Loading...
HomeMy WebLinkAbout20180182 Ver 1_SAW-2017-01927 MY1 Report_20210210Strickland, Bev From: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil> Sent: Wednesday, February 10, 2021 11:08 AM To: Davis, Erin B; Leslie, Andrea J; Wilson, Travis W.; Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Haywood, Casey M CIV (USA); Bowers, Todd; Hamstead, Byron A Cc: Jones, M Scott (Scott) CIV USARMY CESAW (USA) Subject: [External] SAW-2017-01927 Red Barn Mitigation Bank MY1 Report Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good Morning, The Year 1 Monitoring Report review and credit release has been requested by EPR. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you intend to request a site visit prior to the Year 1 credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to EPR and the NCIRT along with District Engineer's intent to approve or disapprove this Year 1 Monitoring Report credit release. Please note, we previously had an IRT site visit to review the Red Barn draft As -Built on June 10, 2020 and the final As - Built was submitted September 18, 2020. Between the two reports, some areas were identified as concerns to monitor, including finishing the CE fencing, completing the footbridge and ATV crossings, removing 3 areas from the CE (2 crossings and 1 sliver of boundary w existing fencing), sediment deposition in UT2 and a section of dry channel downstream of the culvert on UT1. The MY1 report addresses the concerns expressed last year as well as documents additional items. Amongst the various MY1 report results, EPR notes that the project wetlands are not meeting performance standards and are not seeking wetland credit at this time. They also propose to "...move SG 2 from its current location to the first pool downstream of the culvert. The location and data for this gauge will be provided in the next monitoring report." This is in response to the short section of dry channel identified during last June's site visit. I have included the Red Barn Mitigation Site with our Monday, March 22 Yadkin visits due its close proximity to the Hair Sheep Site scheduled for that day. If you feel the MY1 results are of enough concern that credit should not be released prior to the March 22nd site visit, please indicate that with your comment response. Sponsor: Ecosystem Planning & Restoration (EPR) Name: Red Barn Mitigation Site USACE ID: SAW-2017-02529 River Basin: Upper Yadkin Watershed; Upper Pee Dee River Basin H UC: 03040101 County: Surry Cyilk] a1l12ilk] aVFTAVI: I 10-percent of the total stream restoration and enhancement credits: 803.2 stream mitigation units 15-Day Comment Start Date: February 10, 2021 15-Day Comment Deadline: February 24, 2021 *NOTE: If a site visit is request by the IRT, comments are due 15 days after the site visit is complete. You can find the MY1 Report and Cover Letter on RIBITs, under the Monitoring Reports, at the link below. https://ribits.ops.usace.army.mil/ords/f?p=107:278:11467618519579::NO::P278 BANK ID:4775 Feel free to contact me with any questions. Regards, Steve Kichefski Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District, Asheville Field Office 151 Patton Avenue, Suite 208 Asheville, NC 28801 (828)-271-7980 Ext. 4234 (828)-933-8032 cell The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0 to complete the survey online.