HomeMy WebLinkAbout20200950 Ver 2_Pre-Filing Meeting Request_20210113ID#* 20200950
Version* 2
Regional Office* Mooresville Regional Office - (704) 663-1699
Reviewer List* Alan Johnson
Pre -Filing Meeting Request submitted 1/13/2021
Contact Name * Sydnee Potter
Contact Email Address* sydnee@uvillisengineers.com
Project Name* Wiggins Road Sewer Facilities - Gravity Sewer and Force Main Phase II
Project Owner* Town of Mooresville
Project County* Iredell
Owner Address: Street Address
2523 Charlotte Highway
Address Line 2
aty State / Frovince / Region
Mooresville NC
Rbstal/Zip Code Country
28117 United States
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F- 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Please list all existing project ID's associated with this projects.*
20-0950
Do you know the name of the staff member you would like to request a meeting with?
Alan Johnson
Please give a brief project description below.*
The overall project includes installation of a new pump station, force
main and gravity sewer. Approval for Phase I was received on August
13, 2020 under Project # 20-0950. The facilities included as part of
Phase 11 include installation of approximately 12,500 linear feet of new
24-inch force main and 9,635 feet of gravity sewer ranging in size
from 8-inch to 36-inch. Impacts included under this phase include
temporary impacts to wetlands, and both temporary and permanent
stream impacts. The temporary impacts are intended to provide
access along the construction easement. The permanent stream
crossings are needed to allow access for maintenance of the new
facilities. Temporary impacts will be removed immediately following
construction.
Please give a couple of dates you are available for a meeting.
1 /20/2021
1 /22/2021
1 /25/2021
1 /26/2021
1 /29/2021
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 1/13/2021