Loading...
HomeMy WebLinkAbout20120287 Ver 1_401 Application_20120312W�T �9�G £3 Y 2 ®120287 Office Use Only Corps action ID no DWQ project no Form Version 14 January 2009 Page 1 of 10 PCN Form - Version 1 4 January 2009 Pre - Construction Notification (PCN) Form TPA IT M2 A Applicant Information 1 Processing la Type(s) of approval sought from the Corps N ❑ Section 404 Permit ❑ Section 10 Permit 1 b Specify Nationwide Permit (NWP) number or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? Yes ❑ No 1d Type(s) of approval sought from the DWQ (check all that apply) ❑ 401 Water Quality Certification - Regular Non 404 Jurisdictional General Permit ❑ 401 Water Quality Certification - Express ❑ Riparian Buffer Authorization 1 e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes tXl No For the record only for Corps Permit ❑ Yes ❑ No 1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ❑ Yes KNo 1 g Is the project located in any of NC s twenty coastal counties If yes answer 1 h below ❑ Yes blo 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes No 2 Project Information 2a Name of project 2b County nq i� 2c Nearest municipality / town 2d Subdivision name NSA 2e NCDOT only T I P or state project no ^ 012 3 Owner Information WE NR WATERQUgtjl -y 3a Name(s) on Recorded Deed 1`I\or- ate- Q_" g, oh -RIVINATER 3b Deed Book and Page No ack � _ t-2 --l' 3c Responsible Party (for LLC if applicable) i t A 3d Street address ' �, 10 D 3e City state zip �,v 1 all fib, o? L1.j 3f Telephone no 3g Fax no -�3� qua LAg it 3h Email address �oor-V.,.„kd Page 1 of 10 PCN Form - Version 1 4 January 2009 4 A cant Information (if different from owner) 4a p nt is if ❑ Agent ❑ Other specify 4b Name 4c Business name (if applicable) 4d Street address 4e City state zip 4f TelepttClffe'ho " 4g Fax no 4h mad dress 5 Kent/Consultant Information (if applicable) 5 Na 5b Business name (if applicable) 5c Street address 5d City state zip 5e Telephone no 5f Fax no 5g Email address Page 2of10 B Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) (� 1:59 2 lb Site coordinates (in decimal degrees) Latitude Longitude 1c Property size 23 acres 2 Surface Waters 2a Name of nearest body of water to proposed project �,t Pp� 2b Water Quality Classification of nearest receiving water 2c River basin Qx\ 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application 3b List the total estimated acreage of all existing wetlands on the property 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 11X16/1 3d Explain the purpose of the proposed project �O A-6 Q Ja Cr-,,L0. A- a -, 3e Describe the overall project in detail including the type of equipment to be used n 100 V - � 100 �_A t�_o \ar r k- o, a- c -c'.04, ewe, c�, �-�, e.•�cS ► ��d 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by thej Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Yes ❑ No Unknown Comments 4b If the Corps made the jurisdictional determination what type of determination was made Preliminary Final 4c If yes who delineated the jurisdictional areas? Name (if known) C-C Agency /Consultant Company Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5 Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the pasty ❑Yes �] No ❑Unknown 5b If yes explain in detail according to help file instructions 6 Future Project Plans 6a Is this a phased project? ❑ Yes 14 No 6b If yes explain Page 3 of 10 PCN Form -Version 1 4 January 2009 C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) Wetlands ❑ Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a Wetland impact number Permanent (P) or Temporary 2b Type of impact 4e 1r.0CW 6\ 2c Type of wetland 2d Forested 2e Type of jurisdiction Corps (404 10) or DWQ (401 other) 2f Area of impact (acres) W1 _P Choose one Choose one �Sd� Yes/ to �� ko1� W2 Choose one Choose one Yes /No _W3 _ _ Choose one Choose one Yes /No 1/x/4 Choose one Choose one Yes /No W5 Choose one Choose one Yes /No W6 Choose one Choose one Yes /No 2g Total Wetland Impacts 2h Comments 3 St Impacts If there re rennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this ques n for all stream sites impacted 3a Stream impact number Permanent (P) or Temporary (T) 3b Type of impact 3c Stream name 3d Perennial (PER) or intermittent (INT)? 3e Type of jurisdiction 3f Average stream width (feet) 3g Impact length (linear feet) S1 Choose one S2 Choose one S3 Choose one S4 Choose one S5 Choose one S6 Choose one 3h Total stream and tributary impacts 31 Comments Page 4 of 10 PCN Form —Version 1 4 January 2009 4 Open r Impacts If there are ro osed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then indivi ually list all open water impacts below 4a Open water impact number Permanent (P) or Temporary 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f Total open water impacts 4g Comments 5 P ake Construction If and or lake onstruction proposed the complete the chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Filled Pi Gbovse-me t O ppp P2 Choose one 5f Total 5g Comments 5h Is a dam high hazard permit required? ❑ Yes ❑ No If yes permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6 Bu r pacts (for DWQ) If probe ill impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts belo If im acts n-rp wre mitigation then You MUST fill out Section D of this form 6a Project is in which protected basin? ❑ Neuse ❑ Tar Pamlico ❑ Catawba ❑ Randleman ❑ Other 6b Buffer Impact number— Permanent (P) or Temporary 6c Reason for impact 6d Stream name 6e Buffer mitigation required? 6f Zone 1 impact (square feet ) 6g Zone 2 impact (square feet B1 Yes /No B2 Yes /No B3 Yes /No B4 Yes /No B5 Yes /No B6 Yes /No 6h Total Buffer Impacts 61 Comments Page 5 of 10 D Impact Justification and Mitigation 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project —Por, c1 1�IA- (v--N 1 So�C;Jed ire o-- lb Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques -1 of a Ca r-Qa 2 >ensatory Mitigation for Impacts to Waters of the US or Waters of the State el N 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State" ❑ Yes ❑ No 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes which mitigation option will be used for this project'? ❑ Mitigation bank ❑ Payment to in lieu fee program ❑ Permittee Responsible Mitigation 3 C ete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Choose one Type Choose one Type Choose one Quantity Quantity Quantity 3c Comments 4 Co ete if Making a Payment to In heu Fee Program 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature Choose one 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Co to if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan Page 6 of 10 PCN Form —Version 1 4 January 2009 6 Bu Nlitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires Yes No buffer mitigation's 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required 6c 6d 6e Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 15 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) 6h Comments Page 7 of 10 E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ,� No within one of the NC Riparian Buffer Protection Rules? lb If yes then is a diffuse flow plan included? If no explain why ❑ Yes ❑ No 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? Q 2b Does this project require a Stormwater Management Plan? ❑ Yes ❑ No 2c If this project DOES NOT require a Stormwater Management Plan explain why 2d if this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan 2e Who will be responsible for the review of the Stormwater Management Plan? Certified Local Government Stormwater Review 3a In which local governments jurisdiction is this project? ❑ Phase II ❑ NSW 3b Which of the following locally implemented stormwater management programs ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been El Yes ❑ No atta hed? 4 W-,,Q Stormwater Program Review ❑Coastal counties ❑HQW 4a Which of the following state implemented stormwater management programs apply ❑ORW (check all that apply) ❑Session Law 2006 246 ❑Other 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No at hed� 5 WQ 401 Unit Stormwater Review a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 14 January 2009 F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes No use of public (federal /state) land? 1 b If you answered yes to the above does the project require preparation of an environmental document pursuant to the requirements of the National or State El Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval letter ) ❑ Yes ❑ No Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑Yes No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after the fact permit application? ❑Yes ❑ No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in additional development which could impact nearby downstream water El Yes quality? /qNo 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility P� Page 9 of 10 PCN Form — Version 1 4 January 2009 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or habitat? Yes J .No 5b Have you checked with the USFWS concerning Endangered Species Act impacts? El Yes KNo 5c If yes indicate the USFWS Field Office you have contacted 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes 4 No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? Yes �No 7b What data sources did you use to determine whether your site would impact historic or archeological resources? 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA designated 100 year floodplain? ❑ Yes 14 No 8b If yes explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? Appllcant/Agent s Printed Name f—1 Q.AM" It, C-- CA J.,,o- Date 1 a a Applicant/Agent s Signature (Agents signature is valid only if an authorization letter from the applicant is provided Page 10 of 10 I i I` R E a m d` LL sgg § gE Y 8 §§ 5 S S s� s� l a §s b y $ $ x 4 gd b� IN a $$ � � S �s Ip (Lr to � ml 5 6 S LL Y � x s r E i g� s 9 S RI = o Q Yll U ?� a 1 � C / y0� 60 PU0 b b6 e U CL \@+ (7Y1O1J 69666 66SbF L� /0 OF p6 &83� /0 \ ^57 q4 E- - `__ 6r ws 5O 9L b/Z 3 Sp-6r —�'� •� N09 57 y g a '� — FON o � y gg a 3/A Y 3 4 �',�, 2 WWW3W333W3 ILI N �Oa ^ O � phhO p�pR P�P�P �0Oy2�y 3/A ESP V 4 y 6 H. LiION asar Od 9066 as ( 600zroF I ) \ a VC 3�U4 0 Q e m 4 pU•.� c �W � O C _at1U c c I D {4~W O u 4 W 6£ /ld M oc � U Q m ~ x a 1 � C / y0� 60 PU0 b b6 e U CL \@+ (7Y1O1J 69666 66SbF L� /0 OF p6 &83� /0 \ ^57 q4 E- - `__ 6r ws 5O 9L b/Z 3 Sp-6r —�'� •� N09 57 y g a '� — FON o � y gg a 3/A Y 3 4 �',�, 2 WWW3W333W3 ILI N �Oa ^ O � phhO p�pR P�P�P �0Oy2�y 3/A ESP V 4 y 6 ao VC 3�U4 e m n pU•.� c h � _at1U c c I D {4~W =0 �a oc � e�W Gmdil Fw proposed pond site (UNCLASSIFIED) Fw proposed pond site (UNCLASSIFIED) 1 message robert gabb <weishmusican @yahoo com> Reply To robert gabb <welshmusican @yahoo com> To Maripat Moore <mpmooremd @gmail com> Forwarded Message From Brown Craig J SAW < Craig J Brown @ usace army. md> To welshmusican @yahoo com <welshmusican @yahoo com> Sent Friday March 9 2012 2 23 PM Subject FW proposed pond site (UNCLASSIFIED) Classification UNCLASSIFIED Caveats NONE Original Message From Brown Craig J SAW Sent Fnday March 09 2012 2 19 PM To welshmuscian@yahoo com Cc Homewood Sue Brown Craig J SAW Subject proposed pond site (UNCLASSIFIED) Classification UNCLASSIFIED Caveats NONE Mr Gabb Page 1 o Maripat Moore <mpmooremd@gmail coi Fri, Mar 9, 2012 at 5 33 1 On my visit to your property on March 8 2012 I determined that the small wetlands within the area you had staked out for your proposed pond was isolated and therefore was not jurisdictional under Section 404 of the Clean Water Act If you dig a pond on the site I inspected you will not need a permit from the USACE However you may need a permit from the North Carolina Division of Water Quality Your contact there is Sue Homewood at 336 771 4964 I have sent her a copy of this email Thanks for contacting the Corps and good luck with your pond Craig Brown Craig J Brown Regulatory Project Manager US Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive Suite 105 Wake Forest NC 27587 919 554 4884 x 35 Wiftston Salem NC to 2126 Shiloh Church Rd Rural Hall NC 27045 Google Maps GO, VIC Directions to 2126 Shiloh Church Rd, Rural Hall NC 27045 9 8 mi — about 16 mans Winston Salem NC r E th`,r t' � � a t Z ��ariS N Wit � R Pd 1f it stot0alera Z C p 1 i!a � m w'hro a-1 4th of E 3rd St r z 02012 GoAeMaD data C&12 Gooale 1 Head north on N Main St toward 5th St E i About 1 man rh St a m a S2 j "47 WinstAtalem a t� tip v t1 NOO On 5t 3rd S t n s 02012 GooglleNUD data 0=12 Gooale 2 Turn right onto N Martin Luther King Jr Dr - — �---- - -- About 2 miss n t; P Y W W 8th St ti N Ma1Ln Luthikt F th 'at ,@?(V2t1Goog1.4 data C&12 Googh 3 Slight right to merge onto N Carolina 8 N/U S 52 N u. About 5 mans Li a E 119 1 HEif t st1 N Martin c,Y61 N c � v O° 072012 Goog Map 'data gagi Cpoc r4 Take exit 114 for Germanton Rd/N Carolina 8 N 0 i'eAnk My, 9 A tq L e rt1 Page 1 o go03 total 0 3 go05 total 0 9 go50 total 5 9 go02 total 6 0 Winston Salem NC to 2126 Shiloh Church Rd Rural Hall NC 27045 Google Maps ®5 Turn left onto N Carolina 8 N/Germanton Rd About 7 mins 6 Turn right onto Shiloh Church Rd ry Destination will be on the right g 2126 Shiloh Church Rd Rural Hall NC 27045 49° c� �S Fa ty�r � 4 4 f4 02012 Goo ap data 02012 Google tGyt g Tx. ��� �I 02012 Go�g`fLp data 02012 Google i 8 � chal't Aa 1 a D201Z- 9oopleMap data 02012 Page 2 0 go37 total 9 7 go 331 total 9 8 These directions are for planning purposes only You may find that construction projects traffic weather or other events may cause conditions to dlffe from the map results and you should plan your route accordingly You must obey all signs or notices regarding your route Map data 02012 Google Directions weren t right? Please find your route on maps google com and click Report a problem at the bottom left