Loading...
HomeMy WebLinkAboutNCG170364_Inspection Report_20210212ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director Valdese Weavers Inc. Attention: Eddie Atkinson 280 Crescent Street Valdese, North Carolina 28690 NORTH CAROLINA Environmental Quality February 12, 2021 Subject: Compliance Evaluation Inspection Valdese Weavers Inc- F&D Plant General Permit: NCG170000 Certificate of Coverage: NCG170364 Burke County, North Carolina Dear Mr. Atkinson: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on February 3, 2021. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reedRncdenr.gov. Sincerel Isaiah Reed, EI, CPS Q S4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 a„uiawiry 828.296.4500 Compliance Inspection Report Permit:NCG170364 Effective: 08/01/19 Expiration: 05/31/24 Owner: Valdese Weavers Inc SOC: Effective: Expiration: Facility: Valdese Weavers Inc-F&D Plant County: Burke 280 Crescent St NE Region: Asheville Valdese NC 28690 Contact Person: Eddie Atkinson Title: Phone: 828-874-2181 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 02/03/2021 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time 09:30AM Exit Time: 10:OOAM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Textile Mill Products Stormwater Discharge COC Facility Status: ❑ Compliant E Not Compliant Question Areas: Storm Water (See attachment summary) Pagel of 3 Permit: NCG170364 Owner -Facility: Valdese Weavers Inc Inspection Date: 02/03/2021 Inspection Type :Compliance Evaluation Reason for Visit: Routine Inspection Summary: On February 3, 2021 this facility was inspected for compliance. The facility was in operation, but there was no answer when called. A facility inspection was performed but no documentation or stormwater pollution prevention plan was made available. This facility will be re -inspected on or after April 6, 2021. The permittee required to provide all documentation related to compliance with the NCG170000 at the time of the inspection. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG170364 Owner - Facility: Valdese Weavers Inc Inspection Date: 02/03/2021 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ E ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑N ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑E ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑0 ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ E ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ 0 ❑ ❑ # Does the Plan include a BMP summary? ❑ E ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ E ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ 0 ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: A SWPPP was not made available at the time of the inspection. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑ Comment: Qualitative monitoring documentation was not made available at the time of the inspection Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ 0 ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑ # Were all outfalls observed during the inspection? ❑ 0 ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment: Page 3 of 3