Loading...
HomeMy WebLinkAbout20111109 Ver 2_401 Application_20120312W A T�c9OG r O Y n- nz)R vz Office Use Only Corps action ID no DWQ project no Form Version 14 January 2009 Page 1 of 10 PCN Form — Version 14 January 2009 Pre - Construction Notification (PCN) Form A Applicant Information 1 Processing la Type(s) of approval sought from the Corps ❑ Section 404 Permit ❑ Section 10 Permit 1 b Specify Nationwide Permit (NWP) number or General Permit (GP) number 1 c Has the NWP or GP number been verified by the Corps? ❑ Yes ❑ No Id Type(s) of approval sought from the DWQ (check all that apply) ❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ® (- Ripanan Buffer Authorization le Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ❑ No For the record only for Corps Permit ❑ Yes ❑ No If Is payment into a mitigation bank or m lieu fee program proposed fon_ _ lmitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program) ❑ `Y s ®No} � g Is Is the project located in an of NC s twenty p j y M_ nty coastal counties If yes answer 1hi ❑tYes,� ®rN� 11 h Is the project located within a NC DC_M Area of Environmental_ Concern (AEC) ?) ❑LYeS ®`N] 2 Project formation (_ a7 N_ ame _ of r_� dtl Giles Landscaping 103 Cumulus Ct Cary �2b CouMy } Wake �2c Nearest municipality / town j Cary (2­d Subdiwswn name) Weatherstone 2e NCDOT only T I P or state project no r Owner Inform t oiaorm (3a Name(s) on Recorded Deed j Douglas Alan Giles & Kim C Giles tab Deed Book and Page No 6193 345 p U 1J (3c Responsible Party (for LLCM applicable) ; 012 (3d Street address-, 103 Cumulus Ct tae City state zrp; Cary NC 27513 rNgTER� rand+ 919 -467 8974 Stan s 3f Telephone no 3g Fax no J ,_3h Email address giles@mmdspring corn Page 1 of 10 PCN Form — Version 14 January 2009 t41 Applicant information (if dif_fe_rent from owner 4a Apphcant ❑ n) ❑Cgther_speafy 4b Name (4c Business name ((if applicable) ) 4d Street address (4e City state zi j 4f _Telephone n�o (4g Fax no � C4h Email ddress i Agent/Consultant Information (if appllcable)� 5a NName (5b Business name} ((d applicable)) c Ea ddress 5d City state zips 5e Telephone n 5 Fax no 5g Email addre Page 2 of 10 LB Project Information and Prior Project History ,Property Identification` 1a Property identification no (tax PIN_or parcel ID j PIN #0754316994 1b Site coordinates (in decima(degrees) I Latitude 35 788518 Longitude; 78 819139 t1c Property siz 0 31 e n Surface Waters) Na Nam_e_ of nearest body of water to proposed project) Bond Lake (2b Water Quality Classification of nearest receiving water ,2c R ver basin Neuse n Pro ect Descriptlon 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this; �aPPlication .�.� _ � —� — Grass backyard 3b List the total estimated acreage of all existing wetlands on the property (3c Ust the total estimated linear feet of all existing streams (intermittent and perennial) on the property) 30 LM _Ex plain (e purpose of the proposed project.) Reduce flooding u Oescnbi the overall project in detail indudmg the type of egwpment to be used, Regrading yard siopng towards stream -- 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the; Corps or State been requested or obtained for this property /) project (including all nor phases) in the past'? ®YeS� [](No) ❑(Unk Own n1 Comments ,I„auren w�iherspoon cvuQ 4b If the Corps made the jurisdictional determination what type of determination was made? Preliminary ❑ Final 4c �If yes who delineated the junsdidional areas? Name (if known)) (Agency /Consultant Company (Other) 4d (If yes list the dates of the Corps junsdictional determinations or State determinations and attach documentation I Amy Chapman 1/6/2012 —� �— 5 Prooject Histo lry , - - -- - - -- — - — r i5a Have permits or certifications been requested or obtainedfor� tthis project (including all prior phases) in the past? _ l _ � —, ❑Y� J@Ko [].Unknown) 5Eb If yes explain in detail according to help file instructions 6 (Future Project Plans) 6a Is this a phased proje t ❑ Yes ® No 6b (If yes explain CPagg 3 of 10�___ __ _ �PCN Form - version 14 January 2009 C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ❑ Streams —tributaries ® �AufFers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a Wetland impact number Permanent (P) or Temporary 2b Type of impact 2c Type of wetland 2d Forested 2e Type of jurisdiction Corps (404 10) or DWQ (401 other) 2f Area of impact (acres) W1 Choose one Choose one Yes/No VV2 Choose one Choose one Yes/No W3 Choose one Choose one Yes /No W4 Choose one Choose one Yes/No W5 Choose one Choose one Yes /No W6 Choose one Choose one Yes/No 2g Total Wetland Impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a Stream impact number Permanent (P) or Temporary (T) 3b Type of impact 3c Stream name 3d Perennial (PER) or intermittent (INT)? 3e Type of jurisdiction 3f Average stream width (feet) 3g Impact length (linear feet) S1 Choose one S2 Choose one S3 Choose one S4 Choose one S5 Choose one S6 Choose one 3h Total stream and tributary impacts 31 Comments Page 4 of 10 PCN Form — Version 14 January 2009 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then indi ually list all open water impacts below 4a Open water impact number Permanent (P) or Temporary 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f Total open water impacts 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed, the complete the chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f Total 5g Comments 5h Is a dam high hazard permit required? ❑ Yes ❑ No If yes permit ID no 51 Expected pond surface area (acres) 51 S¢e of pond watershed (acres) 5k. Method of construction I Buffer Impacts (for DWQ) If p�o�edt Hill impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitigation. then you MUST fill out Section D of this form E6a Projedt is in which protected —basin?) ® Neuse ❑ Tar Pamlico ❑ Catawba ❑ Randleman ❑ Other 6b — _� (Buffer Impa� lnumber -1 (Permanent (P) j (Tem ora 6c — - -� `Reason for impact 6d �_ —� Stream name 6e _ Buffed `1 mitigation required 6f Zone 1 impact (square] 7feet 6g— Zone 2 'impact ((square (feet B1 P Grading Drainage Easement No 2 850 1900 B2 Yes/No 133 Yes/No 134 Yes /No 65 Yes/No 136 Yes/No 6h Total Buffer Impacts 2850 1900 61' Comments Page 5 of 10 D Impact Justification and Mitigation 1 (Avoidance and Minimization) 1 a Csp-ecifici liy describe measures taken to avoid or minimize the proposed impacts in designing probe This project is to protect an existing back yard 1 b '-Specifically describe measures taken to avoid or minimize the proposed impacts through construction tec Silt fendng 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ❑ No 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes which mitigation option will be used for this project? ❑ Mitigation bank Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Choose one Type Choose one Type Choose one Quantity Quantity Quantity 3c Comments 4 Complete if Makina a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature Choose one 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 14 January 2009 6 u Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation ?) _ J Yes ®No 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the (amount of mitigation required 1 Zone �6cJ _ (Reason for impa� _ (6d 1 Total impact (square feet)/ �_ ;Multiplier) 4j ___ Required mitigation ((square feet) Zone 1 3 (2 for Catawba) Zone 2 15 6f Total buffer mitigation regw 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank) permittee responsible riparian buffer restorabon_payment into an approved in lieu fee fund)- 6h (Comments', Page 7 of 10 E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 (Diffuse Flow Plan ®Yes ❑ No) (1a Does the project include or Is it adjacent to protected riparian buffers Identified) (within one of the NC Riparian Buffer Protection Rules? I 1 b If yes then Is a diffuse flow plan included? if no explain why Storm water will sheet -flow off the completed project! ® Yes ❑ No 2 Stormwater Management Plan 2a What is the overall percent Imperviousness of this project? % 2b Does this project require a Stormwater Management Plan? ❑ Yes ❑ No 2c If this project DOES NOT require a Stormwater Management Plan explain why 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan 2e Who will be responsible for the review of the Stormwater Management Plan? 3 Certified Local Government Stormwater Review 3a In which local governments jurisdiction is this project? �3b Which of the following locally implemented stormwater management programs apply (check all that apply) ❑ Phase II ❑ NSW ❑ USMP ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been attached? ❑Yes ❑ No 4 DWQ Stormwater Program Review 4a Which of the following state - implemented stormwater management programs apply (check all that apply) ❑Coastal counties ❑HQW ❑ORW ❑Session Law 2006 246 ❑Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 14 January 2009 F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state/local) funds or the ❑ Yes ❑ No use of public (federal/state) land? lb If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State []Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval letter) ❑ Yes ❑ No Comments 2 Violations (DWQ Requirement) 2a is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolat-e--d) Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards i f ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after the fact permit application? Ely—es ® No �2 If you answered yes to one or both of the above quash nosrprovide an explanation of the violabon(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result 1 ❑ Yes ® No additional development which could impact nearby downstream water quality? 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative descnption j 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility Page 9 of 10 PCN Form – Version 14 January 2009 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or habitat? Yes ❑ No 5b Have you checked with the USFWS concerning Endangered Species Act impacts? ❑ Yes ❑ No 5c If yes Indicate the USFWS Field Office you have contacted 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑ No 6b What data sources did you use to determine whether your site would Impact Essential Fish Habitat? 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ Yes ❑ No 7b What data sources did you use to determine whether your site would impact historic or archeological resources? 8 Flood Zone Designation (Corps Requirement) 8a W►11 this project occur in a FEMA designated 100 -year floodplain? ❑ Yes ❑ No 8b If yes explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? Douglas A Giles / Kim C Giles �', _ �J Applicant/Agents Signature', Nenrs signature is valid only if an authonzabon f letter from the applicant is provided)) 03 11 2012 Patel `Ap ►Ip cant/Agents Printed Name Page 10 of 10 VT_CINITY MAP NOT TO SCALE MANHOLE AT CORNER / 72-25-46 jV t RON To 1 8 �E 7` ® IRON FOUND O MANHOLE ® SEWER CLEANOUT / 1 WATER METER s UTILITY c/ / o POLE E3 CATV r S ,u o �j J �j•.r w LOT 25 Q L 103 CUMULUS COURT o2i c QN,NNG� S LOT 24 ® 0.1101 ACX (BY COQRDINAT6) R,, C WOOD DECK 7`U U7 2 STORY BRICK 6 FRAME z UNCOVERED LANDING �JJ �l Cl ILLJ 0 0 v CUMULUS COURT 40' R/W l i AEGA r-e--5 e-'A dl LOT 23 iLINE DISTANCE Li 8.42 ' L2 9.38 ° C^AI {' r L -28221 r, rt c THIS PLAT IS OF A SURVEY OF AN EXISTING PARCEL OR PARCELS OF LAND NOT FOR RECORDATIOPd BoM 1992 PAGE 1430 DEED BOOK 6193 PAGE 346 qA _ 0 T LOT 24 PHASE 1 SECTION A WEATHEASTONE SUBDIVISION I HEREBY CERTIFY THAT THIS MAP IS CORRECT AND THAT THE BUILDING FO A' N L _ ON THE LOT AND THAT THERE ARE NO ENCROACHMENTS ON SAID LOT EXCEPT AS SHOWN. SURV'O HAS DRAWN LYNNIE CHK'O.LHS JOB 4035801 r 11 APRIL 20t17 SCALE: 1 30 ' SULLIVAN SURVEYING SURVEY FOR: LAND SURVEYORS DOUGLAS ALAN GILES 1143 -0 EXECUTIVE CIRCLE CARY, NORTH CAROLINA 27511 TELEPHONE: 919/ 469 -4738 KIM C. G I L E S