Loading...
HomeMy WebLinkAbout20180182 Ver 1_Final AsBuilt Monitoring Report_20200918 Ecosystem Planning and Restoration, LLC ECOSYSTEM 1150 SE Maynard Road, Suite 140 Raleigh, NC 27511 PLANNING & EPR RESTORATION Phone: (919) 388-0787 www.eprusa.net Mr. Steve Kichefski 151 Patton Ave, Room 208 Asheville, NC 28801 September 11, 2020 RE: Final As-built Baseline Monitoring Report Red Barn Mitigation Bank Site Surry County, North Carolina SAW-2017-01927 Dear Mr. Kichefski, Ecosystem Planning and Restoration, PLLC (EPR) has prepared the Final Red Barn Mitigation Bank As-built Baseline Monitoring Report for your review based on comments and suggestions made during the on-site field meeting on June 10th, 2020. The following edits have been made to the Baseline Monitoring report: • Two (2) photo points were added to the photo log and will be taken from the same location annually. These photos show the pedestrian crossing located on UT2c (Photo point 31) and the ATV crossing located on UT3c (Photo point 32). • As noted in the draft report, EPR is in the process of releasing three areas from the recorded conservation easement. These areas include a pedestrian crossing over UT2c where a pedestrian bridge will be installed; a riffle crossing connecting the properties on either side of UT3c; and an area along the property line of UT1a where leaving an existing fence will help protect the easement against encroachment. These easement corners have been marked and the paperwork to release them has begun. EPR will submit a draft release to USACE to review before releasing these areas from the conservation easement. • The bamboo area near upstream UT1 is called out on the CCPV and will be treated in winter 2020. • Fencing and a gate near the UT3 culvert were mistakenly installed within the conservation easement and have been moved to their correct locations (see Sheet 15 in As-built Plan Sheets). • The UT3 culvert was installed in the incorrect location and the roadway crossing alignment was incorrect. This has been fixed (see Sheet 15 in As-built Plan Sheets). • The surveyed channel top of bank feature in the As-built Plans did not match with observed site conditions (documented in site cross sections) in a few locations.These areas have been re-surveyed and have been updated in the As-built Plans. The missing structures that were noted in the Draft submittal have also been surveyed and added to the plans. -----"--✓ Providing ecosystem planning and restoration services to support a sustainable environment,-.....''^ Ecosystem Planning and Restoration, LLC ECOSYSTEM 1150 SE Maynard Road, Suite 140 Raleigh, NC 27511 PLANNING & EPR RESTORATION Phone: (919) 388-0787 www.eprusa.net • Saplings on the site were planted in March 2020 according to the planting plan, and no species substitutions were made. As discussed during the site meeting and in the Draft As-built Baseline Monitoring Report, multiple alterations were made during construction that have impacted the number of credits produced by the Site. The updated mitigation assets provided by the Site are shown in Table A below and in Table 1 of the Final As-built Baseline Monitoring Report. These values are unchanged from the Draft submittal of this document. Table A.As-built Credit Summary Value Value from MBI (Approved As built Value Nov 2019) SCs 8,069 8,032 WCs 2.72 2.02 Conservation Easement(AC) 25.4 25.3 The official credit ledger has been updated and the number of stream and wetland credits generated by the Site will be reflected in the second credit release request. In response to a few other items noted in the meeting minutes from the on-site field meeting on June 10th, 2020: • Stream gauge 2 shown on CCPV Figure 2B and Sheet 7 of the plan set is located in UT1c, downstream of the culvert; therefore, we do not believe there is a need to install an additional gauge along this reach to document flow. • Easement markings and crossing signs have all been installed. • The pedestrian bridge has not been installed yet but is scheduled for installation in September 2020. If you have any questions regarding the Final As-built Baseline Monitoring Report, please contact me at 919-999-0262 or via email at ktweedy@eprusa.net. Sincerely, Kevin Tweedy, PE Providing ecosystem planning and restoration services to support a sustainable environment As-built Baseline Monitoring Report FINAL Red Barn Mitigation Bank Site Surry County, North Carolina Monitoring Year 0 Data Collection Period: Submission Date: March 2020— May 2020 September 2020 ue-, USACE Action ID No. SAW-2017-01927 Prepared For: Prepared By: 0US Army Corps of Engineers Ecosystem Planning and Restoration Wilmington District 1150 SE Maynard Road,Suite 140 151 Patton Avenue, Room 208 Cary, NC 27511 rE PR Asheville, NC 28801 TABLE OF CONTENTS 1.0 PROJECT SUMMARY 1 1.1 Goals and Objectives 2 1.2 Mitigation Components 3 1.3 Construction 4 1.3.1 In-Stream Work and Floodplain Grading 4 1.4 Site Planting 4 2.0 BASELINE DATA ASSESSMENT 5 2.1 Performance Criteria 5 2.2 Stream Monitoring 6 2.2.1 Stream Profile 7 2.2.2 Stream Dimension 7 2.2.3 Channel Stability 8 2.2.4 Stream Hydrology 8 2.3 Riparian Vegetation 9 2.3.1 Baseline Vegetation Monitoring 9 2.4 Wetland Hydrology 9 3.0 REFERENCES 12 Red Barn Mitigation Bank Site As-built Baseline Monitoring Report-FINAL rPR Surry County,North Carolina TORT Fc Table A. As-built Credit Summary Table B. USACE Mitigation Success Criteria Table C. Stream Monitoring Summary Table D. Riparian Vegetation Monitoring Summary Table E. Wetland Monitoring Summary APPENDICES Appendix A: Project Information Tables Table 1. Project Mitigation Components Table 2. Project Activity and Reporting History Table 3. Project Contacts Table Table 4. Project Baseline Information and Attributes Appendix B: Visual Assessment Data Figure 1. Project Location Map Figure 2. Current Condition Plan View (CCPV) Figure 3. Riparian Buffer Zones Baseline Photo Log Wilmington District Stream Buffer Credit Calculator Appendix C: Vegetation Plot Data Table 5. Vegetation Planting Information Table 6. Riparian Buffer Vegetation Totals Table 7. Stem Count by Plot Vegetation Photo Log Appendix D: Stream Measurement and Geomorphology Data Table 8. Baseline Stream Data Summary Table 9. Monitoring Data — Dimensional Morphology Summary Table 10. Monitoring Data —Stream Reach Data Longitudinal Profile Plot Cross Section Plots Appendix E: As-built Plan Sheets As-built Plan Sheets Conservation Easement Recorded Plat Red Barn Mitigation Bank Site As-built Baseline Monitoring Report-FINAL r PR Surry County,North Carolina 1.0 PROJECT SUMMARY Ecosystem Planning and Restoration, PLLC (EPR) implemented the Red Barn Mitigation Bank Site (Project; Site) to provide cool temperature stream credits (SCs) and riparian wetland credits (WCs) in the Yadkin-Pee Dee River Basin, Hydrologic Unit Code (HUC) 03040101. Multiple alterations were made during construction that impact the credits produced by the Site. Changes to the number of credits from the Mitigation Plan (Final version submitted November 2019) are summarized in Table A and further explanation is provided in this report. The Project restored and enhanced 7,586 linear feet (LF) of three perennial unnamed tributaries (UT) to Stewarts Creek, and one intermittent deep gully. The three main perennial tributaries are referred to as "UT1", "UT2", and "UT3", while the intermittent gully is referred to as "UT4." The Project also created and rehabilitated 3.67 acres of wetland hydrology by raising and reconnecting the restored stream beds to an active floodplain to restore a stream-wetland complex within the 25.3-acre conservation easement. Mitigation assets are listed in Table 1 of Appendix A. Table A.As-built Credit Summary Value Value from MBI (Approved As built Value Nov 2019) SCs 8,069 8,032 WCs 2.72 2.02 Conservation Easement(AC) 25.4 25.3 The Site is located in DMS targeted local watershed 03040101100010. The Site was historically utilized for agricultural and cattle practices. As such, wetlands and streams in the project area were adversely impacted by direct cattle access, farming activities, and stream channelization. The Site is in a rural but developing area of Surry County. Land use within the UT1 and UT2 watersheds is comprised of 37.3% pasture lands, 27.4% deciduous forest lands, and 35.3% residential development. Land use within the UT3 watershed is comprised of 49.2% cultivated crops and hay, 30.5%forest land, and 20.2% urban land with 2.3% of the urban land being impervious. Prior to construction activities, all four project streams have either sustained significant cattle damage and/or have been channelized to maximize agricultural activities. The adjacent wetlands were drained by channelization of the project streams, and in the case of WA and WB, were also trampled, heavily grazed, and drained by multiple ditches. Pre-construction, or pre-existing, site conditions are provided in Table 4 of Appendix A and the Baseline Stream Data Summary Tables in Appendix D. Photos and a more detailed description of Site conditions before restoration are available in the Mitigation Plan (Final version submitted November 2019). Red Barn Mitigation Bank Site As-built Baseline Monitoring Report-FINAL EPP Surry County, North Carolina Site construction was completed in March 2020 and the as-built survey was completed in May 2020. On April 12th, 2020 a large flood event caused hillslope rilling and some minor damage to in-stream structures and some repair work was completed in April 2020. Planting occurred in March and April 2020 and baseline vegetation data collection occurred in May 2020. A detailed timeline of the Project activity and reporting history are provided in Table 2 of Appendix A. During construction: • Bedrock was encountered in the proposed channel alignment on UT2b between 28+50 and 28+90, the pattern was adjusted adding 11.9 LF to the centerline length. • A rock step structure was added at the upstream end of UT4 to stabilize the headcut. • Additionally, the number of log structures throughout the Site was reduced to account for the amount of wood available onsite; in some cases, wood structures were replaced with constructed riffle structures to provide grade control. All changes from the design are detailed below in Section 1.3.1. Baseline (MYO) profiles and cross-section dimensions closely match the design parameters with notable variations described below. Overall, the Site was built as designed and is expected to meet the upcoming monitoring year's success criteria. 1.1 Goals and Objectives The Project goals were established based on an assessment of site conditions and restoration potential with careful consideration of the stressors identified in the Upper Yadkin Pee-Dee River Basin Restoration Priorities (RBRP) report (NCEEP, 2009) and the NCDWQ Yadkin Pee-Dee River Basin Plan Summary (2008). As such, the established project goals include: 1) Reduce sediment inputs and stream turbidity; 2) Reduce nutrient inputs; 3) Reduce fecal coliform inputs; 4) Restore/enhance degraded riparian buffers; 5) Reduce urban/suburban stormwater runoff; 6) Reduce stream channel and stream bank instability; 7) Improve aquatic habitat; and 8) Improve wetland function. The proposed streams were broken into eleven reaches for design purposes. UT1 consists of three reaches, UT2 consists of three reaches, UT3 consists of four reaches and UT4 is one reach. The design criteria were based on surveys of multiple reference reaches, published reference reach data, and on design criteria and monitoring data from past successful restoration projects performed throughout the Piedmont region of North Carolina. Restoration practices involved raising the streambeds of the project streams and restoring them back to their historic locations along the fall of the valley, thereby restoring historic flow dynamics and a healthy headwater stream-wetland complex. Buffers in excess of 30 feet were established along most reaches. Red Barn Mitigation Bank Site 2 As-built Baseline Monitoring Report-FINAL EPP Surry County, North Carolina Functional uplift will come from restoring natural riparian and wetland vegetation, excluding livestock from all project streams, and restoring the project streams to a stable condition, connected to their adjacent floodplain wetlands. The Project has restored the plan form and bed form diversity to conditions similar to reference channels (Appendix D, Table 8). Functional uplift was achieved by incorporating woody structures throughout the Site and by planting a forested buffer that will serve as a source of large woody debris in the future. Additionally, lateral stability was improved in the short term by removing the cattle and reducing shear stresses in the channel. As the riparian buffer continues to establish, lateral stability should improve further and increase the resiliency of the restored channels. 1.2 Mitigation Components The current condition plan view (CCPV) in Appendix B (Figure 2) shows the mitigation assets along with the location of monitoring features. Post-construction conditions (Appendix A, Table 1) at the Site generated 8,032 SCs and 2.02 WCs as a result of the following: • 3,840 linear feet of Priority 1 stream restoration • 3,089 linear feet of Priority 2 stream restoration • 560 linear feet of Enhancement I • 97 linear feet of Enhancement II • 12.1 acres of riparian buffers outside of the required 30-foot stream buffers were protected and planted within the conservation easement. • 2.4 acres of wetland rehabilitation • 1.3 acres of wetland creation As illustrated in the As-built Plan Sheets in Appendix E, the plan form of the proposed streams did deviate slightly from the proposed design (UT2b and UT4, refer to Section 1.3.1) and the stream lengths have been revised accordingly from the approved mitigation plan. Additionally, due to these pattern changes and the planned release of some areas from the recorded conservation easement, the buffer method was revised to reflect as-built conditions and a revised table and figure are provided in Appendix B. Additional construction activities performed at the Site included the following: • Planting approximately 19,000 stems within the easement, • Chemical treatment of exotic vegetation, • Installing large woody debris within wetland areas, • Fencing of the conservation easement with multiple gates and crossings to keep cows out, and • Installing a well, multiple cattle waterers, and water lines to support these facilities. Red Barn Mitigation Bank Site 3 As-built Baseline Monitoring Report-FINAL Surry County, North Carolina Construction Construction began in November 2019 and site earthwork was completed in April 2020. Table 3 in Appendix A outlines the Project contacts. Deviations from the design are shown in the As- built Plan Sheets (Appendix E) and are described in detail within this section. 1.3.1 In-Stream Work and Floodplain Grading The As-built Plan Sheets (Appendix E) provide a visual markup of the design to show what was installed during construction. The Site is expected to meet the upcoming monitoring year's success criteria. During and post construction, the Site experienced multiple large flow events with no significant lateral and vertical adjustment. The number of log structures throughout the Site was reduced to account for the amount of wood available onsite; in some cases, wood structures were replaced with constructed riffle structures to provide grade control. At the completion of construction, the following structures were installed across the project streams: • 18 Log Vanes • 31 Log Steps • 55 Log Rollers • Approximately 290 LF of Woody Riffle • Approximately 1,980 LF of Constructed Riffle • Approximately 2,060 LF of Toe Wood • A rock step structure was added to stabilize the headcut at the upstream extend of UT4. This structure ends at station 10+04, and adjusts the creditable length of that stream by 4 LF. As shown in the As-built Plan Sheets in Appendix E, the centerline pattern was built roughly to the planned alignment, with one notable exception. UT2b proposed alignment encountered bedrock downstream of the culvert and the channel was re-aligned, adding 11.9 LF of length to the centerline. Lastly, field adjustments were made to the profile and structures in some minor, localized areas where it became obvious during construction that the channel dimensions and stability may be compromised without some slight modifications. Site Plantinc Live stakes were planted starting in February for any completed sections and were planted as reaches were completed through March 2020. Saplings on the site were planted in March 2020 according to the planting plan, and no species substitutions were made. In order to address concerns about herbaceous vegetation growth in low gradient reaches, EPR altered the planting - Red Barn Mitigation Bank Site 4 As-built Baseline Monitoring Report-FINAL EPRSurry County, North Carolina plan to add 1-gallon sycamores along the streambanks of low gradient reaches to provide shade and limit herbaceous growth within the monitoring period. These plants were installed in April 2020. EPR installed an additional 90 trees and shrubs (1-gallon and 3-gallon) in areas with standing water and saturated soil conditions northeast of the confluence of UT1c and UT2a. These larger species were established to provide greater vegetative cover in areas that receive large water inputs from the surrounding hillsides. Species planted within these areas included swamp chestnut oak, willow oak, sycamore, elderberry, buttonbush, silky dogwood, and river birch. These plants were installed at the end of April 2020. 2.0 BASELINE DATA ASSESSMENT This report establishes the baseline data that will be used to determine the success of the Red Barn Mitigation Bank Site. The performance criteria and as-built site conditions are described in the following sections to evaluate whether the project is meeting the success criteria in subsequent monitoring years. 2.1 Performance Criteria Project success criteria were established in accordance with the U.S. Army Corps of Engineers— Wilmington District Public Notice: Notification of Issuance of Guidance for Compensatory Stream and Wetland Mitigation Conducted for Wilmington District (October 24, 2016). The monitoring plan for the site will follow this guidance. Table B details the USACE success criteria that evaluate whether project goals have been met throughout the monitoring period. Table B. USACE Mitigation Success Criteria Restored Stream Channels • All streams must maintain an Ordinary High-Water Mark(OHWM), per RGL 05-05. • Continuous surface flow must be documented each year for at least 30 consecutive days. • Bank height ratio (BHR) cannot exceed 1.2 for all measured cross sections on a given reach. • Entrenchment ratio (ER) must be above 2.2 for all measured riffle cross-sections on a given reach (for C and E streams). • BHR and ER should not change by more than 10%in any given year for all measured cross sections on a given reach. • Must document occurrence of at least 4 bankfull events in separate years during the monitoring period. Red Barn Mitigation Bank Site 5 As-built Baseline Monitoring Report-FINAL EP Surry County, North Carolina Riparian Vegetation • Within planted portions of the site, a minimum of 320 stems per acre must be present at year 3; a minimum of 260 stems per acre must be present at year 4; and a minimum of 210 stems per acre must be present at year 7. • Trees must average 7 feet in height at year 5, and 10 feet in height at year 7. • Planted and volunteer stems are counted, provided they are included in the approved planting list for the site. • Any single species can only account for 50%of the required stems per monitoring plot. Wetland Monitoring • All wetland areas must maintain a hydroperiod of 10% of the growing season, as defined from April 8 to October 26 (USDA 2007) • Wetland creation areas must document the development of hydric soil indicators. • Within planted portions of the Site, a minimum of 320 stems per acre must be present at year 3; a minimum of 260 stems per acre must be present at year 5; and a minimum of 210 stems per acre must be present at year 7. • Trees must average 7 feet in height at year 5, and 10 feet in height at year 7. • Planted and volunteer stems are counted, provided they are included in the approved planting list for the Site. • Any single species can only account for 50%of the required stems per monitoring plot. • Vegetation must be planted, and plots established, at least 180 days prior to the initiation of the first year of monitoring. • Permanent plots will be randomly located throughout the Site, and random plots will not make up more than 50%of the plots. 2.2 Stream Monitoring Stream monitoring will include monitoring of the hydrologic and geomorphic functions of UT1, UT2, UT3 and UT4. Monitored parameters, methods, schedule/frequency, and extent are summarized in Table C. These monitoring parameters follow USACE guidance but will also allow for monitoring of other parameters to document site performance related to the project goals listed in Section 1.1. The locations of the established monitoring cross sections are shown in Figure 2 (Appendix B). Red Barn Mitigation Bank Site 6 As-built Baseline Monitoring Report-FINAL EPP Surry County, North Carolina Table C. Stream Monitoring Summary Parameter Method Schedule/Frequency Number/Extent Stream Profile Full longitudinal survey As built only(unless All four stream channels otherwise required) 5 cross sections on UT1 Stream Dimension Cross sections Years 1, 2, 3, 5, and 7 6 cross sections on UT2 6 cross sections on UT3 1 cross section on UT4 Photo Points Yearly 32 photo points Visual Assessment Yearly All four stream channels Channel Stability Only if instability is Additional Cross sections Yearly documented during monitoring 1 each on UT1a, UT1c, Pressure transducers Continuous recording UT2a, UT2c, UT3a, UT3c, through monitoring Stream Hydrology Precipitation recorder period and UT4; and 1 Tipping Bucket Photos of flood indicators Yearly All four stream channels 2.2.1 Stream Profile A full longitudinal profile was surveyed in May 2020 for the entire length of the restored stream to document as-built conditions. This survey is tied to a permanent benchmark and includes thalweg, water surface, right bank and left bank features. Profile measurements were taken at the head of features (e.g. riffle, pool) and at the max depth of pools. The surveyed longitudinal profile shows that the constructed bedform features are mostly consistent with the reference and design criteria. Table 8 in Appendix D summarizes the measured profile data. UT1a, UT1c, UT2a, and UT4 each have pools that have filled in but are expected to flush out as riparian vegetation establishes. The longitudinal profile will not be surveyed in subsequent years unless vertical channel instability has been observed during monitoring and remedial actions or repairs are needed. 2.2.2 Stream Dimension Eighteen permanent cross sections were installed across the site; five on UT1, six on UT2, six on UT3 and one on UT4. Nine cross sections were installed in riffles and nine were installed in pools. Final cross-section locations did not vary significantly from the locations suggested in the mitigation plan. Each cross-section was marked using a length of rebar and T-posts on both streambanks. The location and elevation of each pin was recorded to facilitate data comparison from year to year. Cross-sections will be surveyed in Monitoring Years 1, 2, 3, 5, and 7 and reported data will include measurements of Bank Height Ratio (BHR) and Entrenchment Ratio Red Barn Mitigation Bank Site 7 As-built Baseline Monitoring Report-FINAL EPP Surry County, North Carolina (ER). Reference photos will be taken of both streambanks every year to provide a visual assessment of any changes that may occur. The surveyed cross-sections indicate that the as-built stream dimensions are consistent with the reference and design criteria. The cross-section plots, photos, and data summary (Tables 8 and 9) are included in Appendix D. As shown in Appendix D, the bankfull area was a little lower and the width-to-depth ratios a little higher than the design criteria in some riffles. These two tables will be updated in subsequent monitoring years to facilitate comparison between monitoring years. There should be little change in the channel dimension data over the monitoring period, but if changes do take place they will be documented and evaluated to determine if they indicate a shift toward stability (potentially represented by settling, vegetative changes, or deposition on top of stream banks) or instability (represented by erosion and down-cutting). Any unstable areas will be assessed to determine whether they are systemic and whether repairs are needed. 2.2.3 Channel Stability Channel stability will be assessed on a yearly basis using photographs to visually document the condition of the restored project streams. Photographs will be taken from the same location in the same direction each year. Thirty-two photo points were established during baseline monitoring and are shown in the CCPV (Figure 2) and As-built Plan Sheets (Appendix E). Visual assessments of channel stability will also be made regularly throughout the monitoring year. Any potential issues with the site will be documented, photographed and reported in the yearly monitoring report. Additional cross-sections will only be surveyed if instability is documented during monitoring. 2.2.4 Stream Hydrology Two pressure transducers were installed on UT1, UT2 and UT3, and one pressure transducer was installed on UT4 to document stream flow and the occurrence of bankfull events within the monitoring period. The locations of these gauges are shown in the CCPV (Figure 2 in Appendix B) and As-built Plan Sheets (Appendix E). Gauges were installed in the downstream end of pools. • The constructed bankfull elevation at each gauge was recorded. This elevation will be compared with the gauge readings to determine whether a bankfull event has occurred. Photos will be taken of flood indicators such as debris lines and sediment deposition on the floodplain whenever it is apparent that a bankfull event has occurred. • The elevation at the head of the downstream riffle at each gauge was also recorded. This elevation will be compared with the gauge readings to determine the duration of continuous flow. A tipping bucket rain gauge was also installed to accurately document rainfall at the Site. The rainfall data will be compared to the flow gauge data to verify that high flows at the Site are Red Barn Mitigation Bank Site 8 As-built Baseline Monitoring Report-FINAL EPP Surry County, North Carolina correlated with rainfall events. The monitoring gauges will be downloaded regularly throughout each monitoring year and data will be presented the annual monitoring reports. 2.3 Riparian Vegetation Riparian vegetation monitoring will evaluate the establishment of planted and volunteer vegetation across the Site. Monitored parameters, methods, schedule/frequency, and extent are summarized in Table D. These monitoring parameters follow USACE guidance but will also allow for monitoring of other parameters to document site performance related to the project goals listed in Section 1.1. Table D. Riparian Vegetation Monitoring Summary Schedule/ Parameter Method Number/Extent Data Collected Frequency Permanent Between July Species, height, 1st and leaf 6 plots, spread vegetation plots, location, planted vs. drop.As-built, across riparian 0.02 acre in size volunteer, age, woody Vegetation Years 1, 2, 3, 5, planting zones establishment (minimum) and 7 stem count. and vigor Annual random Between July 7 plots, vegetation plots, 1st and leaf randomly Species, height, 0.02 acre in size drop. Years 1, 2, selected each woody stem count. (minimum) 3, 5, and 7 year 1 Plot numbers 1, 2, 6,8, 10, 11.The remaining plots are in wetlands and covered in Section 2.4. 2.3.1 Baseline Vegetation Monitoring Baseline vegetation monitoring occurred in May 2020, soon after site planting was completed. Final vegetation plot location did not vary significantly from the locations suggested in the mitigation plan. The corners of the permanent vegetation plots were marked using steel t-posts and the location of each plot was recorded using GPS. The individual trees within each permanent plot were tagged and labeled to facilitate monitoring efforts in future years. The planted stems were counted and measured during baseline monitoring. Species data will be collected during Monitoring Year 1. In subsequent monitoring years, the location of the temporary random vegetation plots will be recorded using GPS and species and height data will be collected. The locations of permanent vegetation plots 1, 2, 6, 8, 10, and 11 are shown in the CCPV (Figure 2). The other permanent vegetation plots are located in wetlands and described in Section 2.4.1. Planted stems per plot in MVO ranged from 14 to 21, or 567 to 850 stems per acre. 2.4 Wetland Monitoring Wetland monitoring will include monitoring of the hydrologic functions and the establishment of planted and volunteer vegetation within WA, WB and WC. Monitored parameters, methods, schedule/frequency, and extent are summarized in Table E. These monitoring parameters Red Barn Mitigation Bank Site 9 As-built Baseline Monitoring Report-FINAL EPR Surry County, North Carolina follow USACE guidance but will also allow for monitoring of other parameters to document site performance related to the project goals listed in Section 1.1. Table E. Wetland Monitoring Summary Parameter Method Schedule/ Number/Extent Data Collected Frequency 9 gauges; two Continuous each in WA and Wetland Pressure transducers recordings WC,three in Water surface Hydrology through growing WB, and two in elevation. season the wetland creation area. 5 plots; one Species, height, each in WA,WC, Permanent vegetation location, planted and the creation plots, 0.02 acre in size As-built, Years 1, vs. volunteer, age, Vegetation (minimum) 2, 3, 5, and 7 area between woody stems establishment WA and WB, count. and vigor Between July 1st and two in WB. Annual random and leaf drop 3 plots, Species, height, vegetation plots, 0.02 randomly woody stems ed acre in size (minimum) sele yeareach count. 1 Plot numbers 3,4, 5, 7, and 9.The remaining plots are in wetlands and covered in Section 2.3. 2.4.1 Wetland Hydrology Two pressure transducers were installed in WA and two were installed in WC, three pressure transducers were installed in WB, and two were installed in the wetland creation area to document hydroperiod at the Site during monitoring. The locations of these gauges are shown in the CCPV (Figure 2 in Appendix B) and As-built Plan Sheets (Appendix E). Hydrological sampling will continue to take place throughout the growing season at intervals necessary to satisfy the jurisdictional hydrology success criteria within each wetland creation area (USEPA 1990). According to the Soil Survey of Surry County, the growing season is from April 8 to October 26 (USDA 2007). The beginning of the growing season will be confirmed annually by soil temperatures exceeding 41 degrees Fahrenheit at 20 inches (50 cm) depth and/or bud burst. Soil temperatures will be collected within wetlands A, B, C, and the creation area in late March of each monitoring year and will be reported in the annual monitoring report. A tipping bucket rain gauge was also installed to accurately document rainfall at the Site. The rainfall data will be compared to the groundwater gauge data to verify that high water levels at the Site are correlated with rainfall events. The monitoring gauges will be downloaded regularly throughout each monitoring year and data will be presented the annual monitoring reports. Red Barn Mitigation Bank Site 10 As-built Baseline Monitoring Report-FINAL EPP Surry County, North Carolina 2.4.2 Vegetation Establishment and Vigor Baseline vegetation monitoring occurred in May 2020. Final vegetation plot location did not vary significantly from the locations suggested in the mitigation plan. The corners of the permanent vegetation plots were marked using steel t-posts and the location of each plot was recorded using GPS. The individual trees within each permanent plot were tagged and labeled to facilitate monitoring efforts in future years. The planted stems were counted and measured during baseline monitoring. Species data will be collected during Monitoring Year 1. In subsequent monitoring years, the location of the temporary random vegetation plots will be recorded using GPS and species and height data will be collected. The locations of permanent vegetation plots 3, 4, 5, 7, and 9 are shown in the CCPV (Figure 2). The other permanent vegetation plots are located in riparian communities rather than wetlands and are described in Section 2.3.1. Planted stems per plot in MY0 ranged from 16 to 21, or 647 to 850 stems per acre. Red Barn Mitigation Bank Site 11 As-built Baseline Monitoring Report-FINAL EPR Surry County, North Carolina 3.0 REFERENCES North Carolina Ecosystem Enhancement Program. 2009. Upper Yadkin Pee-Dee River Basin Restoration Priorities. North Carolina Department of Environmental Quality, Division of Mitigation Services. 2017. As- built Baseline Monitoring Report Format, Data, and Content Requirement June 2017. North Carolina Division of Water Quality. 2008. Yadkin Pee-Dee Basinwide Water Quality Plan. U.S. Army Corps of Engineers. 2016. Wilmington District Public Notice: Notification of Issuance of Guidance for Compensatory Stream and Wetland Mitigation Conducted for Wilmington District. Red Barn Mitigation Bank Site 12 As-built Baseline Monitoring Report-FINAL EPR Surry County, North Carolina Appendix A Project Information Tables Table 1. Project Mitigation Components Table 2. Project Activity and Reporting History Table 3. Project Contacts Table Table 4. Project Baseline Information and Attributes Table 1a. Project Mitigation Components Red Barn Mitigation Bank Existing Mitigation As-Built Project Footage Plan Footage Mitigation Restoration Priority Mitigation Mitigation Comments Segment or Footage or or Category Level Level Ratio(X:1) Credits Acerage Acreage Acreage UT1 a 1170 1567 1567 Cool R P1 1.00000 1567 Creditable length begins following utility easement. I UT1b 0 538 538 Cool - P1 0.00000 0 E channel through wetland may not maintain high-water mark. UT1c 0 688 688 Cool R P2 1.00000 688 Culverted crossing not included in mitigation length. UT2a 1019 1186 1186 Cool R P1 1.00000 1186 Culverted crossing not included in UT2b 929 1011 1023 Cool R P2 1.00000 1023 mitigation length.Channel re aligned during construction to avoid bedrock. UT2c 240 240 240 Cool El - 1.50000 160 Pedestrian bridge crossing not included in mitigation length. UT3a 1526 1378 1378 Cool R P2 1.00000 1378 Culverted crossing not included in mitigation length. UT3b 186 190 190 Cool El - 1.50000 127 UT3c 1015 1087 1087 Cool R P1 1.00000 1087 Riffle crossing not included in I mitigation length. UT3d 109 97 97 Cool Ell - 2.50000 39 UT4 89 134 130 Cool El - 1.50000 86 Jurisdicational point moved downstream during construction. Red text indicates values updated from Approved MBI. Appendix A Red Barn Mitigation Bank As-built Baseline Monitoring Report ECOSYSTEM PLANNING& EPR RESTORATION Table 1a. Project Mitigation Components (continued) Red Barn Mitigation Bank Existing Mitigation As-Built Project Footage Plan Footage Mitigation Restoration Priority Mitigation Mitigation Comments Segment or Footage or or Category Level Level Ratio(X:1) Credits Acerage Acreage Acreage Planted,excluded livestock, plugged ditches,and WA 1.400 0.830 0.830 RR Rehabilitation 1.50000 0.55 encompassess section of priority 2 reach.Calculation error in Approved MBI. Planted,excluded livestock, WB 2.400 1.030 1.030 RR Rehabilitation 1.50000 0.69 plugged ditches,and encompassess section of priority 2 reach. Planted,excluded livestock, plugged ditches,and WC 0.800 0.540 0.520 RR Rehabilitation 1.50000 0.35 encompassess section of priority 2 reach. Easement crossing relocated during construction. Wetland Planted,excluded livestock,and Creation 0.000 1.290 1.290 RR Creation 3.00000 0.43 encompassess section of priority 2 reach. Red text indicates values updated from Approved MBI. Appendix A Red Barn Mitigation Bank As-built Baseline Monitoring Report ECOSYSTEM rE PLANNING& PR RESTORATION Table 1b. Project Mitigation Components Red Barn Mitigation Bank Stream Credits Riparian Wetland Restoration Level Credits Non-Rip Coastal Wetland Marsh Warm Cool Cold Riverine Non-Riv Restoration 6929.000 Re-establishment Rehabilitation 1.590 Enhancement Enhancement I 373.000 Enhancement II 39.000 Creation 0.430 Preservation Totals 7341.000 2.020 Total Base SMUs 7 7341.000 Credit Loss in Required Buffer -238.490 Credit Gain for Additional Buffer 929.870 Net Change in Credit from Buffers 691.390 Total Adjusted SMUs* 8032.390 *Credit adjustment for Non-standard Buffer Width calculation using Wilmington District Stream Buffer Credit Calculator(Updated 1/19/2019) Red text indicates values updated from Approved MBI. Appendix A Red Barn Mitigation Bank As-built Baseline Monitoring Report P rvI PLANNING& EPR RESTORATION Table 2. Project Activity and Reporting History Red Barn Mitigation Bank Elapsed Time Since grading complete: 0 yrs 3 months Elapsed Time Since planting complete: 0 yrs 2 months Number of reporting Years': 0 Activity or Deliverable Data Collection Complete Completion or Delivery Institution Date - Oct-17 404 permit date - Nov-19 Final Mitigation Plan 2018 to 2019 Nov-19 Final Design—Construction Plans - Nov-19 Site Earthwork Dec 2019 to April 2020 Apr-20 As-Built Survey Performed May-20 May-20 Bare root plantings - Apr-20 As-built Baseline Monitoring Report(Monitoring Year 0) May-20 Jun-20 Year 1 Monitoring 2020 Dec-20 Year 2 Monitoring 2021 Dec-21 Year 3 Monitoring 2022 Dec-22 Year 4 Monitoring 2023 Dec-23 Year 5 Monitoring 2024 Dec-24 Year 6 Monitoring 2025 Dec-25 Year 7 Monitoring 2026 Dec-26 1 =The number of reports or data points produced excluding the baseline Appendix A Red Barn Mitigation Bank ECOSYSTEM PLANNiNG& As-built Baseline Monitoring Report EPR RESTORATION Table 3. Project Contacts Table Red Barn Mitigation Bank Ecosystem Planning and Restoration, PLLC Designer 1150 SE Maynard Rd.Ste 140 Cary, NC 27511 Primary project design POC Kevin Tweedy, PE(919)388-0787 Construction Contractor North State Environmental 2889 Lowery St,Winston-Salem, NC 27101 Construction contractor POC Darrell Westmoreland Survey Contractor Turner Land Surveying, PLLC PO Box 148,Swannanoa, NC 28778 Survey contractor POC Lissa Turner(919)827-0745 Planting Contractor North State Environmental 2889 Lowery St,Winston-Salem, NC 27101 Planting contractor POC Darrell Westmoreland Seeding Contractor North State Environmental 2889 Lowery St,Winston-Salem, NC 27101 Contractor point of contact Darrell Westmoreland Nursery Stock Suppliers Foggy Mountain Nursery Dykes and Son Nursery Ecosystem Planning and Restoration, PLLC Monitoring Performers Stream Monitoring POC Cidney Jones, EPR(919)388-0787 Vegetation Monitoring POC Tom Barrett, EPR(919)388-0787 Appendix A Red Barn Mitigation Bank ECOSYSTEM PLANNING& As-built Baseline Monitoring Report EPR RESTORATION Table 4. Project Baseline Information and Attributes Red Barn Mitigation Bank Project Background Information Project Name Red Barn Mitigation Bank County Surry County Project Area(acres) 25.3 Project Coordinates(latitude and longitude) 36.489800,-80.641100 Planted Acreage(Acres of Woody Stems Planted) 22.2 Project Watershed Summary Information Physiographic Province Northern Inner Piedmont River Basin Yadkin Pee-Dee USGS Hydrologic Unit 8- 03040101 USGS Hydrologic Unit 14- 3040101100010 digit digit Project Drainage Area(Acres and Square 233.1 acres/0.47 Sq.Mi. Miles) Project Drainage Area Percentage of 1 Impervious Area CGIA Land Use Classification Pasture(22.5%), Forest(27.3%), Residential(21.3%), Cropland(17.4%), Urban(7%) Reach Summary Information Parameters UT1 UT2 UT3 UT4 Length of reach(linear feet) 2255 2449 2752 130 Valley confinement(Confined,moderately Unconfined Unconfined Confined Confined confined, unconfined) 47.4 acres/0.05 93.23 acres/0.15 82.21 acres/0.25 Drainage area(Acres and Square Miles) 10.22 acres/0.02 sq. mi. sq.mi. sq. mi. sq. mi. Perennial, Intermittent, Ephemeral Perennial Perennial/ Perennial Intermittent Intermittent NCDWR Water Quality Classification N/A Stream Classification(existing) B5 B5/F5 B/G5, B4c,and F4 B5 Stream Classification(proposed) C5b/C5 C5/B5c B4/B4c/C4 B4c Evolutionary trend(Simon) Stage 2/5 Stage 2/5 Stage 3-5 Stage 5 FEMA classification AE/X AE/X AE/X X Appendix A Red Barn Mitigation Bank ECOSYSTEM PLANNING& As-built Baseline Monitoring Report EPR RESTORATION Table 4. Project Baseline Information and Attributes (continued) Red Barn Mitigation Bank Wetland Summary Information Parameters Wetland A Wetland B Wetland C Wetland D Size of Wetland(acres) 1.2 2.4 0.8 0.04 Wetland Type(non-riparian,riparian riverine Riparian Riverine Riparian Riverine Riparian Riverine Riparian Riverine or riparian non-riverine) Dillard fine sandy Rhodhiss Mapped Soil Series loam Colvard and suches Colvard and suches Bannertown Complex Drainage class Moderately Well- Well-drained Well-drained Well-drained Drained Soil Hydric Status Non-Hydric' Non-Hydric` Non-Hydric` Non-Hydric. Groundwater, Groundwater, Source of Hydrology Perecipitation and Perecipitation and precipitation,runoff, precipitation, runoff runoff runoff,overbank overbank flooding flooding Restoration or enhancement method Hydrologic and Hydrologic and Hydrologic and (hydrologic,vegetative etc.) Vegetative Vegetative Vegetative Regulatory Considerations Parameters Applicable? Resolved? Supporting Docs? Water of the United States-Section 404 Yes Yes USACE Nationwide Permit No.27-ID#SAW- 2017-01927 Water of the United States-Section 401 Yes Yes DWQ 401 Water Quality Certification No.4134- ID#18-0182 Division of Land Quality(Erosion and General Permit NCG010000-ID#SURRY-2020- Sediment Control) Yes Yes 015 Endangered Species Act Yes Yes Appendix 5 of Mitigation Plan Historic Preservation Act Yes Yes Coastal Zone Management Act(CZMA or No CAMA) FEMA Floodplain Compliance Yes Yes Surry County Zoning Permit approved 8/23/2019 Essential Fisheries Habitat No - +Jurisdictional wetlands were identified on soils mapped as non-hydric. Appendix A Red Barn Mitigation Bank ECOSYSTEM PLANNSNG& As-built Baseline Monitoring Report EPR RESTORATION Appendix B Visual Assessment Exhibits and Guidance Figure 1. Project Location Map Figure 2. Current Condition Plan View Figure 3. Riparian Buffer Zones Baseline Photo Log Wilmington District Stream Buffer Credit Calculator o I morhorL. 1 S, f' pa; 4. t) * I ` + O, L+Lino,Fd�. in a* SURRY COUNTY % a \� i �6� %� m A 1.1 0 a23 a ' y I's x 11i Rive rxqe Pan Lr a �S db �'0e sr odenoe tiiv N Oak Stf. 1ndc4e S Site Coordinates a Hardy's CustomGoit 9 ----W Pine St - «�_ ~-- 36.4898 °N Center Oldr15.a _-0e9 r= W.. Mt Airy 4 80.6411 °W 7 104,/td :. "e sr * ,. s z si pqi Er Oak RidgeQ V-a a s '%s ^o r 0,a. 5) 413 EN'ernont Rd .� yS ir e- UGC r • CD r Il'ed Brush Rd w CaugNc Worth St N. s. 0 S], 1(I z A Snoylhilll7r 6 tr Q 3 r s� o D naY di FNurF • Airvtcw 0ei- T Cr14,. Park c A ,a,C�r,e Wars - °°Rd $ __ _ r a i601 h prnevtew Or w d b Carte'Si �o� Coot" Chandirr Ra vltv`p v 'n Q O SCOtt$Utz,,,;,k d Creek Legend R:"har ¢C. W /� e. 0'..al i��el 4, Conservation Easement —.Po+'riry �ekq"r�� PREPARED BY: 0 1,500 3,000 RED BARN MITIGATION BANK SITE ECOSYSTEM Feet PL4NNING & VICINITY MAP EPR RESTORATION FIGURE 1 SURRY COUNTY, NC MAY 2020 ate = + ' _41FiejlIGURE�r y + � r x __.‘i , „ '10....X. ..... „_,. '74 1 Y \ ` r i cl L A - . \ 0 �," • �- 1V Y T• m , f' o #. FIGURE a ' r', .. r n Ar y t h... s`T to\ , i ,- . 4. , lit • t• • •. 1 '''''--.;-... , 4_ • . re �f, r ! i .• W - t A r 4 o Photo Points Cross Section Monitoring Gauges Structures Gates Wetland -Creation • Baro Gauge Top of Bank i i Fencing k:';::•:':I Wetland - Existing $ Rain Gauge Pre-Existing Streams Project Streams Vegetation Plots $ Stream Gauge Conservation Easement • Wetland Gague NC OneMap Orthoimagery(2018) 0 300 600 N RED BARN MITIGATION BANK SITE 0 ' Feet CURRENT CONDITION PLAN VIEW: OVERVIEW MAP MAY 2020 1 inch =600 feet MYO: 2020 mrogrroon serWcec ECOSYSTEM FIGURE 2 SURRY COUNTY, NC PLANNING& RESTORATION r` 7 Bamboo to be treated in Winter 2020 XS1 81 \I ::: TSG1 =�As IXp 'if UT1 .. illtraie j:Iffr7 WG1® .., ... . VP34.1.1.1t7 / .balk Allif WG3• RAIN GAb ® =•A, i 1+• '• +.., +. �4+ 40 • i'- A 4t XS4 2� �G4 Og VP4 :(VP5 )(SS `yams6 0 Photo Points Cross Section Monitoring Gauges Structures A Gates Wetland - Creation • Baro Gauge Top of Bank i i Fencing 1:::•-:::•:':I Wetland - Existing ® Rain Gauge Pre-Existing Streams Project Streams MI Vegetation Plots ® Stream Gauge Conservation Easement • Wetland Gague NC OneMap Orthoimagery(2018) o 100 200 N RED BARN MITIGATION BANK SITE 0 ' Feet CURRENT CONDITION PLAN VIEW: ASSET MAP AUGUST 2020 1 inch =200 feet MYO: 2020 Mtganon Seevkes ,�`FIGURE 2Aa SURRY COUNTY, NC ECOSYSTEM PLANNING& RESTORATION XS4 2 � ® G4 C VP4 LT1 XS9 = `i f� VP5 .... XS5 ®':::':.: WG5 :. :'•, r. WG6ED s ` •r XS7SG311 VP7 XS6 i -T - - _ � UT2 • `���' � ;,; •:.,t��`Jlr ,,,�, � ., �l r ,,'tip- 'vr • r�-� •. , SG4 VP8.A 4s 'x " t. AI ar y.wr r Pedestrian Crossing; UT3 O Photo Points Cross Section Monitoring Gauges Structures o Gates Wetland - Creation • Baro Gauge Top of Bank Fencing Wetland - Existing ® Rain Gauge Pre -Existing Streams Project Streams Vegetation Plots ® Stream Gauge (� Conservation Easement • Wetland Gague NC OneMap Orthoimagery (2018) 0 100 200 N RED BARN MITIGATION BANK SITE Feet CURRENT CONDITION PLAN VIEW: ASSET MAP 1C_AUGUST 2020 1 inch = 200 feet MYO: 2020 Mrtrym�o�seevkes ECOSYSTEM FIGURE 213 SURRY COUNTY, NC PLANNING& ARESTORATION .:� rr% 1stags' t. 4-4 WG8 t.„.* j D • BA- •' - - t? 4. Riffle Crossing SG5 ©`. ti :vil SG7 lk. il ? ........--,," r` ---_, ._ , .. tI I 'A,l ' ,*iI XS12 1 if I. x�; -ji Y ' 16 i; 1 • m ' ' . " 0 Photo Points Cross Section Monitoring Gauges Structures A Gates Wetland - Creation • Baro Gauge Top of Bank i i Fencing 1::••.:::•::::I Wetland - Existing ® Rain Gauge Pre-Existing Streams Project Streams MI Vegetation Plots ® Stream Gauge MM Conservation Easement • Wetland Gague NC OneMap Orthoimagery(2018) 0 100 200 N 0 RED BARN MITIGATION BANK SITE ' Feet CURRENT CONDITION PLAN VIEW: ASSET MAP AUGUST 2020 1 inch =200 feet MYO: 2020 Nirrifp8pn servkec ECOSYSTEM FIGURE 2G SURRY COUNTY, NC ,�`F4- PLANNING BC RESTORATION — -': 11 —".-:'r -' ", • " ' r‘ .. ...4 . . ..... ,"V.4.F, '>..= r- ": . .''.,0,4k, . " :' \I„...,----0," '': "...,'"'`,_-','"t",.-.- .'i "' - C • ` -'WC 4 �, u .- "�� l •'''psi .' -�" -fi" }, - . R} . a { �a �� � : � �3� "�r try h .w f� <:' ')';,,L',... -...t ' ; ' c11111111111111. .,,,, ,:ti, - it, _ .. + allikL.' LEGEND ' . CONSERVATION EASEMENT = mac e• r- • IDEAL BUFFER ZONES �' :: ' ' ., :- ACTUAL BUFFER ZONENtv S ` 144: �S. P ate �C 015 i.. ir 15 20 -. 20-25 25 30 . - 30-50 r ` �' 50-75 y i `'ih'k --.1.114�y 75100 # fi rt x t� �; 100-1 25 k.: 7,4 125-150 , o 250 500 RED BARN MITIGATION BANK SITE PREPARED ST ECOSYSTEM Feet RIPARIAN BUFFER ZONES PLANNING & EPR RESTORATION FIGURE 3 SURRY COUNTY, NC MAY 2020 Red Barn Mitigation Bank Baseline - Photo Log UTI r .r. .t - _ ` :ems. �z � i,� �� ".� �a „_ ., 'n _ emst .::r ,;, ' � $ Photo Point 1 —Sta. 12+25 Photo Po int 2—Sta. 14+3,..17.„.„4,,,,,,,,4„,,,,,:,.,;,!.•,.., , ._, ..„ .„,.1.4.„*.•:„..;:::....„. _ ...., :ii ..,4„ Facing Upstream (3/27/2020) Facing Upstrea • m (1/22/2020) 1111, ` a it . �a Photo Point 3—Sta. 14+40 Photo Point 4—Sta. 21+70 Facing Downstream (3/18/2020) Facing Downstream (3/18/2020) 1r^, ei a n "$per �' r ��,'�^' ��-�, a.,i§� "-+$d�'�t �rA .. y{„V_ va k e v i rtr '�` Photo Point 5—Sta. 23+80 Photo Point 6—Sta. 29+60 Facing Downstream (3/18/2020) Facing Upstream (3/27/2020) Appendix B ECOSYSTEM Red Barn Mitigation Bank . PLANNING& As-built Baseline Monitoring Report RESTORATION UT1 a s• ro� I,0 ~ � i 3 F erg.'.: -� .•.r:. ._.' . .lrS.� - tin F - Photo Point 7—Sta. 31+50 ; �' Facing Downstream (4/16/2020) P� . Pk1 k ' ,� , Photo Point 8—Sta. 31+50 ' - �; �--' �, Facing Upstream (3/27/2020) pr 'tei-i� ;{5 ,"{:,2 FY' ; �y �`�� C7�`4,� j.- � 1 !J`s7gf'Sft s` -` s;r •I:. r*Ply tj h ,, 3;1 kl j Y. Photo Point 9—Sta. 34+40 Facing Upstream (3/27/2020) UT2 ' fir, ��.��,� .., •. ,� . ..._ ua mks . A c, s „ ,, — Y_. \fi�! ' Photo Point 10—Sta. 10+40 Photo Point 11 —Sta. 14+75 Facing Downstream (4/16/2020) Facing Upstream (3/27/2020) Appendix B r. ECOSYSTEM Red Barn Mitigation Bank . PLANNING& As-built Baseline Monitoring Report RESTORATION UT2 / ?= hh.4—.0 `� U. � S u 4 ' v '. ism.. • .'. .w,F .=w a .ti Photo Point 12—Sta. 15+80 Photo Point 13—Sta. 18+65 Facing Upstream (3/27/2020) Facing Upstream (3/27/2020) . I1.iw it a. s --•' , t�(� �y ram•'. Photo Point 14—Sta. 22+00 Photo Point 15—UT2 Culvert Facing Upstream (4/16/2020) Facing Upstream (4/16/2020) L r ip s • '` ,. o- ? i ; r Photo Point 16—UT2 Culvert Photo Point 17—Sta. 29+50 Facing Downstream (4/16/2020) Facing Upstream (4/16/2020) Appendix B ECOSYSTEM Red Barn Mitigation Bank . PLANNING& As-built Baseline Monitoring Report RESTORATION UT2 �,.� g X �M rrX> n v }ash b y : ' '- t �r' k a -: kJ- Photo Point 18-Sta 31+36 Photo Point 19-Sta 34+10 Facing Downstream (4/16/2020) Facing Upstream, Pedestrian Crossing (7/29/2020) UT3 Y :, .. s - ; { aid Y- »xq�. ., Photo Point 20-Sta. 13+50 Photo Point 21 -UT3 Culvert Facing Upstream (4/16/2020) Facing Upstream (3/27/2020) , 4 irli „g 3 w . .� gy �, r '� :i y e, I� "T C - g lat•iiti---1",:g;...--';'''.."?.,.:f ;,;••••••,,,..,••Z„..., '•-.4.--.". Photo Point 22-UT3 Culvert Photo Point 23-Sta. 22+00 Facing Downstream (3/27/2020) Facing Upstream (3/27/2020) Appendix B ECOSYSTEM Red Barn Mitigation Bank . PLANNING& As-built Baseline Monitoring Report RESTORATION UT3 Plirlir akd�} >.y1' +,oft+.olirte � , � ; w g Photo Point 24—Sta. 25+50 Photo Point Facing Upstream (4/16/2020) Facing Downstream25— (3/18/202Sta. 28+050) _,„.„,1„...-1...,,,. . *141...4-1P-zi," :':":I " '-443ii --4-,..„.:„..:. .. , `s ' . • , -,..-,„ ',fi•*4T-4,*•.47''''N-r,*..F',;','--1-_,,.''', ••'.'.2,,,,. _:-., ,A.,:„.4,_ _. , _,., '..v ,4.gtfr,' '.--A.,,,'-' ,,, --;-T4•'1,-:' -..''%',0"1"4'0..-',7-* fwY tee: 7 p p,. a .r "fie-, +a fir "� fi � � Photo Point 26—Sta..30+75 Photo Point 27—Sta. 33+00 Facing Upstream,ATV Crossng (9/29/2020) Facing Upstream (4/16/2020) a y�, -c -,,,,,,,,,,A.:.. .. ........-,.,-.: ,-, A y a`ate r: -. -'i.� s � "�. " �- - „may�,:.s nw. �; ti ,, '-'4 '-41?*'' '14 ;--,51.,14.:..t.-;_-----, ----:::,-;,-. : - �u'a►, is -,.,4' � �� � g# • �� r ri °—. ' �q 4:1- • Photo Point 28—Sta. 36+00 Photo Point 29—Sta. 36+65 Facing Upstream (3/27/2020) Facing Upstream (3/27/2020) Appendix B ECOSYSTEM Red Barn Mitigation Bank . PLANNING& As-built Baseline Monitoring Report RESTORATION v v rr11� f �"Rd4 . L• _ - n% Spy 3 �m`� " its n �r�, � ., ,Nr0•4•,,;•;y4--;;Ike:`,.• Photo Point 30—Sta. 36+g5 Facing Downstream (3/27/2020) UT4 • .o- -1;.,= 4ere' t ' C' "4' ' .try . 'a r . � a 'Yf z 'a ! ;( a3t , . ak *t* A 8- hrt il " „,,„ a' .. y ¢ " x h f .a xk xss . .ttf `E',i ' .- am. Photo Point 31 —Sta. 10+25 Photo Point 32—Sta. 11+00 Facing Upstream (3/27/2020) Facing Upstream (4/16/2020) ECOSYSTEM f...Appendix B Red Barn Mitigation Bank . PLANNING& As-built Baseline Monitoring Report RESTORATION Wilmington District Stream Buffer Credit Calculator Site Name: Red Barn Mitigation Bank USACE Action ID: SAW-2017-01927 NCDWR Project Number: NA Sponsor: NCDOT County: Surry Minimum Required Buffer Widths: 30 Mitigation Ratio Creditable Stream Mitigation Type Baseline Stream Credit Multiplier2 Length Restoration(1:1) 1 6929 6929.00 Enhancement I(1.5:1) 1.5 560 373.33 Enhancement II(2.5:1) 2.5 97 38.80 Preservation(5:1) 5 Other(7.5:1) 7.5 Other(10:1) 10 Custom Ratio 1 Custom Ratio 2 Custom Ratio 3 Custom Ratio 4 Custom Ratio 5 Totals 7586.00 7341.13 Buffer Width Zone(feet from Ordinary High Water Mark) Buffer Zones less than 15 feet >15 to 20 feet >20 to 25 feet >25 to 30 feet >30 to 50 feet >50 to 75 feet >75 to 100 feet >100 to 125 feet >125 to 150 feet Max Possible Buffer(square feet)4 227580 75860 75860 75860 303440 379300 379300 379300 379300 Ideal Buffer(square feet)5 229256 75047.4 73541.3 72117.4 281281 347624 348406 350252 354063 Actual Buffer(square feet)6 224609 72300.6 70157.4 68209.1 235238 159650.5889 67320.01043 37906.42658 26495.0984 Zone Multiplier 50% 20% 15% 15% 9% 7% 6% 5% 3% Buffer Credit Equivalent 3670.57 1468.23 1101.17 1101.17 660.70 513.88 440.47 367.06 220.23 Percent of Ideal Buffer 98% 96% 95% 95% 84% 46% 19% 11% 7% Credit Adjustment -74.40 -53.74 -50.67 -59.68 552.55 236.01 85.11 39.73 16.48 Credit Loss in Required Credit Gain for Net Change in Total Baseline Credit Total Credit Buffer Additional Buffer Credit from Buffers 7341.13 -238.49 929.87 691.39 8032.52 'Minimum standard buffer width measured from the top of bank(50 feet in piedmont and coastal plain counties or 30 feet in mountain counties) 2Use the Custom Ratio fields to enter non-standard ratios,which are equal to the number of feet in the feet-to-credit mitigation ratio(e.g.,for a perservation ratio of 8 feet to 1 credit,the multiplier would be 8). 3Equal to the number of feet of stream in each Mitigation Type. If stream reaches are not creditable,they should be excluded from this measurement,even if they fall within the easement. 4This amount is the maximum buffer area possible based on the linear footage of stream length if channel were perfectly straight with full buffer width. This number is not used in calculations,but is provided as a reference. 'Maximum potential size(in square feet)of each buffer zone measured around all creditable stream reaches,calculated using GIS,including areas outside of the easement. The inner zone(0-15')should be measured from the top of the OHWM or the edge of the average stream width if OHWM is not known. Non-creditable stream reaches within the easement should be removed prior to calculating this area wtih GIS. 'Square feet in each buffer zone,as measured by GIS,excluding non-forested areas,all other credit type(e.g.,wetland,nutrient offset,buffer),easement exceptions,open water,areas failing to meet the vegetation performance standard,etc.Additional credit is given to 150 feet in buffer width,so areas within the easement that are more than 150 feet from creditable streams should not be included in this measurement. Non-creditable stream reaches within the easement should be removed prior to calculating this area wtih GIS. Appendix C Vegetation Plot Data Table 5. Vegetation Planting Information Table 6. Riparian Buffer Vegetation Totals Table 7. Stem Count By Plot Vegetation Photo Log Table 5. Vegetation Planting Information Red Barn Mitigation Bank Livestake Planting (1.5 acres) Scientific Name Common Name % by Species Approx. Stem Count Corpus amomum Silky dogwood 40% 1960 Physocarpus opulifolius Ninebark 10% 490 Salix sericea Silky willow 30% 1470 Sambucus canadensis Elderberry 10% 490 Salix nigra Black willow 10% 490 Total 100% 4901 Zone 2 - Riparian Buffer(12.2 acres) 680 stems per acre (8'x 8'spacing) Scientific Name Common Name %by Species Approx.Stem Wetland Indicator Count Status Betula nigra River Birch 15% 1244 FACW Carpinus caroliniana Ironwood 10% 830 FAC Celtis laevigata Sugarberry 5% 415 FACW Diospryos virginiana Persimmon 10% 830 FAC Platanus occidentalis Sycamore 25% 2074 FACW Quercus nigra Water Oak 10% 830 FAC Quercus phellos Willow Oak 15% 1244 FAC Ulmus americana American Elm 10% 830 FACW Total 100% 8296 Zone 3 -Wetlands (6.8 acres) 680 stems per acre (8'x 8' spacing) Scientific Name Common Name %by Species Approx.Stem Wetland Indicator Count Status TREES Betula nigra River Birch 15% 694 FACW Platanus occidentalis Sycamore 25% 1156 FACW Quercus michauxii Swamp chesnut oak 25% 1156 FACW Quercus phellos Willow Oak 15% 694 FAC Ulmus americana American Elm 10% 462 FACW SHRUBS Alnus serrulata Tag Alder 5% 231 OBL Cephanlanthus occidentalis Buttonbush 2% 92 OBL Ilex verticillata Winterberry 3% 139 FACW Total 100% 4624 Appendix C Red Barn Mitigation Bank PLANNING SYSTEM& As-built Baseline Monitoring Report I EPR RESTORATION Table 5 (continued). Vegetation Planting Information Red Barn Mitigation Bank Zone 4 -Wetlands (1.3 acres) 680 stems per acre (8'x 8' spacing) Scientific Name Common Name %by Species Approx.Stem Wetland Indicator Count Status Carya glabra Pignut Hickory 10% 88 FACU Carya tomentosa Mockernut Hickory 12% 106 NI* Cercis canadensis Redbud 5% 44 FACU Corpus florida Flowering Dogwood 5% 44 FACU Diospyros virginiana Persimmon 12% 106 FAC Liriodendron tulipifera Tulip Poplar 12% 106 FACU Oxydendrum arboreum Sourwood 5% 44 UPL Quercus a/ba White Oak 15% 133 FACU Quercus falcata Southern Red Oak 12% 106 FACU Quercus rubra Northern Red Oak 12% 106 FACU Total 100% 884 Zone 6 -Wetland Containerized Stock(0.4 acres) 680 stems per acre (8'x 8' spacing) Scientific Name Common Name %by Species Approx.Stem Wetland Indicator Count Status Platanus occidentalis Sycamore 100% 272 FACW Total 100% 272 *NI=No indicator status Table 6. Riparian Buffer Vegetation Totals Success Criteria Plot# Total Stems per Acre Met? 1 769 Yes 2 567 Yes 3 647 Yes 4 688 Yes 5 567 Yes 6 769 Yes 7 850 Yes 8 728 Yes 9 728 Yes 10 850 Yes 11 567 Yes Project Avg 703 Yes Appendix C ECOSYSTEM Red Barn Mitigation Bank PLANNING& As-built Baseline Monitoring Report I EPR RESTORATION Table 7. Stem Count By Plot Red Barn Mitigation Bank Current Plot Data(MY0 2020) Species VP-1 VP-2 VP-3 VP-4 VP-5 VP-6 Scientific Name —Common Name Type Planted Vol Total Planted Vol Total Planted Vol I Total Planted Vol Total Planted Vol Total Planted Vol Total Alnus serrulata Tag Alder Shrub JI Betula nigra River Birch Tree Carpinus caroliniana Ironwood Tree Celtis laevigata Sugarberry Tree ephanlanthus occidentali Buttonbush Shrub Corpus amomum Silky dogwood Shrub Diospryos virginiana Persimmon Tree Ilex verticillata Winterberry Shrub Physocarpus opulifolius Ninebark Shrub Platanus occidentalis Sycamore Tree Quercus michauxii Swamp chesnut oak Tree Quercus nigra Water Oak Tree Quercus phellos Willow Oak Tree Salix nigra Black willow Tree Salix sericea Silky willow Tree Sambucus canadensis Elderberry Shrub Ulmus americana American Elm Tree Initial count of bare root planted stems,species TBD 19 19 14 14 16 16 17 17 14 14 19 19 Stem count 19 0 19 14 0 14 16 0 16 17 0 17 14 0 14 19 0 19 size(ares) 1 1 1 1 1 1 size(ACRES) 0.02 0.02 0.02 0.02 0.02 0.02 Species count 1 0 1 1 0 1 1 0 1 1 1 0 1 1 0 1 I 1 0 1 Stems per ACRE 769 0 769 567 0 567 647 0 647 688 0 688 567 0 567 769 0 769 Color for Density Exceeds requirements by 10% Exceeds requirements,but by less than 10% Fails to meet requirements,by less than 10% Fails to meet requirements by more than 10% Volunteer Species Included in Total Appendix C ECOSYSTEM Red Barn Mitigation Bank PLANNING& g EPR RESTORATION As-built Baseline Monitoring Report Table 7 (continued). Stem Count By Plot Red Barn Mitigation Bank Current Plot Data(MY0 2020) Annual Means Species VP-7 VP-8 VP-9 VP-10 VP-11 MY0(2020) Scientific Name —Common Name Type Planted Vol Total Planted Vol Total Planted Vol I Total Planted Vol Total Planted Vol Total Planted Vol Total Alnus serrulata Tag Alder Shrub JI Betula nigra River Birch Tree Carpinus caroliniana Ironwood Tree Celtis laevigata Sugarberry Tree ephanlanthus occidentali Buttonbush Shrub Corpus amomum Silky dogwood Shrub Diospryos virginiana Persimmon Tree Ilex verticillata Winterberry Shrub Physocarpus opulifolius Ninebark Shrub Platanus occidentalis Sycamore Tree Quercus michauxii Swamp chesnut oak Tree Quercus nigra Water Oak Tree Quercus phellos Willow Oak Tree Salix nigra Black willow Tree Salix sericea Silky willow Tree Sambucus canadensis Elderberry Shrub Ulmus americana American Elm Tree Initial count of bare root planted stems,species TBD 21 21 18 18 18 18 21 21 14 14 17 17 Stem count 21 0 21 18 0 18 18 0 18 21 0 21 14 0 14 17 0 17 size(ares) 1 1 1 1 1 1 size(ACRES) 0.02 0.02 0.02 0.02 0.02 0.02 Species count 1 0 1 1 0 1 1 0 1 1 1 0 1 1 0 1 I 1 0 1 Stems per ACRE 850 0 850 728 0 728 728 0 728 850 0 850 567 0 567 703 0 703 Color for Density Exceeds requirements by 10% Exceeds requirements,but by less than 10% Fails to meet requirements,by less than 10% Fails to meet requirements by more than 10% Volunteer Species Included in Total Appendix C ECOSYSTEM Red Barn Mitigation Bank PLANNING& g EPR RESTORATION As-built Baseline Monitoring Report Red Barn Mitigation Bank Vegetation Photo Log ,, y,.f I g �yQ, -- �` �'" �' � �r".. fib. .. ', i - K rw e�..�`4`• -awB i`� , � u.: j ,.:• ,fir.?''_ ler, • - � 5,,:;„..":.:, ' �.nf F i' �y A. nr ",• "a^ '4Fs` u " �s s 2w r ti', �� `�'� 1 d7z$` v' u i. tc�` q, '4'y F j 5a t�y r 4 . ' wr x F ."k.+, � �am ,d �44P a.,h, �` fi' '` �� .4 y j► i " ' F . . « r € A�gga : ... d t -FF id. `, ,,t.,.- ''- R''� - � --W— - a`f4�-: y11�a*,.,"' - 3 , ' : .a �`i? �; i 4"fiy F 5'SY x' L y k M { k-. ,-i_.\ � maVeg Plot 1 —NW Corner(5/6/2020) ir_rR` NV eg Plot 2—E Corner(5/6/2020) • • , "'l+ Z.: ' ,. ' w Svc.. ` .h �rod .• ▪ d"- ", t ^� -Z-r : a• arT▪ a v k • pd ad 4 ' r„ T }tr _✓ a-, '',E s ux'^ is#" a' k .w' ; Veg Plot 3—N Corner(5/6/2020) Veg Plot 4—W Corner(5/6/2020) ,., +.d v * I $fir " ` 8 tv 3'".'1,--,_}:::h ,: d ex' ., -. i' as 4 r 8- 1'''•• .w "'•3 „f �, " - ,..-.. .,-yam a ,,wag$ s -' . w^�• c ^�: :^.r 1 : =T " • ' 4::-.+{. a. „'. { + a"i" o• �'yy} yes ya. •4 may_ e ' • ^e , ..✓�'.I��T i_: '.�`�A3:� u v �- u a� 4 C'i .x .e .• — .. �..- .. h� xi. t,... • Veg Plot 5—NW Corner(5/6/2020) Veg Plot 6—W Corner(5/6/2020) ECOSYSTEM Appendix C Red Barn Mitigation Bank . PLANNING& As-built Baseline Monitoring Report RESTORATION �" x,�`�' ., r - �.:5. ,.„ ems: • `',uvb x.�- N* F���+ f�`s- {emu g v k ° 'k� f Ti�R `fit w y Veg Plot 7—W Corner(5/6/2020) Veg Plot 8—W Corner(5/6/2020) lillr 1 � �- e s ,, . r '. 4$ - > c - �, �" xay, - . "`.tip y i r e� # F '3�.t r z '� - '� 7. ..,, • sits •"'_ � :I' ca "' a . F �+. A `: .1.. ,.. I'_ : ..`r!,i- . :hJ!n nxP- 3 � r( A wj t l .y. Veg Plot 9—S Corner(5/6/2020) Veg Plot 10—S Corner(5/6/2020) rg ;' - , v.-dde'" rt %_ Ems' ^'Se �, A , S T-4, f dr fV'1�:. , F "y 1' a->- PL _ p k „!Ga xa Veg Plot 11 —SE Corner(5/6/2020) ECOSYSTEM Appendix C Red Barn Mitigation Bank PLANNING& As-built Baseline Monitoring Report RESTORATION Appendix D Stream Geomorphology Table 8. Baseline Stream Data Summary Table 9. Monitoring Data — Dimensional Morphology Summary Table 10. Monitoring Data — Stream Reach Data Summary Longitudinal Profile Plot Cross Section Plots Table 8a. Baseline Stream Data Summary Red Barn Mitigation Bank Site - UT1a (1590 feet) Parameter I Regional Curve I Pre-Existing Condition I Reference Reach(es)Data I Design I Monitoring Baseline Dimension and Substrate-Riffle Only LL UL Eq. Min Mean Med Max SD5 n Min Mean Med Max SD5 n Min Med Max Min Mean Med Max SD5 n Bankfull Width(ft) 1 7 3.3 5.9 6.0 6.1 6.1 - 2 3.5 7.0 10.4 6.5 7.0 7.3 5.87 5.87 5.87 5.87 - 1 Floodprone Width(ft) 9.1 9.4 9.4 9.6 - 2 7.7 24.7 41.6 30.0 35.0 40.0 >40.3 >40.3 >40.3 >40.3 - 1 Bankfull Mean Depth(ft) 0.3 1 0.6 0.4 0.5 0.5 0.5 - 2 0.2 0.5 0.9 0.4 0.4 0.5 0.29 0.29 0.29 0.29 - 1 1Bankfull Max Depth(ft) 0.7 0.8 0.8 0.9 - 2 0.2 0.7 1.2 0.4 0.6 0.7 0.47 0.47 0.47 0.47 - 1 Bankfull Cross Sectional Area(ft2) 1 6 2.8 2.5 2.7 2.7 2.9 - 2 1.0 3.5 6.0 2.6 3.0 3.7 1.73 1.73 1.73 1.73 - 1 Width/Depth Ratio 12.8 13.4 13.4 14.0 - 2 12.0 15.0 18.0 14.0 16.0 18.0 20.2 20.2 20.2 20.2 - 1 Entrenchment Ratio 1.6 1.6 1.6 1.6 - 2 2.2 3.1 4.0 4.3 5.1 5.8 >6.87 >6.87 >6.87 >6.87 - 1 'Bank Height Ratio 2.1 4.3 4.3 6.5 - 2 1.0 1.0 1.1 1.0 1.0 1.1 1.0 1.0 1.0 1.0 - 1 Profile Riffle Length(ft) 4.0 17.3 18.2 29.0 10.9 4 Total riffle length 50%of reach length 10.0 20.5 32.0 13.4 18.6 18.8 22.8 3.1 10 Riffle Slope(ft/ft) N/A N/A N/A N/A N/A N/A I I I I I 0.008 0.024 0.043 0.013 0.025 0.024 0.037 0.007 10 Pool Length(ft) 10.0 10.6 10.7 11.0 0.4 3 Total pool length 50%of reach length 7.0 13.0 24.0 13.5 20.0 20.6 25.8 4.8 10 Pool Max depth(ft) 0.9 1.0 1.0 1.0 - 2 0.4 1.7 3.0 0.7 1.2 1.6 0.9 1.7 1.6 2.2 0.3 10 Pool Spacing(ft) 17.9 25.5 20.5 38.0 8.9 3 10.4 29.5 48.7 16.0 36.0 50.0 29.3 38.1 35.9 50.2 7.8 10 Pattern Channel Beltwidth(ft) 13.0 21.0 21.0 29.0 8.2 4 N/A N/A 83.2 10 25.9 39 12.3 26.3 25.3 43.0 7.7 40 Radius of Curvature(ft) 22.0 61.6 47.0 130.0 40.9 5 7.0 21.7 36.4 14.5 16.5 20.5 12.0 18.0 17.7 23.8 2.9 41 Rc:Bankfull width(ft/ft) 3.7 10.4 7.8 22.0 6.1 5 2.0 2.8 3.5 2.1 2.4 3.0 2.0 3.1 3.0 4.1 0.5 41 Meander Wavelength(ft) 96.0 176.5 177.0 256.0 88.4 4 24.5 74.7 124.8 49 59.5 73 46.0 60.9 61.8 73.5 6.5 40 Meander Width Ratio 2.2 3.5 3.5 4.8 1.2 4 N/A N/A 8.0 1.4 3.8 5.6 2.1 4.5 4.3 7.3 1.3 40 Transport parameters Reach Shear Stress(competency)lb/f2 0.54 0.60 0.30 Max part size(mm)mobilized at bankfull 93 75 63 Stream Power(transport capacity) W/m2 32.7 33.6 26 Additional Reach Parameters Rosgen Classification B5 C5b C5b C5b Bankfull Velocity(fps) 0.5 30.0 3.6 3.1 3.1 5.8 Bankfull Discharge(cfs) 3 30 10.2 10 10 10 Valley length(ft) 617 1292 1292 Channel Thalweg length(ft) 650 1590 1590 Sinuosity(ft) 1.1 1.2 to 1.6 1.2 1.2 Water Surface Slope(Channel)(ft/ft) 0.021 0.0162 0.0165 BF slope(ft/ft) 0.021 0.0162 0.0167 3Bankfull Floodplain Area(acres) 0.1 1.0 2.0 4%of Reach with Eroding Banks 36% Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1.The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2=For projects with a proximal USGS gauge in-line with the project reach(added bankfull verification-rare). 3.Utilizing XS measurement data produce an estimate of the bankfull floodplain area in acres,which should be the area from the top of bank to the toe of the terrace riser/slope. 4.Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5.Of value/needed only if then exceeds 3 *Note that the valley length has increased in the proposed alignment. Appendix D ECOSYSTEM PLANNING ex Red Barn Mitigation Bank I EPR RESTORATION As-Built Baseline Monitoring Report Table 8b. Baseline Stream Data Summary Red Barn Mitigation Bank Site - UT1c (738 feet) Parameter I Regional Curve I Pre-Existing Condition I Reference Reach(es)Data I Design I Monitoring Baseline Dimension and Substrate-Riffle Only LL UL Eq. Min Mean Med Max SD5 n Min Mean Med Max SD5 n Min Med Max Min Mean Med Max SD5 n Bankfull Width(ft) 2 8 3.8 N/A N/A N/A N/A N/A N/A 4.2 7.5 10.2 6.9 7.5 8.0 6.2 6.2 6.2 6.2 - 1 Floodprone Width(ft) N/A N/A N/A N/A N/A N/A 9.2 25.0 40.8 65.0 142.5 220.0 >57.4 >57.4 >57.4 >57.4 - 1 Bankfull Mean Depth(ft) 0.3 1.1 0.6 N/A N/A N/A N/A N/A N/A 0.3 0.6 0.9 0.40 0.53 0.70 0.50 0.50 0.50 0.50 - 1 1Bankfull Max Depth(ft) N/A N/A N/A N/A N/A N/A 0.3 0.8 1.2 0.50 0.70 0.90 0.72 0.72 0.72 0.72 - 1 Bankfull Cross Sectional Area(ft2) 1.5 6.5 3.5 N/A N/A N/A N/A N/A N/A 1.5 4.0 6.5 2.76 4.00 5.60 3.07 3.07 3.07 3.07 - 1 Width/Depth Ratio N/A N/A N/A N/A N/A N/A 12.0 14.0 16.0 12.00 14.00 16.00 12.34 12.34 12.34 12.34 - 1 Entrenchment Ratio N/A N/A N/A N/A N/A N/A 2.2 3.1 4.0 8.70 19.10 29.50 >9.29 >9.29 >9.29 >9.29 - 1 'Bank Height Ratio N/A N/A N/A N/A N/A N/A 1.0 1.0 1.1 1.0 1.0 1.1 1.0 1.0 1.0 1.0 - 1 Profile Riffle Length(ft) N/A N/A N/A N/A N/A N/A Total riffle length 50%of reach length 12.0 24.0 32.0 16.2 24.4 23.8 34.0 6.8 4 Riffle Slope(ft/ft) N/A N/A N/A N/A N/A N/A I I I I I 0.003 0.006 0.010 0.002 0.005 0.005 0.006 0.002 4 Pool Length(ft) N/A N/A N/A N/A N/A N/A Total pool length 50%of reach length 11.0 16.0 22.0 12.5 19.3 19.4 26.0 5.3 4 Pool Max depth(ft) N/A N/A N/A N/A N/A N/A 0.5 1.8 3.0 0.9 1.5 2.0 1.1 1.4 1.2 2.1 0.4 4 Pool Spacing(ft) N/A N/A N/A N/A N/A N/A 30.0 41.3 52.5 20.0 30.0 53.0 41.0 49.0 50.5 54.1 5.3 4 Pattern Channel Beltwidth(ft) N/A N/A N/A N/A N/A N/A 14.7 23.0 81.6 26.8 38.6 47.4 29.4 38.7 39.0 45.7 3.8 11 Radius of Curvature(ft) N/A N/A N/A N/A N/A N/A 8.4 14.0 35.7 16.7 20.7 23.7 14.3 20.4 21.3 25.7 3.2 13 Rc:Bankfull width(ft/ft) N/A N/A N/A N/A N/A N/A 2.0 2.8 3.5 2.2 2.8 3.2 2.3 3.3 3.4 4.1 0.5 13 Meander Wavelength(ft) N/A N/A N/A N/A N/A N/A 29.4 48.5 122.4 64.0 76.0 83.0 58.5 73.0 73.8 83.2 8.1 11 Meander Width Ratio N/A N/A N/A N/A N/A N/A 3.5 4.5 8.0 3.6 5.2 6.4 4.7 6.2 6.3 7.4 0.6 11 Transport parameters Reach Shear Stress(competency)lb/f2 - 0.09 0.10 Max part size(mm)mobilized at bankfull - 27 30 Stream Power(transport capacity) W/m2 - 1.5 6 Additional Reach Parameters Rosgen Classification - C5 C5 C5 Bankfull Velocity(fps) 0.6 22.0 3.7 - 0.6 3.9 Bankfull Discharge(cfs) 4 33 13.0 - 12 12 Valley length(ft) - 537 537 Channel Thalweg length(ft) - 738 738 Sinuosity(ft) - 1.2 to 1.6 1.4 1.4 Water Surface Slope(Channel)(ft/ft) - 0.0032 0.0034 BF slope(ft/ft) - 0.0032 0.0031 3Bankfull Floodplain Area(acres) - 1.8 0.6 ill 4%of Reach with Eroding Banks - Channel Stability or Habitat Metric - Biological or Other - Shaded cells indicate that these will typically not be filled in. 1=The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2=For projects with a proximal USGS gauge in-line with the project reach(added bankfull verification-rare). 3.Utilizing XS measurement data produce an estimate of the bankfull floodplain area in acres,which should be the area from the top of bank to the toe of the terrace riser/slope. 4=Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5.Of value/needed only if then exceeds 3 Appendix D ECOSYSTEM PLANNING 8c Red Barn Mitigation Bank I ERR RESTORATION As-Built Baseline Monitoring Report Table 8c. Baseline Stream Data Summary Red Barn Mitigation Bank Site - UT2a (1197 feet) Parameter I Regional Curve I Pre-Existing Condition I Reference Reach(es)Data I Design I Monitoring Baseline Dimension and Substrate-Riffle Only LL UL Eq. Min Mean Med Max SD5 n Min I Mean Med I Max SD5 n Min Med Max - Min Mean Med Max SD5 n Bankfull Width(ft) 2.5 8 4.0 7 13 13 19 - 2 4.6 7.6 10.1 6.9 7.5 8.0 7.7 7.7 7.7 7.7 - 1 Floodprone Width(ft) 10 50 50 89 - 2 10.1 25.3 40.4 40.0 70.0 100.0 >53.9 >53.9 >53.9 >53.9 - 1 Bankfull Mean Depth(ft) 0.4 1.2 0.7 0.2 • 0.4 0.4 0.6 - 2 0.3 0.6 0.8 0.40 0.53 0.70 0.39 0.39 0.39 0.39 - 1 1Bankfull Max Depth(ft) 0.5 0.7 0.7 0.8 - 2 0.4 0.8 1.2 0.50 0.70 0.90 0.70 0.70 0.70 0.70 - 1 Bankfull Cross Sectional Area(ft2) 1.8 6.8 3.8 4 4 4 4 - 2 1.8 4.3 6.8 2.76 4.00 5.60 2.95 2.95 2.95 2.95 - 1 Width/Depth Ratio 12 52 52 91 - 2 12.0 13.5 15.0 12.00 14.00 16.00 19.62 19.62 19.62 19.62 - 1 Entrenchment Ratio 2 3 3 5 - 2 2.2 3.1 4.0 5.40 9.40 13.40 >7.04 >7.04 >7.04 >7.04 - 1 'Bank Height Ratio 2.0 2.4 2.4 2.8 - 2 1.0 1.0 1.1 1.0 1.0 1.1 1.0 1.0 1.0 1.0 - 1 Profile Riffle Length(ft) 8 21 23 30 9 4 Total riffle length 50%of reach length 10.0 17.0 40.0 11.5 19.0 17.0 32.2 6.9 10 Riffle Slope(ft/ft) N/A • N/A N/A N/A N/A N/A I I I I I 0.009 0.014 0.024 0.009 0.013 0.012 0.018 0.002 10 Pool Length(ft) 7.6 9 8 11 1.5 3 Total pool length 50%of reach length 8.0 15.5 29.0 10.0 18.9 19.3 28.0 5.6 12 Pool Max depth(ft) 1.2 • 1.2 1.2 1.2 - 1 0.6 1.8 2.9 1.5 1.5 1.8 1.2 1.6 1.7 2.4 0.3 11 Pool Spacing(ft) 18 26 21 38 I 8.9 3 30.4 41.8 53.2 25.0 41.0 54.0 30.3 43.2 40.6 55.6 8.5 13 Pattern Channel Beltwidth(ft) 67 67 67 I 67 - 1 16.1 23.0 80.8 19.3 29.3 48.2 23.2 34.7 33.9 50.1 6.9 22 Radius of Curvature(ft) 40 55 55 69 - 2 9.2 14.0 35.4 16.7 19.0 23.7 11.7 19.1 19.1 24.6 3.1 24 Rc:Bankfull width(ft/ft) 3.1 4.2 4.2 1 5.3 - 2 2.0 2.8 3.5 2.2 2.6 3.2 1.5 2.5 2.5 3.2 0.4 24 Meander Wavelength(ft) 288 288 288 288 - 1 32.2 48.5 121.2 48.0 69.0 83.0 48.4 66.9 66.9 82.6 9.1 22 Meander Width Ratio 5.2 5.2 5.2 5.2 - 1 3.5 4.5 8.0 2.6 3.9 6.5 3.0 4.5 4.4 6.5 0.9 22 Transport parameters Reach Shear Stress(competency)lb/f2 0.17 0.27 0.22 Max part size(mm)mobilized at bankfull 41 58 50 Stream Power(transport capacity) W/m2 9.4 16.3 15 Additional Reach Parameters Rosgen Classification B5, D5 through wetland C5 C5 C5 Bankfull Velocity(fps) 0.6 18.9 3.8 2.3 2.4 4.7 Bankfull Discharge(cfs) 4 34 14.4 14 14 14 Valley length(ft) 882 917 917 Channel Thalweg length(ft) 956 1197 1197 Sinuosity(ft) 1.08 1.2 to 1.6 1.28 1.3 Water Surface Slope(Channel)(ft/ft) 0.0091 0.0093 0.0092 BF slope(ft/ft) 0.0091 0.0093 0.0091 3Bankfull Floodplain Area(acres) 1.0 1.5 1.5 4%of Reach with Eroding Banks 44% ill Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1=The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2=For projects with a proximal USGS gauge in-line with the project reach(added bankfull verification-rare). 3.Utilizing XS measurement data produce an estimate of the bankfull floodplain area in acres,which should be the area from the top of bank to the toe of the terrace riser/slope. 4=Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5.Of value/needed only if then exceeds 3 Appendix D ECOSYSTEM PLANNING 8( Red Barn Mitigation Bank I ERR RESTORATION As-Built Baseline Monitoring Report Table 8d. Baseline Stream Data Summary Red Barn Mitigation Bank Site - UT2b (1062 feet) Parameter I Regional Curve I Pre-Existing Condition I Reference Reach(es)Data I Design I Monitoring Baseline Dimension and Substrate-Riffle Only LL UL Eq. Min Mean Med Max SD5 n Min I Mean Med I Max SD5 n Min Med Max - Min Mean Med Max SD5 n Bankfull Width(ft) 3.8 16 6.0 8 8 8 8 - 1 6.0 11.0 15.0 8.4 9.9 10.2 8.6 8.6 8.6 8.6 - 1 Floodprone Width(ft) 12 12 12 12 - 1 13.2 36.6 60.0 40.0 55.0 70.0 >54.9 >54.9 >54.9 >54.9 - 1 Bankfull Mean Depth(ft) 0.6 1.6 0.9 0.7 0.7 0.7 0.7 - 1 0.4 0.8 1.3 0.60 0.70 1.00 0.48 0.48 0.48 0.48 - 1 1Bankfull Max Depth(ft) 1.1 1.1 1.1 1.1 - 1 0.5 1.1 1.8 0.70 1.00 1.40 0.86 0.86 0.86 0.86 - 1 Bankfull Cross Sectional Area(ft2) 3 15 7.2 6 6 6 6 - 1 3.0 9.0 15.0 5.04 7.00 10.20 4.14 4.14 4.14 4.14 - 1 Width/Depth Ratio 12 12 12 12 - 1 12.0 13.5 15.0 10.00 14.00 15.00 17.85 17.85 17.85 17.85 - 1 Entrenchment Ratio 1 1 1 1 - 1 2.2 3.1 4.0 4.30 5.90 7.50 >6.4 >6.4 >6.4 >6.4 - 1 'Bank Height Ratio 4.3 4.3 4.3 4.3 - 1 1.0 1.0 1.1 1.0 1.0 1.1 1.0 1.0 1.0 1.0 - 1 Profile Riffle Length(ft) 29 91.3 80 165 56 3 Total riffle length 50%of reach length 7.0 21.0 50.0 15.9 28.2 25.3 45.7 9.6 13 Riffle Slope(ft/ft) N/A N/A N/A N/A N/A N/A I I I I I 0.009 0.004 0.003 0.003 0.005 0.005 0.009 0.002 13 Pool Length(ft) 118 142 141.5 165 - 2 Total pool length 50%of reach length 13.0 26.5 39.0 19.0 23.9 22.6 35.7 4.8 10 Pool Max depth(ft) 1.3 1.8 1.8 2.1 0.3 4 0.8 2.6 4.4 1.1 1.8 3.1 1.4 1.7 1.7 2.1 0.2 10 Pool Spacing(ft) 128 246 272 339 88 3 44.0 60.5 77.0 26.0 55.0 69.0 44.5 56.3 57.3 67.0 7.6 10 Pattern Channel Beltwidth(ft) 127 127 127 127 - 1 21.0 23.0 120.0 19.3 43.8 66.3 23.2 46.4 47.9 62.7 10.8 13 Radius of Curvature(ft) 35 73 64 121 44 3 12.0 14.0 52.5 15.7 27.7 32.7 21.1 26.9 27.6 32.9 3.5 12 Rc:Bankfull width(ft/ft) 4.4 9.2 8.0 15.1 4.5 3 2.0 2.8 3.5 1.7 3.0 3.5 2.5 3.1 3.2 3.8 0.4 12 Meander Wavelength(ft) 542 542 542 542 - 1 42.0 48.5 180.0 86.0 101.0 165.0 78.3 102.6 97.7 152.8 17.3 14 Meander Width Ratio 15.9 15.9 15.9 15.9 - 1 3.5 4.5 8.0 2.1 4.7 7.1 2.7 5.4 5.6 7.3 1.3 13 Transport parameters Reach Shear Stress(competency)lb/f2 0.19 0.13 0.09 Max part size(mm)mobilized at bankfull 25 33 26 Stream Power(transport capacity) W/m2 11.1 8.4 9 Additional Reach Parameters Rosgen Classification F5 C5 C5 C5 Bankfull Velocity(fps) 0.6 30.0 3.9 1.9 1.6 6.8 Bankfull Discharge(cfs) 9 90 27.8 20 28 28 Valley length(ft) 1065 840 840 Channel Thalweg length(ft) 1095 1050 1062 Sinuosity(ft) 1.03 1.2 to 1.6 1.25 1.3 Water Surface Slope(Channel)(ft/ft) 0.005 0.0032 0.0030 BF slope(ft/ft) 0.005 0.0032 0.0031 3Bankfull Floodplain Area(acres) 0.3 1.1 1.0 li 4%of Reach with Eroding Banks N/A . ill Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1=The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2=For projects with a proximal USGS gauge in-line with the project reach(added bankfull verification-rare). 3.Utilizing XS measurement data produce an estimate of the bankfull floodplain area in acres,which should be the area from the top of bank to the toe of the terrace riser/slope. 4=Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5.Of value/needed only if then exceeds 3 *Note that the valley length has increased in the proposed alignment. Appendix D ECOSYSTEM PLANNING 8( Red Barn Mitigation Bank I ERR RESTORATION As-Built Baseline Monitoring Report Table 8e. Baseline Stream Data Summary Red Barn Mitigation Bank Site - UT2c (244 feet) Parameter I Regional Curve I Pre-Existing Condition I Reference Reach(es)Data I Design I Monitoring Baseline Dimension and Substrate-Riffle Only LL UL Eq. Min Mean Med Max SD5 n Min I Mean Med I Max SD5 n Min Med Max - Min Mean Med Max SD5 n Bankfull Width(ft) 4 17 6.2 8 8 8 8 - 1 6.0 11.3 15.5 9.2 9.8 10.2 9.2 9.2 9.2 9.2 - 1 Floodprone Width(ft) 12 12 12 12 - 1 13.2 37.6 62.0 72.0 98.0 124.0 41.4 41.4 41.4 41.4 - 1 Bankfull Mean Depth(ft) 0.6 1.6 0.9 0.7 0.7 0.7 0.7 - 1 0.4 0.8 1.3 0.60 0.70 0.90 0.42 0.42 0.42 0.42 - 1 1Bankfull Max Depth(ft) 1.1 1.1 1.1 1.1 - 1 0.5 1.1 1.8 0.70 1.00 1.20 0.82 0.82 0.82 0.82 - 1 Bankfull Cross Sectional Area(ft2) 3 16 7.7 6 6 6 6 - 1 3.0 9.5 16.0 5.52 7.00 9.18 3.90 3.90 3.90 3.90 - 1 Width/Depth Ratio 12 12 12 12 - 1 12.0 13.5 15.0 12.00 14.00 15.00 22.00 22.00 22.00 22.00 - 1 Entrenchment Ratio 1 1 1 1 - 1 2.2 3.1 4.0 7.40 10.10 12.80 4.48 4.48 4.48 4.48 - 1 'Bank Height Ratio 4.3 4.3 4.3 4.3 - 1 1.0 1.0 1.1 1.0 1.0 1.1 1.0 1.0 1.0 1.0 - 1 Profile Riffle Length(ft) 29 91.3 80 165 56 3 Total riffle length 50%of reach length 9.0 25.5 32.0 14.8 23.2 23.9 28.4 4.6 5 Riffle Slope(ft/ft) N/A N/A N/A N/A N/A N/A I I I I I 0.005 0.006 0.014 0.003 0.005 0.004 0.009 0.002 5 Pool Length(ft) 118 142 141.5 165 - 2 Total pool length 50%of reach length 15.0 20.5 25.0 14.2 20.8 23.9 24.3 4.6 3 Pool Max depth(ft) 1.6 1.6 1.6 1.6 - 1 0.8 2.7 4.5 1.2 1.8 2.6 1.7 2.1 2.1 2.5 0.3 3 Pool Spacing(ft) 339 339 339 339 - 1 45.2 62.2 79.1 28.0 48.0 50.0 41.0 45.9 47.6 49.2 3.5 3 Pattern Channel Beltwidth(ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Radius of Curvature(ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Rc:Bankfull width(ft/ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Meander Wavelength(ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Meander Width Ratio N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Transport parameters Reach Shear Stress(competency)lb/f2 0.19 0.13 0.08 Max part size(mm)mobilized at bankfull 25 33 22 Stream Power(transport capacity) W/m2 11.1 8.4 8 Additional Reach Parameters Rosgen Classification F5 B5c B5c B5c Bankfull Velocity(fps) 3.3 5.8 3.9 1.9 1.6 7.2 Bankfull Discharge(cfs) 10 93 29.8 20 28 28 Valley length(ft) 1065 242 242 Channel Thalweg length(ft) 1095 244 244 Sinuosity(ft) 1.03 1.01 1.0 Water Surface Slope(Channel)(ft/ft) 0.005 0.0035 0.0030 BF slope(ft/ft) 0.005 0.0035 0.0030 3Bankfull Floodplain Area(acres) 0.3 0.5 0.1 4%of Reach with Eroding Banks 56% ill Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1=The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2=For projects with a proximal USGS gauge in-line with the project reach(added bankfull verification-rare). 3.Utilizing XS measurement data produce an estimate of the bankfull floodplain area in acres,which should be the area from the top of bank to the toe of the terrace riser/slope. 4=Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5.Of value/needed only if then exceeds 3 *Note that the valley length has increased in the proposed alignment. Appendix D ECOSYSTEM PLANNING 8( Red Barn Mitigation Bank I ERR RESTORATION As-Built Baseline Monitoring Report Table 8f. Baseline Stream Data Summary Red Barn Mitigation Bank Site - UT3a (1410 feet) Parameter I Regional Curve I Pre-Existing Condition I Reference Reach(es)Data I Design I Monitoring Baseline Dimension and Substrate-Riffle Only LL UL Eq. Min Mean Med Max SD5 n Min I Mean Med I Max SD5 n Min Med Max - Min Mean Med Max SD5 n Bankfull Width(ft) 2 8 3.5 5 6 6 6 0.7 3 4.2 7.7 10.8 6.2 6.2 6.2 5.6 5.6 5.6 5.6 - 1 Floodprone Width(ft) 6 8 8 10 1.6 3 5.9 14.8 23.8 9.0 11.5 14.0 31.0 31.0 31.0 31.0 - 1 Bankfull Mean Depth(ft) 0.3 1.1 0.6 0.4 0.5 0.5 0.5 0.0 3 0.2 0.6 0.9 0.50 0.50 0.50 0.28 0.28 0.28 0.28 - 1 1Bankfull Max Depth(ft) 0.6 0.6 0.6 0.7 0.0 3 0.3 0.8 1.3 0.60 0.60 0.60 0.51 0.51 0.51 0.51 - 1 Bankfull Cross Sectional Area(ft2) 1.5 6.5 3.2 2 2 2 3 0.1 3 1.5 4.0 6.5 3.00 3.00 3.00 1.57 1.57 1.57 1.57 - 1 Width/Depth Ratio 9 12 12 16 2.7 3 12.0 15.0 18.0 13.00 13.00 13.00 19.93 19.93 19.93 19.93 - 1 Entrenchment Ratio 1 1 2 2 0.1 3 1.4 1.8 2.2 1.40 1.80 2.20 5.55 5.55 5.55 5.55 - 1 'Bank Height Ratio 1.0 1.9 1.3 3.3 1.0 3 1.0 1.0 1.1 1.0 1.0 1.1 1.0 1.0 1.0 1.0 - 1 Profile Riffle Length(ft) 1 3 9 9 15.8 4 5 Total riffle length 60-70%of reach length 4.5 15.0 29.0 12.5 17.9 17.5 27.6 4.1 11 Riffle Slope(ft/ft) N/A 1 N/A N/A N/A N/A N/A I I I I I 0.024 0.033 0.043 0.021 0.030 0.030 0.042 0.006 11 Pool Length(ft) 2 10 10.1 17 6 4 Total pool length 30-40%of reach length 5.0 14.0 21.0 6.7 11.0 10.8 15.1 3.0 12 Pool Max depth(ft) 0.7 0.8 0.9 0.9 0.1 5 0.5 1.8 3.2 1.5 1.5 1.5 1.4 1.8 1.8 2.3 0.3 12 Pool Spacing(ft) 5.3 18.75 19.95 29.800 8.776 4 3.9 21.2 38.5 6.0 23.0 44.0 21.5 29.8 29.5 45.4 6.2 10 Pattern Channel Beltwidth(ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A 9.2 17.2 28.2 9.0 14.1 13.8 20.9 2.8 12 Radius of Curvature(ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A 15.7 20.1 27.1 18.1 24.1 28.1 28.1 4.4 13 Rc:Bankfull width(ft/ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A 2.5 3.2 4.4 3.2 4.3 5.0 5.0 0.8 13 Meander Wavelength(ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A 45.0 61.0 141.0 47.4 78.2 79.7 132.6 26.2 14 Meander Width Ratio N/A N/A N/A N/A N/A N/A N/A N/A N/A 1.5 2.8 4.5 1.6 2.5 2.5 3.7 0.5 12 Transport parameters Reach Shear Stress(competency)lb/f2 0.57 0.7 0.43 Max part size(mm)mobilized at bankfull 85 117 82 Stream Power(transport capacity) W/m2 9 17 21 Additional Reach Parameters Rosgen Classification B/G 5 B4 B4 B4 Bankfull Velocity(fps) 0.5 20.7 3.7 2.6 1.7 3.2 Bankfull Discharge(cfs) 3.5 31 11.7 5 5 5 Valley length(ft) 1315 1395 1395 Channel Thalweg length(ft) 1476 1410 1410 Sinuosity(ft) 1.12 1.1 to 1.2 1.07 1.01 Water Surface Slope(Channel)(ft/ft) 0.0241 0.0269 0.0256 BF slope(ft/ft) 0.0241 0.0269 0.0258 3Bankfull Floodplain Area(acres) 0.2 0.3 0.7 4%of Reach with Eroding Banks 30% Channel Stability or Habitat MetricL ill Biological or Other Shaded cells indicate that these will typically not be filled in. 1=The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2=For projects with a proximal USGS gauge in-line with the project reach(added bankfull verification-rare). 3.Utilizing XS measurement data produce an estimate of the bankfull floodplain area in acres,which should be the area from the top of bank to the toe of the terrace riser/slope. 4=Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5.Of value/needed only if then exceeds 3 *Note that the valley length has increased in the proposed alignment. Appendix D ECOSYSTEM PLANNING 8( Red Barn Mitigation Bank I ERR RESTORATION As-Built Baseline Monitoring Report Table 8g. Baseline Stream Data Summary Red Barn Mitigation Bank Site - UT3b (190 feet) Parameter I Regional Curve I Pre-Existing Condition I Reference Reach(es)Data I Design I Monitoring Baseline Dimension and Substrate-Riffle Only LL UL Eq. Min Mean Med Max SD5 n Min I Mean Med I Max SD5 n Min Med Max - Min Mean Med Max SD5 n Bankfull Width(ft) 2 8 3.5 7 7 7 7 - 1 4.2 7.7 10.8 7.6 7.6 7.6 6.9 6.9 6.9 6.9 - 1 Floodprone Width(ft) 10 10 10 10 - 1 5.9 14.8 23.8 11 14 17 24.6 24.6 24.6 24.6 - 1 Bankfull Mean Depth(ft) 0.3 1.1 0.6 0.7 0.7 0.7 0.7 - 1 0.2 0.6 0.9 0.60 0.60 0.60 0.54 0.54 0.54 0.54 - 1 1Bankfull Max Depth(ft) 1.0 1.0 1.0 1.0 - 1 0.3 0.8 1.3 0.70 0.70 0.70 0.77 0.77 0.77 0.77 - 1 Bankfull Cross Sectional Area(ft2) 1.5 6.5 3.2 4 4 4 4 - 1 1.5 4.0 6.5 4.50 4.50 4.50 3.74 3.74 3.74 3.74 - 1 Width/Depth Ratio 10 10 10 10 - 1 12.0 15.0 18.0 13.00 13.00 13.00 12.76 12.76 12.76 12.76 - 1 Entrenchment Ratio 2 2 2 2 - 1 1.4 1.8 2.2 1.40 1.80 2.20 3.58 3.58 3.58 3.58 - 1 'Bank Height Ratio 1.5 1.5 1.5 1.5 - 1 1.0 1.0 1.1 1.0 1.0 1.1 1.0 1.0 1.0 1.0 - 1 Profile Riffle Length(ft) N/A N/A N/A N/A N/A N/A Total riffle length 60-70%of reach length 15.0 20.0 25.0 8.9 14.9 15.0 21.2 4.3 6 Riffle Slope(ft/ft) N/A N/A N/A N/A N/A N/A I I I I I 0.020 0.020 0.027 0.022 0.029 0.030 0.038 0.005 6 Pool Length(ft) N/A N/A N/A N/A N/A N/A Total pool length 30-40%of reach length 10.0 15.0 24.0 14.7 16.5 16.2 20.3 1.8 6 Pool Max depth(ft) N/A N/A N/A N/A N/A N/A 0.5 1.8 3.2 1.5 1.5 1.5 1.7 2.1 2.0 2.9 0.4 6 Pool Spacing(ft) N/A N/A N/A N/A N/A N/A 11.6 28.9 46.2 20.0 35.0 44.0 15.4 31.6 33.7 45.0 9.9 6 Pattern Channel Beltwidth(ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Radius of Curvature(ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Rc:Bankfull width(ft/ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Meander Wavelength(ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Meander Width Ratio N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Transport parameters Reach Shear Stress(competency)lb/f2 - 0.49 0.52 Max part size(mm)mobilized at bankfull - 91 91 Stream Power(transport capacity) W/m2 - 13 28 Additional Reach Parameters Rosgen Classification - B4c B4c B4c Bankfull Velocity(fps) 0.5 20.7 3.7 - 3 3.6 Bankfull Discharge(cfs) 3.5 31 11.7 - 13.32 13.32 Valley length(ft) - 183 183 Channel Thalweg length(ft) - 190 190 Sinuosity(ft) - 1.1 to 1.3 1.04 1.04 Water Surface Slope(Channel)(ft/ft) - 0.0155 0.0159 BF slope(ft/ft) - 0.0155 0.0153 3Bankfull Floodplain Area(acres) - 0.1 0.1 4%of Reach with Eroding Banks - Channel Stability or Habitat MetricL ill Biological or Other Shaded cells indicate that these will typically not be filled in. 1=The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2=For projects with a proximal USGS gauge in-line with the project reach(added bankfull verification-rare). 3.Utilizing XS measurement data produce an estimate of the bankfull floodplain area in acres,which should be the area from the top of bank to the toe of the terrace riser/slope. 4=Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5.Of value/needed only if then exceeds 3 *Note that the valley length has increased in the proposed alignment. Appendix D ECOSYSTEM PLANNING 8( Red Barn Mitigation Bank I ERR RESTORATION As-Built Baseline Monitoring Report Table 8h. Baseline Stream Data Summary Red Barn Mitigation Bank Site - UT3c (1097 feet) Parameter I Regional Curve I Pre-Existing Condition I Reference Reach(es)Data I Design I Monitoring Baseline Dimension and Substrate-Riffle Only LL UL Eq. Min Mean Med Max SD5 n Min I Mean Med I Max SD5 n Min Med Max - Min Mean Med Max SD5 n Bankfull Width(ft) 2.5 9.5 4.4 8 8 8 8 - 1 4.9 8.6 11.6 7.6 7.6 7.6 7.8 7.8 7.8 7.8 - 1 Floodprone Width(ft) 9 9 9 9 - 1 >10.8 >10.8 >10.8 25.0 50.0 75.0 >40.0 >40.0 >40.0 >40.0 - 1 Bankfull Mean Depth(ft) 0.4 1.2 0.7 0.5 0.5 0.5 0.5 - 1 0.3 0.6 1.0 0.60 0.60 0.60 0.44 0.44 0.44 0.44 - 1 1Bankfull Max Depth(ft) 0.7 0.7 0.7 0.7 - 1 0.4 0.9 1.5 0.70 0.70 0.70 0.65 0.65 0.65 0.65 - 1 Bankfull Cross Sectional Area(ft2) 2 9 4.5 4 4 4 4 - 1 2.0 5.5 9.0 4.50 4.50 4.50 3.46 3.46 3.46 3.46 - 1 Width/Depth Ratio 15 15 15 15 - 1 12.0 13.5 15.0 13.00 13.00 13.00 17.73 17.73 17.73 17.73 - 1 Entrenchment Ratio 1 1 1 1 - 1 >2.2 >2.2 >2.2 3.30 6.60 9.90 >5.13 >5.13 >5.13 >5.13 - 1 'Bank Height Ratio 2.0 2.0 2.0 2.0 - 1 1.0 1.0 1.1 1.00 1.00 1.10 1.0 1.0 1.0 1.0 - 1 Profile Riffle Length(ft) N/A N/A N/A N/A N/A N/A Total riffle length 60-70%of reach length 5.0 14.0 29.0 11.4 19.2 18.8 29.1 5.1 12 Riffle Slope(ft/ft) N/A N/A N/A N/A N/A N/A I I I I I 0.014 0.022 0.042 0.013 0.018 0.017 0.025 0.003 12 Pool Length(ft) N/A N/A N/A N/A N/A N/A Total pool length 30-40%of reach length 10.0 15.0 41.0 10.9 17.7 18.1 25.9 4.6 18 Pool Max depth(ft) N/A N/A N/A N/A N/A N/A 0.5 1.9 3.4 1.5 1.5 1.5 1.6 2.3 2.3 3.1 0.4 14 Pool Spacing(ft) N/A N/A N/A N/A N/A N/A 30.1 45.2 60.2 10.0 23.5 58.0 10.9 40.4 42.1 59.8 12.0 16 Pattern Channel Beltwidth(ft) N/A N/A N/A N/A N/A N/A 17.2 23.0 92.8 17.0 26.4 39.5 16.9 26.6 25.3 35.9 6.0 18 Radius of Curvature(ft) N/A N/A N/A N/A N/A N/A 9.8 14.0 40.6 15.8 19.1 24.8 9.2 23.0 25.6 29.8 6.6 20 Rc:Bankfull width(ft/ft) N/A N/A N/A N/A N/A N/A 2.0 2.8 3.5 2.1 2.5 3.3 1.2 2.9 3.3 3.8 0.9 20 Meander Wavelength(ft) N/A N/A N/A N/A N/A N/A 34.3 48.5 162.4 59.0 75.0 95.0 46.0 73.6 78.7 85.9 11.4 16 Meander Width Ratio N/A N/A N/A N/A N/A N/A 3.5 4.5 8.0 2.2 3.5 5.2 2.2 3.4 3.2 4.6 0.8 18 Transport parameters Reach Shear Stress(competency)lb/f2 - 0.63 0.54 Max part size(mm)mobilized at bankfull - 108 94 Stream Power(transport capacity) W/m2 - 19 35 Additional Reach Parameters Rosgen Classification F4 C4 C4 C4 Bankfull Velocity(fps) 0.8 12.5 3.8 - 3.3 4.4 Bankfull Discharge(cfs) 7 25 16.9 - 15.06 15.06 Valley length(ft) - 920 920 Channel Thalweg length(ft) - 1097 1097 Sinuosity(ft) - 1.2 to 1.4 1.19 1.19 Water Surface Slope(Channel)(ft/ft) - 0.0198 0.0201 BF slope(ft/ft) - 0.0198 0.0201 3Bankfull Floodplain Area(acres) - 1.1 1.1 4%of Reach with Eroding Banks 70% Channel Stability or Habitat MetricL I Biological or Other Shaded cells indicate that these will typically not be filled in. 1=The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2=For projects with a proximal USGS gauge in-line with the project reach(added bankfull verification-rare). 3.Utilizing XS measurement data produce an estimate of the bankfull floodplain area in acres,which should be the area from the top of bank to the toe of the terrace riser/slope. 4=Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5.Of value/needed only if then exceeds 3 *Note that the valley length has increased in the proposed alignment. Appendix D ECOSYSTEM PLANNING 8( Red Barn Mitigation Bank I ERR RESTORATION As-Built Baseline Monitoring Report Table 8i. Baseline Stream Data Summary Red Barn Mitigation Bank Site - UT4 (134 feet) Parameter I Regional Curve I Pre-Existing Condition I Reference Reach(es)Data I Design I Monitoring Baseline Dimension and Substrate-Riffle Only LL UL Eq. Min Mean Med Max SD5 n Min I Mean Med Max SD5 n Min Med Max - Min Mean Med Max SD5 n Bankfull Width(ft) 1 5 2.2 N/A N/A N/A N/A N/A N/A 2.4 5.1 7.3 4.0 4.0 4.0 4.3 4.3 4.3 4.3 - 1 Floodprone Width(ft) N/A N/A N/A N/A N/A N/A 3.4 9.7 16.1 7.0 9.5 12.0 11.8 11.8 11.8 11.8 - 1 Bankfull Mean Depth(ft) 0.2 0.8 0.4 N/A N/A N/A N/A N/A N/A 0.1 0.4 0.6 0.31 0.31 0.31 0.29 0.29 0.29 0.29 - 1 1Bankfull Max Depth(ft) N/A N/A N/A N/A N/A N/A 0.2 0.5 0.9 0.4 0.4 0.4 0.43 0.43 0.43 0.43 - 1 Bankfull Cross Sectional Area(ft2) 0.5 3 1.5 N/A N/A N/A N/A N/A N/A 0.5 1.8 3.0 1.3 1.3 1.3 1.26 1.26 1.26 1.26 - 1 Width/Depth Ratio N/A N/A N/A N/A N/A N/A 12.0 15.0 18.0 13 13 13 14.72 14.72 14.72 14.72 - 1 Entrenchment Ratio N/A N/A N/A N/A N/A N/A 1.4 1.8 2.2 1.8 2.4 3.0 2.76 2.76 2.76 2.76 - 1 'Bank Height Ratio N/A N/A N/A N/A N/A N/A 1.0 1.0 1.1 1 1 1.1 1.0 1.0 1.0 1.0 - 1 Profile Riffle Length(ft) N/A N/A N/A N/A N/A N/A Total riffle length 50%of reach length 10.0 10.0 18.0 20.0 22.9 22.9 25.9 2.9 2 Riffle Slope(ft/ft) N/A N/A N/A N/A N/A N/A I I I I I 0.005 0.008 0.010 0.012 0.015 0.015 0.017 0.003 2 Pool Length(ft) N/A N/A N/A N/A N/A N/A Total pool length 50%of reach length 9.0 10.0 15.5 13.8 19.0 19.0 24.2 5.2 2 Pool Max depth(ft) N/A N/A N/A N/A N/A N/A 0.3 1.2 2.1 2.2 2.6 3.85 0.8 0.8 0.8 0.9 0.1 2 Pool Spacing(ft) N/A N/A N/A N/A N/A N/A 7.7 19.1 30.6 20.0 23.0 33.1 46.3 46.3 46.3 46.3 0.0 1 Pattern Channel Beltwidth(ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Radius of Curvature(ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Rc:Bankfull width(ft/ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Meander Wavelength(ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Meander Width Ratio N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Transport parameters Reach Shear Stress(competency)lb/f2 N/A 0.02 0.27 Max part size(mm)mobilized at bankfull N/A 7 40 Stream Power(transport capacity) W/m2 N/A 0 2 Additional Reach Parameters Rosgen Classification B/G 4 B4c B4c B4c Bankfull Velocity(fps) 0.7 18.0 3.5 N/A 0.5 0.5 Bankfull Discharge(cfs) 2 9 5.3 N/A 0.62 0.62 Valley length(ft) 1315 129 130 Channel Thalweg length(ft) 1476 134 134 Sinuosity(ft) 1.12 1.1 to 1.3 1.04 1.03 Water Surface Slope(Channel)(ft/ft) 0.0241 0.0084 0.015 BF slope(ft/ft) 0.0241 0.0084 0.015 3Bankfull Floodplain Area(acres) N/A 0.2 0.05 4%of Reach with Eroding Banks N/A _ _ Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1=The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2=For projects with a proximal USGS gauge in-line with the project reach(added bankfull verification-rare). 3.Utilizing XS measurement data produce an estimate of the bankfull floodplain area in acres,which should be the area from the top of bank to the toe of the terrace riser/slope. 4=Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5.Of value/needed only if then exceeds 3 *Note that the valley length has increased in the proposed alignment. Appendix D ECOSYSTEM PLANNING 8( Red Barn Mitigation Bank EPR RESTORATION As-Built Baseline Monitoring Report Table 9. Monitoring Data - Dimensional Morphology Summary (Dimensional Parameters - Cross Sections) Red Barn Mitigation Bank UT1A(1590 feet) UT1c(738 feet) Cross Section 1 (Pool) Cross Section 2(Pool) Cross Section 3(Riffle) Cross Section 4(Riffle) Cross Section 5(Pool) Based on fixed baseline bankfull Base MY1 MY2 MY3 MY4 MY5 MY+ Base MY1 MY2 MY3 MY4 MY5 MY+ Base MY1 MY2 MY3 I MY4 MY5 MY+ Base MY1 MY2 MY3 MY4 I MY5 MY+ Base MY1 MY2 MY3 MY4 MY5 MY+ elevation' Record elevation(datum)used 1043.97 1023.76 1021.58 1018.47 1017.76 Bankfull Width(ft) 11.85 7.57 5.87 6.17 8.92 Floodprone Width(ft) N/A N/A >40.34 >57.36 N/A Bankfull Mean Depth(ft) 0.62 0.55 0.29 0.5 0.57 Bankfull Max Depth(ft) 1.33 0.91 0.47 0.72 1.06 Bankfull Cross Sectional Area(ft2) 7.36 4.14 1.73 3.07 5.1 Bankfull Width/Depth Ratio 19.11 13.76 20.24 12.34 15.65 Bankfull Entrenchment Ratio N/A N/A >6.87 >9.29 N/A Bankfull Bank Height Ratio 1.0 1.0 1.0 1.0 1.0 UT2a(1,197 feet) UT2b(1077 feet) Cross Section 6(Pool) Cross Section 7(Riffle) Cross Section 8(Pool) Cross Section 9(Riffle) Cross Section 10(Pool) Based on fixed baseline bankfull Base MY1 MY2 MY3 MY4 MY5 MY+ Base MY1 MY2 MY3 MY4 MY5 MY+ Base MY1 MY2 MY3 MY4 MY5 MY+ Base MY1 MY2 MY3 MY4 MY5 I MY+ Base MY1 MY2 MY3 MY4 MY5 MY+ elevation' Record elevation(datum)used 1023.50 1019.49 1016.72 1016.16 1014.61 Bankfull Width(ft) 10.76 7.65 9.91 8.57 10.59 Floodprone Width(ft) N/A >53.90 N/A >54.90 N/A Bankfull Mean Depth(ft) 0.73 0.39 1 0.85 0.48 1.00 Bankfull Max Depth(ft) 1.37 0.7 1.47 0.86 2.08 Bankfull Cross Sectional Area(ft2) 7.9 2.95 8.47 4.14 10.56 Bankfull Width/Depth Ratio 14.74 19.62 11.66 17.85 10.59 Bankfull Entrenchment Ratio N/A >7.04 N/A >6.4 N/A Bankfull Bank Height Ratio 1.0 1.0 1.0 1.0 1.0 1 =Widths and depths for annual measurements will be based on the baseline bankfull datum regardless of dimensional/depositional development. Input the elevation used as the datum, which should be consistent and based on the baseline datum established. If the performer has inherited the project and cannot acquire the datum used for prior years this must be discussed with DMS. If this cannot be resolved in time for a given years report submission a footnote in this should be included that states: "It is uncertain if the monitoring datum has been consistent over the monitoring history,which may influence calculated values. Additional data from a prior performer is being acquired to provide confirmation. Values will be recalculated in a future submission based on a consistent datum if determined to be necessary." Appendix D ECOSYSTEM PLANNING& Red Barn Mitigation Bank EPR RESTORATION As-built Baseline Monitoring Report Table 9 (continued). Monitoring Data - Dimensional Morphology Summary (Dimensional Parameters - Cross Sections) Red Barn Mitigation Bank UT2c(244 feet) UT3a(1410 feet) UT3b(190 feet) Cross Section 11 (Riffle) Cross Section 12(Riffle) Cross Section 13(Pool) Cross Section 14(Pool) Cross Section 15(Riffle) Based on fixed baseline bankfull Base MY1 MY2 MY3 MY4 MY5 MY+ Base MY1 MY2 MY3 MY4 MY5 MY+ Base MY1 MY2 MY3 MY4 MY5 MY+ Base MY1 MY2 MY3 MY4 MY5 MY+ Base MY1 MY2 MY3 MY4 MY5 MY+ elevation Record elevation(datum)used 1013.38 1070.58 1052.07 1041.94 1034.66 Bankfull Width (ft) 9.24 5.58 8.49 7.59 6.89 Floodprone Width(ft) 41.38 31.01 N/A N/A 24.62 Bankfull Mean Depth(ft) 0.42 0.28 0.88 0.89 0.54 Bankfull Max Depth(ft) 0.82 0.51 1.64 1.5 0.77 Bankfull Cross Sectional Area(ft2) 3.9 1.57 7.5 6.74 3.74 Bankfull Width/Depth Ratio 22.00 19.93 9.65 8.53 12.76 Bankfull Entrenchment Ratio 4.48 5.55 N/A N/A 3.58 Bankfull Bank Height Ratio 1.0 1.0 1.0 1.0 1.0 UT3c(1097 feet) UT4(134 feet) Cross Section 16(Riffle) I Cross Section 17(Pool) Cross Section 18(Riffle) Based on fixed baseline bankfull Base MY1 MY2 MY3 MY4 MY5 MY+ Base MY1 MY2 MY3 MY4 MY5 MY+ Base MY1 MY2 MY3 MY4 MY5 MY+ elevation' Record elevation(datum)used 1026.46 1020.20 1043.02 Bankfull Width(ft) 7.8 10.21 4.27 Floodprone Width(ft) >40.00 N/A 11.79 Bankfull Mean Depth(ft) 0.44 1.25 0.29 Bankfull Max Depth(ft) 0.65 2.46 0.43 Bankfull Cross Sectional Area(ft2) 3.46 12.74 1.26 Bankfull Width/Depth Ratio 17.73 8.17 14.72 Bankfull Entrenchment Ratio >5.13 N/A 2.76 Bankfull Bank Height Ratio 1.0 1.0 1.0 1 =Widths and depths for annual measurements will be based on the baseline bankfull datum regardless of dimensional/depositional development. Input the elevation used as the datum, which should be consistent and based on the baseline datum established. If the performer has inherited the project and cannot acquire the datum used for prior years this must be discussed with EEP. If this cannot be resolved in time for a given years report submission a footnote in this should be included that states: "It is uncertain if the monitoring datum has been consistent over the monitoring history,which may influence calculated values. Additional data from a prior performer is being acquired to provide confirmation. Values will be recalculated in a future submission based on a consistent datum if determined to be necessary." Appendix D ECOSYSTEM PLANNING& Red Barn Mitigation Bank EPR RESTORATION As-built Baseline Monitoring Report Table 10a. Monitoring Data - Stream Reach Data Summary Red Barn Mitigation Bank Site - UT1a (1590 feet) Parameter Baseline MY-1 MY-2 MY-3 MY-4 MY-5 Dimension nd Substrate-Riffle only Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Bankfull Width(ft) 5.87 5.87 5.87 5.87 1 Floodprone Width(ft) >40.3 >40.3 >40.3 >40.3 - 1 _ Bankfull Mean Depth(ft) 0.29 0.29 0.29 0.29 - 1 'Bankfull Max Depth(ft) 0.47 0.47 0.47 0.47 - 1 Bankfull Cross Sectional Area(ft2) 1.73 1.73 1.73 1.73 - 1 Width/Depth Ratio 20.2 20.2 20.2 20.2 - 1 Entrenchment Ratio >6.87 >6.87 >6.87 >6.87 - 1 1Bank Height Ratio 1.0 1.0 1.0 1.0 - 1 Profile Riffle Length(ft) 13.4 18.6 18.8 22.8 3.1 10 Riffle Slope(ft/ft) 0.013 0.025 0.024 0.037 0.007 10 Pool Length(ft) 13.5 20.0 20.6 25.8 4.8 10 Pool Max depth(ft) 0.9 1.7 1.6 2.2 0.3 10 Pool Spacing(ft) 29.3 38.1 35.9 50.2 7.8 10 Pattern Channel Beltwidth(ft) 12.3 26.3 25.3 43.0 7.7 40 I I I I I I I I I I I I I__ Radius of Curvature(ft) 12.0 18.0 17.7 23.8 2.9 41 Rc:Bankfull width(ft/ft) 2.0 3.1 3.0 4.1 0.5 41 Pattern data will not typically be collected unless visual data, dimensional data or ' profile data indicate significant shifts from baseline Meander Wavelength(ft) 46.0 60.9 61.8 73.5 6.5 40 Meander Width Ratio 2.1 4.5 4.3 7.3 1.3 40 Additional Reach Parameters Rosgen Classification C5b Channel Thalweg length(ft) 1590 Sinuosity(ft) 1.2 Water Surface Slope(Channel)(ft/ft) 0.0165 BF slope(ft/ft) 0.0167 3Ri%/Ru%/P%/G%/S% 3SC%/Sa%/G%/C%/B%/Be% 3d16/d35/d50/d84/d95/ 2%of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = Proportion of reach exhibiting banks that are eroding based on the visual survey from visual assessment table 3 = Riffle, Run, Pool, Glide, Step; Silt/Clay, Sand, Gravel, Cobble, Boulder, Bedrock; dip = max pave, disp = max subpave 4. = Of value/needed only if the n exceeds 3 Appendix D ECOSYSTEM PLANNINex Red Barn Mitigation Bank [EPR RESTORATION As-built Baseline Monitoring Report Table 10b. Monitoring Data - Stream Reach Data Summary Red Barn Mitigation Bank Site - UT1c (738 feet) Parameter Baseline MY-1 MY-2 MY-3 MY-4 MY-5 I Dimension nd Substrate-Riffle only Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Bankfull Width(ft) 6.2 6.2 6.2 6.2 - 1 Floodprone Width(ft)' >57.4 >57.4 >57.4 >57.4 - 1 , _ ' Bankfull Mean Depth(ft) 0.50 0.50 0.50 0.50 - 1 1Bankfull Max Depth(ft) 0.72 0.72 0.72 0.72 - 1 Bankfull Cross Sectional Area(ft2) 3.07 3.07 3.07 3.07 - 1 Width/Depth Ratio 12.34 , 12.34 12.34 12.34 - 1 , Entrenchment Ratio >9.29 >9.29 >9.29 >9.29 - 1 1Bank Height Ratio 1.0 1.0 1.0 1.0 - 1 Profile Riffle Length(ft) 16.2 24.4 23.8 34.0 6.8 4 Riffle Slope(ft/ft) 0.002 0.00 0.01 0.01 0.0 4 , Pool Length(ft) 12.5 19.328 19.4 26.03 5.3 4 Pool Max depth(ft) 1.1 1.4 1.2 2.1 0.4 4 Pool Spacing(ft) 41.0 49.05 50.54 54.10 5.3 4 I Pattern Channel Beltwidth(ft) 29.4 38.66 39.00 45.70 3.8 11 I I I I I I I I I I I I I Radius of Curvature(ft) 14.300 20.38 21.30 25.70 3.2 13 Rc:Bankfull width(ft/ft) 2.3 3.2871 3.4355 4.1452 0.5 13 Pattern data will not typically be collected unless visual data, dimensional data or - profile data indicate significant shifts from baseline Meander Wavelength(ft) 58.5 73.0 73.8 83.2 8.1 11 Meander Width Ratio 4.7 6.24 6.29 7.37 0.6 11 . Additional Reach Parameters Rosgen Classification C5 Channel Thalweg length(ft) 738 Sinuosity(ft) 1.4 Water Surface Slope(Channel)(ft/ft) 0.0034 BF slope(ft/ft) 0.0031 3Ri%/Ru%/P%/G%/S% 3SC%/Sa%/G%/C%/B%/Be% 3d16/d35/d50/d84/d95/ 2%of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = Proportion of reach exhibiting banks that are eroding based on the visual survey from visual assessment table 3 = Riffle, Run, Pool, Glide, Step; Silt/Clay, Sand, Gravel, Cobble, Boulder, Bedrock; dip = max pave, disp = max subpave 4. = Of value/needed only if the n exceeds 3 Appendix D ECOSYSTEM PLANNINex Red Barn Mitigation Bank [EPR RESTORATION As-Built Baseline Monitoring Report Table 10c. Monitoring Data - Stream Reach Data Summary Red Barn Mitigation Bank Site - UT2a (1197 feet) Parameter Baseline MY-1 MY-2 MY-3 MY-4 MY-5 Dimension and Substrate-Riffle only Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Bankfull Width(ft) 7.7 7.7 7.7 7.7 - 1 Floodprone Width(ft) >53.9 , >53.9 >53.9 >53.9 - 1 _ Bankfull Mean Depth(ft) 0.39 0.39 0.39 0.39 - 1 - 1Bankfull Max Depth(ft) 0.70 0.70 0.70 0.70 - 1 - Bankfull Cross Sectional Area(ft2) 2.95 2.95 2.95 2.95 - 1 Width/Depth Ratio 19.62 19.62 19.62 19.62 - 1 Entrenchment Ratio >7.04 >7.04 >7.04 >7.04 - 1 1Bank Height Ratio 1.0 1.0 1.0 1.0 - 1 Profile Riffle Length(ft) 11.5 19.0 17.0 32.2 6.9 10 Riffle Slope(ft/ft) 0.0091 0.0127 0.0123 0.0177 0.0024 10 Pool Length(ft) 10.0 18.9 19.3 28.0 5.6 12 Pool Max depth(ft) 1.2 1.6 1.7 2.4 0.3 11 Pool Spacing(ft) 30.3 43.2 40.6 55.6 8.5 13 Pattern Channel Beltwidth(ft) 23.2 34.7 33.85 50.1 6.89 22 I I I I I I I I I I I I I__ Radius of Curvature(ft) 11.7 19.06 19.05 24.6 3.077 24 Rc:Bankfull width(ft/ft) 1.5195 2.4753 2.474 3.1948 0.399 24 Pattern data will not typically be collected unless visual data, dimensional data or profile data indicate significant shifts from baseline Meander Wavelength(ft) 48.4 66.9 66.85 82.6 9.14 22 Meander Width Ratio 3.013 4.5065 4.3961 6.5065 0.895 22 Additional Reach Parameters Rosgen Classification C5 Channel Thalweg length(ft) 1197 Sinuosity(ft) 1.31 Water Surface Slope(Channel)(ft/ft) 0.0092 BF slope(ft/ft) 0.0091 3Ri%/Ru%/P%/G%/S% 3SC%/Sa%/G%/C%/B%/Be% 3d16/d35/d50/d84/d95/ 2%of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = Proportion of reach exhibiting banks that are eroding based on the visual survey from visual assessment table 3 = Riffle, Run, Pool, Glide, Step; Silt/Clay, Sand, Gravel, Cobble, Boulder, Bedrock; dip = max pave, disp = max subpave 4. = Of value/needed only if the n exceeds 3 Appendix D ECOSYSTEM PLANNINex Red Barn Mitigation Bank [EPR RESTORATION As-Built Baseline Monitoring Report Table 10d. Monitoring Data - Stream Reach Data Summary Red Barn Mitigation Bank Site - UT2b (1062 feet) Parameter Baseline MY-1 MY-2 MY-3 MY-4 MY-5 Dimension and Substrate-Riffle only Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Bankfull Width(ft) 8.6 8.6 8.6 8.6 - 1 'Floodprone Width(ft) >54.9 >54.9 >54.9 >54.9 - 1 Bankfull Mean Depth(ft) 0.48 0.48 0.48 0.48 - 1 1Bankfull Max Depth(ft) 0.86 0.86 0.86 0.86 - 1 Bankfull Cross Sectional Area(ft2) 4.14 4.14 4.14 4.14 - 1 Width/Depth Ratio 17.85 17.85 17.85 17.85 - 1 • Entrenchment Ratio >6.4 >6.4 >6.4 >6.4 - 1 1Bank Height Ratio 1.0 1.0 1.0 1.0 - 1 Profile Riffle Length(ft) 15.9 28.2 25.3 45.7 9.6 13 I Riffle Slope(ft/ft) 0.0026 0.0052 0.005 0.0089 0.0018 13 Pool Length(ft) 19.0 23.9 22.6 35.7 4.8 10 Pool Max depth(ft) 1.4 1.7 1.7 2.1 0.2 10 Pool Spacing(ft) 44.5 56.3 57.3 67.0 7.6 10 Pattern Channel Beltwidth(ft) 23.2 46.38 47.9 62.7 10.76 13 Radius of Curvature(ft) 21.1 26.86 27.6 32.9 3.48 12 Rc:Bankfull width(ft/ft) 2.4535 3.1233 3.2093 3.8256 0.404 12 Pattern data will not typically be collected unless visual data, dimensional data or profile data indicate significant shifts from baseline Meander Wavelength(ft) 78.3 102.6 97.65 152.8 17.3 14 Meander Width Ratio 2.6977 5.393 5.5698 7.2907 1.25 13 . Additional Reach Parameters Rosgen Classification C5 Channel Thalweg length(ft) 1062 Sinuosity(ft) 1.26 Water Surface Slope(Channel)(ft/ft) 0.0030 BF slope(ft/ft) 0.0031 3Ri%/Ru%/P%/G%/S% 3SC%/Sa%/G%/C%/B%/Be% 3d16/d35/d50/d84/d95/ 2%of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = Proportion of reach exhibiting banks that are eroding based on the visual survey from visual assessment table 3 = Riffle, Run, Pool, Glide, Step; Silt/Clay, Sand, Gravel, Cobble, Boulder, Bedrock; dip = max pave, disp = max subpave 4. = Of value/needed only if the n exceeds 3 Appendix D ECOSYSTEM PLANNINex Red Barn Mitigation Bank [EPR RESTORATION As-Built Baseline Monitoring Report Table 10e. Monitoring Data - Stream Reach Data Summary Red Barn Mitigation Bank Site - UT2c (244 feet) Parameter Baseline MY-1 MY-2 MY-3 MY-4 MY-5 Dimension and Substrate-Riffle only Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Bankfull Width(ft) 9.2 9.2 9.2 9.2 - 1 Floodprone Width(ft) 41.4 41.4 41.4 41.4 - 1 Bankfull Mean Depth(ft) 0.42 0.42 0.42 0.42 - 1 1Bankfull Max Depth(ft) 0.82 0.82 0.82 0.82 - 1 Bankfull Cross Sectional Area(ft2) 3.90 3.90 3.90 3.90 - 1 Width/Depth Ratio 22 22 22 22 - 1 Entrenchment Ratio 4.48 4.48 4.48 4.48 - 1 1Bank Height Ratio 1.0 1.0 1.0 1.0 - 1 Profile Riffle Length(ft) 14.8 23.2 23.9 28.4 4.6 5 Riffle Slope(ft/ft) 0.0028 0.0052 0.0043 0.009 0.0022 5 Pool Length(ft) 14.2 20.8 23.9 24.3 4.6 3 Pool Max depth(ft) 1.7 2.1 2.1 2.5 0.3 3 Pool Spacing(ft) 41.0 45.9 47.6 49.2 3.5 3 Pattern Channel Beltwidth(ft) N/A N/A N/A N/A N/A N/A I I I I I I I I I I I I I Radius of Curvature(ft) N/A N/A N/A N/A N/A N/A Rc:Bankfull width(ft/ft) N/A N/A N/A N/A N/A N/A Pattern data will not typically be collected unless visual data, dimensional data or profile data indicate significant shifts from baseline Meander Wavelength(ft) N/A N/A N/A N/A N/A N/A Meander Width Ratio N/A N/A N/A N/A N/A N/A . Additional Reach Parameters Rosgen Classification B5c Channel Thalweg length(ft) 244 Sinuosity(ft) 1.01 Water Surface Slope(Channel)(ft/ft) 0.0030 BF slope(ft/ft) 0.0030 3Ri%/Ru%/P%/G%/S% 3SC%/Sa%/G%/C%/B%/Be% 3d16/d35/d50/d84/d95/ 2%of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = Proportion of reach exhibiting banks that are eroding based on the visual survey from visual assessment table 3 = Riffle, Run, Pool, Glide, Step; Silt/Clay, Sand, Gravel, Cobble, Boulder, Bedrock; dip = max pave, disp = max subpave 4. = Of value/needed only if the n exceeds 3 Appendix D ECOSYSTEM PLANNINex Red Barn Mitigation Bank [EPR RESTORATION As-Built Baseline Monitoring Report Table 10f. Monitoring Data - Stream Reach Data Summary Red Barn Mitigation Bank Site - UT3a (1410 feet) Parameter Baseline MY-1 MY-2 MY-3 MY-4 MY-5 Dimension and Substrate-Riffle only Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Bankfull Width(ft) 5.6 5.6 5.6 5.6 - 1 Floodprone Width(ft) 31.0 31.0 31.0 ,i 31.0 - 1 _ _ _ ,Bankfull Mean Depth(ft) 0.28 0.28 0.28 0.28 - 1 1Bankfull Max Depth(ft) 0.51 0.51 0.51 0.51 - 1 Bankfull Cross Sectional Area(ft2) 1.57 1.57 1.57 1.57 - 1 Width/Depth Ratio 19.93 19.93 19.93 , 19.93 - 1 _ _ _ Entrenchment Ratio 5.55 5.55 5.55 5.55 - 1 , 1Bank Height Ratio 1.0 1.0 1.0 1.0 - 1 Profile Riffle Length(ft) 12.5 17.9 17.5 27.6 4.1 11 I , Riffle Slope(ft/ft) 0.021 0.030 0.030 0.042 0.0056 11 Pool Length(ft) 6.7 11.0 10.8 15.1 3.0 12 Pool Max depth(ft) 1.4 1.8 1.8 2.3 0.3 12 Pool Spacing(ft) 21.5 29.8 29.5 45.4 6.2 10 • Pattern Channel Beltwidth(ft) 9 14.1 13.75 20.9 2.825 12 Radius of Curvature(ft) 18.1 24.09 28.1 28.1 4.43 13 Rc:Bankfull width(ft/ft) 3.2321 4.3018 5.0179 5.0179 0.79 13 Pattern data will not typically be collected unless visual data, dimensional data or profile data indicate significant shifts from baseline Meander Wavelength(ft) 47.4 78.2 79.65 132.6 26.157 14 Meander Width Ratio 1.6071 2.5179 2.4554 3.7321 0.5 12 . Additional Reach Parameters Rosgen Classification B4 Channel Thalweg length(ft) 1410 Sinuosity(ft) 1.01 Water Surface Slope(Channel)(ft/ft) 0.0256 BF slope(ft/ft) 0.0258 3Ri%/Ru%/P%/G%/S% 3SC%/Sa%/G%/C%/B%/Be% 3d16/d35/d50/d84/d95/ 2%of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = Proportion of reach exhibiting banks that are eroding based on the visual survey from visual assessment table 3 = Riffle, Run, Pool, Glide, Step; Silt/Clay, Sand, Gravel, Cobble, Boulder, Bedrock; dip = max pave, disp = max subpave 4. = Of value/needed only if the n exceeds 3 Appendix D ECOSYSTEM PLANNINex Red Barn Mitigation Bank [EPR RESTORATION As-Built Baseline Monitoring Report Table 10g. Monitoring Data - Stream Reach Data Summary Red Barn Mitigation Bank Site - UT3b (190 feet) Parameter Baseline MY-1 MY-2 MY-3 MY-4 MY-5 Dimension and Substrate-Riffle only Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Bankfull Width(ft) 6.9 6.9 6.9 6.9 - 1 Floodprone Width(ft) 24.6 24.6 24.6 24.6 - 1 Bankfull Mean Depth(ft) 0.54 0.54 0.54 0.54 - 1 1Bankfull Max Depth(ft) 0.77 0.77 0.77 0.77 - 1 Bankfull Cross Sectional Area(ft2) 3.74 3.74 3.74 3.74 - 1 Width/Depth Ratio 12.76 12.76 12.76 12.76 - 1 Entrenchment Ratio 3.58 3.58 3.58 3.58 - 1 1Bank Height Ratio 1.0 1.0 1.0 1.0 - 1 Profile Riffle Length(ft) 8.9 14.9 15.0 21.2 4.3 6 Riffle Slope(ft/ft) 0.022 0.0293 0.0297 0.0379 0.0052 6 Pool Length(ft) 14.7 16.5 16.2 20.3 1.8 6 Pool Max depth(ft) 1.7 2.1 2.0 2.9 0.4 6 Pool Spacing(ft) 15.4 31.6 33.7 45.0 9.9 6 Pattern Channel Beltwidth(ft) N/A N/A N/A N/A N/A N/A I I I I I I I I I I I I I Radius of Curvature(ft) N/A N/A N/A N/A N/A N/A Rc:Bankfull width(ft/ft) N/A N/A N/A N/A N/A N/A Pattern data will not typically be collected unless visual data, dimensional data or profile data indicate significant shifts from baseline Meander Wavelength(ft) N/A N/A N/A N/A N/A N/A Meander Width Ratio N/A N/A N/A N/A N/A N/A . Additional Reach Parameters Rosgen Classification B4c Channel Thalweg length(ft) 190 Sinuosity(ft) 1.04 Water Surface Slope(Channel)(ft/ft) 0.0159 BF slope(ft/ft) 0.0153 3Ri%/Ru%/P%/G%/S% 3SC%/Sa%/G%/C%/B%/Be% 3d16/d35/d50/d84/d95/ 2%of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = Proportion of reach exhibiting banks that are eroding based on the visual survey from visual assessment table 3 = Riffle, Run, Pool, Glide, Step; Silt/Clay, Sand, Gravel, Cobble, Boulder, Bedrock; dip = max pave, disp = max subpave 4. = Of value/needed only if the n exceeds 3 Appendix D ECOSYSTEM PLANNINex Red Barn Mitigation Bank [EPR RESTORATION As-Built Baseline Monitoring Report Table 10h. Monitoring Data - Stream Reach Data Summary Red Barn Mitigation Bank Site - UT3c (1097 feet) Parameter Baseline MY-1 MY-2 MY-3 MY-4 MY-5 Dimension and Substrate-Riffle only Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Bankfull Width(ft) 7.8 7.8 7.8 7.8 - 1 Floodprone Width(ft) >40.0 >40.0 >40.0 >40.0 - 1 Bankfull Mean Depth(ft) 0.44 0.44 0.44 0.44 - 1 1Bankfull Max Depth(ft) 0.65 0.65 0.65 0.65 - 1 Bankfull Cross Sectional Area(ft2) 3.46 3.46 3.46 3.46 - 1 Width/Depth Ratio 17.73 17.73 17.73 17.73 - 1 • Entrenchment Ratio >5.13 >5.13 >5.13 >5.13 - 1 1Bank Height Ratio 1.0 1.0 1.0 1.0 - 1 Profile Riffle Length(ft) 11.4 19.2 18.8 29.1 5.1 12 I Riffle Slope(ft/ft) 0.0133 0.0184 0.0172 0.0254 0.0035 12 Pool Length(ft) 10.9 17.7 18.1 25.9 4.6 18 Pool Max depth(ft) 1.6 2.3 2.3 3.1 0.4 14 Pool Spacing(ft) 10.9 40.4 42.1 59.8 12.0 16 Pattern Channel Beltwidth(ft) 16.9 26.62 25.3 35.9 6 18 Radius of Curvature(ft) 9.2 23 25.55 29.8 6.649 20 Rc:Bankfull width(ft/ft) 1.1795 2.9487 3.2756 3.8205 0.85 20 Pattern data will not typically be collected unless visual data, dimensional data or profile data indicate significant shifts from baseline Meander Wavelength(ft) 46 73.61 78.65 85.9 11.44 16 Meander Width Ratio 2.1667 3.4128 3.2436 4.6026 0.77 18 . Additional Reach Parameters Rosgen Classification C4 Channel Thalweg length(ft) 1097 Sinuosity(ft) 1.19 Water Surface Slope(Channel)(ft/ft) 0.0201 BF slope(ft/ft) 0.0201 3Ri%/Ru%/P%/G%/S% 3SC%/Sa%/G%/C%/B%/Be% 3d16/d35/d50/d84/d95/ 2%of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = Proportion of reach exhibiting banks that are eroding based on the visual survey from visual assessment table 3 = Riffle, Run, Pool, Glide, Step; Silt/Clay, Sand, Gravel, Cobble, Boulder, Bedrock; dip = max pave, disp = max subpave 4. = Of value/needed only if the n exceeds 3 Appendix D ECOSYSTEM PLANNINex Red Barn Mitigation Bank [EPR RESTORATION As-Built Baseline Monitoring Report Table 10i. Monitoring Data - Stream Reach Data Summary Red Barn Mitigation Bank Site - UT4 (134 feet) Parameter Baseline MY-1 MY-2 MY-3 MY-4 MY-5 Dimension and Substrate-Riffle only Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Bankfull Width(ft) 4.3 4.3 4.3 4.3 - 1 Floodprone Width(ft) 11.79 11.79 11.79 11.79 - 1 Bankfull Mean Depth(ft) 0.29 0.29 0.29 0.29 - 1 , 1Bankfull Max Depth(ft) 0.43 0.43 0.43 0.43 - 1 Bankfull Cross Sectional Area(ft2) 1.26 1.26 1.26 1.26 - 1 Width/Depth Ratio 14.72 14.72 14.72 14.72 - 1 Entrenchment Ratio 2.76 2.76 2.76 2.76 - 1 , 1Bank Height Ratio 1.0 1.0 1.0 1.0 - 1 Profile Riffle Length(ft) 20.0 22.9 22.9 25.9 2.9 2 I Riffle Slope(ft/ft) 0.0123 0.0149 0.0149 0.0174 0.0026 2 Pool Length(ft) 13.8 19.0 19.0 24.2 5.2 2 Pool Max depth(ft) 0.8 0.8 0.8 0.9 0.1 2 Pool Spacing(ft) 46.3 46.3 46.3 46.3 0.0 1 Pattern Channel Beltwidth(ft) N/A N/A N/A N/A N/A N/A Radius of Curvature(ft) N/A N/A N/A N/A N/A N/A Rc:Bankfull width(ft/ft) N/A N/A N/A N/A N/A N/A Pattern data will not typically be collected unless visual data, dimensional data or profile data indicate significant shifts from baseline Meander Wavelength(ft) N/A N/A N/A N/A N/A N/A Meander Width Ratio N/A N/A N/A N/A N/A N/A . Additional Reach Parameters Rosgen Classification B4c Channel Thalweg length(ft) 134 Sinuosity(ft) 1.03 Water Surface Slope(Channel)(ft/ft) 0.0152 BF slope(ft/ft) 0.0151 3Ri%/Ru%/P%/G%/S°A) 3SC%/Sa%/G%/C%/B%/Be% 3d16/d35/d50/d84/d95/ 2%of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = Proportion of reach exhibiting banks that are eroding based on the visual survey from visual assessment table 3 = Riffle, Run, Pool, Glide, Step; Silt/Clay, Sand, Gravel, Cobble, Boulder, Bedrock; dip = max pave, disp = max subpave 4. = Of value/needed only if the n exceeds 3 Appendix D ECOSYSTEM PLANNINex Red Barn Mitigation Bank [EPR RESTORATION As-Built Baseline Monitoring Report Longitudinal Profile - Baseline (May 2020) UT1 - Sta. 10+00 - 15+00 1060 As-Built Thalweg-MVO 2020 Right Bank Left Bank ■ Cross Sections Water Surface 1055 1050 1045 _ Begin UT1a _v XS1 - "' 1040 1035 - 1 1030 • — • - 1025 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 Stationing(ft) Appendix D ECOSYSTEM Red Barn Mitigation Bank PLANNING& g EPR RESTORATION As-built Baseline Monitoring Report Longitudinal Profile - Baseline (May 2020) UT1 - Sta. 15+00 - 20+00 1050 As-Built Thalweg-MYO 2020 Right Bank Left Bank ■ Cross Sections Water Surface 1045 1040 — --- 1035 0 r > _ a, LT' 1030 - 1025 1020 • • 1015 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 Stationing(ft) Appendix D ECOSYSTEM Red Barn Mitigation Bank PLANNING& g EPR RESTORATION As-built Baseline Monitoring Report Longitudinal Profile - Baseline (May 2020) UT1 - Sta. 20+00 - 25+00 1040 As-Built Thalweg-MYO 2020 Right Bank Left Bank • Cross Sections Water Surface 1035 1030 1025 • fop - a) XS2 LT' 1020 "" - -- XS3 1015 1010 1005 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 Stationing(ft) Appendix D ECOSYSTEM Red Barn Mitigation Bank PLANNING& g EPR RESTORATION As-built Baseline Monitoring Report Longitudinal Profile - Baseline (May 2020) UT1 - Sta. 25+00 - 30+00 1035 As-Built Thalweg-MYO 2020 Right Bank Left Bank ■ Cross Sections Water Surface 1030 1025 1020 — — V v LL' 1015 End UT1a • — Begin UT1b 1010 1005 1000 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 Stationing(ft) Appendix D ECOSYSTEM Red Barn Mitigation Bank PLANNING& g EPR RESTORATION As-built Baseline Monitoring Report Longitudinal Profile - Baseline (May 2020) UT1 - Sta. 30+00 - 35+00 1035 As-Built Thalweg-MYO 2020 Right Bank Left Bank ■ Cross Sections Water Surface 1030 1025 Culvert Crossing -- 1020 — - w End UT1b • XS4 1015 Begin UT1c 1010 1005 i • 1000 30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 Stationing(ft) Appendix D ECOSYSTEM Red Barn Mitigation Bank PLANNING& g EPR RESTORATION As-built Baseline Monitoring Report Longitudinal Profile - Baseline (May 2020) UT1 - Sta. 35+00 - 38+66 1035 As-Built Thalweg-MVO 2020 Right Bank Left Bank ■ Cross Sections Water Surface 1030 1025 1020 End UT1c 4— u LT' 1015 XS5 1010 — 1005 • • 1000 35+00 35+50 36+00 36+50 37+00 37+50 38+00 38+50 39+00 39+50 40+00 Stationing(ft) Appendix D ECOSYSTEM Red Barn Mitigation Bank PLANNING& g EPR RESTORATION As-built Baseline Monitoring Report Longitudinal Profile - Baseline (May 2020) UT2 - Sta. 10+00 - 15+00 1045 As-Built Thalweg-MVO 2020 Right Bank Left Bank ■ Cross Sections Water Surface 1040 1035 -s -- 1030 Begin UT2a ,44 ca a, T 1025 1020 XS6 _ 1015 • — 1010 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 Stationing(ft) Appendix D ECOSYSTEM Red Barn Mitigation Bank PLANNING& g EPR RESTORATION As-built Baseline Monitoring Report Longitudinal Profile - Baseline (May 2020) UT2 - Sta. 15+00 - 20+00 1040 As-Built Thalweg-MYO 2020 Right Bank Left Bank ■ Cross Sections Water Surface 1035 1030 1025 O _ L' 1020 XS7 1015 1010 • 1005 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 Stationing(ft) Appendix D ECOSYSTEM Red Barn Mitigation Bank PLANNING& g EPR RESTORATION As-built Baseline Monitoring Report Longitudinal Profile - Baseline (May 2020) UT2 - Sta. 20+00 - 25+00 1035 As-Built Thalweg-MYO 2020 Right Bank Left Bank • Cross Sections Water Surface 1030 1025 1020 ra ----- LT' 1015 XS8 End UT2a XS9 Begin UT2b 1010 1005 • • 1000 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 Stationing(ft) Appendix D ECOSYSTEM Red Barn Mitigation Bank PLANNING& g EPR RESTORATION As-built Baseline Monitoring Report Longitudinal Profile - Baseline (May 2020) UT2 - Sta. 25+00 - 30+00 1035 As-Built Thalweg-MY0 2020 Right Bank Left Bank ■ Cross Sections Water Surface 1030 1025 Culvert Crossing Bedrock Outcrop 1020 ' 1015 • ®----- XS10 1010 — 1005 • 1000 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 Stationing(ft) Appendix D ECOSYSTEM Red Barn Mitigation Bank PLANNING& g EPR RESTORATION As-built Baseline Monitoring Report Longitudinal Profile - Baseline (May 2020) UT2 - Sta. 30+00 - 35+00 1035 As-Built Thalweg-MYO 2020 Right Bank Left Bank ■ Cross Sections Water Surface 1030 1025 -- 1020 — c 0 v LT-' 1015 — 1010 — 1 XS11 End UT2b Begin UT2c 1005 — 1000 30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 Stationing(ft) Appendix D ECOSYSTEM PLANNING& Red Barn Mitigation Bank g EPR RESTORATION As-built Baseline Monitoring Report Longitudinal Profile - Baseline (May 2020) UT2 - Sta. 35+00 - 35+15 1035 As-Built Thalweg-MYO 2020 Right Bank Left Bank ■ Cross Sections Water Surface 1030 1025 1020 0 v u' 1015 • 1010 End UT2c 1005 • 1000 35+00 35+50 36+00 36+50 37+00 37+50 38+00 38+50 39+00 39+50 40+00 Stationing(ft) Appendix D ECOSYSTEM Red Barn Mitigation Bank PLANNING& g EPR RESTORATION As-built Baseline Monitoring Report Longitudinal Profile - Baseline (May 2020) UT3 - Sta. 10+00 - 15+00 1085 As-Built Thalweg-MVO 2020 Right Bank Left Bank ■ Cross Sections Water Surface 1080 Begin UT3a 1075 6 — 1070 v'' ,44 o I XS12 a) - 1065 ' 1060 - - y 1055 • • • 1050 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 Stationing(ft) Appendix D ECOSYSTEM Red Barn Mitigation Bank PLANNING& g EPR RESTORATION As-built Baseline Monitoring Report Longitudinal Profile - Baseline (May 2020) UT3 - Sta. 15+00 - 20+00 1070 As-Built Thalweg-MYO 2020 Right Bank Left Bank ■ Cross Sections Water Surface 1065 1060 V " 1055 -- Culvert Crossing ra 0 a, LT' 1050 XS13 1045 — 1040 - 1035 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 Stationing(ft) Appendix D ECOSYSTEM Red Barn Mitigation Bank PLANNING& g EPR RESTORATION As-built Baseline Monitoring Report Longitudinal Profile - Baseline (May 2020) UT3 - Sta. 20+00 - 25+00 1060 — 1055 As-Built Thalweg-MYO 2020 — Right Bank Left Bank INCross Sections Water Surface 1050 1045 4 ra ra a, LT' 1040 XS14 1035 XS15 End UT3a 1030 Begin UT3b 1025 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 Stationing(ft) Appendix D ECOSYSTEM Red Barn Mitigation Bank PLANNING& g EPR RESTORATION As-built Baseline Monitoring Report Longitudinal Profile - Baseline (May 2020) UT3 - Sta. 25+00 - 30+00 1050 As-Built Thalweg-MYO 2020 Right Bank Left Bank ■ Cross Sections Water Surface 1045 1040 1035 . i 1030 End UT3b .. Begin UT3c 1025 1020 • 1015 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 Stationing(ft) Appendix D ECOSYSTEM Red Barn Mitigation Bank PLANNING& g EPR RESTORATION As-built Baseline Monitoring Report Longitudinal Profile - Baseline (May 2020) UT3 - Sta. 30+00 - 35+00 1040 As-Built Thalweg-MYO 2020 Right Bank Left Bank ■ Cross Sections Water Surface 1035 1030 — — 1025 ■ _ XS16 -- _v L' 1020 1015 — 1010 — 1005 30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 Stationing(ft) Appendix D ECOSYSTEM Red Barn Mitigation Bank PLANNING& g EPR RESTORATION As-built Baseline Monitoring Report Longitudinal Profile - Baseline (May 2020) UT3 - Sta. 35+00 - 37+94 1035 As-Built Thalweg-MVO 2020 Right Bank Left Bank ■ Cross Sections Water Surface 1030 1025 — 1020 0 "' 1015 XS17 - 1010 — t End UT3c Begin UT3d End UT3d 1005 1000 35+00 35+50 36+00 36+50 37+00 37+50 38+00 38+50 39+00 39+50 40+00 Stationing(ft) Appendix D ECOSYSTEM Red Barn Mitigation Bank PLANNING& g EPR RESTORATION As-built Baseline Monitoring Report Longitudinal Profile - Baseline (May 2020) UT4 - Sta. 10+00 - 11+00 1060 As-Built Thalweg-MVO 2020 Right Bank Left Bank • Cross Sections Water Surface 1055 Begin UT4 1050 1045 End UT4 LI' 1040 XS18 1035 - 1030 • 1025 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 Stationing(ft) Appendix D ECOSYSTEM Red Barn Mitigation Bank PLANNING& g EPR RESTORATION As-built Baseline Monitoring Report Cross Section Plot- Baseline XS1-UT1a Station 11+87-Pool iNs q •A`� .r'.' _ '..:yw' as _ aa 3..� *'`'" - : xs �, f G' ,0- , .• F -T" ' xk sr.� 1.'q_ r . . -'a 4;'' Or'' ,,-"-- -,,. ' .ozit-'rt''';------4tie"Pfe!:.".1.--‘• ,-.- ----, i,'*, lc;:.,,- .'' ' ,- •r 'CAE y = , t # '.' "r, ,as m., .fi d '4 v;l^: < as s -`-:a ,w" .tea:^'. ��.i � ; �rt � 4. g, -_. e;,,,- "` , .._ Z 4 x` 7. Y/f x ' � "' , °:.t4 !._ i� ter- `- . ,,,,.X �' M - i F 'may k f f Y s k Z ti9�Rm : 7 { .,. ^.S �� � yY.: ?. ry1Gt � ",3:: i_4MI XS1 •looking upstream XS1 looking downstream Bankfull Bankfull Bankfull Floodprone Floodprone Max Depth Mean Depth Bank Height ( Z) ( ( , ( ( W/D Ratio ER Elevation(ft) Area ft Width ft Elevation ft Width ft ft ft Ratio 1043.97 7.36 11.85 N/A N/A 1.33 0.62 19.11 N/A 1.0 XS1 Pool - 11+87 1050 As-Built-May 2020 1049 — — — Bankfull 1048 1047 1046 c 1045 as v LT' 1044 — — — — 1043 1042 1041 1040 0 10 20 30 40 50 60 Distance(ft) Cross Section Plot- Baseline XS2-UTla Station 20+33-Pool S 4. ,mow r ,-, C. der: w '' y.w,t,�- _ "* " a qr- `,. „`(- r `, �- ram` :"` £ .e _ -.:y �.1 �, - Ag'x'4^ ip'-:,;, 7: '-', "` .`•-c � 3 � s. L- 4 , ,, a ., tt,f ,max .�. .,r .x r ott,11..6. ',,..., , • ,,(.. •-,'.. ,' ' .n . v•'. n,'I,-..:, '..:..'' .1,,,..:ii.A .6. •'6. '',''''.''.Ple•'''.''''t:..1.l'''' ''.7,•:i.,%•••,.1WP, :6-., XS2 looking upstream XS2 looking downstream Bankfull Bankfull Bankfull Floodprone Floodprone Max Depth Mean Depth Bank Height ( 2) ( , (ft) W/D Ratio ER Elevation(ft) Area ft Width(ft) Elevation ft Width (ft) (ft) Ratio 1023.76 4.14 7.57 N/A N/A 0.91 0.55 13.76 N/A 1.0 XS2 Pool - 20+33 1029 As-Built-May 2020 1028 — — — Bankfull 1027 1026 1025 c 1024 ra l — "' 1023 if 1022 1021 1020 1019 0 10 20 30 40 50 60 70 80 Distance(ft) Cross Section Plot- Baseline XS3-Una Station 22+60 Riffle y; � x .r wr K ....' _.22 j sue )` "qs } 1 $''^$`' eb2 R �m - ofirs-lit r.-1-.-tt• ' -,- •10. .z y$a -Y f;t1. u .', ) s 7 . •t., � 4 . . XS3 looking upstream XS3 looking downstream Bankfull Bankfull Bankfull Floodprone Floodprone Max Depth Mean Depth Bank Height ( Z) (ft) (ft) (ft) W/D Ratio ER Elevation ft Area ft Width(ft) ElevationWidth(ft) Ratio 1021.58 1.73 5.87 1022.05 >40.34 0.47 0.29 20.24 >6.87 1.0 XS3 Riffle- 22+60 1027 As-Built-May 2020 1026 — — — Floodprone - - - Bankfull 1025 1024 1023 c 1022 - - - • co v L' 1021 1020 1019 1018 1017 0 5 10 15 20 25 30 35 40 45 50 Distance(ft) Cross Section Plot- Baseline XS4-UT1b Station 33+64-Riffle � � x c, .,.�., a tee-.� e= v - ! 44:- ..y 'a ,Z. - N fit . _ r -�. L T 4' mot r''- . ,,, . ' Yd,# d - ; to -,4.-,'''' ..,.: _ Itt*.f- ,. -4i.,*-4.16k:-.44s1, _..‘-,:: '-'''S"-i'*477"..-:: t ---:' 4_1'_ , 7,-A s � ",, a 1 J nl !' ,ate. x�• 'a':; < XS4 looking upstream XS4 looking downstream Bankfull Bankfull Bankfull Floodprone Floodprone Max Depth Mean Depth Bank Height ( Z) (ft) ( , ( (ft) W/D Ratio ER Elevation(ft) Area ft WidthElevation ft Width ft ftRatio 1018.47 3.07 6.17 1019.19 >57.36 0.72 0.5 12.34 >9.29 1.0 XS4 Riffle - 33+64 As-Built- 1024 May 2020 1023 — — — Floodprone — — — Bankfull 1022 1021 1020 •° 1019 _.0°°°.4' ......--.....\\J..' w 1018 1017 1016 1015 1014 0 10 20 30 40 50 60 70 Distance(ft) Cross Section Plot- Baseline XS5 UT1b Station 36+40-Pool � ' a ' �''' - )ram"` '` t ��. 4, awe t :' -, aV -f''art ' '. , ,d�a's; R'p' x Sri - ' _ _ � Sys XS5 looking upstream XS5 looking downstream Bankfull Bankfull Bankfull Floodprone Floodprone Max Depth Mean Depth Bank Height ( Z) (ft) ( , (ft) (ft) w/o Ratio ER Elevation(ft) Area ft WidthElevation ft Width ftRatio 1017.76 5.1 8.92 N/A N/A 1.06 0.57 15.65 N/A 1.0 XS5 Pool - 36+40 1023 As-Built-May 2020 1022 — — — Bankfull 1021 1020 1019 o 1018 co a) "' 1017 1016 1015 1014 1013 0 10 20 30 40 50 60 70 80 Distance(ft) Cross Section Plot- Baseline XS6-UT2a Station 14+74-Pool ? 'kfr. y �, 4.'� v� - t t°.. hS yam -` ' } c}x„ i�,$f" ,.,' � Pc ''. - - 5 J XS6 looking downstream XS6 looking upstream Bankfull Bankfull Bankfull Floodprone Floodprone Max Depth Mean Bank Height ( Z) ( ( , ( ( W/D Ratio ER ft Width ft Elevation ft Width ft ft ft Depth Ratio 1023.5 7.9 10.76 N/A N/A 1.37 0.73 14.74 Elevation(ft) Area N/A 1.0 XS6 Pool - 14+74 1029 As-Built-May 2020 1028 — — — Bankfull 1027 1026 1025 I1024 1023 1022 1021 1020 1019 0 10 20 30 40 50 60 70 Distance(ft) Cross Section Plot- Baseline XS7-UT2a Station 19+16-Riffle '� • air' ,+' " '�',rt.� 2' �k k , '-''' '''� ' -„� .� �'s x t`.w ' ''3' ,sy. ti' y „y 5`.tF'" -�"'casv� F k i= ,_ 4 ttom�,, - � '•.s" 44,E t'• +may ,x f .¢ 'Afg. i. v . ,-.,,,,` -,.Wi' = .vim " ti,� e a e' , tea.- �; 1111. - q , Y� E ; '. j� 1 1 q yr. .i XS7 looking upstream XS7 looking downstream Bankfull Bankfull Bankfull Floodprone Floodprone Max Depth Mean Depth Bank Height ( 2) ( , ( ( W/D Ratio ER Elevation(ft) Area ft Width(ft) Elevation ft Width ft ft ft) Ratio 1019.49 2.95 7.65 1020.19 >53.90 0.7 0.39 19.62 >7.04 1.0 XS7 Riffle - 19+16 1025 As-Built-May 2020 1024 — — — Floodprone — — — Bankfull 1023 1022 1021 c ---=----_._.__,__._._._._______x\y..______________,_— ° 1020 ra a, "' 1019 1018 1017 1016 1015 0 10 20 30 40 50 60 70 Distance(ft) Cross Section Plot- Baseline XS8-UT2b Station 22+44 Pool �•,--......E-, s ---,_ f_ s, s -a -, _ -''' , ::'.-- ---,-;,.. .,',3-7.-1-.N,i4'-.:MIt.- -,:fxif •*-17-r.,',-;$.. .#-,11'.`,', 1;x•kii,•5'Z '47-**';',': . -4.k14"-- '---,- ---,-1'-,-,: : _-, .-• ..R T bE .. --- _ . - �� 40-i;ts Y. w, XS8 looking upstream XS8 looking downstream Bankfull Bankfull Bankfull Floodprone Floodprone Max Depth Mean Depth Bank Height ( Z) ( (ft) (ft) (ft) W/D Ratio ER Elevation(ft) Area ft Width ft ElevationWidth(ft) Ratio 1016.72 8.47 9.91 N/A N/A 1.47 0.85 11.66 N/A 1.0 XS8 Pool - 22+44 1022 As-Built-May 2020 1021 — — — Floodprone — — — Bankfull 1020 1019 1018 c 1017 as v "I 1016 1015 1014 1013 1012 0 5 10 15 20 25 30 35 40 45 50 Distance(ft) Cross Section XS9-UT2b Plot- Baseline Station 24+41-Riffle kk ^ I 1, I I �� �,,.+ r 4;Yr� '' r �u S _"" iv"&sue-. 0 '' '' �i - - '` a gam. ..' ' i z& --- :`,x - " m°. ",11k ,5.,.. . `� , *.'1.'� ,4 ` s ) 1 is m z � � r"..' ' f.��t"w'@ a'� �.s"S.v j' XS9 looking upstream XS9 looking downstream Bankfull Bankfull Bankfull Floodprone Floodprone Max Dept- (ft)Mean Depth Bank Height ( Z) (ft) , (ft) w/o Ratio ER Elevation(ft) Area ft Width(ft) Elevation ft Width(ft) Ratio 1016.16 4.14 8.57 1017.02 >54.90 0.86 0.48 17.85 >6.4 1.0 As-Built- XS9 Riffle- 24+41 1021 May 2020 1020 — — — Floodprone — — — Bankfull 1019 1018 1017 c •° 1016 co ai LT' 1015 1014 1013 1012 1011 0 10 20 30 40 50 60 Distance(ft) Cross Section Plot- Baseline XS10-UT2b Station 29+27-Pool S t �� 43. --I ,a- may -tea �^ '` Q �` i ,,w.fIL- -..0',1',7,'gc,,,,pgiz,‘,'--;",-Aw' ' :',;—*N„..-...-'4"-:m„--"f „.. ...„. ....,,,.........,.....,-„,,-.,.....„,, „,:. 4.-: �` T '',,,,.-,..*A*34,-;"-:--.. r •= ^ `•"$ �i 11 4 t; .fie, s� XS10 looking upstream XS10 looking downstream Bankfull Bankfull Bankfull Floodprone Floodprone Max Depth Meanf Bank Height ( ) ( , Width ft ( ( W/D Ratio ER Elevation(ft) Area ftZ Width(ft) Elevation ft ft t Depth Ratio 1014.61 10.56 10.59 N/A N/A 2.08 1.0 10.59 N/A 1.0 XS10 Pool - 29+27 1020 As-Built-May 2020 1019 — — — Bankfull 1018 1017 / 1016 c 1015 co ai "' 1014 1013 1012 1011 1010 0 10 20 30 40 50 60 Distance(ft) Cross Section Plot- Baseline XS11-UT2c Station 32+53-Riffle a ��� "$' n e'er„ - ' at - .-,= -,� � 'zr. .�Tx .y" - z s � X511 looking upstream XS11 looking downstream Bankfull Bankfull Bankfull Floodprone Floodprone Max Depth Mean Depth Bank Height ( Z) ( , W/D Ratio ER Elevation(ft) Area ft Width(ft) Elevation ft Width(ft) (ft) (ft) Ratio 1013.38 3.9 9.24 1014.2 41.38 0.82 0.42 22 4.48 1.0 XS11 Riffle-32+53 1020 As-Built-May 2020 1019 — — — Floodprone — — — Bankfull 1018 1017 1016 I :::: _ 1013 1012 1011 1010 0 10 20 30 40 50 60 Distance(ft) Cross Section Plot- Baseline XS12-UT3a Station 11+20-Riffle 4y - _ . .' s � `• ,' ... 71i;7!1'2-.7.'-' '_.:, ' •W''''''W;t14-:*0.. *7-;t77 Z2.4 ''''''.`*2..!'f'. 1:::Tc''''''.T.;','''''' • :- :.'s--,,' `7---'4:--','-'-''''''' ' -4';':''''''' XS12 looking upstream XS12 looking downstream Bankfull Bankfull Bankfull Floodprone Floodprone Max Depth Mean Depth Bank Height ( ) ( , Width ( (ft) W/D Ratio ER Elevation(ft) Area ftZ Width(ft) Elevation ft ft ftRatio 1070.58 1.57 5.58 1071.09 31.01 0.51 0.28 19.93 5.55 1.0 XS12 Riffle- 11+20 1076 As-Built-May 2020 1075 — — — Floodprone — — — Bankfull 1074 1073 1072 c 1071 ' — — — co ai L' 1070 1069 1068 1067 1066 0 5 10 15 20 25 30 35 40 45 50 Distance(ft) Cross Section Plot- Baseline XS13-UT3a Station 17+81-Pool 1 ,._- ,� f. ; a �� :x� Y{ ,i . r k`"ky > �d t l T ha '. N l" a �" 3 a 14 ,��a ti 4,ir--itz '-- ''— -4111P-,:„.,4.. ,;--4.--!.---;, ',- -1,'- --of•--.' , .-.440 _`i At �s;2 !It 1, X513 looking upstream X513 looking downstream Bankfull Bankfull Bankfull Floodprone Floodprone (Max Depth Mean Depth Bank Height W/D Ratio ER Elevation(ft) Area(ft2) Width(ft) Elevation(ft) Width ft ft (ft) Ratio 1052.07 7.5 8.49 N/A N/A 1.64 0.88 9.65 N/A 1.0 XS13 Pool - 17+81 1058 As-Built-May 2020 1057 — — — Bankfull 1056 1055 1054 ...........---7V c 1053 v "' 1052 1051 1050 1049 1048 0 5 10 15 20 25 30 35 40 45 Distance(ft) Cross Section Plot- Baseline XS14-UT3a Station 21+94-Pool -, • -. - r s � � `-r�.. - �` „ �.r may,a,a-- � �z - 3� r . • � - ,c e+x a ✓ � r. • �r & z , ���., • XS14 looking upstream X514 looking downstream Bank Height Bankfull Bankfull Bankfull Floodprone Floodprone Max Depth Mean( Depth ( ( W/D Ratio ER Elevation(ft) Area ftZ) (Width ft ( Elevation ft, Width ft ft ft Ratio 1041.94 6.74 7.59 N/A N/A 1.5 0.89 8.53 N/A 1.0 XS14 Pool - 21+94 1048 As-Built-May 2020 1047 — — — Floodprone — — — Bankfull 1046 1045 1044 I1043 1042 1041 1040 1039 1038 0 10 20 30 40 50 60 70 Distance(ft) Cross - Baseline XS15-UTb StationSection 24+12 Plot3-Riffle F i Ai— � ,.- ' per, +° _ s i' ' "°,. �z,'. .,� - , i am: ,� a 4 r' . $�g y -. �', .a _ it, 1�r ,� Sw'". :r�4+ "f� "�: s�a '�`"�a c �� ..�t z� s�� � � ,r1 A�o. > �` L j '� r 4100 } 'fie ,� ;.�T e J y, ""•` Y' . ` .d g - �. .4 X515 looking upstream X515 looking downstream Bankfull Bankfull Bankfull Floodprone Floodprone Max Depth Mean(ft)Depth Bank Height ( Z) ( ( , ( W/D Ratio ER Elevation(ft) Area ft Width ft Elevation ft Width ft ftRatio 1034.66 3.74 6.89 1035.43 24.62 0.77 0.54 12.76 3.58 1.0 XS15 Riffle 24+12 1041 As-Built-May 2020 1040 — — — Floodprone — — — Bankfull 1039 1038 1037 c •° 1036 v W 1035 1034 1033 1032 1031 0 5 10 15 20 25 30 35 40 45 Distance(ft) Cross Section t Ba see line .-;l _ h� 'sue `�:;: Z',sa_ s "_ N pl 4. ;[z z:'.gyp$# "' s IP f R ,_,. 7,s— v w '�%'" ,'n aa- `` Y. $ S°T & t. �, „:4', y i. `�'. .! - - 6 as 4Y gyp. r'.... . - '4 '�< .:il� .� XS16 looking upstream X516 looking downstream Bankfull Bankfull Bankfull Floodprone Floodprone Max Depth Mean Depth Bank Height ( Z) ( ( , (ft) (ft) W/D Ratio ER Elevation(ft) Area ft Width ft Elevation ft Width(ft) Ratio 1026.46 3.46 7.8 1027.11 >40.00 0.65 0.44 17.73 >5.13 1.0 As-Built- XS16 Riffle 31+49 1032 May 2020 1031 — — — Floodprone — — — Bankfull 1030 1029 1028 I :::: 1025 1024 1023 1022 0 10 20 30 40 50 60 Distance(ft) Cross Section PlotUT3c- Baseline Station 34+91-Pool I: Eder ,'s a % " 'rcx ' F R }" w ,.,_ :ram ss+ :-` -- , ' ,-' '' }u _ .+t"' �v� ^h � E :'-:;:77,''',.,;,-.4*%00::.-‘,.--''''' ,,,.' '''' '-'-:..:.'.w044*f-4`— ;'—'.' "---.:t_., ;:::, ------' ',--°:,,,=.41:0,--_, _ Zc 'k e Y �� j� '„ 4 Ap fie • `r --_ ter " '� ''' i c - - :' -q '' w'h -- . a ° '.�2" _ -•,yam `- +6tmfp XS17 looking upstream XS17 looking downstream Bankfull (Bankfull Bankfull Floodprone Floodprone Max Depth Mean Depth Bank Height ( ( , ( W/D Ratio ER Elevation(ft) Area(ft2) Width ft Elevation ft Width ft ft ft Ratio 1020.2 12.74 10.21 N/A N/A 2.46 1.25 8.17 N/A 1.0 XS17 Pool 34+91 1025 As-Built-May 2020 1024 — — — Bankfull 1023 1022 1021 — c 1020 as ai "' 1019 1018 1017 - - 1016 1015 0 10 20 30 40 50 60 Distance(ft) Cross Section Plot- Baseline XS18-UT 4 Station 10+73-Riffle �� , o- � � s'a e� �, ,�,,w� t .� �'� � � ma, s T, ` 2,..�-';- g' y` ter jw "�°" ;yam ,. 11;*" y 7 - ,. am_--fr, .'�,y $ ' � �� � �� �;sd;�''- ,�` '�"+ SSA $�� � ,, s�.. � -*r vo-q-� ' .s ew` w`�s' -� gyp- • - +� --, -' .....sTrierr..age ' - . r it ; €T ' '`.� ,,, t ;f t fit' ^' _ r x X518 looking upstream X518 loo4."*A1111111111111Lik- king downstream Bankfull Bankfull Bankfull Floodprone Floodprone Max Depth Mean Depth Bank Height ( Z) ( ( , ( ( W/D Ratio ER Elevation ft Area ft Width ft Elevation ft Width ft ft ft Ratio 1043.02 1.26 4.27 1043.45 11.79 0.43 0.29 14.72 2.76 1.0 As Flo XS18 Riffle 10+73 1049 Built May 2020 1048 - - - odprone — — — Bankfull 1047 1046 1045 r....................................e.7: c o 1044 frs "' 1043 1042 1041 1040 1039 0 5 10 15 20 25 30 35 Distance(ft) Appendix E As-Built Plan Drawings Conservation Easement Recorded Plat P &-c-NS STATE PROJECT REFERENCE NO. SHEET TOTAL NO 1 ,� CNC 092 1 20, eak doi Ale*Aft ` prof 4 � 1 SURRY COUNTY PROJ�_ �l 1" ezo 4��� 36`29'30.53"N ..A� :,.38'20.67"W ' �,gurtA ��/_40 ill�Vpril LOCATION: TIMELESS TRAIL, MOUNT AIRY, NC i ie Dr 44%11111. 4s I- I Z 4 -IINIK ,l l‘ - 'id JI\111 TYPE OF WORK: RECORD DRAWINGS CO< ‘' \ \ / N (. \ VICINITY MAP BEGIN UT1 ♦ / STA. 10+00.00 Z X= 1 51 7667.8010 SHEET 4 SHEET 3 Y= 1002003.0200 Q INDEX OF SHEETS 1 I--- TITLE SHEET i` o4 2--- STREAM CONVENTIONAL SYMBOLS T GENERAL NOTES �12 AlkOk j~I 3-20... PLAN AND PROFILE Jo -‘5)el it I < I ;y z T s5 �Fj) I, DAVID S. TURNER, AS A DULY REGISTERED 8 V FFT PROFESSIONAL LAND SURVEYOR IN THE STATE OF NORTH E BEGIN UT2 CAROLINA, HEREBY CERTIFY THAT THE SURVEY DATA SHOWN STA. 10+00.00 WAS OBTAINED UNDER MY SUPERVISION, IS AN ACCURATE X= 1 51 8517.9910 AND COMPLETE REPRESENTATION OF WHAT WAS SHEETY= 1000893.9280 CONSTRUCTED IN THE FIELD, AND THAT THE PHYSICAL END UT2 �7 sN DIMENSIONS OR ELEVATIONS SHOWN THUS ARE AS-BUILT 2 STA. 35+34.03 ' %_tillt4WP., � CONDITIONS EXCEPT WHERE OTHERWISE NOTED HEREON. ` WITNESS MY ORIGINAL SIGNATURE, REGISTRATION NUMBER, �vw� - ! AND SEAL THIS 14th DAY OF SEPTEMBER , 2020. z ,„, 70 (( II11 END UT 1 � � `=D:t0:SS/p� 4'y % STA. 38+75.06 .et` '�• a .� DAVID S. TURNER, P.L S. #L-4551 = R _ = �/ FT/9 BEGIN UT4 :r L-4551SEAL �: STA. 10+00.00 SS syEET X= 1518168.6980 �Q 9y0 ��0 �' CO F r> Y= 999763.9700 V7• • ,S U R . • �.` STA. 38+I04.04 �� SyEET�6 s ''iiGiO S .�13��\\� yEFT is !!!l1 1 1 1 4 4111 0 BEGIN UT3 iristsyF STA. 10+00.00 T i T FT�� X = 1519131.7810 I..L.1 END UT4 Y= 99941 2.8390 XSTA. 1 1 +47.48 H ` J (...) GRAPHIC SCALES 1 r REVISIONS PREPARED FOR: 1 N. PROJECT ENGINEER NO. DESCRIPTION ENGR. IAPPROV. DATE j 2 1 DRAFT RECORD DRAWINGS CJ KLT 6/3/20 \N CA Rp ■ 1 . 1_ O 40 2 RECORD DRAWINGS CJ KLT 9/4/20 I '., I Ci .fl�Oc Ec, `�y���' by PLANS _ Q 's+ Jain:. Date:' c09.1� 0 20 1 O 0 20 40 / SUMMER 2020 CIDNEY SONG NEER _ JEA1�:09:3 -� '00' ` 1 i 11 US Army Corps COMPLETION DATE. 043187 PROFILE(HORIZONTAL) C�jV of Engineers® ,,,0/o cINE- \�-) ' NFYII IJI I IJT\,. i 5 2.5 0 5 10 ,, `1�11� PROFILE(VERTICAL) P.E. f` J!, `SIGNATURE: J C STREAM CONVENTIONAL SYMBOLS CPR00J9E2T#1�SHEE2TN J o....% aROCK J-HOOK —SF— SAFETY FENCE SYMBOLOGY / MONITORING FEATURES NOTES m=oR, ROCK VANE 9 -TP— TAPE FENCE COFFSET ROCK CROSS VANE OV — I I I— SILT FENCE VP VEGETATION MONITORING PLOT AROCK CROSS VANE xV m CONSERVATION EASEMENT MONITORING GAUGE —- 20—- EXISTING MAJOR CONTOUR PHOTO POINT — TEMPORARY SILT CHECK ROOT WAD EXISTING MINOR CONTOUR xa•_•_•_•_ MONITORING CROSS SECTION 0 GRADE CONTROL LOG J-HOOK 9 — 20— PROPOSED MAJOR CONTOUR ASBUILT FEATURES ® LOG VANE Lv — 21 — PROPOSED MINOR CONTOUR ENNI �.�9 ASBUILT CONSTRUCTED RIFFLE Mil LOG STEP Ls ------- LIMITS OF DISTURBANCE I I I 1 ROCK STEP — — - BANKFULL BENCH(GRADE) C ASBUILT TOE WOOD Rs /\ LOG CROSS VANE Xv — — • PROPERTY LINE ' CONSTRUCTED CASCADE cc ACCESS ROAD r 10+00 7. ' CONSTRUCTED RIFFLE cR -1- STREAM THALWEG BOULDER CLUSTER STREAM TOP OF 8,,o,'"WAOR. LOG ROLLER LR �. FOOT BRIDGE -W0 `� TEMPORARY STREAM CROSSING ji GRADE CONTROL WOODY RIFFLE �h��(I�� I-I PERMANENT FORD STREAM CROSSING ® TRANSPLANTED VEGETATION TOEWOOD WITH GEOLIFT O TREE REMOVAL SOD MATS sM { TREE PROTECTION !i:i:i:i'i GEOLIFT DEBRIS JAM DJ-T# li CHANNEL FILL I DITCH PLUG z SINGLE WING DEFLECTOR Q //// GRADE BANK 2:1 OR FLATTER CI a DOUBLE WING DEFLECTOR D� .-=: EXISTING WETLANDS m' In a m' **NOTE:ALL ITEMS ABOVE MAY NOT BE USED ON THIS PROJECT J S th GENERAL NOTES 5 0011nliuu,,hill 1.CONSTRUCTION WAS COMPLETED IN APRIL 2020. �N CA RO /' , O `I �d4eF�SS! . t�a6yaaneyJones a 2.TOPOGRAPHIC SURVEY WAS COMPLETED BY TURNER LAND SURVEYING,PLLC �- Da • .U9.14Tjns9-04'00' / IN MAY 2020. J®n SEAL z m 3.ASBUILT SURVEY WAS COMPLETED BY TURNER LAND SURVEYING,PLLC IN MAY 2020. = 043187 z 0 F �%C'j FHG I NE�� 2 z �NFY J. J�� ce 0 Si REVISIONS ( It PREPARED IN THE OFFICE OF: 1 t PROJECT ENGINEER 1 O NO. DESCRIPTION ENGR. APPROV DATE O 1 DRAFT RECORD DRAWINGS CJ KLT 6/3/20 ECOSYSTEM O• 2 RECORD DRAWINGS CJ KLT 9/4/20 r RED BARN MITGATION BANK SITE PLANNING & /o SURRY COUNTY, NC oW EPR RESTORATION Noz 1150 SE MAYNARD RD,SUITE 140 �"0� CARY,NC 27511 m,xs, — — .1k. J J` LICENSE#P-1 182 J CPRo092 )(SHEET)(SHEE3 NO, LOG ROLLER ADDED J x PLAN / <�� x X x X�XP' ' c ` X x x PROFILE TOE WOOD INSTALLED —X•;: ® 1�(k`L �1 CE X�x INSTEAD OF LOG VANE X—X 6 X Al pir �� --"--- NO 1� IS,X --- .11111"°°. ---- - 11110-::--- -- -- . .... ___--- - i-oas... O21/ Q ;e i , -- _ --ii I �0 ^ 00 ,����I�ll��,i�! \' \\ C A l i i �,� I / �� ,. _ ' �� ` \ �� , � � xQ) ,1 s ,x CIO Sp.i /ri;esed by ♦4 a T /.%; ' ..+�_ 7 ,�'t ,.,`/:9 + ...." --' ry' ,,�,9;;J, ,�,. '.kk s'�. Lip lir '`Y l 1 } y i -�N 1 �� Jim J D 099.1 4 r: ,EAL16:1 : -04200' 1 // i,? � � x� ; �..�fi' _ bl\ i `°r•� �' \ �" ��� / .., ` ��" = 043187 = e;� I � � 11 I /AOq1 1 / • . — — ——, U �' FHGINE�� 44, MO f / - __ .....,,, _ __ _ Z170 I- .. '' �� e 9b01 z�l •:� Z506 xI _ . �� i. x r BEGIN UT 1 STA.10+00.00 CONSTRUCTED RIFFLE INSTALLED 20 10 0 20 40 INSTEAD OF LOG ROLLERS I. I"�I 1 ■ SCALE(FT) UT1 8• 1,050 -4�3l IL-17Z^f ILr M—1 . m O I- _ W w a = ¢i � W m m 1,040 0 . th o _ u 1111111111 1111111ln 1111111111 1111111111 1111111111 1111111111 1111111111 1111111111 1111111111 IIIII ....■....■..MIMI / ro 1,030 .■-ESIGN PROFILE z' 0 a 0 F 2 z' m 10+00 11+00 12+00 13+00 14+00 15+00 0 �i REVISIONS t PREPARED FOR: 1 t PREPARED IN THE OFFICE OF: PROJECT ENGINEER 1 rn NO. DESCRIPTION ENGR. APPROV DATE O 1 DRAFT RECORD DRAWINGS CJ KLT 6/3/20 ECOSYSTEM O 2 RECORD DRAWINGS CJ KLT 9/4/20 O RED BARN MITIGATION BANK SITE PLANNING & SURRY COUNTY, NC oW EPR RESTORATION 11 Noe I 150 SE MAYNARD RD,SUITE 140 '14 CARY,NC 27511 m�� J` J` LICENSE#P-1 182 J (PROJECT# J )(SHEEN NO, J BEDROCK OUTCROP / PLAN 1 CONSTRUCTED STEAD OF WOODY REFFLEALLED PROFILE INSTEAD Artp*Iortithatiffi„. —6 ... —x 6 x____ x� ,�,u11CiAl ,,, iqt p941;,/,roed by c,�n - ` , c _s i care, • 0� ,,� n g Date: 0.094 Q3— q1L. $Eg§:13: 3 4'0(e- — —�� ��-- I S y<in,F = 043187 ju �Di4. I r Zp Sy I r o o F . ,s, ,,,4,,,,, �� 11 ..o�' ���� ,� p `��. is.. N .,�� rs �---, /.0 FNCIrJE�� <� �' i o o .%`�'"^fib'�h' 1 ,, ��e..i� ^� / '�"° .r .>', . i/i /�/�C`�' ������ wki. iN, �- Off �. :~©E -. �„ ���, m f % % `�` �"11 �� , 4 V N \ � I• VlIP y• v�� \ f�i1'�YE�' � :,, use� a <� �J yu ero�b y� I' LOG STEP a��� r v�,�, NOT INSTALLED I I I .aim �11111 I ".. 1 z If // 1029 j-1- ------_, ° x x x ' X x� X�_ X—L��1x - X X 3�X XTk_X X x x X�X� LOG STEP Allfer 0 C I?' NOT INSTALLED LOG STEP NOT INSTALLED — 20 10 0 20 40 111111111 SCALE(FT) UT1 III o 1,035 IIIor) LO•�� I o 1 w III 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 w EL2 . _ a w m co 111111111111 ■■■ - • w .�- ��Mr to / J iii ��■..■.�__ _— _ _ J . J I- 2 iii ������� ����II -- - P .1i ■■■ _ 1,030 U •... —� ,� . : : : : : •: : v - a Q 111 , —, ,,,,,,, ,,,,,,,, Q . Z CCI 5 -- 0 11 -— m 1,025 ii IILT-PROF1L.II-..� m 15+00 16+00 17+00 18+00 19+00 20+00 0 xi REVISIONS ( PREPARED FOR: 1( PREPARED IN THE OFFICE OF: 1 PROJECT ENGINEER 1 rn NO. DESCRIPTION ENGR. APPROV DATE O 1 DRAFT RECORD DRAWINGS CJ KLT 6/3/20 ECOSYSTEM 7 O 2 RECORD DRAWINGS CJ KLT 9/4/20 PLANNING & m RED BARN MITIGATION BANK SITE SURRY COUNTY, NC No EPR RESTORATION OW Noz 1150 SE MAYNARD RD,SUITE 140 �"I4 CARY,NC 27511 J mixs1 J LICENSE#P-1 182 J 25 „I ,,• t)t i1 / • Z (PR00J9E2cT)(SHEET No) /r' PLAN / PROFILE FLOG INSTALLED VANE 614, TOEINST WOODEAD OF / / 11111466-'''''e LOG ROLLERS NOT INSTALLED40 , 0 I e , 1022 - - cv . ,-- 0 \\\.\\\: \A C A Ro0, / 1. ,,. rn -1 Ci, cc , - .1\\'' .1-'',4-•"1.0t: SG1 , ,/ "'sr ',' 4, -- 0) ,„. %F--- lne4yCidneylones ',.,.,,,,,,..._ ,aiii • 10,4.. r\Q, 22+On141.6 14 05-04'00 (........, „.,......= (It qt,,..t.i .•41 ,JOn s- ,,EAL - .,.-. 1 1 ‘k.'k k 11,11111* ,_-=_,-------: - -4-v.,. -,0001'7, —..,--- :::A111' 4- #44;;', ,,0,‘ ,,,,, ..t• , .:N., -- , 4,.•.,i i i i.....,.. ,.•',... ......_:.._.--...,,,,-‘-• ',, c51- C-,, I •''7-.11111111M''''s \ \Si\ '''0,4111 —''' ..8, 47 Y' N,.- 0 i _I ''7,C) (''/VGIN c • ,• ---`,.,,e 0: //,,,, Y J• ,,,,\\\\ Neriusw-• LOG VAN. \ "•-""' . ..a.....40:7 Silill - 44,7; b .\ NOT IN ALLED leg *-74 ------)( VP2 . : -------___ ____ 42 20 10 0 20 40 \ 4c' ,., Z 1111111 0 11 SCALE(FT) \ \ ., i ,,._______4--„,, 1111111 \ . , UT I —DESIGN PROFILE --OFlitGN WAS H GI-FR F FVATIII \I THAN FXISTJNG GROI IND 6 1 025 PIWFILE ADJUSTED 0 AVOID FILL. o , m L9 o I'71-] j 11111111111111111111 - I 1 w4J In W !xi a 1 co nal to < L.LI mi z !I ce = — — / 1 020 ____ -00-1.1.0. —Pr -.•71"114.1,1210.10.** 5 ci . . . I I m ' im a --. .= H< I - / 2 1 -...— •§ (f) 0 / 0 0 a o • 1,015 m • z1 —AS-BUILT PROFILE ?t' O - iz ct 20+00 21+00 22+00 23+00 24+00 25+00 i 0 (i.d ' • x REVISIONS ( PREPARED FOR: •I PREPARED IN THE OFFICE OF: PROJECT ENGINEER 1 SI NO. DESCRIPTION ENGR. APPROV DATE o 0 1 DRAFT RECORD DRAWINGS CJ KLT 6/3/20 ECOSYSTEM O 2 RECORD DRAWINGS CJ KLT 9/4/20 RED BARN MITIGATION BANK SITE PLANNING & a SURRY COUNTY, NC No EPR RESTORATION 11 ow c:(3z 1 1 50 SE MAYNARD RD,SUITE 140 slt4 CARY,NC 27511 LICENSE#P-1182 oceN.... CPRo092 J T (SHEE6J T NO, cE X X x-®— x � PLAN 7 X X CE X X 10 k PROFILE LOG VANE 102° 20 NOT INSTALLED k 1020 28+00Z Q 27+00 29X b _ ®2 uun iull// ^ _ /& lr 1 • \ H CA Q� ally,/ ty signed� _6 �h ' 2 00° :. / 3� _ CL Es 'crlhones SEALD16{5,:O06 0249.14 30 y J ' 04'00' . „ �. Ci = 043187 NAO _ _ . Q rZn a ni'ii• o\`\\ c OZOL o x x gillsx x x " x ^ x n x x x x x-®--> x- ----(4§)-- p6 x-- 20 10 0 20 40 111111111 SCALE(FT) UT1 I Z 1,025 In —DESIGN PROFILE W • W ce • :U : : : : : •: : : : : : : 1020 m , a ¢ � ^ — ~ - g 7 _ 2z g a 0 o —AS-BUILT PROFIL / I1,015 z' m 25+00 26+00 27+00 28+00 29+00 30+00 0 ili Xi REVISIONS ( PREPARED FOR: 1 PREPARED IN THE OFFICE OF: PROJECT ENGINEER 1 rn NO. DESCRIPTION ENGR. APPROV DATE O 1 DRAFT RECORD DRAWINGS CJ KLT 6/3/20 ECOSYSTEM O 2 RECORD DRAWINGS CJ KLT 9/4/20 PLANNING & RED BARN MITIGATION BANK SITE a SURRY COUNTY, NC oW EPR RESTORATION 11 NO I 150 SE MAYNARD RD,SUITE 140 s"0E- CARY,NC 27511 m�N, — — J ,I` LICENSE#P-1 182 J \+ I I I r (PROJECT))(SHEET NO, 092 7 J \+ ! o X ,r PLAN / \ _ \ PROFILE 1 ----_____ \ ,.-----,x, ,______ Ak \ _, \C- - , P ra 24"HDPE —� INV= 1019.01' ' ) SOD MAT EXTENDED, �� / � ! X-- # LOG VANE NOT INSTALLEC e i =>� X O �' X 24"HDPE \ NICAR t7 L�,� INV= 1 O 18.95' LOG VANES I I ned b c �O Xp 1i�� t Vi NOT INSTALLED C( FESSi1/4 • ' J6s�es v p 4,74 U,, 0 `��' 34+000 35 ''1 Jan �� • 0209.14 ,2 aa�` c 11111 O 4 = 04318 r � ,� ®,mom tom. _ • 7 **,,,, -;--- --- • • �i •i17t //> vth' ‘.9? / °\ / %�0 �i E \� • X 4y +_Jam " i o „i 48"HDPE \ "' ���oi�� \' "'_�, �1 INV= 1018.03' - / — X� Ow - - `- _ 6� ® fit ---- 11 NV=DOE7.80' SLOG VANES NOT VANES %O� 1021 0c NOT INSTALLED INSTALLED '1' x� n x \ 20 10 0 20 40 11_14_ 111 \ SCALE(FT) i 1 UT1 I I 1 I z 1,030 I1 : a —DESIGN PROFILE 1 IJJ m Wro a = _ m co a 11 r m 1,020 U ., /©42HDPE - Q III I M 11111111 1 111111111 I I ,, , ii , _ _ a 0 0 4 Y —AS-@IJII T PROFILE m 1,010 Z 0 a 0 F 21 1 1 1 1 1 , 1 , 1 , 1 , 1 , 1 1 1 1 1 1 z m 30+00 31+00 32+00 33+00 34+00 35+00 0 xi REVISIONS ( PREPARED FOR: • At PREPARED IN THE OFFICE OF: PROJECT ENGINEER 1 rn NO. DESCRIPTION ENGR. APPROV DATE O 1 DRAFT RECORD DRAWINGS CJ KLT 6/3/20 ECOSYSTEM O 2 RECORD DRAWINGS CJ KLT 9/4/20 PLANNING & re RED BARN MITIGATION BANK SITE SURRY COUNTY, NC oW EPR RESTORATION 11 Noz 1 1 50 SE MAYNARD RD,SUITE 140 :1c CARY,NC 2751 1 mix\ - - J ..1l. ` LICENSE#P-1 182 J / V C0 )(SHEET NO. SOD MAT EXTENDED,LOG VANE NOT INSTALLED !;� """� l,y,m, i : I (PROJECT 092 )C 8 +,, WG5 ,,� rnn r, s \, END UT1VP5 �J� >\�/i • tiffer STA.38+66.34 AL‘s PROFILE \\(... t.` 6>, // '! ct •N.\. -41... qe , ,, , •••• ', Naii.-- 4t14,- \ 7 1 c'�1 >�:ry R 1� LOG VANES I LOG VANES NOT INSTALLED Xs I� 0 eat 2a- NOT INSTALLED • E�1 gyp \ WOODY RIFFLE • st Ir -�' i�ii' VtQ - � -::__.*:....ft,z;-•,,,,;-,-„,:„_._ 4,c4/ Wiltmil'''' 4* 7, \ •••\\iirkilk ...,), IIIIIIIIII//� • ___ NOT INSTALLED WO \ / \0 /.0 ir \ , : v.) \\ 0.004 LOG VANES ! \ k \ NOT INSTALLED\ / ` • _ \ \\ \\ \ # \\ t� ,• w =/14.1. 1 Jfin 043187 qr7 R Itt` • tt / • \ (4::' o L L8` _ %!.�/ rub/ VP4 A SOD MAT EXTENDED • I y I LOG VANE NOT INSTALLED �. \ 6 6�A�CH1INE sH SCALE(FT) I UT1 ....,: I 1,030 - . —DESIGN PROFILE z • . ( . . . . . . • m N . .0 _ • : : : a =° I a 1,020 LI ml / !L. raIII I I I I I I I I I I I I I I . h / 2 . Z 5 0 1,010 0 a u / Z Q m a —AS-RUILTPROFJ_E 2 Z 1,000 m 35+00 36+00 37+00 38+00 0 xI REVISIONS ( PREPARED FOR: 1 t PREPARED IN THE OFFICE OF: 1 t PROJECT ENGINEER 1 rn NO. DESCRIPTION ENGR. APPROV DATE O 1 DRAFT RECORD DRAWINGS CJ KLT 6/3/20 ECOSYSTEM 7 O 2 RECORD DRAWINGS CJ KLT 9/4/20 PLANNING & RED BARN MITIGATION BANK SITE a SURRY COUNTY, NC Nu EPR RESTORATION OW Noz I 150 SE MAYNARD RD,SUITE 140 s"4 CARY,NC 27511 mces� J ,I` LICENSE#P-1 182 J PROJECT)(SHEET NO. CO92 9 PLAN 1 ��o°30 PROFILE t oce..t� 102a 102g / �2,� • CONNECTION TO MAIN CHANNEL NOT INSTALLED LOG VANE c1r� 1 / �O NOT INSTALLED K. I �S en:Zp�, LZQi 0 �T " / �� � '�2SI - 1026- 1\�ti tip 103 0E4 I �. 5 \\' ullinlliii e �4 f i 4£04; ' /2�0• �./�+�� � __� / \1p2 p24 _ �� N� /,�� by e,/% ,�� C�� � A tfal d 41h�C`�/ -1029. sEAF:1 .4 04'0i): '£ �`'�A ., ` f�•r�•0� ����I�� SIX ® � �� Dat, 0.014 � 1 �` A� 7 • > �p = 043187 .4d ....t,iv 1".:q ' ..,,, ; BEGIN i\ U � � . ST,A.1O+ 0.00 - ilex ./ 1/04 9£0I- 20 10 O 20 40 `11111 1 SCALE(FT) UT2 : •: : : . • • • • _ —D SIGTe PFCFILE 7.1 5 o .ao • 1,020 • m . • ASDu1LT r zorl_C • • Z m 10+00 11+00 12+00 13+00 14+00 15+00 0 re REVISIONS ( PREPARED FOR: 1( PREPARED IN THE OFFICE OF: 1 t PROJECT ENGINEER 1 rn NO. DESCRIPTION ENGR. APPROV DATE O 1 DRAFT RECORD DRAWINGS CJ KLT 6/3/20 ECOSYSTEM 7 O 2 RECORD DRAWINGS CJ KLT 9/4/20 PLANNING & RED BARN MITIGATION BANK SITE SURRY COUNTY, NC oW EPR RESTORATION Noz I 150 SE MAYNARD RD,SUITE 140 s'10ac CARY,NC 27511 m�s1 J J` LICENSE#P-1 182 J �ZOV `c- (PROJECTHEETNO) ' �\ ��� PLAN / �\ PROFILE ZZOI // 17+��•� / , ' nZ0V COL �� °� V P 7 ,, '�. �� 020 / a v 1 ( i ; ;: � l LOG VANES _— ___ 1?Ii 1/��� �I r, i. �\ NOT INpTALLEDN000\IC QI�1 Q/ /ii .�� //SOD MAT EXTENDED, `�3 ' ''� `� s}fined by���I �A��it/ / LOG VANES , 1214 / NOT INSTALLED SOD MAT EXTENDED �E LiU'� / - � di ��.// Ai n i' p ' "v --, jON GINS O.,c, ,,,, .. mllinm /* . 47 WG7 I *3� � '� o i i S G 3 " V ,. <, 1 —/ / `.*a 1' W i I / / �� 4� �C` / / . // SOD MAT EXTENDED, �� sy, 1 / LOG VANE F� /' NOT INSTALLED ' 7, e `1I11-1��� SCALE(FT) UT2 III DESIGN WAS HIGHER ELEVATION--i . —DESIGN PROFILE T EXISTING GROUND :• •: :• :• •: :• Z PROFILE A _.ED TO AVOID FILL I- co Z m 1,020 j � �,,,,i'��:1�i v 0 4 U / m 1,015 z 0 —A -3LI_TPROFILE 1 z m 15+00 16+00 17+00 18+00 19+00 20+00 0 xi REVISIONS ( PREPARED FOR: 1/- PREPARED IN THE OFFICE OF: PROJECT ENGINEER 1 rn NO. DESCRIPTION ENGR. APPROV DATE O 1 DRAFT RECORD DRAWINGS CJ KLT 6/3/20 ECOSYSTEM O 2 RECORD DRAWINGS CJ KLT 9/4/20 PLANNING & RED BARN MITIGATION BANK SITE SURRY COUNTY, NC oW EPR RESTORATION 11 Noz I 1 50 SE MAYNARD RD,SUITE 140 slrIT CARY,NC 27511 N.mces� — — J ,I` LICENSE#P-1 182 J PROJECT# SHEET NO. 10 _ — �4 / C 092 )C 11 20 �t1 7 �o'o� °24 \,,,.. PLAN 7 ��`� PROFILE 6 I.Cl/I.1 l� „ mob LOG VANE / 5 6' i' NOSTALLED :11 ' / �C1 \\``\\\\NICIAIR//ii"O / / / /l ®I,Z 1 '�ignedby .. O ��Y �. °� J02 1 Qp I Hiit, I/� Cn �n J�DES Da e 0414 �� r ' �, \ r / if ( Yi = _ 043187 �11 / NL St.19.‘1;Aki- '."A-'° ////t/iiiiiii\\O 0 I /ft ."Iii�11► �� ai!siWOODY RIFFLE �ck '_' GiI• � "� NOT INST�/LLED /14lik I /. M 1 SOD MAT EXTENDED, 3X p �„ � // g �!� LOG VANE NOT / Q �; � / IINSTALLED / �, .` � ° / / 1 1 -LOG VANE ,' k,,,,, iiiir t '3` _ ��_' i \ \ NOT INSTALLED / �'`�� ------ __-- �� ---� _ ^� 20 10 0 20 40 SEE SHEET 8 111111111 � SCALE(FT) UT2 1,025 Z —DESIGN PROFIL., N I- to al hi a 1,020 w m in z z / J gi g-- ~�,,�__ /, 0 5 �� W��W- .— _ — O 1,015 ♦ ♦ /— r I Z ml . Z —AS-BUILT PROFILE aI II . a L9 2, 1,010 Z m 20+00 21+00 22+00 23+00 24+00 25+00 0 re REVISIONS ( PREPARED FOR: 1( PREPARED IN THE OFFICE OF: PROJECT ENGINEER 1 rn NO. DESCRIPTION ENGR. APPROV DATE O 1 DRAFT RECORD DRAWINGS CJ KLT 6/3/20 ECOSYSTEM O 2 RECORD DRAWINGS CJ KLT 9/4/20 PLANNING & RED BARN MITIGATION BANK SITE SURRY COUNTY, NC oW EPR RESTORATION 11 Noe I 150 SE MAYNARD RD,SUITE 140 s"0T-c CARY,NC 27511 mces� — — J ,I` LICENSE#P-1 182 J t t CPROOJ�E2T)(SHEET2NO, 6 /017 !\ 0,4 J k 7 )( , - PLAN f Zr ,c4) k 7k\k PROFILE /- 48 HDPE k \ PLANFORM RE-ALIGNED / •�\ INV= 1014.00' AROUND BEDROCK ADDING �� / \ k 1 1.9 LF TO UT2B 110. ., / 6 ^ici� 1p '/ / •���•• '�!��P`61 Os:7�'~r 48"HDPE ,8 i `J k ' 4I � ulilllli i �,,yr.� iI/; INV= 1013.93' �k w /iii _I� io:�i�y .���� r. ♦ 018 10 ES Sg130,d by �\24"HDPE �O/w„�iP �il�)'�`, *`v ,l,of 31�� ��� 07 � pF cyfey +��• le .a4 A 77 Jon Dat OA9.'44 0 .a,..�O �<,,,.� ®�.-• �► ,_ a �- ! IINV= 1015.43' �,� I 4„ � � rr 0 O 1 / k t�//� �� O -, R ;b .i NOT _= SEAL�b:zo:oo aorli r:i■■ \ KO' .:.; _ _ j , 4 ef, INSTALLED = 043187 = \ if / L.U1-illiVale-r-- Ai/;;;4- \\\ `� - • - •- �f� ����/111111111A1• �� IV -, w NL .: (0 2 2 L�,O 24"HDPE �k a —— — 9�� _— i�� W �✓ INV= 1015.21' `'�� ��` ��'� V — -- -11t�_ -6 i6 _\ .' z CV 20 10 0 20 40 `IIII I CA � UT2 I I 1 1■ III —AS-BUILT PROFILE _ z . 1,020 m N ' ' ' I I —BEDROCK ALONG PROPOSED CENTERLINE W • , W . al ace (n m Z I Z . Li / 2 m - Z �i Elm • / m 1,010 II o DESIGN PROFILE — ■■ II III I 0), 25+00 26+00 27+00 28+00 29+00 30+00 xi REVISIONS ( PREPARED FOR: 1 t PREPARED IN THE OFFICE OF: PROJECT ENGINEER 1 rn NO. DESCRIPTION ENGR. APPROV DATE O 1 DRAFT RECORD DRAWINGS CJ KLT 6/3/20 ECOSYSTEM O 2 RECORD DRAWINGS CJ KLT 9/4/20 O PLANNING & RED BARN MITIGATION BANK SITE a SURRY COUNTY, NC oW EPR RESTORATION 11 Noz 1150 SE MAYNARD RD,SUITE 140 s"l4 CARY,NC 27511 N.mces1 - J ,I` LICENSE#P-1 182 J � SEE SHEET 19 CPR00J�E2T#1�SHEj)(SHEET amp .. C) J NO) �� I 1 A4,V" OJ . ♦♦ ♦ kt, ' 1 kr, g., rn / ♦ •♦♦ 7o PLAN f GATE •�' � �.4 PROFILE ,1, 7Ozu al. 7 \ .� 4' � 10194'1 - —— —.A0. — _ 1Y�' T' — — i5. 4 • 't • � 4' _ LOG VANE —_ _- __- _ -_ .iD hl _ ,` s r� ���.^'. r4 •ST INSTALLED _——,_--.1 c' r ��— — ——— 34+00 �- or „,o °�`J` t.li ovilivio#:7 `►il1 18 _a VP8 �� i'� „j ,�1 ���e■t—��� O ����t�llluuliiii 1 p __ __ CAR '%/ 7.s� a • --——QCO t1 �N Q/ / db 11 lk oo .. �. SG � ___ ----' �_ ----5 _--_ sCG_ —'/ �\\ /� _ e\) �i1� OcES' Cd � \ lrO / 9�0C�- _ -- - - l0 '�ic .' = 5EAE6:z0: z 4'00! �- Jon glitt `�, ` . • \Lim,'\ :.a•�`o.-a�� / / .6, $�- 6� ��;5? `� • ) = 043187 ..„— �� k / O' LOG ROLLER I ♦ `♦ .•_. - i : , �/ NOT INSTALLED �� lli` ! F �� CD _____ _ ` / pNFY Jo GIN b \+\ \—.— — —-- I0- _ �// /L�6i, // ��O END UT2 n �nlll STA.34+90.84 -001 C-4 ;PS<I4 -NI: --.----- / ,,,, ^F / 20 10 0 20 40 `11111 SCALE(FT) UT2 . 1,020 . —AS-BUILT PROFILE z O .V coo u) all - a = — al 1,015 IIII�IIIM'IIIIIIIIII1111�11111IIIIIIIIII IIIIIIIIII IIIIIIIIII IIIIIIIIII IIIIIIIIII IIIIIIIIII IIIIIIIIII IIIIIIIIII 1111111111 111111111��11111111��11IIIIIII IIIIIIIIII IIIIIIIIII IIIIIIIIII IIIIIIIIII IIIIIIIIII IIIIIIIIII IIIIIIIIII m Z Ct .. i _✓ �� _ r, err f . I • . : 0 1,010 . 0 Y —DESIGN I-"?- )rILE m� a 2 1,005 z m 30+00 31+00 32+00 33+00 34+00 0 ill xi REVISIONS ( PREPARED FOR: 1 t PREPARED IN THE OFFICE OF: 1 t PROJECT ENGINEER 1 rn NO. DESCRIPTION ENGR. APPROV DATE O 1 DRAFT RECORD DRAWINGS CJ KLT 6/3/20 ECOSYSTEM D O 2 RECORD DRAWINGS CJ KLT 9/4/20 O RED BARN MITIGATION BANK SITE PLANNING & SURRY COUNTY, NC No EPR RESTORATION OW Noe 1 150 SE MAYNARD RD,SUITE 140 slrIT CARY,NC 27511 m�s1 — — J ,I` LICENSE#P-1 182 J k )(SHEET NO. (PROJECT 092 )C 14 ) X/ PLAN 1 +/ n CE CE CECE PROFILE + ®� ,\s�� - `�� .;��54��• -i.44:1,,,....7 I1;31.51,Fht?.(61,,,_.: 7ij. I. LOG STEP NOT INSTALLED__..,..,, pm: , ._,...., _, .________:_o_x5.72 . _i_o — iri ,rG111�� _ " a \ A �� 3;'� � „ fr - ►.r.i 1.i—— . ►� ��+ "^. .,_L . a1iy fe. Yh•i• i�: )tom•1• .v ��h• - 4, 7* + ® . ..., µ v� ' ,. .. �.�r 106�'- _ to J .0 d 1 \. %. :.r . ' I '-6 . fpT \VIyL 11111106 AY,' r1U �r m r .x ' Q r -r' ' <'. III �� h� 4 ,�00,0001110*- I L�_ --- ! I\ ts�.6 �, �l✓ ✓ n I! / �41 C A- ned by �,.. _ i v 0 c9 Da • 20.0114 LSZOL \ 9L0I. 411111 Z0 �'�OL '� �oN,,��•��\�-9� `---_____ -_ ,g _ 043187 At , zzo, iii. BEGINUT38L06 lOL g0 99p1 5906 %/C/�0NGINE�c0\-\C' . TA. 0+00.00 0 6,1 6N,6 090 /'�/n JIi\O 6ZOOq�0\ 1.80 L �g � '� 3C 3C //X/X�� �\ O 3C 3C 3C 3C 3C � � C Z 20 10 0 20 40 `1I11-I SCALE(FT) UT3 I 1,080 —DFSIG-N PROF LF n 1 J I m 1,070 A.. r J J 1 th / 1,060 .� 0 o Z —AS-BU1:L'T MOTTLE m z 0 a 0 2, 1,050 Z m 10+00 11+00 12+00 13+00 14+00 15+00 0 E REVISIONS ( PREPARED FOR: 1 PREPARED •IN THE OFFICE OF: PROJECT ENGINEER 1 rn NO. DESCRIPTION ENGR. APPROV DATE O 1 DRAFT RECORD DRAWINGS CJ KLT 6/3/20 ECOSYSTEM O 2 RECORD DRAWINGS CJ KLT 9/4/20 PLANNING & RED BARN MITIGATION BANK SITE SURRY COUNTY, NC 0w EPR RESTORATION 11 Noz I 150 SE MAYNARD RD,SUITE 140 �"ITc CARY,NC 27511 m,x� J` J` LICENSE#P-1 182 J (PROJECT#)CHEETNO) 15 esPLAN CE 48"HDPE PROFILE INV= 1047.21' CE CD CE CE 11 N1CA Ind LOG STEP NOT INSTALLED i � E� gifOrcees 48"HDPE t, Date? .09.f9 INV= 1047.52' figt t• i �~j - SEAb:21: 6- 4'00 LOG ROLLER NOT INSTALLED ,� �$ ��' E. 043187 r � A W LOG STEP NOT INSTALLED r ,T�� �, __ _ {� - -_ �I: f` ' ~ %,0 4GINEB c-) : 44/ `+ go- I _ - ,tp• _— ! 111 11110w UO 111,)44.11.041,___,01 .g5:8 a �'" {� I v :gto ``w fG��■it,_——— - ``�f: ice. c do,iitIf �O r ems^ Iss q u�+'���, m, �,_, ._ L__ I' �f rl .� / 8rr HDPE of fa r 9 � `^ �I�i .r� �iT... - --- V' Z �n,' se, b� �* i`G .....�%' 0� go 77 � .41` . 6) 11111111111.1 `___990�-�==D��� 91 — — S�` 0d 990� �9ot AA -- - --=6.00 1,,, Zg L901 �--4_a_H-D,o-E_ Ili e 9 -- - E90 6�-- 8901 INV= 1048.06' 04 0Z b901 6906 ti 9901 -090V - 6901 �' ® 9901 3� 3� �x�x .'w 3� X -\\ v 3C ` 3� x � 3 20 i O O 20 40 ' `1I11�� ' SCALE(FT) UT3 : — SIGN PROFILE = w _ • -U m, Z 111 11-- r a- _ 4.1 1,050 FU IIII I I I ..� I I .NM ■0-_ 1 @ 42"HDPE Q Q g I T' p 4 0 / m 1,040 ■■■ -A&BUILTP?OFI_E Z 0 a 0 F 2 z, l m 15+00 16+00 17+00 18+00 19+00 20+00 0 xi REVISIONS f' PREPARED FOR: 1 f' PREPARED IN THE OFFICE OF: PROJECT ENGINEER 1 rn NO. DESCRIPTION ENGR. APPROV DATE O 1 DRAFT RECORD DRAWINGS CJ KLT 6/3/20 ECOSYSTEM D O 2 RECORD DRAWINGS CJ KLT 9/4/20 PLANNING 8c 0 RED BARN MITIGATION BANK SITE a SURRY COUNTY, NC oW EPR RESTORATION 11 Noe 1 150 SE MAYNARD RD,SUITE 140 slrEE CARY,NC 2751 1 Ofc qn J` J` LICENSE#P-1 182 J` ! # SHEET NO. LOG STEP (PROJECT 092 )C 16 ) NOT INSTALLED m m 1050 3D 3� PLAN 7 ® -X X-C 1p1A0A9 3� 3� � _ PROFILE y 0 1 45 0, 3 4 ___- 1052 14 21+ U 1 ;, 2. ,6� �, -.�% ; aro 3,�Y04�1 =_ —_==., r.. '4 15� , Q� �� _� ' ,,/fi X 0 ` ira Cl/la•v �•,,.," �n'oo.,, • r 9 u no._ .r, �7.$.i 104 �r, /�//// r_}•.^ - �" r��, ,���� , ` �'4o- •MAm mmm� M c �m�y ��' �s �rZ _ +� / rr• - .-. I •� �► r ALL,.— !•Ar '. c _ / �` . �� _ ��� ,� ISM q�� a` nrl// ., !t �L/ ifv •-...4 ' /2 boi v _ ----g;0, 6N0� � f9� LbpL OC St'pt �� 6. `v \`� ,• \ Q \\\Mililliiii1/4 -� _ % 8 0 of ,.\`-\N CAR .'+ �f1 . .ipo r • �� Date. .0934 ._ frl %�'`'. �. '/�1 .�� -�_ -� SEAS: . z 4'0(" = 090� r/ y cam/ `I �� END UT4qt = 043187 (n .rn •••a'�,�d�"` _, !'� STA. 1 1+34.1 1 - .,;'` - O , (51 �.,� SEE SHEET 20 FOR PROFILE X X � p �j NGINE �� IIIIW I/�9°� ROCK STEP STRUCTURE X ��0z L�OL /No/ J. ) 0„ ADDED TO STABILIZE HEADCUT X 0.4 llt� / STRUCTURE ENDS AT STA. 10+04 X�X i� 6e X BEGIN UT4 X STA.10+00.00 20 10 0 20 40 111111111 SCALE(FT) UT3 IIII —DESIGN THALWEG " 1,050 SEE SHEET 20 n FOR UT4 PROFILE ai x — m'tn<ifir- m — _ 1,040 IIIIIIII; 111111111111111111nn111111nn1 �� . = ^ _ I- _ _ � — __ _ 4 N —.. g1 I I III I I IIII - `�� - __ o _ 0 a o / m 1,030 Z g —,N3-DUILT PRQrILE 1, z' m 20+00 21+00 22+00 23+00 24+00 25+00 0 re REVISIONS ( PREPARED FOR: 1 t PREPARED IN THE OFFICE OF: 1 t PROJECT ENGINEER 1 rn NO. DESCRIPTION ENGR. APPROV DATE O 1 DRAFT RECORD DRAWINGS CJ KLT 6/3/20 ECOSYSTEM 7 O 2 RECORD DRAWINGS CJ KLT 9/4/20 PLANNING & RED BARN MITIGATION BANK SITE SURRY COUNTY, NC No EPR RESTORATION Noz I 150 SE MAYNARD RD,SUITE 140 s"l4 CARY,NC 27511 m�s, - - J ,I` LICENSE#P-1 182 J (PROJECT)(SHEET NO. 092 )C 17 ) LOG ROLLER AND TOE WOOD PLAN f 03D NOT INSTALLED - PROFILE �A"�y�(���(( • 1V' 46. 8 . -I. .L4.�i� �111111111111/, LOG ROLLER LIT♦ Irc'• - UK ice`• \\`\N CAR l/'1/4,, AND LOG STEP ` \ t•' „ .1 44 ��� ��5- 17aI1}yr ?d by NOT INSTALLED lstOG• Q CVO l,K1C�484-t: le; 1' DKr q- DatE?' 0.09 4 1� � 1'`-- t• �flfl SEAL6:22:28 04•0Ce�'L iii• i 1039 104 = �_'�� 3$ 0 p3 = 043187 0 1041 �Q �Q =�• "• _ V�`0�- - e�_ a an 103 1�ttf• A Q ___ - - 6 ,.yam - k .. OO :. Mfg 1 ^Q ''/ ��, iv Qlge ,� bc3 �Q3� /'w� I11g• ��r ��.�� W..." � � ��. c� • ..�; 1---- G93ht ','iveY J - \. gym -- IilYYil� r�a��.. .� a. E C� ." . 29+ ;. , iit_Z �i 0. --` • ` __ V '.. /Jo y i -- ,=t� �1P��► o,itiali�'l "�Jl .,cit. i oo I I I I I 1 3 _ ��� 1 0/ �n�,v ,. • d d rF ♦+R i � ii y, c �� n �. t Odd J r4 \ _ __ > 1 ���_ i7_1�e�� ye• . � '' ♦c, ., y�,�. r - -,...`"'ar Ii. ... f' 4� 1--. *iv.:911604% 4•41,71.1,75‘7:, ': ',..„.....0.-Ilik ,--- --, __ Viiiiiii. 1 ---- -5..., s0 6£°, $£OL e°/ CO 1 �j '0� Nai o �' ��, • 1 1g x x ► x -_ °� • �x x �x� 19_ x x� x 4111111111111111111111111111111111111111111111111111111b— x x si x`. 20 10 0 20 40 111111111 SCALE(FT) UT3 : : : : —DESIGN PROFILE I ■■ Z r , .. m W ii to W .. m Z - EN i ' i i i i i m• 1,030 I �::�� _ .��. --.... _ 11111111111111111111 / 1�1�1 �E Em.. o :�i':• �� —i� _ m ME_II a .___. m• 1,020 —AS-BUILT PROFILE 0 a F 2 z m 25+00 26+00 27+00 28+00 29+00 30+00 0 xi REVISIONS ( PREPARED FOR: 1( PREPARED IN THE OFFICE OF: PROJECT ENGINEER 1 rn NO. DESCRIPTION ENGR. APPROV DATE O 1 DRAFT RECORD DRAWINGS CJ KLT 6/3/20 ECOSYSTEM O 2 RECORD DRAWINGS CJ KLT 9/4/20 PLANNING & RED BARN MITIGATION BANK SITE SURRY COUNTY, NC Nu EPR RESTORATION 11 ow Noe I 1 50 SE MAYNARD RD,SUITE 140 •"0_-c CARY,NC 2751 1 mix\ - - J ,I` LICENSE#P-1 182 J (PROJECT)(SHEET NO. 092 18 ,4_,Otor40-_ B ® PLAN • G PROFILE eil p,�. • 0�R 30 o CP �0 �4',-;..-;01 /..;35"1,........_ i„el.,,,,.1,47,..7 W s SG5 , ) - rli (yam 11' �"' "- , / ��' ��y #� '� .,., .aDsl .,,. 4.:, 4 .1 n, ksigned by �, IN /,0 , ,;`z• C'aS, ��' 1 / '^� \'�'1k'•,. 'ram = 'n.. `' .... _. :? �' ` � ��... �� 0F SS/(? Jiffies 00/ • tips ' 26 �� r � ��,•� -'. .._ ,>z Jan srAL �i �` 1�z : 1-000 !j / �/ ��\ WGV/ ` // i/ •1 4i'' •� rn �% �' FNGINE�� ��� e J. ,, / / /\ $ " I cb'ffs4 ON ,-� 1 F V- 1 -lS' _�CE / CE _ C C _\ 40 I 0 ��� E `I I I �\ .w CE SCALE(FT) UT3 1,040 _ O N 1111 1 -_ - 3 co co I— III s DESIGN WAS HIGHER ELEVATION THAN EXFSTINGvROUNG a W IIII I PROFILE ADJUSTED TO AVOID FILL. o I T •••• I III IIIII a 1,030 w Ill W co z I _ U z — Illlln1111111111 5 'I' 111 I . I I I I I — ,. O 1,020 !!! 1111111111111111111111111111111.. i u 111 1111 III Q m al —AS-BUILT PROFILE - 2, 1,010 Z m 30+00 31+00 32+00 33+00 34+00 35+00 0 xi REVISIONS t PREPARED FOR: 1 t PREPARED IN THE OFFICE OF: PROJECT ENGINEER 1 rn N0. DESCRIPTION ENGR. APPROV DATE O 1 DRAFT RECORD DRAWINGS CJ KLT 6/3/20 ECOSYSTEM O 2 RECORD DRAWINGS CJ KLT 9/4/20 PLANNING & RED BARN MITIGATION BANK SITE SURRY COUNTY, NC oW EPR RESTORATION 11 Noe I 150 SE MAYNARD RD,SUITE 140 slrIT CARY,NC 27511 mixs� - J J` LICENSE#P-1 182 J (--'''''''' �O STA.37+94.39 (PROCTCHEETNO) . ,.,..... .P PLAN 7 rs \ e PROFILE f)'s (( co\p\i //4b/ ,,A • i / / lai,,,,,Vi4it / ems' I (I o \ \� �o ullnlu iiii�. � �Ir fi�G�� �i � J H CAR \\ END UT2 � xvstd by / */ / 1 . � \ v CIS FESS � ,,' N. //� ' " _ � � ��+ � \\ \'Y,,00\ STA.34+90.84 O / / / -- ii:,7 ke' \ 1 Y1— Da 0.09�4 / /,ii�� ��" 9 I III JdIl SEAL16:211 oavoT "yli/"/i i '/� � � I I _ 043187 i j �'i1j I I IQ co i ♦ ; \ I tiril 08 II F/1/GW :i O 6 �Ier 3 ,, \ 1 I 1°4IJOC oll �1in11` ti II .,' /III �;INI r, ,,isiI0 1 I I I 1 W tr efecn vr•n, +�► .;�.V MhMM i.,All�'S;'k]52✓rs ;�+ -// O I i I �' I I I � Z .,_A v�� .11.4- 'Lam, lw ..r sd ;;,, ' / I I .- I I �1a o`4/ 4,, KII b0/ vaCvv � 3/4�� "4 ' vv 20 10 0 20 40 SEE SHEET 13 1 SCALE(F(FT) UT3 : : : : 1,030 0 m a F DESIGN PROFILE = UJ m Li] a, m 1,020 S a w - -\.- I . _ _— liw-;:�. F I I 5 _ ! 1010 a —AS-BUILT PROFILE ro z' 0 a 0 2 1,000 li Z m 35+00 36+00 37+00 38+00 0 re REVISIONS ( PREPARED FOR: 1( PREPARED IN THE OFFICE OF: 1( PROJECT ENGINEER 1 rn NO. DESCRIPTION ENGR. APPROV DATE O 1 DRAFT RECORD DRAWINGS CJ KLT 6/3/20 ECOSYSTEM D O 2 RECORD DRAWINGS CJ KLT 9/4/20 0 RED BARN MITIGATION BANK SITE PLANNING & a SURRY COUNTY, NC oW EPR RESTORATION Noe 1150 SE MAYNARD RD,SUITE 140 .`10a-c CARY,NC 27511 mlr� — — J` J` LICENSE#P-1 182 J (PROJECT)(SHEET NO. 092 20 • UT4 PROFILE ' —DESIGN PROFILE 1,050 1,040 1,030 —ACIUIL—PRDFI-LE 10+00 11+00 z 0 - N 2 a m m a S IY J 7 (I) a NI�IgIR//'��'''i Z/ C i d, `Cady i49ed by a <Z-- �c'Dater 0.09.fi_4 o Jol€le 2 SEAt:23: 9 4'OO Y = 043187 Z = S - e E � a %cj GIN cc? / -?\ //,:4y � 0 \ , I I1 z In a 0 IYi REVISIONS PREPARED FOR: 1 t PREPARED IN THE OFFICE OF: 1 t PROJECT ENGINEER rn NO. DESCRIPTION ENGR. APPROV DATE O 1 DRAFT RECORD DRAWINGS CJ KLT 6/3/20 ECOSYSTEM O2 RECORD DRAWINGS CJ KLT 9/4/20 PLANNING & m RED BARN MITIGATION BANK SITE PROGRESS DRAWING EW PURPOSES ONLY o� SURRY COUNTY, NC DO NOT UFOR SE FOR CONSTRUCTION EPR RESTORATION Noe 1 1 50 SE MAYNARD RD,SUITE 140 ."4 CARY,NC 2751 1 mlr� _ J` ,I` LICENSE#P-1 182 J 0 ' / 1 WALNUT TREE SUBDIVISION r�_ P.B. 9, PG. 40 a. EX. SHED POSSIBLE ENCROACHMENT w PNsr ' \ 1 \ 17 HERRING ST. \ \ ©POSSIBLE LANDSCAPING ENCROACHMENT NCS9 �� PP B 12,_PG. 134 -� - r I - 16 \ \ 0 EX. 1-STORY WOOD FRAME BUILDING �/�- -i 1 19 1$ 17 N/F dOEX. SHED ‘IIW Point of L \ -if.-- o•` Beginning 1 3 2 1 2� RALPH EE COE Ci 1 O 314i O I I b, f a' j & wife, DOROTHY COE y f RB 1"EIP w`�j D.B. 564, PG. 89 I 3 8" !3E a PIN: 5010-20-72-9031 / �Q,' ol- io RB S88'3�.04_E \ 821.24' t 7---' 11 • SR137. tin 115;,,94' 124.47'.� 124.01' t t S88'32 05 E 473.96' : EIR 6891' 1 EIP 108' t 100' 100' 8482' I PROPERTY LINE JOHNSON FAMILY FARM, LLC h y W W y y W `Y 4, y W ttttySITED.B. 1124, PG. 547 � "D.B. 497, PG. 575 �' y y y y y y W 55.0 y EX. STREAM yd'6 O I � ' „tit''/ r PIN: 5010-00-53-9021 ry�',�� W y y y 4 y v. y y y W y W n L 1 �'� - �� --- 7 F,L. >�/ N85'11 52'VV 509.00' 57223�5g' �� o N E - TO - - 1 n 5R�3�, y y W v nd wit MMY �� + is p W y I p e SHARO B' BOWMA I ! N /`" ;> ��� y y y I I 30' UTILITY EASEMENT PINT.s p960 pG.L' Bpw"' ! + i, - 44 4 2 y y r I ' /D.B. 353, PG. 608 0_2=11 p3 97 a- R 1 r;r ` vJw EX. v �''�, w W ! 'I' SEE SHEET 2 / Ili I 0 C M OF 2 FOR DITCH/Q�� �s�� y y y W ss �"ilo+l--30' yam; z a NC GRID TIE VICINITY MAP (NO SCALE) /Q�o o- y y y 2>>' 1 pro �o�2 INFORMATION. (� /h W w W y �2A I I a p,N �,I) `J� /,0 c4 y y J y '•'.�' I 1 O °' ��`� / REVIEW OFFICER CERTIFICATION / • * y y y y y I I A a;W A' C) Lew 1 1 �� /h'O�`� y y y 4 W Sl L-I m -.1(' STATE OF NORTH CAROLINA '6 rr p 'v w y y O. / COUNTY OF SURRY ak/ oa AREA A-I /LS2>, y y 4, 4, ,<.9- REVIEW OFFICER OF SURRY COUNTY, dry/ 5.542 ACRES 'cps W W y y •���; REF. 1 / N�SF CERTIFY THAT THIS MAP OR PLAT TO WHICH THIS CERTIFICATION IS CREEK !y W W W / GEORGE VERNON DAVIS AFFIXED, MEETS ALL STATUTORY REQUIREMENTS FOR RECORDING FOR BANK Sgs y and wife, LINE TABLE WHICH THE REVIEW OFFICER HAS RESPONSIBILITY AS PROVIDED BY LAW. 5/8"REBAR SS, y y MARGARET SMITH DAVIS / LIFE ESTATE LINE BEARING DISTANCE w CAP SET y �� 1"ERB D.B. 1609, PG. 647 L1 S03'I f 3911 97.52' .• -- �,L' PIN: 5010-20-81-5289 L2 513'08 341V 110.37' ---7--- <<9 ,'-C7)142B L3 S30'0734 E 94.80' S� N \/ z L4 S40'25'14 iY 99.17' REVIEW OFFICER DATE EwgR N. Wy576.7� y 4, y � 0;13f NO 1 15 `A < y J y W W 40�9y / L7UA 9432 14' 170' 1-1 y 1, "J, 4' 4, y w �= / L8 N40'2520' 105.13' CREF.71) y y ' y y Y ' y 'cnC.P- �' L9 S46i435"E 110.94' Lf0 S19'37'44'E 62.65' y W y L * y y y ,y. / NSF y r► IF/ y y cNN �, L12 S82'34'431W 135.36' HULL BROTHERS LUMBER / y AREA A-2 y y w / COMPANY, INC. ti 9, 100 ACRES W y y w v, L13 N1652'47 E 160.47' I, ELISABETH G.TURNER,CERTIFY THAT THIS PLAT WAS DRAWN UNDER D.B. 456, PG. 49 O 1 L14 N66'30'04� 117.00' MY SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY D.B. 489, PG. 1 / Cw W y y y y W y y y O!U�1 J L15 S09'4321 E 116.20' SUPERVISION (DEED DESCRIPTION RECORDED IN BOOK_ AS , PAGE_ PIN: 5010-00-50-5252 rev y O / L16 58025281V 158.46' y y `Y W y y y V' .V � •br5 60 SHOWN ); THAT THE BOUNDARIES NOT SURVEYED ARE CLEARLY I $ y y C'. 1/�2"EIP N/F L17 S54'39281V 13814' INDICATED AS DRAWN FROM INFORMATION SHOWN ON THE FACE OF l, y . .y y W W N77'50'42"W k y y y y W �� 29� W W i/2'NEXT TO DORIS H. VERNON y 1"EIP D.B. 660, PG. 499 TIE LINE TABLE THIS MAP;THAT THE RATIO OF PRECISION AS CALCULATED IS 1:10,000 ; ry,;) } W . �104.45' y y y 4' N85.15'55"E W W Point of� PIN: 5010-20-81-7030 AXLE LINE BEARING DISTANCE TYPE' AND THAT THIS PLAT WAS PREPARED IN ACCORDANCE WITH G.S.47-30 I y y W y y 256.37 y Beginning AS AMENDED. WITNESS MY ORIGINAL SIGNATURE, REGISTRATION L Ti 521'57zs� 5.44' TIE AREA 'A-3" W W y W y W W y y y ./y :.)NEXT TO T2 N21'57'111v 56.44'0 77E NUMBER,AND SEAL THIS 15th DAY OF FEBRUARY,2019. T3 S80'16'391+' 50.02' 11E `\�ttttIII111!!�' 35'05"E W y (O/(�, !•� y \ y W y y y y W y W y / W W 45"POPLAR ///{p .�`� � CARP 777, I 1. 183 ACRES N80" JAB, T3 I J• V �Li R J 15 T4 S072529'W 50.03'. PL 4,6 `/ // 232 y `i' �O<^, x �. W V'. y y W y `V W J. v y�•� y Wto T6 S06'352319 1.3,164' PL /Et ,�C/ � ag. ` °�.c S /0�4(1% L�� ✓L W y j i �p�, Wit:;% \ \ Exg�j 4, �Dt y y ,-� y y W y 4, y 1 4 1 ELISABETH G.TURNER,P.L.S.#L-4440 - .4- 9�. W y y y y y y W U' m y j s.. W y y y y W y y y y W y y y y y �27 �'1"EIP N/F T+EmrrE ONLY PL=PROPERm LINE RE _ - SEAL = - o� JEAN PAT1Y PARRIES W y .4,- ' y 5 y y y y y W W y ,V. and - •r L-4440 �. _ Point of / T4 L Nss• y y y y W O9 V. LARRY DAVIS CONNER m y gyp. ,� Beginning y y L16 283>� y y c�FJi. PIN: 50 660, �20 8048694 y y REF. 1 99 <�`51 •• S U `IXf• '.� STEWA ENTTS CREEKCENTERLINE \ 82.34'43"E v 4'. �11 <>�3�2 w y 1"EIP _ I, ELISABETH G. TURNER, PROFESSIONAL LAND 7BFrH G• �\���`� IS PROPERTY LINE 204 55' (Ft) y L12 .- 8" 7 SURVEYOR # L 4440, CERTIFY TO ONE OR MORE OF 7!I if l l i I I �\ �; i 749.55' EHB N)� i NE �� m m� W THE FOLLOWING AS INDICATED: N� 5/8 1 ,N. ROP02 E kV 802--7 NEXT TO J�E MATCHLINE ~� N/F aB / v £147)- 6' 1"EIR w/BOLT & ,05� 2l JASON RYAN BECK and wife, N E 33" WHITE OAK 04 g 29 N F C KEENIA J. BECK X d. THAT THIS PLAT IS OF A SURVEY OF ANOTHER o�- �7 CEF. 2 pR 5�0 k9 DALE RAY KING of D.B. 1451, PG. 984 CATEGORY, SUCH AS THE RECOMBINATION OF olCA 9 5 3� D.B. 1649, PG. 818 cr EXISTING PARCELS, A COURT ORDERED SURVEY, OR o / ' PIN: 5010-20-80-3191 4 PIN: 5010-20-80-8225 OTHER EXCEPTION TO THE DEFINITION OF __ - . ,„_ /5/8: ,. SUBDIVISION. G NE n ' CONSERVATION EASEMENT AREA SUMMARY ELISABETHTH G.TURNER,P.L.S.#L-4440 EASEMENT LEGEND: PROPERTY EASEMENT AREA(ACRES) CONSERVATION EASEMENT W A-1 5.542 LINE LPT SURVEYED CEF.. CEF. `) CEF. - y REF. 1 - JOHNSON _ TIE LINE PIN: 5010-00-71 -3049 A-2 9.100 - . - EXISTING STREAM N/F N/F N/F - - - - EX. EASEMENT G. EDDIE JOHNSON and wife, DEBORAH M. BEASLEY, SHAWN A. MOSER and wife, A-3 1 .183 GENERAL NOTES: CAROL S. JOHNSON GRETA M. BOYD, and TERESA H. MOSER - _ - OVERHEAD UTILITY LINES 1. ALL DISTANCES SHOWN ARE HORIZONTAL GROUND DISTANCES UNLESS OTHERWISE NOTED. D.B. 1033, PG. 644 PORTIA M. OAKLEY D.B. 1555, PG. 898 REF. 2 - BEASLEY, B-1 4.771 - RIGHT OF WAY (GIS) 2. THE BASIS OF BEARINGS IS NCGS STATE PLANE GRID COORDINATES NAD83(2011) DATUM D.B. 233, PG. 179 D.B. 1555, PG. 895 P.B. 32, PG. 180, Tract 2 r // BOYD, & OAKLEY EASEMENT CORNER TAKEN FROM PLAT BOOK 34, PAGE 125 IN THE SURRY COUNTY REGISTER OF DEEDS PIN: 5010-00-71-3049 P.B. 34, PG. 125, Tract Two PIN: 5919-02-79-1649 PIN: 5010-20-70-7007 B-2 1 .835 � REBAR & CAP SET OWNER ADDRESS: PIN: 5010-20-70-7007 OWNER ADDRESS: OFFICE. 224 Beth Lane OWNER ADDRESS: 169 Scarlett Ln. C-1 0.532 © PROPERTY ) PIN: CORNER 3. THE AREA SHOWN HEREON WAS COMPUTED USING THE COORDINATE COMPUTATION Mt. Airy, NC 27030 286 Cletius Moser TrI. Mt. Airy, NC 27030 REF. 3 - MOSER DESCRIBED Mt. Airy,NC 27030 5919-02-79-1649 EIP EXISTING IRON PIPE METHOD. C-2 0.473 ERB EXISTING REBAR 4. THE PURPOSE OF THIS PLAT IS TO SERVE AS A REFERENCE FOR THE CREATION OF A IRON ROD CONSERVATION EASEMENT. THIS PLAT IS NOT A BOUNDARY SURVEY. THE LAND PARCELSx x x x x x x x x .x REF. 4 - BEASLEY D 0 602 N EIR E EXISTING OR FORMERLY AND THEIR BOUNDARIES AFFECTED BY THIS CONSERVATION EASEMENT ARE NOT CHANGED REF. 4 REF. 5 CEF.-6 X x x x x PIN: 5919-00-79-7501 BY THIS PLAT. 0 CALCULATED CORNER ing 5. 5/8" REBAR WITH CAP SET AT EASEMENT CORNERS. N/F N/F N/F43:8 REF. 5 - BEASLEY P.O.B. for Legal Descriptions 6. LINES NOT SURVEYED ARE SHOWN AS A DASHED LINETYPE AND WERE TAKEN FROM TERRY G. BEASLEY and wife, TERRY G. BEASLEY and wife, GRETA M. BOYD PIN: 5919-08-89-1501 E 0.143 Point of Beginning PL PROPERTY LINE INFORMATION REFERENCED ON THE FACE OF THIS FIAT. DEBORAH M. BEASLEY DEBORAH M. BEASLEY D.B. 320, PG. 98 7. THIS SURVEY WAS PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT AND THEREFORE D.B. 489, PG. 1175 D.B. 1446, PG. 358 PIN: 5919-00-89-4216 i\ \\\\\ REF. 6 - BOYD D.B. 315, PG. 169 PIN: 5919-08-89-1501 OWNER ADDRESS: PIN: 5919-00-89-4216 F 1 .225 MAY NOT SHOW ALL ENCUMBRANCES UPON THE SUBJECT PROPERTY. A LICENSED PIN: 5919-00-79-7501 OWNER ADDRESS: 194 Cletius Moser TrI. ATTORNEY-AT-LAW SHOULD BE CONSULTED REGARDING CORRECT OWNERSHIP, WIDTH, AND OWNER ADDRESS: 286 Cletius Moser TrI. Mt. Airy, NC 27030 LOCATION OF EASEMENTS AND OTHER TITLE QUESTIONS REVEALED BY A TITLE 286 Cletius Moser Trl. Mt. Airy, NC 27030 TOTAL EASEMENT AREA 25,4�6 200' 0' 200' 400' EXAMINATION. THE SURVEYOR HAS MADE NO INVESTIGATION OR INDEPENDENT SEARCH FOR Mt. Airy, NC 27030 ENCUMBERANCES, RESTRICTIVE COVENANTS, EASEMENTS OF RECORD, OWNERSHIP, TITLEMI MI NM INI EVIDENCE, OR OTHER FACTS THAT AN ACCURATE AND CURRENT TITLE EXAMINATION MAY SCALE: 1 inch = 200 feet DISCLOSE. 8. SUBJECT TO ALL EASEMENTS, RIGHT OF WAYS, AND/OR ENCUMBRANCES THAT MAY AFFECT THE PROPERTY(S). 9. A PORTION OF THE SUBJECT PROPERTY IS LOCATED IN A DESIGNATED FEMA FLOOD P.O. BOX 148 CONSERVATION EASEMENT FOR CAD FILE: HAZARD ZONE PER FIRM MAP #371 1 501 000J & #371 1 501 900J EFFECTIVE REVISED DATE 1 SWANNANOA, NC 28778 RED BARN CE F AUGUST 18, 2009. 10.ENVIRONMENTAL AND SUBSURFACE CONDITIONS WERE NOT EXAMINED AS PART OF THIS P-0702 (919)-827-0745 ECOSYSTEM PLANNING AND RESTORATION, LLC SURVEY. www.turnerlandsurveying.com ' 11.THE EXISTENCE OR NON-EXISTENCE OF WETLANDS ON THE SUBJECT PROPERTY HAS NOT LAND SURVEYINGCertified DBE/WBE RED BARN MITIGATION BANK SITE SCALE: 1'=200 BEEN DETERMINED BY THIS SURVEY. 12.UTAITIES ARE SHOWNE WHERE ABOVE GROUND APPURTENANCES WERE VISIBLE AND SURVEY DATE: MAR. 2018) DRAWN BY: DST/EGT TLSPROJ.: 18-003 (USAGE Action ID Number saw-2018-1441 ) ADJACENT TO CONSERVATION EASEMENT. SHEET RECORDED IN PLAT BOOK , PAGE SURVEYED BY: DST) REVIEWED BY: DST/EGT PLAT DATE: 2/15/2019 ' MT. AIRY TOWNSHIP SURRY COUNTY NORTH CAROLINA 1 of 2 REVIEW OFFICER CERTIFICATION STATE OF NORTH CAROLINA COUNTY OF SURRY LINE TABLE , REVIEW OFFICER OF SURRY COUNTY, LINE BEARING DISTANCE CERTIFY THAT THIS MAP OR PLAT TO WHICH THIS CERTIFICATION IS L18 .522'54 39V 155.94' L19 S66'14 24 80.95' AFFIXED, MEETS ALL STATUTORY REQUIREMENTS FOR RECORDING FOR L2120 S62'09'f5 E f34.18' WHICH THE REVIEW OFFICER HAS RESPONSIBILITY AS PROVIDED BY LAW. L21 S89'38' 1"W 214.83' L22 S1t1'2821"W 62.62' L W W W W U) W • (�, V•� W W -W W W �Y * �Y W W ^ L23 S7J 17 09"W 136.58' _ • -/ W W W W 4' 52 1"EIP N//F L24 N7129'327/ 94.12' ��l JEAN PATTY PARRIES L25 N82'39'01►v 130.28' REVIEW OFFICER DATE = `� J 5 N6 2 L26 N21'1107'E 29.48' Point of T4 L W W W W W W W 9 2 ca LARRY DAVIS CONNER .1 Beginning L16 S28, W W W v y I.0 / L27 N6Tf8'51"W 169.01' 5 D.B. 660, PG. 499 CENTERLINE \ W W REF. 1 `�� W W w 5 PIN: 5010-20-80-8694 L28 N54'1851"W 110.00' STEWARTS CREEK N82•3q'43"F �3 W W 1"EIP N L29 N39'25'41"W 140.07' IS PROPERTY LINE (PL) L12 �2 204.55 ( 48" calm=I /49.55' E B �� _` -. a L3� S06 0717E 109.67' Z // �� �� .02 06"),/,. NEEXT TO �,�� M ATC H L I N E ,� L32 s89 z$ Sai tiB v 7'ROpFRn L 8p2.16 1"EIR w/BOLT & R(� / r; N F o 'n L34 N112821"E 81.23' 0 co- �,9 �EF ONE• 33" WHITE OAK PR°4�Oghg9, DALE NF7AY KING a JASON KEENIA RYAN �ECBECKK d wife, z 0: LL35 36 N�9514'11 1v 96.78' o� 55 3� D.B. 1649, PG. 818 � D.B. 1451, PG. 984 L37 N11"2757E 72.47' ' PIN: 5010-20-80-3191 ° PIN: 5010-20-80-8225 g L38 S3205'16'W 80.64' L37 �; L25 �•B s� L39 N6752'32'W 224.72' Ln n �••���•`•� E•B b63¢�" L41 N8f'58591Y 77.43' AREA C-1 ��•.��I•�•. 0., �h'ppg/1 \ \ L42 5112$21 w 78.34' 0.532 ACRES «s L3 sABSo L4� N815859 w 144.12' �w s tiF 9' N/F ���(1 �., rrp q 5//g" \. TIE LINE TABLE HULL BROTHERS LUMBER t� F'• �'- AREA B-1 <,ERB \ LINE BEARING DISTANCE TYPE. COMPANY, INC. �� 1 2 \ 17 N72'2T23E 34.31' nE 78 N73-17 09 E 34.04' PL D.B. 456, PG. 49 �� L . Ti i�.'- , 4.771 ACRES P \ 79 N7T4502 E 3247 nE D.B. 489, PG. 1 G`Z� E.B 6 i9 PIN: 5010-00-50-5252 c 75 g • �PA OV Qv \ik T10 N1 2821'E 9375' PL Pe ERB TAD' r11 N75'5224w 186.60' PL ��/ O` O� �0 REF. 2 h 0° T13 S8455 "E 125.26' PL `` 79`�¢2S�� T14 S21'1109 W 99.54' PL Point of ' M 260 18' h/C Z27 00.e. ns S6T56'�2� 1 93' PL Beginning 5`,8 •-``- /`/9¢3,18A s6 A .77 5�8 G 1-1 J /1,4 Dty 70g976• '?7E=TIE ONLY PL=PROPERTY LINE PE B ���� . 6Y �87. S' `f ERB ` (P4� / SygR AYN�N F • t 1 �39 �����r.��.'�' �2s�' HERB" pe. a& N OAv ANDL i 2" 3 is e e ��� �� �">� 3s8 p/N: S PG 16 PG ANp and Wire,. r_ 014 N F N) � x 6). p L22 / 979• 12S 66ER AXLEc'-- RANDY E. MOSER and wife, ��E�B" 2 5�7•'Nsi�,x x x x x x x �SO L21 n„5�8 08' 89�oc O DONNA B. MOSER AREA `rC-L" `�97 x x x x ' `S,,6' 796 ne D.B. 1555, PG. 902 �6 5�' D / AXLE PN:P.B. 3 919-028779T0296 ract 3 0.473 ACRES /Vj2xxxx�Cx x' P.O.B. 5 8 3 ��� `3s86 3F E/B" n If E(2B ��� 38SO'7" �f x :��o t1� = a� �' �' Eta\ 80 67 I�A(t S6� AREA 35 ACRES n rr 41 P.D.B. NCGS 'AIR VIEW" �� AREA D 8 738ti o NAD83 (NSRS20 1 t) REF. 3 L43 L42 Nj E'B �` 0.602 ACRES / 1 •s°8�8 \ s 1 NN.C 999,400.46D us Fr 2 (I 2g ly 5 s" Oct a IfJ) ry��° QR°=E AREA rrErI A �' � 89- �� E 1,52D,179.1D USFT 0. 143 ACRES � �8 t EBB EI�,.: - , AREA "F" N663o �E e REF. 4 / ¢83s 6 y N: 999,357.44 USFT ERB E B ' �`�� ry E: 1,51 9,391.40 USFT 5/8" 5/8' \ 1.225 ACRES 6' w_ R C / // �, T12 „ T13 5 8" EIP" REF. 5 �IJ Ef26" 5/8"RB L32 5//8 �IE� 5 8" 1/2' I Ef2B" 5/8" ERB REF• 1.5"EIP next to E B EIP 1 i ERB n ' 30' 39"White Oak of I Span.b O k O / ' S 86'52'28" W 5/8" ' 30' ACCESS EASEMENT 3 4" ERB _ 788.87'GROUND RI 1 „E/P /ce 'GRID) // E B P.B. 34, PG. 125 L_ - - - - - L f ERB" MoS�R/ Q i COMBINED GRID / FACTOR=1.00005764 DEBORAH NSA F BEASLEY, - - CLETIUS - „5�8" 30' ACCESS EASEMENT r- _ �/ P.B. 32, PG. 146 �,�/ GRETA M. BOYD, and P.B. 32, PG. 180 } PORTIA M. OAKLEY 5//8'L_ - N/F ` / D.B. 1561, PG. 29 ERB '-'5/8' BRADLEY JOSEPH LINEBERRY and wife, / / D.B. 1555, PG. 895 ERB MINDY DIANA LINEBERY N/F // P.B. 34, PG. 54 Tract 1 D.B. 1603, PG. 458 HOWARD EDWARDS and wife, PIN: 5919-02-79-0094P.B. 34/ PG. 4 Tact 5 PIN: 59'19 085 88 r2864 SHARONETTE EDWARDS D.B. 1561, PG. 32 P.B. 32, PG. 180 Tract 4 PIN: 5919-08-88-9985 I, ELISABETH G.TURNER, CERTIFY THAT THIS PLAT WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY CONSERVATION EASEMENT AREA SUMMARY LEGEND: SUPERVISION (DEED DESCRIPTION RECORDED IN BOOK AS , PAGE_ EASEMENT CONSERVATION EASEMENT SHOWN ); THAT THE BOUNDARIES NOT SURVEYED ARE CLEARLY PROPERTY EASEMENT AREA(ACRES) PROPERTY LINE INDICATED AS DRAWN FROM INFORMATION SHOWN ON THE FACE OF - - LINE NOT SURVEYED THIS MAP;THAT THE RATIO OF PRECISION AS CALCULATED IS 1: 10,000 CFD REF. 2A- 5.542 TIE LINE AND THAT THIS PLAT WAS PREPARED IN ACCORDANCE WITH G.S.47-30 W W REF. 1 - JOHNSON - - • - EXISTING STREAM AS AMENDED. WITNESS MY ORIGINAL SIGNATURE, REGISTRATION N/F N/F N/F W ` NUMBER,AND SEAL THIS 15th DAY OF FEBRUARY,2019.\ �,„�I I i i�I/7/7 G. EDDIE JOHNSON and wife, DEBORAH M. BEASLEY, SHAWN A. MOSER and wife, PIN: 5010-00-71 -3049 A-2 9. OO - - - - EX. EASEMENT '\� . •CAR Oi'%, CA D.B.0L S.1033,J PG. ON PORTIAGRETA M. BOYD, and LEY TTEBRES H.. 1555, MPOSER 898 A-3 1 .183 OVERHEAD UTILITY LINES :4a L�� °'OFESS/Q,y• y % D.B. 233, PG. 179 D.B. 1555, PG. 895 P.B. 32, PG. 180, Tract 2 - - - - RIGHT OF WAY (GIS) PIN: 5010-00-71-3049 P.B. 34, PG. 125, Tract Two PIN: 5919-02-79-1649 REF. 2 - BEASLEY, B- 1 4.771EASEMENT CORNER LISABETH G.TURNER,P.L.S.#L-4440 Q� � = OWNER ADDRESS: PIN: 5010-20-70-7007 OWNER ADDRESS: BOYD, & OAKLEYREBAR & CAP SET SEAL - 224 Beth Lane OWNER ADDRESS: 169 Scarlett Ln. PIN: 5010-20-70-7007 B-2 1 .835 © PROPERTY CORNER L-4440 cr.- z Mt. Airy, NC 27030 286 Cletius Moser Trl. Mt. Airy, NC 27030 (DESCRIBED) Mt. Ai NC 27030 C-1 0.532 EIP EXISTING IRON PIPE ��'p �,O ��� Airy, REF. 3 - MOSER ERB EXISTING REBAR ' ,S•UR`I• • � PIN: 5919-02-79-1649 C-2 0.473 I, ELISABETH G. TURNER, PROFESSIONAL LAND'/��TH G. ��` \ REF. 4 CREF. 5 REF. 6 EIR EXISTING IRON ROD �� N/F NOW OR FORMERLY SURVEYOR # L-4440, CERTIFY TO ONE OR MORE OF x x x x x x x x x x REF. 4 - BEASLEY 0 CALCULATED CORNER THE FOLLOWING AS INDICATED: N/F N/F N/F x x x x x PIN: 5919-00-79-7501 D 0.602 P.O.B. Point of Beginning TERRYE for Legal G. BEASLEY and wife, TERRY G. BEASLEY and wife, GRETA M. BOYD g Descriptions X d. THAT THIS PLAT IS OF A SURVEY OF ANOTHER DEBORAH M. BEASLEY DEBORAH M. BEASLEY D.B. 320, PG. 98 REF. 5 - BEASLEY E PL PROPERTY LINE CATEGORY, SUCH AS THE RECOMBINATION OF D.B. 489, PG. 1175 D.B. 1446, PG. 358 PIN: 5919-00-89-4216 PIN: 5919-08-89-1501 0. 143 EXISTING PARCELS, A COURT ORDERED SURVEY, OR D.B. 315, PG. 169 PIN: 5919-08-89-1501 OWNER ADDRESS: OTHER EXCEPTION TO THE DEFINITION OF PIN: 5919-00-79-7501 OWNER ADDRESS: 194 Cletius Moser Trl. ` REF. 6 - BOYD SUBDIVISION. OWNER ADDRESS: 286 Cletius Moser Trl. Mt. Airy, NC 27030 � \. PIN: 5919-00-89-4216 F 1 .225 Cletius Moser Trl. Mt. Airy, NC 27030 Mt. 200' 0' 200' 400' Mt. Airy, NC 27030 TOTAL EASEMENT AREA 25.406 I. I. ELISABETH G.TURNER,P.L.S.#L-4440 SCALE: 1 inch = 200 feet P.O. BOX 148 SWANNANOA, NC 28778 CONSERVATION EASEMENT FOR CAD FILE: NOTEs: P-o7o2 (919)-827-0745 ECOSYSTEM PLANNING AND RESTORATION LLC RED BARN_CE_F 1 . SEE SHEET 1 OF 2 FOR GENERAL NOTES. LAND- SURVEYING In WWW.turnerlandSurVe n1 y gCO RED BARNSCALE: 1"=200' Certified CBE/wBE MITIGATION T I GAT T O N BANK SITE TE SURVEYDATE: MAR. 2018 DRAWN BY: DST/EGT TLS PROJ.: 18-003 (USACE Action ID Number SAW-2018-1441 ) SHEET RECORDED IN PLAT BOOK , PAGE SURVEYED BY: DST REVIEWED BY: DST/EGT (PLAT DATE: 2/15/2019 MT. AIRY TOWNSHIP SURRY COUNTY NORTH CAROLINA 2 of 2