HomeMy WebLinkAbout20210086 Ver 1_Pre-Filing Meeting Request_20210112ID#* 20210086
Version* 1
Regional Office* Raleigh Regional Office - (919) 791-4200
Reviewer List* Stephanie Goss
Pre -Filing Meeting Request submitted 1/12/2021
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Preston Butler
preston.butler@carolinaeco.com
Perry Creek Interceptor
Aaron Brower
Wake
Street Address
One Exchange Plaza
Address Line 2
aty
Raleigh
Rbstal / Zip Code
27601
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
State / Frovince / Region
NC
Country
USA
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below. *
This project is the repair and rehabilitation of approximately 7,500
linear feet of existing sanitary sewer along Perry Creek and
Greshams Lake in Wake County, NC. Attached is a copy of the
Aquatic Resources Map submitted to the USACE on 12/16/2020. The
map displays the wetlands and streams in and around the project
area. Exact project footprint and plans are not yet available.
Please give a couple of dates you are available for a meeting.
1 /19/2021
1 /26/2021
Please attach the documentation you would like to have the meeting about.
PerryCreek_Fig3_Aerial.pdf 9.51 MB
pdr only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 1/12/2021
001,
rJ yy',OW
y�r -
Je
r •� T .�
r �
+ Azt• :��
i #
Ok
4 S
( yy r //Aa��, w •
!1
're<
Y• I
. C.�--a - �_�. �:_ -. F,� .�,� -. �.: '?� �`�•+' £ � �l �,. l�rti Fy rig �---`�•' f '!s,
y e y
e ,
a i
• it
s
w:
i
3
N Map Date: November 2020 Perry Creek Interceptor
Study Area Pond (�7%CAROLINA Feet revised: Wake County, NC
, /ECOSYSTEMS 0 150 300 Perennial Stream dM Wetland revised: Figure 3: Aquatic Resources
2017 NC Statewide Aerial Photography Revised: Map (Sheet I of 2)