Loading...
HomeMy WebLinkAboutNCC200445_NOT Closeout Documents_20210211North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Robeson Project: Holly Swamp Solar River basin: Lumber Person financially responsible: Renewable Energy Services, LLC - Matthew Project N: ROBES-2020-008 Delafield, Managing Member Address: 148 Cobble Ridge Drive, Unit C, Pittsboro, NC 27312 1. Project Location: Holly Swamp Church Road, Lumberton Pictures: No 2. Weather and soil conditions: Cloudy Soil Saturated Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): None Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: February 08, 2021 10. Comments: Project is complete and stabilized. Close Project E&SC plan. Reported by: Nicholas Mills Others present: Date of inspection: February 05, 2021 Time arriving on site: 2:30 PM Time leaving site: 3:00 PM cc: