Loading...
HomeMy WebLinkAbout20120332 Ver 1_Application_20120403tiM 44T-" STATE OF NORTH CAROLINA 0 zk� }, GY/ DEPARTWNT OF TRANSPORTATION '4' 4 BEVERLY EAVES PERDUE EUGENE A CONTI GOVERNOR SECRETARY Wilmington Regulatory Field Office US Army Corps of Engineers 69 Darlington Avenue Wilmington North Carolina 28403 ATTN Mr Ronnie Smith NCDOT Coordinator Dear Sirs March 27 2012 12 0 33" 2 Subject Application for Section 404 Nationwide Permits 12 and 23 and 401 Water Quality Certification for the Replacement of Bridge No 5 on NC 242 over Singletary Mill Branch in Bladen County North Carolina TIP No B 4711 Federal Aid Project No BRSTP 242(3) Debit $240 00 from WBS Element 38486 1 1 Please find enclosed the Pre Construction Notification (PCN) form permit drawings utility drawings design plans stormwater management plan and jurisdictional determination for the above referenced project A Programmatic Categorical Exclusion (PCE) was completed for this project on June 24 2010 and distributed shortly thereafter Additional copies are available upon request The North Carolina Department of Transportation ( NCDOT) proposes to replace Bridge No 5 over Singletary Mill Branch on NC 242 in Bladen County The project involves replacement of the existing 55 -foot structure with a 121 foot long bridge in approximately the same location There will be 0 09 acre of permanent impacts to riparian wetlands resulting from fill and mechanized clearing on this project The proposed let date for the project is November 20 2012 with a review date of October 2 2012 However the let date may advance as additional funds become available Regulatory Approvals Section 404 Permit All aspects of this project are being processed by the Federal Highway Administration as a "Categorical Exclusion" in accordance with 23 CFR MAILING ADDRESS TELEPHONE 919 707 6100 LOCATION NC DEPARTMENT OF TRANSPORTATION FAX 919 212 5785 CENTURY CENTER BUILDING B PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1020 BIRCH RIDGE DR 1548 MAIL SERVICE CENTER VVEBSITE WWW NCDOT ORG RALEIGH NC 27610 RALEIGH NC 27699 1548 N 771 115(b) The NCDOT requests that these activities be authorized by a Nationwide Permit 23 We are also requesting the issuance of a Nationwide Permit 12 for clearing associated with replacing a utility line Section 401 Permit We anticipate 401 General Certification numbers 3819 and 3701 will apply to this project All general conditions of the Water Quality Certifications will be met NCDOT is providing five copies of this application to the NCDWQ for their review and approval Authorization to debit the $240 Permit Application Fee from "S Element 33788 1 1 is hereby given A copy of this permit application will be posted on the NCDOT Website at http Hwww ncdot org /doh/preconstruct/pe /neu/permit html Thank you for your assistance with this project If you have any questions or need additional information please contact Amy James at aejames @ncdot gov or (919) 707 6129 Sincerely Grego J Thorpe PhD Manager Project Development and Environmental Analysis Unit cc NCDOT Permit Application Standard Distribution List O�O,� W A TF9 I 1 � O Y Office Use Only Corps action ID no DWQ project no Form Version 1 3 Dec 10 2008 Pre - Construction Notification (PCN) Form A Applicant Information 1 Processing la Type(s) of approval sought from the Corps ®Section 404 Permit El Section 10 Permit lb Specify Nationwide Permit (NWP) number 12 23 or General Permit (GP) number 1c Has the N WP or GP number been verified by the Corps? ❑ Yes ® No 1 d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification — Regular ❑ Non 404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit ❑ Yes ® No 1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ❑ Yes ® No 1g Is the project located in any of NC s twenty coastal counties If yes answer 1 h below ❑ Yes ® No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Project Information 2a Name of project Replacement of Bridge No 5 over Singletary Mill Branch on NC 242 2b County Bladen 2c Nearest municipality / town Bladenboro 2d Subdivision name not applicable 2e NCDOT only T I P or state project no B 4711 3 Owner Information 3a Name(s) on Recorded Deed North Carolina Department of Transportation 3b Deed Book and Page No not applicable 3c Responsible Party (for L LC if applicable) not applicable 3d Street address 1598 Mail Service Center 3e City state zip Raleigh NC 27699 1598 3f Telephone no (919) 707 6129 3g Fax no (919) 212 5785 3h Email address aejames @ncdot gov 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other specify 4b Name not applicable 4c Business name (if applicable) 4d Street address 4e City state zip 4f Telephone no 4g Fax no 4h Email address 5 Agent/Consultant Information (if applicable) 5a Name not applicable 5b Business name (if applicable) 5c Street address 5d City state zip 5e Telephone no 5f Fax no 5g Email address B Project Information and Prior Project History 1 Property Identification la Property identification no (tax PIN or parcel ID) not applicable 1 b Site coordinates (in decimal degrees) Latitude 34 495761 Longitude 78 840954 (DD DDDDDD) ( DD DDDDDD) 1 c Property size 3 4 acres 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to Singletary Mill Branch (or Horsepen Branch) proposed project 2b Water Quality Classification of nearest receiving water C SW 2c River basin Lumber 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Land use in the project vicinity consists primarily of agriculture interspersed with residential development and forestland 3b List the total estimated acreage of all existing wetlands on the property 4 9 acres 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 398 linear feet 3d Explain the purpose of the proposed project To replace a structurally deficient and functionally obsolete bridge 3e Describe the overall project in detail including the type of equipment to be used The project involves replacing a 55 foot bridge with a 121 foot 2 span cored slab bridge on the existing alignment with an off site detour Standard road budding equipment such as trucks dozers and cranes will be used 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ® Yes ❑ No ❑ Unknown project (including all prior phases) in the past? Comments 4b If the Corps made the jurisdictional determination what type ® Preliminary ❑ Final of determination was made? 4c If yes who delineated the jurisdictional areas? Agency /Consultant Company Name (if known) NCDOT (Amy James) Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation March 1 2010 5 Project History 5a Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b If yes explain in detail according to help file instructions 6 Future Project Plans -Yes 6a Is this a phased project? --F[:] No 6b If yes explain C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ® Wetlands ® Streams tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ —non 404 other) (acres) Temporary T Site 1 ®P F-1 T Fill Riverine Swamp ® Yes ® Corps 003 Forest El No ❑ DWQ Site 1 ®P [-I T Mechanized Rivenne Swamp ® Yes ® Corps 0 06 Clearing Forest ❑ No ❑ DWQ Utility Site 3 Fill Rivenne Swamp ® Yes ® Corps <0 01 ® P El Forest ❑ No El DWQ Site 4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ Site 5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ Site 6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 0 09 Permanent 0 0 Temporary 2h Comments Due to utility impacts there will also be 0 29 acre of hand clearing on this project (see utility narrative) 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of Average Impact area number (PER) or jurisdiction stream (acres) Permanent (P) or intermittent (Corps 404 10 width Temporary (T) (INT)? DWQ — non 404 (feet) other) Site 1 ® P ❑ T Fill Singletary Mill ® PER ® Corps <0 01 Branch ❑ INT ❑ DWQ Site 2 ❑ P ® T Temporary fill Singletary Mill Branch ® PER ❑ INT ® Corps ❑ DWQ <0 01 Site 3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ Site 4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ Site 5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ Site 6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts <0 01 Perm <0 01 Temp 31 Comments There will be 15 sq ft ( <0 01 acre) of permanent surface water impacts due to bents 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then indiv ually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of impact number — waterbody Type of impact Waterbody type Area of impact (acres) Permanent (P) or (if applicable) Temporary T 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 41' Total open water impacts X Permanent X Temporary 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed then complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or (acres) number purpose of pond Flooded Filled Excavat Flooded Filled Excavated Flooded ed P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a ❑ Neuse ❑ Tar Pamlico ❑ Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number— Reason for impact Buffer Zone 1 impact Zone 2 impact Permanent (P) or Stream name mitigation (square feet) (square feet) Temporary T required? B1 ❑P FIT El Yes ❑ No B2 ❑P El Yes ❑ No B3 ❑P ❑Yes ❑ No 6h Total buffer impacts 61 Comments D Impact Justification and Mitigation 1 Avoidance and Minimization la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project The proposed bridge is 66 feet longer than the existing bridge and at approximately the same grade and alignment as the existing structure 3 1 or steeper fill slopes in wetlands where practicable 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques NCDOT Best Management Practices for Bridge Demolition Removal and Construction will be followed as well as those for Sedimentation and Erosion Control and the utilization of an off site detour 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ® No if no explain Due to minimal impacts NCDOT is not proposing compensatory mite ation 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes which mitigat ion option will be used for this project? ❑ Mitigation bank ❑ Payment to in lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank not applicable 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ❑ No 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) 6h Comments E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan 1a Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b If yes then is a diffuse flow plan included? If not explain why ❑ Yes ❑ No Comments 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? N/A 2b Does this project require a Stormwater Management Plan? ® Yes ❑ No 2c If this project DOES NOT require a Stormwater Management Plan explain why 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan See attached permit drawings ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ® DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local governments jurisdiction is this project? not applicable ❑ Phase II ❑ NSW 3b Which of the following locally implemented stormwater management programs ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties 4a Which of the following state implemented stormwater management programs apply ❑ HQW (check all that apply) ❑ ORW ❑ Session Law 2006 246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes El No N/A attached? 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No N/A 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No N/A F Supplementary Information 1 Environmental Documentation (DWQ Requirement) 1a Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? lb If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ® Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval letter) ® Yes ❑ No Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after the fact permit application? ❑ Yes ® No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes additional development which could impact nearby downstream water quality? ® No 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description Due to the minimal transportation impact resulting from this bridge replacement this project will neither influence nearby land uses nor stimulate growth Therefore a detailed indirect or cumulative effects study will not be necessary 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility not applicable 10 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? ❑ Raleigh 5c If yes Ind icate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would Impact Endangered Species or Designated Critical Habitat? USFWS county list 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur In or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? NMFS County Index 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? NEPA Documentation 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur In a FEMA designated 100 year floodplain? ® Yes ❑ No 8b If yes explain how project meets FEMA requirements NCDOT Hydraulics Unit coordination with FEMA 8c What source(s) did you use to make the floodplain determination? FEMA Maps Dr Gregory J Thorpe, PhD 'L�q� CA u--, 03 Z' ► Z Date " Applicant/Agents Printed Name Applicant/Agents Signature (Agents signature is valid only rf an authorization letter from the applicant is provided 11 I PRELIMINARY JURISDICTIONAL DETERMINATION FORM A R 3 201LI BACKGROUND INFORMATION 4'VISIONOFM.;FPIitAYS DOER- OFFICE OF NATURAL ENVIRONMENT A REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL DETERMINATION (JD) February 23, 2010 B NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD Amy James NCDOT 1598 Mail Service Center Raleigh NC 27699 -1598 C DISTRICT OFFICE, FILE NAME, AND NUMBER SAW 2009 -02252 ( NCDOT/ B -4711/ replacement of bridge no 5 on NC 242 over Horsepen Branch in Bladen County/ Div 6) D PROJECT LOCATION(S) AND BACKGROUND INFORMATION B 4711 bridge no 5 on NC 242 over Horsepen Branch (also known as Singletary Mill Branch) in Bladen County (USE THE ATTACHED TABLE TO DOCUMENT MULTIPLE WATERBODIES AT DIFFERENT SITES) State North Carolina County /parish /borough Bladen City Bladenboro Center coordinates of site (lat/long in degree decimal format) Lat 34 4958540 N Long 78 840970 W Universal Transverse Mercator Name of nearest waterbody Horsepen Branch at the crossing, the channel is defined and looks like it was excavated at one point, however, upon entering the forest Horsepen Branch becomes more swamp like, having neither a distinct channel nor a distinct streambed and bank (so I only included the acreage of the area around the bridge —see below) Identify (estimate) amount of waters in the review area Non - wetland waters 500 linear feet 20 width (ft) and /or 0 23 acre Cowardin Class Rivenne Stream Flo v pe-enn al Wetlands 4 6 acres Cowardin Class PF06C PF01/4A PEM1 /2A Name of any water bodies on the site that have been identified as Section 10 waters Tidal Non Tidal E REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY) ® Office (Desk) Determination Date February 23 2010 ❑ Field Determination Date(s) 1 The Corps of Engineers believes that there may be Jurisdictional waters of the United States on the subject site and the permit applicant or other affected party who requested this preliminary JD is hereby advised of his or her option to request and obtain an approved jurisdictional determination (JD) for that site Nevertheless the permit applicant or other person who requested this preliminary JD has declined to exercise the option to obtain an approved JD in this instance and at this time 2 In any circumstance where a permit applicant obtains an individual permit or a Nationwide General Permit (NWP) or other general permit verification requiring pre - construction notification (PCN) or requests verification for a non - reporting NWP or other general permit and the permit applicant has not requested an approved JD for the activity the permit applicant is hereby made aware of the following (1) the permit applicant has elected to seek a permit authorization based on a preliminary JD which does not make an official determination of Jurisdictional waters (2) that the applicant has the option to request an approved JD before accepting the terms and conditions of the permit authorization and that basing a permit authorization on an approved JD could possibly result in less compensatory mitigation being required or different special conditions (3) that the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization (4) that the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit including whatever mitigation requirements the Corps has determined to be necessary (5) that undertaking any activity in reliance upon the subject permit authorization without requesting an approved JD constitutes the applicants acceptance of the use of the preliminary JD but that either form of JD will be processed as soon as is practicable (6) accepting a permit authorization (e g signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a preliminary JD constitutes agreement that all wetlands and other water bodies on the site affected in any way by that activity are jurisdictional waters of the United States and precludes any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action or in any administrative appeal or in any Federal court and (7) whether the applicant elects to use either an approved JD or a preliminary JD that JD will be processed as soon as is practicable Further an approved JD a proffered individual permit (and all terms and conditions contained therein) or individual permit denial can be administratively appealed pursuant to 33 C F R Part 331 and that in any administrative appeal jurisdictional issues can be raised (see 33 C F R 331 5(a)(2)) If during that administrative appeal it becomes necessary to make an official determination whether CWA Jurisdiction exists over a site or to provide an official delineation of Jurisdictional waters on the site the Corps will provide an approved JD to accomplish that result as soon as is practicable This preliminary JD finds that there may be'waters of the United States on the subject project site and identifies all aquatic features on the site that could be affected by the proposed activity based on the following information 2 SUPPORTING DATA Data reviewed for preliminary JD (check all that apply - checked items should be included in case file and where checked and requested appropriately reference sources below) ® Maps plans plots or plat submitted by or on behalf of the applicant/consultant NCDOT ® Data sheets prepared /submitted by or on behalf of the applicant/consultant ❑ Office concurs with data sheets /delineation report ❑ Office does not concur with data sheets /delineation report ❑ Data sheets prepared by the Corps ❑ Corps navigable waters study ❑ U S Geological Survey Hydrologic Atlas ❑ USGS NHD data ❑ USGS 8 and 12 digit HUC maps ® U S Geological Survey map(s) Cite scale & quad name Bladenboro and Chadbourn NE ® USDA Natural Resources Conservation Service Soil Survey Citation USDA, Bladen County 1990 ❑ National wetlands inventory map(s) Cite name ❑ State /Local wetland inventory map(s) ❑ FEMA /FIRM maps ❑ 100 -year Floodplain Elevation is (National Geodectic Vertical Datum of 1929) ❑ Photographs ❑ Aerial (Name & Date) or ❑ Other (Name & Date) ❑ Previous determination(s) File no and date of response letter ❑ Other information (please specify) IMPORTANT NOTE The information recorded on this form has not ;1alli l �1 a i nj ure and a of Signatu e Ad date of Reg0latory P�ro1 t M Hager person requesting preliminary JD (REQUIRED) (REQUIRED unless obtaining the signature is impracticable) Estimated Site Cowardin amount of Class of number Latitude Longitude Class aquatic aquatic resource in resource review area 1 34 4959 -78 8410 Riverine 5 acres Wetlands 2 344959 788410 Rivenne 500 linear feet Stream Y 3 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PERDUE GOVERNOR MEMORANDUM TO FROM SUBJECT February 6 2012 File Paul F Fisher P E Hydraulics Unit ROADWAY DESCRIPTION Stormwater Management Plan B 4711 Bladen County EUGENE A CONTI JR SECRETARY B 4711 consists of constructing a new bridge on NC 242 over Singletary Mill Branch The total project length is 0 142 miles This project is in the Lumber River Basin The jurisdictional stream is Singletary Mill Branch ENVIRONMENTAL DESCRIPTION This project is in Bladen County which is not a CAMA county There are wetland sites on all four quadrants around the bridge that will be impacted by the proposed project Surface Water Impacts will be minimized to the extent practicable BEST MANAGEMENT PRACTICES AND MAJOR STRUCTURES The primary goal of Best Management Practices (BMP's) is to prevent the degradation of the State s surface waters by the location, construction and operation of the highway system The BMP s are activities practices and procedures taken to prevent or reduce stormwater pollution The BMP measures used on this project to reduce stormwater impacts are PFF Rip rap pads were placed at discharge points in wetlands 3 1 sideslopes on all new ditches Maintain sheet flow off fill slopes where shoulder berm gutter is not required w a 12/7/11 B -4711 NEU Narrative Utility Owners • Power Four County EMC — (contact Edward Pope 910 259 1854) • Telephone CenturyLmk (contact David Walker (910) 678 0243 ext 717) General Utility Relocation All utility lines inside the project limits will be adjusted as necessary or relocated away from construction The power and telephone will be relocated prior to the letting Existing Utilities • Power the existing Four County EMC aerial power pole line runs along east side of NC 242 • Telephone the existing CenturyLmk Telephone lines (fiber optic and copper cables) are underground on the east and west side of NC 242 The telephone lines on the west side are buried up to Singletary Mill Branch then goes aerial across the creek Proposed Utility Relocation • Power Four County EMC will relocate the power pole line along the proposed R/W line on the east side of NC 242 from Sta. 14 +87 to Sta 22 +64 • Telephone CenturyLink will abandon the aerial and underground facilities on the east and west side of NC 242 after new fiber optic cables and conduits are installed on the east side of NC 242 The proposed underground conduits will be installed by directional bore across the wetlands Utility Permit Drawing Sheet ._I of PROPERTY OWNERS NAMES AND ADDRESSES REFERENCE NO NAMES 01 ELISE M BRIDGER ADDRESSES Utility Permit Ora ving Sheet 5 of 5 08 DEC 201106 41 R \Utilities \Rd Ut\Proj \NEU \b4711 rdy neu tsh dgn 09/08/99 $$$$USERNAME �$$,�I� ', 1!I TIP PROJECT: B-47I1 o � � 0 0 � IN Y � y � n cl o � y Q Q H i Q z x I x � oo O n tetltl M � O 0 0„ 3c 0 (D« / i � � O N N N to to Im Qr b DZ I T m O m m n SINGLETARY BRANCH V SINGLETARY MILL BRANCH 2 Z t2l i n + Ln m ;o lv O N o O si i p O p p n Z wAi I I ~ I� I I I i I I I i I I v N J J O p I p o � � 0 0 � IN Y � y � n cl o � y Q Q H i Q z x I x � oo O n M � C3 A ~ tetltl M � O x x ;o 8z 3c \ � i (D« / i � i to Im Qr b DZ I O m n SINGLETARY BRANCH V SINGLETARY MILL BRANCH DZ �v t2l i + Ln lv O o O si i y nl I I wAi I I ~ I� I I I i I I I i I I M � C3 A ~ tetltl M � O x x ;o 8z 3c (D« RJ o n 64 ® OO O C I� b O C b xy n� �a 0 f I 1 � f — (� v �n 0 n� 0 �o �k j o o n .a b `+ O C O M H 0 M M � O O `►b��D C b xy n� �a 0 f I 1 � f — (� v �n 0 n� 0 �o �k j o o n .a b `+ O C O M H 0 I I � � I � I I 21 DEC 201115 56 il R \Roadway \Pro) \b4711 rdy tsh dgn 09/08/9 $$$$USERNAME$$$$Ill C01�T, ACT: C202955 TIP PROJECT: B -4711 r- m 2 D y N Z Z O z v � N Z O z �+ z O 0 0 — C m z X C I 0 � 0 ° b F— 0 �a 0 m�= ° m C �Z 9 II 11 Z m D �� v I N A r- (n D 00 0 I U 0 m II r u O m r O C o v O = A A N W O E m p m = y m r m Z 'b N ° m O Z 0 m a 0 O _ = m D 0 �Z C n n w D w Z y C D m v m p m -< b v„ N A (n O X b � m ti N wv om N N a a Q I OD 0 O N O 'y � i17 a ly a w b 0 o z a � o D D I y Z �� r 41 I VI "' no fj� I I� I I I 1 I I I 1 I I 2 0 m O iZ O PC a m r- m 2 D y N Z Z O z v � N Z O z �+ z O 0 0 — C m z X C v T � ° b F— C m �a ( vII m�= � o G1 <v< m C �Z O Z (� II II II 11 Z m D �� v I Cj O v O z D r- (n D 00 0 I 14 N 0 m II r u O a m r O C o v O = n C O A N W O E m p m = y m r m Z y N m � O Z Z N Om a 0 _ O m D 0 = C n D w D w Z y C D m v m p m -< b v„ 8� r �z A �r z � � � n �a y m z =3 m O C J � 1 O x 14 p c� z In x 0 n u z D A N W O E m r m Z y N N cc Om a n _ z Z SINGLETARY BRAN\ I O m O "y y Ln -1 Z m a M) m X A °o Ir O + +A b � m ti W wv om N i'y N a a Q I OD O N O 'y � i17 a ly a w b 0 o o D r+y 8 y Z �� ^ti R` ' 41 I VI "' no r O I I� I I I 1 I I I 1 I I 2 0 m O iZ O PC a m G7 m �.i 0 8� r �z A �r z � � � a �a C b � � �y x c� z � I» 8� r �z A �r z „7 Q o Q z O � b b o VJ Q a V1 b h � a V J a � ti b h C) C) N N W v- O W O �lb O � O v' �n o � �o O ti j 4 � o O M N N o (4 H i o � � E -m Z I b D cc Om a n _ + pd SINGLETARY BRAN\ I O o� 1.51NGLETARY ILL BRANCH 2� , I r DZ I 1 + +A b � wv om a o ZI I 41 I VI I I� I I I 1 I I I 1 I I „7 Q o Q z O � b b o VJ Q a V1 b h � a V J a � ti b h C) C) N N W v- O W O �lb O � O v' �n o � �o O ti j 4 � o O M N N o (4 H wawa A CD T a " V a R � � 6 o � � wawa A CD T a " V a R � � 6 2011 DD tiH vu ^x0 Fk H n 1 0 00 O� si ZZ 1n13 CIO as ++ OnD zo iz 00 I i P \NEUJ� \64711 dy p h dg Al rz I I A m T�m I I og� I� oa m � �rn n Z V 7 H w�� pN l DD O 2 m O N n =' x � � D m � O y Z A n 0 Z 5 O u � <s o m N D P 1 D 0 33 >T ' °o o° v 00 ? o o So 0 A c C c C m 1n O N 0 m m OD = v r `-a m O m N V! m m w 7�o N s0 m = n C = `^ to rg n m D_ �nD 4 n x p I m T �£TF~n rrn�i �z r zo z / Al. CD x = O N A C D = m ONm \ r)D it \\ rM \ n n �` \ G7 -r7 it 1< �. M A HR O OB R RED C m CD i :13 m m-n r- N I i P \NEUJ� \64711 dy p h dg Al rz I I A m T�m I I og� I� oa m � �rn n Z V 7 H w�� pN l DD O 2 m O N n =' x � � D m � O y Z A n 0 Z 5 O u � <s o m N D P 1 D 0 33 >T ' °o o° v 00 ? o o So 0 A c C c C m 1n O N 0 m m OD = v r `-a m O m N V! m m w 7�o N s0 m = n C = `^ to rg n m D_ �nD 4 n x p I m T �£TF~n rrn�i �z r zo z / Al. CD x = O N A C D = m ONm \ r)D it \\ rM \ n n �` \ G7 -r7 it 1< �. M A HR O OB R RED C m CD i :13 m m-n r- M CMca0 x x i �OH� 2 20V1 -miD ,,r 't Z Z-4 j t t•o rrvm v v ? c O r CD i �� i m-n r- i (D I� 0 0 tG r XIT •J 0 O F� n Z n m o u I m x a r S NGLETARY MILL RANCH m I CH OBSCURED* W dir o >s it ilr i a �r it � * I ir I Do I ir Dl I � C 1 Y it Ir it it � I � rL .1 I .3r 4r it it E 1 I it n 02 I 3 is I `0 it N i 0 m I cm I d- i I .O 1 d. Iii Y m + P m 1� s o Z Ul U � N� L2 ^v^ Y/ 4 m O 15 O a 3-6 12 12 3-5 0 0 a1 m r O p O R� m h I � y~ A A 10 P_� w� m� O 1 � 2 �O �m ��Irpp-0 � � r �o �Z ��tirpD� � 4 4 II II II 11 y ; + b(.i��(n Q C � Uj OoN �m y mg H a2 yb� Z n Z r I rn n D m O 0 m I cm I d- i I .O 1 d. Iii Y m + P m 1� s o Z Ul U � N� L2 ^v^ Y/ 4 m O 15 O a 3-6 12 12 3-5 0 0 a1 m r O p O R� m h I � y~ A A 10 P_� w� m� O 1 � 2 �O �m ��Irpp-0 � � r �o �Z ��tirpD� � 4 4 II II II 11 y ; + b(.i��(n Q C � Uj OoN �m y mg H a2 yb� Z n Z r I rn n D m O O 1 � 2 �O �m ��Irpp-0 � � r �o �Z ��tirpD� � 4 4 II II II 11 y ; + b(.i��(n Q C � Uj OoN �m y mg H a2 yb� Z n Z r I rn n D m O a2 yb� Z n Z r I rn n D m O o sum C- 03b Q Q o 0 o O � h 7 N O W O N -« 70 CD 04/16/11 7C m m v m v v v m v m v v Cl 'i Cl o Q7 C �! o o x x x x Q x 0 f c O n c m ° 3 m m Q o 0 0 0 o 'o y o H Q T T D c v� C o o '° V y -O n ,0 *0 '° 0 3 c o a 3 ° ° °_ _ ° ti � � 3 � 0 9 0 0 0 � m ° O c c a° m m �° m m f° Q_ Q_ Q_ Q_ `7 z c—« m ° til o o > > W fl 7 c a o j > > 0 m a h 4 a CD ° T 0 n 0 7 fD r h. CD 0 ? O 0 t0 (fl o fDD 7 0 n C m v 0 rt 0 (D 7 03 ::� C- :3 t y o; T m a A 7 :3 m F 1y D D °c W m ° Q 0 c a c v ° ° ° �7 �J o o 42 �7 C ° ° I � II►il LJ + a o O a s a a x w ❑ I I I I N N 'O m 7 m 7 m 7 7 T X X N � ° x a x a a 0 a o Q CD co �_ o v v _ v v v 0 0 fl_ (Q 0 m 3 N 0 H w > > > N° t� 0-Z m o m �° 0 m m (o�° b oT o a '� n G� n �" �' C 7(D y m 3 Q c Q c o o � m a Q o o Q O s m m o ao O a _ c a- N 3 Q m Q - `J 3 ID b � {Ili { { O v v >o v CD ° x N n N n ry 0 0 0 -00 �. o �Q o cQ Q v v v o 5 0 0 0 0 o a CD ID N CL N °' m m N N W °- --I S. E a0 o m (D Ci 0 N T 0 O N m 0 v m o Q 'O 0 '05, D o 0 O_ fD O° 0= o= o m � n m 0 O 0 N 0 0 0 ° Q rl o n , n _ ao °o co 0 CD M m m CD c N m m m li I �i l i l I 7 T '7 7 7 0 d - O° ° O O O / N N N N N O n N O W W ° ° N lQ p 0 0 0 0 0 0 0 0 Q a a Q_ Q. Q ° ° ° m° !1 0 Q °° Q n ° O O o o c Q Q o D 0 0 7 Q 70 >o cc , Q 7 m `= D -0 -0 v -1 -i Q (D ° 0 m o° ° o Q v o Q o p °co a b Lj rt o Q G1° n° ° o p 3 7 CD Q 0 0 0 O Q a c c v v p m D Q m o 3� a 7 ID Q 7 N a 0 0 jr CDD CD fD 3 m m m m cp c m m m m 3 c ° m s s m _ m Q m m m 0 N n 3 '. 3 CD CD Q m I D ® I� 10 C m m C I I IIIIII�� I �' m Z W W o 0 y rt o o o (D v a _ O o ° 3 0 -i r 3 o ° tC t° a a � N to m z „° m °" m r o f � 0'° v�r. -1 T o` o y ° ° N � CD i 0i T W x CL ::E m o Q_ 0 3 ° N f �' 7' C t��D C N v O Q c fl O 0 _ _ _ r- AND - CD o0 � Q W CD r Q o ° 0 ° cn v- N C O N 0 m Y O w m I (' o Q_ m 7; 7 'nT' � I ' I I I m m ®a p- •- I o I I l❑ a o -o o ° m Z W W O T T n 7o m m C' a Q FL c CD m ° m to m n o a O n m = o < p v CL ::E m C 0 D 0 7 y 0- G1 0 ' - - _ _ _ r- n0 O m D Q_ O ° 0 ° cn ° O N 0 m Y 70 I (' o Q_ m 7; 7 'nT' to m Q n D ID a 3 Q °° o° Y O z e m z I z r° m --i to O r to C C C C C C N n o Z o o L>n m < p v no, w 0 D m O y 0- G1 0 ' - - _ _ _ n0 O 7 7 O ° lfl ° cn ° O N 0 m 70 ° (' o Q_ m 7; 7 'nT' to m Q n D ID a 3 Q °° o° i o� O Q�? o� 3 O m r N O `2 O ° 0 CD Q Q_ H =_ -� m °- a- m 7 0 1 x- 7 n 0 0 Z N O p m 0 C N m O j o_ 0 °' °_ O T Q 0 p c , Q 0 S ° 0 O Q_ = 3 O I ° 3 � Q O o n m Q_ f O N y 7 °- ,z (D Q 1411 N T Q_ ` Q n m N� �°+D 7 S C N .n m O N N m n m m 70 � m S G p O Q- N Q O C O Ia O 7 Q io W �^p O ° 7 Q 7 p r 1 n 7 Q 0 r W m o Ql m 1 H W x m ° a o C. C 0 c 0 r m c°D O° O n °s m o r : m o m O �Q O° r a g cn m v n m C — I7 r m ° r i m N n p c o N N ID �i r m C m m m C m C m N x N N o r C C a I� m m o g e ®� e o ❑• o o I ® O ®® I t i i i l i I 7 V) D z O D Sv rn v Z v rn D r ME 11 dy yp dg nI m G, O Z Z Oi A. I I I r V1 N DD V 01 W O w !� 00 10 m O0 z m vZ W X 03 v � m Gl to rFi r c N m C7 D r N rn O z OVA X w I W w I — rfi O � I r v CA D CD o N + O O m O o N 00 Z Z ° .-1Z rN p G) 1 � � 02 D m A N + Nr n 00 00 W v 00 m W 2 Om -ia m-fa D-1a -1a �10 z O N C zvDV D� vDV n D'Ov IO N ^' N x r rz z rz c N m C7 D r N rn O z OVA X w I W w I — rfi O � I r v CA D CD o m N + O O m O o N 00 Z Z ° .-1Z < p G) 1 � � 02 D m O + Nr n 00 00 W v 00 m W 2 Om 1-4 REVISIONS z 0 O c -I m N m 0 W 0 N C7 m < � w w O Dv y v D a D 2 2m�a -ia m-fa D-1a -1a r < w C zvDV D� vDV MDm D'Ov IO N ^' D x r rz z rz az w z mm 3 m w D oD< DD D wD< DD DD m z m C) D -i a m<D vma <v my m<D vma <T m� <T rnv n m D a m �D Do ..D Do Do O T < a zz00 mX ZOO CD 0x w m -1 m m y r S mm mDa� mm m m w O aw Dam aw D a� D N r D z C v <Dx D <Dx D v T v ivmD m mMD mD m < m S D w N 0v O D w w o v N O v o D T m w r .1. T w z T x 1= T w ~ D °fir r z m a m m� QIr i> z ' D m rA~ Jr �N� Or0 r ' s m wr0 wmz wo r� wo wo mwz xwo '0 0 wz wo r~ mo wo O W c z Dc~ vz mvmf v� v� Cn 2 mm vmm mm mm m w m N O O w m O a O w Z C w O w m O W O a D p r 2 O 1 z w z D <w <T m D z <n o <m v <w o o m o m v D z z v moo m c o m v o D a T a -1vw v C v vo y0 n O m � 2 v xmm a a w xmc as zc a n o m a m D m A M v { w w rn som mj Om Lz'r DvW m -1 o m =m r r DD -44 W �I w� 10 O O z0 v I ,-o rn D 01 O +_ I O r OR W D ^' C) 00 z wW C.)? °off rn c tn m -v C7 D r N m n --I O z -W �I \J N r O m m O 0 o m m � w w O y N m mmvg y r � IO N N (1 m N nT J O n IF7 Z m m N �p N �o v N Z1 W ull O 00 N r r DD -44 W �I w� 10 O O z0 v I ,-o rn D 01 O +_ I O r OR W D ^' C) 00 z wW C.)? °off rn c tn m -v C7 D r N m n --I O z -W �I \J N r O m m V Z m f� �00 L, A D J =" N r , N 1 fN m N N � x lm „ H �_ C� Z IQ n� IN O N Z V m Z IO � 00 O o m O 3 w Z W r r DD 60 F.) W O w O O O O O 00 DD O UI V 014 O O 00 c m C7 D r m m n O z z O Ln 00 a 0 o 0 1 OD a mm I pZ V z n z 0 Z3 mmro� p' o O 0 o m m � w w O y N mmvg y m f� �00 L, A D J =" N r , N 1 fN m N N � x lm „ H �_ C� Z IQ n� IN O N Z V m Z IO � 00 O o m O 3 w Z W r r DD 60 F.) W O w O O O O O 00 DD O UI V 014 O O 00 c m C7 D r m m n O z z O Ln 00 a 0 o 0 1 OD a mm I pZ V z n z 0 Z3 mmro� p' o m Z IO � 00 O o m O 3 w Z W r r DD 60 F.) W O w O O O O O 00 DD O UI V 014 O O 00 c m C7 D r m m n O z z O Ln 00 a 0 o 0 1 OD a mm I pZ V z n z 0 Z3 mmro� p' o r r DD 60 F.) W O w O O O O O 00 DD O UI V 014 O O 00 c m C7 D r m m n O z z O Ln 00 a 0 o 0 1 OD a mm I pZ V z n z 0 Z3 mmro� p' o 711 dy p h dg 30 m 5 4 00 o � o s O C C m z z T N A m m cv 1 N A r 21 m O m N m r m v m w F � _ > m C = N N m m W REVISIONS DESIGN REVISIONS SEPTEMBER 28 2011 WIDENED THE CORED SLAB BRIDGE DECK BY 3 FEET EXTENDED THE GUARDRAIL AND SHOULDER BERM GUTTER TO STATION L 13 80 ON W REVISION DECEMBER 21 2011 REVISED EXISTING RIGHT OF WAY ON PARCEL NO 1 PER UPDATED SURVEY FROM LOCATION AND SURVEYS AND CHANGED PROPERTY OWNER NAME DO N / / I / 00 n S x � ^ x T x } x .x x � T � m m � O1 } S 7n O� x x I of a T T T I x T r I 1V x T T 3r } 02 31 T T I 2 x n9 T x x (N a x X/ x Tl } 1 # 1 x � I x 1 T T I i I 1 � it � � �j / I I 1 Ito I a} } x } } z T TA > y n } S NGLETARY MILL RANCH x NCH OBSCURED x } x is x >s x T � T T 1 } } x } } T T T T } } } x � I � � x t Z I � I � x x I T � x I T lr ^v I 19 T } 3 T '0 � x y 4w_}01' b i V I O IO tz t2l Z b h y ti a � + tz V rzo m p C) � � 2 �rn k f it n 1 g$NvUl til y O y B a s B 11 11 to C) ��N y�o 2 � � � g yb\ C a n O v Z° O F m0 z z m m z o AO Pn -i Lam' Z Z p 0 n� 50 p �° C 1 > b o 6o N 0 c. � � s ,* y i4Sj 2 I� 77 m I Ouoi ^' NC nm,m,0 n } \ I } � Io P�� } } } x x —sr m x � ^ x T x } x .x x � T � m m � O1 } S 7n O� x x I of a T T T I x T r I 1V x T T 3r } 02 31 T T I 2 x n9 T x x (N a x X/ x Tl } 1 # 1 x � I x 1 T T I i I 1 � it � � �j / I I 1 Ito I a} } x } } z T TA > y n } S NGLETARY MILL RANCH x NCH OBSCURED x } x is x >s x T � T T 1 } } x } } T T T T } } } x � I � � x t Z I � I � x x I T � x I T lr ^v I 19 T } 3 T '0 � x y 4w_}01' b i V I O IO tz t2l Z b h y ti a � + tz V rzo m p C) � � 2 �rn k f it n 1 g$NvUl til y O y B a s B 11 11 to C) ��N y�o 2 � � � g yb\ C a n O v Z° O F m0 z z m m z o AO Pn -i Lam' Z Z p 0 O IO tz t2l Z b h y ti a � + tz V rzo m p C) � � 2 �rn k f it n 1 g$NvUl til y O y B a s B 11 11 to C) ��N y�o 2 � � � g yb\ C a n O v Z° O F m0 z z m m z o AO Pn -i Lam' Z Z p 0 yb\ C a n O v Z° O F m0 z z m m z o AO Pn -i Lam' Z Z p 0