Loading...
HomeMy WebLinkAboutNCG210272_NOD_20210212ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality February 12, 2021 CERTIFIED MAIL: 7019 0700 0000 8867 2755 RETURN RECEIPT REQUESTED WM Cramer Lumber Company Inc. Attn: Wendell M. Cramer 3486 Tex's Fish Camp Road Connelly Springs, North Carolina 28612 Subject: NOTICE OF DEFICIENCY (NOD-2021-PC-0055) NPDES Stormwater General Permit NCG210000 Certificate of Coverage NCG210272 WM Cramer Lumber Co. Incorporated Burke County, North Carolina Dear Mr. Cramer: On February 2, 2021 staff from the Asheville Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR), conducted a compliance inspection for the WM Lumber Company Inc. facility located at Tex's Fishcamp Road, Burke County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. The inspection and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG210000 under Certificate of Coverage NCG210272. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as a tributary of Drowning Creek, a Class WS-IV waterbody in the Catawba River Basin. As a result of the inspection, the following deficiencies are noted: 1) Stormwater Pollution Prevention Plan (SWPPP) A Stormwater Pollution Prevention Plan (SWPPP) has not been developed, recorded, or properly implemented. D_E North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources ��Asheville Regional Office 12090 U.S. Highway 701 Swannanoa, North Carolina 28778 s mw um.z a I 0./'828.296.4500 Notice of Deficiency WM Cramer Lumber Company February 12, 2021 Page 2 of 2 2) Qualitative Monitoring Qualitative monitoring has not been conducted and recorded in accordance with permit requirements. 3) Analytical Monitoring Analytical monitoring has not been conducted and recorded in accordance with permit requirements. Requested Response You are asked to respond to this office, in writing, within 30 calendar days from receipt of this notice. Your written response should include a reasonable explanation as to why the above stated deficiencies have occurred, as well as a Plan of Action to prevent them from recurring. Action Items Immediately begin efforts to comply with General Permit NCG210000, including but not limited to: 1. Develop, implement, and maintain an acceptable SWPPP. 2. Begin monitoring at all outfalls. 3. Corrective action for each deficiency noted. Thank you for your attention to this matter. This office requires that the deficiencies, as noted above and detailed in the enclosed inspection report, be properly resolved. Failure to address the deficiencies could result in the issuance of a Notice of Violation, which could be subject to a civil penalty assessment of up to $25, 000 per day for each violation. Should you have any questions or concerns, please contact Isaiah Reed or myself at (828) 206-4500. Sincerely, Staley Aik a Regional E meer Land Quality Section Enclosure: Inspection Report ec: Alaina Morman, Environmental Specialist Alaina.mormanng,ncdenr.gov Compliance Inspection Report Permit: NGG210272 Effective: 08/01/18 Expiration: 07/31/23 Owner: WM Cramer Lumber Company Inc SOC: Effective: Expiration: Facility: W M Cramer Lumber Co Incorporated County: Burke Tex's Fishcamp Rd Region: Asheville Hildebran NC 28637 Contact Person: Randy Sheffield Title: Phone: 828-397-7481 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 02/02/2021 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time 02:10PM Exit Time: 03:10PM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Timber Products Stormwater Discharge COC Facility Status: ❑ Compliant M Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG210272 Owner - Facility: WM Cramer Lumber Company Inc Inspection Date: 02/02/2021 Inspection Type :Compliance Evaluation Reason for Visit: Routine Inspection Summary: On February 2, 2021 this facility was inspected on site. I met with Randy Sheffield on site. During the inspection, the following deficiencies were noted: 1) No Stormwater Pollution Prevention Plan has been maintained on site. The permittee is directed to immediately create and implement a Stormwater Pollution Prevention Plan on site as outlined in the NCG210000 General Permit. 2) No Analytical Monitoring has been conducted in accordance with the NCG210000 General Permit. The permittee shall immediately begin monitoring efforts as outlined in the NCG210000 General Permit. 3) No Qualitative Monitoring has been conducted in accordance with the NCG210000 General Permit. The permittee shall immediately begin monitoring efforts as outlined in the NCG210000 General Permit. Please give the above items your immediate attention. This facility will be reinspected on or after April 6, 2021. If the above items are not addressed, further action will be taken. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG210272 Owner - Facility: WM Cramer Lumber Company Inc Inspection Date: 02/02/2021 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ N ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ 0 ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ 0 ❑ ❑ # Does the Plan include a BMP summary? ❑ 0 ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ 0 ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ 0 ❑ ❑ # Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ E ❑ ❑ # Is the Plan reviewed and updated annually? ❑ E ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ E ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: No Stormwater Pollution Prevention Plan has been created or maintained on site. Qualitative Monitorinq Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑ Comment: No Qualitative Monitoring has been conducted on site. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ E ❑ Comment: No Analytical Monitoring has been conducted on site. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment: Page 3 of 3