEST STATION. PLACE
1
TEST STATION IN A CATTLE GUARD.
I
B-3 a,
o I I I I I I I I I
I
l i HDD PLAN AND j
PROFILE - HWY 70 PROPOSED HDD
HDD EXIT 5��, "� I I PNG-C-025-0001273 i APPROX. 750' 1
75+00 76+00 77+00 I 1 78+00 , 79+00 I
TS
---------- 3------- -----_ I - 1 HWY 70 R/W = 267' I
1 I IJ I
z
oD oD I I Ir,,LLI
HDD PULL STRING
APPROX. 760', (1 STRING)
R R R
PROPOSED 30'
TEMPORARY WORKSPACE PROPOSED ROAD BY OTHERS
�0 ~0 ILU>
P p LU
I W IDU
PROPOSED 50'
PERMANENT EASEMENT
m
80+00
PERENNIAL
STREAM 01
WETLAND 1
81+00
N/F
EASTERN WA YNE
SANITARY DISTRICT ETA
108.03
BOOK 2878, PAGE 134
CONTRACTOR SHALL
BOOK 2878, PAGE 154
LIMIT CLEARING TO 20'
(coRR
T8898643 A urT)
5
TOTAL IN WETLAND
BOOK
PORTION O F HDD (10'
EASEMENT 3025,
PAGE 501
EACH SIDE OF PIPELINE).
BOOK 3025, PAGE 306
_
0
z
a �
Z Q
W }
m
L
W Z
OW
� O
+ +
co w
Q Q
cf) cn
11.00
PROPOSED 50'
PERMANENT
EASEMENT
oI
M
82+00
o _
N
LO
o
BENJAMIN FFRANKLIN
O
MOZINGO AND
LO
VIRGINIA MOZINGO
LBID SEY
109. 00 (111, 00)
BOOK 252, PAGE 228
PLAT D-6
D
8//�
O
C�
2
r
171
HDD
°cw°
It
Oa ENTRY -�
c+i,
--• ��
o
PROPOSED 50' TEMPORARY WORKSPACE
a
z
m
o
z
0
z
o
m
PROPOSED
EXISTING GRADE
m
W
0
O
U)Q
w -
Q
U - U
w w
8" PIPELINE
H
cn
z
H
W
o
w
cn
z
0
ti
o
_
_
_
_
O O
_0-0
HDD EXIT AT 10°
c
HDD ENTRY AT 16°
STA:75+43
�+
co
+
+
o
+ +
STA:82+93
+
+
ELA 10.6'cn
=
cn
0
cn
00
M M
EL:109.4'
cn
w cn
---
----
- - - --
-
---
----
�n
STA: 77+14 STA: 78+31
EX COMM EX 18" RCP
--
--
---
---------
HDD PLAN AND
STA: 77+06 PROFILE - HWY 70
EX 12" PVC
i PNG-C-025-0001273
72+00 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00 81+00 82+00 83+00
393' 750' 57'
0 10 2O 10 0
OPEN CUT HDD OPEN CUT
130
125
120
115
110
105
100
95
90
CLASS / MAOP
CLASS 3 / 1000 PSIG
v BURNS& McDONNELL CONSULTANTS, INC.
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
v STATE LICENSE # C-14W
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
r CLAUDE A MCMULLAN
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
IFCSUBMITTALDATE
LINE 475 DOT RELOCATION -PIPELINE
A
04-24-2020
30% DESIGN SUBMITTAL
MJD
CNS
CAM
AREA CODE
-
DATE
INITIALS
REGIONAL
NORTH CAROLINA
SEAL047852
NIA
N/A
ENGINEER
�� DUKE
PLAN AND PROFILE
B
08-11-2020
60% DESIGN SUBMITTAL
JJM
CNS
CAM
ACCOUNT NUMBER
-
0231540
DATE
INITIALS
C
10-02-2020
90% DESIGN SUBMITTAL
JJM
CNS
CAM
PROJECT NUMBER
MGR TECH
ENERGYa 0111Nixed aoGsALIGNMENT
D
12-11-2020
REVISED 90% DESIGN SUBMITTAL
MJD
CNS
CAM
DRAWING BY
MJD
NIA
N/A
REC & STD
GOLDSBORO, NORTH CAROLI NA
STATION ID
DATE
INITIALS
PRINCIPAL
_ PROFESSIONAL ENG/ARCHSTAMP
J
12/11/2020
CAM
ENGINEER
COPYRIGHT 2018
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
CHECKER INITIALS
CNS
W
J
LL
0
CY
d
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
REF. DWG(S) PNG-C-025-0001273
SHEET(S) X OF X I DWG SCALE AS NOTED
DWG DATE 04/24/2020 SUPERSEDED
DRAWING NUMBER REVISION
PNG-C-025-0001236 D
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
111.00
OWNERSHIP
BENJAMIN FRANKLIN MOZINGO AND VIRGINIA MOZINGO LINDSEY
Q
i�:
0
252 / 228
0
ACREAGE
c�
EASEMENTS
REF. DWG. NO.
z
z
z
z
0
�
�
z
0
H
H
Ln
LC)
CO
co
co
co
C/)
32 JURISDICTIONAL DITCH 1
PROPOSED 50'
0
_ 1 PERMANENT an 6,
I EASEMENT \■■
��■■ PROPOSED PROPOSED 50'
■
'�
8>X' ■ ADDITIONAL PERMANENT
oo TEMPORARY EASEMENT
o
�
jj�WORKSPACE
koo
86
o
��\���j■\' PROPOSED
■■■■■■■■■■��■� ' 8" P I P E L I N E
���■■■■■■■■■■■■■■■■\.
O
x
k0
'
5■■■■■■■■■■■■■■■■■■■■■■■►
z
V
■■■■■■■■■■■■■■■■. XOO
�,■■■■■■■■■■■■■■■■■■.'�
MOE, �'-■■■■■■■■■■■■■■■■■■/�
¢
J
NOON■■■\� h
/■■■■■■■■■■■■■■■■■■■�� ■■■NONE■\
cr ��i���-
$�koo .rNENNENNENENEENENEE■�_ ■■■NONE\►. ^h
�EEEE
wounnowMwMM
iGN�������C�EEE���. NEN
n •�ENNEN O1�■■■NNONENO����• • al
¢
■NNIO 9
.�EEEEEEEEEEN �NN��.
2 ENO
, EEEEEEEEENENNENEEN\R. ��
lMOEwOwMMw E ENE��-
'IENEEEENNNNENN/
.■�NENNN . �y
111.00 EONONEO �`
w dowNNONONNNN�� NOENNNOO
kLTC, INNS looNENENN��� NIF MENNEN IN
an- BENJAMIN FRANKLIN MOZINGO AND mom
� j VIRGINIA MOZINGO LINDSEY ENO
PROPOSED 50' 109,00 (11100) PROPOSED 30'
BOOK PAGE 228
TEMPORARY PLAT D-6 TEMPORARY
WORKSPACE WORKSPACE
z
z
o
JOINT
o <
Ji
I I
.. LENGTH .�
o
a
t5 t5
0
0
0
II
130
130
R
125
125
rn
120
PROPOSED
8" PIPELINE
EXISTING GRADE
120
0
N
ot
0
115
115
w
J_
u-
x
O
w
J_
LL
0
110
----
----------
110
__
z
II
105
105
---
---
--
---
-- -
R---
--
--
---
--
---
---
--
--
6
100
100
c�
�
95
95 PRELIMINARY -NOT
FOR CONSTRUCTION
0
90% DESIGN SUBMITTAL
84+00
85+00
86+00
87+00
88+00
89+00
MATERIAL
600'
0EN
CONST. METHOD
OPEN
CUT
CLASS / MAOP
CLASS 3 / 1000 PSIG
BURNS& McDONNELL CONSULTANTS, INC.
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
REF. DWG(S) PNG-C-025-0001271
STATE LICENSE # C-14W
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDEA MCMULLAN
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
SHEET(S) X OF X
DWG SCALE AS NOTED
IFC SUBMITTAL DATE
LINE 475 DOT RELOCATION - PIPELINE
A
04-24-2020
30% DESIGN SUBMITTAL
MJD
CNS
CAM
AREA CODE
-
DATE
NITIALS
REGIONAL
NORTH CAROLINA
SEAL047852
NIA
NIA
ENGINEER
�' DUKE Piedmont
ALIGNMENT PLAN AND PROFILEC
DWG DATE 04124/2020
SUPERSEDED —
B
08-11-2020
60% DESIGN SUBMITTAL
JJM
CNS
CAM
ACCOUNT NUMBER
-
p
0231540
DATE
INITIALS
10-02-2020
90 /o DESIGN SUBMITTAL
JJM
CNS
CAM
PROJECT NUMBER
MGR TECH
�-+DRAWING
011INatural
ENERVYa Gas
NUMBER
REVISION
D
12-11-2020
pNIA
REVISED 90% DESIGN SUBMITTAL
MJD
CNS
CAM
DRAWING BY
MJD
NIA
REC &STD
GOLDSBORO, NORTH CAROLI NA
PNG -C-025-0001 237
D
DATE
INITIALS
STATION ID
PRINCIPAL
PROFESSIONAL ENG/ARCHSTAMP
12/11/2020
CAM
ENGINEER
COPYRIGHT 2018
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
CHECKER INITIALS
CNS
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
111.00
SOUTHERN DIST. CONVOCATION-GOLDSBORO
30' NORTH CAROLINA
OWNERSHIP
BENJAMIN FRANKLIN MOZINGO AND VIRGINIA MOZINGO LINDSEY
NORTH OAK
FOREST ROAD
OF THE UNITED HOLY CHURCH OF AMERICA INC
NATURAL GAS CORP
0
252 / 228
112.00 3341 / 711
EASEMENT
ACREAGE
Of
EASEMENTS
REF. DWG. NO.
PNG-C-025-0001271
o �
z w
w M
o
z
w
C7
_
0 of w
=
_ 0
_
z
z
co o
z
U) z
z
Q
L1J w
11 I L
U_
U_ w
LL
H
U)
co
Lf) L()
N
M co
In
CO
+
co LC)
+ +
O
+
� O2
+ +
'T
+
O
O
M M
O O
LC)
O
co I—
O O
ti
O
Q
H
cn
Q Q
H H
cn co
Q
H
co
Q Q
H H
cn U)
Q
H
U)
PROPOSED 30' TEMPORARY WORKSPACE
PROPOSED 8" PIPELINE 111.00
ADDITIONAL TEMPORARY WORKSPACE
z
z
o
J01w
M <
I
LENGTH
I
w co
w
..
.�
a a
�.
..
O
J
Cn
9
9
130
II
R
125
o
�
�
N
120
a
0
at
115
0
w
=
U
c
a
N�
110
L �
II 105
_ R
J
100
J
95
i W
MATERIAL
CONST. METHOD
CLASS /MAOP
BURNS & McDONNELL CONSULTANTS, INC
STATE LICENSE # C-1435
CLAUDE A MdVIULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL 047852
PROFESSIONAL ENG/ARCH STAMP
BENJAMIN FRANKLIN N/F ///
MOZINGO AND MOZINGO J C HEIRS / C�
VIRGINIA MOZINGO (TCE)
LINDSEY J518797455
109,00 (111, 00) BOOK 524, PAGE 271 OOP
IV/F
BOOK 252, PAGE 228 / RO LFO HUERTA ADRIS P. ANDERSON _ l
PROPOSED TCE TCE
PLA r D-6 � � / TCE
)6 TCE (TCE)
351879IJ53
PROPOSED 50' �_//NO ACCESS Boo �2�64�PA �E 2 9 BOOK 2852, PAGE 588
ADDITIONAL /�� I DRIVE PLAT °-1°°
PERMANENT TEMPORARY /�� n
EASEMENT WORKSPACE //,, PROPOSED 50'
PERMANENT
-�:::■■■ 156, // /, / ��■■ �s91 \EASEMENT �' PROPOSED 20'
■■■NEON■■ �� / / ^' M■■■■■■■■■ PERMANENT
■■■■■■■■■■■fie / / /■■■■■■■■■■■■\ - -
■■■■■■■■■■■I hr' _ / / dMMMMM■■■■■■■■■ EASEMENT
� ■■■■■■■■■■■A ,�!� I� � � / III■■■■■■■■■■■■■■■■■ I
■■■■■■■■■■■■ �� )p TC`�■■■ / / / 1■■■■■■■■■■■■■■■■ ■■ ' 97+79
■■■■■■■■■■■■■I -`-A■■■■■ /J■■■■■■■■■■■■■■■■ NOON■ / -�
91+00 92+00 93+00) / 94+00
0
TS
■■■■■■■■■■■■■■■■■ NONE ■■■■■■N� / / / /■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■\ h 3c
■■■■■■■■■■■■■■■■■■■■■■■■■■■i%' /f��■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ L^ OFF
■■■■■■■■■■■■■■■■■■■■■■■ brio .: I■■■■■■■■■■ � -T 'FF�r
■■■■■■■■■■■■■■■■■■■■■■■ JAB - NORTH OAK TEST STATION # 4 INSTALL 3 BLACK STRANDED #12
�' C��I< �) I■■■■■■■■I■\ �� �°
■���������������������� FOREST ROAD V THHN WIRES ONTO LINE 475 AND BRING WIRES UP INTO ■■■ilk MMM�MM■�
■■■■■■■■■■■■■■■■■■�� ■■■ ii�,� BIG FINK ABOVE GRADE TEST STATION. INSTALL BORIN MENNEN
■■■■■■■■■■■■■■■■■ PNG-C-025-0001271 ■■\■■■fir ■■■■�
■■■■■■■■■■■■■■■■ _ ■■■■■■b AC-20 STELTH7 REFERENCE ELECTRODE AT PIPE LEVEL E
■■■■■■■■■■■■■■M. / ! / / �■■■■■■■■■■■ ■■■■■■■ ACCORDING TO MANUFACTURER'S SPECIFICATIONS
; I■■■■■■■■■■ AND BRING WIRE UP INTO SAME FINK TEST STATION. 200' x 200' FLARE YARD
��
ADDITIONAL TEMPORARY WORKSPACE ■■■■■■■■ PLACE TEST STATION IN A CATTLE GUARD.
o EE
w w �
o o
EXISTING GRADE
— Q
Q O O Q
o z z 0
z r, —CD Z
+ M
—'� N co cli
+ 6) +
6) Q cl-i co
co
cn --- cn
-
\
-----
----
-
—
—
----
—
z
—
------
--------�
--- --
Z
I
I N
00
z_
JAB - NORTH OAK
LINE 475 MLV AND ASH ST
N
FOREST ROAD
PROPOSED
8" PIPELINE
SJAFB REGULATOR STATION
PNG-C-025-0001271
--
-
UNDER SEPARATE COVER
90+00 91+00 92+00 93+00 94+00 95+00 96+00 97+00 98+00
292' 100, 442'
10 0 2O 0 10 11 10
OPEN CUT JAB OPEN CUT
130
125
120
115
110
105
100
95
TCE
ADRIS P. ANDERSON
2852 / 588
0
c�
C.�
z
z
H
Q
H
LINE 475 MLV 3 AND ASH
TCE ST SJAFB REGULATOR
STATION UNDER
PENN, IL� SEPARATE COVER
F NIF
PERKINS MARVIN E
112. 00 (114, 00)
BOOK 2852, PAGE 591
5518696591
PLAT 0-27G
EASEMENT BOOK 1156,
PAGE 619
CLASS 3 / 1000 PSIG
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
Piedmont
�' DUKE ENERGY0111Natura4 Gas
� a
COPYRIGHT 2018
LINE 475 DOT RELOCATION - PIPELINE
ALIGNMENT PLAN AND PROFILE
GOLDSBORO, NORTH CAROLINA
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
A
04-24-2020
30% DESIGN SUBMITTAL
MJD
CNS
CAM
AREA CODE
-
DATE
NIA
INITIALS
N/A
REGIONAL
ENGINEER
B
08-11-2020
60% DESIGN SUBMITTAL
JJM
CNS
CAM
ACCOUNT NUMBER
-
C
10-02-2020
p
90%DESIGN SUBMITTAL
JJM
CNS
CAM
PROJECT NUMBER
0231540
DATE
NIA
INITIALS
N/A
MGR TECH
REC&STD
D
12-11-2020
REVISED 90% DESIGN SUBMITTAL
MJD
CNS
CAM
DRAWING BY
MJD
STATION ID
I
DATE
12/11/2020
INITIALS
CAM
PRINCIPAL
ENGINEER
CHECKER INITIALS
CNS
z
J
a
w
J
U_
0
a
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
REF. DWG(S) PNC-C-025-0001271
SHEET(S) X OF X I DWG SCALE AS NOTED
DWG DATE 04/24/2020 SUPERSEDED —
DRAWING NUMBER REVISION
P N G-C-025-0001238 D
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
r i
IBURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-1435
CLAUDE A MdVIULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL 047852
PROFESSIONAL ENG/ARCH STAMP
J
N
PERKINS MARWN E
114.00
BOOK 2852, PAGE 591
3518696591
PLA T 0-27G
EASEMENT BOOK 1136, PAGE 619
N
KENNEDY DURNb00
115.00
3518695568
BOOK 3162, PAGE 106
PLA T 0-270
EASEMENT 1136/619
F-
L
N/F I
ADRIS P. ANDERSON
ICE -
3518791353
BOOK 2852, PAGE 588
PLA T D-172
I I
_ I I •
I I
)SED
_ATO R I i
)N
I I
I �I
— R
c�
L r�7
_ I
I I I
R I I
N e 1V I I
OURWOO
KENNEDY
117.00 �
BOOK 972, PAGE 441 I 30' WIDE NORTH CAROLINA
J518696295 I NATURAL GAS CORP. EASEMENT
PLA T 0-27G I I
I
I
� M-
2 �
DURWOOD R.FKENNEDY
116.00
3518695362
BOOK 902, PAGE 494
PLA T 0-270
EASEMENT BOOK 1304, PAGE 805,
BOOK 1139, PAGE 622
R
MCI
f
w
M
I
49
t
t
pr a
LA
X
N/!`
COUNTY OF WA YNE
ICE
J51858899J
BOOK 3292, PAGE 301
BOOK 462, PAGE 51 (MISSING)
BOOK 462, PAGE 54 (MISSING)
BOOK 631 PAGE 140 (MISSING)
BOOK 3459 PAGE 789
STORMWA TER (HELD SKETCH)
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
IF
w
E�
a
-� S
DERATE EXISTING 4" STEEL
TRANSMISSION LINE 67 TO 150 PSIG HPD
(APPROX. 1900 )
2 L ■
1 1
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
NO.
DATE
REVISION(S) DESCRIPTION
BY
I CHK
APPD
I DESCRIPTION
APPROVALS
� �' ENERGY❑UKEa 011I Natural Gas Piedmont
COPYRIGHT 2018
LINE 475 DOT RELOCATION - PIPELINE
ALIGNMENT PLAN - 4" H P D
GOLDSBORO, NORTH CAROLINA
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
A
04-24-2020
30% DESIGN SUBMITTAL
MJD
CNS
CAM
AREA CODE
-
DATE
NIA
INITIALS
N/A
REGIONAL
ENGINEER
B
08-11-2020
60% DESIGN SUBMITTAL
MJD
CNS
CAM
ACCOUNT NUMBER
-
C
10-02-2020
p DESIGN SUBMITTAL
90%
JJM
CNS
CAM
PROJECT NUMBER
0231540
DATE
NIA
INITIALS
N/A
MGR TECH
REC&STD
D
12-11-2020
REVISED 90% DESIGN SUBMITTAL
MJD
CNS
CAM
DRAWING BY
MJD
STATION ID
I
DATE
12/11/2020
INITIALS
CAM
PRINCIPAL
ENGINEER
CHECKER INITIALS
CNS
■
\ S \
1
a \
EXISTING SJAFB IRS. TO BE
0 50 100 PRELIMINARY - NOT
1IN-50FT FOR CONSTRUCTION
90% DESIGN SUBMITTAL
SHEET(S) X OF X DWG SCALE AS NOTED
DWG DATE 04/14/2020 SUPERSEDED —
DRAWING NUMBER REVISION
P N G-C-025-0001256 D
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
s
-M—
G
G
D -
G
1L
^
'H+L
IBURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-1435
CLAUDE A McIVIULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL 047852
PROFESSIONAL ENG/ARCH STAMP
J
0" \
0 \
S—
0,1
G
SEWER MANHOLE
RIM= 115.7'
12" RCP INV= 101.7' (A)
12" RCP INV= 106.7' (B)
12" RCP INV= 101.3'(C)
12" RCP INV= 101.3' (D)
EXISTING TRANSMISSION
LINE 67 4" STEELpm
\
—ice
0
u /
S �
R O
MW
' CENTRAL HEIGHTS ROAD - SR 1709
5/8" REBAR
NCDOT CONTROL
_ MON. PLUMB &
- v� I \ ' / i FIRM FLUSH
6" STEEL �� I
0
6"X2" CONCENTRIC REDUCER
0
42" STEEL own
°
- 6" CHAIN LINK FENCE
AROUND GAS STATION
PROPOSED LINE 475
8" STEEL
oy� PROPOSED PERMANENT EASE
4�
UNDERGROUND
GAS SUE B
6�
N
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PROPOSED TEMPORARY
CONSTRUCTION
EASEMENT
LEGEND
0 CONTRACTOR SHALL TIE IN TO EXISTING 4"
STEEL TRANSMISSION LINE WITH SPHERICAL
TEE. REDUCER AND TIE IN PIPING TO
PROPOSED LINE 475 SHALL BE INSTALLED IN
PROPOSED PNG PERMANENT EASEMENT.
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
NO.
DATE
REVISION(S) DESCRIPTION
BY
I CHK
APPD
I DESCRIPTION
APPROVALS
. N E 0111 NDUaf•aPiedmont
COPYRIGHT 2018
LINE 475 DOT RELOCATION - PIPELINE
LINE 67 TIE IN PLAN
GOLDSBORO NORTH CAROLINA
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
A
08-11-2020
60% DESIGN SUBMITTAL
HEC
CDW
CAM
AREA CODE
-
DATE
NIA
INITIALS
N/A
REGIONAL
ENGINEER
B
10-02-2020
90% DESIGN SUBMITTAL
JJM -CDW
CAM
ACCOUNT NUMBER
-
C
12-11-2020
REVISED 90% DESIGN SUBMITTAL
MJD
DNS
CAM
PROJECT NUMBER
0231540
DATE
NIA
INITIALS
N/A
MGR TECH
REC&STD
DRAWING BY
HEC
STATION ID
DATE
12/11/2020
INITIALS
CAM
PRINCIPAL
ENGINEER
CHECKER INITIALS
CDW
0 20 40 PRELIMINARY - NOT
1IN - 20FT FOR CONSTRUCTION
90% DESIGN SUBMITTAL
REF. DWG(S) PNG-G-025-0001086
SHEET(S) X OF X DWG SCALE AS NOTED
DWG DATE 07/28/2020 SUPERSEDED
DRAWING NUMBER REVISION
PNG-C-025-0001260 C
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
1
016
SEYMOUR JOHNSON AIR FORCE BASE
SEWER MANHOLE cp
RIM= 116.1' /-
10 PVC INV= 106.4 (A) / /
10" PVC INV= 104.4' (B) / / / / /j o Z SUMMIT ROAD RS
12" PVC INV= 104.4' (C)
UNDERGROUND GAS ��
SUE B �� / /
A-
o� WATER LINE - SUE B
2" STEEL
BYPASS LINE
4" STEEL w\
CO
4" STEEL 4" STEEL / / / \
6 STEEL/
ELEC LINE
- SUE B
�\ G,
6' DECORATIVE FENCE\Al
AROUND GAS STATION��
CATCH BASIN
RIM 111.48
INVERT INFORMATION
NOT OBTAINABLE
BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-1435
DERATE PIPELINE TO 150 PSIG
4 STEEL
/0 w
co
s
COMM LINE - SUE B
SEWER MANHOLE
RIM = 1114.0'
12" PVC INV=104.0' (A)
12" PVC INV=104.0' (B)
4
LEGEND
SUMMIT ROAD RS
N OAK FOREST ROAD RS
CONTRACTOR TO DECOMMISSION AND
DEMOLISH ALL ABOVE GROUND AND BELOW
GROUND APPURTENANCES INCLUDING GAS,
ELECTRIC, AND TELECOM TO
APPROXIMATELY 3' BELOW GRADE.
0 CONTRACTOR TO INSTALL 4" STOPPLE BYPASS
TO MAINTAIN DISTRIBUTION GAS SUPPLY.
2O CONTRACTOR SHALL RETIRE EXISTING
REGULATION STATION ONCE NEW PLASTIC
DISTRIBUTION SYSTEM IS INSTALLED AND
PLACED IN SERVICE.
0 20 40
1IN = 20FT
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDE A McMULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL047852
NO.1
DATE
REVISION(S) DESCRIPTION
A
08-11-2020
60% DESIGN SUBMITTAL
B
10-02-2020
90% DESIGN SUBMITTAL
C
12-11-2020
REVISED 90% DESIGN SUBMITTAL
PROFESSIONAL ENG/ARCHSTAMP
BY
CHK
JAPPD
DESCRIPTION
APPROVALS
. N E r6li Nla d f•ao t
COPYRIGHT 2018
LINE 475 DOT RELOCATION - PIPELINE
RETIREMENT PLAN
GOLDSBORO NORTH CAROLINA
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
HEC
CDW
CAM
AREA CODE
-
DATE
NIA
INITIALS
N/A
REGIONAL
ENGINEER
JJM
CD
CAM
ACCOUNT NUMBER
-
MJD
CNS
CAM
PROJECT NUMBER
0231540
DATE
NIA
INITIALS
N/A
MGR TECH
REC&STD
DRAWING BY
HEC
STATION ID
I
DATE
12/11/2020
INITIALS
CAM
PRINCIPAL
ENGINEER
CHECKER INITIALS
CDW
REF. DWG(S)
N OAK FOREST
ROAD RS
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
SHEET(S) X OF X DWG SCALE AS NOTED
DWG DATE 08/11/2020 SUPERSEDED
DRAWING NUMBER REVISION
P N G-C-025-0001261 C
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
PROPOSED
w
PERMANENT
0
EASEMENT
�
Q
PROPOSED W
w
PERMANENT
Q
EASEMENT
�1
I�
I I I
o, ♦1
II
I
I
♦ /
I0'.
47+00vM461148+001
♦ /
II
III
LIM II
M M1 0 L MA /
i
MAP
I
PROPOSED ♦ i
� �♦
8 PIPELINE RONA
z
Q
I
PROPOSED
♦ ♦
♦
z
Q
J
0-♦
TEMPORARY
J
CL
—
w
� W RK PA
O S C
_I
W W
>
I
PROPOSED
p �I
TEMPORARY
WORKSPACE
r=E)
w
Q
C7
JACK & BORE
- GATEWAY
DRIVE
°
20 40
1IN = 20FT
SCALE: 1"=20'
125
125
FACE
OF BORE = 140'
120
LU
>
o=
->
�
-
120
PROPOSED BORE PIT
a
LU
o
'U�J:
EXISTING GRADE
PROPOSED
CD
C-D
RECEIVING PIT
115
—
115
U)
cn
------------
110
I —STA: 47-+34
EX ELEC
STA:
48+11
EX COMM-7�
STA:48+30
EX COMM
STA:48+32
EX COMM
110
STA: 47+46
°D
EX COMM
o
105
-
STA:47+53
STA:48+36
105
-
-
-
EX ELEC
EX WATER
-
w
J
LL
w
J
J
I
161'
I
a
100
100
8.625" 0.322" W.T.
API 5L X52 STEEL LINE PIPE
PROPOSED 8" PIPELINE
STA: PVC EX 12"
PV
FUSION BONDED EXPDXY
95
WITH POWERCRETE
95
0
20 40
1IN = 20FT
90
90 0
5 10
PRELIMINARY - NOT
47+00
48+00 49+00
46+50
00119
FOR CONSTRUCTION
11N = 5FT
90% DESIGN SUBMITTAL
BURNS&McDONNELLCONSULTANTS, INC.
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED *
DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
REF. DWG(S): PNG-C-025-0001231
STATE LICENSE # C-1435
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDEA McMULLAN
IFC SUBMITTAL DATE
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
LINE 475 DOT RELOCATION - PIPELINE
SHEET(S) X OF X
DWG SCALE AS NOTED
A
10-02-2020
90% DESIGN SUBMITTAL
JJM
CNS
CAM
AREA CODE
-
DATE
NITIALS
N/AREGIONAL
NIA
DWG DATE 10102/2020 SUPERSEDED
NORTH CAROLINA
SEAL 047852
B
12-11-2020
REVISED 90% DESIGN SUBMITTAL
MJD
CNS
CAM
ACCOUNT NUMBER
ENGINEER
PiedmontJACK
& BORE PLAN &
PROFILE - GATEWAY DRIVE
—
DATE
ATE
INITIALS
PROJECT NUMBER
0231540
N/A
NIA
MGR TECH
EDUKENERr6lj��
'ENERGY:.. Natural Gas
DRAWING NUMBER
REVISION
DRAWING BY
MJD
REC&STD
GOLDSBORO,
NORTH CAROLINA
PNG-C-025-0001270
B
DATE
INITIALS
PROFESSIONALENG/ARCH STAMP
STATION ID
12/11/2020
CAM
PRINCIPAL
ENGINEER
COPYRIGHT 2018
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
CHECKER INITIALS
CNS
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
PROPOSED PROPOSED ■
PERMANENT TEMPORARY 1■
1I
EASEMENT WORKSPACE
■ 1.
I1
' I1
I • I■
\
I1 II
I1 I■
1I ■ 1II
\ I1 I1 ■
PROPOSED I1 I1
.■ .
■■ I■� 1■
\ ■■ PERMANENT
I
1 EASEMENT 1I
1 I 1I
I1 1■ I1 ■,
� �
II ■■ ■I
,■ I 1■ 1 � ■I
1I
R /
I � ■1 ��_
/ Al
PROPOSED / �CO
8" PIPELINE
94+00
+06Y'
■I ■ 1 1I I11
I1 ■I � � � 1■ I
I I■ II I1
. 1I � I ■■ ■I
■I 1I � 1I I ■1
1I I�i� � � � 1I ■
,■ ■■ 1I 1 II
II
� / � •
I ■■ - � � � 1I
' II � ■I 1 1I
■ I1 I■ ■■ I
/ _ �
■I I1 1■ I
I I � I 1■ II
II 1■ � 1I ■ ■.
1 I � ■■ ■■
■I ■■ ■I
z
a_
PROPOSED 1
1I ■■ I1 1 I■ ■■ I
� TEMPORARY �■ ■■ I I ■ I1 ■I ■■
WORKSPACE /� I I1 1■'
■1 I1 ■1 I
z
g
0_
I � � ■ ■1 1I
■ i ,1 I1 II It
N
�/
JACK & BORE - N OAK FOREST RD
°
20 40
SCALE: 1"=20'
1IN = 20FT
125
125
FACE OF BORE = 83'
120
� O
� C)uU CO
— Of LU �
120
O 0 w
LU Y Y w
Of O ¢O O OU-
Y z z Q
EXISTING GRADE PROPOSED BORE PIT z o PROPOSED RECEIVING PIT
115
+ Q Q M
N (/j
115
i cn
cn
110
— — — STA: 92+50 STA: 93+16 \ / STA: 93+19
— — — — EX COMM EX COMM
EX COMM
110
I cq
STA: STA:93+24
STA: 92+61- ►6 EX COMM
� EX COMM
- EX COMM i
STA:92+62 N STA:92+69 STA:93+08 - - - -
105
_ _ - - - - - - EX COMM - EX WATER - - EX GAS -
105
O
100'
—
Ji
O
a
Of
a_
100
PROPOSED 8" PIPELINE 8.625" 0.322" W.T.
100
API 5L X52 STEEL LINE PIPE
FUSION BONDED EXPDXY
WITH POWERCRETE
95
95
0 20 40
1IN = 20FT
90
90
0 5 10 PRELIMINARY - NOT
92+00 93+00 94+00
91+50
00119 FOR CONSTRUCTION
11N=5FT 90% DESIGN SUBMITTAL
BURNS&McDONNELLCONSULTANTS, INC.
STATE LICENSE # C-1435
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
REF. DWG(S): PNG-C-025-0001237
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDEA McMULLAN
IFC SUBMITTAL DATE
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
LINE 475 DOT RELOCATION - PIPELINE
SHEET(S) 1 OF X
DWG SCALE AS NOTED
A
08-11-2020
60% DESIGN SUBMITTAL
MJD
CNS
CAM
AREA CODE
-
DATE
NITIALS
NORTH CAROLINA
SEAL047852
N/AREGIONAL
NIA
ENGINEER
rj�ENER DUKENaturalPiedmnt
JACK
& BORE PLAN & PROFILE - N OAK FOREST RD
DWG DATE 08111/2020 SUPERSEDED
B
10-02-2020
90% DESIGN SUBMITTAL
JJM
CNS
CAM
ACCOUNT NUMBER
0231540
ATE
DATE
INITIALS
C
12-11-2020
REVISED 90% DESIGN SUBMITTAL
MJD
CNS
CAM
PROJECT NUMBER
N/A
NIA
MGR TECH
G
'� ENERGY:.. Natural GasDRAWING
DRAWING NUMBER
REVISION
BY
MJD
REC&STDr6lj��GOLDSBORO
NORTH CAROLINA
PNG-C-025-0001271
C
DATE
INITIALS
PROFESSIONALENG/ARCH STAMP
STATION ID
12/11/2020
CAM
PRINCIPAL
ENGINEER
COPYRIGHT 2018
�
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
CHECKER INITIALS
CNS
DISCIPLINE /RESOURCE CENTER /LINE NUMBER
GENERAL NOTES:
GEOTECHNICAL NOTES:
PROTECTION OF EXISTING FACILITIES:
PROPOSED PIPELINE SHALL BE CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH PIEDMONT
NATURAL GAS' DESIGN AND CONSTRUCTION MANUALS, LATEST EDITION.
ALL EQUIPMENT MUST ACCESS THE SITE ALONG THE CONSTRUCTION RIGHT-OF-WAY OR FROM
APPROVED ACCESS ROADS.
CONTRACTOR SHALL SUBMIT ANY REQUESTS FOR DEVIATION FROM THIS DESIGN FOR REVIEW
PRIOR TO CONSTRUCTION.
CONTRACTOR SHALL DISPOSE OF EXCESS DRILLING FLUID AS DIRECTED BY THE COMPANY
REPRESENTATIVE IN ACCORDANCE WITH PERMIT CONDITIONS, UNDER NO CIRCUMSTANCES SHALL
DRILLING FLUID BE DISPOSED OF IN WATER BODIES OR WETLANDS. THE ENTRY AND EXIT POINTS
SHALL BE CONTAINED AND COLLECTED TO THE EXTENT PRACTICAL AND DISPOSED OF AS DIRECTED
BY THE COMPANY REPRESENTATIVE IN ACCORDANCE WITH PERMIT CONDITIONS.
EXISTING UNDERGROUND UTILITIES SHOWN ARE APPROXIMATE AND ARE TO BE FIELD VERIFIED BY
CONTRACTOR PRIOR TO CONSTRUCTION.
CONTRACTOR SHALL VERIFY ALL COORDINATES AND DIMENSIONAL INFORMATION PRIOR TO
CONSTRUCTION. BRING ANY DISCREPANCIES WITH LAYOUT TO ATTENTION OF COMPANY PRIOR TO
STARTING CONSTRUCTION.
CONTRACTOR IS RESPONSIBLE FOR KNOWING LOCATION OF ALL ENVIRONMENTALLY SENSITIVE
AREA RESTRICTIONS PERTAINING TO THIS PROJECT.
z
J
d
w
J
LL
0
BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-1435
CLAUDE A McMULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL 047852
PROFESSIONAL ENG/ARCH STAMP
J
125
120
115
110
105
100
95
90
85
80
75
70
65
60
55
50
45
40
35
21 +00
GEOTECHNICAL DATA PROVIDED BY ATC GROUP SERVICES, LLC. REFER TO THE PROJECT
GEOTECHNICAL BORING LOGS ON SHEET PNG-C-025-0001274 FOR MORE DETAILED SUBSURFACE
INFORMATION.
THE GEOTECHNICAL DATA IS ONLY DESCRIPTIVE OF THE LOCATIONS ACTUALLY SAMPLED.
EXTENSION OF THE DATA OUTSIDE OF THE ORIGINAL BORINGS MAY BE DONE TO CHARACTERIZE
THE SOIL CONDITIONS. HOWEVER, COMPANY DOES NOT GUARANTEE THESE CHARACTERISTICS TO
BE ACCURATE. CONTRACTOR MUST USE HIS OWN EXPERIENCE AND JUDGEMENT IN INTERPRETING
THIS DATA.
TOPOGRAPHIC SURVEY NOTES:
TOPOGRAPHIC SURVEY DATA PROVIDED BY SGC SURVEYING.
NORTHINGS AND EASTINGS ARE IN U.S. SURVEY FEET REFERENCED TO
NORTH CAROLINA STATE PLANE COORDINATES.
ELEVATIONS ARE IN FEET REFERENCED TO NAVD 88.
DRILL PATH NOTES:
DRILL PATH STATIONING IS IN FEET BY HORIZONTAL MEASUREMENT AND IS REFERENCED TO
CONTROL ESTABLISHED FOR THE DRILLED SEGMENT.
DRILL PATH COORDINATES REFER TO THE CENTERLINE OF PILOT HOLE AS OPPOSED TO TOP OF
INSTALLED PIPE.
HORIZONTAL DIRECTIONAL DRILL PATH DEPICTS MINIMUM REQUIREMENTS ONLY.
FINAL PATH TO BE DETERMINED BY CONTRACTOR AT TIME OF CONSTRUCTION.
PILOT HOLE TOLERANCES:
THE PILOT HOLE SHALL BE DRILLED TO THE TOLERANCES LISTED BELOW. HOWEVER IN ALL CASES,
RIGHT-OF-WAY RESTRICTIONS AND CONCERN FOR ADJACENT FACILITIES SHALL TAKE PRECEDENCE
OVER THESE TOLERANCES.
1. ENTRY POINT: NO MODIFICATIONS SHALL BE MADE WITHOUT APPROVAL FROM THE COMPANY
ENGINEER.
2. ENTRY ANGLE: UP TO 1' INCREASE FROM THE DESIGNED ENTRY ANGLE; NO DECREASE IN ENTRY
ANGLE WILL BE ALLOWED.
3. EXIT POINT: UP TO 20 FEET LONGER OR 10 FEET SHORTER FROM THE EXIT POINT; UP TO 5 FEET
RIGHT OR LEFT OF THE DESIGNED ALIGNMENT.
4. EXIT ANGLE: NO INCREASE FROM THE DESIGNED EXIT ANGLE; UP TO 2' DECREASE IN EXIT ANGLE
WILL BE ALLOWED.
5. ELEVATION: UP TO 2 FEET ABOVE AND 10 FEET BELOW DESIGNED PROFILE.
6. ALIGNMENT: UP TO 5 FEET RIGHT OR LEFT OF THE DESIGNED ALIGNMENT.
7. CURVE RADIUS: NO LESS THAN 800 FEET BASED ON A 3 JOINT AVERAGE.
EXISTING ATLANTIC NORTH -
CAROLINA RAILROAD
R/W 200' WIDE R
PROPOSED HDD
APPROX. 816'
CONTRACTOR SHALL UNDERTAKE THE FOLLOWING STEPS PRIOR TO COMMENCING DRILLING
OPERATIONS:
1. CONTACT THE UTILITY LOCATION IDENTIFICATION SERVICE FOR THE CONSTRUCTION AREA.
2. POSITIVELY LOCATE AND STAKE ALL EXISTING UNDERGROUND FACILITIES. ANY FACILITIES
LOCATED WITHIN 10 FEET OF THE DESIGNED PATH SHALL BE EXPOSED.
3. MODIFY DRILLING PRACTICES AND DOWNHOLE ASSEMBLIES AS NECESSARY TO PREVENT
DAMAGE TO EXISTING FACILITIES.
4. DRILLING MUD SHALL BE BENTONITE ONLY.
B-6 -
A���, STA _ 27+01
OFF - 43 L -
14)
'L
- PROPOSED 50' PERMANENT EASEMENT
0
PROPOSED 50 �����������������
TEMPORARY � ������♦�♦�:�:����♦�♦�:�:�:�:♦��♦��
0 PROPOSED 3' WORKSPACE::�:♦:♦:.�♦�:�:♦:♦:♦�♦�♦�♦♦♦♦�♦�.
\ \ TEMPORARY
� \ 105.00
WORKSPACE 300'
HORIZONTAL LENGTH = 816'
TRUE DRILLED LENGTH = 822'
NOTE: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT ALL EXISTING
UTILITIES AND OTHER STRUCTURES. CONTRACTOR SHALL BE RESPONSIBLE FOR
LOSSES AND REPAIRS OCCASIONED BY DAMAGE TO FACILITIES RESULTING FROM
DRILLING OPERATIONS. CONTRACTOR SHALL TAKE STEPS TO PROTECT EXISTING
FACILITIES, INCLUDING, BUT NOT LIMITED TO, SETTING SURFACE CASING AS
NECESSARY TO PREVENT SETTLEMENT AND DISPLACEMENT.
NOTE: STRATIFICATION LINES AND SUBSURFACE MATERIAL DESCRIPTIONS SHOWN
ON THIS DRAWING HAVE BEEN SIMPLIFIED FOR PRESENTATION PURPOSES. REFER
TO THE PROJECT GEOTECHNICAL BORING LOGS AND REPORT FOR MORE DETAILED
SUBSURFACE INFORMATION.
NOTE: CONTRACTOR SHALL ACTIVELY MONITOR THE DRILLED ALIGNMENT FOR
IMPACTS THAT COULD OCCUR AS A RESULT OF HDD OPERATIONS (I.E.
SETTLEMENT, HEAVE, AND DRILLING FLUID FLOW). CONTRACTOR'S MONITORING
PROCEDURES AND ASSOCIATED EMERGENCY RESPONSE PLANS SHALL BE
APPROPRIATE TO ENSURE THAT PUBLIC SAFETY IS NOT COMPROMISED.
_ � I
HDD ENTRY POINT AT 120
STA: 30+66, ELEV: 113.2'
PROPOSED 8" PIPELINE HDD - 8" PIPELINE PLAN
cn
0
HDD EXIT AT 10'
STA:22+50
ELA 14.9'
HDD ENTRY AT 12°-
STA:30+66
ELA 13.2'
PT/ENTRY
CURVE
STA:29+89
ELEV:96.8' - - -
1Q'
-
+
-
-
-
-
-
-
-
-11.0
::\\:
i
+
-12.0 ......
-17.0
PT / EXIT
STA:23+85
ELEV:91.2'
CURVE
-
o
N
.:
0
M
-22.0
PC / EXIT CURVE
STA:25+24
ELEV:79.0'
-22.0
:
R - 800'
-27.0
PC / ENTRY CURVE
STA:28+21
ELEV:79.0'
'
-32.0
:::
7�4'
-32.0
16°�
297'
-42.0
8.625" X .322" W.T.
API 5L X52 STEEL LINE PIPE
FUSION BONDED EPDXY
WITH POWERCRETE AND
SCARGUARD ON GIRTH WELDS
-52.0
-57.o
-57.0
-62.0
.::..:.
-62.0
SOIL BORING B-5
SEE PNG-C-025-0001274
- --
-67.0
SOIL BORING B-6 -
SEE PNG-C-025-0001274
--
75.0:::
-75.0
22+00
23+00
24+00
25+00
26+00
27+00
28+00
29+00
30+00
31 +00
32+00
SCALE: 1 "=50'
0 50 100
11N = 50FT
125
120
115
110
105
100
95
90
85
z
J
d
w
80
LL
0
a
Ili
70
65
60
55 HDD - 8" PIPELINE
PROFILE
50
45
40
35
32+50
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
rj sDUKE Pied al Gas mont
ENERGY,
COPYRIGHT 2018
LINE 475 DOT RELOCATION - PIPELINE
HDD PLAN AND PROFILE - RAILROAD
GOLDSBORO NORTH CAROLINA
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
A
08-11-2020
60% DESIGN SUBMITTAL
MJD
CNS
CAM
AREA CODE
-
DATE
N/A
INITIALS
N/A
REGIONAL
ENGINEER
B
10-02-2020
90% DESIGN SUBMITTAL
JJM
CNS
CAM
ACCOUNT NUMBER
C
12/11/2020
REVISED 90% DESIGN SUBMITTAL
MJD
ICNS
CAM
PROJECT NUMBER
0231540
DATE
N/A
INITIALS
N/A
MGR TECH
REC&STD
DRAWING BY
MJD
STATION ID
DATE
12/11/2020
INITIALS
CNS
PRINCIPAL
ENGINEER
CHECKER INITIALS
CNS
0 50 100
HORIZONTAL 11N = 50FT
0 10 20
00119
VERTICAL 11N = 10FT
PRELIMINARY - NOT
FOR CONSTRUCTION
ISSUED FOR PERMITTING
REF. DWG(S): PNG-C-025-0001230
SHEET(S) X OF X I DWG SCALE AS NOTED
DWG DATE 08/11/2020 SUPERSEDED -
DRAWING NUMBER REVISION
PNG-C-025-0001272 C
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
GENERAL NOTES:
GEOTECHNICAL NOTES:
PROTECTION OF EXISTING FACILITIES:
PROPOSED PIPELINE SHALL BE CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH PIEDMONT
NATURAL GAS' DESIGN AND CONSTRUCTION MANUALS, LATEST EDITION.
ALL EQUIPMENT MUST ACCESS THE SITE ALONG THE CONSTRUCTION
RIGHT-OF-WAY OR FROM APPROVED ACCESS ROADS.
CONTRACTOR SHALL SUBMIT ANY REQUESTS FOR DEVIATION FROM THIS
DESIGN FOR REVIEW PRIOR TO CONSTRUCTION.
CONTRACTOR SHALL DISPOSE OF EXCESS DRILLING FLUID AS DIRECTED BY THE
COMPANY REPRESENTATIVE IN ACCORDANCE WITH PERMIT CONDITIONS, UNDER NO
CIRCUMSTANCES SHALL DRILLING FLUID BE DISPOSED OF IN WATER BODIES OR WETLANDS. THE
ENTRY AND EXIT POINTS SHALL BE CONTAINED AND
COLLECTED TO THE EXTENT PRACTICAL AND DISPOSED OF AS DIRECTED BY THE COMPANY
REPRESENTATIVE IN ACCORDANCE WITH PERMIT CONDITIONS.
EXISTING UNDERGROUND UTILITIES SHOWN ARE APPROXIMATE AND ARE TO BE
FIELD VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION.
CONTRACTOR SHALL VERIFY ALL COORDINATES AND DIMENSIONAL INFORMATION PRIOR TO
CONSTRUCTION. BRING ANY DISCREPANCIES WITH
LAYOUT TO ATTENTION OF COMPANY PRIOR TO STARTING CONSTRUCTION.
CONTRACTOR IS RESPONSIBLE FOR KNOWING LOCATION OF ALL
ENVIRONMENTALLY SENSITIVE AREA RESTRICTIONS PERTAINING TO THIS
PROJECT.
GEOTECHNICAL DATA PROVIDED BY ATC GROUP SERVICES, LLC. REFER TO THE PROJECT
GEOTECHNICAL BORING LOGS ON SHEET PNG-C-025-XXXXXX FOR MORE DETAILED SUBSURFACE
INFORMATION.
THE GEOTECHNICAL DATA IS ONLY DESCRIPTIVE OF THE LOCATIONS ACTUALLY SAMPLED.
EXTENSION OF THE DATA OUTSIDE OF THE ORIGINAL BORINGS MAY BE DONE TO CHARACTERIZE
THE SOIL CONDITIONS. HOWEVER, COMPANY DOES NOT GUARANTEE THESE CHARACTERISTICS TO
BE ACCURATE. CONTRACTOR MUST USE HIS OWN EXPERIENCE AND JUDGEMENT IN INTERPRETING
THIS DATA.
TOPOGRAPHIC SURVEY NOTES:
TOPOGRAPHIC SURVEY DATA PROVIDED BY SGC SURVEYING
NORTHINGS AND EASTINGS ARE IN U.S. SURVEY FEET REFERENCED TO
NORTH CAROLINA STATE PLANE COORDINATES.
ELEVATIONS ARE IN FEET REFERENCED TO NAVD 88.
DRILL PATH NOTES:
DRILL PATH STATIONING IS IN FEET BY HORIZONTAL MEASUREMENT AND IS REFERENCED TO
CONTROL ESTABLISHED FOR THE DRILLED SEGMENT.
DRILL PATH COORDINATES REFER TO THE CENTERLINE OF PILOT HOLE AS OPPOSED TO TOP OF
INSTALLED PIPE.
HORIZONTAL DIRECTIONAL DRILL PATH DEPICTS MINIMUM REQUIREMENTS ONLY.
FINAL PATH TO BE DETERMINED BY CONTRACTOR AT TIME OF CONSTRUCTION.
PILOT HOLE TOLERANCES:
THE PILOT HOLE SHALL BE DRILLED TO THE TOLERANCES LISTED BELOW. HOWEVER IN ALL CASES,
RIGHT-OF-WAY RESTRICTIONS AND CONCERN FOR ADJACENT FACILITIES SHALL TAKE PRECEDENCE
OVER THESE TOLERANCES.
1. ENTRY POINT: NO MODIFICATIONS SHALL BE MADE WITHOUT APPROVAL FROM THE COMPANY
ENGINEER.
2. ENTRY ANGLE: UP TO 1' INCREASE FROM THE DESIGNED ENTRY ANGLE; NO DECREASE IN ENTRY
ANGLE WILL BE ALLOWED.
3. EXIT POINT: UP TO 20 FEET LONGER OR 10 FEET SHORTER FROM THE EXIT POINT; UP TO 5 FEET
RIGHT OR LEFT OF THE DESIGNED ALIGNMENT.
4. EXIT ANGLE: NO INCREASE FROM THE DESIGNED EXIT ANGLE; UP TO 2° DECREASE IN EXIT ANGLE
WILL BE ALLOWED.
5. ELEVATION: UP TO 2 FEET ABOVE AND 10 FEET BELOW DESIGNED PROFILE.
6. ALIGNMENT: UP TO 5 FEET RIGHT OR LEFT OF THE DESIGNED ALIGNMENT.
7. CURVE RADIUS: NO LESS THAN 800 FEET BASED ON A 3 JOINT AVERAGE.
CONTRACTOR SHALL UNDERTAKE THE FOLLOWING STEPS PRIOR TO COMMENCING DRILLING
OPERATIONS:
1. CONTACT THE UTILITY LOCATION IDENTIFICATION SERVICE FOR THE CONSTRUCTION AREA.
2. POSITIVELY LOCATE AND STAKE ALL EXISTING UNDERGROUND FACILITIES. ANY FACILITIES
LOCATED WITHIN 10 FEET OF THE DESIGNED PATH SHALL BE EXPOSED,
3. MODIFY DRILLING PRACTICES AND DOWNHOLE ASSEMBLIES AS NECESSARY TO PREVENT
DAMAGE TO EXISTING FACILITIES.
4. DRILLING MUD SHALL BE BENTONITE ONLY.
NOTE: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT ALL EXISTING
UTILITIES AND OTHER STRUCTURES. CONTRACTOR SHALL BE RESPONSIBLE FOR
LOSSES AND REPAIRS OCCASIONED BY DAMAGE TO FACILITIES RESULTING FROM
DRILLING OPERATIONS. CONTRACTOR SHALL TAKE STEPS TO PROTECT EXISTING
FACILITIES, INCLUDING, BUT NOT LIMITED TO, SETTING SURFACE CASING AS
NECESSARY TO PREVENT SETTLEMENT AND DISPLACEMENT.
NOTE: STRATIFICATION LINES AND SUBSURFACE MATERIAL DESCRIPTIONS SHOWN
ON THIS DRAWING HAVE BEEN SIMPLIFIED FOR PRESENTATION PURPOSES. REFER
TO THE PROJECT GEOTECHNICAL BORING LOGS AND REPORT FOR MORE DETAILED
SUBSURFACE INFORMATION.
NOTE: CONTRACTOR SHALL ACTIVELY MONITOR THE DRILLED ALIGNMENT FOR
IMPACTS THAT COULD OCCUR AS A RESULT OF HDD OPERATIONS (I.E.
SETTLEMENT, HEAVE, AND DRILLING FLUID FLOW). CONTRACTOR'S MONITORING
PROCEDURES AND ASSOCIATED EMERGENCY RESPONSE PLANS SHALL BE
APPROPRIATE TO ENSURE THAT PUBLIC SAFETY IS NOT COMPROMISED.
PERENNIAL
- I - , I � -1
PROPOSED 50' PERMANENT EASEMENT - - PROPOSED 50' TEMPORARY WORKSPACE EXISTING US HIGHWAY 70 BYPASS STREAM 01R/W (VARIABLE WIDTH)
_ I _
300' I I I I WETLAND 1
f'' 108.00 I EXISTING COMMERCIAL DRIVE
O I I SR 1803 R/W (VARIABLE WIDTH) 108.03 PROPOSED 50 PERMANENT EASEMENT
B-3 0
STA = 77+18 PROPOSED HDD
OFF = 82' L APPROX. 750'
71+00 72+00 73+00 J� 74+00 75+00 76+00 77+00 I I 78+00 79+00 1/ 0 81+00 0 83+00 C 84+00
�� I 11 I - 1 1 1 1 o
\ 1 I IIPSAP
N
BEMI
•• ••• •• I
B_4 ••,, �••♦•.♦•.;♦• ♦•.♦••,♦•.♦•., ♦•, HDD - 8 PIPELINE PLAN
�♦♦♦♦♦♦♦♦♦♦♦♦i ..:�♦♦�i� M - - _
�� ♦,,��_1����1��� �r. 1 ���� ' -_ _ I W STA - 81 +38♦♦1♦1,♦11♦♦11�� ♦♦♦♦♦♦♦♦♦♦♦♦♦111♦� SCALE:1"-50'
- \ ` I I ° I � I � I/ I CONTRACTOR SHALL OFF - 8' L 1♦�1♦ r♦♦�1♦♦1♦♦♦� 1♦�1♦�♦1♦♦1♦1♦♦�♦1
HDD PULL STRING - / _ _ HDD EXIT POINT AT 10 _ /
- APPROX. 760' 1 STRING = - _ _ STA: 75+43 ELEV: 110.6' - � I II I LIMIT CLEARING TO 20 1�♦=♦♦1�♦♦♦♦11♦�♦ -1♦1�1♦��♦♦1♦1� /� / 0 50 100
( ) ��I= _ _, _ I _ _ I I I� 1 I I I TOTAL IN WETLAND HDD ENTRY POINT AT 10° ' V 1IN=50FT
PORTION OF (10'I,,h II
PROPOSED 30' TEMPORARY WORKSPACE � � � � � ( � r � I � I - I I I EACH SIDE OF PIPELINE). STA: 82+93, ELEV: 109.4'
BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-1435
CLAUDE A McMULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL 047852
PROFESSIONAL ENG/ARCH STAMP
120
115
110
105
100
95
90
85
80
75
70
65
60
55
50
45
40
35
30
HORIZONTAL LENGTH = 750'
TRUE DRILLED LENGTH = 759'
120
115
110
105
100
95
90
I
85
:o,
w
J
LL
75 a
70
65
60
55
50
45
40 HDD - 8" PIPELINE PROFILE
0 50 100
35 11N = 50FT 00119
PRELIMINARY - NOT
30 0 10 20 FOR CONSTRUCTION
74+00 75+00 76+00 77+00 78+00 79+00 80+00 81+00 82+00 83+00 84+00 11N = 1oFT 90% DESIGN SUBMITTAL
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY REF. DWG(S): PNG-C-025-0001235
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
HDD EXIT AT 10°
STA:75+43
HDD ENTRY AT 16'
ELEVA 10.6'
STA:82+93
ELEV:109.4'
STA:77+14
EX
COMM
\
-6.0
STA: 78+31
EX 18" RCP
-
- -
-
-6.0-
PT / ENTRY CURVE h
STA:82+31 �O
ELEV:91.5'
\
STA: 77+06
EX 12" PVC
\
-12.0
--12.0
..
-16.0
.::.
\
-22.0
--22.0
....
PT / EXIT CURVE
STA:77+58
ELEV:72.7'
jff
\
CD
RADIUS =
RADIUS = 800'
-36.0
\
800'
-4
.0
-52.0
113'
PC / EXIT CURVE
STA:78+97
ELEV:60.5'
PC /ENTRY CURVE
STA:80+10 -
ELEV:60.5'
SOIL BORING B-3
SEE PNG-C-025-0001275
i
-62.0
....
SOIL BORING B-4 _
SEE PNG-C-025-0001275
-
8.625" X 0.322" W.T.
API 5L X52 STEEL LINE PIPE
FUSION BONDED EPDXY
WITH POWERCRETE AND
SCARGUARD ON GIRTH WELDS
_66 0
-72.0
75.0
-75.0 ---
I
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
I DESCRIPTION
APPROVALS
rj sDUKE Pied al Gas mont
ENERGY,
COPYRIGHT 2018
LINE 475 DOT RELOCATION - PIPELINE
HDD PLAN AND PROFILE - HIGHWAY 70
GOLDSBORO NORTH CAROLINA
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
A
08-11-2020
60% DESIGN SUBMITTAL
MJD
CNS
CAM
AREA CODE
-
DATE
N/A
INITIALS
N/A
REGIONAL
ENGINEER
B
10-02-2020
90% DESIGN SUBMITTAL
JJM
CNS
CAM
ACCOUNT NUMBER
C
12/11/2020
REVISED 90% DESIGN SUBMITTAL
MJD
CNS
CAM
PROJECT NUMBER
0231540
DATE
N/A
INITIALS
N/A
MGR TECH
REC&STD
DRAWING BY
MJD
STATION ID
DATE
12/11/2020
INITIALS
CAM
PRINCIPAL
ENGINEER
CHECKER INITIALS
CNS
SHEET(S) X OF X I DWG SCALE AS NOTED
DWG DATE 08/11/2020 SUPERSEDED
DRAWING NUMBER REVISION
PNG-C-025-0001273 C
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
7606 Whitehall Executive Center Dr. Building 800 TEST BORING LOG
7606 Whitehall Executive Center Dr. Building 800 TEST BORING LOG
/ Charlotte NC, 28273
/ Charlotte NC, 28273
704-529-3200
704-529-3200
Fax 704-529-3272
Fax 704-529-3272
CLIENT BURNS AND MCDONNELL BORING# B-5
CLIENT BURNS AND MCDONNELL BORING# 0-6
PROJECT NAME LINE 67 (475) JOB # 199BAM2012
PROJECT NAME LINE 67 (475) JOB # 199BAM2012
PROJECT LOCATION GOLDSBORO, NC DRAWN BY ASS
PROJECT LOCATION GOLDSBORO, NC DRAWN BY ASS
35.374003,-77.91783 APPROVED BY JGS
35.372931,-77.918618 APPROVED BY JGS
DRILLING and SAMPLING INFORMATION TEST DATA
DRILLING and SAMPLING INFORMATION TEST DATA
Date Started 1212/20 Hammer Wt. 140 lbs.
Date Started 1211 /20 Hammer Wt. 140 lbs.
Date Completed 12/2/20 Hammer Drop 30 in.
Date Completed 12/1 /20 Hammer Drop 30 in.
Drill Foreman MAD Spoon Sampler OD 2 in.
!4
Drill Foreman MAD Spoon Sampler OD 2 in.
Inspector ATC Rock Core Dia. N/A in. w
Boring Method MD Shelby Tube OD NIA in. a m "
ID a2 Z.
p m C - El
SOIL CLASSIFICATION E m d m m Ca m z � w ON j a
m n a� E E Ecmi 2 pia m'E '� 5 w E
SURFACE ELEVATION 116.0 in o z m I (0 V = U° Cr a o°
N
Inspector ATC Rock Core Dia. NIS in. w
Baring Method MD Shelby Tube OD NIA in. m o a)v m
m N T Zr N o m C J d
SOIL CLASSIFICATION E m �a�i m m m z j a N
m n aA E E Ecmi 2 y aE '3 v, E
SURFACE ELEVATION 113.0 m m o m 0 m m m Q m m = a 'o o- m o m
mo ❑cn mz co Ao O 8� Cic) 2 _j a o
:=•
Medium dense to dense brown to dark brown poorly
•;
Dense dark brown to brown well graded silty SAND
r
graded SAND
SS
4-7-8
SS
'�-10-23
22.9
1
1
5
X.
5
Loose gray poorly graded SAND with gravel
11.0
10
SS
25-1
18.4
12.0
10
SS
X
4-14-23
2
2
Loose to very loose gray poorly graded silty SAND with
SS
6-6-3
trace gravel
SS
5-5-5
3
3
15
15
----------- - - - - - - - - - -
17.0
.• •
Veryloose gray clayey SAND
4
4
SS
X
1A
OH/1
.4
SS
3-2-2
20
20
----------------------
22.0
----------------------
22.0
Very stiff gray sandy CLAY
Soft gray fat CLAY with trace gravel
5
5
SS
X
E-15-15
SS
X
W
H/1
"-2
38.7
25
25
•Dense
- -
gray poorly graded SAND
26.5
---------------------
Very stiff gray silty CLAY
27.0
SS
1
-234
4
SS
8-1
6
6
30
30
- - - - - - - - - - - - - - - - - - - - - -
32.0
----------------------
32.0
•
Very dense to dense gray silty SAND
: •
Dense gray silty SAND
7
SS
2
3-501,"
7
SS
-14-1
35
35
SS
2
-31-
SS
1
17-
8
8
8
Sample Type Depth to Groundwater Boring Method
Sample Type Depth to Groundwater Boring Method
SS - Driven Split Spoon a Noted on Drilling Tools 2.0 ft. HSA - Hollow Stem Augers
SS - Driven Split Spoon Noted on Drilling Tools 4.0 ft. HSA - Hollow Stem Augers
ST - Pressed Shelby Tube # At Completion (in augers) N/A ft. CFA - Continuous Flight Augers
CA - Continuous Flight Auger At Completion {open hole} N/A ft. DC - Driving Casing
RC -Rock Core MD -Mud Drilling
CU - Cuttings After NIA hours NIA ft.
CT -Continuous Tube i After NIA hours N/A ft. Page 1 of 2
a Cave Depth ft.
ST - Pressed Shelby Tube # At Completion (in augers) N/A ft. CFA -Continuous Flight Augers
CA - Continuous Flight Auger At Completion (open hole) NIA ft. DC - Driving Casing
RC -Rock Core MD -Mud Drilling
CU - Cuttings After NIA hours N/A ft.
CT -Continuous Tube t After NIA hours N/A ft. Page 1 of 2
a Cave Depth ft.
-N-T 7606 Whitehall Executive Center Dr. Building 800 TEST BORING LOG
7606 Whitehall Executive Center Dr. Building 800 TEST BORING LOG
/�C Charlotte NC, 28273
/C Charlotte NC, 28273
/ 704-529-3200
704-529-3200
Fax 704-529-3272
Fax 704-529-3272
CLIENT BURNS AND MCDONNELL BORING # B-5
CLIENT BURNS AND MCDONNELL BORING # B-6
PROJECT NAME LINE 67 (475) JOB # 199BAM2012
PROJECT NAME LINE 67 (475) JOB # 199BAM2012
PROJECT LOCATION GOLDSBORO,NC DRAWN BY ASS
PROJECT LOCATION GOLDSBORO, NC DRAWN BY ASS
35.374003,-77.91783 APPROVED BY JGS
35.372931,-77.918618 APPROVED BY JGS
DRILLING and SAMPLING INFORMATION TEST DATA
DRILLING and SAMPLING INFORMATION TEST DATA
Date Started 1212120 Hammer Wt. 140 lbs.
Date started 1211120 Hammer Wt. 140 lbs.
Date Completed 1212120 Hammer Drop 30 in.
Date Completed 1211120 Hammer Drop 30 in.
Drill Foreman MAD Spoon Sampler OD 2 in.
y
Drill Foreman MAD Spoon Sampler OD 2 in.
y
Inspector ATC Rock Core Dia. NIA in. 0.6 :EInspector
Boring Method MD Shelby Tube OD NIA in. u t o c E J E
a m
°! m� `m acio 0,m c
a U.. � o c
E m
SOIL CLASSIFICATION E m m m 30 m z D m m j a
m oa H H o _ i3 a v Y m
(continued) u m cmi Eo d m cc m a= o o Q m 8 0
in o ❑ co co z cn w o in Ci U a o
ATC Rock Core Dia. N/S in. .2,6
Boring Method MD Shelby Tube OD NIA in. u t o 09 E
m o
°' m� `m o0 om c aD
a U.. �? o c
�` t7 m 0_ n c m U E m
SOIL CLASSIFICATION E m m m 30 m z � m m j a
w w L m a H H o a a 0 m
(continued) `� iu m cca cc d m m B m o o Q m aEi
in o ❑ co cn z cn w rr 0 in ti U a a 12!
•
Very dense to dense gray silty SAND
: •
Dense gray silty SAND
42.0
Hard gray sandy SILT
9
9
SS
X
2-9-1A9.1
SS
X
R-1
6-2
7
28.8
45
45
50
SS
18-2
50
SS
X
1
-18
8
10
10
----------------------
52.0
•
Dense gray silty SAND
11
11
55
SS
-14-1
55
SS
1
21-
1
32.2
- - - - - - - - - - - - - - - - - - - - - -
57.0
57.0
Hard gray sandy SILT with trace clay
Dense gray silty SAND with gravel
12
12
60
SS
X
1
-21-
5
64.2
60
SS
15-2
- - - - - - - - - - - - - - - - - - - - - -
62.0
----------------------
62.0
•
Medium dense gray silty SAND with clay with mica
Hard gray fat CLAY with silt with trace sand
13
SS
4-5-7
13
SS
X
&17-3
65
65
67.0
Very stiff gray silty CLAY
70
SS
3-5-7
5.6
70
SS
-10-1
35.2
14
14
75.0
75
SS
X
4-5-9
75.0
75
SS
-11-1
15
15
BORING TERMINATED @ 75'
BORING TERMINATED @ 75'
Sample Type Depth to Groundwater Boring Method
Sample Type Deoth to Groundwater Boring Method
SS -Driven Split Spoon Noted on Drilling Tools 2.0 ft. HSA - Hollow Stem Augers
SS -Driven Split Spoon Noted on Drilling Tools 4.0 ft. HSA - Hollow Stem Augers
ST -Pressed Shelby Tube At Completion (in augers) N/A ft. CFA -Continuous Flight Augers
CA - Continuous Flight Auger � DC - Driving Casing
At Completion (open hole) N/A ft.
RC - Rock Core y After NIA hours N/A ft. MD - Mud Drilling
CU - Cuttings -
CT - Continuous Tube 1 After NIA hours N/A ft. Page 2 of 2
X Cave Depth ft.
ST -Pressed Shelby Tube At Completion (in augers) N/A ft. CFA -Continuous Flight Augers
CA - Continuous Flight Auger DC - Driving Casing
� At Completion (open hole) N/A ft.
RC - Rock Core y After NIA hours N/A ft. MD - Mud Drilling
CU - Cuttings -
CT -Continuous Tube i After NIA hours N/A ft. Page 2 of 2
it Cave Depth ft.
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
BURNS&McDONNELLCONSULTANTS, INC.
STATE LICENSE # C-1435
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDEA MCMULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL047852
PROFESSIONALENG/ARCHSTAMP
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
Piedmont
� ENERGY: Nc�tUl'a� Gas
'W" DUKEr6111
COPYRIGHT 2018
LINE 475 DOT RELOCATION - PIPELINE
G EOTECH N I CAL BORING LOGS
GOLDSBORO, NORTH CAROLI NA
GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA
SHEET(S) X OF X
DWG SCALE NONE
A
10-02-2020
90% DESIGN SUBMITTAL
MJD
CNS
CAM
AREA CODE
-
DATE
NITIALS
NIA
REGIONAL
ENGINEER
DWG DATE 10102/2020
SUPERSEDED
B
12-11-2020
REVISED 90% DESIGN SUBMITTAL
MJD
CNS
CAM
ACCOUNT NUMBER
-
PROJECT NUMBER
0231540
DATE
ATE
N/A
INITIALS
NIA
MGR TECH
REC &STD
DRAWING NUMBER
PNG-C-025-0001274
REVISION
B
DRAWING BY
MJD
STATION ID
DATE
12/11/2020
INITIALS
CAM
PRINCIPAL
ENGINEER
CHECKER INITIALS
CNS
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
7606 Whitehall Executive Center Dr. TEST BORING LOG
■ 7606 Whitehall Executive Center Dr. TEST BORING LOG
Charlotte, North Carolina 28217
ATC
j�_ Charlotte, North Carolina 28217
Phone 704-529-3200
j Phone 704-529-3200
Fax 704-529-3272
Fax 704-529-3272
CLIENT BURNS AND MCDONNELL BORING # B-3
CLIENT BURNS AND MCDONNELL BORING # B-4
PROJECT NAME LINE 475 JOB # 199BAM2012
PROJECT NAME LINE 475 JOB # 199BAM2012
PROJECT LOCATION DRAWN BY JIGS
PROJECT LOCATION DRAWN BY JIGS
GOLDSBORO. NC APPROVED BY JIGS
GOLDSBORO. NC APPROVED BY JIGS
DRILLING and SAMPLING INFORMATION TEST DATA
DRILLING and SAMPLING INFORMATION TEST DATA
Date Started 9122/20 Hammer Wt. 140 lbs.
Date Started 9122/20 Hammer Wt. 140 lbs.
Date Completed 9122/20 Hammer Drop 30 in.
Date Completed 9122/20 Hammer Drop 30 in.
Drill Foreman MAD Spoon Sampler OD 2 in.
Drill Foreman MAD Spoon Sampler OD 2 in.
Inspector ATC Rock Core Dia. N/A in. c
Inspector ATC Rock Core Dia. N/A in. c
Boring Method HSA Shelby Tube OD N/A in. - o °o a d °
rn m
Boring Method HSA Shelby Tube OD N/A in. 3r @ o c
g y E
_ 3
L� m N C (!� tN, J a O
a c c v
o �c7- ao ".>_ c
C
J
a c c v
o mom_. ao "� cg E m
@
SOIL CLASSIFICATION -o a, E j a y
SOIL CLASSIFICATION o v E a y
E 2 d ;y -�
r r o. o. a> c m z ro p_ v d
- a y Y
m a a- E E E o o N E 3 y o E
m z .w d E
r r a o. a -p a v '2
m a a- E E E o o N a E y 3 y E
SURFACE ELEVATION m d an d m m o S d 10 o g m o d
m❑ ❑m mz m co U) c1v a a
SURFACE ELEVATION m m an d m m o d o o g m o d
wo ❑m mz m m12 m.2 .0 2 � a a �
Very loose light brown clayey SAND (SC)
Medium dense light brown fine to medium silty SAND
(SM)
�
g
SS
X
1-2-1
18.2
SS
X
4-5-6
1
1
----------------------
6.0
5
- - - - - - - - - - - - - - - - - - - - - -
6.0
5
Medium dense tan fine to coarse SAND (SP-SC) with
Loose tan fine to medium SAND (SP)
clay
SS
X
5-7-1(2
SS
2-3-6
18.6
2
10
10
12.0
12.0
:. •
Very loose dark gray silty SAND (SM) with clay
Very loose light tannish gray clayey SAND (SC)
3
SS
X
1-1-1
3
SS
X
1-1-1
29.5
15
- - - - - - - - - - - - - - - - - - - - - -
16 0
15
'
----------------------
17.0
:..
Very loose gray silty fine SAND (SM)
Very soft dark gray clayey SILT (ML) with fine sand
4
4
SS
OH/1
"
33.5
SS
OH/1
"
20
20
______________________
22.0
_ _________________ __
22.0
Dense to very dense dark gray silty SAND (SM)
Medium dense dark gray silty fine SAND (SM) with
SS
X
1)-14-
8
clay
SS
X
1-9-1:9.0
5
5
T.
25
25
SS
X
1
-18-
4
32.0
SS
12-2
6
6
30
30
SS
X
E
18-2
SS
X
1-14-23.1
7
7
36.0
35
35
Very stiff dark gray fine sandy SILT (ML) with clay
40.0
SS
X
f
-10-23
7
SS
1
-37-
3
2.5
8
8
Sample Type Depth to Groundwater Boring Method
Sample Type Depth to Groundwater Boring Method
SS - Driven Split Spoon A Noted on Drilling Tools N/A ft. HSA - Hollow Stem Augers
SS - Driven Split Spoon A Noted on Drilling Tools N/A ft. HSA - Hollow Stem Augers
ST - Pressed Shelby Tube f At Completion (in augers) 3.0 ft. CFA - Continuous Flight Augers
ST - Pressed Shelby Tube f At Completion (in augers) 3.0 ft. CFA - Continuous Flight Augers
CA - Continuous Flight Auger DC - Driving Casing
At Completion (open hole) 3.0 ft.
CA - Continuous Flight Auger DC - Driving Casing
At Completion (open hole) 3.0 ft.
RC - Rock Core MD -Mud Drilling
CU - Cuttings 3 After NIA hours N/A ft.
RC - Rock Core MD -Mud Drilling
CU - Cuttings 3 After NIA hours N/A ft.
CT - Continuous Tube i After NIA hours N/A ft. Page 1 of 2
CT - Continuous Tube After NIA hours N/A ft. Page 1 of 2
ffi Cave Depth ft.
ffi Cave Depth ft.
7606 Whitehall Executive Center Dr. TEST BORING LOG
7606 Whitehall Executive Center Dr. TEST BORING LOG
Charlotte, North Carolina 28217
N.Affric
jkTIC Charlotte, North Carolina 28217
Phone 704-529-3200
N Phone 704-529-3200
Fax 704-529-3272
Fax 704-529-3272
CLIENT BURNS AND MCDONNELL BORING # B-3
CLIENT BURNS AND MCDONNELL BORING # B-4
PROJECT NAME LINE 475 JOB # 199BAM2012
PROJECT NAME LINE 475 JOB # 199BAM2012
PROJECT LOCATION DRAWN BY JIGS
PROJECT LOCATION DRAWN BY JIGS
GOLDSBORO. NC APPROVED BY JIGS
GOLDSBORO. NC APPROVED BY JIGS
DRILLING and SAMPLING INFORMATION TEST DATA
DRILLING and SAMPLING INFORMATION TEST DATA
Date Started 9/22/20 Hammer Wt. 140 lbs.
Date Started 9/22120 Hammer Wt. 140 lbs.
Date Completed 9122/20 Hammer Drop 30 in.
Date Completed 9122/20 Hammer Drop 30 in.
Drill Foreman MAD Spoon Sampler OD 2 in.
m
Drill Foreman MAD Spoon Sampler OD 2 in.
m
Inspector ATC Rock Core Dia. NIA in.
m
Inspector ATC Rock Core Dia. NIA in.
o .
Boring Method HSA Shelby Tube OD NIA in. �'N-' o a�i 2?E
Boring Method HSA Shelby Tube OD NIA in. 2:E o ai ? E
o am c3 cm c �a o
C
d am �3 �m c �a o
a i° d d o '. o .. m
> �C7 U E m
a d o g > o .. m
> C70 a� `cg- U E m
SOIL CLASSIFICATION m d `m d v v m �, a Y
SOIL CLASSIFICATION 3 -o �, E J a N
7$ L a a a o > 'O Z O. a :6 �= Y W
m a o-- E E E o o c y E !� w E
7$ L a M a o 5 'O Z CL a :2 �= Y
% a o-- E E E o o c m E !� 9 w E
o ° � m
(continued) o o y z° ron U)X F civ a a
(continued) ® m m W a� o v o
in ❑ ❑ m rn z m cn rn Ci U a a
Stiff dark gray clayey SILT (ML)
: •' •:
Medium dense dark gray silty fine SAND (SM) with
.:
clay
SS
5-5-7
48.1
SS
1
13-2
9
9
---------------------
46.0
45
---------------------
46.0
45
:. •
Very dense dark gray silty SAND (SM)
:: •
Very dense dark gray silty SAND (SM)
SS
1
-22-
1
SS
1
-50/
"
6.8
10
10
50
50
- - - - - - - - - - - - - - - - - - - - -
52.0
Stiff to very stiff CLAY (CL-CH)
55
11
SS
3-6-9
44.7
trace wood encountered 53.5' to 55'
55
11
SS
X
1 -38
2
38.1
SS
-5-1
53.1
SS
X
19 27-
5"
12
12
60
A60
---------------------
62.0
Hard dark gray CLAY (CL) with silt
SS
3-5-7
48.8
SS
X
-�-13-31
32.3
13
13
65
66.0
65
:4
Very dense dark gray silty SAND (SM)
SS
X
i-7-1:2.4
SS
1 33-5
27.6
14
14
70
70
72.0
Very dense dark gray silty SAND (SM)
75.0
15
SS
-11-1
6.9
750
15
SS
1 -27-
5
6.0
75
75
BORING TERMINATED @ 75'
BORING TERMINATED @ 75'
E
1_1
I
I
I
Sample Type Depth to Groundwater Boring Method
Sample Type Depth to Groundwater Boring Method
SS - Driven Split Spoon A Noted on Drilling Tools N/A ft. HSA - Hollow Stem Augers
SS - Driven Split Spoon A Noted on Drilling Tools N/A ft. HSA - Hollow Stem Augers
ST -Pressed Shelby Tube f At Completion (in augers) 3.0 ft. CFA - Continuous Flight Augers
ST -Pressed Shelby Tube f At Completion (in augers) 3.0 ft. CFA - Continuous Flight Augers
CA - Continuous Flight Auger DC - Driving Casing
At Completion (open hole) 3.0 ft.
CA - Continuous Flight Auger DC - Driving Casing
At Completion (open hole) 3.0 ft.
RC - Rock Core MD -Mud Drilling
CU - Cuttings After N/A hours N/A ft.
RC - Rock Core MD -Mud Drilling
CU - Cuttings After NIA hours N/A ft.
PRELIMINARY NOT
CT - Continuous Tube After N/A hours N/A ft. Page 2 of 2
CT - Continuous Tube After NIA hours N/A ft. Page 2 of 2
A Cave Depth ft.
Cave Depth ft.
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
BURNS&McDONNELLCONSULTANTS, INC.
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
STATE LICENSE # C-1435
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDEA MCMULLAN
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
SHEET(S) x OF X
DWG SCALE NONE
IFC SUBMITTAL DATE
LINE 475 DOT RELOCATION - PIPELINE
A
10-02-2020
90% DESIGN SUBMITTAL
MJD
CNS
CAM
AREA CODE
-
DATE
NITIALS
REGIONAL
NIA
DWG DATE 10102/2020
SUPERSEDED
NORTH CAROLINA
B
12/11/2020
REVISED 90% DESIGN SUBMITTAL
MJD
CNS
CAM
ACCOUNT NUMBER
-
ENGINEER
SEAL047852
Piedmont
DUKEr6111
G EOTECH N I CAL BORING LOGS
0231540
ATE
DATE
INITIALS
PROJECT NUMBER
MGR TECH
'W"
� ENERGY: Nc�tUl'a� Gas
DRAWING NUMBER
REVISION
DRAWING BY
MJD
N/A
NIA
REC &STD
GOLDSBORO, NORTH CAROLI NA
PNG-C-025-0001275
B
DATE
INITIALS
L
STATION ID
PRINCIPAL
PROFESSIONALENG/ARCH STAMP
12/11/2020
CAM
ENGINEER
COPYRIGHT 2018
GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA
I
I
I
ICHECKER INITIALS
CNS
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
Oki IL.
END STA. 97+83
4.ffl- �-
�. -
-
'. R FALLIN BLVD ES&PC PLAN,
SHEET PNG-C-025-0001285
BEGIN STA. 0+00 #
TEMPORARY CONSTRUCTION ENTRANCE
TEMPORARY CONSTRUCTION ENTRANCE
CENTRAL HEIGHTS RD
TEMPORAF
APPROXIMATELY 6 ACRE LAYDOWN
YARD UNDER SEPARATE PERMIT
40
WETLANDS 2 �00�
OG
- - HDD EXIT OAT
r:
0
PERENNIAL
�STREAM 01
WETLANDS 1
HDD ENTRY ��
SOD _ J �� i —
/ �0 ��00�
GqT / /i
TEMPORARY CONSTRUCTION ENTRANCE
JURISDICTIONAL DITCH 1
- TEMPORARY CONSTRUCTION ENTRANCE
- LINE 475 MLV 3 AND ASH ST
REGULATOR STATION UNDER
SEPARATE COVER
o°
HDD EXIT
�00 00,
TEMPORARY CONSTRUCTION ENTRANCE
°0 TN
Q)/ _ �o
% oo/
HDD ENTRY i
M
TEMPORARY CONSTRUCTION ENTRANCE
wom
PIPELINE CONSTRUCTION PHASING
1. NOTIFY NCDEQ AT LEAST 48 HOURS PRIOR TO PROJECT MOBILIZATION.
2. CONSTRUCTION AND LAND DISTURBANCE ACTIVITIES TO BEGIN NO EARLIER THAN JANUARY 2021.
PREPARE PROPOSED LINES WITH STORMWATER BMPS. SEE PHASED APPROACH BELOW:
a. PHASE I: CLEARING AND GRUBBING ROW
i. INSTALL PERIMETER CONTROLS - CONSTRUCTION ENTRANCES, COMPOST SOCK, SILT FENCE
ii. BEGIN CLEARING AND GRUBBING OPERATIONS.
' ij. HAUL OFF ALL CHIPPED WOOD TO AN APPROVED LANDFILL
iii. TEMPORARY STABILIZATION WITH TEMPORARY SEEDING, SEE ES&PC PLANS
�. iv. WHEREVER SLOPES ARE 2% OR STEEPER, TEMPORARY SEEDING SHALL BE APPLIED IMMEDIATELY
FOLLOWING CLEARING AND GRUBBING.
b. PHASE 2: GRADING OF ROW FOR ACCESS AND DITCH EXCAVATION
i. MAINTAIN EXISTING PERIMETER MEASURES AND INSTALL ADDITIONAL PERIMETER MEASURES AS
NEEDED.
ii. PRIOR TO GRADING OPERATIONS INSTALL EARTHEN BERMS OR COMPOST SOCKS ALONG THE
UPGRADIENT EDGE OF THE ROW TO DIVERT CLEAN WATER AROUND OR THROUGH DISTURBED
TRANCE AREAS. BERMS MUST BE MATTED IMMEDIATELY UPON CONSTRUCTION.
iii. BEGIN GRADING ROW IN PREPARATION OF PIPE INSTALLATION.
iv. DURING GRADING OPERATIONS MANAGE EROSION AND SEDIMENT CONTROL FROM WITHIN THE
DISTURBED AREAS BY INSTALLING SILT FENCE OUTLETS, SEDIMENT TRAPS, ETC. INSTALL
DEWATERING FEATURES AT IDENTIFIED LOCATIONS. MAKE SURE STOCKPILED MATERIAL IS
PROTECTED WITH SILT FENCE ALONG THE DOWNSTREAM EDGE.
v. PRIOR TO INSTALLING THE PIPE INSTALL TRENCH PLUGS IN THE OPEN DITCH IN AREAS WHERE
SLOPES WARRANT TRENCH PLUGS. THE TOP OF THE DOWNSTREAM TRENCH PLUG WILL BE AT THE
SAME ELEVATION AS THE BOTTOM OF THE UPSTREAM TRENCH PLUG.
vi. TEMPORARY STABILIZATION OF DISTURBED AREAS WITH TEMPORARY SEEDING AND MATTING, SEE
ES&PC PLANS.
c. PHASE 3: PIPE INSTALLATION
i. MAINTAIN INSTALLED EROSION AND SEDIMENT CONTROL MEASURES.
ii. MAINTAIN DEWATERING OPERATIONS OF OPEN DITCH.
iii. BEGIN PIPE INSTALLATION OPERATIONS WHICH INCLUDE STAGING OF PIPE, WELDING OF PIPE, AND
LOWERING OF PIPE INTO THE OPEN DITCH.
iv. AS PIPE IS INSTALLED DITCH IS TO BE BACKFILLED AND IMMEDIATELY PERMANENTLY STABILIZED
WITH PERMANENT SEEDING.
v. IN AREAS OF PROPOSED TRENCH PLUGS, SEDIMENT WITHIN THE DITCH TRAPPED BEHIND THE
TRENCH PLUGS SHOULD BE REMOVED, TRENCH PLUGS SHALL BE TEMPORARILY REMOVED, PIPE IS
TO BE INSTALLED, AND TRENCH PLUGS ARE TO BE REINSTALLED.
3. FOLLOWING CONSTRUCTION ACTIVITIES, AND AFTER INSPECTION BY NCDEQ, REMOVE TEMPORARY
EROSION AND SEDIMENT CONTROL BMPS, AND SEED ANY AREAS DISTURBED DURING BMP REMOVAL
ACCORDING TO THE SPECIFICATIONS IN APPENDIX D; SEE BELOW:
a. PHASE 4: FINAL CONDITIONS
i. CONTINUE STABILIZING DISTURBED AREAS.
ii. CONTRACTOR TO PROVIDE SEED, FERTILIZER, SOIL AMENDMENTS, AND WATER UNTIL PERMANENT
VEGETATION IS ESTABLISHED IN ACCORDANCE TO NCDEQ STANDARDS.
iii. CONTRACTOR TO RETURN CULTIVATED FIELDS TO ORIGINAL CONDITIONS.
iv. ONCE AREAS ARE PERMANENTLY STABILIZED IN ACCORDANCE TO NCDEQ STANDARDS AND
CULTIVATED FIELDS ARE RETURNED TO ORIGINAL CONDITIONS, REMOVE REMAINING E&SC
MEASURES AND CLOSE PERMIT IN ACCORDANCE TO NCDEQ REQUIREMENTS
4. UPON ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION, AN
INSPECTION BY THE DEMLR-LQS SHALL BE REQUESTED TO VERIFY THE ADEQUACY OF THE GROUND
COVER. PERMIT COVERAGE WILL END UPON ELECTRONIC SUBMITTAL OF THE NOTICE OF TERMINATION
(NOT).
y LIMITS OF DISTURBED AREA
r
o PIPELINE PROJECT: 25.61 AC
POINT OF CONTACT (MAINTENANCE):
DENNIS ROVERTSON (803)-917-6577
BURNS&McDONNELLCONSULTANTS, INC. I PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
STATE LICENSE # C-1435
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDE A McMULLAN
07/31i2020
NORTH CAROLINA
SEAL047852
NO.1
DATE
REVISION(S) DESCRIPTION
A
08-11-2020
60% DESIGN SUBMITTAL
B
10-02-2020
90% DESIGN SUBMITTAL
C
12-11-2020
REVISED 90% DESIGN SUBMITTAL
PROFESSIONAL ENG/ARCH STAMP
BY
CHK
JAPPID
DESCRIPTION
APPROVALS
jr� DUKE Piedmont
V ENERGY r6lj� Natural Gas
COPYRIGHT 2018
LNR
CNS
CAM
AREA CODE
1853
DATE
N/A
INITIALS
NIA
REGIONAL
ENGINEER
ABR
JTG
CAM
ACCOUNT NUMBER
LLO
JTG
CAM
PROJECT NUMBER
0228178
DATE
N/A
INITIALS
N/A
MGR TECH
REc & sTD
DRAWING BY
-
STATION ID
DATE
12/11/2020
INITIALS
CAM
PRINCIPAL
ENGINEER
CHECKER INITIALS
JTG
LINE 475 DOT RELOCATION - PIPELINE
OVERALL ES&PC PLAN
GOLDSBORO, NORTH CAROLI NA
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
PRELIMINARY - NOT
0 500 1000,FOR CONSTRUCTION
SCALE IN FEET 90% DESIGN SUBMITTAL
SHEET(S) X OF X I DWG SCALE
DWG DATE 12/11/2020 ISUPERSEDED
DRAWING NUMBER
PNG-C-025-0001280
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
NONE
REVISION
C
GENERAL EROSION AND SEDIMENT CONTROL NOTES
CONSTRUCTION SEQUENCE (SITE)
a.
INITIAL INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES;
1. THIS PROJECT IS LOCATED IN THE NEUSE RIVER BASIN.
(PHASE
1)
b.
CLEARING AND GRUBBING OF EXISTING GROUND COVER;
RECEIVING WATERS: SWIFT CREEK
CLASSIFICATION: C;NSW
1.
CONTACT THE DEMLR RALEIGH REGIONAL OFFICE AT LEAST 48 HOURS PRIOR
C.
COMPLETION OF ANY GRADING THAT REQUIRES GROUND COVER;
TO COMMENCING THE LAND -DISTURBING ACTIVITY. THE CONTACT NUMBER
2. CONSTRUCTION ACTIVITY POLLUTION PREVENTION IS REQUIRED FOR THIS
IS (919) 791-4200.
d.
COMPLETION OF ALL LAND -DISTURBING ACTIVITY, CONSTRUCTION, OR
PROJECT. PREVENTION OF POLLUTION RESULTING FROM CONSTRUCTION
DEVELOPMENT, INCLUDING PERMANENT GROUND COVER ESTABLISHMENT
ACTIVITIES SHALL BE ACCOMPLISHED BY CONTROLLING SOIL EROSION,
2.
INSTALL CONSTRUCTION ENTRANCE(S) AS SHOWN ON PLAN SHEETS WHERE
AND REMOVAL OF ALL TEMPORARY MEASURES; AND
WATERWAY SEDIMENTATION, AND AIRBORNE DUST GENERATION.
EQUIPMENT WILL ENTER AND LEAVE THE PROJECT SITE.
CONTRACTOR SHALL ENSURE THAT NO SEDIMENT RESULTING FROM
e.
TRANSFER OF OWNERSHIP OR CONTROL OF THE TRACT OF LAND WHERE
CONSTRUCTION ACTIVITIES INFRINGES ONTO ADJACENT PROPERTIES.
3.
INSTALL EROSION CONTROL DEVICES.
THE EROSION AND SEDIMENTATION CONTROL PLAN HAS BEEN APPROVED
CONTRACTOR SHALL COORDINATE EROSION AND SEDIMENT CONTROL WITH
AND WORK HAS BEGUN. THE NEW OWNER OR PERSON IN CONTROL SHALL
OTHER CONSTRUCTION ENTITIES PERFORMING WORK ON ADJACENT
4.
STABILIZE DISTURBED AREAS WITH EROSION CONTROL DEVICES. UTILIZE
CONDUCT AND DOCUMENT INSPECTIONS UNTIL THE PROJECT IS
PROPERTIES.
TEMPORARY SEEDING AS NECESSARY.
PERMANENTLY STABILIZED AS SET FORTH IN SUB -ITEM (C) OF THIS ITEM.
3. SOIL EROSION AND SEDIMENT CONTROLS ARE MEASURES USED TO REDUCE
5.
CONTACT INSPECTOR FOR ONSITE INSPECTION OF INSTALLED EROSION
2.
DOCUMENTATION OF SELF -INSPECTIONS PERFORMED UNDER ITEM (1) OF
THE AMOUNT OF SOIL PARTICLES THAT ARE CARRIED OFF AN AREA AND
CONTROL DEVICES.
THIS RULE SHALL INCLUDE:
DEPOSITED INTO A DRAINAGE COLLECTION SYSTEM OR INTO A BODY OF
WATER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT
6.
MAINTAIN DEVICES AS NEEDED PER NCDEQ MAINTENANCE INSTRUCTIONS.
a.
VISUAL VERIFICATION OF GROUND STABILIZATION AND OTHER EROSION
EROSION AND SEDIMENTATION ARE CONTROLLED TO THE EXTENT
CONTROL MEASURES AND PRACTICES AS CALLED FOR IN THE APPROVED
PRACTICABLE. ALL APPLICABLE SOIL EROSION AND SEDIMENT CONTROL
7.
ALL BARE SOILS ARE TO BE STABILIZED UNDER CONDITIONS OUTLINED IN THE
PLAN;
MEASURES SHALL BE IMPLEMENTED AND MAINTAINED THROUGHOUT THE
CURRENT NPDES PERMIT OR, IF IT IS IN A CRITICAL AREA, BY THE END OF THE
DURATION OF CONSTRUCTION ACTIVITIES. PRIOR TO INITIATING
DAY.
b.
VERIFICATION BY MEASUREMENT OF SETTLING BASINS, TEMPORARY
CONSTRUCTION IN AN AREA, ALL TEMPORARY EROSION AND SEDIMENT
CONSTRUCTION ENTRANCES, ENERGY DISSIPATORS, AND TRAPS.
CONTROL PRACTICES SHALL BE IN PLACE. UPON PROJECT COMPLETION AND
8.
SELF -INSPECTIONS FOR EROSION AND SEDIMENTATION CONTROL MEASURES
PERMANENT STABILIZATION, ALL TEMPORARY SOIL EROSION AND SEDIMENT
ARE TO BE PERFORMED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND
c.
THE NAME, ADDRESS, ORGANIZATION AFFILIATION, TELEPHONE NUMBER,
CONTROL MEASURES SHALL BE REMOVED.
WITHIN 24 HOURS OF EVERY RAIN EVENT OF GREATER THAN 1 INCH. ANY
AND SIGNATURE OF THE PERSON CONDUCTING THE INSPECTION AND THE
NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN MEASURES AS
DATE OF THE INSPECTION SHALL BE INCLUDED, WHETHER ON A COPY OF
4. TEMPORARY EROSION CONTROL SHALL BE THE CONTRACTOR'S
DESIGNED. ALL ESC MEASURES SHALL BE MAINTAINED AS SPECIFIED IN THE
THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR AN
RESPONSIBILITY, WHO SHALL UTILIZE APPROPRIATE BEST MANAGEMENT
CONSTRUCTION DETAILS ON THIS PLAN. A RAIN GAUGE SHALL BE INSTALLED
INSPECTION REPORT. A TEMPLATE FOR AN EXAMPLE OF AN INSPECTION
PRACTICES (BMPS). THOSE BMPS SHALL CONSIST OF SILT FENCE, WATTLES
AT THE PROJECT SITE FOR MONITORING.
AND MONITORING REPORT IS PROVIDED ON THE DEMLR WEBSITE AT:
OR OTHER MEANS TO CONTROL EROSION AS NEEDED.
HTTPS://DEQ.NC.GOV/ABOUT/DIVISIONS/ENERGY-MINERAL-
(PHASE
2 & 3)
LAN DRESOURCESIEROSION-SEDIMENT-CONTROL/FORMS. ANY RELEVANT
5. CONTRACTOR SHALL PLACE SILT FENCE PRIOR TO BEGINNING WORK. THE
LICENSES AND CERTIFICATIONS MAY ALSO BE INCLUDED. ANY
DEVICES SHALL BE PLACED DOWN -SLOPE OF DISTURBED AREAS WHERE
1.
BEGIN ACCESS ROAD INSTALLATION ON THE SITE AND SITE EXPANSION.
DOCUMENTATION OF INSPECTIONS THAT OCCUR ON A COPY OF THE
SHEET EROSION WOULD OCCUR. SILT FENCE SHALL BE CLEANED AND
APPROVED EROSION AND SEDIMENTATION CONTROL PLAN SHALL OCCUR
REPAIRED WHEN SEDIMENT BUILDUP REACHES ONE-THIRD OF SILT FENCE
2.
MAINTAIN ALL EROSION CONTROL DEVICES PER NCDEQ MAINTENANCE
ON A SINGLE COPY OF THE PLAN AND THAT PLAN SHALL BE MADE
HEIGHT. AFTER SIGNIFICANT RUNOFF EVENTS (V OF RAINFALL OR MORE)
INSTRUCTIONS.
AVAILABLE ON THE SITE.
AND ON A WEEKLY BASIS, THE CONTRACTOR SHALL INSPECT ALL EROSION
CONTROL STRUCTURES FOR SILT BUILD-UP THAT INTERFERES WITH THE
3.
STABILIZE SITE AS AREAS ARE BROUGHT UP TO FINISH GRADE WITH
d.
A RECORD OF ANY SIGNIFICANT DEVIATION FROM ANY EROSION OR
PERFORMANCE OF THE EROSION CONTROL STRUCTURE AND REPAIR OR
VEGETATION, GRAVEL, ETC.
SEDIMENTATION CONTROL MEASURE FROM THAT ON THE APPROVED PLAN.
REPLACE THOSE STRUCTURES, AS NECESSARY.
FOR THE PURPOSE OF THIS RULE, A "SIGNIFICANT DEVIATION" MEANS AN
4.
ALL EROSION CONTROL DEVICES SHALL REMAIN IN PLACE AS SHOWN ON THE
OMISSION, ALTERNATION, OR RELOCATION OF AN EROSION OR
6. ALL STORM DRAIN INLETS SHALL BE PROTECTED BY APPROPRIATE BMPS
DRAWINGS UNTIL THE ENTIRE SITE IS PERMANENTLY STABILIZED AND
SEDIMENTATION CONTROL MEASURE THAT PREVENTS IT FROM
DURING CONSTRUCTION, UNTIL ALL SOURCES WITH POTENTIAL FOR
APPROVED BY THE NCDEQ INSPECTOR.
PERFORMING AS INTENDED. THE RECORD SHALL INCLUDE MEASURES
DISCHARGE TO THE INLETS HAVE BEEN STABILIZED.
REQUIRED TO CORRECT THE SIGNIFICANT DEVIATION, ALONG WITH
5.
GROUNDCOVER SHALL BE ESTABLISHED IN 90 CALENDAR DAYS. HOWEVER,
DOCUMENTATION OF WHEN THOSE MEASURES WERE TAKEN. DEVIATIONS
7. ALL EXISTING DRAIN INLETS SHALL HAVE INLET PROTECTION INSTALLED IN
NPDES GROUNDCOVER REQUIREMENTS TAKE PRECEDENCE.
FROM THE APPROVED PLAN MAY ALSO BE RECOMMENDED TO ENHANCE
ACCORDANCE WITH NORTH CAROLINA MANUAL FOR EROSION CONTROL.
THE INTENDED PERFORMANCE OF THE SEDIMENTATION AND EROSION
EROSION PROTECTION MAY BE REMOVED WHEN VEGETATION IS
6.
WHEN CONSTRUCTION IS COMPLETE AND ALL AREAS ARE STABILIZED
CONTROL MEASURES.
ESTABLISHED.
COMPLETELY, ARRANGE FOR FINAL INSPECTION WITH THE NCDEQ
INSPECTOR.
8. IN ACCORDANCE WITH SECTION II.B.2 OF THE NPDES GENERAL PERMIT, ANY
DISTURBED AREA LEFT EXPOSED SHALL BE STABILIZED WITH TEMPORARY
7.
WHEN THE PROJECT IS COMPLETE, THE PERMITTEE SHALL CONTACT DEMLR
SEEDING WITHIN 7 TO 14 DAYS IN ACCORDANCE WITH NORTH CAROLINA
TO CLOSE OUT THE E&SC PLAN. AFTER DEMLR INFORMS THE PERMITTEE OF
EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL SECTION
THE PROJECT CLOSE OUT, VIA INSPECTION REPORT, THE PERMITTEE SHALL
6.11. PERMANENT STABILIZATION SHALL BE ACHIEVED THROUGH PERMANENT
VISIT DEQ.NC.GOV/NCG01 TO SUBMIT AN ELECTRONIC NOTICE OF
SEEDING FOR ALL DISTURBED AREAS. SEE SEEDING SCHEDULE IN NORTH
TERMINATION (E-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE
CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN
CHARGED UNTIL THE E-NOT HAS BEEN FILLED OUT.
MANUAL SECTION 6.11.
9. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED AND APPROVED BY
NCDEQ, TEMPORARY EROSION AND SEDIMENTATION CONTROLS MUST BE
REMOVED. AREAS DISTURBED DURING REMOVAL OF THE CONTROLS MUST
BE STABILIZED WITH PERMANENT SEEDING AS SOON AS POSSIBLE WITHIN 14
CALENDAR DAYS.
10. PER NPDES REQUIREMENTS, A RAIN GAUGE, SELF -INSPECTIONS RECORDS,
PERMIT, CERTIFICATE OF COVERAGE, AND S&E PLAN ARE REQUIRED TO BE
MAINTAINED ON SITE AND ACCESSIBLE DURING INSPECTION. IT IS
RECOMMENDED THAT THESE ITEMS BE PLACED IN A PERMITS BOX AT THE
BEGINNING OR ENTRANCE OF PROJECT.
11. THE CONTRACTOR SHALL CONDUCT SELF -INSPECTIONS OF THE EROSION
AND SEDIMENTATION CONTROL MEASURES AND COMPLETE THE DUKE
ENERGY PROVIDED SELF -INSPECTION FORM. TWELVE MONTHS OF COMPLETE
INSPECTION FORMS SHALL BE KEPT ON -SITE AND AVAILABLE FOR
INSPECTION AT ALL TIMES. IT IS RECOMMENDED A COPY BE KEPT IN A
PERMITS BOX.
8. IF SITE IS APPROVED, REMOVE EROSION CONTROL MEASURES AND
STABILIZE RESULTING BARE AREAS IMMEDIATELY.
SELF -INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY
NCGS 113A54.1 (E)
(EFFECTIVE OCTOBER 1, 2010; READOPTED EFFECTIVE APRIL 1, 2020)
15A NCAC 04B .0131 SELF -INSPECTIONS
ALL LAND -DISTURBING ACTIVITIES REQUIRED TO HAVE AN APPROVED EROSION
AND SEDIMENTATION CONTROL PLAN UNDER G.S. 113A54.1(E) SHALL CONDUCT
SELF -INSPECTIONS FOR INITIAL INSTALLATION OR MODIFICATION OF ANY EROSION
AND SEDIMENTATION CONTROL DEVICES AND PRACTICES DESCRIBED IN AN
APPROVED PLAN. IN ADDITION, WEEKLY AND RAIN -EVENT SELF -INSPECTIONS ARE
REQUIRED BY FEDERAL REGULATIONS, THAT ARE IMPLEMENTED THROUGH THE
NPDES CONSTRUCTION GENERAL PERMIT NO. NCG 010000.
1. FOR SELF -INSPECTIONS REQUIRED PURSUANT TO G.S. 11 3A-54.1 (E), THE
INSPECTION SHALL BE PERFORMED DURING OR AFTER EACH OF THE
FOLLOWING PHASES OF THE PLAN;
BURNS& McDONNELLCONSULTANTS, INC. I PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
STATE LICENSE # C-1435
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDE A. McMULLAN
NO.1
DATE
REVISION(S) DESCRIPTION
07/31/2020
A
08-11-2020
60% DESIGN SUBMITTAL
NORTH CAROLINA
B
IC
10-02-2020
90% DESIGN SUBMITTAL
SEAL047852
12-11-2020
REVISED 90% DESIGN SUBMITTAL
PROFESSIONAL ENG/ARCH STAMP
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
BY
CHK
JAPPD
DESCRIPTION
APPROVALS
DUKELLO Piedmont
p/ ENERr6ljl�
�C ENERGY:.. Natural Gas
COPYRIGHT 2018
LINE 475 DOT RELOCATION - PIPELINE
ES&PC GENERAL NOTES
GOLDSBORO, NORTH CAROLINA
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
SHEET(S) X OF X
DWG SCALE NONE
LNR
CNS
CAM
AREA CODE
-
DATE
N/A
NITIALS
NIA
REGIONAL
ENGINEER
DWG DATE 12111/2020
SUPERSEDED
ABR
JTG
CAM
ACCOUNT NUMBER
-
JTG
CAM
PROJECT NUMBER
0228178
DATE
N/A
INITIALS
NIA
MGR TECH
REC&STD
DRAWING NUMBER
PNG-C-025-0001281
REVISION
C
DRAWING BY
-
STATION ID
DATE
12/11/2020
INITIALS
CAM
PRINCIPAL
ENGINEER
CHECKER INITIALS
JTG
FDISCIPLINE / RESOURCE CENTER / LINE NUMBER
BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-1435
CLAUDE A MCMULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL 047852
PROFESSIONAL ENG/ARCH STAMP
LOD
N 595241.21
E 2320025.66
F'KUF'UStU I tIVIF'UKAKY
WORKSPACE (TYP)
4f PROPOSED BOX SECTION
fAlllN SUE MARY REPLACEMENT FOR FALLIN
Wff 3WPAW IM BLVD EXPANSION
PLAT Ih?ffi
Nlr
FALLIN SUE MARY
JMN$7m
B�OIX J1Nd PAW 1W
Pur m-w
AUUtzb5 KUAU I U tit
MATTED AS REQUIRED
BASED ON FIELD
CONDITIONS, SEE
DETAIL 2 ON SHEET
PNG-C-025-0001292
I I I
r I
d
I I
I H
18' SILT FENCE
Ir
d SFWB
r
� I d
I
12' TRAVEL LANE
I ld
I
r I
I
I F
LODr
N 594389.08
E 2320217.77
LOD
N 594387.27
E 2320193.84
LOD
N 594348.59
E 2320265.11
LOD
N 594340.02"
E 2320153.25
lop PTL
�� CENTRAL HEIGHTS RD
E 2320290.68
I
30 U�A 41
PLAT M-22J AND M-221
�LOD
N 594958.51
E 2320290.68
\ N,
L/\IV I IIVIJ Vlll \lJLII VlI
POWER AND LIGHT
EASEMENT
TEMPORARY GRAVEL
CONSTRUCTION
ENTRANCE,SEE
DETAIL 1 ON SHEET
PNG-C-025-0001290
SEVER MAAHOLE
RIM= 113.013.0'
12" PIC INV= 102.8' (A)
12" PIC INV= 102.8' (8) , /
KInTCC'.
1. SILT FENCE SHALL BE INSTALLED IN ALL NON
PAVED AREAS. IN PAVED AREAS, COMPOST
SOCKS SHALL BE INSTALLED.
MANHOLE 2. CONTRACTOR SHALL INSTALL CONSTRUCTION
,'NOW INV= 99.1' EXIT AT ALL SITE ACCESS POINTS. 3. ALL TREES TO REMAIN SHALL BE PROTECTED
WITH TREE PROTECTION FENCING.
4. ANY DISTURBED AREA LEFT IDLE FOR A PERIOD
OF 14 DAYS OR LONGER SHALL BE STABILIZED
WITH MULCHING AND TEMPORARY SEEDING
WITH THE EXCEPTION OF AGRICULTURAL
fAlllN #or£ A/ARY FIELDS WHICH ONLY NEED STABILIZATION TO
isavmw THE EXTENT REQUIRED TO AVOID TOP SOIL
MIX J18B PAW IM
Para -sal WASHING AWAY.
5. ALL DISTURBED AREA SHALL BE PERMANENTLY
STABILIZED WITH PERMANENT SEEDING UPON
COMPLETION OF CONSTRUCTION ACTIVITIES.
6. CONTRACTOR SHALL NOT PARK VEHICLES OR
EXISTING PNG REFUEL WITHIN 125' OF EXISTING
PERMANENT EASEMENT WATERBODIES UNLESS SECONDARY
CONTAINMENT MEASURES ARE IMPLEMENTED.
EXISTING PNG LINE 67
o \
ok�
oy \
\ o
0% \ \ NDERGROUND GAS
ti�
\ SUER LEGEND:
\ \ t PROPERTY LINE
\ 2
o \ TEMPORARY SILT
N/P \ oy ti� \ o FENCE C-02 -- J 290
MARY SUE FALLIN LIMITS OF DISTURBANCE
118.00 \.
\ \ STREAM
BOpI 3/6Q PACE 16b
Puri -ter \ ,
TEMPORARY 1
CONSTRUCTION C-025-0001290
\ \ ENTRANCE �J
\ \ \5EWO SFWB SILT FENCE WATTLE 3
\ \ R'M= BREAK C-025-0001290
-SUES
LIMITS OF DISTURBED AREA
PIPELINE PROJECT: 25.61 AC
_ N
LI I oy
LINE - SUWB I 5" RCP UNKNOWN WHERE OTHER \
END IS LOCATED
INV= 111.8'
pr
Gp 0 60 120 PRELIMINARY - NOT
1
1IN=60FT FOR CONSTRUCTION
90% DESIGN SUBMITTAL
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
NO.
DATE
REVISION(S) DESCRIPTION
BY
I CHK
APPD
I DESCRIPTION
APPROVALS
Piedmont
I DUKE 0111
4 ENERGY_-. Natural Gas
COPYRIGHT 2018
LINE 475 RELOCATION - PIPELINE
FALLIN BLVD ES&PC PLAN
GOLDSBORO, NORTH CAROLINA
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
A
08-11-2020
60% DESIGN SUBMITTAL
HEC
CDWCAM
AREA CODE
-
DATE
N/A
INITIALS
N/A
REGIONAL
ENGINEER
B
10-02-2020
90% DEISGN SUBMITTAL
ABR
JTG
CAM
ACCOUNT NUMBER
-
C
12/11/2020
REVISED 90% DESIGN SUBMITTAL
LLO
JTG
CAM
PROJECT NUMBER
0231540
DATE
N/A
INITIALS
N/A
MGR TECH
REC & STD
DRAWING BY
-
ISTATION ID
DATE
12/11/2020
INITIALS
CAM
PRINCIPAL
ENGINEER
CHECKER INITIALS
JTG
SHEET(S) X OF X I DWG SCALE AS NOTED
DWG DATE 12/11/2020 SUPERSEDED
DRAWING NUMBER REVISION
PNG-C-025-0001285 C
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
TEMPORARY 5��ooc
CONSTRUCTION `_ 101.00 NIF
MARY SUE FALLI
ENTRANCE, SEE \ 101,00 (101,00)
DETAIL 1 ON SHEET \ 3529048073
PNG-C-025-0001290 ° I / BOOK 3468 PAGE q18
PLAT L-40i
NL / \/ �-LOD PLAT K-25F
EASEMENT BOOK 741 PAGE
Z
/ 0y3ft O
---LO LOD-----LOD-----LOD-----LOD — — — —
0.16 /o
b.
OG����e v0P5 �P 0 0 2+00 3+00 - 4+00 '
EXISTING PNG LINE 67/ o o mA� 46'
�/
t' �°
�o �� gip. —LO-D 8-----
LOD
�� 0
OHW OH \V �HW OHW OHW OHW OHW OHW OHW OHW OHW
OHW OHW , °H EXISTING CAROLINA POWER OHW OHW OHW OHW OHW OHW
AND LIGHT COMPANY CAROLINA POWER AND LIGHT COMPANY EASEMENT
\ / / 70' WIDE
EASEMENT 70' WIDE PLAT L-401 30'
OHW O Q�. HI OHW-
// NIF
D
C�
2
r
z
m
z
m
U)
m
m
0_0
\ NIF
\ SOUTHWEST INVESTORS GROUP LLC \
103.00 (103.00)
J52915776J
V BOOK 2842 PAGE 135 (NAME CHANGE)
BOOK 1800, PAGE 184
\ PLA T 1-294
PLAT B-94
\ NO EASEMENT ON L TC
JD
CLOD
CLOD
\ �_p
13 0
co
14+00
Oct., 15+00
MATCH LINE 21+50
w 'LODE
WETLANDS 2 M
";W _
MATCH LINE THIS SHEET - A
5+00 6+00
OHW - /ejOHW -
2F 4- OHW
ACCESS FROM
LAYDOWN YARD
- OHW -
OHW
.0-1 �LpD
pD
�i100'
i
1g+00
�x00 �' \(i�
i
A7+00 L C
g+00 �cp. L D
o L D /V/F
i SOUTHEAST INVESTORS
Q� GROUP LLC
i 104,00 (104, 00)
i 3529235465
i BOOK 2842, PAGE 135
i (NAME CHANGE)
L D BOOK 1800, PAGE 184
TEMPORARY SILT FENCE, TYP EXCEPTION BOOK 1175
PA GE 78
PLAT B-94
NO RECORD INFORMA TION FOUND \ NO EASEMENT \LTC
OR PROVIDED FOR CP&L EASE)\T \
IN THIS AREA/ \
0
OHW -
OHW
LOI
to
7+00
8+00
OHw TEMPORARY SILT FENCE, TYP OHW _
- OHW MEN OHW OHW
,21+00
s<<'
i--- LODE--7 LUU—
\
EXISTING ATLANTIC NORTH—
CAROLINA RAILROAD JURISDICTIONAL DITCH
R/W 200' WIDE j I I _J C�\ \ \
ILA
-7/
�� /\\ \
\ 14+00L \\ I I, 2 0 2 +00 \ III I / 27+00 28+00 29+00 \ /I \ 30+00 31
JOIN-
- — — — \ y I 0.56%
4_43 / ��o I' o
'z__ 0.34%
ao-I CIO] _ --aO_I
TEMPORARY SILT FENCE, TYP \ \ \ \ \ V \I N/F I \\\\
\\ \ \ o\ COUNTY OF WAYNE I \\ \\
\ I (105, 00) \
\ ' y z \ OOK 1309, PAGE 859 I \ \\
\ \� \ PLAT L D DITCH JURISDICTIONAL OD— —001 0 001 --- —4]
%�
\ z \ TEMPORARY SILT FENCE, TYP \\\\
103.00
NIF
SOUTHWEST INVESTORS GROUP
LLC
103.00 (103, 00)
J52913776J
BOOK 2842 PAGE 155 (NAME
CHANGE)
BOOK 1800, PAGE 184
PLAT 1-294
PLAT B-94
NO EASEMENT ON L TC
---LOD -- --LOD — — — LOD
0,4
9 o
D
c�
9+00
10+00 11+00
c
LO
z
T
m
o
-A A A
+
LOD----- LOD----- LOD----- LOD—
v,
0
NO RECORD INFORMA TION FOUND
OR PROVIDED FOR CP&L EASEMENT
OHW
,.".
IN THIS AREA
OHW �� OHW OHW OHW
OHW OHW OHW OHW
MATCH LINE THIS SHEET - A
0
115
1
°Nw 1
w
1
ACCESS FROM °"w\
LAYDOWN YARD
Z
NON -JURISDICTIONAL
DITCH V�
APPROXIMATELY 6
ACRE LAYDOWN
YARD UNDER
SEPARATE PERMIT
1. CONTRACTOR SHALL INSTALL CONSTRUCTION EXIT AT ALL
SITE ACCESS POINTS.
2. ALL TREES TO REMAIN SHALL BE PROTECTED WITH TREE
PROTECTION FENCING.
3. ANY DISTURBED AREA LEFT IDLE FOR A PERIOD OF 14 DAYS OR
LONGER SHALL BE STABILIZED WITH MULCHING AND
TEMPORARY SEEDING WITH THE EXCEPTION OF
AGRICULTURAL FIELDS WHICH ONLY NEED STABILIZATION TO
THE EXTENT REQUIRED TO AVOID TOP SOIL WASHING AWAY.
SEE DETAIL 1, SHEET C-025-0001291.
4. STABILIZE ALL DISTURBED AREAS OUTSIDE OF THE
CULTIVATED FIELD WITH PERMANENT SEEDING IN
ACCORDANCE WITH DETAIL 2, SHEET C-025-0001291. ALL
OTHER DISTURBED AREAS SHALL BE RESTORED TO ORIGINAL
CONDITIONS AS A CULTIVATED FIELD; PERMANENT SEEDING
WILL NOT BE UTILIZED.
5. REFER TO SITE PLAN PNG-C-025-0001280 FOR OVERALL LIMITS
OF DISTURBANCE, HDD ENTRY AND EXIT WORKSPACE, AND
TEMPORARY AND PERMANENT ACCESS ROADS.
6. CONTRACTOR SHALL CLEAR TREES TO STUMPS ONLY
(GROUND LEVEL OR WATERLINE); NO GRUBBING IN HDD
REQUIRED. CONTRACTOR SHALL PULL ALL CUT MATERIAL OUT
OF HDD ROW AND DISPOSE OF AS DIRECTED BY COMPANY.
HAND CLEARING IS ALLOWED. IF EQUIPMENT IS USED, MATTING
AND EROSION CONTROL MEASURES SHALL BE IN PLACE TO
SATISFACTION OF COMPANY.
LEGEND:
u+UU
0
BURNS& McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-14W
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDE A McMULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL047852
PROFESSIONAL ENG/ARCHSTAMP
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
I Piedmont
DUKE r6l
� ENERGY. Natural Gas
COPYRIGHT 2018
LINE 475 DOT RELOCATION - PIPELINE
ES&PC PLAN
GOLDSBORO, NORTH CAROLINA
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
A
08-11-2020
60% DESIGN SUBMITTAL
MJD
CNS
CAM
AREA CODE
-
DATE
NIA
INITIALS
N/A
REGIONAL
ENGINEER
B
09-23-2020
90% DESIGN SUBMITTAL
ABR
JTG
CAM
ACCOUNT NUMBER
-
C
12-11-2020
REVISED 90% DESIGN SUBMITTAL
LLO
JTG
CAM
PROJECT NUMBER
0231540
DATE
NIA
INITIALS
N/A
MGR TECH
REC &STD
DRAWING BY
-
STATION ID
DATE
12/11/2020
INITIALS
CAM
PRINCIPAL
ENGINEER
CHECKER INITIALS
JTG
PROPERTY LINE
2 1
TEMPORARY SILT
FENCE C-025-0001290
LIMITS OF DISTURBANCE
STREAM
TEMPORARY 1
CONSTRUCTION C-025-0001290
ENTRANCE
WETLANDS
- I PROPOSED 8" PIPELINE
LIMITS OF DISTURBED AREA
PIPELINE PROJECT: 25.61 AC
POINT OF CONTACT (MAINTENANCE):
DENNIS ROBERTSON 803-917-6577
PRELIMINARY - NOT
50 100 FOR CONSTRUCTION
1IN = 50FT 90% DESIGN SUBMITTAL
SHEET(S) X OF X I DWG SCALE AS NOTED
DWG DATE 12/11/2020 SUPERSEDED
DRAWING NUMBER REVISION
PNG-C-025-0001286 C
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
TEMPORARY SILT FENCE, TYP
spa. pb � mb r
o
oot
'lo �6vj
2d
d
Z
�
�s�m Aso TEMPORARY \ — — — — — — 3go�o -----"
_ CONSTRUCTION 0.33°0
ENTRANCE, SEE
DETAIL 1 ON SHEET
PNG-C-025-0001290 I
� 1
� I
0.
o
4W GO (30
0 a0�7 /
o� /
BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-1435
CLAUDE A MdVIULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL 047852
PROFESSIONAL ENG/ARCH STAMP
C,y
D
C�
2
r_
z
m
N
v,
0
TEMPORARY
EXISTINI
E
1LIV11 VI%r-1I%1 %JIL1 1 LIVVL, 1 11
N/F
COUNTY OF WA YNE
(105, 00)
BOOK 1509, PAGE 859
PLAT L -57E 105.00
LOT 6
/�
00
_ a0-1---.— QI
CHENEY BROS, NC (TITLE)
105.00 (103.05)
BOOK 5289, PAGE 669 (MERGER)
BOOK 3248, PAGE 215
5529124586
JURISDICTIONAL DITCH PLAT L -57E
PLAT L-57
..
MATCH LINE 42+50
qr
/W 90' VVI DE
c INC.
381
J76
-F
-D
AInTCC`•
1. CONTRACTOR SHALL INSTALL CONSTRUCTION EXIT AT ALL SITE ACCESS
POINTS.
2. ALL TREES TO REMAIN SHALL BE PROTECTED WITH TREE PROTECTION
FENCING.
3. ANY DISTURBED AREA LEFT IDLE FOR A PERIOD OF 14 DAYS OR LONGER
SHALL BE STABILIZED WITH MULCHING AND TEMPORARY SEEDING WITH
THE EXCEPTION OF AGRICULTURAL FIELDS WHICH ONLY NEED
STABILIZATION TO THE EXTENT REQUIRED TO AVOID TOP SOIL WASHING
AWAY. SEE DETAIL 1, SHEET C-025-0001291.
4. STABILIZE ALL DISTURBED AREAS OUTSIDE OF THE CULTIVATED FIELD
WITH PERMANENT SEEDING IN ACCORDANCE WITH DETAIL 2, SHEET
C-025-0001291. ALL OTHER DISTURBED AREAS SHALL BE RESTORED TO
ORIGINAL CONDITIONS AS A CULTIVATED FIELD; PERMANENT SEEDING
WILL NOT BE UTILIZED.
5. REFER TO SITE PLAN PNG-C-025-0001280 FOR OVERALL LIMITS OF
DISTURBANCE, HDD ENTRY AND EXIT WORKSPACE, AND TEMPORARY AND
PERMANENT ACCESS ROADS.
6. CONTRACTOR SHALL CLEAR TREES TO STUMPS ONLY (GROUND LEVEL OR
WATERLINE); NO GRUBBING IN HDD REQUIRED. CONTRACTOR SHALL PULL
ALL CUT MATERIAL OUT OF HDD ROW AND DISPOSE OF AS DIRECTED BY
COMPANY. HAND CLEARING IS ALLOWED. IF EQUIPMENT IS USED, MATTING
AND EROSION CONTROL MEASURES SHALL BE IN PLACE TO SATISFACTION
OF COMPANY.
LEGEND:
D
--- L❑D---
8+00 9+00
PROPERTY LINE
2 1
TEMPORARY SILT FENCE 1
C-025-0001290
LIMITS OF DISTURBANCE
STREAM
1
TEMPORARY CONSTRUCTION
ENTRANCE C-025-0001290
PROPOSED 8" PIPELINE
(�s Fwe SILT FENCE WATTLE BREAK 3
- - C-025-0001290
COIR WATTLE 3
C-025-0001291
LIMITS OF DISTURBED AREA
PIPELINE PROJECT: 25.61 AC
POINT OF CONTACT (MAINTENANCE):
DENNIS ROBERTSON 803-917-6577
0
/\IJ I IIVV V I ILA I I 1--P'%%7LIVILIV I GV VVIVL
1 �
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED *
DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE *
TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
Piedmont
�� DUKE 0111
4 ENERGY. Natural Gas
COPYRIGHT 2018
LINE 475 DOT RELOCATION - PIPELINE
ES&PC PLAN
GOLDSBORO, NORTH CAROLINA
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
A
08-11-2020
60% DESIGN SUBMITTAL
MJD
CNS
CAM
AREA CODE
-
DATE
NIA
INITIALS
N/A
REGIONAL
ENGINEER
B
09-23-2020
90% DESIGN SUBMITTAL
ABR
JTG
CAM
ACCOUNT NUMBER
-
C
12-11-2020
REVISED 90% DESIGN SUBMITTAL
LLO
JTG
CAM
PROJECT NUMBER
0231540
DATE
NIA
INITIALS
N/A
MGR TECH
REC & STD
DRAWING BY
-
STATION ID
DATE
12/11/2020
INITIALS
CAM
PRINCIPAL
ENGINEER
CHECKER INITIALS
JTG
PRELIMINARY - NOT
50 100 FOR CONSTRUCTION
1IN = 50FT 90% DESIGN SUBMITTAL
SHEET(S) X OF X I DWG SCALE AS NOTED
DWG DATE 12/11/2020 SUPERSEDED —
DRAWING NUMBER REVISION
P N G-C-025-0001287 C
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
Maj
i
APPROXIMATE LOCATION
107.00 (103.06)
BOOK 3280, PAGE 381
BOOK .3280, PAGE .376
PLAT 0 PAGE 52-F
/ TRACT 2B
PLAT M PAGE 56-D
\ J519915801
R LOT 22C
PLAT SLIDE M PAGE 56-D
DEED BOOK 2567, PAGE 523
TRACT NO. 2
�OO� �
�—
AI�ITCC-
1. CONTRACTOR SHALL INSTALL CONSTRUCTION EXIT AT ALL
SITE ACCESS POINTS.
2. ALL TREES TO REMAIN SHALL BE PROTECTED WITH TREE
PROTECTION FENCING.
3. ANY DISTURBED AREA LEFT IDLE FOR A PERIOD OF 14 DAYS
OR LONGER SHALL BE STABILIZED WITH MULCHING AND
TEMPORARY SEEDING WITH THE EXCEPTION OF
AGRICULTURAL FIELDS WHICH ONLY NEED STABILIZATION
TO THE EXTENT REQUIRED TO AVOID TOP SOIL WASHING
AWAY. SEE DETAIL 1, SHEET C-025-0001291.
4. STABILIZE ALL DISTURBED AREAS OUTSIDE OF THE
CULTIVATED FIELD WITH PERMANENT SEEDING IN
ACCORDANCE WITH DETAIL 2, SHEET C-025-0001291. ALL
OTHER DISTURBED AREAS SHALL BE RESTORED TO
ORIGINAL CONDITIONS AS A CULTIVATED FIELD;
PERMANENT SEEDING WILL NOT BE UTILIZED.
5. REFER TO SITE PLAN PNG-C-025-0001280 FOR OVERALL
LIMITS OF DISTURBANCE, HDD ENTRY AND EXIT
WORKSPACE, AND TEMPORARY AND PERMANENT ACCESS
I ROADS.
108.00 HARRY � MOLLIE LLC 6. CONTRACTOR SHALL CLEAR TREES TO STUMPS ONLY
108 (108,00) (GROUND LEVEL OR WATERLINE); NO GRUBBING IN HDD
55199054592 2 11, AGE 4154591 REQUIRED. CONTRACTOR SHALL PULL ALL CUT MATERIAL
BOOK 2811, PAGE 413
PLAT J-234 (REMAINDER of TRACT 3) OUT OF HDD ROW AND DISPOSE OF AS DIRECTED BY
EASEMENTS
' BOOK 2135, PAGE 432 COMPANY. HAND CLEARING IS ALLOWED. IF EQUIPMENT IS
BOOK 1206, PAGE 206 USED, MATTING AND EROSION CONTROL MEASURES SHALL
�O% BOOK 825, PAGE 626
Gb BOOK 828, PAGE 694 I BE IN PLACE TO SATISFACTION OF COMPANY.
68+00
CO
69+00 NC 00 /
1 i col 70+0
2 i 001 60�M� ��° 71+00
i
RicH7 D °RC Y � p
I� \ SLAT
+ � °°�� --- \� � aoi��
U' .�� z z h ��� +
o �� w
22C \ 'A 'Rc
ono
�QCXWAT
---__— PA�DCCAAOCATj0V �� Q O �0)
_ C PACE
N/E
HARRY & MOLLI LLC 108.00
108 (108, 00)
35799054592 A 1
FCC
PERENNIAL STREAM 01
ND 35 99054591
BOOK 2811, PAGE 413 I I - I
PLAT J-234 (REMAINDER OF TRACT 5) 1 1 1 1 O
EASEMENTS I 1 ' I- I ! O
BOOK 2135, PAGE 452
BOOK 1206, PAGE 206 TEMPORARY CONSTRUCTION
— — TEMPORARY SILT FENCE, TYP BOOK 825 PAGE 626 ENTRANCE SEE DETAIL 1 ON
BOOK 828, PAGE 694 3N�
SHEET PNG-C-025-0001290 Iwo I I I _ I / �� /
�/,WETLANDS 1 -
\� --�-- ----- ----- — SFWB 8+00
0 0� ao� aOl —-- �/
F II gFWB
NOTE 6 WATTLE BARRIER, TYP
LEGEND:
t
--- L❑D---
9+00
PROPERTY LINE
TEMPORARY SILT FENCE
2 1
C-025-0001290
LIMITS OF DISTURBANCE �J
STREAM
TEMPORARY CONSTRUCTION L:)
ENTRANCE C-025-0001290
N��
WETLANDS
2
TIMBER MATS
C-025-0001292
COIR WATTLE 3
C-025-0001291
PROPOSED 8 PIPELINE
SILT FENCE WATTLE BREAK 3
C-025-0001290
��
---a0I-----ao� — — o� -- I 1 , I 1 I I —�—ao� --I — of av CD
o� ao�-
1 I _ II I I I i II / �'�
_ 72+00 AID 7s+oo 4+00 ���, �5+00 �6+00 I 7s+oo I I I I 9 o i �/ ! I se�oo _ \ + 2 �° 83+00 LIMITS OF DISTURBED AREA
r ��N ; I I I I I I
Z O ° ' 1 I' IP' I' I I
��_ — — — PIPELINE PROJECT: 25.61 AC
— �, , 1 I HWYI70 R/WI= 267' I ao-I--- o� o r_
3 3 3 3 3 3 3 3 3 J
/ O Z
\ ` --O t -- — -- 1 I I C5 I I I I Q I / / I NIF
00
c+ii \ I I - I I _BENJAMIN FRANK N HDD WPOINT OF CONTACT (MAINTENANCE):
O73e7,I Z 1 Z I - I I Z U� �� MOZINGO AND I +aol—� --ao�— — — ao�----- asa " 1go�— r GO---- ao� ��""� HDD E XIT � � o m - I 0 �� C�RG�NIA Moz�NGo I ENTRY o DENNIS ROBERTSON 803-917-6577
- uNOSEY I
fl-w I II � � I - I I 0 ��� �� CONTRACTOR SHALL LIMIT o9.00 (111.00)
----------------- - —
�F
BURNS & McDONNELL CONSULTANTS, INC
STATE LICENSE # C-1435
CLAUDE A MdVIULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL 047852
PROFESSIONAL ENG/ARCH STAMP
(n I (n IPLAT D-6
\ L
X I z LU Q p CLEARING TO 20' TOTAL IN )OK 252 ACE 228 ao�-----
I I I I- I I w L- U �\ � WETLAND PORTION OF HDD -
-01 (10' EACH SIDE OF PIPLINE) — — — —
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS
A 08-11-2020 60% DESIGN SUBMITTAL MJD CNS CAM AREA CODE - DATE INITIALS REGIONAL LINE 475 DOT RELOCATION - PIPELINE
B 09-23-2020 90% DESIGN SUBMITTAL ABR JTG CAM ACCOUNT NUMBER - NIA N/A ENGINEER
C 12-11-2020 REVISED 90% DESIGN SUBMITTAL LLO JTG CAM PROJECT NUMBER 0231540 DATE INITIALS MGR TECH 4nENERGY.DUKE 011INaturalGas
Piedmont ES&PC PLAN
NIA N/A REC &STD
DRAWING BY - DATE INITIALS GOLDSBORO, NORTH CAROLI NA
STATION ID PRINCIPAL
CHECKER INITIALS JTG 12/11/2020 CAM ENGINEER COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
50 10o PRELIMINARY - NOT
FOR CONSTRUCTION
1IN = 50FT 90% DESIGN SUBMITTAL
SHEET(S) X OF X I DWG SCALE AS NOTED
DWG DATE 12/11/2020 SUPERSEDED —
DRAWING NUMBER REVISION
P N G-C-025-0001288 C
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-1435
CLAUDE A MdVIULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL 047852
PROFESSIONAL ENG/ARCH STAMP
NI=w1w/
BENJAMIN FRANKLIN
MOZINGO AND
VIRGINIA MOZINGO
L LINDSEY
TEMPORARY CONSTRUCTION
ENTRANCE WITH 15" CULVERT,
SEE DETAILS 1 AND 5 ON
C'UCCT mAIr`_ r` nor_ nnn-1Inn
0
000
— — TEMPORARY
SILT FENCE, TYP
a�Os
° 8j A`\
.00�
0
$5-r0� �/ ��° 88
ry
a�koo Q
GO
N/F \
/ BENJAMIN FRANKLIN MOZINGO AND \
\\ VIRGINIA MOZINGO LINDSEY
109.00 (111, 00)
JURISDICTIONAL DITCH BOOK 252,. PAGE 228
PLA r D-6
N/F
MOZINGO J C HEIRS
)TCE)
5518797453
BOOK 524. PAGE 271
'--1
-I_ "
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
s6UF\ F
aFATioN00cA iNc
RC F L
3 00
nn062 a4
O N/F
_, ' /NS MARVIN E
0 00 (174, 00)
BO h°E852, PAGE 591
J518696591
PLAT 0-27C
EASEMENT BOOK 1136,
PAGE 619
z— _
a ins -
3Nn J313
nInTCc-
1. CONTRACTOR SHALL INSTALL CONSTRUCTION EXIT AT ALL
SITE ACCESS POINTS.
2. ALL TREES TO REMAIN SHALL BE PROTECTED WITH TREE
PROTECTION FENCING.
3. ANY DISTURBED AREA LEFT IDLE FOR A PERIOD OF 14 DAYS
OR LONGER SHALL BE STABILIZED WITH MULCHING AND
TEMPORARY SEEDING WITH THE EXCEPTION OF
AGRICULTURAL FIELDS WHICH ONLY NEED STABILIZATION
TO THE EXTENT REQUIRED TO AVOID TOP SOIL WASHING
AWAY. SEE DETAIL 1, SHEET C-025-0001291.
4. STABILIZE ALL DISTURBED AREAS OUTSIDE OF THE
CULTIVATED FIELD WITH PERMANENT SEEDING IN
ACCORDANCE WITH DETAIL 2, SHEET C-025-0001291. ALL
OTHER DISTURBED AREAS SHALL BE RESTORED TO
ORIGINAL CONDITIONS AS A CULTIVATED FIELD;
PERMANENT SEEDING WILL NOT BE UTILIZED.
5. REFER TO SITE PLAN PNG-C-025-0001280 FOR OVERALL
LIMITS OF DISTURBANCE, HDD ENTRY AND EXIT
WORKSPACE, AND TEMPORARY AND PERMANENT ACCESS
ROADS.
6. CONTRACTOR SHALL CLEAR TREES TO STUMPS ONLY
(GROUND LEVEL OR WATERLINE); NO GRUBBING IN HDD
REQUIRED. CONTRACTOR SHALL PULL ALL CUT MATERIAL
OUT OF HDD ROW AND DISPOSE OF AS DIRECTED BY
COMPANY. HAND CLEARING IS ALLOWED. IF EQUIPMENT IS
USED, MATTING AND EROSION CONTROL MEASURES SHALL
BE IN PLACE TO SATISFACTION OF COMPANY.
LEGEND:
t PROPERTY LINE
2
TEMPORARY SILT FENCE
C-025-0001290
— — — L❑D — — — LIMITS OF DISTURBANCE
PROPOSED 8" PIPELINE
9+00
1
TEMPORARY CONSTRUCTION
ENTRANCE C-025-0001290
0 o PROPOSED GRAVEL SURFACE
COURSE
ROCK PIPE INLET 4
PROTECTION C-025-0001290
N��
LIMITS OF DISTURBED AREA
PIPELINE PROJECT: 25.61 AC
POINT OF CONTACT (MAINTENANCE):
DENNIS ROBERTSON 803-917-6577
0
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
NO.
DATE
REVISION(S) DESCRIPTION
BY
I CHK
APPD
I DESCRIPTION
APPROVALS
Piedmont
�� DUKE 0111
4 ENERGY. Natural Gas
COPYRIGHT 2018
LINE 475 DOT RELOCATION - PIPELINE
ES&PC PLAN
GOLDSBORO, NORTH CAROLI NA
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
A
08-11-2020
60% DESIGN SUBMITTAL
MJD
CNS
CAM
AREA CODE
-
DATE
NIA
INITIALS
N/A
REGIONAL
ENGINEER
B
10-02-2020
90% DESIGN SUBMITTAL
ABR
JTG
CAM
ACCOUNT NUMBER
-
C
12-11-2020
REVISED 90% DESIGN SUBMITTAL
LLO
JTG
CAM
PROJECT NUMBER
0231540
DATE
NIA
INITIALS
N/A
MGR TECH
REC & STD
DRAWING BY
-
STATION ID
DATE
12/11/2020
INITIALS
CAM
PRINCIPAL
ENGINEER
CHECKER INITIALS
JTG
50 10o PRELIMINARY - NOT
FOR CONSTRUCTION
1IN = 50FT 90% DESIGN SUBMITTAL
SHEET(S) X OF X I DWG SCALE AS NOTED
DWG DATE 12/11/2020 ISUPERSEDED —
DRAWING NUMBER REVISION
P N G-C-025-0001289 C
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
INSTALLATION NOTES:
—AGGREGATE SIZE: 2-3" DIAMETER WASHED STONE.
—PAD THICKNESS: 6" MINIMUM.
—PAD WIDTH: 24' MINIMUM.
—PAD LENGTH: 100' MINIMUM.
—PAD LOCATION: LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT
SEDIMENT FROM LEAVING THE SITE AND TO PROVIDE MAXIMUM UTILITY BY
ALL CONSTRUCTION VEHICLES. AVOID STEEP GRADES AND ENTRANCES AT
CURVES IN PUBLIC ROADS.
o �
o�0
/ 5
a od o
FILTRATION GEOTEXTILE TO STABILIZE
FOUNDATION (ESPECIALLY IMPORTANT
WHERE SOFT SOIL IS ANTICIPATED)
2-3" DIAMETER WASHED
STONE, 6" DEEP
MAINTENANCE NOTES:
—MONITOR DAILY TO SUPPLEMENT STONE TO
ENSURE ENTRANCE FUNCTIONS PROPERLY.
—CLEAN ANY MATERIAL TRACKED ONTO PUBLIC
ROADWAY IMMEDIATELY.
—SCHEDULE ROUTINE SWEEPING AT THE END OF
EACH WORK DAY.
—WASHING: IF CONDITIONS AT THE SITE ARE SUCH
THAT MOST OF THE MUD AND SEDIMENT ARE NOT
REMOVED BY VEHICLES TRAVELING OVER THE
GRAVEL, THE TIRES SHOULD BE WASHED.
WASHING SHOULD BE DONE ON AN AREA
STABILIZED WITH CRUSHED STONE THAT DRAINS
INTO A SEDIMENT TRAP OR OTHER SUITABLE
DISPOSAL AREA. A WASH RACK MAY BE USED TO
MAKE WASHING STONE MORE CONVENIENT AND
EFFECTIVE.
Too"
MiN�M�M
PERSPECTIVE VIEW
DETAIL
SCALE: NTS
GRAVEL CONSTRUCTION ENTRANCE
INSTALLATION NOTES:
—USE MINIMUM 12 IN. DIAMETER EXCELSIOR WATTLE AND
LENGTH OF 10 FT.
—EXCAVATE A 1 TO 2 INCH TRENCH FOR WATTLE TO BE
PLACED.
—DO NOT PLACE WATTLE ON TOE OF SLOPE.
—OFFSET SLIGHTLY OFF TOE.
—USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL
CROSS SECTION.
—INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4
DOWNSLOPE STAKES AT AN ANGLE TO WEDGE WATTLE TO
GROUND.
—PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE
FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH.
—INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON
BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT
TO THE SOIL.
INSET A
ISOMETRIC VIEW
BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-1435
FILL SLOPE
VIEW FROM SLOPE
DETAIL 3
SCALE: NTS
SILT FENCE WATTLE BREAKS
1"-2" TRENCH
SIDE VIEW
PLASTIC CAP
6' MAX. WITH WIRE OVER POST INSTALLATION NOTES
4' MAX FOR TROUT WATERS —USE FILTRATION GEOTEXTILE
A MINIMUM OF 36" IN WIDTH AND FASTEN ADEQUATELY TO THE
POSTS AND WIRE AS DIRECTED.
—USE WIRE A MINIMUM OF 32" IN WIDTH AND WITH A MINIMUM
MIDDLE AND VERTICAL WIRES OF 6 LINE WIRES WITH 12" STAY SPACING.
SHALL BE 121/2 GAUGE MIN. —PROVIDE 5'-0" STEEL POST OF THE SELF —FASTENER ANGLE
STEEL TYPE.
—FOR MECHANICAL SLICING METHOD INSTALLATION, GEOTEXTILE
TOP AND BOTTOM STRAND SHALL BE A MAXIMUM OF 18" ABOVE GROUND SURFACE.
SHALL BE 10 GAUGE MIN. T248" MAX.
" MIN.)
MAINTENANCE NOTES:
—REMOVE AND DISPOSE OF SILT ACCUMULATIONS
WHEN THE DEPTH REACHES ONE—HALF OF THE
HEIGHT OF THE WATTLE.
—REPLACE OR CLEAN THE WATTLE AS NEEDED TO
ALLOW RUNOFF TO SLOWLY DEWATER THROUGH THE
DEVICE BETWEEN RAIN EVENTS.
—MONITOR THE WOODEN STAKES AND STAPLES TO
ENSURE THAT THE WATTLE REMAINS SECURELY
ANCHORED AFTER RAIN EVENTS.
—MONITOR THE WATTLE/SILT FENCE OVERLAP TO
ENSURE THIS INTERFACE REMAINS SECURELY SEALED
AFTER RAIN EVENTS.
SILT FENCE POST
INSET A
DOWNSLOPE STAKE
IF7IGI. ...... ......
1--...--... . GEOTEXTILE. ...-..r-.. r..-..__---...--...--...--1 �..--...__...-- ...--...--...-._..-...
MAINTENANCE NOTES:
—REMOVE AND DISPOSE OF SILT ACCUMULATIONS WHEN THE
IFIIAI IA
-- DEPTH REACHES ONE—HALF OF THE HEIGHT OF THE
WIRE GEOTEXTILE.
—REMOVE AND REPLACE DETERIORATED OR CLOGGED
FILTRATION GEOTEXTILE
FI LTR
EXTENSION OF GEOTEXTILE AND
WIRE INTO TRENCH
DETAIL 2
SCALE' NTS
��
TEMPORARY SILT FENCE
1
DETAIL 4
SCALE: NTS
ROCK PIPE INLET PROTECTION
Natural Ground
STREAM CF
PLAN VIEW
12" MIN.
r'11 LLr ^r% LLr-7 r'-r^K1r' 1h1 A /1 /1 ^ Mr-%AKIv WITH
D
ERMINED BY
#5 OR #57 STONE, 6" DEPTH (MIN.)
■� , ■►
■ • , -y}. �i� ti'C•L�ii L�iLT �'C �i� ti'C. ..... 10.1 GROUND
-
. r,,, `��: ����•���•• • • • • �•���i���� -���_' .:vim -. _
CLASS B STONE
GEOTEXTILE FOR \ / I _ _ I \- CROSS PIPE(S) (SEE NOTE)
DRAINAGE VAR. . DOUBLE WALL CORRUGATED METAL PIPE
NOTE:
ROCK PIPE INLET PROTECTION CONSTRUCTION NOTES:
1. CLEAR THE AREA OF ALL DEBRIS THAT MIGHT HINDER EXCAVATION AND
DISPOSAL OF SPOIL.
2. INSTALL THE CLASS B OR CLASS I RIPRAP IN A SEMI -CIRCLE AROUND THE PIPE
INLET. THE STONE SHOULD BE BUILT UP HIGHER ON EACH END WHERE IT TIES
INTO THE EMBANKMENT. THE MINIMUM CREST WIDTH OF THE RIPRAP SHOULD
BE 3 FEET, WITH A MINIMUM BOTTOM WIDTH OF 11 FEET. THE MINIMUM HEIGHT
SHOULD BE 2 FEET, BUT ALSO 1 FOOT LOWER THAN THE SHOULDER OF THE
EMBANKMENT OR DIVERSIONS.
3. A 1 FOOT THICK LAYER OF NCDOT #5 OR #57 STONE SHOULD BE PLACED ON
THE OUTSIDE SLOPE OF THE RIPRAP.
4. THE SEDIMENT STORAGE AREA SHOULD BE EXCAVATED AROUND THE OUTSIDE
OF THE STONE HORSESHOE 18 INCHES BELOW NATURAL GRADE.
5. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, FILL
DEPRESSION AND ESTABLISH FINAL GRADING ELEVATIONS, COMPACT AREA
PROPERLY, AND STABILIZE WITH GROUND COVER.
ROCK PIPE INLET PROTECTION MAINTENANCE NOTES:
1. INSPECT ROCK PIPE INLET PROTECTION AT LEAST WEEKLY AND AFTER EACH
SIGNIFICANT (1 INCH OR GREATER) RAINFALL EVENT AND REPAIR
IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE SEDIMENT STORAGE
AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED
TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS
REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE
CONTAMINATED PART OF THE GRAVEL FACING.
2. CHECK THE STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED FROM THE
STONE HORSESHOE MUST BE REPLACED IMMEDIATELY.
3. AFTER ALL THE SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY
STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT.
SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND PROVIDE
PERMANENT GROUND COVER (SURFACE STABILIZATION).
SECTION A -A
NOT TO SCALE
1. PIPE(S) FOR TEMPORARY STREAM CROSSING SHALL BE
DESIGNED TO PASS THE PEAK OR BANKFULL FLOW,
WHICHEVER IS LESS, FROM A 2-YEAR PEAK STORM,
WITHOUT OVER TOPPING.
DETAIL 5
SCALE: NTS
TEMPORARY STREAM CROSSING
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDE A MCMULLAN
07/31i2020
NORTH CAROLINA
SEAL047852
NO.1
DATE
REVISION(S) DESCRIPTION
A
08-11-2020
60% DESIGN SUBMITTAL
B
IC
10-02-2020
90% DESIGN SUBMITTAL
12-11-2020
REVISED 90% DESIGN SUBMITTAL
PROFESSIONAL ENG/ARCH STAMP
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
BY
CHK
JAPPID
DESCRIPTION
APPROVALS
Piedmont
,f*N DUKEr6111
� ENERGY: Natural Gas
COPYRIGHT 2018
LINE 475 DOT RELOCATION - PIPELINE
ES&PC DETAILS
GOLDSBORO NORTH CAROLINA
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
SHEET(S) X OF X
DWG SCALE NONE
LNR
CNS
CAM
AREA CODE
-
DATE
N/A
NITIALS
NIA
REGIONAL
ENGINEER
DWG DATE 12111/2020
SUPERSEDED
ABR
JTG
CAM
ACCOUNT NUMBER
-
LLO
JTG
CAM
PROJECT NUMBER
0228178
DATE
N/A
INITIALS
NIA
MGR TECH
REC&STD
DRAWING NUMBER
P N G - C- 025-0001290
REVISION
C
DRAWING BY
-
STATION ID
DATE
12/11/2020
INITIALS
CAM
PRINCIPAL
ENGINEER
CHECKER INITIALS
JTG
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
seeding mixture
species Rate (lb/acre)
Rye (grain) 120
Annual lespedeza (Kobe in
Piedmont and Coastal Plain,
Korean in Mountains) 50
Omit annual lespedeza when duration of temporary cover is not to
extend beyond June.
seeding dates
Mountains —Above 2500 feet: Feb. 15 - May 15
Below 2500 feet: Feb. 1- May 1
Piedmont —Jan. 1 - May 1
Coastal Plain —Dec. 1 - Apr. 15
soil amendments
Follow recommendations of soil tests or apply 2,000 lb/acre ground
agricultural limestone and 750 lb/acre 10-10-10 fertilizer.
mulch
Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, nettin
or a mulch anchoring tool. A disk with blades set nearly straight can be
used as a mulch anchoring tool.
maintenance
Refertilize if growth is not fully adequate. Reseed, refertilize and mulch
immediately following erosion or other damage.
seeding mixture
species
German millet
Rate (lb/acre)
40
In the Piedmont and Mountains, a small -stemmed Sudangrass may be I
substituted at a rate of 50 lb/acre.
seeding dates
Mountains —May 15 - Aug. 15
Piedmont —May 1 - Aug. 15
Coastal Plain —Apr. 15 - Aug. 15
soil amendments
Follow recommendations of soil tests or apply 2,000 lb/acre ground
agricultural limestone and 750 lb/acre 10-10-10 fertilizer.
mulch
Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting
or a mulch anchoring tool. A disk with blades set nearly straight can be
used as a mulch anchoring tool.
maintenance
Refertilize if growth is not fully adequate. Reseed, refertilize and mulch
immediately following erosion or other damage.
seeding mixture
species
Rye (grain)
Rate (lb/acre)
120
seeding dates
Mountains —Aug. 15 - Dec. 15
Coastal Plain and Piedmont —Aug. 15 - Dec. 30
soil amendments
Follow soil tests or apply 2,000 lb/acre ground agricultural limestone
and 1,000 lb/acre 10-10-10 fertilizer.
mulch
Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting
or a mulch anchoring tool. A disk with blades set nearly straight can be
used as a mulch anchoring tool.
maintenance
Repair and refertilize damaged areas immediately. Topdress with 50
lb/acre of nitrogen in March. If it is necessary to extent temporary
cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and
Coastal Plain) or Korean (Mountains) lespedeza in late February or
early March.
BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-1435
TEMPORARY SEEDING NOTES:
1. COMPLETE GRADING BEFORE PREPARING SEEDBEDS, AND INSTALL ALL NECESSARY
EROSION CONTROL PRACTICES SUCH AS, DIKES, WATERWAYS, AND BASINS. MINIMIZE
STEEP SLOPES BECAUSE THEY MAKE SEEDBED PREPARATION DIFFICULT AND
INCREASE THE EROSION HAZARD. IF SOILS BECOME COMPACTED DURING GRADING,
LOOSEN THEM TO A DEPTH OF 6-8 INCHES USING A RIPPER, HARROW, OR CHISEL PLOW.
SEEDBED PREPARATION
2. GOOD SEEDBED PREPARATION IS ESSENTIAL TO SUCCESSFUL PLANT ESTABLISHMENT.
A GOOD SEEDBED IS WELL -PULVERIZED, LOOSE, AND UNIFORM. WHERE
HYDROSEEDING METHODS ARE USED, THE SURFACE MAY BE LEFT WITH A MORE
IRREGULAR SURFACE OF LARGE CLODS AND STONES.
3. LIMING —APPLY LIME ACCORDING TO SOIL TEST RECOMMENDATIONS. IF THE
PH (ACIDITY) OF THE SOIL IS NOT KNOWN, AN APPLICATION OF GROUND AGRICULTURAL
LIMESTONE AT THE RATE OF 1 TO 1 1/2 TONS/ACRE ON COARSE -TEXTURED SOILS AND
2-3 TONS/ACRE ON FINE -TEXTURED SOILS IS USUALLY SUFFICIENT. APPLY LIMESTONE
UNIFORMLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF SOIL. SOILS WITH A PH OF
6 OR HIGHER NEED NOT BE LIMED.
4. FERTILIZER —BASE APPLICATION RATES ON SOIL TESTS. WHEN THESE ARE NOT
POSSIBLE, APPLY A 10-10-10 GRADE FERTILIZER AT 700-1,000 LB/ACRE. BOTH
FERTILIZER AND LIME SHOULD BE INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. IF
A HYDRAULIC SEEDER IS USED, DO NOT MIX SEED AND FERTILIZER MORE THAN 30
MINUTES BEFORE APPLICATION.
5. SURFACE ROUGHENING —IF RECENT TILLAGE OPERATIONS HAVE RESULTED IN A LOOSE
SURFACE, ADDITIONAL ROUGHENING MAY NOT BE REQUIRED, EXCEPT TO BREAK UP
LARGE CLODS. IF RAINFALL CAUSES THE SURFACE TO BECOME SEALED OR CRUSTED,
LOOSEN IT JUST PRIOR TO SEEDING BY DISKING, RAKING, HARROWING, OR OTHER
SUITABLE METHODS. GROOVE OR FURROW SLOPES STEEPER THAN 3:1 ON THE
CONTOUR BEFORE SEEDING (PRACTICE 6.03, SURFACE ROUGHENING).
PLANT SELECTION
6. SELECT AN APPROPRIATE SPECIES OR SPECIES MIXTURE FROM TABLE 6.10A FOR
SEEDING IN LATE WINTER AND EARLY SPRING, TABLE 6.10B FOR SUMMER, AND TABLE
6.10C FOR FALL.
7. IN THE MOUNTAINS, DECEMBER AND JANUARY SEEDINGS HAVE POOR CHANCES OF
SUCCESS. WHEN IT IS NECESSARY TO PLANT AT THESE TIMES, USE
RECOMMENDATIONS FOR FALL AND A SECURELY TACKED MULCH.
SEEDING
8. EVENLY APPLY SEED USING A CYCLONE SEEDER (BROADCAST), DRILL, CULTIPACKER
SEEDER, OR HYDROSEEDER. USE SEEDING RATES GIVEN IN TABLES 6.10A-6.10C.
BROADCAST SEEDING AND HYDROSEEDING ARE APPROPRIATE FOR STEEP SLOPES
WHERE EQUIPMENT CANNOT BE DRIVEN. HAND BROADCASTING IS NOT RECOMMENDED
BECAUSE OF THE DIFFICULTY IN ACHIEVING A UNIFORM DISTRIBUTION.
9. SMALL GRAINS SHOULD BE PLANTED NO MORE THAN 1 INCH DEEP, AND GRASSES AND
LEGUMES NO MORE THAN 1/2 INCH. BROADCAST SEED MUST BE COVERED BY RAKING
OR CHAIN DRAGGING, AND THEN LIGHTLY FIRMED WITH A ROLLER OR CULTIPACKER.
HYDROSEEDED MIXTURES SHOULD INCLUDE A WOOD FIBER (CELLULOSE) MULCH.
MULCHING
10. THE USE OF AN APPROPRIATE MULCH WILL HELP ENSURE ESTABLISHMENT UNDER
NORMAL CONDITIONS, AND IS ESSENTIAL TO SEEDING SUCCESS UNDER HARSH SITE
CONDITIONS (PRACTICE 6.14, MULCHING). HARSH SITE CONDITIONS INCLUDE:
• SEEDING IN FALL FOR WINTER COVER (WOOD FIBER MULCHES ARE NOT CONSIDERED
ADEQUATE FOR THIS USE),
• SLOPES STEEPER THAN 3:1,
• EXCESSIVELY HOT OR DRY WEATHER,
• ADVERSE SOILS (SHALLOW, ROCKY, OR HIGH IN CLAY OR SAND), AND
• AREAS RECEIVING CONCENTRATED FLOW.
11. IF THE AREA TO BE MULCHED IS SUBJECT TO CONCENTRATED WATER FLOW, AS IN
CHANNELS, ANCHOR MULCH WITH NETTING (PRACTICE 6.14, MULCHING).
TEMPORARY SEEDING MAINTENANCE NOTES:
1. RESEED AND MULCH AREAS WHERE SEEDLING EMERGENCE IS POOR, OR WHERE
EROSION OCCURS, AS SOON AS POSSIBLE. DO NOT MOW. PROTECT FROM
TRAFFIC AS MUCH AS POSSIBLE.
DETAIL
SCALE: NTS
TEMPORARY SEEDING
PERMANENT SEEDING SCHEDULE:
THE KINDS OF SEED AND FERTILIZER, AND THE RATES OF APPLICATION OF SEED, FERTILIZER, AND LIMESTONE, SHALL
BE AS STATED BELOW. DURING PERIODS OF OVERLAPPING DATES, THE KIND OF SEED TO BE USED SHALL BE
DETERMINED. ALL RATES ARE IN POUNDS PER ACRE.
i I.1 Intel : `e.T1141i601191i
50#
TALL FESCUE
10#
CENTIPEDE
25#
BERMUDAGRASS (HULLED)
500#
FERTILIZER
4000#
LIMESTONE
PERMANENT SEEDING NOTES:
A21a921►yl1:3:1:I09a:1Gt11.1say&%
50#
TALL FESCUE
10#
CENTIPEDE
35#
BERMUDAGRASS (UNHULLED)
500#
FERTILIZER
4000#
LIMESTONE
SOIL PREPARATION
1. PROPER SOIL PREPARATION IS NECESSARY FOR SUCCESSFUL SEED GERMINATION AND ROOT
ESTABLISHMENT. IT IS ALSO NECESSARY FOR ESTABLISHMENT OF ROOTED SPRIGS, SOD AND
WOODY PLANTS. HEAVILY COMPACTED SOILS PREVENT AIR, NUTRIENTS AND MOISTURE FROM
REACHING ROOTS THEREBY RETARDING OR PREVENTING PLANT GROWTH. THE SUCCESS OF
SITE STABILIZATION AND REDUCTION OF FUTURE MAINTENANCE ARE DEPENDENT ON AN
ADEQUATELY PREPARED SOIL BED. FOLLOWING ARE THE REQUIREMENTS FOR PREPARATION
OF AREAS TO BE VEGETATED BY GRASSING, SPRIGGING, SODDING, AND/OR PLANTING OF
WOODY PLANTS:
GENERAL REQUIREMENTS:
2. PREPARATION FOR PRIMARY/PERMANENT STABILIZATION SHALL NOT BEGIN UNTIL ALL
CONSTRUCTION AND UTILITY WORK WITHIN THE PREPARATION AREA IS COMPLETE.
HOWEVER, IT MAY BE NECESSARY TO PREPARE FOR NURSE CROPS PRIOR TO COMPLETION
OF CONSTRUCTION AND INSTALLATION OF UTILITIES.
3. A NORTH CAROLINA DEPARTMENT OF AGRICULTURE SOILS TEST (OR EQUAL) SHALL BE
OBTAINED FOR ALL AREAS TO BE SEEDED, SPRIGGED, SODDED OR PLANTED. RECOMMENDED
FERTILIZER AND PH ADJUSTING PRODUCTS SHALL BE INCORPORATED INTO THE PREPARED
AREAS AND BACKFILL MATERIAL PER THE TEST.
4. ALL AREAS TO BE SEEDED OR PLANTED SHALL BE TILLED OR RIPPED TO A DEPTH SPECIFIED
ON THE APPROVED PLANS, CONSTRUCTION SEQUENCE AND/OR CONSTRUCTION BID LIST.
RIPPING CONSISTS OF CREATING FISSURES IN A CRISS-CROSS PATTERN OVER THE ENTIRE
SURFACE AREA, UTILIZING AN IMPLEMENT THAT WILL NOT GLAZE THE SIDE WALLS OF THE
FISSURES. SITE PREPARATION THAT DOES NOT COMPLY WITH THESE DOCUMENTS SHALL
NOT BE ACCEPTABLE. THE DEPTH OF SOIL PREPARATION MAY BE ESTABLISHED AS A RANGE
BASED ON THE APPROVAL OF THE REVIEWING STATE OR LOCAL AGENCY. ONCE TILLED OR
RIPPED ACCORDING TO THE APPROVED PLAN, ALL AREAS ARE TO BE RETURNED TO THE
APPROVED FINAL GRADE. PH MODIFIERS AND/OR OTHER SOIL AMENDMENTS SPECIFIED IN
THE SOIL TESTS CAN BE ADDED DURING THE SOIL PREPARATION PROCEDURE OR AS
DESCRIBED BELOW.
5. ALL STONES LARGER THAN THREE (3) INCHES ON ANY SIDE, STICKS, ROOTS, AND OTHER
EXTRANEOUS MATERIALS THAT SURFACE DURING THE BED PREPARATION SHALL BE
REMOVED.
AREAS TO BE SEEDED:
6. TILL OR DISC THE PREPARED AREAS TO BE SEEDED TO A MINIMUM DEPTH OF FOUR (4)
INCHES. REMOVE STONES LARGER THAN THREE (3) INCHES ON ANY SIDE, STICKS, ROOTS AND
OTHER EXTRANEOUS MATERIALS THAT SURFACE. IF NOT INCORPORATED DURING THE SOIL
PREPARATION PROCESS, ADD PH MODIFIER AND FERTILIZERS AT THE RATE SPECIFIED IN THE
SOIL TEST REPORT.
7. RE -COMPACT THE AREA UTILIZING A CULTIPACKER ROLLER. THE FINISHED GRADE SHALL BE A
SMOOTH EVEN SOIL SURFACE WITH A LOOSE, UNIFORMLY FINE TEXTURE. ALL RIDGES AND
DEPRESSIONS SHALL BE REMOVED AND FILLED TO PROVIDE THE APPROVED SURFACE
DRAINAGE. SEEDING OF GRADED AREAS IS TO BE DONE IMMEDIATELY AFTER FINISHED
GRADES ARE OBTAINED AND SEEDBED PREPARATION IS COMPLETED.
AREAS TO BE SPRIGGED, SODDED, AND/OR PLANTED:
8. AT THE TIME OF PLANTING TILL OR DISC THE PREPARED AREAS TO A DEPTH OF FOUR (4) TO
SIX (6) INCHES BELOW THE APPROVED FNISHED GRADE. REMOVE ALL STONES LARGER THAN
THREE (3) INCHES ON ANY SIDE, STICKS, ROOTS AND OTHER EXTRANEOUS MATERIALS THAT
SURFACE. IF NOT INCORPORATED IN THE RIPPING PROCESS, ADD PH MODIFIER, FERTILIZER,
AND OTHER RECOMMENDED SOIL AMENDMENTS.
9. RE -COMPACT THE AREA UTILIZING A CULTIPACKER ROLLER AND PREPARE FNAL GRADES AS
DESCRIBED ABOVE. INSTALL SPRIGS, SOD AND PLANTS AS DIRECTED IMMEDIATELY AFTER
FINE GRADING IS COMPLETE. MULCH, MAT AND/OR TACK AS SPECIFIED.
DETAIL 2
SCALE: NTS
PERMANENT SEEDING
ISOMETRIC VIEW
FRONT VIEW
INSTALLATION NOTES:
—USE MINIMUM 18 IN. NOMINAL DIAMETER EXCELSIOR WATTLE AND
LENGTH OF 10 FT.
—EXCAVATE A 2 TO 3 INCH TRENCH FOR WATTLE TO BE PLACED.
—DO NOT PLACE WATTLES ON TOE OF SLOPE.
—USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL
CROSS SECTION.
—INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE
STAKES AT AN ANGLE TO WEDGE WATTLE TO GROUND.
—PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE
FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH.
—INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH
SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL.
—FOR BREAKS ALONG LARGE SLOPES (HEIGHT OF 15' OR MORE
MEASURED ALONG THE SLOPE), USE MAXIMUM SPACING OF 25 FT.
SEE INSET A
INSET A
FI
FI LL
MAINTENANCE NOTES:
—REMOVE AND DISPOSE OF SILT ACCUMULATIONS
WHEN THE DEPTH REACHES ONE—HALF OF THE
HEIGHT OF THE WATTLE.
—REPLACE OR CLEAN THE WATTLE AS NEEDED
TO ALLOW RUNOFF TO SLOWLY DEWATER
THROUGH THE DEVICE BETWEEN RAIN EVENTS.
—MONITOR THE WOODEN STAKES AND STAPLES
TO ENSURE THAT THE WATTLE REMAINS
SECURELY ANCHORED AFTER RAIN EVENTS.
and Specifications
Definition A to " X x ' x' ` >z > '' _ combination ridge and channel
- -
constructed acr ss sloping la�DOWNSLOPE
on a predetermined grade.
18' WATTLE STAKE
Purpose To protect work areakfprWMWope runoff, and to divert sediment -laden water
to appropriate traps or sta a out ets.
Conditions Where This practice applies to construction areas where runoff can be diverted and
Practice Applies
disposed of properly to control erosion, sedimentation, or flood damage.
Specific locations and conditions include:
• above disturbed existing slopes, and above cut or fill slopes to prevent
runoff over the slope;
• across unprotected slopes, as slope breaks, to reduce slope length;
• below slopes to divert excess runoff to stabilized outlets;
• where needed to divert sediment -laden water to sediment traps;
DETAIL3• at r near the perimeter of the construction area to keep sediment from
SCALE: NTS ing the site; and
above disturbed areas before stabilization to prevent erosion, and maintain
WATTLE BARRIER **-� acceptable working conditions.
• Temporary diversions may also serve as sediment traps when the site has
been overexcavated on a flat grade; they may also be used in conjunction
with a sediment fence.
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDEA McMULLAN
NO.1
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
I DESCRIPTION
APPROVALS
07/31i2020
NORTH CAROLINA
A
08-11-2020
60% DESIGN SUBMITTAL
LNR
CNS
CAM
AREA CODE
-
DATE
N/A
INITIALS
NIA
REGIONAL
ENGINEER
B
10-02-2020
90% DESIGN SUBMITTAL
ABR
JTG
CAM
ACCOUNT NUMBER
-
SEAL047852
C
12-11-2020
REVISED 90% DESIGN SUBMITTAL
LLO
JTG
CAM
PROJECT NUMBER
0228178
DATE
N/A
INITIALS
N/A
MGR TECH
REC & STD
DRAWING BY
-
PROFESSIONALENG/ARCH STAMP
STATION ID
I
DATE
12/11/2020
INITIALS
CAM
PRINCIPAL
ENGINEER
I
I
ICHECKER INITIALS
I JTG
LINE 475 DOT RELOCATION - PIPELINE
� DUKEr6111 Piedmont ES&PC DETAILS
'WENERGY,, Natural Gas GOLDSBORO NORTH CAROLINA
COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
SHEET(S) X OF X I DWG SCALE
DWG DATE 12/11/2020 ISUPERSEDED
DRAWING NUMBER
P N G-C-025-0001291
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
NONE
REVISION
C
;\\� ��
WATERBODY
PROFILE VIEW 1
0
PROFILE VIEW 2
SEE NOTE 9
SEE NOTE 4
---------------- PROFILE VIEW 1
1. THIS TYPE OF BRIDGE IS GENERALLY USED ON NARROW CROSSINGS, LESS THAN 20 FEET
WIDE WITH APPROPRIATE BANK CONFIGURATION. MULTIPLE MATS MAY BE LAYERED FOR
HEAVIER EQUIPMENT CROSSINGS.
2. BRIDGE IS ANCHORED AND/OR TIED OFF TO ANCHOR BLOCKS FOR STABILITY. BRIDGE
SHOULD BE TEMPORARILY REMOVED IF HIGH WATER RENDERS IT UNSAFE TO USE.
3. IF REQUIRED, UTILIZE APPROACH FILLS OF CLEAN GRANULAR MATERIAL, SWAMP MATS,
SKIDS OR OTHER SUITABLE MATERIALS TO AVOID CUTTING THE BANKS WHEREVER FEASIBLE.
ENSURE ADEQUATE FREEBOARD. AS REQUIRED, ENSURE THAT FILL MATERIAL IF USED DOES
NOT SPILL INTO WATERCOURSE INCLUDING REMOVAL OF DIRT FROM DECK DURING
OPERATION.
V VlI I I LLV I V PIUV I I IIVI ULI\ IVIll1 V. VVL I I VV 1
OVERLAP ON ADJOINING WATTES
4. CONSTRUCT SEDIMENT BARRIERS ACROSS THE ENTIRE CONSTRUCTION R.O.W. TO PREVENT
SILT LADEN WATER AND SPOIL FROM FLOWING BACK INTO WATERBODY. BARRIERS MAY BE
TEMPORARILY REMOVED TO ALLOW CONSTRUCTION ACTIVITIES BUT MUST BE REPLACED BY
MAINTENANCE NOTES:
THE END OF EACH WORK DAY. SILT FENCE, COIR WATTLES OR SANDBAGS MAY BE USED
INTERCHANGEABLY.
1.
REMOVE AND DISPOSE OF SILT ACCUMULATIONS WHEN THE DEPTH REACHES ONE-HALF OF THE HEIGHT OF THE
PERIMETER WATTLES.
5. REMOVE BRIDGES AS SOON AS POSSIBLE AFTER PERMANENT SEEDING UNLESS OTHERWISE
2.
REPLACE OR CLEAN THE WATTLES AS NEEDED TO ALLOW RUNOFF TO SLOWLY DEWATER THROUGH THE DEVICE BETWEEN
DIRECTED BY COMPANY REPRESENTATIVE. THE STRUCTURE IS TO BE REMOVED IF THERE IS
RAIN EVENTS.
MORE THAN ONE MONTH BETWEEN FINAL GRADING AND SEEDING, AND ALTERNATIVE
3.
MONITOR THE WOODEN STAKES AND STAPLES TO ENSURE THAT THE WATTLES REMAIN SECURELY ANCHORED AFTER RAIN
EVENTS.
ACCESS TO THE CONSTRUCTION R.O.W. IS AVAILABLE.
4.
MONITOR DAILY TO SUPPLEMENT / REFURBISH / REPLACE MATS TO ENSURE PROPER FUNCTIONALITY.
5.
CLEAN ANY ERODIBLE MATERIAL OR POLLUTANT TRACKED ONTO THE MATS IMMEDIATELY.
6. DISPOSE OF ANY ROCK AS DIRECTED BY COMPANY REPRESENTATIVE.
6.
TIMBER MATS AND ALL OTHER MATERIALS SHALL BE COMPLETELY REMOVED DURING FINAL CLEAN-UP. REMOVAL OF THIS
STRUCTURE IS NOT CONTINGENT UPON ESTABLISHMENT OF PERMANENT VEGETATION.
7. RESTORE AND STABILIZE BED AND BANKS TO APPROXIMATE PRE -CONSTRUCTION
7.
ATTEMPT TO USE NO MORE THAN TWO (2) LAYERS OF TIMBER MATS IN WETLANDS.
CONDITIONS.
8.
TIMBER MATS SHALL EXTEND A MINIMUM OF 15 FEET OUTSIDE OF WETLAND BOUNDARIES.
9.
INSTALL EARTHEN RAMP APPROACHES TO TIMBER MATS. EARTHEN RAMPS TO BE CONSTRUCTED OF UPLAND MATERIAL.
8. TIMBER MATTING BOARDS SHALL BE PLACED IN TWO LAYERS, ONE AFTER ANOTHER ALONG
TOP SOIL SHALL NOT BE USED.
10.
INSTALL TIMBER MATS IN WORK AREA AS NEEDED. POSITION A SERIES OF TIMBER MATS AS NEEDED TO CREATE A SAFE,
THE ENTIRE LENGTH OF BRIDGE SUCH THAT THE TWO LAYERS ARE PERPENDICULAR TO
FLAT, WORK AREA. MATS SHALL BE POSITIONED TO BUTT UP AGAINST EACH OTHER AND INTERLOCK OR ATTACH TO EACH
EACH OTHER
OTHER.
11.
EROSION CONTROL DEVICES SHALL BE INSTALLED ADJACENT TO TIMBER MATS AS SHOWN ON THE PLAN DRAWINGS.
9. GEOSYNTHETIC FABRIC SHALL BE PLACED BETWEEN THE TWO PERPENDICULAR LAYERS OF
12.
CONTRACTOR SHALL PREVENT THE INTRODUCTION OF UPLAND SOILS OR OTHER MATERIALS INTO WETLANDS.
MATS AND WRAPPED UP THE SIDES OF THE TOP MAT. RUNNING BOARDS SHALL BE
INSTALLED ALONG THE LENGTH OF BRIDGE TO PREVENT SEDIMENT LOSS OVER THE EDGES
OF THE TOP MAT.
DETAIL
DETAIL 2
SCALE: NTS
SCALE: NTS
TYPICAL TIMBER MAT WATERBODY BRIDGE
TIMBER MATS
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
BURNS&McDONNELLCONSULTANTS, INC. I PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
STATE LICENSE # C-1435
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDEA McMULLAN
NO.1
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
I DESCRIPTION
APPROVALS
07/31i2020
NORTH CAROLINA
A
08-11-2020
60% DESIGN SUBMITTAL
LNR
CNS
CAM
AREA CODE
-
DATE
N/A
INITIALS
NIA
REGIONAL
ENGINEER
B
10-02-2020
90% DESIGN SUBMITTAL
ABR
JTG
CAM
ACCOUNT NUMBER
-
SEAL047852
C
12-11-2020
REVISED 90% DESIGN SUBMITTAL
LLO
JTG
CAM
PROJECT NUMBER
0228178
DATE
N/A
INITIALS
N/A
MGR TECH
REC & STD
DRAWING BY
-
PROFESSIONALENG/ARCH STAMP
STATION ID
I
DATE
12/11/2020
INITIALS
CAM
PRINCIPAL
ENGINEER
I
I
ICHECKER INITIALS
I JTG
LINE 475 DOT RELOCATION - PIPELINE
rj�DUKE Piedmont ES&PC DETAILS
'""ENERGY, Natural Gas
GOLDSBORO, NORTH CAROLI NA
COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
SHEET(S) X OF X I DWG SCALE
DWG DATE 12/11/2020 ISUPERSEDED
DRAWING NUMBER
P N G-C-025-0001292
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
NONE
REVISION
C
TEMP.
R.O.W.
BOUNDARY
TRENCH, SPOIL
AND /OR
TRAVEL LANE -
TEMPORARY
FILL
12" MAXIMUM
(SEE NOTE 3)
q
TRENCH
05
(AS REQUIRED SEE NOTE 3)
TEMP.
R.O.W.
BOUNDARY
WORKING SIDE
TOPSOIL
SALVAGE LIMIT
15' 60'
SPOIL SIDE WORKING SIDE
50' 25'
PERMANENT EASEMENT TEMPORARY
(SEE NOTE 2) WORKSPACE
75'
CONSTRUCTION RIGHT-OF-WAY (SEE NOTE 2)
TEMP ESMT
IBOUNDARY
R/W
BOUNDARY
SILT FENCE I
AS REQUIRED
TRENCH SPOIL
TEMPORARY SEE NOTE 7
CUT TOPSOIL
a
O
—1 I =-11 I =-11 I =-11
I
OPTIONAL / ADDITIONAL
TOPSOIL STORAGE
+/- 32'
NOTES:
1. SIDE HILL CONSTRUCTION CUT AND FILL SHALL BE ALLOWED WHENEVER, IN THE OPINION OF
THE CONTRACTOR, STEEP SIDE HILL CONSTRUCTION IS WARRANTED FOR PERSONNEL AND/ OR
EQUIPMENT SAFETY CONSIDERATIONS.
2. CONSTRUCTION RIGHT-OF-WAY WILL TYPICALLY BE 80 FEET WIDE CONSISTING OF 50 FEET OF
PERMANENT EASEMENT AND 25 FEET OF TEMPORARY WORKSPACE.
3. THIS DRAWING REFLECTS "TRENCH, SPOIL, AND WORKING SIDE" TOPSOIL STRIPPING
PROCEDURES AS NEEDED FOR HILL SIDE LEVELING. SALVAGE TOPSOIL OVER TRENCH UNDER
THE SPOIL PILE AND FROM TEMPORARY CUT AND FILL AREAS AT LOCATIONS IDENTIFIED ON
THE CONSTRUCTION ALIGNMENT SHEETS OR AS DIRECTED BY THE COMPANY'S INSPECTOR.
4. STOCKPILE TOPSOIL AS SHOWN OR IN ANY CONFIGURATION APPROVED BY THE COMPANY'S
REPRESENTATIVE. KEEP TOPSOIL CLEAN OF ALL CONSTRUCTION DEBRIS.
5. LEAVE GAPS IN TOPSOIL AND SPOIL POLES AT OBVIOUS DRAINAGES. DO NOT PUSH TOPSOIL
INTO CREEKS OR WETLANDS. DO NOT USE TOPSOIL FOR PADDING. AVOID SCALPING
VEGETATED GROUND SURFACE WHEN BACKFILLING TOPSOIL PILE.
6. TEMPORARY SUSPEND TOPSOIL HANDLING OPERATIONS DURING INORDINATELY WINDY
CONDITIONS UNTIL MITIGATIVE MEASURES TO MINIMIZE WIND EROSION CAN BE IMPLEMENTED.
7. EROSION AND SEDIMENT CONTROL PROVIDED ON SEPARATE DETAILS.
8. ALL DIMENSIONS INDICATED SHALL BE DETERMINED BY ACTUAL CONSTRUCTION CONDITIONS.
DETAIL
SCALE: NTS
TYPICAL FULL TOPSOIL SEPARATION SIDE HILL
+/- 57' WORKING SIDE
B r&
ap
L+,,a+d Io' Lrx soIN 01KIIIIII &aw
C/L R/W -
TRENCH BOUNDARY _
IT G
SILT FENCE
AS REQUIRED I .-,-7 '
'4
�F
+/-12'
+/- 18' SPOIL SIDE
+/-25' MIN. / VARIES I +/- 50'
TEMPORARY WORKSPACE PERMANENT EASEMENT
+/- 75'
CONSTRUCTION RIGHT-OF-WAY
NOTES:
1. CONSTRUCTION RIGHT-OF-WAY WILL TYPICALLY BE 100 FEET WIDE CONSISTING OF 70 FEET OF
PERMANENT EASEMENT AND 30 FEET OF TEMPORARY WORKSPACE. EXTRA TEMPORARY WORK
SPACE MAY BE NECESSARY AT MAJOR ROAD AND OTHER SPECIAL CIRCUMSTANCES, AS
REQUIRED. CERTAIN SITUATIONS MAY REQUIRE A NARROWER WIDTH.
2. STOCKPILE TOPSOIL AS SHOWN OR IN ANY CONFIGURATION APPROVED BY THE COMPANY'S
INSPECTOR. KEEP TOPSOIL CLEAN OF ALL CONSTRUCTION DEBRIS.
3. LEAVE GAPS IN TOPSOIL AND SPOIL PILES AT OBVIOUS DRAINAGE LOCATIONS. DO NOT PUSH
TOPSOIL INTO CREEKS OR WETLANDS. DO NOT USE TOPSOIL FOR PADDING.
4. AVOID SCALPING VEGETATED GROUND SURFACE WHEN BACKFILLING SPOIL AND TOPSOIL PILES.
5. SAME LAYOUT APPLIES WHERE CONSTRUCTION RIW DOES NOT ABUT EXISTING R/W.
6. TEMPORARILY SUSPEND TOPSOIL HANDLING OPERATIONS DURING INORDINATELY WINDY
CONDITIONS UNTIL MITIGATIVE MEASURES TO MINIMIZE WIND EROSION CAN BE IMPLEMENTED.
7. TOPSOIL AND TRENCH SPOIL RELATIVE POSITIONS CAN, AS DIRECTED BY THE COMPANY'S
INSPECTOR, BE REVERSED.
DETAIL 2
SCALE: NTS
TYPICAL WORKSPACE
p!I!FaR!
Ek%r'trodr
C OWKkM
Itr �40 V VA .W lips,* Ii IV, M � # -w or * ' ,r ; a, *em s mop - or a* 4F
�r
- �� a 400 +
# 00 -
1 A Itt� w � it I*
■ ■ d
ap, AV
16j;ft .11.4
4p
4w if, '-� .
r v*.8a we dw 0 Ono�a ��J0 " 00 90A'4.7.j 4 a'� dO *0''"
jp
�94;1 0 4w on .0 qp % w ft 0 do % & 0 .2, 00%0 0 a 6%
i i% .i i i 3 i i. i i i. i %doi i +i% .i.
DETAIL 3
SCALE: NTS
TYPICAL CP TEST STATION
BURNS& McDONNELL CONSULTANTS, INC.
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
d STATE LICENSE # C-1435
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) *DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS &INFO. MANAGEMENT (RIM) POLICY 1001
r CLAUDEA MCMULLAN
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
- IFC SUBMITTAL DATE
LINE 475 DOT RELOCATION -PIPELINE
A
08-11-2020
60% DESIGN SUBMITTAL
LNR
CNS
CAM
AREA CODE
-
DATE
INITIALS
REGIONAL
NORTH CAROLINA
SEAL047852
N/A
NIA
ENGINEER
/r I Piedmont
CONSTRUCTION DETAILS
B
10-02-2020
90% DESIGN SUBMITTAL
JJM
CNS
CAM
ACCOUNT NUMBER
0231540
DATE
INITIALS
C
12/11/2020
REVISED 90% DESIGN SUBMITTAL
MJD
CNS
CAM
PROJECT NUMBER
MGR TECH
V` ENERGY,,.
ENERGY: Natural Gas
DRAWING BY
LNR
N/A
NIA
REC&STD
GOLDSBORO NORTH CAROLINA
STATION ID
DATE
INITIALS
PRINCIPAL
PROFESSIONALENG/ARCHSTAMP
V
12/11/2020
CAM
ENGINEER
COPYRIGHT
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
CHECKER INITIALS
CNS
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
SHEET(S) X OF X I DWG SCALE AS SHOWN
DWG DATE 08/11/2020 SUPERSEDED
DRAWING NUMBER REVISION
P N G-C-025-0001300 C
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
OF�vU/O�y
�Tcy
PIPE LOCATION
DEPTH OF COVER (A)
NORMAL
5'-0"
STREAM/WETLAND CROSSING
5'-0"
ROAD CROSSING
5'-0"
DETAIL
SCALE: NTS
N_.�
PIPELINE DEPTH OF COVER
NOTES:
1. ALL MATERIALS SHALL BE SUPPLIED BY
CONTRACTOR.
2. WIDTH SHALL BE INCREASED PROPORTIONAL TO
SPACING INCREASE IF REQUIRED.
3. SPACING SHALL BE IN ACCORDANCE WITH
PIEDMONT NATURAL GAS STANDARD CM-ST-2060.
4. SUPPORT PILLOWS TO BE OF SUFFICIENT SIZE TO
MAINTAIN 6" OF CLEARANCE BETWEEN THE PIPE
AND TRENCH BOTTOM.
DETAIL 2
SCALE: NTS
N_.�
TYPICAL PIPELINE SUPPORT PILLOWS
NOTES:
1. PIPELINE MARKERS SHALL BE PLACED AT:
- IN LINE -OF -SIGHT INTERVALS AND TURNING POINTS
- ALL PUBLIC ROAD CROSSINGS
- ALL RAILROAD CROSSINGS
- RIVER, STREAM, CREEK, DITCH AND CANAL CROSSINGS
- UTILITY CROSSINGS (PER DUKE DISCRETION)
- SWAMPS OR WETLANDS (ENTRY AND EXIT)
- ROAD MEDIANS
- ABOVE GROUND FACILITIES SUCH AS VALVE SETTINGS, BORDER STATIONS,
REGULATOR STATIONS, AND PIPELINE INTERCONNECTS
- UNDERGROUND VALVES
- HDD ENTRY AND EXIT POINTS
2. PIPELINE MARKERS SHALL BE PLACES DIRECTLY ON TOP OR WITHIN 24 INCHES OF
THE PIPELINE.
3. SET MARKERS AS SOON AS PRACTICAL AFTER THE INSTALLATION OF THE PIPELINE.
MAKE EVERY EFFORT TO PROVIDE MARKERS BEFORE VEGETATION IS
RE-ESTABLISHED AFTER CONSTRUCTION.
BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-1435
DETAIL 3
SCALE: NTS
��
PIPELINE MARKER LOCATIONS
ABOVE GRADE PIPELINE MARKER
UNPAVED SURFACE
NOTE:
1. ABOVE GRADE PIPELINE MARKERS TO BE INSTALLED IN GRASS OR UNPAVED AREAS
WHEN PIPELINE MARKER IS REQUIRED.
2 LAYEI
TIED BF
2" X 2" WOODEN STAKE (TYP.)
v I I v\ V V ✓/ \LL\J
INSTALL GEOTEXTILE
FABRIC BENEATH ENTIRE
DEWATERING STRUCTURE
TO PREVENT SCOURING
900 le
=D
kLES.
1. STAKES SECURING "HIGH EFFICIENCY AIR
FILTER MEDIA" AND CHICKEN WIRE FENCE
ARE NOT SHOWN FOR CLARITY PROPOSES.
SECTION rA
NOT TO SCALE 111,_j
C-T 1I= 1kwAr tar 7 10 1_
v�i�v vwv
SECTION B
NOT TO SCALE
NOTES:
1. STRUCTURE SHALL BE PLACED ON A SUITABLE, WELL
VEGETATED SITE SUCH THAT WATER WILL FLOW AWAY
FROM STRUCTURE AND ANY WORK AREAS.
2. FLOW RATES THROUGH DISCHARGE AND DIVERTER PIPES
SHALL BE SUCH THAT STRUCTURE WILL NOT OVERFLOW OR
AT A RATE NOT GREATER THAN SPECIFIED BY ANY AGENCY
PERMIT IF APPLICABLE.
3. WHERE CONDITIONS WARRANTED, A 30" X 30"
RECTANGULAR STRUCTURE MAY BE SUBSTITUTED FOR THE
CIRCULAR CONFIGURATION SHOWN.
4. DIMENSIONS SHOWN ARE THE MINIMUM ACCEPTABLE
VALUES AND MAY VARY DEPENDING ON SPECIFIC LOCATION.
5. CONTRACTOR SHALL PROPERLY REMOVE AND DISPOSE OF
DEWATERING STRUCTURE IMMEDIATELY UPON COMPLETION
OF DEWATERING PROCEDURE. UNDER NO CIRCUMSTANCES
SHALL USED DEWATERING STRUCTURES BE LEFT IN PLACE
FOR ANY PERIOD OF TIME GREATER THAN 48 HOURS AFTER
TO COMPLETION OF DEWATERING PROCEDURE.
D ETAI L 4
SCALE: NTS
DEWATER DETAIL
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDE A. McMULLAN
NO.1
DATE
REVISION(S) DESCRIPTION
IFC SUBMITTAL DATE
A
08-11-2020
60% DESIGN SUBMITTAL
NORTH CAROLINA
B
IC
10-02-2020
90% DESIGN SUBMITTAL
SEAL047852
12-11-2020
REVISED 90% DESIGN SUBMITTAL
PROFESSIONAL ENG/ARCH STAMP
BY
CHK
JAPPD
DESCRIPTION
APPROVALS
°/r, DUKE Piedmont
V ENERGY r6lj� Natural Gas
COPYRIGHT2018
LNR
CNS
CAM
AREA CODE
-
DATE
N/A
INITIALS
NIA
REGIONAL
ENGINEER
JJM
CNS
CAM
ACCOUNT NUMBER
MJD
CNS
CAM
PROJECT NUMBER
0231540
DATE
N/A
INITIALS
N/A
MGR TECH
REC &STD
DRAWING BY
LNR
STATION ID
I
DATE
12/11/2020
INITIALS
CAM
PRINCIPAL
ENGINEER
CHECKER INITIALS
CNS
LINE 475 DOT RELOCATION - PIPELINE
CONSTRUCTION DETAILS
GOLDSBORO, NORTH CAROLI NA
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
SHEET(S) X OF X I DWG SCALE AS SHOWN
DWG DATE 08/11/2020 ISUPERSEDED
DRAWING NUMBER REVISION
P N G-C-025-0001301 C
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
SEE NOTE 3 & 6
WATERBODY
PLAN
\\V\� \\\
PROFILE
SEE NOTE 4
1. THIS TYPE OF BRIDGE IS GENERALLY USED ON NARROW CROSSINGS, LESS THAN 20 FEET
WIDE WITH APPROPRIATE BANK CONFIGURATION. MULTIPLE MATS MAY BE LAYERED FOR
HEAVIER EQUIPMENT CROSSINGS.
2. BRIDGE IS ANCHORED AND/OR TIED OFF TO ANCHOR BLOCKS FOR STABILITY. BRIDGE
SHOULD BE TEMPORARILY REMOVED IF HIGH WATER RENDERS IT UNSAFE TO USE.
3. IF REQUIRED, UTILIZE APPROACH FILLS OF CLEAN GRANULAR MATERIAL, SWAMP MATS,
SKIDS OR OTHER SUITABLE MATERIALS TO AVOID CUTTING THE BANKS WHEREVER
FEASIBLE. ENSURE ADEQUATE FREEBOARD. AS REQUIRED, ENSURE THAT FILL MATERIAL IF
USED DOES NOT SPILL INTO WATERCOURSE INCLUDING REMOVAL OF DIRT FROM DECK
DURING OPERATION.
4. CONSTRUCT SEDIMENT BARRIERS ACROSS THE ENTIRE CONSTRUCTION R.O.W. TO PREVENT
SILT LADEN WATER AND SPOIL FROM FLOWING BACK INTO WATERBODY. BARRIERS MAY
BE TEMPORARILY REMOVED TO ALLOW CONSTRUCTION ACTIVITIES BUT MUST BE REPLACED
BY THE END OF EACH WORK DAY. SILT FENCE OR SANDBAGS MAY BE USED
INTERCHANGEABLY.
5. REMOVE BRIDGES AS SOON AS POSSIBLE AFTER PERMANENT SEEDING UNLESS OTHERWISE
DIRECTED BY COMPANY REPRESENTATIVE. THE STRUCTURE IS TO BE REMOVED IF THERE
IS MORE THAN ONE MONTH BETWEEN FINAL GRADING AND SEEDING, AND ALTERNATIVE
ACCESS TO THE CONSTRUCTION R.O.W. IS AVAILABLE.
6. DISPOSE OF ANY ROCK AS DIRECTED BY COMPANY REPRESENTATIVE.
7. RESTORE AND STABILIZE BED AND BANKS TO APPROXIMATE PRE -CONSTRUCTION
CONDITIONS.
BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-1435
CLAUDE A. McMULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL 047852
DETAIL
SCALE: NTS
TYPICAL TIMBER MAT WATERBODY BRIDGE
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
NO. DATE REVISION(S) DESCRIPTION
A 08-11-2020 60% DESIGN SUBMITTAL
B 10-02-2020 90% DESIGN SUBMITTAL
C 12-11-2020 REVISED 90% DESIGN SUBMITTAL
BY CHK JAPPD DESCRIPTION
LNR CNS CAM AREA CODE
JJM CNS CAM ACCOUNT NUMBER
MJD CNS CAM PROJECT NUMBER
DRAWING BY
APPROVALS
_ DATE INITIALS
NREGIONAL
/A NIA
ENGINEER
0231540 DATE INITIALS MGR TECH
LNR N/A NIA REC & STD
LINE 475 DOT RELOCATION - PIPELINE
'& DUKE Piedmont CONSTRUCTION DETAILS
VENERGY,: r6lj� Natural Gas
GOLDSBORO, NC
COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
SHEET(S) X OF X
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
DWG SCALE AS SHOWN
DWG DATE 08/11/2020 ISUPERSEDED
DRAWING NUMBER
P N G-C-025-0001302
REVISION
C
PROFESSIONAL ENG/ARCH STAMP
STATION ID I
DATE INITIALS
CHECKER INITIALS I CNS 12/11/2020 CAM
PRINCIPAL
ENGINEER
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
GENERAL NOTES:
SOILS AND FOUNDATIONS:
1. THESE NOTES AND OTHER DRAWING NOTES CONTAINED WITHIN ARE PROVIDED TO MEET SPECIFIC REQUIREMENTS AND TO
SUPPLEMENT THE CONTRACT SPECIFICATIONS. THESE NOTES NEITHER REPLACE NOR OVERRIDE THE PROVISIONS AND
REQUIREMENTS OF THE CONTRACT SPECIFICATIONS.
2. CONTRACTOR SHALL COORDINATE ALL STRUCTURAL WORK WITH WORK SHOWN ON ALL OTHER DRAWINGS.
3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS OF EXISTING CONSTRUCTION AND REPORT ANY DISCREPANCIES FROM THE
CONTRACT DRAWINGS TO THE ENGINEER PRIOR TO COMMENCING WITH WORK. SCALING OF WORKING DIMENSIONS FROM THE
STRUCTURAL DRAWINGS IS PROHIBITED.
4. CONTRACTOR TO FIELD VERIFY ALL FOUNDATION TOPS OF CONCRETE, REVEALS, AND DIMENSIONS PRIOR TO CONSTRUCTION.
5. CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. CONTRACTOR SHALL BE RESPONSIBLE FOR
ALL MEANS AND METHODS OF CONSTRUCTION INCLUDING, BUT NOT LIMITED TO, SHORING AND TEMPORARY BRACING.
CONTRACTOR SHALL UNDERTAKE ALL NECESSARY MEASURES TO ENSURE SAFETY OF ALL PERSONS AND STRUCTURES AT THE
SITE AND ADJACENT TO THE SITE. VISITS TO THE SITE BY THE COMPANY OR ENGINEER SHALL NOT RELIEVE THE CONTRACTOR OF
SUCH RESPONSIBILITY.
6. IF CERTAIN FEATURES ARE NOT FULLY SHOWN OR CALLED FOR ON THE CONTRACT DRAWINGS OR SPECIFICATIONS, THEIR
CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE SHOWN OR CALLED FOR WITH THE
APPROVAL OF THE ENGINEER. WHERE SECTIONS VARY, CONTRACTOR SHALL PROVIDE FOR SMOOTH TRANSITIONS BETWEEN
THEM, UNLESS NOTED OTHERWISE.
7. ALL PRODUCTS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS' WRITTEN INSTRUCTIONS AND
RECOMMENDATIONS, UNLESS NOTED OTHERWISE.
8. ITEMS WHICH ARE TO BE FURNISHED AND INSTALLED BY SEPARATE CONTRACTS ARE IDENTIFIED AND LABELED FOR EACH
CONTRACT.
9. FOR ADDITIONAL INFORMATION, SUBMITTAL REQUIREMENTS, AND CODES AND STANDARDS, SEE THE CONTRACT SPECIFICATIONS.
DESIGN STANDARDS:
1. PRINCIPAL CODE OF RECORD: INTERNATIONAL BUILDING CODE 2015 AS ADOPTED BY THE STATE OF NORTH CAROLINA.
2. AMERICAN CONCRETE INSTITUTE: (ACI)
a. ACI 318-14, BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE
3. AMERICAN INSTITUTE OF STEEL CONSTUCTION: (AISC)
a. AISC 360-10, SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, 14TH EDITION
4. AMERICAN SOCIETY OF CIVIL ENGINEERS: (ASCE)
a. ASCE 7-10, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
5. AMERICAN WELDING SOCIETY: (AWS)
a. AWS D1.1, STRUCTURAL WELDING CODE, 2006
6. PROCESS INDUSTRY PRACTICES: (PIP)
a. STC01015, STRUCTURAL DESIGN CRITERIA
b. STE05121, ASCE ANCHORAGE DESIGN FOR PETROCHEMICAL FACILITIES
C. STF05121, ANCHOR FABRICATION AND INSTALLATION INTO CONCRETE
d. STS03001, PLAIN AND REINFORCED CONCRETE SPECIFICATION
e. STS03600, NONSHRINK CEMENTITIOUS GROUT SPECIFICATION
f. STS03601, EPDXY GROUT SPECIFICATION
g. STS05120, STRUCTURAL MISCELLANEOUS STEEL FABRICATION SPECIFICATION
h. STS05130, STRUCTURAL AND MISCELLANEOUS STEEL ERECTION SPECIFICATION
7. PIEDMONT NATURAL GAS STANDARDS:
a. 2019 DESIGN MANUAL, REVISION 0.0, DATED APRIL 2019
b. 2019 CONSTRUCTION MANUAL, REVISION 0.0, DATED APRIL 2019
STATEMENT OF SPECIAL INSPECTIONS
1. USE SPECIAL CARE DURING EXCAVATION NOT TO DAMAGE EXISTING STRUCTURES. PROVIDE SHEETING OR SHORING WHERE NECESSARY.
2. FOUNDATION CONSTRUCTION SHALL BE OBSERVED BY THE GEOTECHNICAL ENGINEER OF RECORD.
3. SITE PREPARATION:
a. ENGINEER OF RECORD SHALL OBSERVE SUBGRADE PRIOR TO CONCRETE PLACEMENT.
b. EXCAVATION, FILL, AND BACKFILL SHALL BE IN ACCORDANCE WITH THE CONTRACT AND SPECIFICATIONS. CONTRACTOR SHALL NOTIFY
THE ENGINEER WHEN LOOSE OR SOFT SOILS ARE EXPOSED WHERE SLABS, MATS, OR FOOTINGS ARE TO BE PLACED SO A
DETERMINATION MAY BE MADE REGARDING IMPROVEMENT OF THIS POTENTIALLY UNDESIRABLE CONDITION.
C. EXISTING UNDERGROUND UTILITIES AND FOUNDATIONS SHALL BE LOCATED BY CAREFUL EXCAVATION BEFORE STARTING FOUNDATION
OR HYDROEXCAVATION AS REQUIRED. SUPPORT AND PROTECTION OF THESE UTILITIES AND FOUNDATIONS SHALL BE PROVIDED
DURING EARTHWORK OPERATIONS.
d. SHALLOW FOUNDATION GROUND IMPROVEMENTS:
- SUBGRADE PREP: OVEREXCAVATE AND RE -COMPACT UNCONSOLIDATED NATIVE SITE SOIL 24 INCHES BELOW BEARING
ELEVATION, 24 INCHES OUTSIDE FOOTING PERIMETER.
- BACKFILL: STRUCTURAL FILL OR ONSITE SANDY SOIL
- COMPACTION: 6 INCH LAYERS, 95% ASTM D 698
- IN THE EVENT SILTSTONE BEDROCK IS ENCOUNTERED AT FOOTING ELEVATION, THE GEOTECHNICALE ENGINEER SHOULD BE
CONSULTED.
4. FILL AND BACKFILL MATERIALS:
a. STRUCTURAL FILL: NCDOT #57 OR #67, IMPORTED
b. SLAB SUB BASE: NCDOT #57 OR #67, IMPORTED
C. SITE FILL: NATIVE SITE SOIL; ONSITE
RECOMMENDED GRADED MATERIALS
NCDOT #57 AGGREGATE BASE
NCDOT #67 AGGREGATE BASE
SIEVE
PERCENT FINER
SIEVE
PERCENT FINER
1 %"
100
1"
100
1"
95-100
3/4"
90-100
1 /2"
20-60
3/8"
20-55
#4
0-10
#4
0-10
#8
0-5
#8
0-5
LIQUID LIMIT<30, PI<4
LIQUID LIMIT<30, PI<4
5. DESIGN PARAMETERS:
a. MINIMUM STABILITY FACTORS OF SAFETY:
OVERTURNING: 1.5
UPLIFT: 1.5
SLIDING: 1.5
b. NET ALLOWABLE BEARING PRESSURE: 1500 PSF (ASSUMED PER IBC TABLE 1806.2)
C. COEFFICIENT OF FRICTION: 0.25 (ASSUMED PER IBC TABLE 1806.2)
d. ALLOWABLE LATERAL BEARING PRESSURE: 100 PSF (ASSUMED PER IBC TABLE 1806.2)
1. REQUIRED AND PREPARED IN ACCORDANCE WITH IBC 2015 SECTIONS 1704 AND 1705.
2. THE OWNER OR REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL EMPLOY ONE OR MORE APPROVED
AGENCIES/SPECIAL INSPECTORS TO PROVIDE "SPECIAL INSPECTIONS" DURING CONSTRUCTION. MATr:QI°I c
3. THE SPECIAL INSPECTOR(S) SHALL BE QUALIFIED PER IBC 2015 SECTION 1704.2.1.
4. THE SPECIAL INSPECTOR(S) SHALL SUBMIT REPORTS PER IBC 2015 SECTION 1704.2.4.
5. THE SPECIAL INSPECTOR(S) SHALL USE THE LATEST ISSUE OF THE STRUCTURAL DRAWINGS FOR THE INSPECTIONS. SHOP
FABRICATION DRAWINGS SHALL NOT BE USED FOR INSPECTION PURPOSES.
6. SPECIAL INSPECTIONS:
a. STEEL CONSTRUCTION PER IBC 2015 SECTION 17.5.2.1.
b. CONCRETE CONSTRUCTION PER IBC 2015 SECTION 1705.3 AND TABLE 1705.3.
C. SOILS PER IBC IBC 2015 SECTION 1705.3 AND TABLE 1705.3.
d. DRILLED PIERS PER IBC 2015 SECTION 1705.7 AND TABLE 1705.7.
DESIGN LOADS:
1. RISK CLASSIFICATION: CATEGORY IV PER ASCE 7.
2. DEAD LOAD:
a. EQUIPMENT LOADS ARE ACTUAL WEIGHTS OF EQUIPMENT (EMPTY, OPERATING, AND/OR TESTING WEIGHTS AS PROVIDED BY
EQUIPMENT SUPPLIER)
b. FOUNDATIONS ARE DESIGN FOR EQUIPMENT, WHICH SATISFIES THE CONTRACT SPECIFICATIONS.
3. SNOW LOADS PER ASCE 7:
a. GROUND SNOW LOAD: 10 PSF
b. EXPOSURE FACTOR: 0.9
C. THERMAL FACTOR: 1.2
d. IMPORTANCE FACTOR: 1.2
4. ICE LOADS PER ASCE 7:
a. NOMINAL ICE THICKNESS: 0.75 INCH
b. CONCURRENT WIND SPEED: 30 MPH
C. IMPORTANCE FACTOR: - MULTIPLIER ON ICE THICKNESS: 1.25 - MULTIPLIER ON CONCURRENT WIND PRESSURE: 1.0
5. WIND LOAD PER ASCE 7:
a. BASIC WIND SPEED: 131 MPH 3-SECOND GUST - ULTIMATE
b. BASIC WIND SPEED: 101 MPH 3-SECOND GUST - SERVICE LEVEL
C. EXPOSURE CATEGORY: C
6. SEISMIC LOAD PER ASCE 7:
a. MAXIMUM CONSIDERED EARTHQUAKE SPECTRAL RESPONSE ACCELERATIONS: - Ss COEFFICIENT: 0.111g - S1 COEFFICIENT: 0.055g
b. DESIGN EARTHQUAKE SPECTRAL RESPONSE ACCELERATIONS: - Sds COEFFICIENT: 0.119g - Sd1 COEFFICIENT: 0.087g
C. IMPORTANCE FACTOR: 1.5
d. SITE CLASS: D
e. SEISMIC DESIGN CATEGORY: C
7. FROST DEPTH PER NCBC:
a. 12"
1. SEE THE CONTRACT SPECIFICATIONS FOR COMPLETE REQUIREMENTS AND COMPLY WITH ALL APPLICABLE OSHA REGULATIONS.
2. REINFORCED CONCRETE:
a. REINFORCED CONCRETE SHALL BE PREPARED AND PLACED IN ACCORDANCE WITH ACI, PIP STS03001, PROJECT SPECIFICATIONS, AND
OWNER STANDARD.
b. CONCRETE:
- ALL CONCRETE CONSTRUCTION SHALL COMPLY WITH THE LATEST ADOPTED EDITION OF THE FOLLOWING ACI CODES: ACI 318, ACI
315, AND ACI 301.
- ALL CEMENT SHALL BE TYPE I CEMENT AND CONFORM TO ASTM C150, UNLESS OTHERWISE SPECIFIED OR REQUIRED AND HAVE
MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 4,000 PSI.
- MAXIMUM WATER/CEMENT RATIO SHALL BE 0.45.
- SLUMP OF CONCRETE SHALL BE BETWEEN 3 AND 4 INCHES AS TESTED IN ACCORDANCE WITH ASTM C143. IF CONTRACTOR WISHES
TO USE A MIX WITH SLUMP OUTSIDE THE RANGE LISTED ABOVE, WRITTEN APPROVAL FROM ENGINEER OF RECORD IS REQUIRED
PRIOR TO MIX DESIGN SUBMITTAL.
- MIXING WATER SHALL BE POTABLE WATER AND CONFORM TO ASTM C1602.
- AGGREGATES FOR NORMAL WEIGHT CONCRETE SHALL CONFORM TO ASTM C33 "SPECIFICATION FOR CONCRETE AGGREGATES".
THE NOMINAL MAXIMUM SIZE OF THE AGGREGATE SHALL NOT BE MORE THAN 1-1/211
.
- FOR NEW COARSE -AGGREGATE SOURCE, WHEN 3 YEARS' APPROVED SERVICE RECORDS ARE NOT AVAILABLE OR WHEN SERVICE
RECORDS ARE UNACCEPTABLE, AGGREGATE SHALL BE EVALUATED FOR POTENTIAL REACTIVITY. AGGREGATE MUST BE CONSIDERED
INNOCUOUS IN ACCORDANCE WITH ASTM 1260. IF EVALUATION ABOVE INDICATES REACTIVE AGGREGATES AND ALTERNATE
AGGREGATE SOURCES ARE NOT AVAILABLE, REQUEST RE-EVALUATION OF AGGREGATE USING ASTM C1567. COARSE AGGREGATES
CONSIDERED DELETERIOUS OR POTENTIALLY DELETERIOUS SHALL NOT BE USED WITHOUT APPROVAL.
ADMIXTURES SHALL NOT BE USED WITHOUT THE APPROVAL OF THE ENGINEER'S CONSTRUCTION FIELD REPRESENTATIVE.
CONCRETE FOR ALL PARTS OF THE WORK SHALL BE OF THE SPECIFIED QUALITY, CAPABLE OF BEING PLACED WITHOUT EXCESSIVE
SEGREGATION, AND WHEN HARDENED, OF DEVELOPING ALL CHARACTERISTICS REQUIRED BY THESE SPECIFICATIONS AND THE
CONTRACT DOCUMENTS. BEFORE CONCRETE WORK BEGINS, THE PROPOSED CONCRETE MIX DESIGN ALONG WITH COLLABORATING
DATA SHOWING COMPLIANCE WITH THE SPECIFICATIONS SHALL BE SUBMITTED TO ENGINEER FOR APPROVAL.
- ALL REINFORCING STEEL, WIRE MESH, ANCHOR BOLTS, HOLD-DOWN ANCHORS, AND OTHER INSERTS SHALL BE SECURED IN
POSITION PRIOR TO PLACING OF CONCRETE.
- EXPOSED HORIZONTAL CONCRETE SURFACES SHALL BE WOOD FLOATED TO DEPRESS COARSE AGGREGATE AND STEEL TROWELED
TO A SMOOTH SURFACE.
- ALL WALKING SURFACES SHALL HAVE A LIGHT BROOM FINISH.
- CONCRETE SURFACES SHALL BE PROTECTED DURING CURING AGAINST EARLY EVAPORATION OF WATER, ACTION BY SUN, RAIN,
WATER, FROST, AND CRACKING.
3. FORMWORK:
a. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGN, ENGINEERING, STRUCTURAL ADEQUACY, AND CONSTRUCTION OF ALL
CONCRETE FORMWORK IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS.
b. COORDINATE ALL CONCRETE WORK WITH THE PLACEMENT OF PIPING, INSERTS, FLOOR DRAINS, AND OTHER EMBEDDED ITEMS
INDICATED ON THE CONTRACT DRAWINGS OR IN THE CONTRACT SPECIFICATIONS.
C. ALL NEW OR EXISTING PIPING OR UTILITIES PASSING THROUGH NEW CONCRETE SHALL BE SLEEVED 1/2" CLEAR ALL AROUND
UNLESS NOTED OTHERWISE. (SEE OTHER DISCIPLINE DRAWINGS FOR SLEEVE DETAILS. CONTRACTOR SHALL PROVIDE
MEASURES TO ENSURE THAT SLEEVES REMAIN FREE OF DEBRIS AND WATER DURING CONSTRUCTION).
d. PROVIDE 1", 450 CHAMFER ON ALL EDGES OF EXPOSED CONCRETE UNLESS CONCRETE NOT EXPOSED TO WEATHER OR IN
CONTACT WITH THE GROUND.
4. REINFORCING STEEL:
a. BARS: ASTM A615 GRADE 60
b. ALL CONCRETE SHALL BE REINFORCED UNLESS SPECIFICALLY MARKED "NOT REINFORCED" OR "UNREINFORCED".
C. CONTRACTOR SHALL DETAIL AND PLACE ALL REINFORCEMENT IN ACCORDANCE WITH ACI SP-66, ACI 301, ACI 318, AND CRSI
MANUAL OF STANDARD PRACTICE.
d. MINIMUM CONCRETE CLEAR COVER OVER REINFORCEMENT SHALL BE AS FOLLOWS, UNLESS NOTED OTHERWISE:
- CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 3"
- CONCRETE EXPOSED TO EARTH OR WEATHER:
- #6 THROUGH #18 BARS - 2"
- #5 AND SMALLER BARS AND WELDED WIRE FABRIC -1 1/2"
- CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH THE GROUND:
- SLABS AND WALLS - #14 AND #18 BARS - 1 1/2"
- #11 AND SMALLER BARS - 3/4"
- BEAMS AND COLUMNS, PRIMARY REINFORCEMENT, TIES, STIRRUPS, SPIRALS -1 1/2"
e. EMBEDMENT AND LAP SPLICE LENGTHS FOR ALL REINFORCING STEEL BARS SHALL CONFORM TO THE FOLLOWING PROVISIONS,
UNLESS NOTED OTHERWISE.
MINIMUM STRAIGHT EMBEDMENT LENGTHS:
#3 - 15" #6 - 29" #9 - 54"
#4-19" #7-42" #10-61"
#5 - 24" #8 - 48" #11 - 67"
MINIMUM LAP SPLICE LENGTHS:
#3 - 19" #6 - 37" #9 - 70"
#4 - 25" #7 - 54" #10 - 79"
#5 - 31" #8 - 62" #11 - 87"
MINIMUM HOOK EMBEDMENT LENGTHS:
#3 - 8" #6 -15" #9 - 22"
#4 - 10" #7 -17" #10 - 25"
#5 - 12" #8 -19" #11 - 27"
f. THE MINIMUM LENGTHS SHOWN ABOVE ARE BASED ON THE FOLLOWING CONCRETE COVERAGE AND REINFORCING C/C
SPACING:
BEAMS AND COLUMNS: COVER = 1.0db (BAR DIAMETER)
CENTER TO CENTER (C/C) SPACING = 2.Odb
ALL OTHERS: COVER = 1.0db (BAR DIAMETER)
CENTER TO CENTER (C/C) SPACING = 3.Odb
g. THE DEVELOPMENT AND SPLICE LENGTHS SHOWN SHALL NOT APPLY IF ANY OF THE FOLLOWING CONDITIONS OCCUR:
- fc < 4,000 PSI
- fy > 60,000 PSI
- THE COVER OR C/C BAR SPACING IS NOT AS LISTED ABOVE.
- THE REINFORCING STEEL IS EPDXY COATED.
- LIGHT WEIGHT CONCRETE IS USED.
HORIZONTAL BARS HAVING MORE THAN 12" OF CONCRETE PLACED BELOW THEM SHALL BE CONSIDERED TOP
REINFORCEMENT AND SHALL HAVE MINIMUM STRAIGHT EMBEDMENT AND LAP SPLICE LENGTHS INCREASED BY NOT LESS
THAN 30% OVER THOSE GIVEN ABOVE.
HOOK EMBEDMENT IS THE MINIMUM STRAIGHT LINE DISTANCE FROM THE CRITICAL SECTION OF THE BAR TO THE FARTHEST
EDGE OF THE HOOK.
5. JOINTS:
a. LOCATE ALL CONSTRUCTION, CONTRACTION, ISOLATION, EXPANSION, AND OTHER JOINTS AS INDICATED OR SPECIFIED, OR
OTHERWISE APPROVED BY THE ENGINEER.
b. SURFACES OF ALL HORIZONTAL AND VERTICAL CONSTRUCTION JOINTS SHALL BE CLEANED OF LAITANCE AND SHALL
EXPOSE CLEAN COARSE AGGREGATE SOLIDLY EMBEDDED IN MORTAR MIX TO MINIMUM 1/4" AMPLITUDE. APPLY CONCRETE
BONDING AGENT PRIOR TO DEPOSITING CONCRETE IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
C. THESE PROVISIONS SHALL ALSO APPLY WHEN NEW CONCRETE IS PLACED AGAINST EXISTING CONCRETE.
d. PROVIDE WATERSTOPS AT CONCRETE JOINTS WHERE INDICATED ON THE CONTRACT DRAWINGS. ALL WATERSTOPS SHALL
BE FUEL RESISTANT TYPE, UNLESS NOTED OTHERWISE.
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
BURNS & McDONNELL CONSULTANTS, INC. I PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
STATE LICENSE#C-1435 PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 REF. DWG(S) PNG-G-025-0001086
CLAUDE A. McMULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL0478.52
NO.1
DATE
REVISION(S) DESCRIPTION
A
08-11-2020
60% DESIGN SUBMITTAL
B
IC
10-02-2020
90% DESIGN SUBMITTAL
12-11-2020
REVISED 90% DESIGN SUBMITTAL
PROFESSIONAL ENG/ARCH STAMP
BY CHK JAPPD DESCRIPTION
NPH NCT CAM AREA CODE -
VISW NCT CAM ACCOUNT NUMBER -
VISW NCT CAM PROJECT NUMBER 0231540
DRAWING BY MSW
STATION ID 84-T-91-G LD-6733
CHECKER INITIALS I NCT
APPROVALS
DATE
INITIALS
REGIONAL
ENGINEER
DATE
INITIALS
MGR TECH
REC & STD
DATE
INITIALS
PRINCIPAL
12/11/2020
CAM
ENGINEER
LINE 475 DOT RELOCATION -PIPELINE SHEET(S) XOFx I DWGSCALE NONE
DWG DATE 08/11/2020 SUPERSEDED ---
p/r'r6ljl� Piedmont Natural Gas STRUCTURAL NOTES (1 OF 2)
�C ENERGY:ENER.. DRAWING NUMBER REVISION
GOLDSBORO, NORTH CAROLINA PNG-S-025-0001086 C
COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA DISCIPLINE / RESOURCE CENTER / LINE NUMBER
6.
STRUCTURAL AND MISCELLANEOUS STEEL:
ABBREVIATIONS:
a.
STRUCTURAL AND MISCELLANEOUS STEEL SHALL BE FABRICATED AND ERECTED IN ACCORDANCE WITH AISC STEEL CONSTRUCTION MANUAL, 14TH EDITION, PIP STS05120 AND PIP STS05130, AND ALL
AB
ANCHOR BOLT
L
ANGLE
APPLICABLE OWNER STANDARDS.
ABV
ABOVE
LB
POUND
b.
TEMPORARY ERECTION BRACING SHALL BE DESIGNED AND PROVIDED BY THE CONTRACTOR AS REQUIRED AND SHALL NOT BE REMOVED UNTIL ALL PERMANENT LATERAL -LOAD -RESISTING ELEMENTS
ACI
AMERICAN CONCRETE INSTITUTE
LG
LONG
AND CONNECTIONS ARE COMPLETELY INSTALLED.
AGGR
AGGREGATE
LL
LIVE LOAD
C.
ALL STEEL SHALL BE HOT -DIP GALVANIZED UNLESS NOTED OTHERWISE ON PLANS.
AISC
AMERICAN INSTITUTE OF STEEL CONSTRUCTION
LLBB
LONG LEG BACK TO BACK
d.
WIDE FLANGE SHAPES AND TEES: ASTM A992, Fy = 50 KSI OR ASTM A572, Fy = 50 KSI
ANSI
AMERICAN NATIONAL STANDARD INSTITUTE
LLH
LONG LEG HORIZONTAL
ASTM
AMERICAN SOCIETY FOR TESTING OF MATERIALS
LLV
LONG LEG VERTICAL
e.
PLATES, ANGLES, AND CHANNELS: ASTM A36, Fy = 36 KSI, UNLESS NOTED OTHERWISE
AWS
AMERICAN WELDING SOCIETY
LONG
LONGITUDINAL
f.
SQUARE AND RECTANGULAR HOLLOW STRUCTURAL SECTIONS: ASTM A500 GRADE B, Fy = 46 KSI
BBP
BOTTOM OF BASE PLATE
LS
LAP SPLICE
g.
ROUND HOLLOW STRUCTURAL SECTIONS: ASTM A500 GRADE B, Fy = 42 KSI
BTW
BETWEEN
MATL
MATERIAL
h.
PIPE: ASTM A53 GRADE B, Fy = 35 KSI
BLDG
BUILDING
MAX
MAXIMUM
i.
ALL DOUBLE ANGLE MEMBERS SHALL HAVE SPACER PLATES CONFORMING TO AISC STEEL CONSTRUCTION MANUAL PARAGRAPH E6. SPACER PLATES SHALL BE THE SAME THICKNESS AS THE
BM
BEAM
MECH
MECHANICAL
GUSSET PLATES.
BOC
BOTTOM OF CONCRETE
MFR
MANUFACTURER
7.
BOLTS:
BOP
BOTTOM OF PIPE
MH
MANHOLE
a.
3/4"DIAMETER ASTM A3125 GRADE A325, UNLESS NOTED OTHERWISE.
BOS
BOTTOM OF STEEL
MIN
MINIMUM
b.
FRAMING CONNECTIONS: SNUG -TIGHTENED JOINTS WITH STANDARD HOLES, UNLESS NOTED OTHERWISE.
BOT
CAP
BOTTOM
CAPACITY
MI
MISC
MISCELLANEOUS
C.
BRACING CONNECTIONS: SNUG -TIGHTENED JOINTS WITH STANDARD HOLES, UNLESS NOTED OTHERWISE.
C/C
CENTER TO CENTER
NF
NOT APPLICABLE
NEAR FACE
d.
ON ONE SIDE OF EACH DOUBLE CONNECTION OF BEAMS TO A COLUMN WEB OR A GIRDER WEB DIRECTLY OVER A COLUMN, PROVIDE A TEMPORARY SEAT ANGLE ATTACHED TO COLUMN OR GIRDER
CL
CENTERLINE
NO
NUMBER
WEB AND TO BOTTOM FLANGE OF BEAM. MINIMUM SEAT CONNECTION SHALL BE L4x3x3/8 LLH WITH TWO 3/4" DIAMETER A307 OR A325-ST BOLTS EACH LEG. SINGLE AND DOUBLE STAGGERED
CIR
CIRCLE
NOM
NOMINAL
CONNECTIONS ARE PROHIBITED WITHOUT THE EXPLICIT PRIOR APPROVAL IN WRITING OF THE STRUCTURAL ENGINEER OF RECORD.
CJ
CONSTRUCTION JOINT
NS
NEAR SIDE
8.
WELDING:
CLR
CLEAR
NTS
NOT TO SCALE
a.
IN ACCORDANCE WITH AWS D1.1 USING E70 ELECTRODE
CLJ
CONTROL JOINT
OC
ON CENTER
b.
MINIMUM STRUCTURAL WELD REQUIREMENTS ARE SHOWN ON DESIGN DRAWINGS. CLIENT REQUESTS WELDED CONNECTIONS TO BE FINISHED WITH MINIMUM SEAL WELDING ON REMAINDER OF JOINT
COL
CONIC
COLUMN
CONCRETE
OD
OUTSIDE DIAMETER
AT ALL OTHER CREVICES. SEAL WELDING SHALL NOT PRODUCE AN UNSAFE CONDITION FOR HOT -DIP GALVANIZING.
CONT
CONTINUOUS
OF
OPP
OUTSIDE FACE
OPPOSITE
9.
ANCHOR BOLTS:
COORD
COORDINATE
OSHA
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
a.
ASTM F1554 GRADE 55 NOTED OTHERWISE ON DRAWINGS.
CTR
CENTER
PED
PEDESTAL
b.
ANCHOR BOLT HOLES IN BASE PLATES TO BE OVERSIZED TO ACCOUNT FOR CONSTRUCTION TOLERANCES IN ANCHOR BOLT PLACEMENT. HOLES CORRESPONDING TO APPROPRIATE ANCHOR BOLT
db
BAR DIAMETER
PEN
PENETRATE, PENETRATION
SIZE SHALL BE NO LARGER THAN THE MAXIMUM RECOMMENDED SIZES IN THE AISC STEEL CONSTRUCTION MANUAL, 14TH EDITION, TABLE 14-2.
DET
DETAIL
PERP
PERPENDICULAR
C.
PROVIDE PLATE WASHERS AT OVERSIZED ANCHOR BOLT HOLES.
DIA
DIAMETER
PL
PLATE
d.
LOCATE ANCHOR BOLTS ACCURATELY, SET WITH TEMPLATE, AND SECURELY HOLD IN POSITION WHILE PLACING CONCRETE. PROTECT IN -PLACE ANCHOR BOLTS FROM CONSTRUCTION ACTIVITY.
DIAG
DIM
DIAGONAL
DIMENSION
PROJ
PROJECTION
e.
THE FOLLOWING ARE PROHIBITED WITHOUT THE EXPLICIT PRIOR APPROVAL IN WRITING OF THE ENGINEER:
DL
DEAD LOAD
PSF
POUNDS PER SQUARE FOOT
- INSERTING ANCHOR BOLTS INTO FRESH OR PARTIALLY HARDENED CONCRETE.
DN
DOWN
PSI
PVC
POUNDS PER SQUARE INCH
POLYVINYL CHLORIDE
- SUBSTITUTING POST -INSTALLED ANCHORS WHERE EMBEDDED ANCHOR BOLTS ARE INDICATED.
DWG
DRAWING
RAD
RADIUS
- REPAIRING, REPLACING, OR MODIFYING INSTALLED ANCHOR BOLTS.
DWL
DOWEL
REF
REFERENCE
f.
ANCHOR BOLT THREADS SHALL BE UNC-2A AND PROTECTED FROM DAMAGE DURING CONSTRUCTION.
EA
EACH
REINF
REINFORCE
9.
SLEEVES FOR STATIONARY EQUIPMENT AND STRUCTURAL BASE PLATES SHALL BE FILLED WITH GROUT WHEN BASE PLATE/EQUIPMENT IS GROUTED IN FINAL LOCATION.
EF
EACH FACE
REQD
REQUIRED
h.
ANCHOR BOLTS, NUTS, AND WASHERS SHALL BE SHIPPED GALVANIZED.
EJ
EXPANSION JOINT
REV
REVISION
10.
POST -INSTALLED
ANCHORS:
EL
ELEVATION
SCHED
SCHEDULE
a.
INSTALL ANCHORS PER MANUFACTURER INSTRUCTIONS INCLUDED IN ANCHOR PACKAGING.
ELEC
ELEV
ELECTRICAL
ELEVATION
SECT
SH
SECTION
SHEET
b.
CONTRACTOR SHALL ARRANGE AN ANCHOR MANUFACTURER'S REPRESENTATIVE TO PROVIDE ONSITE INSTALLATION TRAINING FOR ALL OF THEIR ANCHORING PRODUCTS SPECIFIED. ENGINEER OF
EMBED
EMBEDMENT
SIM
SIMILAR
RECORD MUST RECEIVE DOCUMENTED CONFIRMATION THAT ALL OF CONTRACTOR'S PERSONNEL WHO INSTALL ANCHORS ARE TRAINED PRIOR TO COMMENCEMENT OF INSTALLING ANCHORS.
EQ
EQUAL
SLP
SLOPE
C.
ANCHOR CAPACITY IS DEPENDENT ON SPACING BETWEEN ADJACENT ANCHORS AND PROXIMITY OF ANCHORS TO EDGE OF CONCRETE. INSTALL ANCHORS IN ACCORDANCE WITH SPACING AND EDGE
EQUIP
EQUIPMENT
SPEC
SPECIFICATION
CLEARANCES INDICATED ON DRAWINGS.
EQUIV
EQUIVALENT
SQ
SQUARE
d.
EXISTING REINFORCING BARS IN CONCRETE STRUCTURE MAY CONFLICT WITH SPECIFIC ANCHOR LOCATIONS. REINFORCING BARS SHALL NOT BE CUT UNLESS NOTED ON DRAWINGS THAT BARS CAN
EXIST
EXISTING
STD
STANDARD
BE CUT. CONTRACTOR SHALL CONTACT ENGINEER OF RECORD WHEN INTERFERENCES OCCUR.
EXP
EXPANSION
STIFF
STIFFENER
e.
PERMITTED POST INSTALLED ANCHORS/EPDXY ARE LISTED AS FOLLOWS (ALTERNATE PRODUCTS MUST BE APPROVED IN WRITING BY ENGINEER OF RECORD PRIOR TO USE. SUBSTITUTIONS REQUIRE
EW
fc
EACH WAY
SPECIFIED 28-DAY CONCRETE COMPRESSIVE STRENGTH (MINIMUM)
STIR
STL
STIRRUP
STEEL
STAMPED CALCULATIONS)
FDN
FOUNDATION
STR
STRAIGHT
- WEDGE TYPE - LIFE SAFETY APPLICATIONS:
FF
FAR FACE
STRL
STRUCTURAL
- SIMPSON STRONG TIE - STRONG BOLT 2
FLG
FLANGE
STRUC
STRUCTURE
- HILTI KWIK BOLT TZ
FS
FAR SIDE
SYMM
SYMMETRICAL
- POWERS POWER STUD SD2
FT
FEET
T&B
TOP & BOTTOM
- WEDGE TYPE - NON -LIFE SAFETY APPLICATIONS:
FTG
FOOTING
TOB
TOP OF BOLT
- SIMPSON STRONG TIE - WEDGE ALL
Fy, fy
YIELD STRESS
TOC
TOP OF CONCRETE
- HILTI KWIK BOLT 3
FV
FIELD VERIFY
TOG
TOP OF GRATING
GA
GAGE
TOS
TOP OF STEEL
- POWER POWER STUD SD1
GALV
GALVANIZE
TYP
TYPICAL
- UNDERCUT TYPE (USE ONLY WHERE SPECIFICALLY INDICATED ON DRAWINGS):
GR
GRADE
UNO
UNLESS NOTED OTHERWISE
- SIMPSON STRONG TIE - TORQUE -CUT
GRTG
GRATING
VAR
VARIES
- HILTI HDA UNDERCUT ANCHOR
H
HIGH
VERT
VERTICAL
- POWERS ATOMIC + UNDERCUT
HORIZ
HORIZONTAL
W
WIDE
- EPDXY ANCHORS - LIFE SAFETY APPLICATIONS:
HR
HS
HANDRAIL
HIGH STRENGTH
W/
W/0
WITH
WITHOUT
- SIMPSON STRONG TIE - SET XP
IBC
INTERNATIONAL BUILDING CODE
WD
WIDTH
- HILTI HIT-RE500 V3
ID
INSIDE DIAMETER
WF
WIDE FLANGE
- HILTI HIT-HY200
IF
INSIDE FACE
WP
WORK POINT
- POWER PE1000
IJ
ISOLATION JOINT
WT
WEIGHT/STRUCTURAL
- ADHESIVE ANCHORS - FOR NON -VIBRATING EQUIPMENT ANCHORAGE AND OTHER NON -LIFE SAFETY APPLICATIONS:
INTR
INTERIOR
WWF
WELDED WIRE FABRIC
- SIMPSON STRONG TIE - AT
VT
TT
@
AT
- HILTI HIT-HY200
JT
KB
JOIN
KNEE BRACE
&
#
AND
POUNDS OR NUMBER
- POWER - AC100+ GOLD
KSI
PERCENT
f.
CONCRETE ANCHORS:
SQUARE INCH
�
DIAMETER
- GALVANIZED OR ZINC -COATED CARBON STEEL MANUALLY EXPANDED WEDGE TYPE, UNLESS NOTED OTHERWISE.
g.
ADHESIVE ANCHORS:
- INSTALL ADHESIVE ANCHORS AS INDICATED ON DRAWINGS.
- ALL PERSONNEL INSTALLING ADHESIVE ANCHORS SHALL BE ACI ADHESIVE ANCHOR CERTIFIED.
- ADHESIVE ANCHORS SHALL BE INSTALLED IN CONCRETE HAVING A MINIMUM AGE OF 21 DAYS AT TIME OF ANCHOR INSTALLATION.
11.
GROUT:
a.
NON -SHRINK GROUT IN ACCORDANCE W/ PIP STS03600.
- NON-METALLIC, HYDRAULIC -CEMENT GROUT IN ACCORDANCE WITH ASTM C1107.
- MINIMUM COMPRESSIVE STRENGTH = 6,000 PSI @ 28 DAYS.
- GROUT SHALL BE SUITED FOR OUTDOOR USE. b. EPDXY GROUT IN ACCORDANCE W/ PIP STS03601.
- PROVIDE EPDXY GROUT FOR ALL PUMP BASES
12.
STEEL
BAR GRATING:
a.
PER VENDOR INSTRUCTIONS
BURNS&McDONNELLCONSULTANTS, INC. I PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
STATE LICENSE # C-1435
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDE A. McMULLAN
NO.1
DATE
REVISION(S) DESCRIPTION
IFC SUBMITTAL DATE
A
08-11-2020
60% DESIGN SUBMITTAL
NORTH CAROLINA
B
IC
10-02-2020
90% DESIGN SUBMITTAL
SEAL0478.52
12-11-2020
REVISED 90% DESIGN SUBMITTAL
PROFESSIONAL ENG/ARCH STAMP
BY CHK JAPPD DESCRIPTION
NPH NCT CAM AREA CODE -
VISW NCT CAM ACCOUNT NUMBER -
VISW NCT CAM PROJECT NUMBER 0231540
DRAWING BY MSW
STATION IDI 84-T-91-G LD-6733
CHECKER INITIALS I NCT
APPROVALS
DATE
INITIALS
REGIONAL
ENGINEER
p � DUKE
DATE
INITIALS
MGR TECH
ENERGY,:
REC & STD
DATE
INITIALS
PRINCIPAL
12/11/2020
CAM
ENGINEER
LINE 475 DOT RELOCATION -PIPELINE
r6lll� Piedmont STRUCTURAL NOTES (2 OF 2)
Natural Gas
GOLDSBORO, NORTH CAROLI NA
COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
REF. DWG(S) PNG-G-025-0001086
SHEET(S) X OF X I DWG SCALE NONE
DWG DATE 08/11/2020 ISUPERSEDED ---
DRAWING NUMBER REVISION
PNG-S-025-0001087 C
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
EQUIPMENT FOUNDATION TABLE
BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # G1435
16' SLIDING GATE
16' SLIDING GATE
MAN GATE —
6"
M
MAN GATE
I
PIPELINE I MLV
HTR-401
MAN GATE
--- 16' SLIDING GATE 16' SLIDING GATE —
W
Z
W /a
a 8"
MAN GATE ---
M LV-3
" MAN GATE
POINT # I DESCRIPTION
1 PIG RECEIVER FOUNDATION
NOTES:
1. LOCATE FOUNDATIONS PER DWG PNG-C-025-0001212 (SEE ASH ST SJAFB RS
PACKAGE).
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDEA MCMULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL047852
NO.1
DATE
REVISION(S) DESCRIPTION
A
08-11-2020
60% DESIGN SUBMITTAL
B
IC
10-02-2020
90% DESIGN SUBMITTAL
12-11-2020
REVISED 90% DESIGN SUBMITTAL
PROFESSIONAL ENG/ARCHSTAMP
BY CHK JAPPD DESCRIPTION
NPH NCT CAM AREA CODE -
VISW NCT CAM ACCOUNT NUMBER -
VISW NCT CAM PROJECT NUMBER 0231540
DRAWING BY I MSW
STATION I D 84-T-91-G L D-6733
CHECKER INITIALS I NCT
APPROVALS
DATE INITIALS
REGIONAL
ENGINEER {(
DATE INITIALS MGR TECH r DUKE
REC & STD' ENERGY
DATE INITIALS
12/11 /2020 CAM
PRINCIPAL
ENGINEER
ONPiedmont
Natural Gas
COPYRIGHT 2018
LINE 475 DOT RELOCATION -PIPELINE
STRUCTURAL FOUNDATION PLAN
GOLDSBORO, NORTH CAROLINA
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
N
0 10, 20'
SCALE IN FEET
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
REF. DWG(S) PNG-G-025-0001086
PNG-G-000-0001132
SHEET(S) X OF X I DWG SCALE 1 "=10'
DWG DATE 08/11/2020 ISUPERSEDED
DRAWING NUMBER REVISION
PNG-S-025-0001088 C
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
0
gz
4" 4" W
z
J
W
a
a
NG PIPELINE MLV MLV PIPELINE
FROM LINE 475 8"x4" 8" 8"x4"
BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # G1435
CLAUDE A McMULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL 047852
PROFESSIONAL ENG/ARCH STAMP
4" 4"x2" 2" 4"x2" 4"x2" 2" 6"x2" 6"
WORKING WORKER
MONITOR
4" 4"x2" 2" 4"x2" 4"x2" 2" 6"x2" 6"
WORKING WORKER
MONITOR
4" 4"x2" 2" 4"x2" 4"x2" 2" 6"x2" 6"
WORKING WORKER
MONITOR
4" 4"x2" 2" 4"x2" 4"x2" 2" 6"x2" 6"
WORKING WORKER
MONITOR
f0 HIGH PRESSURE DISTRIBUTION
REGULATOR
STATION.T DISTRIBUTION NG
J I I TO DISTRIBUTION
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
NO. DATE REVISION(S) DESCRIPTION
A 04-24-2020 30% DESIGN SUBMITTAL
B 08-11-2020 60% DESIGN SUBMITTAL
C 10-02-2020 90% DESIGN SUBMITTAL
D 12-11-2020 REVISED 90% DESIGN SUBMITTAL
BY CHK JAPPD DESCRIPTION
AJB JRC CAM AREA CODE -
AJB JRC CAM ACCOUNT NUMBER -
AJB JRC CAM PROJECT NUMBER 0231540
AJB JRC CAM DRAWING BY I AJB
STATION ID 84-T-91-G LD-6733
CHECKER INITIALS I JRC
APPROVALS
DATE
INITIALS
REGIONAL
ENGINEER
DATE
INITIALS
MGR TECH
REC & STD
DATE
INITIALS
PRINCIPAL
12/11/2020
CAM
ENGINEER
LINE 475 DOT RELOCATION -PIPELINE
ESN E r6livaturalt PROCESS FLOW DIAGRAM
GOLDSBORO, NC
COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
REF. DWG(S) PNG-G-025-0001086
SHEET(S) X OF X DWG SCALE NONE
DWG DATE 03/27/2020 1 SUPERSEDED
DRAWING NUMBER REVISION
PNG-D-025-0001063 D
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
NG
001 PNG—D-025-0001051
FROM MLV
BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-1435
CLAUDE A McMULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL 047852
PROFESSIONAL ENG/ARCH STAMP
MLV
8
8"x6"
g
cz
W
c
co
8"x8"
B"-VB-6F
2"-VB-6F
PIG
co SIG
m
0
V-VB-6F
PR-101
8" RECEIVER
U —
m
a
v
m
0
v
"I
2"-VB-6F
RECEIVER SKID
NG
005 PNG—D-025-0001059
TO BYPASS
NG
002 PNG—D-025-0001057
TO FILTER _>
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
NO.I DATE
REVISION(S) DESCRIPTION
A
04-24-2020
30% DESIGN SUBMITTAL
B
08-11-2020
60% DESIGN SUBMITTAL
C
10-02-2020
90% DESIGN SUBMITTAL
D
12-11-2020
REVISED 90% DESIGN SUBMITTAL
BY CHK JAPPID DESCRIPTION
JJM JRC CAM AREA CODE -
AJB JRC CAM ACCOUNT NUMBER -
AJB JRC CAM PROJECT NUMBER 0231540
AJB JRC CAM DRAWING BY AJB
STATION ID 84-T-91-G LD-6733
CHECKER INITIALS I JRC
APPROVALS
DATE
INITIALS
REGIONAL
ENGINEER
DATE
INITIALS
MGR TECH
REC & STD
DATE
INITIALS
PRINCIPAL
12/11/2020
CAM
ENGINEER
LINE 475 DOT RELOCATION -PIPELINE
N E r6lil Nl,d ,nt RECEIVER P&ID
EERGOLDSBORO, NC
COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
PR-101:
BI-DIRECTIONAL LAUNCHER/RECEIVER
ANSI CLASS: 600
DESIGN PRESSURE: 1000 PSIG
MIN/MAX DESIGN TEMPERATURE:-20/12OF
DESIGN FACTOR 0.5
NOTES:
1. ANY CHANGES REQUIRED DUE TO FIELD CONDITIONS
MUST BE APPROVED BY THE ENGINEERING DEPARTMENT
2. PIPE AND FITTING SPECIFICATIONS PER PNG DESIGN
STANDARD DM-ST-2110
3. CATHODIC PROTECTION DESIGN DETAILS TO BE
COORDINATED WITH PNG SYSTEM INTEGRITY.
4. REFER TO VENDOR EQUIPMENT DRAWINGS FOR
ADDITIONAL DETAILS.
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
REF. DWG(S) PNG-G-025-0001086
SHEET(S) X OF X I DWG SCALE
DWG DATE 03/27/2020 1 SUPERSEDED
DRAWING NUMBER
NONE
PNG-D-025-0001064
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
REVISION
D
PIPE CLEANING:
WELDING AND NON-DESTRUCTIVE EXAMINATION:
1. THOROUGHLY CLEAN INTERIOR OF ALL PIPE, FITTINGS, AND JOINTS
BEFORE INSTALLATION. EXCLUDE ENTRANCE OF FOREIGN MATTER
DURING DISCONTINUANCE OF INSTALLATION BY CAPPING OR
PLUGGING TO A WATERTIGHT CONDITION AT THE END OF EACH
WORK DAY. PRIOR TO FINAL FITTING OF THE SYSTEM, VISUALLY
INSPECT ALL LINES AND JOINTS, REMOVE ALL STRUTS, SWEEP
AND/OR FLUSH CLEAN TO THE SATISFACTION OF DUKE ENERGY
NGBU. NOTIFY DUKE ENERGY NGBU AT LEAST 24 HOURS IN
ADVANCE OF INTENDED CLOSING UP OF A SYSTEM.
2. CONTRACTOR IS RESPONSIBLE FOR PROPERLY CLEANING NEW PIPE
TO BE INSTALLED BEFORE RELEASING IT FOR SERVICE.
CONTRACTOR SHALL PROVIDE PROCEDURES FOR CLEANING PIPE
FOR APPROVAL BY DUKE ENERGY NGBU.
PRESSURE AND LEAK TESTING:
1. ALL PIPE SHALL BE TESTED IN ACCORDANCE WITH DUKE ENERGY
NGBU CONSTRUCTION MANUAL CM-ST-1300.
2. ALL PIPE SHALL BE PRESSURE TESTED IN ACCORDANCE WITH ASME
B31.8 AT A PRESSURE DESIGNATED ON THE DRAWINGS.
CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AND MATERIALS
ASSOCIATED WITH PRESSURE TESTING. SHOULD SURFACE LEAKS
BECOME APPARENT, THE LEAKS SHALL BE LOCATED AND REPAIRED,
AND THE LINE RE -TESTED UNTIL IT FULFILLS THE ABOVE
REQUIREMENTS. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
COSTS ASSOCIATED WITH REPAIRS AND RE -TESTING. CONTRACTOR
SHALL PROVIDE NOTIFICATIONS TO DUKE ENERGY NGBU 48 HOURS
PRIOR TO TESTING FOR WITNESS.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL
MATERIALS, TOOLS, EQUIPMENT, AND PERSONNEL NECESSARY TO
CONDUCT THE PRESSURE TEST INCLUDING BUT NOT LIMITED TO AIR
COMPRESSOR AND/OR PUMP, TEST MANIFOLDS, DEAD WEIGHT, AND
CERTIFIED GAUGES.
4. THE CONTRACTOR IS RESPONSIBLE TO PERFORM INITIAL SERVICE
LEAK TESTS IN ACCORDANCE WITH THE REQUIREMENTS OF ASME
B31.8
5. A SEALED CERTIFIED TEST RECORD SHALL BE PROVIDED TO DUKE
ENERGY NGBU WITHIN 30 DAYS OF COMPLETION OF THE TEST. TEST
RECORDS SHALL INCLUDE ALL EQUIPMENT CERTIFICATIONS AND
PRESSURE AND TEMPERATURE RECORDING CHARTS. DRAFT COPY
OF TEST RECORDS SHALL BE PROVIDED TO DUKE ENERGY NGBU
THE DAY OF THE TEST.
6. CONTRACTOR SHALL ALLOW THE TEST PRESSURE TO REACH
EQUILIBRIUM WITH TEMPERATURE, PRIOR TO STARTING THE TEST.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR DE -PRESSURIZATION OF
THE TEST MEDIUM TO THE ENVIRONMENT IN A SAFE AND
REASONABLE MANNER.
8. TEST PRESSURES SHALL BE A MINIMUM OF 1.5 TIMES DESIGN
PRESSURE.
9. ALL PIPING SHALL BE TESTED FOR 8 HOURS MINIMUM.
MATERIAL NOTES:
1. MATERIAL LIST SHALL BE CONSIDERED AN ESTIMATE. DUKE ENERGY
NGBU WILL PROVIDE THE MATERIALS IN THE MATERIALS LIST.
CONTRACTOR TO PROVIDE ANY REMAINING MATERIALS NECESSARY
TO COMPLETE THE PROJECT.
STEEL PIPE, FITTING, AND VALVE NOTES:
1. ALL STEEL PIPE, FITTINGS, VALVES, AND EQUIPMENT SHALL BE
INSTALLED ACCORDING TO ASME B31.8 LATEST EDITION,
MANUFACTURER'S RECOMMENDATIONS, AND CONSTRUCTION
DRAWINGS.
2. CONTRACTOR TO PROVIDE ALL HARDWARE NECESSARY TO
COMPLETE THE CONSTRUCTION OF THE FACILITIES INCLUDING
GASKETS, NUTS, AND BOLTS. ONLY NEW GASKETS AND BOLTS
SHALL BE USED WHEN CONNECTING FLANGES.
3. FIELD VERIFY ALL DIMENSIONS.
BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # G1435
CLAUDE A McMULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL 047852
PROFESSIONAL ENG/ARCH STAMP
1. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, TOOLS
AND EQUIPMENT REQUIRED FOR SURFACE PREPARATION AND
WELDING.
2. ALL WELDING MUST BE COMPLETED ACCORDING TO ALL APPLICABLE
REGULATORY REQUIREMENTS INCLUDING API 1104.
3. WELDING PROCEDURES SPECIFIC TO PROJECT SHALL BE PROVIDED
TO ENGINEER AND DUKE ENERGY NGBU BY THE CONTRACTOR FOR
APPROVAL. WELDING PROCEDURE TO BE QUALIFIED PER API 1104.
4. ALL CONTRACTOR WELDERS MUST HAVE THE APPROPRIATE
QUALIFICATION RECORDS TO BE SUBMITTED TO DUKE ENERGY
NGBU FOR REVIEW PRIOR TO WELDING. DUKE ENERGY NGBU
INSPECTOR RESERVES THE RIGHT TO WITNESS ANY NEW WELDER
QUALIFICATIONS.
5. CONTRACTOR IS RESPONSIBLE FOR COST FOR TESTING AND
QUALIFICATION OF WELDERS INCLUDING MATERIALS AND NDE.
6. DUKE ENERGY NGBU SHALL HIRE A 3RD PARTY X-RAY COMPANY TO
XRAY 100% OF ALL THE BUTT WELDS. CONTRACTOR TO
COORDINATE SCHEDULING WITH X-RAY COMPANY.
7. ALL WELDS SHALL BE EXAMINED PER API 1104.
PAINTING NOTES:
1. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, PAINTS,
TOOLS AND EQUIPMENT REQUIRED FOR PAINTING.
2. ALL STEEL SHALL BE THOROUGHLY WIPED DOWN TO REMOVE ALL
TRACES OF GRIT OR OTHER CONTAMINANTS. REMOVE ALL WELD
SPLATTER AND GRIND SMOOTH THE BURRS ON ANY CUT EDGES AND
ROUGH WELDS. SURFACES TO BE PAINTED SHALL BE PRIMED
BEFORE ANY RUSTING CAN OCCUR AND, IN ANY CASE, WITHIN 8
HOURS OF COMPLETION OF SURFACE PREPARATION AND UNDER
CONTROLLED TEMPERATURE AND HUMIDITY. IF IT CANNOT BE
PRIMED WITHIN THE 8-HOUR PERIOD, THEN ANY RUST BLOOM SHALL
BE REMOVED BEFORE PAINT APPLICATION BY SUITABLE HAND OR
POWER TOOL.
3. THE PIPING AND PIPING COMPONENT PAINTING SHALL BE
INSPECTED AND REPAIRED ACCORDINGLY AFTER INSTALLATION.
4. FOLLOWING THREE -COAT PAINT SYSTEM SHALL BE USED. ALL
COATS SHALL BE APPLIED ACCORDING TO MANUFACTURES
RECOMMENDATION. ABRASIVE BLAST TO SSPC SP-10. FINAL COLOR
TO MATCH ASTM-49-GREY, WITH THE FINAL COAT APPLIED WITHIN 30
DAYS OF PRIMER COAT IF EXPOSED TO SUNLIGHT.
a. COAT NO. 1 - SHERWIN WILLIAMS FAST CLAD HS REINFORCED
ZINC 2-PART EPDXY PRIMER - MINIMUM 5 MILS
b. COAT NO.2 - SHERWIN WILLIAMS MACROPDXY 646 2-PART
MARINE EPDXY - 5 MILS
C. COAT NO.3 - SHERWIN WILLIAMS ACROLON ULTRA HIGH
PERFORMANCE MARINE POLYURETHANE UV ADDITIVE - 5 MILS
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
NO.I DATE
REVISION(S) DESCRIPTION
A 08-11-2020 60% DESIGN SUBMITTAL
B 10-02-2020 90% DESIGN SUBMITTAL
C 12-11-20201 REVISED 90% DESIGN SUBMITTAL
BY CHK JAPPD DESCRIPTION
AJB JRC CAM AREA CODE -
AJB JRC CAM ACCOUNT NUMBER -
AJB JRC CAM PROJECT NUMBER 0231540
DRAWING BY AJB
STATION ID 84-T-91-G LD-6733
CHECKER INITIALS JRC
APPROVALS
DATE
INITIALS
REGIONAL
ENGINEER
DATE
INITIALS
MGR TECH
REC & STD
DATE
INITIALS
PRINCIPAL
12/11/2020
CAM
ENGINEER
LINE 475 DOT RELOCATION -PIPELINE
DUENERr6livatural Piedmont MECHANICAL GENERAL NOTES
GOLDSBORO, NC
COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
REF. DWG(S) PNG-G-025-0001086
SHEET(S) XX OF XX I DWG SCALE
DWG DATE 05/28/2020 1 SUPERSEDED
DRAWING NUMBER
NONE
PNG-M-025-0001260
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
REVISION
C
G
I
I
0
I
I
I
I
16' SLIDING GATE
I
I
I
I
I
I
I
MAN GATE
I
I
I
I
I
I
L
Y
O
L
I
BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-1435
CLAUDE A McMULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL 047852
PROFESSIONAL ENG/ARCH STAMP
0
Q
0
ry
U
U
Q
IV SLIDING GATE
ED
CV
MAN GATE
MAN GATE
ZEE
Aw
mJ
Nil
Orz
00
Q�
ZD N
w
Of
0
F ---z
0
CD w �
Of U)
MAN GATE
16' SLIDING GATE
16' SLIDING GATE
J
W /
8"
PIPELINE MLV MLV-3
23.1' MLV RTU
Ll
M-025�� 266
MAN GATE
STATION RTU
m
ATE
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
NO. DATE REVISION(S) DESCRIPTION
A 04-24-2020 30% DESIGN SUBMITTAL
B 08-11-2020 60% DESIGN SUBMITTAL
C 10-02-2020 90% DESIGN SUBMITTAL
D 12-11-2020 REVISED 90% DESIGN SUBMITTAL
BY CHK JAPPD DESCRIPTION
AJB JRC CAM AREA CODE -
AJB JRC CAM ACCOUNT NUMBER -
AJB JRC CAM PROJECT NUMBER 0231540
AJB JRC CAM DRAWING BY AJB
STATION ID I 84-T-91-G LD-6733
CHECKER INITIALS I JRC
APPROVALS
DATE
INITIALS
REGIONAL
ENGINEER
DATE
INITIALS
MGR TECH
REC & STD
DATE
INITIALS
PRINCIPAL
12/11/2020
CAM
ENGINEER
LINE 475 DOT RELOCATION -PIPELINE
PENERGY, DUKE r6111
PNal ied ao t MECHANICAL PLOT PLAN
GOLDSBORO, NC
COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
REF. DWG(S)
0 10, 20'
SCALE IN FEET
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
PNG-G-025-0001086
SHEET(S) XX OF XX DWG SCALE 1 "=10'
DWG DATE 04/14/2020 SUPERSEDED
DRAWING NUMBER REVISION
PNG-M-025-0001265 D
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
NOTES:
1. ANY CHANGES REQUIRED DUE TO FIELD CONDITIONS
MUST BE APPROVED BY THE ENGINEERING DEPARTMENT.
TO REGULATOR
STATION BYPASS
PR-101
CRUSHED -ROCK
CONCRETE
PR-101 FOUNDATION
DETAIL
SCALE: 1 /4"=1'-0" M-025-0001265
ENLARGED PLAN - PIPELINE RECEIVER
CONCRETE
FOUNDATION
SECTION A
SCALE: 1/4"=1'-0" THIS DWG
SUPPLIED BY
VENDOR
17
of �
Ow
--- �
Q J
J LL
� Z
O O
Lu -
ry Q
O
�C/)
SUPPLIED BY 35
VENDOR 34
33-
I
--------—
�r �1
I I
L I I J
L.
REST BLOCK (TYP.) - u
31-1 I I I I
37-1
A
THIS DW G
FROM MLV
6'-0"
REST BLOCK (TYP.)
B
HIS DWG
CRUSHED ROCK
COI
FOUN
SECTION(a:)
SCALE: 1/4"=1'-0" THIS DWG
I %"V I ✓L wl x \ 1 I1P.)
0 2' 4' 8'
SCALE IN FEET
BURNS&McDONNELLCONSULTANTS, INC.
STATE LICENSE # C-1435
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDE A McMULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL047852
PROFESSIONAL ENGIARCH STAMP
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
r� DUKE Piedmont
s NO ENERGY Natural Gas
COPYRIGHT2018
LINE 475 DOT RELOCATION - PIPELINE
MECHANICAL PIPING PLAN &SECTION S
GOLDSBORO, NC
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
A
08-11-2020
60% DESIGN SUBMITTAL
AJB
JRC
CAM
AREA CODE
-
DATE
INITIALS
REGIONAL
ENGINEER
B
10-02-2020
90% DESIGN SUBMITTAL
AJB
JRC
CAM
ACCOUNT NUMBER
-
C
12-11-2020
REVISED 90% DESIGN SUBMITTAL
AJB
JRC
CAM
PROJECT NUMBER
0231540
DATE
INITIALS
MGR TECH
REC & STD
DRAWING BY
AJB
STATION ID
84-T-91-GLD-6733
DATE
12/11/2020
INITIALS
CAM
PRINCIPAL
ENGINEER
CHECKER INITIALS
I JRC
2. PIPE AND FITTING SPECIFICATIONS PER PNG DESIGN
STANDARD DM-ST-2110.
3. CATHODIC PROTECTION DESIGN DETAILS TO BE
COORDINATED WITH PNG SYSTEM INTEGRITY.
4. REFER TO VENDOR EQUIPMENT DRAWINGS FOR
ADDITIONAL DETAILS.
INDICATES ELECTRICALLY ISOLATED.
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
REF. DWG(S) PNG-G-025-0001086, PNG-C-025-0001228
SHEET(S) XX OF XX DWG SCALE 1/4"=1'-0"
DWG DATE 08/07/2020 1 SUPERSEDED
DRAWING NUMBER REVISION
PNG-M-025-0001266 C
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-1435
CLAUDE A McMULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL 047852
PROFESSIONAL ENG/ARCH STAMP
FROM LINE 475
PLAN VIEW
SCALE: AS NOTED BELOW
0 4' 8' 12'
SCALE IN FEET
8'
1)11 enu 4r-n 0T17n1 mmr! 1TVP 1
SECTION A
SCALE: 3/8" = 1'-0" THIS DWG
0 2' 4' 6'
SCALE IN FEET
FROM LINE 475
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
NO.1 DATE REVISION(S) DESCRIPTION
A 12-11-2020 REVISED 90% DESIGN SUBMITTAL
BY CHK JAPPID DESCRIPTION
JTB CNS CAM AREA CODE -
ACCOUNT NUMBER -
PROJECT NUMBER 0231540
DRAWING BY WTB
STATION ID -
CHECKER INITIALS CNS
APPROVALS
DATE
INITIALS
NIA
N/A
REGIONAL
ENGINEER
DATE
INITIALS
MGR TECH
NIA
N/A
REC & STD
DATE
INITIALS
PRINCIPAL
12/11/2020
CAM
ENGINEER
LINE 475 DOT RELOCATION - PIPELINE
N E r6li Need ao t STATION INLET VALVE
EERGOLDSBORO, NC
COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, GOLDSBORO NORTH CAROLINA
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
REF. DWG(S)
SHEET(S) X OF X I DWG SCALE AS NOTED
DWG DATE 12/10/2090 1 SUPERSEDED
DRAWING NUMBER REVISION
PNG-M-025-0001281 A
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
57
57
q
51
I
60
55
Is
54
53
52
I
SANDWICH VALVE (TYP.)
GRADE
U_
ry
o w
,>
�o
J
w
59
6"
]BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-1435
EXISTING PIPE TO BE
REMOVED
STOPPLE PLUGGING WITH TRAIN
ISOLATION SYSTEM (TYP.)
i SANDWICH VALVE (TYP.)
58 58
1'-6" 3'-0"
PROPOSED 4" BY-PASS
EXISTING 4" LINE 67
51
FLOW
161'-416'
SECTION A
SCALE: 3/8"=1'-0" THIS DWG
170'-416"
(NOTE 2)
FLOW
119'-4"
161'-416"
DETAIL
SCALE: 3/8"=1'-0" _
FALLIN BOULEVARD
(80' WIDE)
STOPPLE PLUGGING WITH TRAIN
ISOLATION SYSTEM (TYP.)
1
1" TDW THREAD-O-RING 1.1 58 58
FITTING (TYP.)
3'-0" 1'-6"
59
611
PROPOSED 4" BY-PASS
1" TDW THREAD-O-RING
FITTING (TYP.)
EXISTING 4" LINE 67
EXISTING PIPE TO BE
REMOVED
8'-011
SECTION E:)
SCALE: 3/8"=1'-0" THIS DWG
57 THIS DWG
A
57
52 153 X 54 155
12" 0' 1' 5' 10,
3/8" = 1'-0"
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDE A. McMULLAN
NO.1
DATE
REVISION(S) DESCRIPTION
IFC SUBMITTAL DATE
A
08-11-2020
60% DESIGN SUBMITTAL
NORTH CAROLINA
B
IC
10-02-2020
90% DESIGN SUBMITTAL
SEAL 047852
12-11-2020
REVISED 90% DESIGN SUBMITTAL
PROFESSIONAL ENG/ARCH STAMP
BY CHK JAPPD DESCRIPTION
NPR CNS CAM AREA CODE -
NPR CNS CAM ACCOUNT NUMBER -
NPR CNS CAM PROJECT NUMBER 0231540
DRAWING BY I NPR
STATION ID I 84-T-91-G LD-6733
CHECKER INITIALS I CNS
APPROVALS
DATE INITIALS
REGIONAL
ENGINEER
DATE INITIALS DUKE
RE C& STDTECHp ENERGY
DATE INITIALS
12/11 /2020 CAM
PRINCIPAL
ENGINEER
NOPiedmont
Natural Gas
COPYRIGHT 2018
LINE 475 RELOCATION - PIPELINE
FALLIN BLVD BOX SECTION BYPASS
GOLDSBORO, NORTH CAROLINA
GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
NOTES:
1. ANY CHANGES REQUIRED DUE TO FIELD CONDITIONS
MUST BE APPROVED BY THE ENGINEERING DEPARTMENT.
2. APPROXIMATELY 160' OF LINE 67 TRANSMISSION PIPE
TO BE REPLACED. FINAL LENGTH MAY VARY BASED ON
FIELD CONDITIONS SUCH AS WELD LOCATION AND FIELD
BENDS. 160' MINIMUM REPLACMENT LENGTH REQUIRED TO
AVOID IMPACTS FROM FUTURE FALLIN BLVD EXPANSION.
3. DPS TO CONTACT INTEGRITY TECHNICIAN AT START OF
PROJECT. PROJECT CANNOT BE GASSED UP UNTIL
INTEGRITY HAS CONFIRMED NO ADDITIONAL WORK IS
NEEDED.
4. TOR SPACING PER TDW CUTSHEETS. FINAL
SPACING/ORIENTATION SHALL BE COORDINATED PRIOR TO
CONSTRUCTION.
5. ANY TRANSITION PIECES REQUIRED SHALL BE
PROVIDED BY CONTRACTOR AND HAVE MINIMUM 1,000 PSIG
MAOP.
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
REF. DWG(S) PNG-G-025-0001086, PNG-M-025-0001283,
PNG-M-025-0001284
SHEET(S) XX OF XX DWG SCALE 3/8"=1'-0"
DWG DATE 02/14/2020 1 SUPERSEDED
DRAWING NUMBER REVISION
PNG-M-025-0001282 C
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
4'-6"
NEW 4" PIPE
DETAIL
SCALE: 3/8"=1'-0"
170'-416'
(NOTE 2)
161'-416'
NEW 4" PIPE
4'-6"
FALLIN BOULEVARD
(80' WIDE)
THIS DWG
119'-4"
GRADE
i
\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\//
59 TIE-IN POINT
56
BURNS & McDONNELL CONSULTANTS, INC.
STATE LICENSE # C-1435
a
W
O
z
56
50 50
56 50 56
PROPOSED 4" LINE 475
4sa 150'-0" �50
SECTION
SCALE: 3/8"=1'-0" THIS H W G
TIE-IN POINT (59
EXISTING 4" LINE 67
12" 0' 1' 5' 10,
3/8" = V-0"
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
CLAUDE A. McMULLAN
IFC SUBMITTAL DATE
NORTH CAROLINA
SEAL 047852
NO.
DATE
REVISION(S) DESCRIPTION
A
08-11-2020
60% DESIGN SUBMITTAL
B
IC
10-02-2020
90% DESIGN SUBMITTAL
12-11-2020
REVISED 90% DESIGN SUBMITTAL
PROFESSIONAL ENG/ARCHSTAMP
BY CHK APPD DESCRIPTION
NPR CNS CAM AREA CODE
NPR CNS CAM ACCOUNT NUMBER
NPR CNS CAM PROJECT NUMBER 0231540
DRAWING BY NPR
STATION ID 84-T-91-G LD-6733
CHECKER INITIALS CNS
APPROVALS
DATE
INITIALS
REGIONAL
ENGINEER
DATE
INITIALS
MGR TECH
REC & STD
DATE
INITIALS
PRINCIPAL
12/11/2020
CAM
ENGINEER
LINE 475 RELOCATION - PIPELINE
t DUE r6111Piedmont
Natural FALLIN BLVD BOX SECTION INSTALLATION
GOLDSBORO, NORTH CAROLINA
COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, GOLDSBORO, NORTH CAROLINA
NOTES:
1. ANY CHANGES REQUIRED DUE TO FIELD CONDITIONS
MUST BE APPROVED BY THE ENGINEERING DEPARTMENT.
2. APPROXIMATELY 160' OF LINE 67 TRANSMISSION PIPE TO
BE REPLACED. FINAL LENGTH MAY VARY BASED ON FIELD
CONDITIONS SUCH AS WELD LOCATION AND FIELD BENDS.
160' MINIMUM REPLACMENT LENGTH REQUIRED TO AVOID
IMPACTS FROM FUTURE FALLIN BLVD EXPANSION.
3. DPS TO CONTACT INTEGRITY TECHNICIAN AT START OF
PROJECT. PROJECT CANNOT BE GASSED UP UNTIL
INTEGRITY HAS CONFIRMED NO ADDITIONAL WORK IS
NEEDED.
4. TOR SPACING PER TDW CUTSHEETS. FINAL
SPACING/ORIENTATION SHALL BE COORDINATED PRIOR TO
CONSTRUCTION.
5. ANY TRANSITION PIECES REQUIRED SHALL BE
PROVIDED BY CONTRACTOR AND HAVE MINIMUM 1,000 PSIG
MAOP.
6. DOT ROAD EXPANSION WILL CUT SWALES TO 109'
ELEVATION AT LOWEST POINT. LINE 67 SHALL BE LOWERED
SO TOP OF PIPE IS AT 104' ELEVATION, OR LOWER, TO
MAINTAIN F COVER THROUGHOUT CROSSING. LOWERING
PLAN BASED ON "U-5724100% Final plans.pdf' BY
KIMLEY-HORN DATED 8/24/2020.
PRELIMINARY - NOT
FOR CONSTRUCTION
90% DESIGN SUBMITTAL
REF. DWG(S) PNG-G-025-0001086, PNG-M-025-0001282,
PNG-M-025-0001284
SHEET(S) XX OF XX DWG SCALE 3/8"=1'-0"
DWG DATE 01/2012020 SUPERSEDED
DRAWING NUMBER REVISION
PNG-M-025-0001283 C
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
B
SKID OUTER BEAM
"01" HILTI "HAS" ROD
SLAB LENGTH "A„ — — W/NUT & WASHER
O
1x1l LL
SKID LENGTH "C„ n CLAMP PLATE 0-
SHIM PLATE _
"Z"x"Z"GROUT LEVELING PAD
"NS" GROUT & CLAMP SETS THICKNESS =1"AS REQUIRED
(SEE DETAIL)LU
Z
FOUNDATION m
o0- z w
A-- -- -- -- -- — •.— -- -- -- -- -- -- -- -- — �•— -- -- -- -- w
,
pr ,
01
0
m
Q
J
W
0
CV
i
7
c
c
Ne
v
SKID ON SLAB FOUNDATION - PLAN
3/8"=1'-0"
"TT" BARS, TOP TRANSVERSAL, SEE REBAR TABLE
"TL" BARS, TOP LONGITUDINAL, SEE REBAR TABLE SKID
`"BL" BARS, BOTTOM LONGITUDINAL, SEE REBAR TABLE
"BT" BARS, BOTTOM TRANSVERSAL, SEE REBAR TABLE
a
as
A SECTION
11IJ �_ 3/8"=V-01,
COMPACTED SUBGRADE
%-- 2" THK. LEAN CONCRETE
COMPACTED WASHED STONE
(NCDOT #57 OR #67)
FOUNDATION SLAB - DIMENSIONS TABLE
FOUNDATION SLAB - REBAR TABLE
L/R
PIPE SIZE
"A"
SLAB LENGTH
"B"
SLAB WIDTH
"C"
SKID LENGTH
"D"
SKID WIDTH
"Sill
BOLT SPA
11S2"
BOLT SPA
"Y"
BOLT TO EDGE
"BL" BARS
"137 BARS
"TL" BARS
77 BARS
BAR SIZE
No.
SPACING
BAR SIZE
No.
SPACING
BAR SIZE
No.
SPA
BAR SIZE
No.
SPA
6"
44'-0"
12'-0"
40'-0"
8'-0"
6'-0"
8'-0"
1'-10"
#6 (%"p
12
12"
#6 (%" 0)
44
12"
#5 (%" 0)
12
12"
#5 (%"P
44
12"
8"
48'-0"
12'-0"
44'-0"
8'-0"
6'-0"
9'-0"
1'-10"
#6 (%110)
12
12"
#6 0/4110)
48
12"
#5 (s110)
12
12"
#5 (s"P
48
12"
10"
44'-0"
12'-6"
40'-0"
8'-6"
6'-0"
8'-0"
1'-10"
#6 (4"0)
1 13
12"
#6 (4" 0)
44
12"
#5 (%110)
13
12"
#5 (%"P
44
12"
12"
44'-0"
14'-0"
40'-0"
10'-0"
4'-6"
7'-0"
1'-10"
#6 (%"p
14
12"
#6 (%" 0)
44
12"
#5 (%" 0)
14
12"
#5 (%"P
44
12"
16"
48'-0"
14'-0"
44'-0"
10'-0"
5'-3"
7'-6"
1'-10"
#6 (%110)
14
12"
#6 (%" 0)
48
12"
#5 (s"0)
14
12"
#5 (s110)
48
12"
20"
56'-10%"
14'-0"
52'-10%"
10'-0"
5'-8%"
7'-7"
1'-10"
#6 (4"0)
17
10"
#6 (4" 0)
68
10"
#5 (%" 0)
17
1 10"
#5 (%"P
68
10"
24"
56'-4"
14'-0"
52'-4"
10'-0"
5'-5"
7'-7"
1'-10"
#6 (%"p
17
10"
#6 (%" 0)
68
10"
#5 (%" 0)
17
10"
#5 (%"P
68
10"
30"
62'-5%"
14'-0"
58'-5%"
10'-0"
1 6-8%"
1 7'-0"
1 V-10"
#6 (%110)
17
10"
#6 0/4"0)
75
10"
#5 (s"0)
17
1 10"
#5 NFO)
75
10"
9
LEGEND:
%" CHAMFER (TYP)
"CHAMFER
(TYP @ CORNERS)
FINISHED GRADE
3" CLR
SKID GROUT & CLAMP DETAIL
NOT TO SCALE
5"
M
"TH1" THICK PL
CLAMP PLATE
3"
M
"TH2" THICK PL
SHIM PLATE
GROUT & CLAMP DIMENSIONS TABLE
L/R
PIPE SIZE
"N S"
SETS
110111
101"
BOLT DIA
"P"
PROJ
"X"
DISTANCE
"E"MIN
EMBEDMENT
"Z"
GROUT
1102"
HOLE DIA
TH 1
CLAMP PL
TH 2
SHIM PL
6"
10
8"
3 2"
6"
6"
1211
%8"
Y2"
/6"
811
10
Y8"
3Y2"
611
611
1211
%8"
12"
/Y2
/6"
" 10
10
8
%" 3"
611611$"
1211
°
/611
12"
12
Y4"
3 2"
7"
6 2"
14"
ill
Y2"
16"
16"
12
%"
3%"
7"
6%"
14"
ill
z"
16"
20"
14
%"
3%"
7"
6%"
14"
ill
%"
16"
24"
14
%"
3%"
7"
7"
14"
1%"
%"
16°
30"
16
%"
3�"
7"
7"
14"
1%"
z"
16°
%" CHAMI
(TYP @ C,
rB_'
SECTION
1\17i �_ 3/8"= 1 " Oil
"02" HOLE
"02" HOLE
INISHED GRADE
N+0.00
NOTES:
1. ALL FOUNDATIONS SHALL BE PLACED ON UNDISTURBED SOIL. IF SOIL UNDERNEATH FOUNDATIONS HAS
BEEN DISTURBED OR FILLED, CONTRACTOR SHALL PROPERLY COMPACT SUB -GRADE OR STRUCTURAL
FILL TO 95% OF STANDARD PROCTOR.
TYP
TYPICAL
CLR
CLEAR
2. ALL REINFORCING STEEL SHALL BE GRADE 60.
THK
THICK
BOS
BOTTOM OF STEEL
3. CONCRETE STRENGTH @ 28 DAYS = 4000 PSI.
TOG
TOP OF GROUT
TOC
TOP OF CONCRETE
4. ANCHOR BOLT PROJECTION IS REFERRED TO TOP OF CONCRETE.
EL
ELEVATION
PL
PLATE
5. REQUIRED MINIMUM ALLOWABLE SOIL BEARING PRESURE 1500 PSF, TO BE VERIFIED FOR EACH
PROJ
PROJECTION
LOCATION.
DIA
DIAMETER
SPA
SPACING
L/R
LAUNCHER/RECEIVER
NOTES FOR FOUNDATION TYPE SELECTION
1. THE USE OF SLAB FOUNDATION TYPE SHALL BE VERIFIED AND APPROVED BY A GEOTECHNICAL
ENGINEER OR THEIR REPRESENTATIVE, BASED ON SPECIFIC SOIL CHARACTERISTICS AT THE SITE WHERE
THE LAUNCHER/RECEIVER IS INTENDED TO BE USED.
2. THICKNESS OF SLAB AND/OR WASHED STONE UNDER SLAB MAY VARY DEPENDING OF SPECIFIC
REQUIREMENTS FOR FOUNDATION LEVELS, IN PARTICULAR WHERE FROST EAVE EFFECTS NEED TO BE
CONSIDERED.
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
IEDMONT'S NATURAL GAS FACILITY DR_AAJ_NG�E CqNSIDEBQD CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE *TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
1
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
0
01/05/2017
ISSUED FOR PROJECT USE- ENGINEERING DONE BY AECOM
JLS
EJP
EB
AREA CODE
_
DATE
01/25/2018
SIGNATURE/INITIALS
ELIZABETH LEMONS
REGIONAL
ENGINEER
P
iedmont1
01/25/2018
REVISED TITLE BLOCK TO SHOW UPDATED CHECKERS
EMC
EPL
EB
ACCOUNT NUMBER
-
PROJECT NUMBER
-
DATE
01/26/2018
SIGNATURE/INITIALS
JIM KALISHA
MGR TECH
REC &STD
Natural Gas
r6v
DRAWING BY
JLS
PROFESSIONALENGIARCHSTAMP
STATION ID
DATE
01/26/2018
SIGNATURE / INITIALS
ED BOONE
PRINCIPAL
ENGINEER
COPYRIGHT 2015 PIEDMONT NATURAL GAS CORP.
CORP. OFFICE 4720 PIEDMONT ROW DRIVE
CHARLOTTE, NC28210
CHECKER INITIALS
EPL
LAUNCHER/RECEIVER
SKID INSTALLED ON SLAB FOUNDATION
6"-30" LAUNCHER/RECEIVER DETAILS
STRUCTURAL
REF. DWG(S) PNG-G-000-0001114
PNG-G-000-0001115
PNG-G-000-0001121
SHEET(S) 1 OF 1 1 DWG SCALE AS NOTED
DWG DATE 11/21/2016 SUPERSEDED
DRAWING NUMBER REVISION
PNG-G-000-0001132 1
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
SYMBOLS
AND LEGEND
FLOW TAG
LINE SERVICE DESIGNATION
VALVES
ACTUATED VALVES
FITTINGS
MISCELLANEOUS
A AIR
NOTE: THE DEFAULT CONFIGURATION FOR VALVE SYMBOLS SHOWN IS
LINKED DRAWING NUMBER
BG
PILOT GAS (BSD_)
WELDED/THREADED/OPEN. FOR FLANGED VALVES OR CLOSED VALVES SEE THE
EXAMPLES SHOWN.
P
�'
THREADED END OR WELDED CONNECTION
OTHER VENDOR
VENDOR SUPPLY LIMIT
001 (EQUIPMENT DESCRIPTION)
CA
COMBUSTION AIR
c0
CARBON DIOXIDE
><
GATE VALVE (WELDED/THREADED/OPEN)
FLANGED CONNECTION
CORRESPONDING ARROW IDENTIFIER
DF
DW
DRAIN FUEL
DOMESTIC WATER
GATE VALVE (WELDED/THREADED/CLOSED)
CHOKE NIPPLE
EA
EG
ENGINE AIR
PILOT GAS (ESD)
>
GATE VALVE (FANGED/OPEN)
PILOT ACTUATED VALVE
CLIENT CUSTOMER
CUSTOMER SUPPLY LIMIT
EX
FA
EXHAUST
FREE AIR
GATE VALVE (FLANGED/CLOSED)
DIELECTRIC UNION
VALVE IDENTIFICATION
FG
FUEL GAS
UNION
FW
G
GL
HD
HO
FIRE WATER
PROCESS GAS
GYLCOL
HYDROCARBON DRAIN
HYDRAULIC OIL
ANGLE VALVE
BALL VALVE
DIRECT OPERATED VALVE
PRESSURE REGULATOR
EXISTING NEW
EXISTING SUPPLY LIMIT
12"-VA-1 F
MISCELLANEOUS
SIZE (INCHES)
HW
IA
IG
HEATED WATER
INSTRUMENT AIR
INERT GAS
GLOBE VALVE
ORBIT VALVE
(SELF-CONTAINED)
VALVE TYPE
L
LO
PROCESS LIQUID
LUBE OIL
BUTTERFLY VALVE
BACK PRESSURE REGULATOR
INSULATION WITH THICKNESS (INCHES)
SLOPE
PRESSURE CLASS
N
MT�ROG OL
CHECK VALVE
(SELF-CONTAINED)
PP
PERSONNEL PROTECTION
DO NOT POCKET
SLOPE
END CONNECTION
NG
NATURAL GAS
CHECK VALVE PISTON TYPE
M
OW
PG
OILY WATER
POWER GAS
ET
HEAT TRACED WITH INSULATION
❑�
CONE FLOW METER
PW
POTABLE WATER
STOP CHECK VALVE
MOTOR ACTUATED VALVE
RW
SG
RAW WATER
STARTING GAS
GAUGE VALVE W/BLEEDER
RUPTURE DISC -PRESSURE RELIEF
PITOT TUBE (AVERAGE)
SPG
UA
SECONDARY POWER GAS
UTILITY AIR
NEEDLE VALVE
PITOT TUBE (SINGLE PORT)
V
WW
VENT
WASTE WATER
PLUG VALVE
� �
DOUBLE-ACTING PISTON ACTUATED
VALVE (HIGH PRESSURE GAS)
RUPTURE DISC -VACUUM RELIEF
�
POSITIVE DISPLACEMENT METER
VALVE TYPE DESIGNATION
�
FOUR-WAY VALVE
THREE-WAY VALVE
PISTON ACTUATED VALVE
FLAME ARRESTOR
STRAIGHTENING VANES
VA GATE VALVE
ABBREVIATIONS
>
DOUBLE ACTING
TURBINE METER
VB BALL VALVE
VC CHECK VALVE
®
FLEXIBLE HOSE
❑�
ULTRASONIC FLOWMETER
VF BUTTERFLY VALVE
ACTUATED VALVES
Y
OPEN DRAIN
VG GLOBE VALVE
ACP
INST. AIR COMP. CONTROL PANEL
PISTON ACTUATED VALVE
�
VENTURI METER
VI GAUGE VALVE W/ BLEEDER AND PLUG
AOV AIR OPERATED VALVE
i
SINGLE ACTING (SPRING OPEN)
Q
VN NEEDLE VALVE
VP PLUG VALVE
AOY
A/M
AIR OPERATED SOLENOID
AUTOMATIC/MANUAL 2 POSITION SWITCH
NOTE: VALVE BODIES IN THIS SECTION ARE SHOWN AS SIMPLE GATE, ANGLE OR
CLOSURE
�M
METER
V3 3-WAY VALVE
BSW
BASIC SEDIMENT & WATER
THREE WAY VALVES.
THE ACTUATOR CAN BE SHOWN ON ANY TYPE OF VALVE.
ED**
TEST OR BLEED RING (W/VENT VALVE)
CSC
CSO
CAR SEAL CLOSED
CAR SEAL OPEN
PISTON ACTUATED VALVE
WEDGE METER
D
DRAIN
S
SINGLE ACTING (SPRING CLOSE)
❑T
TRAP VALVE
PRESSURE CLASS DESIGNATION
ESD
BSD
STATION EMERGENCY SHUTDOWN
CONTROL PANEL C = "CLOSE"
BUILDING EMERGENCY SHUTDOWN
THREE WAY SOLENOID VALVE
S S S
STARTER WITH START/ STOP
PUSHBUTTON SWITCH
GRADE PENETRATION
FITTINGS
0 ATMOSPHERIC
U CLASS 125
1 CLASS 150
E/H
CONTROL PANEL 0 = "OPEN"
ELECTRO-HYDRAULIC ACTUATOR
S]
__NMI
MANUAL ACTUATOR OR RESET
THERMOMETER
EX
FC
EXHAUST
FAIL CLOSED
MAN
PADDLE BLIND (OPEN)
XX
NOZZLE TAG
4 CLASS 400
6 CLASS 600
FLP
FAIL IN LAST POSITION
WAY SOLENOID VALVE WITH MANUAL RESET
1
9 CLASS 900
15 CLASS 1500
FO
GOV
FAIL OPEN
GAS OPERATED VALVE
I
PADDLE BLIND (CLOSED)
PADDLE
TXPX
TIE -POINT
20 2000 PSI CWP
GOY
GAS OPERATED SOLENOID
30 3000 PSI CWP
HOA
HAND -OFF -AUTO STATION
PILOT/DNERTER VALVE
SPECTACLE BLIND (OPEN)
60 6000 PSI CWP
IAS
INSTRUMENT AIR SUPPLY
�1 c
�J >
BOTTLE
NOTE:
IGS
INSTRUMENT GAS SUPPLY
SEE PROJECT PIPING MATERIAL SPECIFICATIONS FOR DESIGN
LC
LOCK CLOSED
SPECTACLE BLIND (CLOSED)
24"
PRESSURE AND MAOP FOR SPECIFIC PRESSURE CLASS.
LCB
LHC
LOCAL CONTROL BOARD
LOCKING HANDLE VALVE CLOSED
EXPANSION JOINTS
PRESSURE/VACUUM RELIEF VALVE
LHO
LO
LOCKING HANDLE VALVE OPEN
LOCK OPEN
0
ORIFICE PLATE IN QUICK
CHANGE FITTING
EXP JOINT
END CONNECTION DESIGNATION
MCC CC
MOTOR CONTROL CENTER
MOTOR OPERATED VALVE
s
S
CONE -TYPE STRAINER
PD
PLC
POSITIVE DISPLACEMENT
PROGRAMMABLE LOGIC CONTROLLER
ANGLE SOLENOID VALVE
ORIFICE FLANGE OR
RESTRICTION ORIFICE
A SOCKET WELD
PP
PV
PERSONNEL PROTECTION
PRESSURE CONTROL VALVE
a
TUBING ADAPTER
S
BASKET STRAINER (S)
B SCREWED
RA
REVERSE ACTING
S
n
THREADED PIPET
c BUTT WELD
RCP
REGULATOR STATION CONTROL PANEL
E FIAT FACED FLANGED
F RAISED FACED FLANGED
RF
RO
RAISED FACE
RESTRICTION ORIFICE
MAN
ANGLE SOLENOID VALVE WITH MANUAL RESET
o
(LONG)
COUPLING LONG
G BUTT WELD X RAISED FACED FLANGED
RTU
REMOTE TERMINAL UNIT
�S� S
TEE STRAINER
H BUTT WELD X RING JOINT FLANGED
SCP
STATION CONTROL PANEL
J RING JOINT FLANGED
SD
SHUTDOWN
THERMOWELL (THREADED)
SE
SP
T/c
SCREWED END
SET POINT
THERMOCOUPLE
ANGLE VALVE WITH PILOT/DIVERTER
PLUG
F
FILTER (F)
LINE NUMBER IDENTIFICATION
MR
TIME DELAY RELAY
SWAGE
UCP
V
COMPRESSOR CONTROL PANEL
WELD
3"-STD-B(SG-1)0001
WE
END
PILOT RELIEF VALVE
D
REDUCER
5-i K
Y-TYPE STRAINER
NOMINAL PIPE SIZE IN INCHES--J
S S
UNION ORIFICE
PIPE SCHEDULE
MATERIAL GRADE
PRESSURE OR VACUUM RELIEF VALVE
S
INSULATED COUPLING OR UNION.
®
FILTER OR MIST EXTRACTOR ELEMENT
LINE SERVICE
/
(CONDUIT, PIPE OR TUBING)
PRESSURE CLASS
SEQUENTIAL LINE NUMBER
INSULATING FLANGE
SADDLE BRANCH
REINFORCEMENTPISTON
ACTUATED VALVE
INSULATING JOINT (MONOLITHIC)
MATERIAL GRADE DESIGNATION
11110-
FLOW ARROW
RAIN CAP
VO
ITEM SUPPLIED BY
X65 API 5L X65
��
BUG SCREEN
EQUIPMENT VENDOR
X65 API 5L X6
DIAPHRAGM ACTUATED VALVE
X52 API 5L X52
X42 API 5L X42
WITH VALVE POSITIONER
] S
HOSE CONNECTION
Q
SCRAPER BAR RED TEE
AI_ ALUMINUM TUBING
B API 5L GRADE B OR ASTM GRADE B
S
PIPE BREAK
304L ASTM A312 GRADE TP
S
PVC ASTM D1785 POLYVINYL CHLORIDE
C >
PIPE CAP
/71
vxxi
SPECIALTY ITEM TAG
SS ASTM 316 SS SEAMLESS ANNEALED TUBING
*PROPRIETARY & CONFIDENTIAL *ALL RIGHTS RESERVED *DO NOT SCALE THIS DRAWING *USE DIMENSIONS ONLY
DUKE ENERGY & PIEDMONT NATURAL GAS DRAWINGS ARE CONFIDENTIAL *DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE *TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE, ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO MANAGEMENT (RIM)
NO.
DATE
REVISION(S)
DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
SHEET(S) 1 OF 3
DWG SCALE NONE
0
9/30/2020
ISSUE OF
P&ID STANDARD
AA
JLS
JLS
AREA CODE
DATE
NITIALS
REGIONAL
N/A
N/A
ENGINEER
DWG DATE 9/30/2020 SUPERSEDED
ACCOUNT NUMBER
I DUKE
Piedmont
r6111
P&I D
SYMBOLS
AND LEGENDS
DATE INITIALS
PROJECT NUMBER
N/A
N/A
MGR TECH
ENERGY
Natural Gas
DRAWING NUMBER
REVISION
DRAWING BY
REC&STD%
PNG—G-000-0002250
O
STATION ID
DATE INITIALS
PRINCIPAL
PROFESSIONALENGIARCHSTAMP
N/A
N/A
ENGINEER
COPYRIGHT 2018
CHECKER INITIALS
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
SYMBOLS AND LEGEND
PUMPS
EQUIPMENT
MISCELLANEOUS
CENTRIFUGAL
cy
v-xxxx
HORIZONTAL FILTER SEPARATOR
FAN MOTOR
CENTRIFUGAL
F M -XXXX
(SIDE VIEW)
SATELLITE DISH
8
POSITIVE DISPLACEMENT
V-xxxx
GENERIC EQUIPMENT
SLOWDOWN SILENCER W/ RAIN HOOD
DIAPHRAM
SL- XXXX
SUMP
v-xxxx
HORIZONTAL TANK
PMP41 P LIQUID DRIVE
�
BLOWER, CENTRIGAL
COMPRESSOR
v-xxxx
VERTICAL TANK
BA-xxxx
(FLAT BOTTOM)
BLOWER, AXIAL
VOLUME BOTTLE
S
EXHAUST HOOD/DIFFUSER
PUMP
VERTICAL TANK
v-xxxx
(ROUNDED BOTTOM)
A
EQUIPMENT IDENTIFICATION
PUMP
AC GAS COOLER
C COMPRESSOR
LAUNCHER/RECEIVER
AUTOMATIC DAMPER
R-XXXX
(CONCENTRIC)
E HEAT EXCHANGER
ARROW INDICATES
DIRTECTION OF FLOW
F FILTER
FE FLOW ELEMENT
C- XXX
RECIP. COMPRESSOR
G FUEL GAS SCRUBBER
H HEATER/REBOILER
-XXXX
LAUNCHER/RECEIVER
L LACT UNIT
L/R LAUNCHER/RECEIVER
R
(ECCENTRIC)
M MOTOR
P PUMP
M
SCP STATION CONTROL PANEL
SL SILENCER
RELIEF DAMPER
T CONTACTOR/ACCUMULATOR
ARROW INDICATES
TK TANK
DIRTECTION OF FLOW
V VESSEL
W WELL HEAD
WELLHEAD
I
M
MOTORIZED
(POSITIONING)
DAMPER
HORIZONTAL FILTER SEPARATOR
FILTER
FILTER
*PROPRIETARY & CONFIDENTIAL *ALL RIGHTS RESERVED *DO NOT SCALE THIS DRAWING *USE DIMENSIONS ONLY
DUKE ENERGY & PIEDMONT NATURAL GAS DRAWINGS ARE CONFIDENTIAL *DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE *TO
ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE, ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO MANAGEMENT (RIM)
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
SHEET(S) 2 OF 3
DWG SCALE NONE
0
9/30/2020
ISSUE OF P&ID STANDARD
AA
JLS
JLS
AREA CODE
DATE
INITIALS
REGIONAL
N/A
N/A
ENGINEER
DWG DATE 9/30/2020
SUPERSEDED
ACCOUNT NUMBER
I DUKE 0111
Piedmont
P&I D SYMBOLS AND LEGENDS
DATE
INITIALS
PROJECT NUMBER
N/A
N/A
MGR TECH
ENERGY
Natural Gas
DRAWING NUMBER
REVISION
DRAWING BY
REC&STD
PNG—G-000-0002250
O
STATION ID
DATE
INITIALS
PRINCIPAL
PROFESSIONALENGIARCHSTAMP
N/A
N/A
ENGINEER
COPYRIGHT 2018
CHECKER INITIALS
DISCIPLINE / RESOURCE CENTER / LINE NUMBER
SYMBOLS AND LEGEND
INSTRUMENTATION IDENTIFICATION LETTERS
INSTRUMENT BALLOONS
MISCELLANEOUS
MISCELLANEOUS
(USED INSIDE INSTRUMENT BALLOONS)
(FROM ISA "TABLE 2")
CONTROLLING
READOUT
SWITCHES do
DEVICES
DEVICES
ALARM DEVICES
*
TRANSMITTERS
DEVICES
PLC 1/0
AI=ANALOG INPUT AO=ANALOG OUTPUT
MEASURED OR
DI=DIGITAL INPUT DO=DIGITAL OUTPUT
INITIATING VARIABLE
XXXX
LOCAL MOUNTED INSTRUMENT
W %
J
W
U
c
z
z
J
z
z
z
z
c z
REMOTE PANEL MOUNTED INSTRUMENT
z
U
z
J a
w
o m
z N
U
J
(FRONT OF PANEL) (PRIMARY)
Of
U
uj
?
M
�
ccnnQ
U
c
?
_
3
0
Q
U
w
?
M
ccnwQ.�
aw
�a
3a
SC.D
c
U_w
LOCAL PANEL MOUNTED INSTRUMENT
(FRONT OF PANEL) (AUXILIARY)
A
ANALYSIS
ARC
AIC
AC
AR
Al
ASH
ASL
ASHL
ART
AIT
AT
AY
AE
AP
AW
AV
B
BURNER/COMBUSTION
BRC
BIC
BC
BR
BI
BSH
BSL
BSHL
BRT
BIT
BT
BY
BE
BW
BG
BZ
C
USER'S CHOICE
_
REMOTE PANEL MOUNTED INSTRUMENT
(REAR OF PANEL) (PRIMARY)
D
USER'S CHOICE
E
VOLTAGE
ERC
EIC
EC
ER
El
ESH
ESL
ESHL
ERT
EIT
ET
EY
EE
EZ
F
FLOW RATE
FRC
FIC
FC
FCV
FR
A
FSH
FSL
FSHL
FRT
FIT
FT
FY
FE
FP
FG
FV
:
LOCAL PANEL MOUNTED INSTRUMENT
(REAR OF PANEL) (AUXILIARY)
FQ
FLOW QUANTITY
FQRC
FQIC
FOR
FQI
FQSH
FQSL
FQIT
FQT
FOY
FQE
FQV
FF
FLOW RATIO
FFRC
FFIC
FFC
FFR
FFI
FFSH
FFSL
FE
FFV
G
USER'S CHOICE
00
INSTRUMENT FOR TWO MEASURED
VARIABLES OR FUNCTIONS (COMMON
H
HAND
HIC
HC
HS
HV
ENCLOSURE)
I
CURRENT
IRC
TIC
IR
II
ISH
ISL
ISHL
IRT
IIT
IT
IY
IE
IZ
J
POWER
JRC
JIC
JR
JI
JSH
JSL
JSHL
JRT
JIT
JT
JY
JE
JV
PNEUMATIC SUPPLY TO INSTRUMENT
K
TIME
KRC
KIC
KC
KCV
KR
KI
KSH
KSL
KSHL
KRT
KIT
KT
KY
KE
KV
L
LEVEL
LRC
LIC
LC
LCV
LR
LI
LSH
LSL
LSHL
LRT
LIT
LT
LY
LE
LW
LG
LV
M
USER'S CHOICE
N
USER'S CHOICE
ELECTRICAL SUPPLY TO INSTRUMENT
STATION CONTROL SYSTEM
INSTRUMENT WITH COMMON (SHARED)
DISPLAY (CRT)
0
USER'S CHOICE
P
PRESSURE/VACUUM
PRC
PIC
PC
PCV
PR
PI
PSH
PSL
PSHL
PRT
PIT
PT
PY
PE
PP
PSV
PV
PD
PRESSURE, DIFFERENTIAL
PDRC
PDIC
PDC
PDCV
PDR
PDI
PDSH
PDSL
PDRT
PDIT
PDT
PDY
PE
PP
PDV
Q
QUANTITY
QRC
QIC
OR
QI
QSH
QSL
ASHL
QRT
QIT
QT
QY
OE
QZ
R
RADIATION
RRC
RIC
RC
RR
RI
RSH
RSL
RSHL
RRT
RIT
RT
RY
RE
RW
RZ
XXX
LOCAL PANEL MOUNTED INSTRUMENT
WITH COMMON (SHARED) DISPLAY (CRT)
S
SPEED/FREQUENCY
SRC
SIC
SC
SCV
SR
SI
I SSH
SSL
SSHL
SRT
SIT
ST
SY
SE
SV
T
TEMPERATURE
TRC
11C
TC
TCV
TR
11
TSH
TSL
ISHL
I TRT
TIT
TT
TY
TE
TP
TW
TSE
TV
TD
TEMPERATURE, DIFFERENTIAL
TDRC
TDIC
TDC
TDCV
TOR
MI
TDSH
TDSL
TORT
MIT
TOT
MY
TE
TP
TW
TDV
U
MULTIVARIABLE
UR
UI
UY
UV
VXXX
STATION PLC FUNCTION OR STATION ESD
(PROGRAMMABLE LOGIC CONTROLLER)
LOCAL PLC FUNCTION OR UNIT CONTROL PANEL
V
VIBRATION/MACHINERY ANALYSIS
VR
VI
VSH
VSL
VSHL
VRT
VIT
VT
VY
VE
VZ
W
WEIGHT/FORCE
WRC
WIC
WC
WCV
WR
WI
WSH
WSL
WSHL
WRT
WIT
WT
WY
WE
WZ
WD
WEIGHT/FORCE DIFFERENTIAL
WDRC
WDIC
WDC
WDCV
WDR
WDI
WDSH
WDSL
WDRT
WDIT
WDT
WDY
WE
WDZ
X
UNCLASSIFIED
ESD
EBD
EMERGENCY SHUTDOWN
(HARDWIRED)
EMERGENCY BLOWDOWN
(HARDWIRED)
Y
EVENT/STATE/PRESENCE
YIC
YC
YR
YI
YSH
YSL
YT
YY
YE
YZ
Z
POSITION/DIMENSION
ZRC
ZIC
ZC
ZCV
ZR
ZI
ZSH
ZSL
ZSHL
ZRT
ZIT
ZT
ZY
ZE
ZV
ZD
GAUGING/DEVIATION
ZDRC
ZDIC
ZDC
ZDCV
ZDR
ZDI
ZDSH
ZDSL
ZDRT
ZDIT
ZDT
ZDY
ZDE
ZDV
*NOTE: ADDITIONAL INSTRUMENT ABBREVIATIONS, IF REQUIRED, SHALL USE THIS TABLE AS A GUIDE.
ZSC = LIMIT SWITCH CLOSE
MCC
MOTOR CONTROL CENTER
"H", "L", "HH", OR "LL" SUFFIXED TO TAGS FOR
SWITCHES
ZSO = LIMIT SWITCH OPEN
AND RELATED DEVICES INDICATE ALARM OR SHUTDOWN
AS FOLLOWS:
SVO = SOLENOID VALVE OPEN
®
VARIABLE FEQUENCY DRIVE
SVC = SOLENOID VALVE CLOSE
H = HIGH
HH = HIGH HIGH
IR = FIRE
DETECTOR
L = LOW ALARM
LL = LOW LOW
SHUTDOWN
RO = RESTRICTION ORIFICE
CGE = GAS DETECTOR
RELAY FUNCTION DESIGNATIONS
LINE SYMBOLS
LOGIC
MISCELLANEOUS
(ADJACENT TO INSTRUMENT BALLOON)
�f CHARACTERIZE
CAPILLARY TUBING
< > I GENERALIZED FOR UNDEFINED OR COMPLEX INTERLOCK LOGIC
`
SUMMING
❑
XX
RUNNING LIGHT ON (GREEN)
XXX
COMPUTER CONNECTION
iO \
❑] SQUARE ROOT
AND
INTERLOCK IS EFFECTIVE ONLY IF ALL INPUTS EXIST
TOTALIZE
EXAMPLE
ELECTRICAL LEAD
` �
OR
RUNNING LIGHT OFF (RED)
LOCALDISPLAY
HIGH SIGNAL SELECT
FIBER OPTIC/ELECTROMAGNETIC
SIGNAL
OR
INTERLOCK IS EFFECTIVE IF ANY ONE OR MORE INPUTS EXIST
`
�G LOW SIGNAL SELECT
HYDRAULIC LINE
P
< >
PURGE LINE - AIR, GAS, LIQUID
`
OA
RUNNING LIGHT READY (AMBER)
Fil CURRENT REPEATER
SIGNAL PNEUMATIC LINE
P CURRENT TO PRESSURE TRANSDUCER
P I PNEUMATIC TO CURRENT TRANSDUCER
SKID LIMITS
<>
UNDEFINED CONTROL LOGIC (USUALLY HIGH PRESSURE GAS OR
GAS/HYD. VALVE ACTUATORS)
STARTER WITH START/STOP
S S S PUSHBUTTON SWITCH
I RESISTANCE TO CURRENT CONVERTER
E 0 VOLTAGE TO ELECTROMAGNETIC
I VOLTAGE TO CURRENT
*PROPRIETARY & CONFIDENTIAL *ALL RIGHTS RESERVED *DO NOT SCALE THIS DRAWING *USE DIMENSIONS ONLY
DUKE ENERGY & PIEDMONT NATURAL GAS DRAWINGS ARE CONFIDENTIAL *DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE *TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE, ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO MANAGEMENT (RIM)
NO.
DATE
REVISION(S)
DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
SHEET(S) 3 OF 3
DWG SCALE NONE
0
9/30/2020
ISSUE OF P&ID
STANDARD
AA
JLS
JLS
AREA CODE
DATE
NITIALS
REGIONAL
N/A
N/A
ENGINEER
DWG DATE 9/30/2020
SUPERSEDED
ACCOUNT NUMBER
If DUKE Piedmont
r6111
P&I D SYMBOLS AND LEGENDS
DATE
NITIALS
PROJECT NUMBER
MGR TECH
ENERNatural Gas
ENERGY
DRAWING NUMBER
REVISION
DRAWING BY
N/A
N/A
REC&STD
�. .
PIG—G-000-0002250
O
STATION ID
DATE
INITIALS
PRINCIPAL
PROFESSIONAL ENG/ARCHSTAMP
N/A
N/A
ENGINEER
COPYRIGHT 2018
CHECKER INITIALS
DISCIPLINE / RESOURCE CENTER / LINE NUMBER