Loading...
HomeMy WebLinkAbout20120316 Ver 1_Application_20120329STATE OF NORTH CAROLINA 0� Nt� g �� < >0/ DEPARTW NTT OF TRANSPORTATION BEvERLY EAvEs PERDUE EUGENE A Corry , JR GOVERNOR SECRETARY March 26, 2012 Ms Lon Beckwith US Army Corps of Engineers 151 Patton Avenue, Room 208 6 Asheville, NC 28801 -5006 Subject Nationwide Pernnt #14 SR 2144, McDans Road State Project No 13C 01 1171 (DWQ Minor Permit Fee $240) Buncombe County NC Dear Ms Beckwith I have enclosed a straight -line diagram with erosion control plan, a PCN application for NWP #14, and a vicinity map relative to the proposed secondary road project on SR 2144 McDans Road Buncombe County NC We propose to replace /extend one (1) pipe culvert on an unnamed tributary (UT) to Gentry Branch Total culvert extension will be 10 linear feet with a temporary impervious dike for dewatenng during installation The UT to Gentry Branch is an approximately less than 1 foot wide stream with a predominately sand and gravel substrate Existing channel morphology will be maintained upstream and downstream of the culvert The culvert will be placed below existing streambed elevation whenever possible Riparian vegetation will be reestablished along disturbed areas associated with the culvert extensions Stormwater will be diverted through grass -lined ditches or vegetated buffers prior to entering streams No effect on federally listed species (threatened or endangered) or their habitats is anticipated As a part of the 401 Certification process, a copy of the application will be forwarded to the NC State Historic Preservation Office as required by Section 106 of the National Historic Preservation Act of 1966 and GS 121 -12(a) Division Thirteen Office Post Office Box 3279 Asheville NC 28802 Phone 828/251 -6171 Office of the Division Engineer Fax 828/251 -6709 www ncdot gov /doh/operations /division13 Ms Lon Beckwith Page —2 SR 2144, Buncombe County March 26, 2012 By copy of this letter, we request David McHenry, North Carolina Wildlife Resources Commission Coordinator, to comment directly to the Corps concerning the permit request By copy of this letter we are asking Ed Ingle, Area Roadside Field Operations Engineer, to comment on the above project The UT to Jimmy Branch is classified as WS -II, HQW By copy of this letter, I am forwarding four (4) copies of the application package to Brian Wrenn NC Division of Water Quality, 401/Wetland Unit and an additional copy to Mike Parker, NC DWQ Asheville Regional Office for review and comment Please charge the application fee of $240 00 to WBS element # 13C 011171 Please forward comments directly to the Corps with copy to Division 13 Environmental Officer Your earliest consideration for this request would be greatly appreciated If you have any questions or information needs, please contact me at (828) 251 -6171 Sincerely, 0�& 40 iq"t� Roger D Bryan Division 13 Environmental Officer Enclosures cc J J Swam Jr P E Chad Bandy P E Ed Ingle, CPESC David McHenry Mike Parker Brian Wrenn O�OF W A T�c9OG -c M Office Use Only - Corps action ID no DWQ probed no Form Version 13 Dec 10 2008 k-x Page 1 of 10 PCN Form — Version 1 3 December 10 2008 Version Pre - Construction Notification (PCN) Form A Applicant Information 1 Processing la Type(s) of approval sought from the Corps X Section 404 Permit ❑ Section 10 Permit lb Specify Nationwide Permit (NWP) number 14 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? X Yes ❑ No 1 d Type(s) of approval sought from the DWQ (check all that apply) X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes X No For the record only for Corps Permit ❑ Yes X No 1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ❑ Yes X No 1 g Is the protect located in any of NC s twenty coastal counties If yes answer 1 h below ❑ Yes X No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes X No 2 Project Information 2a Name of project SR 2144 McDans Road 2b County Buncombe 2c Nearest municipality / town Weaverville 2d Subdivision name N/A 2e NCDOT only T I P or state protect no 13C 011171 3 Owner Information 3a Name(s) on Recorded Deed North Carolina Department of Transportation 3b Deed Book and Page No N/A 3c Responsible Party (for LLC if applicable) N/A 3d Street address N/A 3e City state zip N/A 3f Telephone no N/A 3g Fax no N/A 3h Email address N/A Page 1 of 10 PCN Form — Version 1 3 December 10 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is North Carolina Department of Transportation 4b Name J J Swain Jr P E Division Engineer 4c Business name (if applicable) N C Department of Transportation 4d Street address 55 Orange Street P O Box 3279 4e City state zip Asheville NC 28802 4f Telephone no 828- 251 -6171 4g Fax no 828 -251 -6394 4h Email address yallenancdot goy 5 Agent/Consultant Information (if applicable) 5a Name N/A 5b Business name (if applicable) N/A 5c Street address N/A 5d City state zip N/A 5e Telephone no N/A 5f Fax no N/A 5g Email address N/A Page 2 of 10 B Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) N/A lb Site coordinates (in decimal degrees) Latitude 35 75823 N Longitude 82 53315°W 1c Property size 0 82 acres 2 Surface Waters 2a Name of nearest body of water (stream river etc ) to proposed project UT to Gentry Branch 2b Water Quality Classification of nearest receiving water WS-II HQW 2c River basin French Broad 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Existing gravel secondary road 3b List the total estimated acreage of all existing wetlands on the property 00 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 400 for 1 stream and 150 for impacted stream 3d Explain the purpose of the proposed project Increase the typical section and pave the secondary road 3e Describe the overall project in detail including the type of equipment to be used Grade drain base and pave the roadway Extend one pipe on jurisdictional stream Equipment used mll include excavators trucks and graders 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments field confirmed by NCDOT ❑ Yes X No ❑ Unknown 4b If the Corps made the jurisdictional determination what type of determination was made? ❑ Preliminary ❑ Final 4c If yes who delineated the jurisdictional areas? Name (if known) N/A Agency /Consultant Company Other N/A 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5 Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes X No ❑ Unknown 5b If yes explain in detail according to help file instructions 6 Future Project Plans 6a Is this a phased project? ❑ Yes X No 6b If yes explain Page 3 of 10 PCN Form —Version 13 December 10 2008 Version C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands X Streams tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ — non-404 other) (acres) Temporary W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑DWQ 2g Total wetland impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) or intermittent DWQ — non -404 width (linear Temporary (T) (INT)? other) (feet) feet) S1 X P ❑ T Pipe Culvert UT to Gentry Branch X PER ❑ INT X Corps X DWQ 05 10 S1 ❑ P X T Dewatenng UT to Gentry Branch X PER ❑ INT X Corps X DWQ 05 10 S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 20 31 Comments 10 feet of permanent and 10 feet of temporary impacts at same location Page 4 of 10 PCN Form — Version 1 3 December 10 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then indi ually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑ PEI T 4f Total open water Impacts 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed, then complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes permit ID no 51 Expected pond surface area (acres) 51 Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a ❑ Neuse ❑ Tar Pamlico ❑ Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary impact required 61 ❑P ❑T El Yes ❑ No B2 ❑P ❑T ❑Yes ❑ No B3 ❑P ❑T ❑Yes ❑ No 6h Total buffer Impacts 61 Comments Page 5 of 10 D Impact Justification and Mitigation 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Minimum pipe length used to obtain needed typical section and shoulder width for safety 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques N/A 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ❑ No 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes which mitigation option will be used for this project? ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4 Complete if Making a Payment to in lieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 13 December 10 2008 Version 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes X No 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 15 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) 7 6h Comments Page 7 of 10 E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan 1a Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? El Y es X No 1b If yes then is a diffuse flow plan included? If no explain why Comments ❑ Yes No ❑ 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? N/A 2b Does this project require a Stormwater Management Plan? X Yes ❑ No 2c If this project DOES NOT require a Stormwater Management Plan explain why NC DOT Project 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan The project will use BMP s to the Maximum Extent Practicable (MEP) in compliance with NCDOT s NPDES Permit No 000250 Post Construction Stormwater Program ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? X DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local government s jurisdiction is this project? N/A ❑ Phase II 3b Which of the following locally implemented stormwater management programs ❑ NSW apply (check all that apply) ❑ USMP ❑ Water Supply Watershed ❑ Other N/A 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties 4a Which of the following state - implemented stormwater management programs apply ❑ HQW ❑ ORW (check all that apply) ❑ Session Law 2006 -246 ❑ Other N/A 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 13 December 10 2008 Version F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /statenocal) funds or the ® Y es ❑ No use of public (federal /state) land? 1 b If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval letter) ❑ Yes ❑ No Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after the fact permit application? ❑ Yes ® No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes No additional development which could impact nearby downstream water quality 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance wrath the most recent DWQ policy If you answered no provide a short narrative description 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility N/A Page 9 of 10 PCN Form — Version 1 3 December 10 2008 Vernon 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will thi? project occur in or near an area with federally protected species or [I Yes No habitat 5b Have you checked with the USFWS concerning Endangered Species Act ❑Yes ®No impacts 5c If yes indicate the USFWS Field Office you have contacted El Raleigh ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? field survey 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? Current Maps/Database 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? Current Maps /Database 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA- designated 100 -year floodplain? --Fo Yes ® No 8b If yes explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? Current FEMA Maps Roger Bryan 26 Mar 12 , 0 'g� Applicant/Agent s Printed Name ppiicant/Ag s Signature Date (Agent's signature is valid only rf an authonzation letter from the applicant is provided Page 10 of 10 ONIM N C DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS SECONDARY ROAD SURVEY SUBJECT SR 2144, McDaris Rd LOCATION From SR 2181 To E O M WORK TYPE Grade, Drain, Widen and Pave WORK ORDER 13 C 011171 PRIORITY SPP #5 COUNTY Buncombe TOWNSHIP Flat Creek DATE 3/8/2012 SCALE 1" =50' NOTES 45' R/W LENGTH 792', 15Mi PREPARED BY JSA/CAP -ir PIPE DATA SR 2144, McDans Rd County Buncombe WORK ORDER STATION PRESENT SIZE PROPOSED SIZE NOTES 10 +19 40 x18 CMP Cross Pipe 11 +30 30 x15 CMP 40 x18 CMP Cross Pipe 15 +40 30 x15 CMP Dnve Pipe 15 +93 40 x15 CMP Dnve Pipe 15 +98 30 x24 CMP Dnve Pipe 16 +28 0 x15 CMP 0 x18 CMP Cross Pipe s• L 1 16 +31 8 PVC Pipe 16 +34 50 x15 CMP Dnve Pipe 17 +58 30 x15 CMP Dnve Pi Cs. ro-es S i512A 3CES WH ITT 1 +111 LOIS Lr-,j P: ; Mr Y IAauxNTA +� 1 08 - 12,a 03 N e� 4- � +31 F1C�iJ AOU A DCffVF1- O 06- -wis V,-,-36 36 t / * Install low &or endpoint measures in TSF $ 6 * Construct using the 30 day option ..� * All wattles require PAM * All basins located at a 5% or greater grade I �t� must be tiered 1 v i r I I\4/ b i f 9 6 I 1 � 3 X2.3 k2 i yP5 $ BAVIV Wlco,k frBC-R aAFFLGs I YPt A AOC C CIJkCK yml 3 x7 X2 TYPE B eAS ,AJ wlcooe C/Br'R BAFj�cES Ty,Ot A Por r GNHGK p� -y7�6 'ter✓ � ��* SR_ 2181 i {I I �EIP - I 61 f � 3 X7 X 2 TYPE B BASIN I 1 N rrs�R a F4 E5 /TyPr A 1?Ur-C Gti =4C i I — 3DXl5'Cr t t Ra. P i 1 I Awj STuRg7" O I l as -.2000 ot, - � N N 3 � � 1 it t Sx7 X1 iyo --B ?t &l w /CGyK r E er K of `r, i� TyPC A ROCK LN -cCK peoP 40 -Z C, P SR_ 2181 r, �r y ),- - A t C- ) ) /57 P,- 116 I . 'I I f 'T �� ; � �CS) (ID7 !U c� —2s �n�a ` 1 86 ti J * Install low & or endpoint measures in TSF * Construct using the 30 day option ' * All wattles require PAM d * All basins located at a 5% or greater grade must be tiered � r ` ` 3X/3 YL ppTYBBPti � ��` ✓ RAP s° "`S cmP I cmP — 7�oP yo Y A� r PROP 3a x }s CMP 1 � N N C C� <1 Er _ Buncombe Counfiy 1 � , C. / / / s/ a a/ 2137 zip rr • ^..F: .tiYi :.:.lam.; }(� 1- ,hl - ,; -y; � �,'_� -• -' Wit, / � � - � ;a: � - k' • TJ�_f^t � `ti eft �:� �•,IMr � {1� I •��'�y ��I� H'� T�� -rte.' � t�� �r ?� ' � t to ,t f �• 7. I1� ty� ?�' --,lam fr S r 26. 2012 g _ �� ,nK ` I • f • �^� ^" �. ter°^ .,, 1 r V' �? ������ � �� �`��rP • �� �� �� ,� - •ice ���' ��9 \` r� ��" ; � ��.� ,. fi £ �M'�'E •N� ? tr 1 eta x�� a _ MP AXI VVdo 0 1p jF t r qw r � G 138 - ,,� _' �.4�? ""� � — � _ `S'�•+'r 2 It w.".ti � • + "T N � � r � �6ti � / �• '1 IN f S � r Name MARS HILL Location 035 7574305 N 082 5388428 W Date 3/26/2012 Caption SR 2144 McDans Road Scale 1 inch equals 1000 feet Buncombe County NC CopyngM (C)1998 Wptech Inc.