HomeMy WebLinkAboutNCC200445_NOT Closeout Documents_20210211North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
County: Robeson Project: Holly Swamp Solar River basin: Lumber
Person financially responsible: Renewable Energy Services, LLC - Matthew Project N: ROBES-2020-008
Delafield, Managing Member
Address: 148 Cobble Ridge Drive, Unit C, Pittsboro, NC 27312
1. Project Location: Holly Swamp Church Road, Lumberton
Pictures: No
2. Weather and soil conditions: Cloudy Soil Saturated Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): None
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: February 08, 2021
10. Comments: Project is complete and stabilized. Close Project E&SC plan.
Reported by: Nicholas Mills Others present:
Date of inspection: February 05, 2021 Time arriving on site: 2:30 PM Time leaving site: 3:00 PM
cc: