Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutWQCS00221_Regional Office Historical File Pre 2018 (4)Page 1 of 1
http://www2.hickoryrecord.com/news/201 I/mar/08/furniture-maker-lease-claremont-plant-ar-844853/
N ISM, s N,
Published: March 08, 2011
Home / news / local /
Furniture maker to lease Claremont plant
By John Dayberry
A furniture manufacturer that said it would create hundreds of Catawba County jobs has agreed to lease a 411,706-
square-foot distribution warehouse in Claremont.
Sutter Street Manufacturing, a division of California -based Williams -Sonoma, has agreed to lease the Kelly
Boulevard building previously owned by Collezione Europa USA Inc.
Sutter Street Manufacturing plans to use the facility for warehousing, manufacturing and distribution, according to
JER Partners, a Virginia -based commercial real estate management company that announced the lease agreement.
Sutter Street Manufacturing provides upholstered furniture to Williams -Sonoma.
"Williams -Sonoma recognizes the superior quality of the Kelly Boulevard warehouse and the benefits of being
located in Catawba County," said Jim Smith, managing director of U.S. funds at JER Partners.
"We are extremely pleased to have attracted such a high quality tenant during challenging economic times, and we
believe this transaction reflects the strengthening of the local market."
The building is owned by Kelly Boulevard Associates, LLC, a joint venture of JER Partners of and Fulcra
Enterprises, headquartered in Cornelius. JER Partners/Fulcra Enterprises purchased the distribution warehouse in
late 2008 under bankruptcy proceedings.
Sutter Street Manufacturing announced in April 2008 that it would open a distribution and manufacturing center in
Hickory, creating 820 jobs. Sutter Street said it would invest $2.7 million in the facility and create the 820 jobs
over a five-year period. The state of North Carolina agreed to provide up to $8.96 million in tax incentives over a
10-year period.
It is believed that Sutter Street Manufacturing currently employs about 270 people at its facility in southeast
Hickory. Company officials declined to comment.
Scott Millar, president of the Catawba County Economic Development Corp., which worked to bring Sutter Street
Manufacturing to the county, would not speculate as to whether the company's Claremont lease agreement
indicates an expansion or more jobs.
Hickory Daily Record C Copyright 2011 Media General Communications Holdings, LLC. A Media General company.
http://www2.hickoryrecord.comlmember-center/share-this/print/?content=ar844853 3/11/2011
City of Claremont, NC
Spill Control Plan for Wastewater Treatment Facilities
and Lift Stations
Operated By:
. -A �
WOODARD
&CURRAN
City of Claremont, NC Spill Response Plan
Table of Contents
Section 1 Overview .
1.1 Purpose of Document
1.2 Overview of System
1.3 Equipment
1.4 Spare Parts
Section 2 Prevention of Spills
2.1 Causes of Spills
2.2 Lift Station Inspections
2.3 Lift Station Maintenance
2.4 Collection System Maintenance
2.5 Wastewater Treatment Plant Inspections and Maintenance
Section 3 Identification of Spills
3.1 Alarms
3.2 ORC Contact and Response Time
3.3 Customer Call -In
Section 4 Initial Spill Response
4.1
Cause Assessment and Alleviation
4.2
Notifications
4.3
Contact List (Contractors)
4.4
Contact List (City of Claremont)
4.5
Contact List (Woodard & Curran)
4.6
Contact List (Vendors)
4.7
Access to Cleaning Equipment
4.8
Catastrophic Damage/Emergency Fund
Section 5 Spill Clean -Up Procedures
5.1 Procedures
5.2 Clean -Up Supplies
Section 6 Reporting Requirements
6.1 Immediate Reporting
6.2 Report Submittal
6.3 Form CS-SSO (Attached)
1.0 Overview
1.1 Purpose of Document
1.1.1 The purpose of this document is to establish general procedures for
response to spills of wastewater. These procedures will include
practices for the prevention of these events, as well as recognition
of spills, initial response, notification procedures, and clean-up
procedures.
1.2 Overview of Collection System
1.2.1 The City of Claremont, located in Catawba County, NC, operates a
wastewater collection system that consists of approximately 20
miles of gravity sewer, approximately 2.5 miles of force main, five
(5) duplex pump stations, and associated appurtenances commonly
found in a complete and operational wastewater collection system.
1.2.2 Collected wastewater is treated at either the City of Claremont's
North Wastewater Treatment Facility or the City's McLin Creek
Wastewater Treatment Facility.
1.2.3 The lift stations and the wastewater treatment facilities are contract
operated by Woodard & Curran, Inc.
1.3 Equipment
Name of Station
Number of Pumps
Cargo Pump Station
2
State Pump Station
4
School Pump Station
2
Mom & Pop's Pump Station
2
Smyres Pump Station
2
1.4 Spare Parts
1.4.1 Currently, spare parts are located at the McLin Creels Wastewater
Treatment Facility. They consist of fuses, electrical relays, and
assorted gaskets and seals for lift station pumps. Spare fuses may
be kept inside lift station control cabinets as well.
2.0 Prevention of Spills
2.1 Causes of Spills
2.1.1 While some spills may be unavoidable due to abnormal weather
conditions, electrical outages, or catastrophic system damage,
proper maintenance of lift stations and wastewater treatment plants
could be considered a best management practice for the prevention
of wastewater spills.
2.2 Lift Station Inspections
2.2.1 Lift stations should be inspected daily in order to identify any
abnormal conditions that may lead to overflow of process tanks or
to identify spills in progress. Daily checks of lift stations should
include:
2.2.1.1 Inspection of pumps for leaks, overheating, broken belts,
etc.
2.2.1.2 Inspection of wet well level
2.2.1.3 Inspection of wet well floats for accumulation of grease
(which may weigh down floats, preventing actuation)
2.2.1.4 Inspection of pump control panel for abnormalities, burning
wire smell, etc.
2.2.1.5 Manual activation of pumps to check operation
2.2.1.6 Recording pump runtimes
2.3 Lift Station Maintenance
2.3.1.1 Other lift station maintenance activities throughout the year
should include:
2.3.1.2 Cleaning inside pump station and wet well
2.3.1.3 Inspection and exercise of valves
2.3.1.4 Inspection and lubrication of pumps
2.3.1.5 Verification of float switch/level control operation
2.3.1.6 Verification of alarm systems
2.4 Collection System Maintenance
2.4.1 Cleaning and inspection of sewer lines, force mains, and manholes
should be an ongoing program throughout the year.
4.2.3 Operator in Responsible Charge can also notify City of Claremont
Maintenance personnel as needed (See Contact List)
4.2.4 When the spill is under control, the ORC should contact the
following people:
4.2.5 Thomas Winkler, City of Claremont, Public Works Director
4.2.6 Doris Bumgarner, City of Claremont, City Manager
4.2.7 Eric Teittinen, Woodard & Curran Area Manager
4.2.8 Bill Luksha, Woodard & Curran Compliance Manager
4.2.9 After the spill condition has been alleviated and the above
notifications have been made, spill clean-up should begin (See
Section 6).
4.2.10 After spill clean-up or within 24 hours of spill, notification to the
State of North Carolina should be made
4.3 Contact List (Contractors)
Company
Purpose
Office
Cell
Pager
IEM
Electrical
828-459-1654
Sanitary Septic
Tank Service
Septage Hauler
828-294-1831
828-312-9626
828-345-0662
Ronnie Turner
Construction
Structural
828-294-1844
4.4 Contact List (City of Claremont Personnel)
Name
Title
Home
Cell
Pager
Doris
Bumgarner
City Manager
828-459-7009
Office
Thomas
Winkler
PW Director
828-241-3754
828-312-8977
828-261-3631
Tim Taylor
828-478-9380
828-261-3629
Shannon
Dickerson
704-924-6800
828-261-3628
William Stout
1
828-478-2507
1
1 828-261-3626
Ashley Sweet
1
828-632-6785
1
1 828-261-3627
4.5 Contact List (Woodard & Curran)
Name
Title
Office
Cell
Eric Teittinen
Area Manager
770-396-0073
770-296-4601
Bill Luksha
Compliance Mgr.
800-426-4262
207-632-1578
5.0 Spill Clean -Up
5.1 Procedures
5.1.1 When possible, standing water may be pumped back into the
station from which it overflowed.
5.1.2 All solid materials from the spill should be collected and disposed
of at a landfill.
5.1.3 All areas of the ground which has come into contact with the
spilled wastewater should be neutralized/sanitized by application
of lime or soda ash.
5.1.4 Spills on private property should be cleaned up to the satisfaction
of the property owner.
5.2 Clean -Up Supplies
5.2.1 Spill clean-up supplies should include, but not be limited to:
5.2.1.1 Sandbags
5.2.1.2 Straw/Hay Bales
5.2.1.3 Storm Drain Covers (optional)
5.2.1.4 Lime and/or Soda Ash
5.2.1.5 Personal Protective Gear such as gloves, rubber boots,
coveralls, etc.
5.2.1.6 Hand Sanitizer
5.2.1.7 Shovels, Rakes, and other Hand Tools
5.2.2 Adequate supplies of lime and/or soda ash will be maintained at
the McLin Creek and North Wastewater Treatment Facilities.
5.2.3 Straw/hay bales will be maintained at the McLin Creels
Wastewater Treatment Facility.
5.2.4 Sandbags will be maintained at the McLin Creek Wastewater
Treatment Facility.
6.0 Reporting Requirements
6.1 Immediate Reporting
6.1.1 The regional office of the North Carolina Department of Water
Quality should receive verbal notification within 24 hours of spill
discovery.
6.2 Report Submittal
6.2.1 The North Carolina Department of Water Quality requires that
Form CS-SSO be submitted within five days of discovery of spill.
This form can be found at the following web address:
http://h2o.enr.state.nc.us/peres/Collection%20Systems/documents/SSO1. pdf
63 Form CS-SSO (Attached)
4/17/2008
Ordinance
City Council of the City of Claremont
Catawba County, North Carolina
Ordinance No.
AN ORDINACE OF THE CITY OF CLAREMONT AMENDING CLAREMONT MUNICIPAL
CODE, CHAPTER ,
THE CITY COUNCIL OF THE CITY OF CLAREMONT DOES HEREBY ORDAIN AS
FOLLOWS:
Section 1:
Scope and purpose
1. The objective of this section is to aid in preventing the introduction and
accumulation of fats, oils, and greases into the municipal wastewater system,
which will or tend to cause or contribute to sanitary sewer blockages and
obstructions. Food Service Establishments and other industrial or commercial
establishments generating wastewater containing fats, oils or greases are subject
to this section. This section regulates such users by requiring that grease
interceptors and other approved strategies be.installed, implemented, and.
maintained in accordance with the provisions hereof.
_Definitions.
1. The definitions contained in Section 36-172 and the following terms, when used
in this section, shall apply.
A. Action Level means the concentration based numeric value that the
Grease interceptor effluent, at the device's outlet tee and prior to mixing
with any other waste water from the contributing establishment's
property, are expected to achieve on a consistent or stipulated basis.
B. Common interceptor means one or more interceptors receiving FOG
laden wastewater from more than one establishment. Common
interceptors may be located at shopping centers, malls, entertainment
complexes, sporting arenas, hotels, multi -tenant "flex" spaces, mixed -use
spaces, and other sites where multiple establishments are connected to a
single grease interceptor. The owner of the property on which the
common grease interceptor is located shall be primarily responsible for
the maintenance, upkeep, and repair of the common interceptor.
C. Fats, oils, and greases means organic polar compounds derived from
animal and/or plant sources that contain multiple carbon chain
triglyceride molecules. These substances are detectable and measurable
using analytical test procedures established in 40 CFR 136, as may be
amended from time to time. All are sometimes referred to herein as
"grease" or "greases." or "FOG".
4/17/2008
D. Food Service Establishments or "FSE" means those establishments
primarily engaged in activities of preparing, serving, or otherwise
making available for consumption foodstuffs and that use one or more of
the following preparation activities: Cooking by frying (all methods),
baking (all methods), grilling, sauteing, rotisserie cooking, broiling (all
methods), boiling blanching, roasting, toasting, or poaching, and infrared
heating, searing, barbecuing, and any other food preparation or serving
activity that produces a consumable food product in or on a receptacle
requiring washing to be reused.
E. FOG enforcement response plan means the document and written plan
and procedures by which the director implements an enforcement
strategy applicable to the FOG control and management program
established herein. The plan applies to FOG program violations and
matters of program noncompliance. Stipulated penalties for specific and
programmatic infractions are addressed in the plan and set forth in the
Town's annual budget ordinance. The director shall make site and case
specific determinations of program non-conformance in accordance with
this Division 2.
F. Grease trap or interceptor means a device for separating waterborne
greases and grease complexes from wastewater and retaining such
greases and grease complexes prior to the wastewater exiting the trap and
entering the sanitary sewer collection and treatment system. Grease traps
also serve to collect solids that settle, generated by and from activities
that subject Users to this section, prior to the water exiting the trap and
entering the sanitary sewer collection and treatment system. Grease traps
and interceptors are sometimes referred to herein as "grease
interceptors."
G. Minimum design capability means the design features of a grease
interceptor and its ability or volume required to effectively intercept and
retain greases and settled solids from grease -laden wastewaters
discharged to the public sanitary sewer.
H. Non -cooking establishment means those establishments primarily
engaged in the preparation of precooked foodstuffs that do not include
any form of cooking: but that may produce a consumable food product in
or on a receptacle requiring washing to be reused.
On -site grease interceptor treatment (sometimes "Onsite Treatment')
means mechanisms or procedures utilized by a User to treat grease
interceptor contents on the User's site, followed by the reintroduction of
such treated wastewater back into the interceptor. A User may only
accomplish on -site grease interceptor treatment if the NC Division of
Waste Management as a septage management firm permits the User or
the User's contract service provider or service provider.
Program Acknowledgement Certificate means program confirmation
documentation issued by the Director. The User is required to keep
4/17/2008
Program Acknowledgement Certificate on premises and produce it upon
request of City of Claremont.
K. Service provider means any third party not in the employment of the
User that performs maintenance, repair, and other services on a User's
grease interceptor at the User's directive.
L. User is as defined in Section 36-172 for the purpose of this Section.
Users include property owners who provide common interceptors for one
or more independent establishments, including tenants.
Grease interceptor installation, maintenance, record .
keeping, and grease removal
1. Grease interceptors shall be installed and maintained at the User's expense,
when a User operators a food service establishment. Grease interceptors may be
required in non -cooking or cold dairy and frozen foodstuffs establishments and
other industrial or commercial establishments when the establishment generates
wastewater containing fat or grease and the director determines an interceptor is
necessary to prevent contribution or accumulation of grease to the sanitary sewer
collection and treatment system. Upon notification by the Director or designee
that the User is subject to the terms of an enforcement action, as stipulated in the
FOG Enforcement Response Plan, said user shall not allow wastewater discharge
concentration from subject grease interceptor to exceed an establishment action
level of 200 milligrams per liter, expressed as Hexane Extractable Material. All
grease interceptors shall be of a type, design, and capacity approved by the
director and shall be readily and easily accessible for maintenance and repair,
including cleaning and for town inspection. All grease interceptors shall be
serviced and emptied of accumulated waste content as required in order to
maintain minimum design capability or effective volume of the grease
interceptor, but not less often than every sixty (60) days or as permitted in a valid
program modification. Users who are required to pass wastewater through a
grease interceptor shall:
A. Provide for a minimum hydraulic retention time of 24 minutes at actual
peak flow between the influent and effluent baffles, with twenty-five
percent (25%) of the total volume of the grease
interceptor being allowed for any food -derived solids to settle or
accumulate and floatable grease derived materials to rise and accumulate,
identified hereafter as a solids blanket and grease cap respectively."
B. Remove any accumulated grease cap and solids blanket as required, but
at intervals of not longer than sixty (60) days at the user's expense, or in
accordance with a valid program modification or other director's
requirements. Grease interceptors shall be kept free of inorganic solid
materials, such as grit, rocks, gravel, sand, eating utensils, cigarettes,
shells, towels, rags, etc., which could settle into this solids blanket and
thereby reduce the effective volume of the grease interceptor.
C. If the User performs on -site grease interceptor treatment pursuant to a
modification granted fewer than 36-183(g) (5) below, User shall
4/17/2008
a. Prior to commencement of Onsite Treatment, obtain written
approval by and from the Director of all processes utilized in
said Onsite Treatment.
b. If any pumped wastes or other materials removed from
the grease interceptor are treated in any fashion on -site and
reintroduced back into the grease interceptor as an activity of and
after such on -site treatment, the user shall meet the criteria
contained in (c) (1) (c) (3) below.
c. Attain and adhere to the criteria listed below:
I. Within and not more than 24 hours after onsite grease
interceptor servicing, not more than 2" (inches) of
settlable solids and/or grease shall be allowed to have
accumulated therein as a result of said operations.
D. Operate and maintain the grease interceptor to achieve and consistently
maintain any applicable grease action level. "Consistent" shall mean any
wastewater sample taken from such grease interceptor must meet the
terms of numerical limit attainment described in subsection (c) (1). If a
User documents that conditions exist ("space constraints") on their
establishment site that limit the ability to locate a grease interceptor on
the exterior of the establishment, the User may request an interior
location for the interceptor. Such request shall contain the following
information:
E. The use of biological or other additives as a grease degradation or
conditioning agent is permissible only upon prior written approval of the
director. Any User using biological or other additives shall maintain the
trap or interceptor in such a manner that attainment of any grease
wastewater, action level, solids blanket or grease cap criteria, goal or
directive, as measured from the grease interceptor outlet or interior, is
consistently achieved.
F. The use of automatic grease removal systems is permissible only upon
prior written approval of the director, the lead plumbing inspector of the
town, and the Wake County Department of Environmental Services or
the US Department of Agriculture. Any user using a grease interceptor
located on the interior of the site shall be subject to any operational
requirements set forth by the North Carolina Division of Waste
Management. Any User using this equipment shall operate the system in
such a manner that attainment of the grease wastewater discharge limit,
as measured from the unit's outlet, is consistently achieved as required by
the Director.
G, The director may make determinations of grease interceptor adequacy
need, design, appropriateness, application, location, modification(s), and
conditional usage based on review of all relevant information regarding
4/17/2008
grease interceptor performance, facility site and building plan review by
all regulatory reviewing agencies and may require repairs to, or
modification or replacement of grease interceptors.
2. The user shall maintain a written record of grease interceptor maintenance for three
years. All such records will be available for inspection by the town at all times. These
records shall include:
o FSE name and physical location
o Date of grease interceptor service
o Time of grease interceptor service
o Name of grease interceptor Service Company
o Name and signature of grease interceptor service company agent performing s
aid service
o Established service frequency and type of service: full pump -out, partial pump -
out, on -site treatment (type of nature of operations)
o Number and size of each grease interceptor serviced at FSE location
o Approximated amount, per best professional judgment of contract service
provider, of grease and solids removed from each grease interceptor
o Total volume of waste removed from each grease interceptor
o Destination of removed wastes, food solids, and wastewater disposal
o Signature and date of FSE personnel confirming service completion
o Such other information as required by Director
3. A User may request a modification to the following requirements of this ordinance.
Such request for a modification shall be in writing and shall provide the information
set forth below.
A. The user's grease interceptor pumping frequency. The Director may modify the
60 day grease interceptor pump out frequency when the User provides data and
performance criteria relative to the overall effectiveness of a proposed alternate
and such can be substantiated by the Director. Proposed alternatives may include:
grease interceptor pumping or maintenance matters, bioremediation as a
complement to Grease interceptor maintenance, Grease interceptor selection and
sizing criteria, onsite grease interceptor maintenance, and specialized ware
washing procedures
B. Grease interceptor maintenance and service procedures. The Director may
modify the method(s) or procedure(s) utilized service a grease interceptor when
the User provides data, and performance criteria relative to the overall
4/17/2008
effectiveness of a proposed alternate method or procedure and such can be
substantiated by the Director. If a modification to maintenance and service
procedures is permitted it shall be a conditional discharged permit approval.
C. Any modification must be approved by the Director in written form before
implementation by the User or the user's designated service provider. The User
shall pay modification fees as set forth in the Budget Ordinance Fee Schedule.
Section 3
Violations and Penalties
1. Any User failing to submit the "Grease Trap Service Record", due by the first of each
month, to the Pretreatment Staff by the 7`1' day of the month, may be fined $100.00
per week until said document is submitted.
2. It shall be a violation of this ordinance for any user to allow floatable oils, fats, or
greases to enter the Claremont City wastewater collection or treatment system, in
excess of the limits outlined in section 1 of Grease interceptor installation,
maintenance, record keeping, and grease removal, because of Grease Interceptors
or other Grease handling facilities being inadequately serviced or maintained.
3. Users receiving unsatisfactory evaluations during inspections may be required, at the
users expense, to sample its Grease Interceptor discharge and have it analyzed for oil
and grease. Results of such analyses shall be reported to the Pretreatment Staff. Any
User found to be in violation shall be notified in writing of any noncompliance and
will be required to provide a schedule whereby corrections will be accomplished.
Users known to be in violation shall be subject to fines of $500.00 per day until
actions are taken to prevent said violations from recurring.
4. Users who continue to violate the Claremont City oil and Grease Control Ordinance
may be considered from discontinuance of sewer services
5. Users whose operations cause or allow excessive grease to discharge or accumulate
in the Claremont City wastewater collections and treatment system may be liable to
the City for costs related to service calls for sewer line blockages, line cleaning, line
and pump repairs, etc. including all labor, materials, and equipment. Failure to pay
all service related charges may also be grounds for sewer service discontinuance.
Section 2
Severability.
If any court of competent jurisdiction invalidates any provision, paragraph, word, section or
article of this division, the remaining provisions, paragraphs, words, sections, and chapters shall
not be affected and shall continue in full force and effect.
Section 3
Conflict.
All other ordinances and parts of other ordinances inconsistent or conflicting with any part of this
division are hereby repealed to the extent of such inconsistency or conflict.
INTRODUCED at a regular meeting of the City Council of the City of Claremont on
52008.
ADOPTED at a regular meeting of the City Council of the City of Claremont on
, 2008 by the following vote:
4/17/2008
ATTEST:
MAYOR
, City Clerk
APPROVED AS TO FORM:
, City Attorney
Re: Claremont Grease Issues
Subject: Re: Claremont Grease Issues
From: John Lesley <john.lesley@ncmail.net>
Date: Wed, 07 Mar 2007 08:51:45 -0500
To: Deborah Gore <deborah.gore@ncmail.net>
CC: Barbara Sifford <Barbara.Sifford@ncmail.net>, Jeff Poupart <Teff.Poupart@ncmail.net>, Dana
Folley <Dana.Folley@ncmail.net>
Thanks Deborah, I am going up there next week for a PCI and will try to do a quick
look at the WWTP and pop open some manholes. I will work toward getting their
attention from the SUO side of things, and WWTP impacts..Barbara Sifford, the
collection system person in MRO, will assist you from our end of things with any
collection system permitting issues.
Deborah Gore wrote:
John,
When I looked in BIMS it says an application was received on July 15, 2005. I had
a file drawer full of first rounds with problems and renewals. I took a bunch of
them home to try to get caught up and I think the Claremont folder is there. So,
I'll have to look at it tomorrow and get back to you to let you know where we are
with it. My next thought was that they would be deemed permitted if they don't have
an individual permit, but the rule (2T .0403) says systems with average daily flow
less than 200,000 gpd are deemed permitted. So are systems above 200,000 gpd that
haven't received an individual permit just allowed to do whatever they want - I
don't think so, but I'm not really sure if we can fall back on the deemed
permitted thing. I talked to Dana a little bit and we can fall back on the current
SUO. It has language about controlling discharges to the WWTP, interference, etc.
It has a specific prohibition against discharging grease of animal or vegetable
origin in amounts greater than 100 mg/l. So I think there are plenty of options to
make them comply, but I guess the best thing is to get them permitted and make them
get started on the grease control and take enforcement against Claremont for SSOs.
I'll get back to you tomorrow regarding the status of their collection system
permit and we'll work on a definite plan.
Deborah
John Lesley wrote:
Deborah, the ORC at Claremont has reported some issues related to grease from a
number of restaurants that discharge to the Claremont North WWTP Plant. The
WWTP is heavily impacted by the grease buildup. What do we need to do to require
Claremont to enforce a grease program? The restaurants tell the WWTP staff to
get lost, the Town will not do anything because the Mayor owns one of the
restaurants... are they deemed permitted? I have no reported SSOs for
Claremont, but I am sure they have some with that much of a grease problem.
Barbara tells me that even with a permit they have 12 months to implement an oil
and grease program... Any ideas? thanks JL
John Lesley - John.Lesley@ncmail.net
North Carolina Dept. of Environment & Natural Resources
Div. of Water Quality
610 E. Center Ave., suite 301
Mooresville, NC 28115
Ph: (704) 663-1699 Fax: (704) 663-6040
1 of 1 3/8/2007 8:58 AM
. q
0
Performance Annual Report
L General Information
Facility / System Name: Claremont — McLin Creek
Responsible Entity: City of Claremont
Person in Charge/Contact: Jonathan Graaa
Applicable Permit(s): NCO081370
Description of Collection System or Treatment Process:
DEFT. OF BMRmG MENT
G t�D NATURAL RESOURCES
NMRESVILI 7. OFFICE
E00e y Z Ill ('
WA,T
r;
l
The City of Claremont has a series of sewer lines and pump stations that carry wastewater to a treatment
facility on McLin Creek. The wastewater is treated at the treatment facility by units that remove pollutants
before the water flows into McLin Creek.
IL Performance
Text Summary of System Performance for the Fiscal Year ending June 30, 2003.
All the wastewater is treated and tested to meet specific state requirements. Weekly samples analyzed
showed the treated water to be in compliance with the permitted limits for each month during the fiscal
year ending June 30, 2003.
List (by month) any violations of permit conditions or other environmental regulations. Monthly
Lists should include discussion of any environmental impacts and corrective measures taken to
Address violations.
There were no violations of permit conditions for the City of Claremont — McLin Creek Plant for the fiscal
year ending June 30, 2003.
M. Notification
State how this report has been made available to users or customers of the system and how those
users have been notified of its availability.
A copy of this report will be available in the city office and printed in the city newsletter for users
awareness.
IV. Certification
I certify under penalty of law that this report is complete and accurate to the best of my knowledge.
I further certify that this report has been made available to the users or customers of the name
system and that those users have been notified of its availability.
1�
Respon ible Pers Date
Title
Entity (�
Performance Annual Report
L General Information
Facility / System Name: Claremont — McLin Creek
Responsible Entity: City of Claremont
Person in Charge/Contact: Jonathan Gragg
Applicable Permit(s): NCO081370
Description of Collection System or Treatment Process:
The City of Claremont has a series of sewer lines and pump stations that carry wastewater to a treatment
facility on McLin Creek. The wastewater is treated at the treatment facility by units that remove pollutants
before the water flows into McLin Creek.
H. Performance
Text Summary of System Performance for the Fiscal Year ending June 30, 2003.
All the wastewater is treated and tested to meet specific state requirements. Weekly samples analyzed
showed the treated water to be in compliance with the permitted limits for each month during the fiscal
year ending June 30, 2003.
List (by month) any violations of permit conditions or other environmental regulations. Monthly
Lists should include discussion of any environmental impacts and corrective measures taken to
Address violations.
There were no violations of permit conditions for the City of Claremont — McLin Creek Plant for the fiscal
year ending June 30, 2003.
III. Notification
State how this report has been made available to users or customers of the system and how those
users have been notified of its availability.
A copy of this report will be available in the city office and printed in the city newsletter for users
awareness.
IV. Certification
I certify under penalty of law that this report is complete and accurate to the best of my knowledge.
I further certify that this report has been made available to the users or customers of the name
system and that those users have been notified of its availability.
Respo W e Pe o Date
Title
Enti
.?
Performance Annual Report
L General Information
Facility / System Name: Claremont — North Plant
Responsible Entity: City of Claremont
Person in Charge/Contact: Jonathan Graau
Applicable Permit(s): NCO032662
Description of Collection System or Treatment Process:
OFFUCp
JUL 3 1 2003 ,
1
l
i
Moz 9 z J n r
The City of Claremont has a series of sewer lines and pump stations that carry wastewater to a treatment
facility on Mull Creek. The wastewater is treated at the treatment facility by units that remove pollutants
before the water flows into Mull Creek.
H. Performance
Text Summary of System Performance for the Fiscal Year ending June 30, 2003.
All the wastewater is treated and tested to meet specific state requirements. Weekly samples analyzed
showed the treated water to be in compliance with the permitted limits for each month during the fiscal
year ending June 30, 2003.
List (by month) any violations of permit conditions or other environmental regulations. Monthly
Lists should include discussion of any environmental impacts and corrective measures taken to
Address violations.
There were no violations of permit conditions for the City of Claremont — North Plant for the fiscal year
ending June 30, 2003.
III. Notification
State how this report has been made available to users or customers of the system and how those
users have been notified of its availability.
A copy of this report will be available in the city office and printed in the city newsletter for users
awareness.
IV. Certification
I certify under penalty of law that this report is complete and accurate to the best of my knowledge.
I further certify that this report has been made available to the users or customers of the name
system and that those users have been notified of its availability.
c � a
RespoWPers Date
Title t�Entity
a
a
Performance Annual Report
L General Information
Facility / System Name: Claremont — North Plant
Responsible Entity: City of Claremont
Person in Charge/Contact: Jonathan Graga
Applicable Permit(s): NCO032662
Description of Collection System or Treatment Process:
moz 9z � n r
The City of Claremont has a series of sewer lines and pump stations that carry wastewater to a treatment
facility on Mull Creek. The wastewater is treated at the treatment facility by units that remove pollutants
before the water flows into Mull Creek.
II. Performance
Text Summary of System Performance for the Fiscal Year ending June 30, 2003.
All the wastewater is treated and tested to meet specific state requirements. Weekly samples analyzed
showed the treated water to be in compliance with the permitted limits for each month during the fiscal
year ending June 30, 2003.
List (by month) any violations of permit conditions or other environmental regulations. Monthly
Lists should include discussion of any environmental impacts and corrective measures taken to
Address violations.
There were no violations of permit conditions for the City of Claremont — North Plant for the fiscal year
ending June 30, 2003.
III. Notification
State how this report has been made available to users or customers of the system and how those
users have been notified of its availability.
A copy of this report will be available in the city office and printed in the city newsletter for users
awareness.
IV. Certification
I certify under penalty of law that this report is complete and accurate to the best of my knowledge.
I further certify that this report has been made available to the users or customers of the name
system and that those users have been notified of its availability.
G !��yA-4—v3
Respo si4le erson Date
Title
Entity
"OF W A
v� T�99
�5
O `C
Michael F. Easley, Governor
William G: Ross Jr.,"Secr.0ary
North Carolina Department of Environment and Natural, Resources
Alan W. Klimek; P.E'jDirector
Division of Water Quality:,
June 27, 2005
CERTIFIED MAIURETURN RECEIPT REQUESTED
M Dean McGinnis, City Manager.
City of Claremont
P.O. Box 446
Claremont, NC 28610-0446
Dear Mr. McGinnis:
JUN 2 9 20M
SUBJECT: Notice of Violation
NOV-2005-OP-0014
Failure to Submit Application for a
System Wide Wastewater Collection
System Permit (WQCS00221)
Pursuant to General Statute 143-215.913 and 15A NCAC 2H .0227(a), the Division shall issue a system -wide
collection system permit to any collection system owner conveying or permitted for over 200,000 gallons per
day of wastewater. On December 30, 2004 a letter and permit application was sent certified mail to the City
of Claremont requesting submittal of the permit application within 60 days of receipt. Records reflect the City
signed for this letter on January 3, 2005.
To date, no application has been submitted. The City has violated 15A NCAC 2H .0227(c) by failing to
submit a completed application within 60 days of receipt.
It is imperative that the system wide collection system permit application be completed and
submitted to the letterhead address within 15 days of receiving this letter to avoid future
enforcement actions. A copy of the application can be downloaded from
http://h2o.enr.state.nc.us/ndpu/documents/CSOnlineApplicationO6-04 001.doc.
If you have any questions regarding this Notice of Violation please contact Daryl Merritt at (919) 733-5083
ext. 554 or via E-mail at daryl.merrittKcD_ncmail.net.
If you have any questions regarding the permit application, please contact Marie Doklovic at 919-733-5083
ext. 371 or via E-mail at marie.doklovicCcD-ncmail.net.
Sincerely,
� e re o part
Supervisor
Cc: Barbara-Sifford,: Mooresville-Regior 0 _-Office
Central Files — WQCS00221
One Pretreatment, Emergency Response and Collection Systems Unit Internet http://h2o.enr.nc.state.us/ndpu
NOrthCarohna 1617 Mail Service Center, Raleigh, NC 27699-1617 An Equal Opportunity Action Employer
N%{ura//ff Telephone (919) 733-5083 Fax (919) 733-0059 50% recycled/10% post -consumer paper
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
March 28, 2005
M Dean McGinnis, City Manager
City of Claremont
PO Box 446
Claremont, NC 28610-0446
Alan W. Klimek, P.E., Director
Division of Water Quality
MAP ,
Subject: Delinquent Application
Claremont Wastewater Collection System
Application Number WQCS00221
Dear Mr. McGinnis:
On December 30, 2004, an application to obtain a collection system permit was sent by certified
mail to your facility. Our records indicate that receipt of the application package was acknowledged by the
City of Claremont on January 3, 2005. Statutes provided for 60 days from the date of receipt to submit the
completed application. For your Claremont Collection System collection system, the due date was March
4, 2005. To date, we have not received your application nor have any record of an extension request
exceeding today's date. As stated in the permit application cover letter, failure to apply for a collection
system permit within 60 days as required may subject your facility to a civil penalty and other enforcement
actions for each day the facility is operated following the due date of the application. Please submit your
completed application no later than April 22, 2005 to avoid further action which may include permit
issuance or a Notice of Violation.
This permit is for the operation and maintenance of your collection system. The person
responsible for the wastewater collection system should review and complete this application and review
the permit shell. If for some reason the permit application was misplaced, the application and draft permit
shell are available from our web site at http://h20.enr.state.nc.us/ndpu/ndpuapps.htmi or by calling the
contact number below.
The original application signed by an authorized signing official, one copy of the signed application
and two copies of any attachments must be returned to complete the application package. Please note
the requirements for an authorized signing official on the last page of the application. Public Works
Directors are not authorized signing officials for this application unless otherwise delegated.
If you have any questions concerning this letter, please call Marie Doklovic at (919)733-5083
extension 371 or E-mail at marie.doklovic@ncmail.net.
cc: Claremont Collection System j?ermit"File _ _
bara-Slfford� Mooresville, egional-Offce7
Non -Discharge Permitting Unit
1617 Mail Service Center, Raleigh, NC 27699-1617
DENR Customer Service Center
An Equal Opportunity Action Employer
Sincerely,
t_'A !~y'3 !
for Alan W. Klimek, P.E.
Internet http://h2o.enr.state.nc.us/ndpu
Telephone (919) 733-5083 Fax (919) 715-6048
Telephone 1 800 623-7748
50% recycled/10% post -consumer paper
r -11)s �
1 F WATF fvlichael F. Easley. Governor
rd
�; OG William G. Ross Jr., Secretary
i North Carolina Department of Environment and Natural Resources
r Alan W. Klimek, P.E.. Dircctnr
w nt:nr R_ _Division of Water Quality
_ AND,9ryTi_7" ^fTt,_�a=�
December 30, 2004
CERTIFIED MAIL/RETURN RECEIPT REQUESTED nVIs4W�J
Current Collection System O erap tor, Administrator/Manager or Mayor ® 3 2 010 r
City of Claremont
PO Box 446
Claremont, NC, 28610
r F
SUBJECT: System -Wide Collection System Permitting for the Claremont Collo.;Lm, n��5y�ste
Catawba County
Application Number WQCS00221
Dear Mr. McGinnis:
You are hereby notified that in accordance with the North Carolina G.S. 143-215.9B and 15A NCAC 2H .0227, an
application for coverage under a System -Wide Wastewater Collection System Permit for the subject collection
system must be submitted.; Upon receipt of this letter, your facility has sixty (60) days to submit the attached
application and all supporting documentation.
This permit is for the operation and maintenance of your collection system. The person responsible for the
wastewater collection system should review and complete this application and review the permit shell. This
application and draft permit shell are also available electronically on our web site at
hftp://h20.enr.stafe.nc,us/ndpu/ndpuapps.hfml. Note the pre -assigned application number in the subject heading.
Please reference this number in any collection system correspondence, including Sanitary Sewer Overflow (SSO)
reporting. This number will become your permit number upon permit issuance.
The original application signed by on authorized signing official, one copy of the signed application and two
copies of any attachments must be returned to complete the application package (i.e. all application materials
submitted in duplicate). The completed package should be sent to the following address:
North Carolina Division of Water Quality
Pretreatment, Emergency Response & Collection Systems Unit
1617 Mail Service Center
Raleigh, NC 27699-1617
ATTN: M. Doklovic
It is imperative that you respond to this request within the timeframe provided. If you have any questions
concerning this letter, please call Marie Doklovic at (919)733-5083 extension 371 or E-mail at
marie.doklovic@ncmail.net.
Sincerely,
for Alan W. Klimek, P.E.
Enclosures
cc: Permit File (w/o encl.)
n1n'�ra':t i14� R 7 n7rel (?ffire (w/n Pnrl I
One
NorthCarolina Pretreatment, Emergency Response and Collection Systems Unit Internet http://h2o.enr.nc.sfate.us/ndpu
va
f / t,f/ I 1617 Mill Service Center, Raleigh, NC 27699-1617 An Egnal Opportunity Action Employer
�/ bl[l L� Telephone (919) 733-5053 Fax (919) 733-0059 50% recycled/I O% post -consumer paper
C�Ceoq )
SIZZ,
jel�
3`� � 9z,
E
G�PFIEMpHT
o �
v a2
1893
CITY OF CLAREMONT
P.O. Box 446
3288 EAST MAIN STREET
CLAREMONT, N.C. 28610
828/459-7009 • FAX 828/459-0596
May 12, 2000
Mr. G.T. Chen
NCDENR
919 North Main Street
Mooresville, N.C. 28115
Dear Mr. Chen:
��-fti°�1�C➢Ia�fl�%F'!C� �1.�/�,IC.°II'7
My 16 2000
"•�i' R N, 41� a
This letter is in reply to your letter of May 3, 2000, concerning the NON -Discharge Facility
Inspection of the Sewer Collection System of the City of Claremont on April26, 2000. We are
very pleased that the inspection revealed that the sewer collection system of the City of
Claremont is being properly operated and maintained. The City has worked very hard to
maintain and improve the sewer collection system
We noted the deficiencies listed and plan to respond as follows:
GRAVITY SEWERS I
I.4. The City will correct this deficiency by June 2, 2000.
I.8. The City will install new pumps in the Cloninger Street pump station and remove the bar
screen and remove solids from the closest manhole to the Pembrook pump station by June 2,
2000
I.9. Prepare a sewer system map showing the vents currently in the system,
PUMP STATIONS/SIPHONS
3. The City will complete the replacement of the old pumps at the Catawba and Cloninger
Street pump stations by June 16, 2000.
a
4. The City will remove the accumulated solids by June 16, 2000.
5. The City will remove the accumulated solids/debris by June 16, 2000.
7. The City will make all necessary additions and repairs by June 16, 2000. Please note that
the systems were not broken - they simply did not have a test button.
8. The City is setting up a maintenance documentation log.
9. The City Manager will ask the City Council to include funding for telemetry systems at all
pump station in the 2000-2001 City Budget. The City Budget is effective July 1, 2000.
11. The City will include air relief valves on the next update sewer system map.
12. The City has a system in place which inspections all pump stations twice a day, including
opening the top and looking into the wet well. The City also has a septic hauler which
responses 24 hours a day 365 days a year to pump and haul sewer when we have a pump go
out at a pump station. The stations are checked more often if we have bad weather. The City
plans to remove all but one of the exist in pump stations within six years and does not
believe we need to spend $50,000 per station to install generators.
13. The signs will be installed by June 16, 2000.
18. The City will install hour meters at all pump stations by June 16, 2000.
COLLECTION SYSTEM FILE REVIEW
3. The City will document regular and/or annual inspections of all sewer lines.
4. The City will document maintenance of right-of-ways.
5. The City is budgeting $30,000 in the 2000-2001 Budget for a sewer line cleaning machine
and will develop and document regular cleaning of the lines.
6. The City will develop a spare parts inventory list.
8. The City will document all maintenance, inspections and tests for its pump stations.
9. We will develop a correct trouble log.
The City has worked very hard to maintain and improve it's entire wastewater system and will
continue to do so in the future.
Please call me at 1828-459-7009 if you need additional information.
Cordially,
c
M.D. McGinnis
City Manager
G�=
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
MOORESVILLE REGIONAL OFFICE
DIVISION OF WATER QUALITY
JAMES B. HUNT JR.
GOVERNOR
Mr. M. Dean McGinnis, City Manager
City of Claremont
BILL HOLMAN
Post Office Box 446
SECRETARY
Claremont, North Carolina 28610
May 3, 2000
Subject: Non -Discharge Facility Inspection
Sewer Collection System
City of Claremont
Catawba County, NC
This letter transmits a copy of the inspection report covering the inspection of the subject
sewer collection system conducted on April 26, 2000 by Mr. G. T. Chen of this Office. Mr. Chen was
accompanied by Mr. Thomas Winkler, Director of Public Works.
Generally, the inspection revealed that the sewer'collection system of the City of Claremont is
being properly operated and maintained. However, there were some deficiencies noted that are set forth
under "Additional Comments " in the attached inspection report.
The Town needs to take action to correct the noted deficiencies. It is also requested that you
_ "respond to this matter in writing by no later than May 17, 2000, indicating actions taken to correct the
deficiencies. Please address your response to Mr. Chen.
If you have any questions regarding to this matter, please contact Mr. Chen or me at (704) 663-
{ ' 7
1699.
Sincerely,
r
D. Rex Gleason, P.E.
Water Quality Regional Supervisor
Attachments
cc: Catawba County Department of Environmental Health
Dennis Ramsey, Non -Discharge Branch
gtc
Arra
2 0 1 0
919 NORTH MAIN STREET, MOORESVILLE, NORTH CAROLINA 281 15
PHONE 704-663-1699 FAX 704-663-6040
AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED/10% POST -CONSUMER PAPER
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Bill Holman, Secretary
Kerr T. Stevens, Director
1••
0004%
NCDENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
NON -DISCHARGE COMPLIANCE INSPECTION
GENERAL INFORMATION
City/Town/Owner: City of Claremont
NPDES Permit No.: NC0081370/NC0032662*
NPDES Issuance Date: 06-26-95/05-30-95
NPDES Expiration Date: 06-30-00/06-30-00
SOC Issuance Date: N/A
Permittee Contact: M. Dean McGinnis
ORC Name: Thomas Winkler
24-hr Contact Name: Thomas Winkler
County: Catawba
Non -discharge Permit No.: See attached
Non -discharge Issuance Date: See attached
Non -discharge Expiration Date: N/A
SOC Expiration Date: N/A
Telephone No.: (828, 45) 9-7800
Telephone No.: (828) 241-2098
Telephone No.: (704) 241-2098
Reason for Inspection
X ROUTINE COMPLAINT FOLLOW-UP OTHER
Type of inspection
X Collection System Spray Irrigation Sludge Other
Inspection Summary: (additional comments may be included on attached pages)
*NPDES Permit No. NCO081370 was issued on June 26, 1995, with an expiration date of June 30,
2000, for the operation of the McLin Creek WWTP, and NPDES Permit No. NCO032662 was issued
on May 30, 1995, with an expiration date of June 30, 2000, for the operation of the North WWTP.
Is a follow-up inspection necessary X yes no
Inspector(s) Names)/Title(s): Gong-Tseh Chen/Environmental Specialist II
Telephone No.: (704) 663-1699 Fax No.: (704) 663-6040
Date of Inspection: April 26, 2000
Permittee: City of Claremont
Facility: Catawba Pump Station, Cloniger Street Pump Station, Pembrook
Pump Station, Pierre Foods (formerly Western Steer Mom N Pop's
Inc.) Pump Station, and School Pump Station.
Permit: No permits were found for the Catawba, Cloniger Street, and Pierre
Foods pump stations. The School pump station was permitted under
Permit No. WQ0006391 issued on March 31, 1994 for the replacement
of an existing pump station. The Pembrook pump station was
permitted under Permit No. WQ0007656. According to Mr. Thomas
Winkler, Director of Public Works, the Catawba pump station was
built approximately15 years ago, the Cloniger Street pump station 30
years ago, and the Pierre Foods pump station 20 — 30 years ago.
Facility Location: The Catawba pump station is located in a wooded area adjacent to
Catawba Trucking Company on the east side of North Oxford Road,
approximately 0.3 mile north of the intersection with I-40 WB; the
Cloniger Street pump station is located in a wooded area near the
junction of Cloniger Street and Carpenter Street; the Pembrook
pump station is located behind the Progressive Furniture Company on
an unpaved drive adjacent to the railroad tracks, at the end of Penny
Road; the Pierre Foods pump station is located inside the Pierre
Foods, Inc.'s business compound on WSMP Road; and the School
pump station is located in a wooded area near the junction of Byrd
Street and Calvin Street.
Gravity Sewers
I. Manholes
1. Are manholes accessible?
2. Are manhole covers above grade?
Visible signs of overflow?
Sinkholes or depressions?
3. Are manhole covers missing or improperly seated?
2
Yes ® No ❑
Yes ® No ❑
Yes ❑ No
Yes ❑ No
Yes ❑ No
City of Claremont
Sewer Collection System
April 26, 2000
4. Are manholes in need of repair?
Yes
®
No
❑
Due to normal wear and tear?
Yes
®
No
_ ❑
Due to vandalism?
Yes
❑
No
❑
5. Are inverts in need of repair?
Yes
❑
No
6. Is there evidence of collection system deterioration?
Yes
❑
No
Z
7. Is flow visibly restricted in pipe or manhole?
Yes
❑
No
8. Is there an excessive amount of grease?
Yes
❑
No
Roots?
Yes
❑
No
Sand?
Yes
❑
No
9. Is there evidence of submergence of vents?
Yes
❑
No
❑
10. Are bypass structures or pipes visible in manhole?
Yes
❑
No
ADDITIONAL COMMENTS RELATIVE TO ITEMS OF MANHOLE INSPECTION:
*I. 2. Some manhole covers are above grade.
*I. 4. The City needs to grout the closest manhole to the Pierre Foods pump station. The City needs to
raise the first manhole up -line from the School pump station to prevent infiltration/inflow and/or
overflow.
*I. 8. The closest manhole to the Cloniger Street pump station has a screen built into the bottom, while
the screen can prevent solid waste from entering the wet -well it also can restrict the flow. The
City needs to routinely/frequently remove the solids from this manhole to prevent overflow. The
City also needs to remove solids from the closest manhole to the Pembrook pump station.
*I. 9. There were no vents for the manholes inspected.
II. Lines/Right-of-Ways
1. Are easement, right-of-ways, in need of mowing or clearing?
Yes
❑
No
2. Are sinkholes or depressions observed above line?
Yes
❑
No
3. Is there evidence of leakage or seepage from the line?
Yes
❑
No
3
City of Claremont
Sewer Collection System
April 26, 2000
4. Are there areas of exposed line?
Yes
®
No
❑
Are exposed lines constructed of material other
than ductile iron?
Yes
®
No
❑
5. Are stream/ditch crossings and aerial supports in need of repair?
Yes
❑
No
6. Are right-of-ways being used for roads?
Yes
❑
No
7. Do lines show evidence or history of damage?
Yes
❑
No
ADDITIONAL COMMENTS RELATIVE TO ITEMS OF LINES/RIGHT-of-WAYS INSPECTION:
*II. 4. There were seven stream/ditch crossings; the total length of exposed line (polyvinyl
chloride pipe in steel casing) is approximately 150 feet.
Pump Stations/Siphons
1. Are any pump station/siphon sites difficult to access?
Yes
❑
No
2. Does general housekeeping need improvement?
Yes
❑
No
3. Are there any missing pumps?
Yes
❑
No
4. Do wet wells/siphons have accumulations of debris
that could potentially affect the operation of the unit?
Yes
®
No
❑
5. Does the first manhole up line from the pump
station or siphon show signs of backup,
overflow, debris originating from the line?
Yes
®
No
❑
6. Are there any floats/controls for pumps, alarms or alternators
that do not work?
Yes
❑
No
❑
7. Did high water alarms fail to work when tested?
Yes
®
No
❑
8. Did ORC fail to produce maintenance log?
Yes
®
No
❑
9. Is telemetry, SCADA present?
Yes
®
No
❑
Operable?
Yes
®
No
❑
Gd
City of Claremont
Sewer Collection System
April 26, 2000
10. Are backflow devices in place and operable?
Yes
®
No
❑
11. Where necessary are air relief valves present
and operable?
Yes
❑
No
❑
12. Are standby generators present?
Yes
❑
No
Operable?
Yes
❑
No
❑
Is fuel tank full?
Yes
❑
No
❑
13. Is there a 24-hr notification sign?
Yes
❑
No
14. Is public access limited?
Yes
®
No
❑
15. Is there any bypass mechanism present?
Yes
❑
No
16. Any signs of overflow at the station/siphon?
Yes
❑
No
17. Is there chemical addition capability for:
Odor control
Yes
❑
No
_ pH control
Yes
❑
No
_ Other, explain?
Yes
®
No
❑
18. Does the pump station have a flow meter, pump counter
or other means to measure flow?
Yes
❑
No
ADDITIONAL COMMENTS RELATIVE TO ITEMS OF PUMP STATIONS/SIPHONS INSPECTION:
*3. The City is in the process of replacing old pumps at the Catawba and Cloniger Street pump stations.
Therefore, there was only one functional pump at each of the two stations on the day of the
inspection. The City needs to complete this work as soon as possible.
*4. The City needs to remove accumulated solids from the wet -wells of the Cloniger Street, Pierre Foods,
and School pump stations.
*5. The City needs to remove solids/debris from the closest up -line manholes of the Cloniger Street
and Pembrook pump stations.
*6. Refer to *7.
5
City of Claremont
Sewer Collection System
April 26, 2000
*7. There were no high water alarms (visual and/or audible) at the Cloniger Street pump station. There
were only visual high water alarm systems at the Catawba, Pembrook, and Pierre Foods pump
stations. The alarm system at the Pierre Foods pump station operated when tested, the other
two failed (probably due to burnt light bulbs). The School pump station has an audible alarm system
and it was in good working order. The City needs to install and/or repair both visual and audible high
water alarm systems at its pump stations.
*8. The City needs to document. maintenance activities for all its pump stations.
*9. The School pump station has a telemetry system which was tested and found to be in good working
order (Norman Security, Inc. in Sherrills Ford responded to the signal from the pump station by
telephone). No telemetry systems are installed on the other pump stations. The City should
install telemetry systems at all its pump stations.
* 11. None observed.
* 12. The City needs to provide portable generators for all its pump stations.
* 13. There were no signs at the pump stations regarding the need to report spills within 24 hours. The
Town needs to provide a 24-hr notification sign at each pump station.
* 17. No specific chemical addition facilities at the pump stations. However, chemicals and degreasing
agents can be added to the wet wells from the top of the pump stations.
* 18. The City should install flow measuring devices for all its pump stations.
Collection System File Review
1. Does DWQ Database indicate repetitive overflows at any point?
Yes
❑
No
If yes is there a corrective action plan?
Yes
❑
No
❑
2. Do records include a map of the collection system?
Yes
®
No
❑
3. Are there records of annual visual inspections of all lines not visible from
normal public access?
Yes
❑
No
Regular visual inspections of high priority areas?
Yes
❑
No
4. Do records indicate that right of ways are maintained to allow access?
Yes
❑
No
5. Are there areas of regular or scheduled cleaning?
Yes
❑
No
n
City of Claremont
Sewer Collection System
April 26, 2000
6. Is there a spare parts inventory and list of contractors? Yes ❑
7. Is the spare parts inventory adequate? Yes
8. Are maintenance logs up-to-date and include inspections, tests, maintenance? Yes ❑
9. Is there a trouble log of all problems that include the following information? Yes ❑
Overflow locations, who responded.
Time/date, action taken, cause of problem/overflow.
Was problem resolved.
10. Does the Town have a Sewer Use Ordinance?
Is the SUO being enforced?
11. Does the system have any known points of bypass?
If yes describe type of bypass and location.
12. Is there records of pump station telemetry/SCADA notifications?
Yes
Yes
Yes ❑
No
No ❑
No
No ❑
No ❑
No ❑
No
Yes ❑ No
ADDITIONAL COMMENTS RELATIVE TO ITEMS OF COLLECTION SYSTEM FILE REVIEW:
*3. The City needs to document regular and/or annual inspections of all sewer lines.
*4. The City needs to document maintenance of right-of-ways.
*5. The City needs to develop and document regular or scheduled cleaning of sewer lines.
*6. No spare parts inventory list was available. The City needs to develop a spare parts inventory list.
*7. Spare parts appeared to be adequate at the time of inspection.
*8. The City needs to document all maintenance, inspections, and tests for its pump stations.
*9. The City uses the "Sewage Spill Response Evaluation" records as a trouble log.
7
ti NORTH CAROLINA DEPARTMENT OF
A4 ENVIRONMENT AND NATURAL RESOURCES
NCDENRDIVISION OF WATER QUALITY
MOORESVILLE: REGIONAL OFFICE
DIVISION OF WATER QUALITY
JAMES B. HUNT JR. May 3, 2000
GOVERNOR
Mr. M. Dean McGinnis, City Manager
of Claremont
BILL HOLMAN "Post Office Box 446
SECRETARY Claremont, North Carolina 28610
Subject: Non -Discharge Facility Inspection
Sewer Collection System
City of Claremont
KERR T. STEvE"*;"��f_'
DIRECTOR Catawba County, NC
Dear Mr. McGinnis:
This letter transmits a copy of the inspection report covering the inspection of the subject
:sewer collection system conducted on April 26, 2000 by Mr. G. T. Chen of this Office. Mr. Chen was
accompanied by Mr. Thomas Winkler, Director of Public Works.
-collection system of the City Claremont Generally, the inspection revealed that the sewer of C emont is
being properly operated and maintained. However, there were some deficiencies noted that are set forth
under "Additional Comments in the attached inspection report.
The Town needs to take action to correct the noted deficiencies. It is also requested that you
respond to this matter in writing by no later than May 17, 2000, indicating actions taken to correct the
deficiencies. Please address your response to Mr. Chen.
If you have any questions regarding to this matter, please contact Mr. Chen or me at (704) 663-
1699.
Sincerely,
D. Rex Gleason, P.E.
Water Quality Regional Supervisor
;7
�H-
Attachments
cc: Catawba County Department of Environmental Health
Dennis Ramsey, Non -Discharge Branch
gtc
2
919 NORTH MAIN STREET, MOORESVILLE, NORTH CAROLINA 28115
-663-1699 PHONE704 FAX 704-663-6040
AN EQUAL OPPORTUNITY AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED/10% POST -CONSUMER PAPER
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Bill Holman, Secretary
Kerr T. Stevens, Director
sLTWA••
NCDENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
NON -DISCHARGE COMPLIANCE INSPECTION
GENERAL INFORMATION
City/Town/Owner: City of Claremont County: Catawba
NPDES Permit No.: NC0081370/NC0032662* Non -discharge Permit No.: See attached
NPDES Issuance Date: 06-26-95/05-30-95 Non -discharge Issuance Date: See attached
NPDES Expiration Date: 06-30-00/06-30-00 Non -discharge Expiration Date: N/A
SOC Issuance Date: N/A SOC Expiration Date: N/A
Permittee Contact: M. Dean McGinnis Telephone No.: (828) 459-7800
ORC Name: Thomas Winkler Telephone No.: (828) 241-2098
24-hr Contact Name: Thomas Winkler Telephone No.: (704) 241-2098
Reason for Inspection
X ROUTINE COMPLAINT FOLLOW-UP OTHER
Type of inspection
X Collection System Spray Irrigation Sludge
Inspection Summary: (additional comments may be included on attached pages)
Other
*NPDES Permit No. NCO081370 was issued on June 26, 1995, with an expiration date of June 30,
2000, for the operation of the McLin Creek WWTP, and NPDES Permit No. NCO032662 was issued
on May 30, 1995, with an expiration date of June 30, 2000, for the operation of the North WWTP.
Is a follow-up inspection necessary des no
Inspector(s) Name(s)/Title(s): Gong-Tseh Chen/Environmental Specialist II
Telephone No.: (704) 663-1699 Fax No.: (704) 663-6040
Date of Inspection: April 26, 2000
Permittee: City of Claremont
Facility: Catawba Pump Station, Cloniger Street Pump Station, Pembrook
Pump Station, Pierre Foods (formerly Western Steer Mom N Pop's
Inc.) Pump Station, and School Pump Station.
Permit: No permits were found for the Catawba, Cloniger Street, and Pierre
Foods pump stations. The School pump station was permitted under
Permit No. WQ0006391 issued on March 31, 1994 for the replacement
of an existing pump station. The Pembrook pump station was
permitted under Permit No. WQ0007656. According to Mr. Thomas
Winkler, Director of Public Works, the Catawba pump station was
built approximately15 years ago, the Cloniger Street pump station 30
years ago, and the Pierre Foods pump station 20 — 30 years ago.
Facility Location: The Catawba pump station is located in a wooded area adjacent to
Catawba Trucking Company on the east side of North Oxford Road,
approximately 0.3 mile north of the intersection with I-40 WB; the
Cloniger Street pump station is located in a wooded area near the
junction of Cloniger Street and Carpenter Street; the Pembrook
pump station is located behind the Progressive Furniture Company on
an unpaved drive adjacent to the railroad tracks, at the end of Penny
Road; the Pierre Foods pump station is located inside the Pierre
Foods, Inc.'s business compound on WSMP Road; and the School
pump station is located in a wooded area near the junction of Byrd
Street and Calvin Street.
Gravity Sewers
Manholes
1. Are manholes accessible?
2. Are manhole covers above grade?
Visible signs of overflow?
sinkholes or depressions?
3. Are manhole covers missing or improperly seated?
01
Yes ® No ❑
Yes ® No ❑
Yes ❑ No
Yes ❑ No
Yes ❑ No
.n
City of Claremont
Sewer Collection System
April 26, 2000
4. Are manholes in need of repair?
Yes
®
No
❑
Due to normal wear and tear?
Yes
®
No
❑
Due to vandalism?
Yes
❑
No
❑
5. Are inverts in need of repair?
Yes
❑
No
6. Is there evidence of collection system deterioration?
Yes
❑
No
7. Is flow visibly restricted in pipe or manhole?
Yes
❑
No
8. Is there an excessive amount of grease?
Yes
❑
No
Roots?
Yes
❑
No
Sand?
Yes
❑
No
9. Is there evidence of submergence of vents?
Yes
❑
No
❑
10. Are bypass structures or pipes visible in manhole?
Yes
❑
No
ADDITIONAL COMMENTS RELATIVE TO ITEMS OF MANHOLE INSPECTION:
*I. 2. Some manhole covers are above grade.
*I. 4. The City needs to grout the closest manhole to the Pierre Foods pump station. The City needs to
raise the first manhole up -line from the School pump station to prevent infiltration/inflow and/or
overflow.
*I. 8. The closest manhole to the Cloniger Street pump station has a screen built into the bottom, while
the screen can prevent solid waste from entering the wet -well it also can restrict the flow. The
City needs to routinely/frequently remove the solids from this manhole to prevent overflow. The
City also needs to remove solids from the closest manhole to the Pembrook pump station.
*I. 9. There were no vents for the manholes inspected.
H. Lines/Right-of-Ways
1. Are easement, right-of-ways, in need of mowing or clearing?
Yes
❑
No
2. Are sinkholes or depressions observed above line?
Yes
❑
No
3. Is there evidence of leakage or seepage from the line?
Yes
❑
No
3
City of Claremont
Sewer Collection System
April 26, 2000
4. Are there areas of exposed line?
Yes
®
No
❑
Are exposed lines constructed of material other
than ductile iron?
Yes
®
No
❑
5. Are stream/ditch crossings and aerial supports in need of repair?
Yes
❑
No
6. Are right-of-ways being used for roads?
Yes
❑
No
7. Do lines show evidence or history of damage?
Yes
❑
No
ADDITIONAL COMMENTS RELATIVE TO ITEMS OF LINES/RIGHT-of-WAYS INSPECTION:
*II. 4. There were seven stream/ditch crossings; the total length of exposed line (polyvinyl
chloride pipe in steel casing) is approximately 150 feet.
Pump Stations/Siphons
1. Are any pump station/siphon sites difficult to access?
Yes
❑
No
2. Does general housekeeping need improvement?
Yes
❑
No
3. Are there any missing pumps?
Yes
❑
No
4. Do wet wells/siphons have accumulations of debris
that could potentially affect the operation of the unit?
Yes
®
No
❑
5. Does the first manhole up line from the pump
station or siphon show signs of backup,
overflow, debris originating from the line?
Yes
®
No
❑
6. Are there any floats/controls for pumps, alarms or alternators
that do not work?
Yes
❑
No
❑ *
7. Did high water alarms fail to work when tested?
Yes
®
No
❑ *
8. Did ORC fail to produce maintenance log?
Yes
®
No
❑ *
9. Is telemetry, SCADA present?
Yes
®
No
❑
Operable?
Yes
®
No
❑
M
City of Claremont
Sewer Collection System
April 26, 2000
10. Are backflow devices in place and operable?
Yes
Z
No
❑
11. Where necessary are air relief valves present
and operable?
Yes
❑
No .
❑
12. Are standby generators present?
Yes
❑
No
Operable?
Yes
❑
No
❑
Is fuel tank full?
Yes
❑
No
❑
13. Is there a 24-hr notification sign?
Yes
❑
No
14. Is public access limited?
Yes
®
No
❑
15. Is there any bypass mechanism present?
Yes
❑
No
16. Any signs of overflow at the station/siphon?
Yes
❑
No
17. Is there chemical addition capability for:
Odor control
Yes
❑
No
_ pH control
Yes
❑
No
_ Other, explain?
Yes
®
No'
❑
18. Does the pump station have a flow meter, pump counter
or other means to measure flow?
Yes
❑
No
ADDITIONAL COMMENTS RELATIVE TO ITEMS OF PUMP STATIONS/SIPHONS INSPECTION:
*3. The City is in the process of replacing old pumps at the Catawba and Cloniger Street pump stations.
Therefore, there was only one functional pump at each of the two stations on the day of the
inspection. The City needs to complete this work as soon as possible.
*4. The City needs to remove accumulated solids from the wet -wells of the Cloniger Street, Pierre Foods,
and School pump stations.
* 5. The City needs to remove solids/debris from the closest up -line manholes of the Cloniger Street
and Pembrook pump stations.
*6. Refer to *7.
5
9
City of Claremont
Sewer Collection System
April 26, 2000
*7. There were no high water alarms (visual and/or audible) at the Cloniger Street pump station. There
were only visual high water alarm systems at the Catawba, Pembrook, and Pierre Foods pump
stations. The alarm system at the Pierre Foods pump station operated when tested, the other
two failed (probably due to burnt light bulbs). The School pump station has an audible alarm system
and it was in good working order. The City needs to install and/or repair both visual and audible high
water alarm systems at its pump stations.
*8. The City needs to document maintenance activities for all its pump stations.
*9. The School pump station has a telemetry system which was tested and found to be in good working
order (Norman Security, Inc. in Sherrills Ford responded to the signal from the pump station by
telephone). No telemetry systems are installed on the other pump stations. The City should
install telemetry systems at all its pump stations.
* 11. None observed.
* 12. The City needs to provide portable generators for all its pump stations.
* 13. There were no signs at the pump stations regarding the need to report spills within 24 hours. The
Town needs to provide a 24-hr notification sign at each pump station.
* 17. No specific chemical addition facilities at the pump stations. However, chemicals and degreasing
agents can be added to the wet wells from the top of the pump stations.
* 18. The City should install flow measuring devices for all its pump stations.
Collection System File Review
1. Does DWQ Database indicate repetitive overflows at any point?
Yes
❑
No
If yes is there a corrective action plan?
Yes
❑
No
❑
2. Do records include a map of the collection system?
Yes
®
No
❑
3. Are there records of annual visual inspections of all lines not visible from
normal public access?
Yes
❑
No
Regular visual inspections of high priority areas?
Yes
❑
No
4. Do records indicate that right of ways are maintained to allow access?
Yes
❑
No
5. Are there areas of regular or scheduled cleaning?
Yes
❑
No
2
City of Claremont
Sewer Collection System
April 26, 2000
6. Is there a spare parts inventory and list of contractors? Yes ❑
7. Is the spare parts inventory adequate? Yes
8. Are maintenance logs up-to-date and include inspections, tests, maintenance? Yes ❑
9. Is there a trouble log of all problems that include the following information? Yes ❑
Overflow locations, who responded.
Time/date, action taken, cause of problem/overflow.
Was problem resolved.
10. Does the Town have a Sewer Use Ordinance?
Is the SUO being enforced?
11. Does the system have any known points of bypass?
If yes describe type of bypass and location.
12. Is there records of pump station telemetry/SCADA notifications?
Yes
Yes
Yes ❑
No
No ❑
No
No ❑
No ❑
No ❑
No
Yes ❑ No
ADDITIONAL COMMENTS RELATIVE TO ITEMS OF COLLECTION SYSTEM FILE REVIEW:
*3. The City needs to document regular and/or annual inspections of all sewer lines.
*4. The City needs to document maintenance of right-of-ways.
*5. The City needs to develop and document regular or scheduled cleaning of sewer lines.
*6. No spare parts inventory list was available. The City needs to develop a spare parts inventory list.
*7. Spare parts appeared to be adequate at the time of inspection.
*8. The City needs to document all maintenance, inspections, and tests for its pump stations.
*9. The City uses the "Sewage Spill Response Evaluation" records as a trouble log.
7
r
OF W ATF9 State of North Carolina
\O� QG Department of Environment and Natural Resources
cry Division of Water Quality
Flow Tracking/Acceptance for Sewer Extension Permit Applications
(FTSE—10/07)
Project Applicant Name: City of Claremont
Project Name for which flow is being requested: North Plant Flow Tracking
More than one FTSE-10107 may be required for a single project if the owner of the WWTP is not responsible for all
pump stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Claremont North Plant
b. WWTP Facility Permit #: NC0032662
All flows are in MGD
c. WWTP facility's permitted flow
0.100
MGD
d. Estimated obligated flow not yet tributary to the WWTP
0
MGD
e. WWTP facility's actual avg. flow
0.083
MGD
f. Total flow for this specific request
0
MGD
g. Total actual and obligated flows to the facility
0.083
MGD
h. Percent of permitted flow used
83%
Note: WWTP's actual flow dates are from March 1, 2010 thru February 28, 2011.
II. Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP
Pump Station Name Approx. Capacity, MGD Approx. Current Avg.
(Fin- /Design) Daily Flow, MGD
Catawba Truck . 0.032 MGD 0.002961
III. Certification Statement:
I, Doug Barrick,. City Manage certify that, to the best of my knowledge, the addition of the volume of
wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater
treatment facility and that the flow from this project is not anticipated to cause any capacity related
sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment
plant under normal circumstances. This analysis has been performed in accordance with local established
policies and procedures using the best available data. This certification applies to those items listed above
in Sections I and II for which I am the responsible party. Signature of this form `indicates acceptance of
this was w. / i
Signing Official Signature 6 Dhte
Instructions for: Flow Tracking/Acceptance for Sewer Extension Permit
Applications (FTSE—10/07)
Section I
a. WWTP Facility: Enter the name of the WWTP that will receive the wastewater flow.
b. WWTP Facility Permit #: Enter the NPDES or Non -Discharge number for the WWTP receiving the
wastewater flow.
c. WWTP facility's permitted flow, MGD: From WWTP owner's NPDES or Non -Discharge permit.
d. Estimated obligated flow not vet tributary to the WWTP, MGD: This includes flows allocated to
other construction projects not yet contributing flow to the collection system. Flows allocated through
interlocal agreements or other contracts not yet contributing flow to the collection system are also
included. For POTWs that implement a pretreatment program, include flows allocated to industrial
users who may not be using all of their flow allocation. Please contact your Pretreatment Coordinator
for information on industrial flow tributary to your WWTP.
As of January 15, 2008 the POTW should have reviewed flow allocations made over the last two
years and reconciled their flow records, to the best of their ability, so it is known how much flow has
been obligated and is not yet been made tributary to the WWTP, in accordance with local policies and
procedures employed by the reporting entity.
The obligated flow not yet tributary plus actual flow will be reconciled annually for systems at less
than 60% of pennitted flow used. Annual updates shall be submitted to the appropriate Regional
Office by January 15 of each year and cover the previous calendar year.
Semi -Annual updates shall be required when the percent of permitted flow used reaches 60%. Semi-
annual time period are defined as January 1 through June 30 and July 1 through December 31. Semi-
annual updates shall be submitted to the appropriate Regional Office by July 15 and January 15 of
each year.
Quarterly updates shall be required when the percent of permitted flow used reaches 80%. Quarters
are defined as Qtrl (Jan -Feb -Mar); Qtr2 (Apr -May -Jun); Qtr3 (Jul -Aug -Sep); Qtr4 (Oct -Nov -Dec).
Quarterly updates shall be submitted to the appropriate Regional Office by April 15, July 15, October
15 and January 15 of each year.
e. WWTP facility's actual avg. flow, MGD: Previous 12 month average.
f. Total flow for this specific request, MGD: Enter the requested flow volume.
g. Total actual and obligated flows to the facility, MGD Equals [d + e + f]
h. Percent of permitted flow used: Equals [(g / c)*100]
_S For example:
On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there
is 0.5 MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7
MGD.
The first Form FTSE-10/07 submitted after January 15, 2008 may have numbers like this:
c. = 6.0 MGD
d. = 0.5 MGD
e. = 2.7 MGD
f. = 0.015 MGD
g. = 3.215 MGD
h. = 53.6 %
The next Form FTSE-10/07 may be updated like this:
c.
= 6.0
MGD
d.
= 0.515
MGD
e.
= 2.73
MGD
f.
= 0.102
MGD
g.
= 3.349
MGD
h.
= 55.8 %
Each subsequent Form FTSE-10/07 will be updated in the same manner.
Section II
List the naive, approximate pump station firm (design) capacity and approximate current average flow
(previous 12 months) through the pump station for each pump station that will be impacted by the
proposed sewer extension project. Include the proposed flow for this project and other flows that have
been approved for the pump station but are not yet tributary.
Finn (design) capacity is the design average daily flow of the pump station as calculated by the design
engineer or the station capacity with the largest pump out of service as per the Minimum Design Criteria
if the design capacity is unknown.
Section III
Form FTSE-10/07 must be signed by the appropriate official as per 15A NCAC 02T .0106.
OF W ATFR State of North Carolina
O� QG Department of Environment and Natural Resources
c� r Division of Water Quality
p '< Flow Tracking/Acceptance for Sewer Extension Permit Applications
(FTSE—10/07)
Project Applicant Name: City of Claremont
Project Name for which flow is being requested: McLin Creek WWTP Flow Tracking
More than one FTSE-10107 may be required for a single project if the ovvner of the YVYVTP is not responsible for all
pump stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Claremont McLin Creek WWTP
b. WWTP Facility Pen -nit #: NC0081370
All flows are in MGD
c. WWTP facility's permitted flow 0.300 MGD
d. Estimated obligated flow not yet tributary to the WWTP 0 MGD
e. WWTP facility's actual avg. flow 0.151 MGD
f. Total flow for this specific request 0 MGD
g. Total actual and obligated flows to the facility 0.151 MGD
h. Percent of permitted flow used 50%
Note: WWTP's actual flow dates are from March 1, 2010 thru February 28, 2011.
II. Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP
Pump Station Name Approx. Capacity, MGD Approx. Current Avg.
(Firm/Design) Daily Flow, MGD
School Lift Station 0.058 MGD 0.010172 MGD
State Lift Station 0.127 MGD 0.005844 MGD
Mom and Pops 0.058 MGD 0.004895 MGD
Smyre Lift Station 0.045 MGD 0.004850 MGD
III. Certification Statement:
I, Doug Barrick, City Manager, certify that, to the best of my knowledge, the addition of the volume of
wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater
treatment facility and that the flow from this project is not anticipated to cause any capacity related
sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment
plant under normal circumstances. This analysis has been performed in accordance with local established
policies and procedures using the best available data. This certification applies to those items listed above
in Sections I and II for which I am the responsible party. Signature of this form indicates acceptance of
this wastew-Aaw. ,
Signing Official Signature
'P 11
Date
Instructions for: Flow Tracking/Acceptance for Sewer Extension Permit
Applications (FTSE—10/07)
Section I
a. WWTP Facility Name: Enter the name of the WWTP that will receive the wastewater flow.
b. WWTP Facility Permit #: Enter the NPDES or Non -Discharge number for the WWTP receiving the
wastewater flow.
c. WWTP facility's permitted flow, MGD: From WWTP owner's NPDES or Non -Discharge permit.
d. Estimated obligated flow not yet tributary to the WWTP, MGD: This includes flows allocated to
other construction projects not yet contributing flow to the collection system. Flows allocated through
interlocal agreements or other contracts not yet contributing flow to the collection system are also
included. For POTWs that implement a pretreatment program, include flows allocated to industrial
users who may not be using all of their flow allocation. Please contact your Pretreatment Coordinator
for information on industrial flow tributary to your WWTP.
As of January 15, 2008 the POTW should have reviewed flow allocations made over the last two
years and reconciled their flow records, to the best of their ability, so it is known how much flow has
been obligated and is not yet been made tributary to the WWTP, in accordance with local policies and
procedures employed by the reporting entity.
The obligated flow not yet tributary plus actual flow will be reconciled annually for systems at less
than 60% of permitted flow used. Annual updates shall be submitted to the appropriate Regional
Office by January 15 of each year and cover the previous calendar year.
Semi -Annual updates shall be required when the percent of permitted flow used reaches 60%. Semi-
annual time period are defined as January 1 through June 30 and July 1 through December 31. Semi-
annual updates shall be submitted to the appropriate Regional Office by July 15 and January 15 of
each year.
Quarterly updates shall be required when the percent of permitted flow used reaches 80%. Quarters
are defined as Qtrl (Jan -Feb -Mar); Qtr2 (Apr -May -Jun); Qtr3 (Jul -Aug -Sep); Qtr4 (Oct -Nov -Dec).
Quarterly updates shall be submitted to the appropriate Regional Office by April 15, July 15, October
15 and January 15 of each year.
C. WWTP facility's actual avg. flow, MGD: Previous 12 month average.
f. Total flow for this specific request, MGD: Enter the requested flow volume.
g. Total actual and obligated flows to the facility, MGD Equals [d + e + f]
h. Percent of pennitted flow used: Equals [(g / c)*100]
For example:
On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there
is 0.5 MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7
MGD.
The first Form FTSE-10/07 submitted after January 15, 2008 may have numbers like this:
c. = 6.0 MGD
d. = 0.5 MGD
e. = 2.7 MGD
f. = 0.015 MGD
g. = 3.215 MGD
h. = 53.6 %
The next Form FTSE-10/07 may be updated like this:
c. = 6.0 MGD
d.=0.515MGD
e. = 2.73 MGD
f. = 0.102 MGD
g. = 3.349 MGD
h. = 55.8 %
Each subsequent Form FTSE-10/07 will be updated in the same manner.
Section II
List the name, approximate pump station firm (design) capacity and approximate current average flow
(previous 12 months) through the pump station for each pump station that will be impacted by the
proposed sewer extension project. Include the proposed flow for this project and other flows that have
been approved for the pump station but are not yet tributary.
Firm (design) capacity is the design average daily flow of the pump station as calculated by the design
engineer or the station capacity with the largest pump out of service as per the Minimum Design Criteria
if the design capacity is unknown.
Section III
Form FTSE-10/07 must be signed by the appropriate official as per 15A NCAC 02T .0106.
C
Month of March 2011
Claremont - North
Day Flow (MGD) Rain (Inches)
1
0.105
0.90
2
0.094
0.00
3
0.083
0.00
4
0.087
0.00
5
0.085
0.00
6
0.116
1.40
7
0.117
0.80
8
0.136
0.00
9
0.093
0.00
10
0.148
0.80
11
0.144
0.10
12
0.112
0.00
13
0.105
0.00
14
0.095
0.00
15
0.097
0.00
16
0.104
0.10
17
0.079
0.00
18
0.088
0.00
19
0.091
0.00
20
0.088
0.00
21
0.073
0.00
22
0.083
0.00
23
0.083
0.00
24
0.079
0.20
25
0.084
0.00
26
0.077
0.00
27
0.090
0.40
28
0.072
0.10
29
0.084
0.00
30
0.087
0.80
31
0.095
0.00
Total
2.974
5.60
Min.
0.072
0.00
Max
0.148
1.40
Average
0.096
0.18
Month of March Flow
0.16
0.14
_ 0.12
0
0.10
0.08
p 0.06
u" 0.04
0.02
0.00
1 2 3 4 5 6 7 8 9 1011 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Claremont - North
Month of March Rainfall
4.00
3.50
3.00
t
2.50
2.00
1.50
1.00
0.50
0.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Claremont - North
Day Flow (MGD) Rain (Inches)
1
0.060
0.00
2
0.122
0.60
3
0.069
0.00
4
0.087
0.10
5
0.119
0.70
6
0.103
0.00
7
0.089
0.00
8
0.082
0.00
9
0.080
0.00
10
0.072
0.00
11
0.077
0.00
12
0.075
0.00
13
0.081
0.00
14
0.076
0.00
15
0.087
0.00
16
0.086
0.00
17
0.075
'0.00
18
0.087
0.00
19
0.083
0.00
20
0.078
0.00
21
0.079
0.00
22
0.092
0.00
23
0.076
0.00
24
0.074
0.40
25
0.090
0.00
26
0.081
0.00
27
0.083
0.00
28
0.085
0.00
Total
2.348
1.80
Min.
0.060
0.00
Max
0.122
0.70
Average
0.084
0.06
Month of February 2011
Claremont - North
Month of February Flow
0.14
0.12
0.10
13
0.08
0.06
0
u- 0.04
0.02
0.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Claremont - North
Month of February Rainfall
4.00
3.50
Cn
(D 3.00
t
2.50
2.00
CU
1.50
cs 1.00
0.50
0.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Claremont - North
Day
Flow (MGD)
Rain (Inches)
1
0.120
0.00
2
0.127
0.00
3
0.115
0.30
4
0.082
0.00
5
0.086
0.00
6
0.078
0.00
7
0.088
0.00
8
0.087
0.00
9
0.084
0.00
10
0.062
0.20
11
0.068
0.20
12
0.076
0.00
13
0.083
0.00
14
0.081
0.00.
15
0.072
0.00
16
0.075
0.00
17
0.077
0.00
18
0.078
0.10
19
0.080
0.00
20
0.072
0.00
21
0.081
0.00
22
0.070
0.00
23
0.069
0.00
24
0.059
0.00
25
0.070
0.00
26
0.095
0.70
27
0.094
0.00
28
0.079
0.00
29
0.084
0.00
30
0.083
0.00
31
0.075
0.00
Total
2.550
1.50
Min.
0.059
0.00
Max
0.127
0.70
Average
0.082
0.05
Month of January 2011
Claremont - North
Month of January Flow
0.14
0.12
0.10
0.08
0.06
0
0.04
0.02
0.00
1 2 3 4 5 6 7 8 9 1011 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Claremont - North
Month of January Rainfall
4.00
3.50
cn
cD 3.00
s
= 2.50
2.00
1.50
C
.� 1.00
0.50
0.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Claremont - North
Day
Flow (MGD)
Rain (Inches)
1
0.112
1.70
2
0.124
0.00
3
0.109
0.00
4
0.109
0.00
5
0.110
0.00
6
0.099
0.00
7
0.111
0.00
8
0.096
0.00
9
0.109
0.00
10
0.111
0.00
11
0.115
0.00
12
0.109
0.20
13
0.106
0.10
14
0.111
0.00
15
0.109
0.00
16
0.124
0.10
17
0.104
0.00
18
0.121
0.00
19
0.123
0.00
20
0.122
0.00
21
0.121
0.00
22
0.115
0.00
23
0.132
0.00
24
0.116
0.00
25
0.123
0.00
26
0.109
0.30
27
0.115
0.00
28
0.115
0.00
29
0.118
0.00
30
0.117
0.00
31
0.124
0.00
Total
3.539
2.40
Min.
0.096
0.00
Max
0.132
1.70
Average
0.114
0.08
Month of December 2010
Claremont - North
Month of December Flow
0.14
0.12
p 0.10
0.08
0 0.06
LL 0.04
. 0.02
0.00
1 2 3 4 5 6 7 8 9 1011 12131415161718192021 22 23 24 25 26 27 28 29 30 31
Claremont - North
Month of December Rainfall
4.00
3.50
3.00
t
= 2.50
2.00
1.50
1.00
0.50
0.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Claremont - North
Day Flow (MGD) Rain (Inches)
1
0.077
0.00
2
0.104
0.00
3
0.088
0.00
4
0.110
0.20
5
0.107
0.00
6
0.100
0.00
7
0.102
0.00
8
0.097
0.00
9
0.103
0.00
10
0.104
0.00
11
0.095
0.00
12
0.096
0.00
13
0.116
0.00
14
0.097
0.00
15
0.076
0.10
16
0.117
0.60
17
0.118
0.00
18
0.104
0.00
19
0.105
0.00
20
0.103
0.00
21
0.098
0.00
22
0.106
0.00
23
0.117
0.00
24
0.103
0.10
25
0.123
0.00
26
0.082
0.00
27
0.133
0.00
28
0.067
0.00
29
0.116
0.00
30
0.128
0.40
Total
3.092
1.40
Min.
0.067
0.00
Max
0.133
0.60
Average
0.103
0.05
Month of November 2010
Claremont - North
Month of November Flow
0.14
0.12
p 0.10
C�
0.08
3 0.06
O
�- 0.04
0.02
0.00
1 2 3 4 5 6 7 8 9 1011 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Claremont - North
Month of November Rainfall
4.00
3.50
3.00
s
2.50
2.00
1.50
1.00
0.50
0.00
1 2 3 4 5 6 7 8 9 1011 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Claremont - North
D��—I
< o
CD X QL) W CW N N IV N N N N N N N - -- -s --
DO O CO W -4W mW N O 0 m --4 m Cn A W N -� O CO W O Cn A W N Cu
(0
CD
TI
O
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
O O O W O N W CO O N O O O O O O W- s - - -• O O O O o 0 0 CO W O s M
s O N O 0 00 W-4 N W" Cn 00 Cn O W (0 O) -4 Cn Cn -I W4�L" v 0 Cn O N E 00 G)
O W CO 00
0) CO 0 00 .
N
W
C O O -� N O O O O O O O O O O o O O O O O O O'=
O O O Cn O 0) O O o o O 0 0 0 0 0 0) O O O O O O O O O N O O O=3
O N O Cn o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
O O O CD
O O O
Rainfall (Inches)
O Cn O Cn O m o Cn o
OCOOCCOCC
N
w
rn
00
(0
0-
0
O
^
,I
3
N
O
r�
T
nd
�p
w
O
" h
0
O
m
0
1
(n
�
Z
O
0)
-
00
0
N
O
N
N
N
N
W
N
-P
N
Cn
N
CA
N
4
N
00
N
CO
W
O
W
0
O
N
Flow (MGD)
0 0 0 0 0 0 0
N � CA Cb O N •P
w
.p
cn
rn
00
0
o
-�
�
O
O
cp w
O
h
0
O
r* Cn
O
Cr
1
Z °)
0 �
-1
�_
00
CO
C
(O
N
0
N
N
N
N
W
N
•P
N
Cn
N
O
N
V
N
00
N
CO
W
O
W
C�
0
n
a� 0
<D
OO
O 0
Z a
O CD
S�
O
O
Day Flow (MGD) Rain (Inches)
1
0.096
0.00
2
0.090
0.00
3
0.085
0.00
4
0.095
0.00
5
0.083
0.00
6
0.064
0.00
7
0.080
0.00
8
0.082
0.00
9
0.085
0.00
10
0.092
0.00
11
0.113
0.00
12
0.064
0.10
13
0.094
0.00
14
0.091
0.00
15
0.110
1.00
16
0.068
0.00
17
0.097
0.00
18
0.109
0.00
19
0.092
0.00
20
0.080
0.00
21
0.097
0.00
22
0.100
0.00
23
0.081
0.00
24
0.102
0.00
25
0.106
0.50
26
0.089
0.00
27
0.128
2.00
28
0.131
1.60
29.
0.113
0.00
30
0.112
0.70
Total
2.829
5.900
Min.
0.064
0.000
Max
0.131
2.000
Average
0.094
0.197
Month of September 2010
Claremont - North
Month of September Flow
0.16
0.14
0.12
0.10
0.08
0 0.06
1i 0.04
0.02
0.00
1 2 3 4 5 6 7 8 9 1011 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Claremont - North
Month of September Rainfall
4.00
3.50
3.00
= 2.50
2.00
�a
1.50
W 1.00
0.50
0.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Claremont - North
D K � o
a)
(0- X W W N N PON N N N N N N --- 1- ---� -' CO CYO -1 CA Ui p, W N ��
N O O W v M M 4�, W N O O M -,1 O M -P W N O
CO
CD
T
O
O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
O O O N 1 CO Cn A W W - CO -I CO " O W (0 (fl M M CO W CO -I W -I CO O O o0 00 CO �l 00
O" O W N O W • W (0 -A W m� W P CO CO O -1 -I N W v W 'A -1 -I CIl O N N W (D N G)
O 41 W W �
;U
O O O O O O O O O O O O - O O O O O O O O O O O O N O 0 0 0 0
O O O O O O O O O O O O m" O P O O O O O O O O O (O O O O O'" n-
o 0 0 0 0 CD O O O O O O O C 0 0 C 0 0 0 O O O 0 0 0 0 C 0 0 0 0
O N O .A S
_ CD
M O O O
Rainfall (Inches)
O O N N W W-r�--N M
O a O U1 O M O M O Ui O
O O CD O O O O O CD O O
N
W
-P
CSl
CA
CO
O
O
0
� N
0
-�
W
0 4�1
� > N
0
YI
cc
N
O
N
N
N
N
W
N
�P
N
U1
N
CA
N
4
N
OD
N
O
W
CO.)
1
N
Flow (MG®)
O O O O O O O O
O N 4�- M 00 O N -P
O
0
CO
-A
CJ7
(A
v
CO
CO
O
0
CD CA)
0
0 P
D
�
^to
L
_
Z m
0
in
r-11.
n
CO
0
N
O
N
3
N
N
N
W
N
�P
N
Cn
N
O
N
N
00
N
CO
W
O
W
1
J
Month of July 2010
Claremont - North
Day
Flow (MGD)
Rain (Inches)
1
0.055
0.000
2
0.066
0.000
3
0.051
0.000
4
0.053
0.000
5
0.048
0.000
6
0.059
0.000
7
0.062
0.000
8.
0.054
0.000
9
0.062
0.000
10
0.082
0.300
11
0.059
0.000
12
0.048
0.000
13
0.084
2.200
14
0.070
0.000
15
0.063
0.000
16
0.067
0.000
17
0.067
0.000
18
0.086
2.300
19
0.075
0.000
20
0.074
0.000
21
0.093
0.700
22
0.073
0.000
23
0.075
0.000
24
0.071
0.000
25
0.093
0.000
26
0.061
0.800
27
0.102
1.600
28
0.092
0.000
29
0.081
0.100
30
0.075
0.000
31
0.079
0.000
Total
2.180
8.000
Min.
0.048
0.000
Max
0.102
2.300
Average
0.070
0.258
Month of July Flow
0.12
0.10
0.08
0.06
o 0.04
FL
0.02
0.00
1 2 3 4 5 6 7 8 9 1011 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Claremont - North
Month of July Rainfall
5.000
4.500
4.000
v 3.500
a 3.000
2.500
2.000
1.500
1.000
0.500 - A A
0.000
..... I i JON,
1 2 3 4 5 6 7 8 9 1011 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Claremont - North
Day Flow (MGD) Rain (Inches)
1
0.067
0.50
2
0.057
0.00
3
0.058
0.00
4
0.060
0.00
5
0.074
0.00
6
0.046
0.10
7
0.068
0.50
8
0.061
0.00
9
0.064
0.00
10
0.060
0.00
11
0.060
0.00
12
0.065
0.00
13
0.050
0.00
14
0.061
0.10
15
0.054
0.10
16
0.064
1.00
17
0.047
0.00
18
0.052
0.00
19
0.050
0.00
20
0.058
0.00
21
0.048
0.00
22
0.059
0.00
23
0.060
0.00
24
0.063
0.10
25
0.068
0.50
26
0.069
0.00
27
0.059
0.00
28
0.049
0.00
29
0.065
0.10
30
0.053
0.10
Total
1.769
3.10
Min.
0.046
0.00
Max
0.074
1.00
Average
0.059
0.10
Month ®f June 2010
Claremont - North
Month of June Flow
0.10
0.09
0.08
® 0.07
(D 0.06
0.05
0 0.04
LL, 0.03
0.02
0.01
0.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Claremont - North
Month of June Rainfall
4.00
3.50
v 3.00
W
v 2.50
2.00
= 1.50
QC 1.00
0.50
0.00
1 2 3 4 5 6 7 8 9 1011 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Claremont - North
fh
Diversified Integration, Inc.
Service Report
Date: October 1, 2009
2113 Fries Road, Galax, VA 24333
Phone: (276) 236-7211
Fax: (276) 236-0170
Service by: Bryan Dillon/Greg Kimble
Customer:
City of Hickory — Claremont WWTP
Total Hours:
5.0
Address:
Attn: Shawn Pennell
Mileage, 7 233
$ 0.00
P.O. Box 398
Total Labor:
$ 350.00
Hickory, NC 28603
Total Expenses:
$ 0.00
Project:
09049
Total Parts:
$ 0.00
Phone:
(828) 323-7590
Total Cost:
$ 350.00
Parts
Item
Qty
Manufacturer
Part Number
Description
Net
Extended
1
2
3
4
5
Services Provided
Left office at 7:00 AM. Arrived at the North WWTP at 8:30 AM.
Calibrated Claremont North Plant Effluent Flow Transmitter and recorder. It was within recommended
operating tolerance at normal flow ranges.
The ultrasonic transmitter is a Stevens AXSYS CCR Flowmeter with an integral circular chart recorder.
The effluent flume is a PlastiFab 60 deg V-Trapezoidal Flume.
The flow transmitter- measured the level in the flume within 0.01 inches, and the flow output corresponds
within 1 GPM of the ISCO flow measurement table for this type of flume.
0.5 Feet is maximum head in flume, and is equal to 116.3 GPM.
Went to McLin Creek WWTP to look at the Influent Flow transmitter and flume. The transmitter was
manufactured by Advanced Instrumentation, Inc Model 315GPD. It is monitoring an ' 11.5" Subsize
Flume'. We do not have a measurement table for this type flume. There is no manual or information on
this equipment. We could not locate any information on the internet. We cannot check the calibration of
this flow transmitter.
9.75" Inches is maximum head in flume, and is equal to 700 GPM.
Left McLin Creek WWTP at 12:00 PM.
Looked into problems with Claremont Water Distribution SCADA system. There is no charge for the
evaluation, since we were close to the location.
Left public works at 2:00 PM. Arrived at office at 3:30 PM.
Diversified Integration, Inc.
2113 Fries Load, Galax, VA 24333
Phone: (276) 236-7211
Fax: (276) 236-0170
Service Report
Date: April 21, 2010 Service by: Greg Kimble
Customer:
City of Hickory — Claremont WWTP
Total Hours:
6.5
Address:
Attn: Shawn Pennell
Mileage: 1 233
$ 0.00
P.O. Box 398
Total Labor:
$ 455.00
Hickory, NC 28603
Total Expenses:
$ 0.00
Project:
10024
Total Parts:
$ 34.00
Phone:
(828) 323-7590
Total Cost:
$ 489.00
Parts
Item
Qty
Manufacturer
Part Number
Description
Net
Extended
1
1
Andrews
F4PNF-C
Female antenna connector
$34.00
2
3
4
5
Services Provided
Left office at 6:30 AM. Arrived at the valve vault at 8:30 AM.
Worked with Michael on antenna testing. First we tried aiming the antenna in different directions and
the radio would not link up. Next we made a jumper and tried raising the antenna 16' higher than the top
of the pole, the radio would not link in any direction. We bypassed the polyphaser and radio jumper with
new ones to eliminate any possible problems, there was no change.
We removed the radio from the vault and took it to another site to eliminate any radio problems. When
installed the radio linked up and immediately began transnutting and receiving signals from the public
works tank.
Left valve vault at 1:00 PM.
0-
Diversified In tegra ti®n, Inc,
2113 Fries Road, Galax, VA 24333
Phone: (276) 236-7211
Fax: (276) 236-0170
Service Report
Date: July 13, 2010 Service by: Greg Kimble
Customer:
City of Hickory — Claremont WWTP
Total Hours:
4.0
Address:
Attn: Shawn Pennell
Mileage: 1 233
$ 0.00
P.O. Box 398
Total Labor:
$ 280.00
Hickory, NC 28603
Total Expenses:
$ 0.00
Project:
10024
Total Parts:
$ 0.00
Phone:
(828) 323-7590
Total Cost:
$ 280.00
Parts
Item
Qty
Manufacturer
Part Number
Description
Net
Extended
1
2
3
4
5
Services Provided
Arrived at the North WWTP at 10:00 AM.
Calibrated Claremont North Plant Effluent Flow Transmitter and recorder. It was within recommended
operating tolerance at normal flow ranges.
Flow measurements taken were 53.40 GPM at .37 foot of head and 83.40 GPM at 0.44 foot of head.
These measurements correspond with the ISCO Open Channel Flow Handbook table 17-1.
Went to McLin Creek WWTP.
Checked calibration of the Influent flume and recorder. It was within recommended operating tolerance
at normal flow ranges.
Flow measurements taken were 227.1 GPM at 0.499 feet of head and 257.3 GPM at 0.523 feet of head.
These measurements correspond to the flow table provided for this flume in the Advanced
Instrumentation manual provided with the flowmeter.
Travel time is split with Catawba WWTP.
Left McLin Creek WWTP at 12:00 PM.
Diversified Integration, Inc.
2113 Fries Road, Galax, VA 24333
Phone: (276) 236-7211
Fax. (276) 236-0170
Service Report
Date: January 3, 2011 Service by: Greg Kimble
Customer:
City of Hickory — Claremont WWTP
Total Hours:
4.0
Address:
Attn: Shawn Pennell
Mileage: 1 109
$ 0.00
P.O. Box 398
Total Labor:
$ 280.00
Hickory, NC 28603
Total Expenses:
$ 0.00
Project:
11007
Total Parts:
$ 0.00
Phone:
(828) 323-7590
Total Cost:
$ 280.00
Parts
Item
Qty
Manufacturer
Part Number
Description
Net
Extended
1
2
3
4
5
Services Provided
Arrived at the North WWTP at 11:45 AM.
Calibrated Claremont North Plant Effluent Flow Transmitter and recorder. It was within recommended
operating tolerance at normal flow ranges.
Flow measurements taken were 93.60 GPM at .46 foot of head and 74.40 GPM at .42 foot of head.
These measurements correspond with the ISCO Open Channel Flow Handbook table 17-1.
Went to McLin Creek WWTP.
Checked calibration of the Influent flume and recorder. It was within recommended operating tolerance
at normal flow ranges.
Flow measurement taken was 114.8 GPM at .391 feet of head.
This measurement corresponds to the flow table provided for this flume in the Advanced Instrumentation
manual provided with the flowmeter.
Travel time is split with Catawba WWTP.
Left McLin Creek WWTP at 2:00 PM.
i
w
oNr, No��ti
C� n
J ,ate/
• 1893
CITY OF CLAREMONT
April 14, 2011
Robert B. Krebs, Regional Supervisor
NCDENR Surface Water Protection
610 East Center Ave. Suite 301
Mooresville, NC 28115
Dear Mr. Krebs,
RECEIVED
DIVISION OF WATER QUALITY
APR 15 2011
SWP SECTION
MOORESVILLE REGIONAL OFFICE
Subject: Notice of Violation — Effluent Limitation
Tracking #: NOV-2011-LV-0096
North WWTP — NPDES Permit NCO032662
The City of Claremont has been actively working to find a point source or reason for the change in
influent flows to the Claremont North WWTP. The City of Claremont in conjunction with our contract
operator the City of Hickory have seen the trend line for this plant creep upward since July 2010 with a
peak in December 2010. The City of Claremont is very concerned about this situation and has been
actively working to pinpoint a source or explanation for these higher flows, as the City has not added
any major users or additional customers to this plant during this time.
The City has taken the following actions to address the flow issue. We have inspected all of the outfall
lines that flow into the plant looking for any infiltration or inflow issues as well as any maintenance
issues with the manholes or lines. Upon our inspections we did not find any evidence of inflow due to
creek rise, we did find three manholes with infiltration issues and two manholes that needed to be
raised. The City has ordered the material needed to perform these maintence issues and will be
preforming this work during the month of April. We have found an inflow and infiltration study that was
performed in 2003 for the North WWTP but never implemented. This study recommended installing
raincaps on some manholes and fixing some older bricked manholes. We have ordered 45 manhole rain
covers for various in street manholes that flow to the North Plant. According to the study, these covers
should save at least 23,000 G.P.D during rainfall events. The issues that were found during the
inspection above where also listed in the study with 5,000 G.P.D. in savings upon completion.
The City has also been working with the City of Hickory to pin point flows and peak flows at the North
Plant. Staffs from both cities have tracked flows during peak run times, by pulling manholes and tracking
the flows back to the potential source points. Staff has also tested the interconnect system to insure
that they are working correctly, which they are both flowing to the McLin Plant. The attached maps
show the entire system and how each drainage area and pump station areas flow to our two plants. Also
included with this map are enlarged maps that show how theiSchool Street pump station and the Rest
Area Pump Station now flow to the McLin Plant. Both of these. interconnects have valves to switch flow
back to the North Plant if needed but they are both operational and have flow going in the appropriated
directions. We have also begun monitoring monthly water bills to look for peak usage and any higher
828-459-7009 City Hall • 828-459-0596 Fax
3288 East Main Street • Post Office Box 446 • Claremont, NC 28610
than average usages. The City of Claremont has also purchased a portable flow meter to deploy in the
outfall lines to establish some base flow data that can be used to track some possible points of increased
flow.
As we have studied this issue, we have also seen the flow numbers begin to recede from the high
experienced in December 2010. 1 have included our internal flow data charts from June 2010 — March
2011 for the North Plant to show that flows have begun to recede from the high average of 114,000
G.P.D. to a current figure for March of 96,000 G.P.D. While the City realizes that this flow is still above
the 80/90 rule we do want to note that flows are within the permit limits and that the City will continue
to investigate this issue and begin the installation of the measures listed above to reduce flow.
The City of Claremont does take the higher flow numbers extremely seriously as the area that this plant
serves is one of the areas that the City has targeted for future growth. Knowing that the City needs to
begin looking at how we handle future development and the associated sewer flows the City has
entered in to a partnership with Catawba County, the City of Hickory and the City of Conover. Catawba
County has hired Davis & Floyd Engineers to lead this group through a Preliminary Engineering Report to
address future sewer flows and how those flows are treated in the study area. I have included a map of
the study area that includes both the North and McLin WWTP's and two other WWTP's in eastern
Catawba County. Once this report is completed, the group will discuss and pinpoint the best option and
begin an environmental assessment on that design option. The Preliminary Engineering Report is
tracking to be completed in mid -May and currently all of the options on the table address the North
WWTP in some format. The City of Claremont expects to move forward under the chosen option and
begin working towards a more permanent solution for our wastewater as a direct result of this study.
Commitment to this can be found in our proposed Capital Improvement Plan to be adopted as part of
the Enterprise Fund Fiscal Year 2012 budget. This will mark the first time that the City of Claremont has
actively engaged in long term capital planning for this fund and addresses future needs of the system as
a whole.
As requested, we have also submitted the flow meter calibration reports for the North WWTP. This
calibration work is contracted with Diversified Integration, Inc..which is the contactor that the City of
Hickory uses for all facilities. This calibration found that the meter was slightly out of calibration but still
within the allowable specification range recommended by the Manufacturer. The contractor made a
1/16th of and inch adjustment, which would result in minimal flow differential on this installation. The
last calibration prior to the Janurary 2011 recalibration was in July 2010, therefore it was within the last
6 months.
The City of Claremont in conjunction with City of Hickory Staff analyzed the City of Claremont System to
determine the actual conditions under which it is operated. The Wastewater Treatment Facilities and
tributary Collection System does operated as previously described. The North Wastewater Treatment
Facility serves primarily the northwest quadrant of Claremont, as reflected in the attached maps. The
only Lift Station tributary to this facility is the Catawba Truck Lift Station which is located on the north
side of US 1-40. This facility has experienced a trend of unexplainable increasing flows; however the
attached Flow Tracking Form (FTSE- 10/07) annualizes the daily discharge for this facility from March 1,
2010 thru February 28, 2011 and reflects an average -day of 0.083 MGD.
Staff from both municipalities has also analyzed the comparable statistics for the McLin Wastewater
Treatment Facility, which serves the southeast and southwest quadrants of Claremont and the NCDOT
Rest Area along US 1-40, as reflected in the attached maps. The McLin Wastewater Treatment Facility
has four (4) Lift Stations tributary, which include School Lift Station, State Lift Station, Mom and Pops Lift
Station and Smyre Lift Station. The attached Flow Tracking Form (FTSE- 10/07) reflects the annualized
daily discharge for this facility from March 1, 2010 thru February 28, 2011 and reflects an average day of
0.151 MGD.
The City of Claremont is not aware of any wastewater flow obligated but not yet tributary to either of
these facilities. The completed Flow Tracking Forms for the respective facilities will be maintained and
updated from this point forward to ensure adequate treatment capacity remains available to serve the
customers of the City of Claremont.
The City of Claremont also hopes to gain a higher understanding of the flow as we continue to receive
survey data back from our commercial and industrial users. The City is working directly with the City of
Hickory to administer the Industrial Pretreatment program information request from the State. We have
taken the advice of the State and will be gathering data on the entire system and have sent surveys to all
clients regardless of which plant their flows are allocated. With the understanding that the City is taking
proactive steps to address the flow concerns and address the future needs of our system we would
respectively ask NCDENR to work with the City has we navigate these issues and help us deploy our
assets towards a solution for this issue rather than potential fines. As previously stated the City does
take this issue seriously and we will continue to work towards a resolution for these flows and our
future utility needs.
Sincerely,
Q�D
Doug Barrick
City Manager
City of Claremont
Enclosures:
Original NCDENR NOV Letter Dated March 14, 2011
Claremont Sewer Map
Claremont Rest Area Pump Station Map
Claremont School Street Pump Station.Map
Claremont North Plant Flow Data June 2010 — March 2011
McLin/Lyle Creek Preliminary Engineering Report Study Area
North WWTP Flow Meter Calibration Reports
North Wastewater Treatment Facility Flow Tracking Form (FTSE-10/07)
McLin Wastewater Treatment Facility Flow Tracking Form (FTSE-10/07)
cc: Marcia Allocco, SWP
Dana Foley, PERCS
Kevin Greer, City of Hickory
Honorable David Morrow, Mayor
AZYA
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freeman
Governor Director Secretary
March 14, 2011
Mr. Doug Barrick, City Manager
City of Claremont
Post Office Box 446
Claremont, North Carolina 28610
Subject: Notice of Violation — Effluent Limitation
Tracking #: NOV-2011-LV-0096
Claremont North WWTP
NPDES Permit No. NCO032662
Catawba County
Dear Mr. Barrick:
A review of the December 2010 self -monitoring report for the subject facility revealed a
violation of the following parameter at Outfall 001:
Date Parameter Reported Value Permit Limit
12/31/10 Flow 0.114 MGD 0.1 MGD (Monthly average)
This is the third consecutive month with violations of the monthly average flow limit in
NC0032662. A review of your submitted DMRs for calendar year 2010 indicated the average flow
calculated for this period was 0.0766 MGD, and represented 76.6% of the current treatment capacity
at the North WWTP. The Environmental Management Commission adopted 15A NCAC 02T .0118
(formerly codified as 15A NCAC 02H .0223) entitled, "Demonstration of Future Wastewater Treatment
Capacities," to ensure that wastewater treatment systems owned or operated by municipalities,
counties, sanitary districts, or public utilities do not exceed their hydraulic treatment capacities.
Please be advised that this Rule (known as the 80/90 Rule) specifies that no permits for sewer line
extensions (a moratorium) will be issued by the Division of Water Quality (DWQ) to facilities
exceeding 80% of their hydraulic treatment capacity unless specific evaluations of future wastewater
treatment needs have been completed. Facilities exceeding 90% of their hydraulic treatment capacity
must submit plans and specifications and obtain all permits needed for expansion of the wastewater
treatment system before permits for sewer line extensions may be issued. The Division will complete
a review of the average flow at the Claremont North WWTP again at the end of 2011.
The City of Claremont North WWTP has been the subject of scrutiny for flow with regard to
the 80/90 rule and has received prior moratorium letters from DWQ in the 1990s. At that time the City
of Claremont was to explore measures to shift flow from the North `JWV P to McLin Creek (higher
capacity) to avoid flow issues at the North WWTP. It is the Division's understanding that an
interconnect was installed between the two plants owned by the City of Claremont to achieve this
purpose. Enclosed is a graph of the North WWTP flow data from 2006 through the end of 2010 taken
from the data reported on the monthly DMRs submitted to the Division. The data indicate that flow
increased to the plant starting in early 2007 but drastically increased from July 2010 to December
2010. During this time it appears that flow was decreasing at the McLin Creek WWTP as noted by
Mooresville Regional Office
Location: 610 East Center Ave., Suite 301 Mooresville, NC 28115 One
Phone: (704) 663-16991 Fax: (704) 663-60401 Customer Service: 1-877-623-6748 NorthCarohna
Internet: http:llportal.ncdenr.orglwebhNq ���9�N���
An Equal Opportunity \ Affirmative Action Employer— 30% Recycledi10% Post Consumer paper y i y
Mr. Doug Barrick, City of Claremont
NOV-201 1 -LV-0096, Page 2
March 14, 2011
the trend lines in the enclosed graph comparing the flow at the two Claremont WWTPs. Although the
City of Claremont has investigated the source of the elevated flow as noted on the October through
December Discharge Monitoring Reports (DMRs) a definitive source of the additional flow to the plant
has not been discovered. Therefore, the Division is requesting additional information including:
® The December 2010 North WWTP DMR notes that the flow meter was recently calibrated and
found to be "slightly out of calibration." Please submit the calibration data to this Office
detailing whether the meter was reading high or low before the calibration by
Diversified Integration, Inc. and by what amount.
• Please describe the measures the City of Claremont uses to reduce the flow tributary to
the North WWTP. Specifically, has an interconnect been installed in the collection
system between the North WWTP and the McLin Creek WWTP? How is it operated?
This Office issued a Notice of Violation for the March 23, 2010, collection system inspection
conducted by Barbara Sifford. The inspection report noted that a flow tracking form was
submitted by the City of Claremont in June 2008 in relation to a sewer -extension permit
application. The flow tracking form noted that all five of the City's pump stations flow to the
McLin Creek WWTP which is incorrect. In addition, the form noted that the approximate
current average daily flow through the five pump stations was 0.097 MGD. However, the
average flow data reported on the May 2008 DMRs notes that the total average flow to the
two Claremont WWTPs at the time was 0.201 MGD (0.147 MGD to McLin Creek WWTP and
0.054 MGD to the North WWTP). This is inline with data obtained from the Public Water
Supply section of DENR stating the City of Claremont supplies approximately 0.2 to 0.25 MGD
of potable water. Please submit revised flow tracking forms for each of the Claremont
WWTPs noting, which pump stations are associated with each WWTP and include
updated current average daily flow data for each pump station.
Because of the recent flow violations at the North WWTP a review of the data reported on the
monthly DMRs was initiated. The review of the influent total suspended solids concentrations found
they ranged from 57 mg/L to 2,170 mg/L whereas the influent BOD concentrations ranged from 115
mg/L to >2,040 mg/L. The review found that the wastewater entering the plant had pollutant loadings
well beyond the expected range of domestic wastewater. Enclosed is a comparison of the influent
BOD concentrations for the two Claremont WWTPs. While the increased BOD concentrations to the
McLin Creek WWTP seem to be a recent occurrence the elevated BOD concentrations to the North
WWTP occurred during the entire review period.
This Office sent the City of Claremont a letter on February 9, 2011, pertaining to the City's inactive
Industrial Pretreatment program requesting information for updated industrial user information,
sampling data, and a subsequent evaluation of the sampling data to determine if reactivation of the
Industrial Pretreatment program was warranted. This letter was prompted by the recent non-
compliance issues at the City's McLin Creek WWTP. In light of the above noted elevated
concentrations of wastes entering the North WWTP, this Office wants to emphasize that the entire
collection system should be reviewed as part of your response to that letter.
As per the fee schedule in G.S. §143-215.3D permits that are associated with a publicly owned
treatment works (POTW) that administers a POTW pretreatment program as defined in 40 Code of
Federal Regulations §403.3 (July 1, 1996 edition) is considered a major individual permit with an
annual fee of $3,440 (compared with the City's current permit fees of $860 for each of the City's
Mr. Doug Barrick, City of Claremont
NOV-201 1 -LV-0096, Page 3
March 14, 2011
WWTPs. Should the City of Claremont need to reactivate the approved Industrial Pretreatment
Program, each of the City's WWTPs receiving industrial waste from a significant industrial user will be
reclassified as a major facility subject to the increased annual fee. In addition, you would most likely
need to obtain coverage for each affected WWTP under the associated industrial stormwater general
permit (NCG110000) for owners or operators of stormwater point source discharges associated with
activities classified as treatment works treating domestic sewage or any other sewage sludge or
wastewater treatment device or system that is required to have an approved pretreatment program
under Title 40 CFR Part 403.
Finally, you should be aware the U.S. Environmental Protection Agency (EPA) reviews the
compliance history of permitted facilities on a quarterly basis. Their current emphasis is on major
facilities with non-compliance issues but they are contemplating expanding their review to minor
facilities. If the City of Claremont's WWTPs are reclassified as major permits, the compliance history
at each plant would be subject to greater scrutiny from the EPA. The Mooresville Regional Office
currently has one major facility under an EPA Administrative Order for recurrent DMR permit limit
violations.
Remedial actions, if not already implemented, should be taken to correct any problems related to the
issues noted with the North WWTP. The Division of Water Quality may pursue enforcement actions
for this and any additional violations. If the violations are of a continuing nature, not related to
operation and/or maintenance problems, and you anticipate remedial construction activities, then you
may wish to consider applying for a Special Order by Consent.
Please respond by April 15, 2011, providing the information requested on page 2 of this letter. You
should respond to the address noted at the bottom of the cover page and address your response to
Ms. Marcia Allocco of this Office. If you have questions concerning this letter, please do not hesitate
to contact Ms. Allocco or me at (704) 663-1699.
Sincerely,
Robert B. Krebs
Surface Water Protection
Regional Supervisor
Enclosures:
Claremont North WWTP Flow 2006-2010
Claremont WWTP Flows June — December 2010
Claremont WWTPs Influent BOD 2006 — 2010
cc: Point Source Branch
Dana Foley, PERCS
Kevin Greer, City of Hickory
Honorable David Morrow, Mayor
MA
1/1/06
4/1/06
7/1/06
10/1/06
1/1/07
4/1/07
7/1/07
10/1/07
1/1/08
4/1/08
7/1/08
10/1/08
1/1/09
4/1/09
7/1/09
10/1/09
1/1/10
4/1/10
7/1/10
10/1/10
MG®
0 0 0 0 0 0 0 0
0
O r1i -P m 00 F-' N A 01 00
CL
r
0
0
O F�
6/1/10
6/15/10
6/29/10
7/13/10
7/27/10
8/10/10
8/24/10
9/7/10
9/21/10
10/5/10
10/19/10
11/2/10
11/16/10
11/30/10
12/14/10
12/28/10
MGD
0
i-�
Ui
0
O Iv
N Ln
mg/L
NJ Ln Ni Ln
� N N
0 0 0 0 0 0 0
1/4/06
4/12/06
7/19/06
10/13/06 0
1/10/07 ,
s
3/22/07 a
6/20/07
9/5/07
12/12/07
3/12/08
6/18/08
o ■
h
8/26/08
12/3/08
z
0 0 0
C ,t r
3/10/09
r
n
rD
6/9/09
9/8/09
12/8/09
3/9/10
5/25/10
8/10/10
11/5/10
,w,