Loading...
HomeMy WebLinkAboutNCG200448_Inspection Report_20210212ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director Gordon Recycling Attention: Barry Gordon 1300 Salisbury Road Statesville, North Carolina 28625 NORTH CAROLINA Environmental Quality February 12, 2021 Subject: Compliance Evaluation Inspection Permit: NCG200000 Certificate of Coverage: NCG200448 Burke County, North Carolina Dear Mr. Gordon: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on February 2, 2021. The report should be self-explanatory, however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Isaiah Reed, EI, CPSWQ B Environmental Specialist Land Quality Section Enclosure: Inspection Report -DEQ�North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources _ Asheville Regional Office 1 2090 US. Highway 70 1 Swannanoa, North Carolina 28778 oNOn Maiamiry 828.296.4500 Compliance Inspection Report Permit: NCG200448 Effective: 08/01/19 Expiration: 05/31/24 Owner: Gordon Recyclers Inc SOC: Effective: Expiration: Facility: Gordon Recyclers- ConnellySprings County: Burke 1581 Highway 70 Region: Asheville Connelly Spg NC 28612 Contact Person: Scott Powell Title: Phone: 704-873-9004 Directions to Facility: 1-40 to exit 116. Right off ramp. Left at the first light. Facility is 1 mile on the right System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 02/02/2021 Entry Time 03:15PM Exit Time: 04:15PM Primary Inspector: Isaiah L Reed Phone: 828-296-4614 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Wholesale Trade of Metal Waste and Scrap Stormwater Discharge COC Facility Status: ❑ Compliant 0 Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG200448 Owner- Facility: Gordon Recyclers Inc Inspection Date: 02/02/2021 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On February 2, 2021 this facility was inspected for compliance. I met with David Okay on site. The following items were noted during the inspection. 1) The Stormwater Pollution Prevention Plan as not been maintained. The permittee is directed to review and revise the SWPPP as needed based on the outlines given in the NCG200000 General Permit. 2) Qualitative Monitoring has not been documented on site. The qualitative monitoring shall be conducted in addition to the analytical monitoring conducted on site. 3) Tire Response actions required by the permit have not been undertaken by the permittee. Be advised that the facility is now in Tier 2 status. the permittee shall immediately begin all Tier response actions required by the NCG200000 General Permit. Please give the above items your immediate attention. This facility will be reinspected on or after April 6, 2021. If the above actions have not been addressed, further action will be taken. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG200448 Owner -Facility: Gordon Recyclers Inc Inspection Date: 02/02/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? E ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ 0 ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? 0❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? E ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑0 ❑ ❑ Comment: The Stormwater Pollution Prevention Plan has not been maintained. Qualitative Monitorina Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ Comment: Qualitative monitoring reports were not present during the Inspection Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: While Analytical Monitoring has been conducted Tier response actions have not been taken Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment: Page 3 of 3