Loading...
HomeMy WebLinkAboutNC0005363_Discharge Outfall 001_20210210 DUKEW.H.Weatherspoon Plant 2 ENERGY® 491 Power Plant Rd Lumberton,NC 28358 PROGRESS Mailing Address: Kent Tyndall L.V.Sutton Energy Complex 801 Sutton Steam Plant Rd Wilmington,NC 28401 February 5, 2021 0 910.341-4775 t 910.341-4790 Certified Mail(2 copies) NCDEQ-DWR, FRO 225 Green Street, Suite 714 ECEWE Fayetteville, NC 28301 D Subject: Weatherspoon's February 2021 Discharge from Outfall 001 FEB / 0 202, Dear NCDEQ-DWR Regional Supervisor: NCDEQ/D wivNPDES In accordance with A. (1) Footnote 1 of National Pollutant Discharge Elimination System (NPDES) Permit No. NC0005363; we are submitting this written information on the February 1, 2021, discharge from Outfall 001 to the Lumber River. This written information is provided within ten (10) days of the discharge: • On January 27, 2021; the Weatherspoon site made verbal and email notification of plans to exercise the Outfall 001 sluice gate. This maintenance activity will result in a discharge from the cooling pond to the Lumber River. • At 11:45 AM on February 1, 2021; NPDES Outfall 001 was opened and started to discharge. • At 12:29 PM on February 1, 2021; verbal notification within 24-hours after discharge event was made to NC DWR-FRO. • At 12:32 PM on February 1, 2021; verbal notification within 24-hours after discharge event was made to Ms. Brena Jones, NCWRC. A voicemail was recorded. • At 12:35 PM on February 1, 2021; verbal notification within 24-hours after discharge event was made to NC DEQ Permitting Unit. • We will close NPDES Outfall 001 and stop the discharge once the cooling pond reaches normal operating level. We estimate this may take approximately 2-3 weeks. We are lowering the water level slowly since the Lumber River is in flood conditions. • We will monitor the discharge and provide the data as specified by our NPDES Permit. • Instream monitoringof the Lumber River will be conducted ducted upstream and downstream as required by our NPDES permit and reported on the monthly DMR. If there are any questions, please contact either: • Mr. Kent Tyndall, EHS Professional for the W. H. Weatherspoon Plant; phone (910) 341- 4775 or e-mail Kent.Tvndall@duke-energv.com; or • Ms. Elizabeth Glenn, Environmental Specialist with our Environmental Permitting and Compliance Group, phone (864) 642-8833 or email Elizabeth.Glenn@duke-energy.com. Weatherspoon's February 2021 Discharge from Outfall 001 February 5,2021 Page 2 I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true,accurate,and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. :: agn rely, y Station Manager C: Certified Mail(1 copy) NC DEQ- DWR, NPDES Permitting Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Certified Mail(1 copy) NC WRC 1722 Mail Service Center Raleigh, North Carolina 27699