HomeMy WebLinkAbout20191059 Ver 2_Meeting Request Review_20210209 oil
DWR Pre-Filing Meeting Request Form
ID#* 20191059 Version* 2
Regional Office* Wilmington Regional Office-(910)796-7215
Reviewer List* Joanne Steenhuis
Pre-Filing Meeting Request submitted 2/9/2021
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Jason Dilday
Contact Email Address* jldilday@ncdot.gov
Project Name* B-5703(Bridge 60 over Little Lower River on US401)
Project Owner* NCDOT
Project County* Cumberland
Owner Address: Street Address
1000 Birch Ridge Drive
Address Line 2
aty State/Frovince/Region
Raleigh NC
Rbstal/Zip Code Country
27610 USA
Is this a transportation project?* r Yes r No
Type(s)of approval sought from the DWR:
W 401 Water Quality Certification- F 401 Water Quality Certification-
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Joanne Steinhuis
Please give a brief project description below.
This project did not require a written certification under the permitted NW
13.This submittal is in case possible,future modifications to design would
result in written notification.
Please give a couple of dates you are available for a meeting.
2/17/2021
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
01 r"Iy
Submittal Date 2/9/2021
Reviewer Meeting Request Decision
.............................................................................................................................................................................
Has a meeting been scheduled?* r Yes r No