Loading...
HomeMy WebLinkAbout20201862 Ver 1_More Info Received_20210210Strickland, Bev From: Carrie Caviness <carrie.caviness.1 @gmail.com> Sent: Wednesday, February 10, 2021 3:53 PM To: Fuemmeler, Amanda J CIV (US); Homewood, Sue Cc: Leslie, Andrea J Subject: [External] Re: 404 PCN Application Submittal - Walker Pond Maintenance Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good afternoon - In regard to the PCN submission for the Walker Pond Maintenance Project (ID20201862), the landowner and engineer have decided to maintain a smaller impounded area of the pond with a new weir and plant the remaining area as a wetland through New River Conservancy's Riverbuilder program. There will be no complete dewatering of the pond, nor any earthwork to restore the inflowing stream (due to thickness of accumulated sediment). It seems like now the project will qualify under the NW3 without reporting. How do I withdraw the application? Is this email sufficient? Thanks for your assistance. Carrie Carrie Caviness, PhD Interface Environmental Consulting, LLC. 476 Hidden Pond Rd Boone, NC 28607 (919) 656-4543 On Mon, Feb 1, 2021 at 12:57 PM Carrie Caviness<carrie.caviness.l(cr��,gmail.com> wrote: Good afternoon - In regard to the PCN submission for the Walker Pond Maintenance Project (I1320201862), the landowner and engineer have decided to do a partial dewater and then restore a section of stream (to upstream conditions) and a section of wetland at the deepest part of the pond that will outflow over a low weir to downstream. Therefore, I will be submitting plan designs and amending the permit application to a NW27/GC4134 in the next couple weeks. Thank you for your patience. Carrie Caviness Carrie Caviness, PhD Interface Environmental Consulting, LLC. 476 Hidden Pond Rd Boone, NC 28607 (919) 656-4543 ---------- Forwarded message --------- From: <laserfiche@ncdenr.gov> Date: Tue, Jan 19, 2021 at 4:57 PM Subject: 404 PCN Application Submittal - Walker Pond Maintenance To:<carrie.caviness.l(cr��,gmail.com>, <salreyl947@gmail.com> Your pre -construction notification application has been submitted to the Wilmington District US Army of Corp of Engineers. The time clock for the review process will begin on the first business day of the submittal or the next business day if submitted on a weekend or holiday. If this pre -construction notification was not submitted to the correct field office, the time clock will not start until the correct field office receives the application. If the application is incomplete a project manager will be contacting you to request more information. If you have any questions, or are experiencing any issues with the PCN online form, please contact Bev Strickland at Bev.Strickland(cr�,ncdenr.gov. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses aren't monitored. Q