Loading...
HomeMy WebLinkAbout20220439 Ver 1_Draft Mitigation Plan_20210210Strickland, Bev From: Jessop, Jordan E CIV USARMY CESAW (USA) <Jordan.E.Jessop@usace.army.mil> Sent: Wednesday, February 10, 2021 9:26 AM To: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Davis, Erin B; kathryn_matthews@fws.gov; Bowers, Todd; Dunn, Maria T.; Coburn, Chad; Wilson, Debra; fritz.rohde; Wilson, Travis W.; Haywood, Casey M CIV (USA); DCR - Environmental Review Subject: [External] Juniper Tract Draft Mitigation Plan Attachments: SAW-2019-01067 Lower Cape Fear Umbrella Bank Juniper Tract Evaluation Letter.pdf Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spa m.<mailto:report.spam@nc.gov> Hey everyone, The Juniper Tract Draft Mitigation Plan was received and is now in the cyber repository on RIBITS. Please let me know if you have any issues retrieving it, so I can send you a DoD SAFE link. Please provide feedback on the plan by March 15. If you are interested in doing a site visit, please let me know. The initial site visit for the prospectus was fairly short (August of 2019), especially given the size of the site, and the various communities present and site variability (large sections of bedded silviculture, some AWC stands, with a fair amount of ditching in sections). I attached the initial evaluation letter for Juniper, as a refresher for anyone interested. Please let me know if you would like to do a site visit. Thanks, Jordan -----Original Message ----- From: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley@usace.army.mil> Sent: Tuesday, June 11, 2019 2:21 PM To: kathryn_matthews@fws.gov; Todd Allen Bowers (bowers.todd@epa.gov) <bowers.todd@epa.gov>; Haupt, Mac <mac.haupt@ncdenr.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org>; Coburn, Chad <chad.coburn@ncdenr.gov>; Wilson, Debra <debra.wilson@ncdenr.gov>; Fritz. Rohde@noaa.gov; travis.wilson@ncwildlife.org Cc: Sugg, Mickey T CIV USARMY CESAW (USA) <Mickey.T.Sugg@usace.army.mil>; Jessop, Jordan E CIV USARMY CESAW (US) <Jordan.E.Jessop@usace.army.mil>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil> Subject: Juniper Tract Prospectus / LCFUMB Wilmington Regulatory Field Office / Hello All, I hope everyone is doing well! I am filling in for Mickey on mitigation and IRT related projects in the Wilmington Field Office due to his promotion to Field Office Chief. Please find the attached Prospectus for the "Juniper Tract". This site has been proposed for inclusion in the Lower Cape Fear Umbrella Mitigation Bank (LCFUMB). The Bank sponsor has a limited window for land acquisition, and has therefore requested to forego the Preliminary Review process of a Draft version. Upon review, this office will provide the sponsor a notification of completeness and issue a Public Notice of the proposal. I am distributing this version to the IRT members ahead of the normal timelines, to give you time for review and commenting. The PN will be forthcoming. Please let us know if you need anything else. I look forward to working with you again! Thank you. -Tyler Tyler Crumbley, PWS Project Manager Regulatory Division U.S. Army Corps of Engineers -Wilmington District 69 Darlington Avenue Wilmington, NC 28403 Phone: 910-251-4170 Fax: 910-251-4025 Email: tyler.a.crumbley@usace.army.mil -----Original Message ----- From: Novak, Corey [mailto:cnovak@lmgroup.net] Sent: Friday, June 7, 2019 2:17 PM To: Crumbley, Tyler A CIV USARMY CETAA (USA) <Tyler.A.Crumbley@usace.army.mil> Cc: Preziosi, Christian <cpreziosi@lmgroup.net> Subject: [Non-DoD Source] Juniper Tract Prospectus Tyler, Please see the attached Juniper Tract Prospectus. As discussed, we are proposing to add the site to the existing Lower Cape Fear Umbrella Mitigation Bank (LCFUMB). We also have a hard copy ready for you. Let me know when I can drop it off this afternoon. Thanks, Corey Novak, PWS I Environmental Scientist — Project Manager Direct: 452-0001 x 1905 1 Fax: 910.452.0060 Email: cnovak@lmgroup.net <mailto:cnovak@lmgroup.net> I Website: Blockedhttps://urldefense.com/v3/_http://www.lmgroup.net_;! ! HYmSToo!JdcVXCN4xFYc_GUg3Ezxc9M7U yJAwauwpYDLw_2TNusd5LBYbEcifRYZPiSI_1xtNEo$<Blockedhttp://www.lmgroup.net/> Land Management Group, Inc I Environmental Consultants 3805 Wrightsville Ave I Suite 15 1 Wilmington, NC 28403 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 August 27, 2019 Regulatory Division Action ID. SAW-2019-01067 LCFUMB, LLC C/O: Mr. Jon Vincent 1508 Military Cutoff Road, Suite 302 Wilmington, North Carolina 28403 Dear Mr. Vincent: This letter confirms the initial Interagency Review Team's (IRT) evaluation and comments received during the June 20, 2019 Public Notice of your prospectus detailing the addition of the wetland and stream mitigation site, known as the Juniper Tract, to the Lower Cape Fear Umbrella Mitigation Bank (Bank). The proposed addition is an approximately 782-acre tract containing a 765-acre main parcel and a 17-acre adjacent tract. The properties are located on the south side of Mill Creek Road SE, on the north side of Danford Road, adjacent to Harris Swamp, Bolivia Branch, Hickman Branch, and Mill Creek, east of Bolivia, Brunswick County, North Carolina. Also, please reference the August 14, 2019 onsite meeting with your agents Messrs. Christian Preziosi and Corey Novak of Land Management Group, Inc., along with IRT members Mr. Mac Haupt of the North Carolina Division of Water Resources and Mr. Travis Wilson of the North Carolina Wildlife Resource Commission, Ms. Erin Davis of North Carolina Division of Water Resources, Mr. Todd Tugwell of The U.S. Army Corps of Engineers, and Ms. Kim Browning of The U.S. Army Corps of Engineers. Pursuant to 33 CFR Part 332.8(d)(5) Compensatory Mitigation For Losses of Aquatic Resources, our office is providing our initial evaluation as to the potential of your proposed Bank modification, or site addition, for providing appropriate compensatory mitigation for activities authorized by Department of the Army (DA) permits. Based on our review, coordination with the IRT, and the onsite inspection, it is our position that the potential of the additional Bank site is contingent on several factors and the need for additional information. As discussed onsite, these contingencies and/or concerns are as follows: -2- 1) Please provide additional information on the size of the drainage areas for each stream restoration segment proposed. 2) The prospectus states that financial assurances will be 30% of construction costs, which is not sufficient, please review Kimberly Browning's email dated August 15, 2019 for additional information and requirements regarding financial assurances. 3) Please identify reference wetlands to monitor, which you indicated you have on - site. 4) Please identify reference headwater stream systems with similar soils and drainage areas. 5) As discussed on -site, new Jurisdictional Determination is needed. 6) The enhancement areas where vegetation is not planned to be modified are proposed at a 2:1 ratio, which may be too high given the current function of these areas. The proposed 2:1 ratio may be more appropriate for areas where vegetation will be enhanced. 7) There are concerns about whether the upper -ends of the zero -order tributaries will develop stream characteristics. These proposed systems may be need to start closer to the first order tributaries. This was discussed on -site and Christian Preziosi indicated they would likely propose revised starting points for at least two of the zero -order stream systems. 8) During the site visit, questions were raised regarding the proposed performance standards and mapped soil types, clarification is needed to make sure they have been proposing in accordance with the SAW 2016 guidance. Additionally, please make sure the 2016 success criteria for zero -order systems area incorporated into the proposal. 9) Please clarify the areas where vegetation restoration work is proposed. 10) Please integrate the 2016 tree vigor performance standards into the proposal. 11) Please provide additional information and analysis to address concerns about potential future development outside and around the bank area (e.g. road widening), and how you propose to address these concerns. 12) Please provide additional details about which roads on -site will be kept intact and to what extent. 13) Please provide NC WAM forms for each wetland community type on -site. -3- Other components were also covered during the meeting and all discussed topics should be considered and incorporated in your bank planning and development of the mitigation plan. If you have any questions regarding the banking process or moving forward with the establishment of your proposal, please do not hesitate to contact me at the Wilmington Regulatory Field Office, telephone (910) 251-4810 or jordan.e.jessop@usace.army.mil. Sincerely, Digitally signed by JESSOP.JORDAN.E.15150 90548 Date: 2019.08.27 10:27:17 -04'00' Jordan Jessop, Project Manager Wilmington Regulatory Field Office Copies furnished via email: Mr. Christian Preziosi, Land Management Group, Inc. cpreziosi@lmgroup.net Mr. Corey Novak, Land Management Group, Inc. cnovak@lmgroup.net Ms. Kathy Matthews, U.S. Fish and Wildlife Services, Kathryn_Matthews@fws.gov Mr. Mac Haupt, North Carolina Division of Water Resources mac.haupt@ncdenr.gov Mr. Todd Bowers, U.S. Environmental Protection Agency bowers.todd@epa.gov Mr. Chad Coburn, NC Department of Environmental Quality Chad.Coburn@ncdenr.gov Ms. Erin Davis, NC Department of Environmental Quality erin.davis@ncdenr.gov Copies w/o enclosures: MGA Group, LLC C/o: Mr. Kent Mitchell PO Box 12221 Wilmington, North Carolina 28405 Ms. Debra Wilson North Carolina Division of Coastal Management 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Ms. Twyla Cheatwood Southeast Region, Habitat Conservation Division NOAA Fisheries Beaufort, NC 28516 -4- Mr. Travis Wilson North Carolina Wildlife Resource Commission 1718 Highway 56 West Creedmor, North Carolina 27522 Ms. Maria Dunn North Carolina Wildlife Resource Commission 943 Washington Square Mall Washington, North Carolina 27889