Loading...
HomeMy WebLinkAbout20201751 Ver 1_Pre-Filing Meeting Information_20210207ID#* 20201751 Version* 1 Regional Office* Central Office - (919) 707-9000 Reviewer List* Rob Ridings Pre -Filing Meeting Request submitted 11/14/2020 Contact Name* William Wescott Contact Email Address* wescottenvironmentalservices@gmail.com Project Name * Industrial entrance between West Blanche St. and US70 Alt. Project Owner* Eastfield Associates, LLC Project County* Johnston Owner Address: Street Address 111 West Oak Street Address Line 2 City State / Frovince / Plegion Selma North Carolina Fbstal / Zip Code Country 27576 USA Is this a transportation project?* Yes (- No Type(s) of approval sought from the DWR: 140 401 Water Quality Certification - 401 Water Quality Certification - Regular Express • Individual Permit F Modification I Shoreline Stabilization Does this project have an existing project ID#?* Yes r: No Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below.* The applicant will apply for a nationwide permit #14. This is not a NCDOT project. This is a road proposed by a property owner. The proposed project will provide direct access to US70 Alt. for a future industrial site. Wetlands have been verified by USACE. The proposed project impacts 0.15 acres of wetlands. To minimize the wetland impact, the road alignment was designed to cross the narrowest wetland area. To further reduce the wetland impact, the road footprint was designed as two 11 foot lanes and the 5 foot wide concrete sidewalk which transitions to a pile supported 5- foot wide elevated boardwalk over wetlands. Clearing and ground disturbing activities will be limited to the minimum needed to construct the project. All sedimentation and erosion control measures standard for road construction will be utilized and maintained throughout the construction of the project. Wetland areas will be clearly marked to avoid inadvertent unauthorized impacts during construction. There will also be periodic monitoring of construction conditions by qualified individuals to ensure that work is progressing per established plan. Please give a couple of dates you are available for a meeting. 12/2/2020 12/9/2020 Please attach the documentation you would like to have the meeting about. Impervious areas 4 Exhibit 201104.pdf 439.53KB NCDWR - soil - topo - aerial.pdf 157.41 KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 11/14/2020 Reviewer Meeting Request Decision Has a meeting been scheduled?* r Yes (' No