Loading...
HomeMy WebLinkAbout20200950 Ver 2_Pre-Filing Meeting Request_20210113ID#* 20200950 Version* 2 Regional Office* Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 1/13/2021 Contact Name * Sydnee Potter Contact Email Address* sydnee@uvillisengineers.com Project Name* Wiggins Road Sewer Facilities - Gravity Sewer and Force Main Phase II Project Owner* Town of Mooresville Project County* Iredell Owner Address: Street Address 2523 Charlotte Highway Address Line 2 aty State / Frovince / Region Mooresville NC Rbstal/Zip Code Country 28117 United States Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Please list all existing project ID's associated with this projects.* 20-0950 Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below.* The overall project includes installation of a new pump station, force main and gravity sewer. Approval for Phase I was received on August 13, 2020 under Project # 20-0950. The facilities included as part of Phase 11 include installation of approximately 12,500 linear feet of new 24-inch force main and 9,635 feet of gravity sewer ranging in size from 8-inch to 36-inch. Impacts included under this phase include temporary impacts to wetlands, and both temporary and permanent stream impacts. The temporary impacts are intended to provide access along the construction easement. The permanent stream crossings are needed to allow access for maintenance of the new facilities. Temporary impacts will be removed immediately following construction. Please give a couple of dates you are available for a meeting. 1 /20/2021 1 /22/2021 1 /25/2021 1 /26/2021 1 /29/2021 Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 1/13/2021