Loading...
HomeMy WebLinkAbout20210046 Ver 1_Ashe 355 EC plans for PCN_20210208 GRAPHIC SCALE STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 1/20/2021X:\NCDOT\Div 11 Ashe 355\Drainage\Erosion Control\Ashe355_EC_dsn_TSH.dgnUser:acochrane PLAN FOR PROPOSED HIGHWAY EROSION CONTROL EROSION AND SEDIMENT CONTROL MEASURES Temporary Silt Ditch Temporary Silt Fence Silt Basin Type B Stilling Basin TDTemporary Diversion Temporary Rock Silt Check Type-B Temporary Rock Silt Check Type-A Temporary Rock Sediment Dam Type-A Temporary Rock Sediment Dam Type-B Type A Type B Type C A B C Temporary Silt Fence TSD Std. #Description Symbol Temporary Berms and Slope Drains Rock Inlet Sediment Trap: 1630.03 1630.05 1605.01 1622.01 1633.01 1634.01 1634.02 1635.01 1635.02 1630.04 1632.01 1632.02 1632.03 Rock Pipe Inlet Sediment Trap Type-A Rock Pipe Inlet Sediment Trap Type-B EC-1 1606.01 Special Sediment Control Fence Skimmer Basin Tiered Skimmer Basin Infiltration Basin Special Stilling Basin1630.06 Temporary Rock Silt Check Type-A with Matting and Polyacrylamide (PAM) Wattle/Coir Fiber Wattle Wattle/Coir Fiber Wattle with Polyacrylamide (PAM) 1630.02 1633.02 EW CFW Prepared in the Office of: NAME LEVEL III CERTIFICATION NO. 2550 0 50 100 PLANS VICINITY MAP NOT TO SCALE Designed by: for Special Considerations. Refer To E. C. Special Provisions to Sta. From Sta. High Quality Water Zone(s) Exist ON THIS PROJECT HIGH QUALITY WATER(S) EXIST for Special Considerations. Refer To E. C. Special Provisions ON THIS PROJECT SENSITIVE AREA(S) EXIST ENVIRONMENTALLY STANDARDS. SENSITIVE WATERSHED BEEN DESIGNED TO THIS PROJECT HAS End Begin CONSTRUCTION. GRUBBING PHASE OF FOR CLEARING AND EROSION CONTROL PLANS THIS PROJECT CONTAINS Temporary Rock Sediment Dam Type A Temporary Rock Sediment Dam Type B Temporary Silt Fence Roadway Standard Drawings The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design revison thereto are applicable to this project and by reference hereby are considered a part of these plans. Rock Pipe Inlet Sediment Trap Type A 1634.01 1634.02 1635.01 1605.01 1630.01 Temporary Berms and Slope Drains 1606.01 1622.01 Special Sediment Control Fence Riser Basin 1635.02 Rock Pipe Inlet Sediment Trap Type B 1604.01 Railroad Erosion Control Detail 1607.01 Gravel Construction Entrance 1630.05 Temporary Diversion 1630.04 Stilling Basin 1630.03 Temporary Silt Ditch 1630.02 Silt Basin Type B 1630.06 Special Stilling Basin 1631.01 Matting Installation 1632.02 1632.01 Rock Inlet Sediment Trap Type B Rock Inlet Sediment Trap Type A 1632.03 Rock Inlet Sediment Trap Type C 1633.01 1633.02 Temporary Rock Silt Check Type B Temporary Rock Silt Check Type A 1640.01 1645.01 Temporary Stream Crossing Unit - N. C. Department of Transportation - Raleigh, N. C., dated January 2018 and the latest Coir Fiber Baffle 17BP.11.R.162 17BP.11.R.162 17BP.11.R.162 N/A N/A N/A PE R/W & UTIL. CONST. TGS ENGINEERS Andrew H. Cochrane, PE 3015 SHELBY, NC 28150 804-C N. LAFAYETTE ST. ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES. AND ISSUED BY THE NORTH CAROLINA DEPARTMENT OF GENERAL CONSTRUCTION PERMIT EFFECTIVE APRIL 1, 2019 THE APPLICABLE REGULATIONS SET FORTH BY THE NCG-010000 THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY WITHPROJECT: 17BP.11.R.162ASHE COUNTY TYPE OF WORK: GRADING, DRAINAGE, PAVING, AND STRUCTURE ON SR 1181 (HARTZOG FORD ROAD) LOCATION: BRIDGE NO. 040355 OVER SOUTH FORK NEW RIVER 17BP.11.R.162 17BP.11.R.162 END PROJECT -L- STA. 19+50.00 17BP.11.R.162 BEGIN PROJECT -L- STA. 13+00.00 SR 1181 -L- BEGIN BRIDGE -L- STA. 15+70.48 END BRIDGE -L- STA. 17+43.52SOUTH FORK NEW RI VERHARTZOG FORD RDHARTZO G FORD RDTO US 221 TO NC 163 -DR1- STA. 11+60.00 17BP.11.R.162 END CONSTRUCTION -DR2- STA. 10+00.00 17BP.11.R.162 BEGIN CONSTRUCTION - D R2- - D R1- 17BP.11.R.162 BEGIN PROJECT -L- STA. 13+00.00 LOCATION PROJECT Obids 1181 Yates Idlewild Par kwayRidge Blue16 163 11811180 1179 1003 1168 1166 1167 1268 1165 1159 1183 1181 1181 1180 1181 1196 1201 1192 1159 1187 1633 1159 Sout h For kNew Ri ver NAD 83/ 2011 FLOW A A WIDTH PLAN SECTION A-A SECTION B-B B B 2/3 CHANNEL STRUCTURAL STONE SEDIMENT CONTROL STONE 12" MATTING EXCELSIOR MATTING EXCELSIOR CLASS B STONE PAM INSET A See Inset A USE EXCELSIOR FOR MATTING MATERIAL AND ANCHOR MATTING SECTION AT TOP AND BOTTOM WITH CLASS B STONE. TO TOP OF MATTING SECTION AND AFTER EVERY RAINFALL EVENT THAT EQUALS OR EXCEEDS 0.50 INCHES. MATTING EXCELSIOR CLASS B STONE HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. NOT TO SCALE EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM) TEMPORARY ROCK SILT CHECK TYPE 'A' WITH TO BE APPLIED TO EACH ROCK SILT CHECK. MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT A SOIL SAMPLE FROM PROJECT LOCATION, AND FROM OFFSITE PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN INITIALLY APPLY 4 OUNCES OF POLYACRYLAMIDE (PAM) (4 OZ.) H = 2' MIN 1' MIN 1' MIN ACCORDANCE WITH ROADWAY STANDARD DRAWING NO. 1633.01. INSTALL TEMPORARY ROCK SILT CHECK TYPE A IN NOTES: 17BP.11.R.162 EC-2 SHEET NO.PROJECT REFERENCE NO. DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 17BP.11.R.162 SITE DESCRIPTION SOIL STABILIZATION TIMEFRAMES STABILIZATION TIME 7 DAYS TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. NONE SLOPES 3:1 OR FLATTER 14 DAYS 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH. ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 NONE, EXCEPT FOR PERIMETERS AND HQW ZONES. EC-3 POT Sta. 23+40.00 020203030404 02 01 01 00 02 03 04 05 02 01 02 -L- STA 19+50.00 17BP.11.R.162 END PROJECT -L- STA 17+43.52 END BRIDGE -L- STA 15+70.48 BEGIN BRIDGE -L- PC 17+52.19 -L- STA 13+00.00 17BP.11.R.162 BEGIN PROJECT -L- STA. 14+26.52 BEGIN FDPS 15'TYP.+2010'10'9.3'9.0' REMOVE EXIST. BRIDGE -L- PT 15+62.19 -L- PT 20+32.86 -L- PRC 19+00.57 -L- PRC 18+03.18 -L- PC 13+45.90 -L- PCC 14+90.12 20+00 15+00 9.1'9.3'.TSIXE OT REPAT '05+00 040045 049007 REPAT '05.TSIXE OTTYP.15'+50 +30 10' 10'15'TYP.+15 AT-1 AT-1 PI Sta 14+18.05 D L = 144.22' T = 72.14' R = 1,900.00' PI Sta 15+34.04 D L = 72.07' T = 43.92' R = 50.00' PI Sta 17+80.15 D L = 50.99' T = 27.96' R = 50.00' PI Sta 18+51.98 D L = 97.39' T = 48.80' R = 600.00' PI Sta 19+66.71 D L = 132.29' T = 66.14' R = 10,000.00' -L- CURVE DATA DS = 15 MPH SE = NC DS = 20 MPH DS = 15 MPH SE = NC DS = 35 MPH SE = NC PI Sta 10+16.45 D L = 32.31' T = 16.45' R = 70.00' PI Sta 10+63.74 D L = 62.54' T = 31.43' R = 250.00' 10+00 (R=10') SHOP CURVE B-83 (R=10') SHOP CURVE B-83GREU TL-2GREU TL-28:18:1-DR2- PT 10+94.85 -DR2- PRC 10+32.31 -DR2- PC 10+00.00 -DR1- CURVE DATA -DR2- CURVE DATA -L- STA. 19+19.74 END FDPS -L- STA. 17+87.50 END SBG -DR2- STA. 10+81.21 END SBG +8 5 .5 8 80'R 16' +07.34 25'R +41.3925'R PROP. ASPHALT DRIVE PROP. 16' ASPHALT DRIVE PROP. 10' ASPHALT DRIVE T YP.10'+50 04 -DR1- PRC 11+32.75 -DR1- PT 11+60.51 60'R+33.21 -DR1- PC 10+28.30 PI Sta 10+81.75 D L = 104.45' T = 53.45' R = 200.00' PI Sta 11+46.65 D L = 27.76' T = 13.90' R = 230.00' SE = NC -DR1- STA. 10+78.18 END FDPS -DR2- STA. 10+52.07 BEGIN FDPS 0302 01 01 =-L- POC 17+71.00 -DR2- POT 11+20.50 =-L- POC 15+45.00 -DR1- POT 10+00.00 +7010'T YP.000001 -DR1- STA 11+60.00 END CONSTRUCTION -DR2- STA 10+00.00 BEGIN CONSTRUCTION10'-L- STA. 14+40 TO 15+30 RT BY THE RESIDENT ENGINEER BE CONSIDERED IF APPROVED TO BENCHING MAY NOTE: ALTERNATIVE METHODS B1 (R=37') SHOP CURVE TYPE III (R=37') SHOP CURVE TYYPE III FIREPIT 24" CMP 24" CMP 36" CMPSOUTH FORK NEW RIVER8' GR 8' GR 13' GR 12' GR 10' CONC11' GRSI DEWALK24" ROCKSTEPS42" WD7' GRWOODS WOODS WOODSPILE DEBRIS WALL 6" ROCK 18" C MPELLIS RDTT J EAN F PI NNI XBOBBY W PI NNI XHELEN L HARTZOG SUE HARTZOG FISHER MARTHA D BARKERCHRI S TOP HER W BARKERHELEN L HARTZOG 30.00' 30.00'DB 15 5 P G 1 9 5 3 DB 15 5 P G 19 5 3 3 0' R/WBRIDGE #355HARTZOG FORD RD - SR 1181HARTZOG FORD RD - SR 118124" HDPE GUY 15" C MP 15" CMP PASTURE P AST URE 1SFD36" 1S ELEC18" CMP18" CMP36" 3SBW 36" 2SBW36" 2SBW ELEC1SFD WALL 12" ROCK LT36"WD SPLI T RAI LWIRERAIL18"WD W S DILAPIDATED2 34 57WD/BST DECKEXI S TI NG R/WE XI S TI NG R/WP RI VATE 3 0' R/WWOODS WOODS WOODS WOODS SOUTH FORK NE W RIVER F F F F F F F F F F F F F F F F F C C C C C C C C C C C C C F C C C C C C C C F C C F F C C F F 2 8 0 0 2 8 0 0 280028002800 280028002800280028002800 28002800285028502850285028502850 28502850 285028502850 290029002900290029002900 2950295029502950 2950295030003000300015"TB 2GI 6 SY GEO 2 TONS, RIP RAP CLASS 1 0404 0401 0402 2GI TB ITEM) (STRUCTURES RIP RAP (TYP.) CLASS II 24" (SEE DETAIL B) SPECIAL CUT DITCH @ MIN. 0.2% TO DRAIN WARP GUTTER 0406 RETAIN REMOVE (SEE DETAIL E) EMBANKMENT RIP RAP AT 0405 42" RCP-IV REMOVE RCP-IV30" ( Not to Scale) PIPE OUTLET STABILIZATION Ground Natural Ground Natural EXI STI NG BANKEXISTING BANK d d=3 Ft. Length=14 Ft. KEYED-IN (TYP.) CLASS I RIP-RAP DETAIL A -L- STA 13+27 LT 15 TONS CLASS I (SEE DETAIL A) PIPE OUTLET STABILIZATION HW 0403 REMOVE ( Not to Scale) PIPE OUTLET STABILIZATION Ground Natural Ground Natural EXI STI NG BANKEXISTING BANK d d=3 Ft. Length=12 Ft. KEYED-IN (TYP.) CLASS I RIP-RAP DETAIL D -L- STA 18+39 RT ( Not to Scale) RIP RAP AT EMBANKMENT DETAIL E KEYED-IN (TYP.) CLASS I RIP-RAP 18"Pipe FROM -DR1- STA 10+98 TO 11+08 LT EXISTING BANK Type of Liner= 6 TONS, CL I Rip-Rap Flatter4:1 or D2:1( Not to Scale) SPECIAL CUT DITCH DETAIL B Min. D= 1 Ft. (-DR2-) Min. D= 2 Ft. (-L-) Ground Natural Slope Ditch Front 1:1*FROM -L- STA. 17+83 TO 18+30 LT FROM -DR2- STA. 10+80 TO 11+21 LT *(1:1 SLOPE FROM -L- STA. 14+50 TO 15+00 RT) FROM -L- STA. 13+50 TO 15+00 RT CONCRETE ABUTMENT RETAIN EXISTING DOWN TO STREAMBED ELEVATION REMOVE EXISTING CONCRETE FOOTINGS CONCRETE ABUTMENT RETAIN EXISTING 15 TONS CLASS I (SEE DETAIL D) STABILIZATION PIPE OUTLET BURY INV. 0.5' INV. 0.7' BURY INV. 0.7' BURY 15" R C P-I V(SEE DETAIL B) DITCH SPECIAL CUT 2:1 or Flatter D Flatter3:1 or d ( Not to Scale) SPECIAL CUT DITCH FROM -DR1- STA. 10+60 TO 10+94 RT DETAIL C Min. d= 1 Ft. Min. D= 1 Ft. Type of Liner= CL B Rip-Rap Slope Ditch Front Ground Natural Geotextile 24 SY GEO 11 TONS CLASS B (SEE DETAIL C) SPECIAL CUT DITCH 01 02 01Z HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. EC-4/CONST.4 CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 804-C N. LAFAYETTE ST TGS ENGINEERS BY REMOVAL OF END BENTS. RAP, BUT WILL BE EXPOSED WILL NOT BE PLATED IN CLASS II RIP STREAMBANK AT LOCATIONS WHICH PLACE COIR FIBER MATTING ALONG THE PRACTICES FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL. NCDOT BEST MANAGEMENTAREA STABILIZED AND ACCORDING TO INSTALL PIPE(S) IN JURISDICTIONAL AREAS WITHOUT IMPACTING STREAM UNTILNOTE: STILLING BASIN WHERE APPLICABLE. UTILIZE SPECIAL STILLING BASIN(S) AS CONSTRUCTION SHEET 4 EROSION CONTROL FOR CLEARING AND GRUBBING NOTE: PLACE TEMPORARY ROCK SEDIMENT DAMS TYPE - B AND TEMPORARY ROCK SILT CHECKS TYPE - A AT DRAINAGE OUTLETS. SEE PROJECT SPECIAL PROVISIONS ENVIRONMENTALLY SENSITIVE AREANAD 8 3/ 2 0 1 1 Bridge #040355 Ashe County 17BP.11.R.162 BY REMOVAL OF END BENTS. RAP, BUT WILL BE EXPOSED WILL NOT BE PLATED IN CLASS II RIP STREAMBANK AT LOCATIONS WHICH PLACE COIR FIBER MATTING ALONG THE DIKES IMPERVIOUS B POT Sta. 23+40.00 020203030404 02 01 01 00 02 03 04 05 02 01 02 -L- STA 19+50.00 17BP.11.R.162 END PROJECT -L- STA 17+43.52 END BRIDGE -L- STA 15+70.48 BEGIN BRIDGE -L- PC 17+52.19 -L- STA 13+00.00 17BP.11.R.162 BEGIN PROJECT -L- STA. 14+26.52 BEGIN FDPS 15'TYP.+2010'10'9.3'9.0' REMOVE EXIST. BRIDGE -L- PT 15+62.19 -L- PT 20+32.86 -L- PRC 19+00.57 -L- PRC 18+03.18 -L- PC 13+45.90 -L- PCC 14+90.12 20+00 15+00 9.1'9.3'.TSIXE OT REPAT '05+00 040045 049007 REPAT '05.TSIXE OTTYP.15'+50 +30 10' 10'15'TYP.+15 AT-1 AT-1 PI Sta 14+18.05 D L = 144.22' T = 72.14' R = 1,900.00' PI Sta 15+34.04 D L = 72.07' T = 43.92' R = 50.00' PI Sta 17+80.15 D L = 50.99' T = 27.96' R = 50.00' PI Sta 18+51.98 D L = 97.39' T = 48.80' R = 600.00' PI Sta 19+66.71 D L = 132.29' T = 66.14' R = 10,000.00' -L- CURVE DATA DS = 15 MPH SE = NC DS = 20 MPH DS = 15 MPH SE = NC DS = 35 MPH SE = NC PI Sta 10+16.45 D L = 32.31' T = 16.45' R = 70.00' PI Sta 10+63.74 D L = 62.54' T = 31.43' R = 250.00' 10+00 (R=10') SHOP CURVE B-83 (R=10') SHOP CURVE B-83GREU TL-2GREU TL-28:18:1-DR2- PT 10+94.85 -DR2- PRC 10+32.31 -DR2- PC 10+00.00 -DR1- CURVE DATA -DR2- CURVE DATA -L- STA. 19+19.74 END FDPS -L- STA. 17+87.50 END SBG -DR2- STA. 10+81.21 END SBG +8 5 .5 8 80'R 16' +07.34 25'R +41.3925'R PROP. ASPHALT DRIVE PROP. 16' ASPHALT DRIVE PROP. 10' ASPHALT DRIVE T YP.10'+50 04 -DR1- PRC 11+32.75 -DR1- PT 11+60.51 60'R+33.21 -DR1- PC 10+28.30 PI Sta 10+81.75 D L = 104.45' T = 53.45' R = 200.00' PI Sta 11+46.65 D L = 27.76' T = 13.90' R = 230.00' SE = NC -DR1- STA. 10+78.18 END FDPS -DR2- STA. 10+52.07 BEGIN FDPS 0302 01 01 =-L- POC 17+71.00 -DR2- POT 11+20.50 =-L- POC 15+45.00 -DR1- POT 10+00.00 +7010'T YP.000001 -DR1- STA 11+60.00 END CONSTRUCTION -DR2- STA 10+00.00 BEGIN CONSTRUCTION10'-L- STA. 14+40 TO 15+30 RT BY THE RESIDENT ENGINEER BE CONSIDERED IF APPROVED TO BENCHING MAY NOTE: ALTERNATIVE METHODS B1 (R=37') SHOP CURVE TYPE III (R=37') SHOP CURVE TYYPE III FIREPIT 24" CMP 24" CMP 36" CMPSOUTH FORK NEW RIVER8' GR 8' GR 13' GR 12' GR 10' CONC11' GRSI DEWALK24" ROCKSTEPS42" WD7' GRWOODS WOODS WOODSPILE DEBRIS WALL 6" ROCK 18" C MPELLIS RDTT J EAN F PI NNI XBOBBY W PI NNI XHELEN L HARTZOG SUE HARTZOG FISHER MARTHA D BARKERCHRI S TOP HER W BARKERHELEN L HARTZOG 30.00' 30.00'DB 15 5 P G 1 9 5 3 DB 15 5 P G 19 5 3 3 0' R/WBRIDGE #355HARTZOG FORD RD - SR 1181HARTZOG FORD RD - SR 118124" HDPE GUY 15" C MP 15" CMP PASTURE P AST URE 1SFD36" 1S ELEC18" CMP18" CMP36" 3SBW 36" 2SBW36" 2SBW ELEC1SFD WALL 12" ROCK LT36"WD SPLI T RAI LWIRERAIL18"WD W S DILAPIDATED2 34 57WD/BST DECKEXI S TI NG R/WE XI S TI NG R/WP RI VATE 3 0' R/WWOODS WOODS WOODS WOODS SOUTH FORK NE W RIVER F F F F F F F F F F F F F F F F F C C C C C C C C C C C C C F C C C C C C C C F C C F F C C F F 15"TB 2GI 6 SY GEO 2 TONS, RIP RAP CLASS 1 0404 0401 0402 2GI TB ITEM) (STRUCTURES RIP RAP (TYP.) CLASS II 24" (SEE DETAIL B) SPECIAL CUT DITCH @ MIN. 0.2% TO DRAIN WARP GUTTER 0406 RETAIN REMOVE (SEE DETAIL E) EMBANKMENT RIP RAP AT 0405 42" RCP-IV REMOVE RCP-IV30" ( Not to Scale) PIPE OUTLET STABILIZATION Ground Natural Ground Natural EXI STI NG BANKEXISTING BANK d d=3 Ft. Length=14 Ft. KEYED-IN (TYP.) CLASS I RIP-RAP DETAIL A -L- STA 13+27 LT 15 TONS CLASS I (SEE DETAIL A) PIPE OUTLET STABILIZATION HW 0403 REMOVE ( Not to Scale) PIPE OUTLET STABILIZATION Ground Natural Ground Natural EXI STI NG BANKEXISTING BANK d d=3 Ft. Length=12 Ft. KEYED-IN (TYP.) CLASS I RIP-RAP DETAIL D -L- STA 18+39 RT ( Not to Scale) RIP RAP AT EMBANKMENT DETAIL E KEYED-IN (TYP.) CLASS I RIP-RAP 18"Pipe FROM -DR1- STA 10+98 TO 11+08 LT EXISTING BANK Type of Liner= 6 TONS, CL I Rip-Rap Flatter4:1 or D2:1( Not to Scale) SPECIAL CUT DITCH DETAIL B Min. D= 1 Ft. (-DR2-) Min. D= 2 Ft. (-L-) Ground Natural Slope Ditch Front 1:1*FROM -L- STA. 17+83 TO 18+30 LT FROM -DR2- STA. 10+80 TO 11+21 LT *(1:1 SLOPE FROM -L- STA. 14+50 TO 15+00 RT) FROM -L- STA. 13+50 TO 15+00 RT CONCRETE ABUTMENT RETAIN EXISTING DOWN TO STREAMBED ELEVATION REMOVE EXISTING CONCRETE FOOTINGS CONCRETE ABUTMENT RETAIN EXISTING 15 TONS CLASS I (SEE DETAIL D) STABILIZATION PIPE OUTLET BURY INV. 0.5' INV. 0.7' BURY INV. 0.7' BURY 15" R C P-I V(SEE DETAIL B) DITCH SPECIAL CUT 2:1 or Flatter D Flatter3:1 or d ( Not to Scale) SPECIAL CUT DITCH FROM -DR1- STA. 10+60 TO 10+94 RT DETAIL C Min. d= 1 Ft. Min. D= 1 Ft. Type of Liner= CL B Rip-Rap Slope Ditch Front Ground Natural Geotextile 24 SY GEO 11 TONS CLASS B (SEE DETAIL C) SPECIAL CUT DITCH 01 02 01Z HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. EC-4/CONST.4 CORP. LICENSE NO.: C-0275 PH (704) 476-0003 SHELBY, NC 28150 804-C N. LAFAYETTE ST TGS ENGINEERS BY REMOVAL OF END BENTS. RAP, BUT WILL BE EXPOSED WILL NOT BE PLATED IN CLASS II RIP STREAMBANK AT LOCATIONS WHICH PLACE COIR FIBER MATTING ALONG THE NOTE: STILLING BASIN WHERE APPLICABLE. UTILIZE SPECIAL STILLING BASIN(S) AS NAD 8 3/ 2 0 1 1 Bridge #040355 Ashe County 17BP.11.R.162 BY REMOVAL OF END BENTS. RAP, BUT WILL BE EXPOSED WILL NOT BE PLATED IN CLASS II RIP STREAMBANK AT LOCATIONS WHICH PLACE COIR FIBER MATTING ALONG THE Wetlands as Work Allows. on Slopes Adjacent to Permitted Place Matting for Erosion Control Entire Slope as Work Allows. Install Matting for Erosion Control on For Slopes Excavated Greater Than 10 feet EC-5/CONST.4 EST. 70 SY -L- STA 17+83 TO 18+30 LT PROPOSED DITCH LINE INSTALL MATTING IN THE EST. 30 SY -DR2- STA 10+80 TO 11+21 LT PROPOSED DITCH LINE INSTALL MATTING IN THE C C B DIKES IMPERVIOUS STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS SHEET HEALING IN DIBBLE PLANTING METHOD firming soil at top. 5. Push handle forward PLANTING NOTES: N.C.D.O.T. - ROADSIDE ENVIRONMENTAL UNIT protected area. 1. Locate a healing-in site in a shady, well the root collar is at ground level. against the sloping end so that 4. Place a single layer of plants as necessary and water thoroughly. 6. Repeat layers of plants and sawdust correct depth. and place seedling at 2. Remove planting bar USING THE KBC PLANTING BAR SEEDLING / LINER BAREROOT PLANTING DETAIL PLANTING DETAILS MIXTURE, TYPE, SIZE, AND FURNISH SHALL CONFORM TO THE FOLLOWING: toward planter. as shown and pull handle 1. Insert planting bar root systems from drying. container to prevent the canvas bag or similar shall be kept in a moist During planting, seedlings PLANTING BAG soil at bottom. toward planter, firming 4. Pull handle of bar thoroughly. hole open. Water 6. Leave compaction 12 inches deep and provide drainage. 2. Excavate a flat bottom trench a sloping angle. sawdust over the roots maintaining 5. Place a 2 inch layer of well rotted at one end of the trench. well rotted sawdust at a sloping angle rotted sawdust. Place a 2 inch layer of 3. Backfill the trench with 2 inches well 2 inch from seedling. 2 inches toward planter 3. Insert planting bar 1 inch thick at center. 4 inches wide and be 12 inches long, cross section, and shall blade with a triangular Planting bar shall have a KBC PLANTING BAR root collar. 10 inches below the no roots extend more than pruned, if necessary, so that All seedlings shall be root ROOT PRUNING REFORESTATION AVERAGING 8 FT. ON CENTER, APPROXIMATELY 680 PLANTS PER ACRE. TREE REFORESTATION SHALL BE PLANTED 6 FT. TO 10 FT. ON CENTER, RANDOM SPACING, REFORESTATION REFORESTATION DETAIL SHEET RF-117BP.11.R.162N.C. 25% NYSSA SYLVATICA 25% BETULA NIGRA 25% PLATANUS OCCIDENTALIS 25% LIRIODENDRON TULIPIFERA BLACK GUM RIVER BIRCH SYCAMORE TULIP POPLAR 12 in - 18 in BR 12 in - 18 in BR 12 in - 18 in BR 12 in - 18 in BR