HomeMy WebLinkAbout20120316 Ver 1_Application_20120329STATE OF NORTH CAROLINA
0�
Nt� g �� < >0/
DEPARTW NTT OF TRANSPORTATION
BEvERLY EAvEs PERDUE EUGENE A Corry , JR
GOVERNOR SECRETARY
March 26, 2012
Ms Lon Beckwith
US Army Corps of Engineers
151 Patton Avenue, Room 208 6
Asheville, NC 28801 -5006
Subject Nationwide Pernnt #14
SR 2144, McDans Road
State Project No 13C 01 1171 (DWQ Minor Permit Fee $240)
Buncombe County NC
Dear Ms Beckwith
I have enclosed a straight -line diagram with erosion control plan, a PCN application for
NWP #14, and a vicinity map relative to the proposed secondary road project on SR 2144
McDans Road Buncombe County NC
We propose to replace /extend one (1) pipe culvert on an unnamed tributary (UT) to
Gentry Branch Total culvert extension will be 10 linear feet with a temporary
impervious dike for dewatenng during installation The UT to Gentry Branch is an
approximately less than 1 foot wide stream with a predominately sand and gravel
substrate
Existing channel morphology will be maintained upstream and downstream of the
culvert The culvert will be placed below existing streambed elevation whenever
possible Riparian vegetation will be reestablished along disturbed areas associated with
the culvert extensions Stormwater will be diverted through grass -lined ditches or
vegetated buffers prior to entering streams
No effect on federally listed species (threatened or endangered) or their habitats is
anticipated
As a part of the 401 Certification process, a copy of the application will be forwarded to
the NC State Historic Preservation Office as required by Section 106 of the National
Historic Preservation Act of 1966 and GS 121 -12(a)
Division Thirteen Office Post Office Box 3279 Asheville NC 28802
Phone 828/251 -6171 Office of the Division Engineer Fax 828/251 -6709
www ncdot gov /doh/operations /division13
Ms Lon Beckwith
Page —2 SR 2144, Buncombe County
March 26, 2012
By copy of this letter, we request David McHenry, North Carolina Wildlife Resources
Commission Coordinator, to comment directly to the Corps concerning the permit
request
By copy of this letter we are asking Ed Ingle, Area Roadside Field Operations Engineer,
to comment on the above project The UT to Jimmy Branch is classified as WS -II, HQW
By copy of this letter, I am forwarding four (4) copies of the application package to Brian
Wrenn NC Division of Water Quality, 401/Wetland Unit and an additional copy to Mike
Parker, NC DWQ Asheville Regional Office for review and comment Please charge the
application fee of $240 00 to WBS element # 13C 011171 Please forward comments
directly to the Corps with copy to Division 13 Environmental Officer
Your earliest consideration for this request would be greatly appreciated If you have any
questions or information needs, please contact me at (828) 251 -6171
Sincerely,
0�& 40 iq"t�
Roger D Bryan
Division 13 Environmental Officer
Enclosures
cc J J Swam Jr P E
Chad Bandy P E
Ed Ingle, CPESC
David McHenry
Mike Parker
Brian Wrenn
O�OF W A T�c9OG
-c
M
Office Use Only -
Corps action ID no
DWQ probed no
Form Version 13 Dec 10 2008
k-x
Page 1 of 10
PCN Form — Version 1 3 December 10 2008 Version
Pre - Construction Notification (PCN) Form
A
Applicant Information
1
Processing
la
Type(s) of approval sought from the
Corps
X Section 404 Permit ❑ Section 10 Permit
lb Specify Nationwide Permit (NWP) number 14 or General Permit (GP) number
1c
Has the NWP or GP number been verified by the Corps?
X Yes
❑ No
1 d
Type(s) of approval sought from the DWQ (check all that apply)
X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification
❑ Yes X No
For the record only for Corps Permit
❑ Yes X No
1f
Is payment into a mitigation bank or in lieu fee program proposed for mitigation
of impacts? If so attach the acceptance letter from mitigation bank or in lieu
fee program
❑ Yes
X No
1 g
Is the protect located in any of NC s twenty coastal counties If yes answer 1 h
below
❑ Yes
X No
1h
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes
X No
2
Project Information
2a
Name of project
SR 2144 McDans Road
2b
County
Buncombe
2c
Nearest municipality / town
Weaverville
2d
Subdivision name
N/A
2e
NCDOT only T I P or state
protect no
13C 011171
3
Owner Information
3a
Name(s) on Recorded Deed
North Carolina Department of Transportation
3b
Deed Book and Page No
N/A
3c
Responsible Party (for LLC if
applicable)
N/A
3d
Street address
N/A
3e
City state zip
N/A
3f
Telephone no
N/A
3g
Fax no
N/A
3h
Email address
N/A
Page 1 of 10
PCN Form — Version 1 3 December 10 2008 Version
4
Applicant Information (if different from owner)
4a
Applicant is
North Carolina Department of Transportation
4b
Name
J J Swain Jr P E Division Engineer
4c
Business name
(if applicable)
N C Department of Transportation
4d
Street address
55 Orange Street P O Box 3279
4e
City state zip
Asheville NC 28802
4f
Telephone no
828- 251 -6171
4g
Fax no
828 -251 -6394
4h
Email address
yallenancdot goy
5
Agent/Consultant Information (if applicable)
5a
Name
N/A
5b
Business name
(if applicable)
N/A
5c
Street address
N/A
5d
City state zip
N/A
5e
Telephone no
N/A
5f
Fax no
N/A
5g
Email address
N/A
Page 2 of 10
B Project Information and Prior Project History
1 Property Identification
1a Property identification no (tax PIN or parcel ID)
N/A
lb Site coordinates (in decimal degrees)
Latitude 35 75823 N Longitude 82 53315°W
1c Property size
0 82 acres
2 Surface Waters
2a Name of nearest body of water (stream river etc ) to
proposed project
UT to Gentry Branch
2b Water Quality Classification of nearest receiving water
WS-II HQW
2c River basin
French Broad
3 Project Description
3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application
Existing gravel secondary road
3b List the total estimated acreage of all existing wetlands on the property
00
3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property
400 for 1 stream and 150 for impacted stream
3d Explain the purpose of the proposed project
Increase the typical section and pave the secondary road
3e Describe the overall project in detail including the type of equipment to be used
Grade drain base and pave the roadway Extend one pipe on jurisdictional stream Equipment used mll include
excavators trucks and graders
4 Jurisdictional Determinations
4a Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
Comments field confirmed by NCDOT
❑ Yes X No ❑ Unknown
4b If the Corps made the jurisdictional determination what type
of determination was made?
❑ Preliminary ❑ Final
4c If yes who delineated the jurisdictional areas?
Name (if known) N/A
Agency /Consultant Company
Other N/A
4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation
5 Project History
5a Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
❑ Yes X No ❑ Unknown
5b If yes explain in detail according to help file instructions
6 Future Project Plans
6a Is this a phased project?
❑ Yes X No
6b If yes explain
Page 3 of 10
PCN Form —Version 13 December 10 2008 Version
C Proposed Impacts Inventory
1 Impacts Summary
la Which sections were completed below for your project (check all that apply)
❑ Wetlands X Streams tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2 Wetland Impacts
If there are wetland impacts proposed on the site then complete this question for each wetland area impacted
2a
2b
2c
2d
2e
2f
Wetland impact
Type of jurisdiction
number —
Type of impact
Type of wetland
Forested
(Corps 404 10
Area of impact
Permanent (P) or
(if known)
DWQ — non-404 other)
(acres)
Temporary
W1 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W2 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W3 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W4 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W5 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W6 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑DWQ
2g Total wetland impacts
2h Comments
3 Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this
question for all stream sites impacted
3a
3b
3c
3d
3e
3f
3g
Stream impact
Type of impact
Stream name
Perennial
Type of jurisdiction
Average
Impact
number
(PER) or
(Corps 404 10
stream
length
Permanent (P) or
intermittent
DWQ — non -404
width
(linear
Temporary (T)
(INT)?
other)
(feet)
feet)
S1 X P ❑ T
Pipe Culvert
UT to Gentry
Branch
X PER
❑ INT
X Corps
X DWQ
05
10
S1 ❑ P X T
Dewatenng
UT to Gentry
Branch
X PER
❑ INT
X Corps
X DWQ
05
10
S2 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S2 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S3 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S5 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
3h Total stream and tributary impacts
20
31 Comments 10 feet of permanent and 10 feet of temporary impacts at same location
Page 4 of 10
PCN Form — Version 1 3 December 10 2008 Version
4 Open Water Impacts
If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of
the U S then indi ually list all open water impacts below
4a
4b
4c
4d
4e
Open water
Name of waterbody
impact number —
(if applicable)
Type of impact
Waterbody type
Area of impact (acres)
Permanent (P) or
Temporary
01 ❑P ❑T
02 ❑P ❑T
03 ❑P ❑T
04 ❑ PEI T
4f Total open water Impacts
4g Comments
5 Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below
5a
5b
5c
5d
5e
Wetland Impacts (acres)
Stream Impacts (feet)
Upland
Pond ID
Proposed use or purpose
(acres)
number
of pond
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
P1
P2
5f Total
5g Comments
5h Is a dam high hazard permit required
❑ Yes ❑ No If yes permit ID no
51 Expected pond surface area (acres)
51 Size of pond watershed (acres)
5k Method of construction
6 Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts
below If any impacts require mitigation then you MUST fill out Section D of this form
6a
❑ Neuse ❑ Tar Pamlico ❑ Other
Project is in which protected basin?
❑ Catawba ❑ Randleman
6b
6c
6d
6e
6f
6g
Buffer impact
number —
Reason
Buffer
Zone 1 impact
Zone 2 impact
Permanent (P) or
for
Stream name
mitigation
(square feet)
(square feet)
Temporary
impact
required
61 ❑P ❑T
El Yes
❑ No
B2 ❑P ❑T
❑Yes
❑ No
B3 ❑P ❑T
❑Yes
❑ No
6h Total buffer Impacts
61 Comments
Page 5 of 10
D Impact Justification and Mitigation
1 Avoidance and Minimization
1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project
Minimum pipe length used to obtain needed typical section and shoulder width for safety
1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques
N/A
2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State
2a Does the project require Compensatory Mitigation for
impacts to Waters of the U S or Waters of the State?
❑ Yes ❑ No
2b If yes mitigation is required by (check all that apply)
❑ DWQ ❑ Corps
2c If yes which mitigation option will be used for this
project?
❑ Mitigation bank
El Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3 Complete if Using a Mitigation Bank
3a Name of Mitigation Bank
3b Credits Purchased (attach receipt and letter)
Type
Quantity
3c Comments
4 Complete if Making a Payment to in lieu Fee Program
4a Approval letter from in -lieu fee program is attached
❑ Yes
4b Stream mitigation requested
linear feet
4c If using stream mitigation stream temperature
❑ warm ❑ cool ❑cold
4d Buffer mitigation requested (DWQ only)
square feet
4e Riparian wetland mitigation requested
acres
4f Non riparian wetland mitigation requested
acres
4g Coastal (tidal) wetland mitigation requested
acres
4h Comments
5 Complete if Using a Permittee Responsible Mitigation Plan
5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan
Page 6 of 10
PCN Form — Version 13 December 10 2008 Version
6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
❑ Yes X No
6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the
amount of mitigation required
Zone
6c
Reason for impact
6d
Total impact
(square feet)
Multiplier
6e
Required mitigation
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
15
6f Total buffer mitigation required
6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank
permittee responsible riparian buffer restoration payment into an approved in lieu fee fund)
7
6h Comments
Page 7 of 10
E Stormwater Management and Diffuse Flow Plan (required by DWQ)
1 Diffuse Flow Plan
1a Does the project include or is it adjacent to protected riparian buffers identified
within one of the NC Riparian Buffer Protection Rules?
El Y es X No
1b If yes then is a diffuse flow plan included? If no explain why
Comments
❑ Yes No
❑
2 Stormwater Management Plan
2a What is the overall percent imperviousness of this project?
N/A
2b Does this project require a Stormwater Management Plan?
X Yes ❑ No
2c If this project DOES NOT require a Stormwater Management Plan explain why NC DOT Project
2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan
The project will use BMP s to the Maximum Extent Practicable (MEP) in compliance with NCDOT s NPDES Permit No
000250 Post Construction Stormwater Program
❑ Certified Local Government
2e Who will be responsible for the review of the Stormwater Management Plan?
X DWQ Stormwater Program
❑ DWQ 401 Unit
3 Certified Local Government Stormwater Review
3a In which local government s jurisdiction is this project?
N/A
❑ Phase II
3b Which of the following locally implemented stormwater management programs
❑ NSW
apply (check all that apply)
❑ USMP
❑ Water Supply Watershed
❑ Other N/A
3c Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
4 DWQ Stormwater Program Review
❑ Coastal counties
4a Which of the following state - implemented stormwater management programs apply
❑ HQW
❑ ORW
(check all that apply)
❑ Session Law 2006 -246
❑ Other N/A
4b Has the approved Stormwater Management Plan with proof of approval been
attached?
❑ Yes ❑ No
5 DWQ 401 Unit Stormwater Review
5a Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 13 December 10 2008 Version
F
Supplementary Information
1
Environmental Documentation (DWQ Requirement)
la
Does the project involve an expenditure of public (federal /statenocal) funds or the
® Y es
❑ No
use of public (federal /state) land?
1 b
If you answered yes to the above does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes
® No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c
If you answered yes to the above has the document review been finalized by the
State Clearing House? (If so attach a copy of the NEPA or SEPA final approval
letter)
❑ Yes
❑ No
Comments
2
Violations (DWQ Requirement)
2a
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated
Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards
❑ Yes
® No
or Riparian Buffer Rules (15A NCAC 2B 0200)?
2b
Is this an after the fact permit application?
❑ Yes
® No
2c
If you answered yes to one or both of the above questions provide an explanation of the violation(s)
3
Cumulative Impacts (DWQ Requirement)
3a
Will this project (based on past and reasonably anticipated future impacts) result in
❑ Yes
No
additional development which could impact nearby downstream water quality
3b
If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance wrath the
most recent DWQ policy If you answered no provide a short narrative description
4
Sewage Disposal (DWQ Requirement)
4a
Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from
the proposed project or available capacity of the subject facility
N/A
Page 9 of 10
PCN Form — Version 1 3 December 10 2008 Vernon
5 Endangered Species and Designated Critical Habitat (Corps Requirement)
5a Will thi? project occur in or near an area with federally protected species or
[I Yes No
habitat
5b Have you checked with the USFWS concerning Endangered Species Act
❑Yes ®No
impacts
5c If yes indicate the USFWS Field Office you have contacted
El Raleigh
❑ Asheville
5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
field survey
6 Essential Fish Habitat (Corps Requirement)
6a Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ® No
6b What data sources did you use to determine whether your site would impact Essential Fish Habitat?
Current Maps/Database
7 Historic or Prehistoric Cultural Resources (Corps Requirement)
7a Will this project occur in or near an area that the state federal or tribal
governments have designated as having historic or cultural preservation
❑ Yes ® No
status (e g National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b What data sources did you use to determine whether your site would impact historic or archeological resources?
Current Maps /Database
8 Flood Zone Designation (Corps Requirement)
8a Will this project occur in a FEMA- designated 100 -year floodplain? --Fo
Yes ® No
8b If yes explain how project meets FEMA requirements
8c What source(s) did you use to make the floodplain determination? Current FEMA Maps
Roger Bryan
26 Mar 12
, 0 'g�
Applicant/Agent s Printed Name
ppiicant/Ag s Signature
Date
(Agent's signature is valid only rf an authonzation letter from the applicant
is provided
Page 10 of 10
ONIM
N C DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
SECONDARY ROAD SURVEY
SUBJECT SR 2144, McDaris Rd
LOCATION From SR 2181 To E O M
WORK TYPE Grade, Drain, Widen and Pave
WORK ORDER 13 C 011171 PRIORITY SPP #5
COUNTY Buncombe TOWNSHIP Flat Creek
DATE 3/8/2012 SCALE 1" =50'
NOTES 45' R/W
LENGTH 792', 15Mi
PREPARED BY JSA/CAP
-ir
PIPE DATA
SR 2144, McDans Rd
County
Buncombe
WORK ORDER
STATION
PRESENT
SIZE
PROPOSED
SIZE
NOTES
10 +19
40 x18 CMP
Cross Pipe
11 +30
30 x15 CMP
40 x18 CMP
Cross Pipe
15 +40
30 x15 CMP
Dnve Pipe
15 +93
40 x15 CMP
Dnve Pipe
15 +98
30 x24 CMP
Dnve Pipe
16 +28
0 x15 CMP
0 x18 CMP
Cross Pipe s• L 1
16 +31
8 PVC
Pipe
16 +34
50 x15 CMP
Dnve Pipe
17 +58
30 x15 CMP
Dnve Pi
Cs. ro-es S i512A 3CES WH ITT
1 +111
LOIS Lr-,j P: ; Mr Y IAauxNTA
+� 1 08 - 12,a
03
N
e�
4-
� +31 F1C�iJ
AOU A DCffVF1- O
06- -wis V,-,-36
36
t / * Install low &or endpoint measures in TSF
$ 6 * Construct using the 30 day option
..� * All wattles require PAM
* All basins located at a 5% or greater grade
I �t� must be tiered
1 v
i
r
I I\4/
b
i
f
9 6
I
1 �
3 X2.3 k2 i yP5 $ BAVIV
Wlco,k frBC-R aAFFLGs
I YPt A AOC C CIJkCK
yml
3 x7 X2 TYPE B eAS ,AJ
wlcooe C/Br'R BAFj�cES
Ty,Ot A Por r GNHGK
p� -y7�6 'ter✓ � ��*
SR_ 2181
i
{I
I
�EIP -
I
61
f
�
3 X7 X 2 TYPE B BASIN
I
1
N
rrs�R a F4 E5
/TyPr A 1?Ur-C Gti =4C
i
I
— 3DXl5'Cr
t t
Ra. P
i
1
I
Awj STuRg7"
O
I
l
as -.2000 ot, -
�
N
N
3
�
�
1
it
t
Sx7 X1 iyo --B ?t &l
w /CGyK r E er K of `r,
i� TyPC A ROCK LN -cCK
peoP 40 -Z C, P
SR_ 2181
r,
�r y ),- - A t C- ) )
/57 P,- 116
I . 'I I
f
'T �� ;
� �CS)
(ID7
!U c�
—2s �n�a
` 1 86
ti
J
* Install low & or endpoint measures in TSF
* Construct using the 30 day option
' * All wattles require PAM
d * All basins located at a 5% or greater grade
must be tiered
� r
` ` 3X/3 YL ppTYBBPti � ��` ✓
RAP
s° "`S cmP I cmP
— 7�oP yo Y
A� r
PROP 3a x }s CMP
1 �
N
N
C
C� <1
Er _
Buncombe Counfiy
1 � , C.
/
/
/
s/
a
a/
2137
zip
rr
• ^..F: .tiYi :.:.lam.; }(� 1- ,hl
-
,; -y; � �,'_� -• -' Wit, / � � - � ;a: � -
k' • TJ�_f^t � `ti eft �:�
�•,IMr �
{1� I •��'�y ��I� H'� T�� -rte.' � t�� �r ?� ' � t
to
,t f
�•
7.
I1� ty� ?�'
--,lam fr
S r
26. 2012
g _
�� ,nK ` I • f • �^� ^" �. ter°^ .,, 1 r V'
�? ������ � �� �`��rP • �� �� �� ,� - •ice ���' ��9 \` r� ��" ; � ��.�
,.
fi £
�M'�'E
•N� ? tr 1 eta x�� a _
MP
AXI
VVdo 0
1p
jF
t
r
qw r
� G 138 - ,,� _' �.4�? ""� � — � _ `S'�•+'r
2
It w.".ti � • + "T N � � r � �6ti � / �• '1
IN f
S � r
Name MARS HILL Location 035 7574305 N 082 5388428 W
Date 3/26/2012 Caption SR 2144 McDans Road
Scale 1 inch equals 1000 feet Buncombe County NC
CopyngM (C)1998 Wptech Inc.