Loading...
HomeMy WebLinkAbout20210099 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210214Strickland, Bev From: laserfiche@ncdenr.gov Sent: Sunday, February 14, 2021 12:01 AM To: brady.dodd@usda.gov Cc: Turlington, Chad Subject: Pre -Filing Time Clock has been reached for Moccasin Creek Stream Enhancement Project - 20210099 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Moccasin Creek Stream Enhancement Project that you submitted on 1/14/2021. The ID number for that project is 20210099, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored ID#* 20210099 Version* 1 Regional Office* Fayetteville Regional Office - (910) 433-3300 Reviewer List* Chad Turlington Pre -Filing Meeting Request submitted 1/14/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Brady Dodd brady.dodd@usda.gov Moccasin Creek Stream Enhancement Project James Melonas, USDA Forest Service, National Forests in North Carolina Montgomery Street Address 160 Zillicoa Street Address Line 2 aty Asheville Rbstal / Zip Code 28801 Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No State / Frovince / Region NC Country USA Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below. * The proposed work is intended to improve the health of the stream ecosystem by improving channel stability and habitat quality, along with improving riparian and streamside vegetation conditions. This will be accomplished with the construction of instream structures using trees found on site fashioned in the channel to protect eroded stream banks and create high quality aquatic habitat features. The desired condition is to have high quality riparian areas and aquatic habitat features that maintain hydrologic function, floodplain connectivity, enhance stream stability, and minimize erosion. The proposed action is needed at this time, at these locations, because taking no action would lead to further erosion and sedimentation which, in turn, would cause further damage to aquatic habitat and the maintenance of state designated uses. The following channel enhancement and stabilization techniques are planned in this reach to improve degraded conditions and reverse the trend to improving conditions: 1) With a medium sized trackhoe construct channel features, e.g. point bars and floodplain (bankfull benches) where appropriate. Access for the equipment would be from a Forest Service road and off -road on the floodplain without construction of a road bed. Only vegetation would be cleared for equipment access and any compaction would be obliterated as the equipment leaves the area and access would be blocked. 2) Fell live trees from within 100 feet of the stream and incorporate large wood structures into the channel at designed locations to enhance channel stability and aquatic habitat diversity, e.g. riffles and pools. 3) Erosion control measures would be implemented on all disturbed soil. Please give a couple of dates you are available for a meeting. 1 /21 /2021 1 /28/2021 Please attach the documentation you would like to have the meeting about. Moccasin Crk StrmEnhmmnt_ProjectDescriptio... 1.66MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 1/14/2021