Loading...
HomeMy WebLinkAbout20120253 Ver 1_CAMA Application_20120312March 9 2012 MEMORANDUM TO Karen Higgins Webscape Unit Supervisor Division of Water Quality Raleigh FROM Doug Huggett Mayor Permits Processing Coordinator 120253 Resources SUBJECT CAMA/DREDGE & FILL Permit Application Review Applicant Bryan and Susie Perry, Frisco Shopping Center Protect Location 53610 NC Hwy 12 Frisco Dare County Proposed Protect Bulkhead Finger Piers Boat Slips Boat Ramp Dredging Dee Freeman Secretary Teo D MAR 1 2 20;2 QENR WATL.R ()U41 'etlands a. r.,.,..._. Ty Please indicate below your agency s position or viewpoint on the proposed project and return this form by 3/30/12 to 400 Commerce Avenue Morehead City, NC 2855,1 If you have any questions regarding the proposed project please contact Kelly Russell at (252) 264 3901 When appropriate in depth comments with supporting data are requested REPLY This agency has no objection to the project as proposed This agency has no comment on the proposed project This agency approves of the project only if the recommended changes are incorporated See attached This agency objects to the project for reasons described in the attached comments SIGNED DATE 1367 US 17 South Elizabeth City NC 27909 Phone 252 264 3901 1 FAX 252 264 3723 Internet www nccoastalmanagement net An Equal Opportunity 1 Affirmative Action Employer NorthCarohna Naturally 0 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1 APPLICANTS NAME Frisco Shopping Center Bryan & Susie Perry 2 LOCATION OF PROJECT SITE 53610 NC Hwy 12 Frisco Dare County adjacent to an unnamed canal leading to the Pamlico Sound Photo Index — 2006 172 -7876 (V 21) 2000 172 -2016 (W 3) 1998 33 757 (K 13) State Plane Coordinates - X 3017792 Y 568435 Quadrangle Buxton NC LL 3 INVESTIGATION TYPE CAMA D &F 4 INVESTIGATIVE PROCEDURE Dates of Site Visit - 2/16/2012 Was Applicant Present no 5 PROCESSING PROCEDURE Application Received Complete - March 8 2012 Office - Elizabeth City 6 SITE DESCRIPTION (A) Local Land Use Plan — Dare County Land Classification From LUP conservation (B) AEC(s) Involved EW PTA ES (C) Water Dependent yes (D) Intended Use commercial (E) Wastewater Treatment Existing — individual septic system Planned none (F) Type of Structures Existing — shopping center parking area fuel tanks 1 finger pier 1 platform Planned bulkhead 9 finger piers boatramp (G) Estimated Annual Rate of Erosion 2-4 ft/yr Source applicant 7 HABITAT DESCRIPTION [AREA] DREDGED FILLED Shade (A) Highground Estuarine Shoreline 6670 sq ft (B) Shallow Water Bottom Estuarine Waters 540 sq ft 1395 sq ft 297 sq ft (D) Total Area Disturbed 8902 sq ft (E) Primary Nursery Area no (F) Water Classification SA Open no 8 PROJECT SUMMARY The applicant proposes to construct 418 ft of new bulkheading construct 9 finger piers creating 9 boatslips in addition to one existing slip construct a boatramp and dredge a 36 ft by 15 ft area Field Investigation Report Page 2 Proiect Setting The proposed project is located at 53610 NC Hwy 12 in Frisco Dare County The project site is located adjacent to an unnamed canal and basin that leads to the Pamlico Sound The tract is 80 300 sq ft and is approximately 4 5 ft above normal water level (NWL) The property is developed with a commercial shopping center which currently houses a provisioning company convenience store and a US Post Office The site also has an existing parking area fuel tanks outbuildings for storage and an abandoned water treatment station The undeveloped areas are vegetated with typical lawn grasses and some pine trees A previous mayor permit was issued on this site in 2010 for the installation of the groundwater treatment system There are no known areas of archaeological significance in the project location The tract has approximately 433 ft of shoreline with no delineated wetlands On the western portion of the tract there is a small area of the shoreline along the canal that is stabilized with rip rap the remaining length of the shoreline is unstabilized The adjoining property to the west has an existing wood bulkhead and the adjoining property to the east has an unstabilized shoreline The Pamlico Sound and the adjoining canal are classified as SA in this area and are closed to shellfish harvesting The existing water depths in the canal range from -1 0 to 3 5 ft Development Proposal The applicant proposes to stabilize the shoreline construct a boatramp and excavate around the boatramp and construct finger piers creating 9 boatslips The proposed vinyl bulkhead will be 418 ft long with an average alignment of 2 8 ft waterward of NWL The maximum distance waterward of NWL is 10 ft The applicant plans to use the dried dredge spoil generated from the boatramp construction and excavation to fill behind the bulkhead The estimated rate of erosion along this shoreline is 2-4 ft according to the applicant The applicant also proposes to construct 9 finger piers in the basin The finger piers will be 11 ft long and 3 ft wide There will be 10 tie pilings at the end of the finger piers creating 9 boat slips extending out 25 ft from NWL The width of the basin is approximately 80 ft The water depth at the end of the proposed piers is 5 ft The applicant has also proposed to construct a 15 ft wide boatramp that will extend 15 ft below NWL in order to achieve navigable depths from the boatramp the applicant will excavate a 36 ft by 15 ft area an additional 2 ft to reach a final depth of 3 5 ft The proposed dredging will create approximately 62 cubic yards of sandy spoil material The dredge spoil will be temporarily stored in a 20 ft by 20 ft containment area surrounded by silt fencing and allowed to dry before being used as backfill for the proposed bulkheading Field Investigation Report Page 3 Anticipated Impacts The proposed bulkheading project will fill 1170 sq ft of Estuarine Waters (EW) Public Trust Area (PTA) Areas of Environmental Concern of the man made canal and basin and 6 270 sq ft of Estuarine Shoreline (ES) Areas of Environmental Concern (AEC) The proposed finger piers will shade 297 sq ft of EW /PTA AECs The proposed boatramp construction and excavation will fill 225 sq ft of EW /PTA AECs and excavate 540 sq ft of EW /PTA AECs The spoil containment area will temporarily fill 400 sq ft of ES AEC Temporary water turbidity will occur in the project area during construction Submitted by Kelly Russell Date March 8 2012 MAJOR PERMIT FEE MATRIX Applicant BRYAN & SUSIE PERRY, FRISCO SHOPPING CENTER Selection Development Type DCM % DWQ % 14300 1601 435100093 1625 6253) (24300 1602 435100095 2341) I Private non commercial J$250 E] development that does not 100%($250) 0%($0) involve the filling or excavation of any wetlands or open water areas AiiiiiliiiiM II Public or commercial E] development that does not $400 100%($400) 0%($0) involve the filling or excavation of any wetlands or open water areas III For development that involves the filling and /or excavation of up to 1 acre of wetlands and /or open water areas determine if A B C or D below applies III(A) Private non commercial development if $250 100%($250) 0%($0) General Water Quality Certification No 3490 (See attached ) can be applied III(B) Public or commercial ® development if General $400 100%($400) 0%($0) Water Quality Certification No 3490 (See attached) can be applied HI(C) if General Water Quality Certification No $400 60%($240) 40%($160) 3490 (see attached) could be applied but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life III(D) If General Water Quality Certification No $400 60%($240) 40%($160) 3490 (see attached) cannot be applied IV For development that El involves the filling and /or $475 60%($285) 40%($190) excavation of more than one acre of wetlands and /or open water areas Project Narrative Frisco Shopping Center February 6 2012 pr:rr- 11 COASTAL MANAGEMENT ELIZABETH CITY The shopping and convenience center in Frisco locally known as Frisco Shopping Center is a +/ 7 500 square foot building which houses a provisioning company convenience store and post office The site also contains support appurtenances such as parking fuel tanks (including bulk storage) out buildings for storage and an abandoned water treatment station which was installed to abate a petroleum release which has been remediated The site is adjacent to an unstabilized borrow pit which is connected to the sound by a canal which is partially stabilized with rock rip rap along the canal Within the borrow pit is one 10 x 10 dock and one pier Recent storms have resulted in erosion along the shoreline The applicant proposes to stabilize the 418 feet of shoreline with sheet pile vinyl bulkhead The maximum distance waterward of normal water level (NWL) will be 10 feet and the average alignment will be 2 8 feet waterward of NWL The bulkhead will be backfilled with clean sand resulting in fill bemg placed in +/ 1 170 square feet below NWL requinng approximately 90 cubic yards of material being placed below the surface water level The applicant also proposes to install additional piers to accommodate a total of nine boats (18 22 foot range) that will be used for recreational or commercial fishing Also proposed is the installation of a boat ramp which is 15 feet wide and will slope beyond the NWL 15 feet to access the 3 5 foot waters of the canal The +/ 36 x 15 area where the boat ramp will be installed and dust north of the boat ramp will be excavated to connect to 3 5 foot existing water depths The 15 x 20 highground area where the boat ramp will be installed will be sloped to the existing elevation of the adjacent site elevation A DgMM' 1 RECEIVED APPLICATION for F F B 8 2012 major Development Permit COASTAL MANAGEMENT (last revised 12/27/06) ELIZABETH CITY North Carolina DIVISION OF COASTAL MANAGEMENT 1 Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Frisco Shopping Center N/A Applicant 1 First Name MI Last Name Bryan L Perry Applicant 2 First Name MI Last Name Susie E Perry If additional applicants please attach an additional page(s) with names listed Mailing Address PO Box City State 25 Frisco NC ZIP Country Phone No FAX No 27936 USA 1 252 995 5366 ext Street Address (if different from above) City State ZIP 53610 NC 12 Hwy Frisco NC 27936 Email bryanlperry@embargmail com 2 Agent/Contractor Information Business Name Environmental Professionals Inc Agent/ Contractor 1 First Name I MI Last Name George H Wood Agent/ Contractor 2 First Name MI Last Name Mailing Address PO Box City State 3368 Kill Devil Hills NC ZIP Phone No 1 Phone No 2 27948 252 441 0239 ext 105 X252 423 1234 ext FAX No Contractor # 252 441 0721 Street Address (if different from above) City ; State ZIP 1404 S Virginia Dare Trail Kill Devil Hills NC 27948 Email - - — -- - - - — - - - - - -- -- obxwood @yahoo corn <Form continues on back> 252 808 2808 1 888 4RCOAST urwav anccoastalman- igernesnt net i Form DCM MP 1 (Page 2 of 4) RECEIVED r r n n nnin APPLICATION for Major Development Permit 3 Project Locafon Site Description a Total length of shoreline on the tract (ft) b Size of entire tract (sq ft ) County (can be multiple) Street Address I COASTAL MANAGEMENT c State Rd # Dare 53610 NC 12 Hwy ELIZABETH CITY NWL (normal water level) NC 12 Hwy Subdivision Name City State Zip None Frisco NC 27936 Phone No Lot No (s) (if many attach additional page with list) 252 995 5366 ext N/A a In which NC river basin is the project located? b Name of body of water nearest to proposed project Pasquotank Unnamed Creek/Canal c Is the water body identified in (b) above natural or manmade? d Name the closest major water body to the proposed project site ®Natural ❑Manmade ❑Unknown Pamlico Sound e Is proposed work within city limits or planning jurisdiction? f If applicable list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within Dare County 4 Site Description a Total length of shoreline on the tract (ft) b Size of entire tract (sq ft ) 433 (418 with straight line) measuring turns in a shoreline 80 300 sq ft c Size of individual lot(s) d Approximate elevation of tract above NHW (normal high water) or N/A NWL (normal water level) (If many lot sizes please attach additional page with a list) +/ 45 ❑NHW or ®NWL e Vegetation on tract some pines and lawngrass f Man made features and uses now on tract Retail store parking one pier rip rap storage buildings and sheds water treatment plant gas pump and canopy wooden bulkhead g Identify and describe the existing land uses adjacent to the proposed project site west commercial east undeveloped h How does local government zone the tract? i Is the proposed project consistent with the applicable zoning? commercial (Attach zoning compliance certificate if applicable) ®Yes ❑No ❑NA I Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No k Hasa professional archaeological assessment been done for the tract? If yes attach a copy []Yes ®No ❑NA If yes by whom? N/A I Is the proposed project located in a National Registered Historic District or does it involve a []Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> 252 808 2808 1 888 4RCOAST %&wwr nccoastallmanagement net Form DCM MP 1 (Page 3 of 4) RECEIVED G F R R >01? APPLICATION for Major Development Permit m (i) Are there wetlands on the site? ❑Yes ®No (n) Are there coastal wetlands on the site? COASTAL PIANAGtNIENT ❑Yes ®No ELIZABETH CITY (iii) If yes to either (i) or (u) above has a delineation been conducted? ❑Yes ®No (Attach documentation if available) n Describe existing wastewater treatment facilities LPP system o Describe existing drinking water supply source County p Describe existing storm water management or treatment systems none 5 Activities and Impacts a Will the project be for commercial public or private use? ®Commercial ❑Public/Government ❑Private /Community b Give a brief description of purpose use and daily operations of the project when complete The existing retail will continue to operate as a sporting goods convenience mart and post office with boating access via the proposed boat ramp The 9 slips will be used by small (18 22 foot) open boats for commercial and/or recreational fishing c Describe the proposed construction methodology types of construction equipment to be used during construction the number of each type of equipment and where it is to be stored The proposed bulkhead will be constructed of vinyl and backfilled The pilings and finger piers for the 10 slips will be installed using a wateget and hand tools The boat ramp will be poured on highground and pushed into place d List all development activities you propose piers and pilings for 9 slips bulkhead and boat ramp e Are the proposed activities maintenance of an existing project new work or both? both f What is the approximate total disturbed land area resulting from the proposed project? 8 960 ®Sq Ft or ❑Acres g Will the proposed project encroach on any public easement public accessway or other area []Yes ®No ❑NA that the public has established use of? h Describe location and type of existing and proposed discharges to waters of the state none i Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA If yes will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA Is there any mitigation proposed? ❑Yes ®No ❑NA If yes attach a mitigation proposal <Form continues on back> 252 808 2808 1 888 4RCOAST www nccopstalimanagement net Form DCM MP 1 (Page 4 of 4) APPLICATION for Mayor Development Permit 6 Addit►onallnformat-on In addition to this completed application form (MP 1) the following items below if applicable must be submitted in order for the application package to be complete Items (a) - (t) are always applicable to any major development application Please consult the application instruction booklet on how to properly prepare the required items below — — — - a A project narrative b An accurate dated work plat (including plan view and cross sectional drawings) drawn to scale Please give the present status of the -� proposed project Is any portion already complete? If previously authorized work clearly indicate on maps plats drawings to distinguish between work completed and proposed c A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site r - - d A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties e The appropriate application fee Check or money order made payable to DENR i f A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mad Such landowners must be advised that they have 30 days in , which to submit comments on the proposed project to the Division of Coastal Management Name Land s End Development LLC Phone No Address P O Box 890 Avon NC 27915 0890 I Name Carl M Bornfnend Phone No 252 995 -4440 , Address P O Box 399 Frisco NC 27936 Name Phone No Address I � g A list of previous state or federal permits issued for work on the project tract Include permit numbers permittee and issuing dates CAMA Major Permit #3 00 1 11 00 (installation of groundwater treatment system) h Signed consultant or agent authorization form if applicable 1 Wetland delineation if necessary I A signed AEC hazard notice for projects in oceanfront and inlet areas (Must be signed by property owner) k A statement of comphance with the N C Environmental Policy Act (N C G S 113A 1 10) if necessary If the project involves expenditure of public funds or use of public lands attach a statement documenting compliance with the North Carolina Environmental Policy Act j 7 Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application The project will be subject to the conditions and restrictions contained in the permit I certify that I am authorized to grant and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow up monitoring of the project I further certify that the information provided in this application is truthful to the best of my know RECEIVED Date February 6 2012 Print Name George H Wood CEP P S Signature Aw/i FEB 8 2012 Please indicate application attachments pertaining to your proposed project ®DCM MP 2 Excavation and Fill Information ❑DCM MP 5 Bridges and Cul erts COASTAL MANAGEMENT ELIZABETH CITY ❑DCM MP 3 Upland Development ®DCM MP4 Structures Information 252 808 2808 1 888 4RCOAST www ncccastalmanagernent net Form DCM MP -2 EXCAVATION and FILL (Except for budges and culverts) RECEIVED F F P 8 2'J'19, COASTAL VANpGOIENT ELLtiEcTf CITY Attach this form to Joint Application for CAMA Major Permit Form DCM MP 1 Be sure to complete all other sections of the Joint Application that relate to this proposed project Please include all supplemental information Describe below the purpose of proposed excavation and /or fill activities All values should be given in feet 1 EXCAVATION ❑This section not applicable a Amount of material to be excavated from below NHW or NWL in b Type of material to be excavated cubic yards sand 40 cubic yards 1 c (i) Does the area to be excavated include coastal wetlands /marsh (CW) submerged aquatic vegetation (SAV) shell bottom (SB) or other wetlands (WL)? If any boxes are checked provide the number of square feet affected ❑CW ❑SAV ❑SB OWL ®None (ii) Describe the purpose of the excavation in these areas to connect the boat ramp to 3 5 existing depth of the canal d High ground excavation in cubic yards 22 cubic yards 2 DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a Location of disposal area b Dimensions of disposal area behind the proposed bulkhead C (i) Do you claim title to disposal area? ®Yes ❑No ❑NA (ii) If no attach a letter granting permission from the owner (i) Does the disposal area include any coastal wetlands/marsh (CW) submerged aquatic vegetation (SAV) shell bottom (SB) or other wetlands (WL)? If any boxes are checked provide the number of square feet affected ❑CW ❑SAV ❑SB OWL ®None (ii) Describe the purpose of disposal in these areas Backfill for Bulkhead 433 x 2 8 x 1 5 d (i) Will a disposal area be available for future maintenance? ❑Yes ®No ❑NA (ii) If yes where? N/A (i) Does the disposal include any area in the water? ®Yes ❑No ❑NA (ii) If yes how much water area is affected? 1200 sq ft 252 808 2808 1 888- 4RCOAST www riccoastalmanaciement net revised 12126 06 Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL ) stabilization) Length 36 35 Width 15 15 Avg Existing 15 1 5 NA NA Depth Final Project 3 5 3 5 NA NA Depth 1 EXCAVATION ❑This section not applicable a Amount of material to be excavated from below NHW or NWL in b Type of material to be excavated cubic yards sand 40 cubic yards 1 c (i) Does the area to be excavated include coastal wetlands /marsh (CW) submerged aquatic vegetation (SAV) shell bottom (SB) or other wetlands (WL)? If any boxes are checked provide the number of square feet affected ❑CW ❑SAV ❑SB OWL ®None (ii) Describe the purpose of the excavation in these areas to connect the boat ramp to 3 5 existing depth of the canal d High ground excavation in cubic yards 22 cubic yards 2 DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a Location of disposal area b Dimensions of disposal area behind the proposed bulkhead C (i) Do you claim title to disposal area? ®Yes ❑No ❑NA (ii) If no attach a letter granting permission from the owner (i) Does the disposal area include any coastal wetlands/marsh (CW) submerged aquatic vegetation (SAV) shell bottom (SB) or other wetlands (WL)? If any boxes are checked provide the number of square feet affected ❑CW ❑SAV ❑SB OWL ®None (ii) Describe the purpose of disposal in these areas Backfill for Bulkhead 433 x 2 8 x 1 5 d (i) Will a disposal area be available for future maintenance? ❑Yes ®No ❑NA (ii) If yes where? N/A (i) Does the disposal include any area in the water? ®Yes ❑No ❑NA (ii) If yes how much water area is affected? 1200 sq ft 252 808 2808 1 888- 4RCOAST www riccoastalmanaciement net revised 12126 06 3 SHORELINE STABILIZATION ❑This section not applicable (If development is a wood groin use MP 4 — Structures) a Type of shoreline stabilization ®Bulkhead ❑Riprap ❑Breakwater /Sill ❑Other c Average distance waterward of NHW or NWL 2 8 e Type of stabilization material sheet vinyl g Number of square feet of fill to be placed below water level Bulkhead backfiil 1.170 Riprap Breakwater/Sill Other I Source of fill material from area excavated for boat ramp b Length 418 Width 1 d Maximum distance waterward of NHW or NWL 10 f 0) Has there been shoreline erosion during preceding 12 months? ®Yes ❑No ❑NA (u) If yes state amount of erosion and source of erosion amount information 2 4 feet applicant h Type of fill material sand 4 OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a (i) Will fill material be brought to the site? ❑Yes ❑No ❑NA b b) Will fill material be placed in coastal wetlands /marsh (CW) If yes (u) Amount of material to be placed in the water (m) Dimensions of fill area (iv) Purpose of fill submerged aquatic vegetation (SAV) shell bottom (SB) or other wetlands (WL)? If any boxes are checked provide the number of square feet affected ❑CW ❑SAV ❑SB OWL ❑None (u) Describe the purpose of the fill in these areas 15 GENERAL a How will excavated or fill material be kept on site and erosion b What type of construction equipment will be used (e g dragline controlled? backhoe or hydraulic dredge)? Material placed behind bulkhead smoothed and grassed water het hand tools backhoe to push boat ramp in place c (i) Will navigational aids be required as a result of the prolectl ❑Yes SNo [DNA (u) If yes explain what type and how they will be implemented February 6 2012 Date Frisco Shopping Center Project Name ECEIVED FEB 8 2012 COASTAL ELIZABETH CITY d (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes SNo SNA (u) If yes explain steps that will be taken to avoid or minimize environmental impacts George H Wood CEP PWS Agent for Frisco Shopping Center Applicant N e 1 App, is k Signature 252 808 2808 1 888 4RC€3AST www racc®asta7r7aaria eroren net revised 12126106 Form DCM MP -4 STRUCTURES (Construction within Public Trust Areas) RECEIVED L L CN" P 1NACOIENT ELI. L.Tw CITY Attach this form to Joint Application for CAMA Major Permit Form DCM MP 1 Be sure to complete all other sections of the Joint Application that relate to this proposed project Please include all supplemental information 1 DOCKING FACILITY /MARINA CHARACTERISTICS a (i) Is the docking facility /manna ❑Commercial ❑PublictGovernment ®Private /Commundy ❑ This section not applicable b (i) Will the facility be open to the general public? ®Yes []No c (i) Dock(s) and /or pier(s) d (i) Are Finger Piers included? ®Yes []No (u) Number 9 If yes (m) Length 25 (u) Number 9 (iv) Width 12 (oi) Length 11 (v) Floating []Yes ®No (iv) Width 3 (v) Floating ❑Yes ®No e (i) Are Platforms included? ❑Yes ®No f (i) Are Boatlifts included? ❑Yes ®No If yes If yes (u) Number (u) Number (iii) Length (iii) Length (iv) Width (iv) Width (v) Floating []Yes []No Note Roofed areas are calculated from dnp/ine dimensions g (i) Number of slips proposed h Check all the types of services to be provided 9 ❑ Full service including travel lift and /or rail repair or (u) Number of slips existing maintenance service 0 ❑ Dockage fuel and marine supplies ® Dockage ( wet slips ) only number of slips 9 ❑ Dry storage number of boats ® Boat ramp(s) number of boat ramps 1 ❑ Other please describe i Check the proposed type of siting ® Land cut and access channel ❑Open water dredging for basin and /or channel ❑Open water no dredging required ❑Other please describe k Typical boat length 22 m (i) Will the facility have tie pilings? ®Yes []No (u) If yes number of tie pilings? 10 j Describe the typical boats to be served (e g open runabout charter boats sad boats mixed types) open runabout I (i) Will the facility be open to the general public? ®Yes ❑No 252 808 2808 1 888 4RCOAST wvvvtv nccoastalmanagement net revised 12/27106 Form 0CM MP ®4 (Structures Page 2 of 4) 2 DOCKING FACILITY /MARINA OPERATIONS ®This section not applicable a Check each of the following sanitary facilities that will be included in the proposed project ❑ Office Toilets ❑ Toilets for patrons Number Location RECEIVED ❑ Showers ❑ Boatholding tank pumpout Give type and location b Describe treatment type and disposal location for all sanitary wastewater CoAST1, PI "AG P1FfvT tLicti,, I N ('.ITV C Describe the disposal of solid waste fish offal and trash d How will overboard discharge of sewage from boats be controlled? e (i) Give the location and number of No Sewage Discharge signs proposed (u) Give the location and number of Pumpout Available signs proposed f Describe the special design if applicable for containing industrial type pollutants such as paint sandblasting waste and petroleum products g Where will residue from vessel maintenance be disposed of? h Give the number of channel markers and No Wake signs proposed Give the location of fuel handling facilities and describe the safety measures planned to protect area water quality What will be the marina policy on overnight and live aboard dockage? k Describe design measures that promote boat basin flushing? I If this project is an expansion of an existing marina what types of services are currently provided? m Is the marina /docking facility proposed within a primary or secondary nursery area? ❑Yes [--]No 252 808 2808 1 888 4RCOdAS`r www »ccoastalo- nanaciement net revised 12/27/06 Forl►vtt DCM IWP 4 (Structures, Pave 3 of 4) n Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o Is the manna/docking facility proposed within or adjacent to coastal wetlands /marsh (CW) submerged aquatic vegetation (SAV) shell bottom (SB) or other wetlands (WL)? If any boxes are checked provide the number of square feet affected ❑CW ❑SAV ❑SB OWL ❑None p Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes give the name and address of the leaseholder(s) and give the proximity to the lease 3 BOATHOUSE (including covered lifts) ®This section not applicable a (Q Is the boathouse structure(s) C ❑Commercial ❑Public/Govemment ❑Private /Commune y (u) Number COASTAL P�r1NPG Pi1EPJT (in) Length ELIZrSLTH CITY (iv) Width Note Roofed areas are calculated from dnpline dimensions 4 GROIN (e g wood sheetp►le etc If a rock groin use MP 2 Excavation and Fill) ® This section not applicable a (i) Number (n) Length (m) Width 5 BREAKWATER (e g wood sheetp►le etc) ®This section not applicable a Length b Average distance from NHW NWL or wetlands c Maximum distance beyond NHW NWL or wetlands 6 MOORING PILINGS and BUOYS ® This section not applicable a Is the structure(s) ❑Commercial ❑Public/Government ❑Private /Community c Distance to be placed beyond shoreline Note This should be measured from marsh edge if present e Arc of the swing 7 GENERAL b Number d Description of buoy (color inscription size anchor etc) 252 808 2808 1 888 4RCOAST vvvvvv nccoastalmanazgement net revised /2127108 a Proximity of structure(s) to adjacent riparian property lines > 15 feet Note For buoy or moonng piling use arc of swing including length of vessel c Width of water body +/ 80 feet e (i) Will navigational aids be required as a result of the project? E]Yes ®No ❑NA (ir) If yes explain what type and how they will be implemented b Proximity of structure(s) to adjacent docking facilities +/ 200 yards d Water depth at waterward end of structure at NLW or NWL 5 8 OTHER ®This section not applicable a Give complete description February 6 2012 Date Frisco Shopping Center Project Name George H Wood CEP PWS Agent for Frisco Shopping Center Applican ame Apple nt Signature FEB 8 2012 COASTAL MANAGEMENT ELIZABETH CITY 252 808 2808 1 888 4RCOAST vvvvvv nccoastalmanagernent net revised 12/27/06