HomeMy WebLinkAbout20201934 Ver 1_Pre-Filing Meeting Information_20210212DWR Pre-Fil ing Meeting Req u est Form
Contact Name *
Contact Email Addre ss *
Proje ct Owne r *
Proje ct Name *
Proje ct County *
Owne r Addre ss:*
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low.*
Please give a couple of dates you are available for a meeting.
Larry Thompson
lthompson@ncdot.gov
NCDOT Highway Division 10
Cabarrus Pipe 15 on SR 1616 over Mill Creek; 17BP.10.PE.4
Cabarrus
City
Albemarle
State / Province / Region
NC
Postal / Zip Code
28001
Country
USA
Street Address
716 W Main Street
Address Line 2
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
Donna Hood
NCDOT proposes to replace the existing functionally deficient culvert
on SR 1616 (Tuckaseegee Road) at Mill Creek with an improved
modern culvert; STV Engineers is providing planning, design and
Section 404/401 services on behalf of Division 10; an MCDC has
been prepared; a delineation of waters of the U.S. has been
completed - jurisdictional waters of the U.S. in the project area
include Mill Creek and an unnamed tributary of Mill Creek; there are
no wetlands in the project area; proposed culvert replacement will
include an offsite detour; the project has a Let date of March 3, 2021.
12/16/2020
Ple ase attach the docume ntation you would like to hav e the me e ting about.
Signature *
Submittal Date
12/17/2020
12/18/2020
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
12/10/2020