HomeMy WebLinkAbout20210110 Ver 1_Meeting Request Review_20210115ID#* 20210110
Version* 1
Regional Office* Asheville Regional Office - (828) 296-4500
Reviewer List* Amy Annino
Pre -Filing Meeting Request submitted 1/15/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Steve Cahoon
steve.cahoon@duke-energy.com
Rhodhiss Dredging
Duke Energy, Carolinas, Inc.
Burke
Street Address
410 S Wilmington St
Address Line 2
aty
Raleigh
Rbstal / Zip Code
27601
Is this a transportation project?* r Yes r No
State / Frovince / Region
NC
Country
United States
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Amy Annino
Please give a brief project description below.
This is the same project we have discussed before to dredge at the
powerhouse and complete some improvements at the crane pad. No
written certification was needed, it was authorized under Nationwide 3 and
the corresponding WQ certification. However, one of the bidders on the
project may want to let the return water from the dredge spoil go back to
the lake. It appears if that is the case written authorization from DWR may
be required for a Corps Nationwide 16 permit.
If that bidder is successful we may apply for written permission for the
return water to go back to the reservior.
Please give a couple of dates you are available for a meeting.
2/15/2021
2/22/2021
3/1 /2021
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 1/15/2021
Reviewer Meeting Request Decision
Has a meeting been scheduled?* r Yes r No