Loading...
HomeMy WebLinkAboutNCC200258_NOT Closeout Documents_20210212SEDIMENTATION INSPECTION REPORT (City of Winston-Salem/Forsyth County) Winston-Salem Field Operations Department Permit #: EN1900152 Erosion Control Division P.O. Box 2511 Date: 2/11/2021 Winston-Salem, NC 27102 Report by: F Wesley Williams Revised 1-1-20 Phone: 1 336-727-2487 Project: I Quality Mart Union Cross Location: 1 1980 Pecan Lane 1. Pictures: ("x" One) Yes: No: X 2. Potential for NPDES Violation: ("x" One) Yes: No: x Describ 3. Weather and soil conditions: Cloudy /wet Initial inspection: ("x" One) Yes: No: X 4. Is site currently under notice of violation? ("x7' One) Yes: No: X 5. Is the site in compliance with S.P.C.A. and rules? ("x" One) Yes: X No: If no, check violations below: 6. Violations: ("X" all applicable sections) ( )--- No approved plan, [UDO Sec. 8.4.6 (G) ; & G.S. 113A-57 (4) and 15A N.C.A.C413.0107(e)] ( )--- Failure to follow approved plan, [UDO See.8.4.19 (A); & G.S. 113A-61.1] ( )--- Failure to submit revised plan, [UDO Sec. 8.4.17 (B) (5); & G.S. 113A-54.1(b) and 15A N.C.A.C. 413.0118(a)] ( )--- Failure to provide adequate groundcover, [UDO See. 8.4.6 (D) (1) (b); & G.S. 113A-57(3); & 15A N.C.A.C. 413.0007(b) or 15A N.C.A.C. 413.0124(e)] ( )--- Insufficient measures to retain sediment on site, [UDO Sec. 8.4.6 (D) (1) (a); & G.S. 113A-57(3)] ( )--- Failure to take all reasonable measures, [UDO Sec. 8.4.4 (B); & 15A N.C.A.C.4130105] ( )--- Inadequate buffer zone, [UDO See. 8.4.6 (A); & G.S. 113A-57(1)] ( )--- Graded slopes and fills too steep, [UDO Sec. 8.4.6 (B) (1) (a, b, e); & G.S. 113A-57(2) or 15A N.C.A.C. 413.0124(d)] Unprotected exposed slopes, [ UDO See. 8.4.6 (B) (1) (t); & G.S. 113A-57(2)] Failure to install and maintain erosion control measures, [UDO See. 8.4.12; & 15A N.C.A.C. 413.0113] Failure to keep cw Other (describe): rent self -inspection records, [G.S. 113A-54.1 & 15A NCAC 048. 0131] 7. Contact made with (name): Rodney Cheek Title Owner 8. Contact Method: phone # () email (X) fax # () letter () person ( ) 9. Corrective actions needed: No corrective actions needed at the time of inspection. 10. Comments: ( ) No devices in place O Additional devices needed O Devices need maintenance ( ) Devices in & functioning O No seeding noted ( ) Partially seeded (X) Areas seeded (No) Off -site sedimentation (Yes ) Project in compliance All phases of grading and construction are complete. The site is stabilized per the approved plan 11. Others present: Office use only: Cityworks ( ) Final ( ) [white notebook] Excel ( ) Financially responsible contact ( ) ARCGIS ()