HomeMy WebLinkAbout20210099 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210214Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Sunday, February 14, 2021 12:01 AM
To: brady.dodd@usda.gov
Cc: Turlington, Chad
Subject: Pre -Filing Time Clock has been reached for Moccasin Creek Stream Enhancement
Project - 20210099 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Moccasin Creek
Stream Enhancement Project that you submitted on 1/14/2021. The ID number for that project is 20210099, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored
ID#* 20210099
Version* 1
Regional Office* Fayetteville Regional Office - (910) 433-3300
Reviewer List* Chad Turlington
Pre -Filing Meeting Request submitted 1/14/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Brady Dodd
brady.dodd@usda.gov
Moccasin Creek Stream Enhancement Project
James Melonas, USDA Forest Service, National Forests in North Carolina
Montgomery
Street Address
160 Zillicoa Street
Address Line 2
aty
Asheville
Rbstal / Zip Code
28801
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F- 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
State / Frovince / Region
NC
Country
USA
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below. *
The proposed work is intended to improve the health of the stream
ecosystem by improving channel stability and habitat quality, along
with improving riparian and streamside vegetation conditions. This will
be accomplished with the construction of instream structures using
trees found on site fashioned in the channel to protect eroded stream
banks and create high quality aquatic habitat features.
The desired condition is to have high quality riparian areas and
aquatic habitat features that maintain hydrologic function, floodplain
connectivity, enhance stream stability, and minimize erosion. The
proposed action is needed at this time, at these locations, because
taking no action would lead to further erosion and sedimentation
which, in turn, would cause further damage to aquatic habitat and the
maintenance of state designated uses.
The following channel enhancement and stabilization techniques are
planned in this reach to improve degraded conditions and reverse
the trend to improving conditions:
1) With a medium sized trackhoe construct channel features, e.g.
point bars and floodplain (bankfull benches) where appropriate.
Access for the equipment would be from a Forest Service road and
off -road on the floodplain without construction of a road bed. Only
vegetation would be cleared for equipment access and any
compaction would be obliterated as the equipment leaves the area
and access would be blocked.
2) Fell live trees from within 100 feet of the stream and incorporate
large wood structures into the channel at designed locations to
enhance channel stability and aquatic habitat diversity, e.g. riffles
and pools.
3) Erosion control measures would be implemented on all disturbed
soil.
Please give a couple of dates you are available for a meeting.
1 /21 /2021
1 /28/2021
Please attach the documentation you would like to have the meeting about.
Moccasin Crk StrmEnhmmnt_ProjectDescriptio... 1.66MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 1/14/2021