HomeMy WebLinkAbout20210193 Ver 1_Pre-Filing Meeting Information_20210210DWR Pre-Fil ing Meeting Req u est Form
ID#*Ve rsion *
Re gional Office *
Re v ie we r List *
Contact Name *
Contact Email Addre ss *
Proje ct Name *
Proje ct Owne r *
Proje ct County *
Owne r Addre ss:
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low.*
20210193 1
Central Office - (919) 707-9000
Rob Ridings
Pre-Filing Me eting Reque st submitte d 1/27/2021
John Thomas
jthomas@gfnet.com
Removal of Existing Maryland Avenue Bridge and Stream Bank Restoration
City of Durham
Durham
City
Durham
State / Province / Region
North Carolina
Postal / Zip Code
27704
Country
Durham
Street Address
1600 Mist Lake Drive
Address Line 2
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
Rod Ridings
The removal of the existing closed/abandoned Maryland Avenue
bridge over Ellerbe Creek in the City of Durham, Durham County,
North Carolina. The project includes the removal of bridge and its
abutments, restoration/stabilization of impacted stream banks, and
repair of an existing storm water pipe outlet that ran through the
existing bridge abutment.
(Bridge no. 310233 / Coordinates 36.02540 -78.92213)
Please give a couple of dates you are available for a meeting.
Ple ase attach the docume ntation you would like to hav e the me e ting about.
Signature
Submittal Date
2/2/2021
2/3/2021
2/4/2021
2/8/2021
2/9/2021
310233_BUFFERT DRAWINGS.pdf 1.06MB
310233_PERMIT DRAWINGS.pdf 2.51MB
Location Map.pdf 500.2KB
Topo Map.pdf 394.72KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
1/27/2021