Loading...
HomeMy WebLinkAbout20210089 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210213Strickland, Bev From: laserfiche@ncdenr.gov Sent: Saturday, February 13, 2021 12:01 AM To: karrance@hazenandsawyer.com Cc: Goss, Stephanie Subject: Pre -Filing Time Clock has been reached for Lake Michie and Little River Raw Water Pump Station Improvements - 20210089 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Lake Michie and Little River Raw Water Pump Station Improvements that you submitted on 1/13/2021. The ID number for that project is 20210089, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20210089 Version* 1 Regional Office* Raleigh Regional Office - (919) 791-4200 Reviewer List* Stephanie Goss Pre -Filing Meeting Request submitted 1/13/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Keven Arrance karrance@hazenandsawyer.com Lake Michie and Little River Raw Water Pump Station Improvements City of Durham Durham Street Address Attn: Lori Montgomery Address Line 2 1600 Mist Lake Drive aty Durham Rbstal / Zip Code 27704 Is this a transportation project? * r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit F Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Please list all existing project ID's associated with this projects.* RRO #20-238 State / Frovince / Region NC Country USA Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below.* The project consists of improvements to the City of Durham's raw water pumping stations at Lake Michie and Little River Reservoir. See below for details regarding the proposed work at each pump station. Little River PS The project consists of upgrades to the existing raw water pumping station and raw water intake, as well as construction of a new water service line along the entrance road. The majority of the upgrade work will be performed within the existing infrastructure. Components of the existing gates on the raw water intake, accessible from the operating deck, will be replaced from the exterior with minor adjustments to the drain gate being performed by divers in the lake. Furthermore, spillway roller gate and stop log monorail components, will be replaced from the exterior. Impacts regulated under Section 401 will be restricted to replacement of components of the existing gates by divers. Lake Michie PS The project consists of upgrades to the existing raw water pumping station and raw water intake, installation of a new water service line to the pump station, and installation of a septic system and associated piping and pumping system to connect the pump station's facilities to the septic field. The majority of the upgrades will be fully contained and constructed within the existing infrastructure. Work on the intake will necessitate maintenance dredging in the lake to remove accumulated sediment surrounding the intake. Sediment removal is not expected to extend beyond 200 feet from the intake structure and will be the minimum necessary to allow the intake work to be completed. Following the dredging, a coffer cell will be installed around the intake in order to provide and maintain a dry work area. The intake upgrades consist of providing new bar screens, new multi- level withdrawal capabilities, a low-level intake for emergency use, and a low-level outlet/drain for the lake while maintaining regulated, minimum release volumes. The intake upgrades will increase the capacity of the intake, in preparation for possible future increased demands, but the new pumps installed in this project will not have the capacity to support the increased intake capacity at this time. Please give a couple of dates you are available for a meeting. 1 /19/2021 1 /20/2021 1 /21 /2021 1 /25/2021 1 /26/2021 Please attach the documentation you would like to have the meeting about. 60% Design - Drawings EXCERPT.pdf 1.25MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 1/13/2021