HomeMy WebLinkAbout20210300 Ver 1_Meeting Request Review Doc Attachment_20210208(106
20+00N
A
D 83/ 2011
4
CREEK
TO SR 1634
-L- STA. 20+50.00
17BP.14.R.210
END PROJECT
-L- STA. 10+55.00
17BP.14.R.210
BEGIN PROJECT
-L- STA. 15+52.20
BEGIN BRIDGE
-L- STA. 16+39.80
END BRIDGE
VICINITY MAP
LOCATION
PROJECT
106
MIDDLE
TO DEAD ENDSR 1635 -L-MIDDLE CREEK RD
MACON COUNTY
BRIDGE #550043 OVER MIDDLE CREEK
ON SR 1635 (MIDDLE CREEK RD)
GRADING, DRAINAGE, PAVING, AND STRUCTURE
25 50 10050
25 50 10050
5 10 2010
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
0
0
0
PROFILE (HORIZONTAL)
17BP.14.R.210 PE
17BP.14.R.210 UTIL & R/W
17BP.14.R.210 CONST.
N/A
N/A
N/A
PROJECT LENGTH
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
DESIGN DATAGRAPHIC SCALES PLANS
PROFILE (VERTICAL)
LOCATION:
TYPE OF WORK:09/08/9917BP.14.R.210DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
0
00
3/15/2019X:\NCDOT\Division 14 - 2017\Macon 550043\Roadway\Proj\550043_Rdy_tsh.dgnUser:smelvinCONTRACT:17BP.14.R.210ARTMEN
N ASO
H
DEPT
O
F TRA S PORTTIONTATEOFNRTCAR
O
LI
NASee Sheet 1A For Index of Sheets
ENGINEER
HYDRAULICS
SIGNATURE:
P.E.
ENGINEER
ROADWAY DESIGN
P.E.
SIGNATURE:
RIGHT OF WAY DATE:
LETTING DATE:
JIMMY L. TERRY, PE
OF TRANSPORATION
DEPARTMENTNORTH CAROLINA
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
---
CLINTON PRUETT, EI
Bryson City, NC 28713
345 Toot Hollow Rd
DIVISION 14
=0.188
=0.017
=0.171
TOTAL LENGTH PROJECT 17BP.14.R.210 #550043
LENGTH STRUCTURE PROJECT 17BP.14.R.210 #550043
LENGTH ROADWAY PROJECT 17BP.14.R.210 #550043
T
V
=
=
=
6
35 MPH
ADT 2018
% *
DUAL =3%* TTST =3%
FUNC CLASS =
SUB-REGIONAL TIER
LOCAL - RURAL
570PROJECT:MacDonald
Mill
Cr
eekMiddle
Evans
Cr
eekTessentee Creek
ShoalCreekOtto
1636
1635
1635
1633
1110
1114
1115
1118 1653
1684
1634
1635
1727
1632
1109
23
441
23
441
1108
1629
1106
1107
1726
1726
1104
1105
1102
1683
1683
1642
1641
1636
1636
1636
1637
1638
1731
1639
1722
1685
1622
1624
1623 1732
106
1625
1720
Scaly
Norton
JAN. 7, 2019
PROFESSION
A
LE
NG INEERNORTHCAROLINA
SEAL
35018 YRRET .L YMMIJPROFESSIONALENGINEERNORTHCAROLINA
SEAL
038697 YTTEP .B DI
VA
D
FINAL PLANS SUBMITTALADAM DOCKERY
PROJECT ENGINEER
PROJECT DESIGN ENGINEER
PLANS PREPARED FOR:PLANS PREPARED BY:
NCDOT CONTACT:
2018 STANDARD SPECIFICATIONS
ENGINEER
SHEET NO.PROJECT REFERENCE NO.
1A 17BP.14.R.210
4/15/2019X:\NCDOT\Division 14 - 2017\Macon 550043\Roadway\Proj\550043_Rdy_tsh.dgnUser:smelvin8/17/99ROADWAY DESIGN
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETEDPROFESSIONALENGINEERNORTHCAROLINA
SEAL
35018 YRRET .L YMMIJ
STANDARD DRAWINGSGENERAL NOTESINDEX OF SHEETS
876.02 Guide for Rip Rap at Pipe Outlets
876.01 Rip Rap in Channels
(Special Detail for Type III Anchor Units Sheets 1 of 7 and 2 of 7)
862.03 Structure Anchor Units
862.02 Guardrail Installation (Special Detail for Sheet 6 of 8)
862.01 Guardrail Placement
846.04 Drop Inlet Installation in Shoulder Berm Gutter
846.01 Concrete Curb, Gutter and Curb & Gutter
840.66 Drainage Structure Steps
840.46 Traffic Bearing Precast Drainage Structure
840.35 Traffic Bearing Grated Drop Inlet - for Cast Iron Double Frame and Grates
840.29 Frames and Narrow Slot Flat Grates
840.25 Anchorage for Frames - Brick or Concrete or Precast
840.00 Concrete Base Pad for Drainage Structures
815.02 Subsurface Drain
DIVISION 8 - INCIDENTALS
560.01 Method of Shoulder Construction - High Side of Superelevated Curve - Method I
DIVISION 5 - SUBGRADE, BASES AND SHOULDERS
422.02 Bridge Approach Fills - Type II Modified Approach Fill
DIVISION 4 - MAJOR STRUCTURES
310.10 Driveway Pipe Construction
300.01 Method of Pipe Installation
DIVISION 3 - PIPE CULVERTS
225.04 Method of Obtaining Superelevation - Two Lane Pavement
225.02 Guide for Grading Subgrade - Secondary and Local
200.02 Method of Clearing - Method II
DIVISION 2 - EARTHWORK
STD.NO. TITLE
are considered a part of these plans:
Dated January, 2018 are applicable to this project and by reference hereby
Highway Design Branch - N. C. Department of Transportation - Raleigh, N. C.,
The following Roadway Standards as appear in "Roadway Standard Drawings"
2018 ROADWAY ENGLISH STANDARD DRAWINGS
REV.
EFF. 01-16-2018
S-1 THRU S-18 STRUCTURE PLANS
STRUCTURE TITLE STRUCTURE PLANS TITLE SHEET
X-1 THRU X-6 CROSS-SECTIONS
X-1A CROSS-SECTION SUMMARY SHEET
UO-1 THRU UO-2 UTILITIES BY OTHERS PLANS
RF-1 REFORESTATION DETAIL SHEET
EC-1 THRU EC-5 EROSION CONTROL PLANS
PMP-1 THRU PMP-2 PAVEMENT MARKING PLANS
TMP-1 THRU TMP-4 TRANSPORTATION MANAGEMENT PLANS
4 PLAN AND PROFILE SHEET
OF AGGREGATE SUBGRADE/STABILIZATION
3G-1 SUMMARY OF SUBSURFACE DRAINAGE, AND SUMMARY
LIST OF PIPES, ENDWALLS, ETC(FOR PIPES 48IN & UNDER)
3B-1 EARTHWORK, PAVEMENT REMOVAL, AND GUARDRAIL SUMMARIES &
2G-1 STANDARD TEMPORARY SHORING DETAIL
2C-2 SPECIAL DETAIL - TYPE III STRUCTURE ANCHOR UNITS
2C-1 SPECIAL DETAIL - W BEAM RAIL SECTION
2A-1 PAVEMENT SCHEDULE AND TYPICAL SECTIONS
CONTROL AND PROPERTY TIES
RW-01 THRU RW-__ SURVEY CONTROL, ALIGNMENT CONTROL, RIGHT OF WAY
1B CONVENTIONAL SYMBOLS
1A INDEX OF SHEETS, GENERAL NOTES, AND STANDARD DRAWINGS
1 TITLE SHEET
SHEET NUMBER SHEET
ALL RIGHT-OF-WAY MARKERS ON THIS PROJECT SHALL BE PLACED BY CONTRACT.
RIGHT-OF-WAY MARKERS:
ANY RELOCATION OF EXISTING UTILITIES WILL BE ACCOMPLISHED BY OTHERS.
UTILITY OWNERS ON THIS PROJECT ARE HEMC AND FRONTIER COMMUNICATIONS
UTILITIES:
APPROACHING A BRIDGE.
SECTION PRIOR TO SETTING OF THE SLOPE STAKES FOR THE EMBANKMENT OR EXCAVATION
THE ENGINEER SHALL CHECK THE STRUCTURE END BENT PLANS, DETAILS, AND CROSS-
END BENTS:
WILL BE PAID FOR AT THE CONTRACT PRICE FOR "TEMPORARY SHORING".
SHORING REQUIRED FOR THE MAINTENANCE OF TRAFFIC NOT SHOWN ON THE PLANS
TEMPORARY SHORING:
WITH THE ENGINEER PRIOR TO ORDERING GUARDRAIL MATERIAL.
CONSTRUCTION AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHOULD CONSULT
THE GUARDRAIL LOCATIONS SHOWN ON THE PLANS MAY BE ADJUSTED DURING
GUARDRAIL:
LOCATIONS DIRECTED BY THE ENGINEER.
SUBSURFACE DRAINS SHALL BE CONSTRUCTED IN ACCORDANCE WITH STD. NO. 815.02 AT
SUBSURFACE DRAINS:
INVOLVED.
THIS WORK WILL BE PAID FOR AT THE CONTRACT UNIT PRICE FOR THE PARTICULAR ITEMS
SUITABLE CONNECTIONS WITH ALL ROADS, STREETS, AND DRIVES ENTERING THIS PROJECT.
THE CONTRACTOR WILL BE REQUIRED TO DO ALL NECESSARY WORK TO PROVIDE
SIDE ROADS:
SUPERELEVATED CURVES SHALL BE IN ACCORDANCE WITH STD. NO. 560.01
ASPHALT, EARTH, AND CONCRETE SHOULDER CONSTRUCTION ON THE HIGH SIDE OF
SHOULDER CONSTRUCTION:
SECTIONS.
SUPERELEVATION IS TO BE REVOLVED ABOUT THE GRADE POINTS SHOWN ON THE TYPICAL
STD. NO. 225.04 USING THE RATE OF SUPERELEVATION AND RUNOFF SHOWN ON THE PLANS.
ALL CURVES ON THIS PROJECT SHALL BE SUPERELEVATED IN ACCORDANCE WITH
SUPERELEVATION:
METHOD II.
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY
CLEARING:
ENGINEER IN ORDER TO SECURE A PROPER TIE-IN.
ADJUSTED AT THEIR BEGINNING AND ENDING AND AT STRUCTURES AS DIRECTED BY THE
SURFACING AT GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. GRADE LINES MAY BE
THE GRADE LINES SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED
GRADING AND SURFACING:
GRADE LINE:
REVISED:
EFFECTIVE: 01-16-2018
GENERAL NOTES: 2018 SPECIFICATIONS
Existing Edge of Pavement
Existing Curb
Proposed Slope Stakes Cut
Proposed Slope Stakes Fill
Existing Metal Guardrail
Existing Cable Guiderail
Proposed Guardrail
Equality Symbol
Pavement Removal
Existing Right of Way Marker
Existing Right of Way Line
h
Existing Control of Access
C
F
Existing Easement Line
HYDROLOGY:
Stream or Body of Water
Hydro, Pool or Reservoir
Flow Arrow
Disappearing Stream
Spring
;zvW
K
Proposed Lateral, Tail, Head Ditch
False Sump
Proposed Cable Guiderail
MAJOR:
Bridge, Tunnel or Box Culvert
Bridge Wing Wall, Head Wall and End Wall
MINOR:
Head and End Wall
Pipe Culvert
Footbridge
Paved Ditch Gutter
UTILITIES:
ROADS AND RELATED FEATURES:
Existing Power Pole
Proposed Power Pole
P
U/G Power Cable Hand Hole
Power Manhole
Power Line Tower
Power Transformer
Existing Joint Use Pole
Proposed Joint Use Pole
Existing Telephone Pole
Proposed Telephone Pole
Telephone Manhole
Telephone Pedestal
U/G Telephone Cable Hand Hole
R
}Tp
Q
l
]
/
b
H-Frame Pole O O
POWER:
TELEPHONE:
Telephone Cell Tower
WATER:
Water Manhole
Water Meter
Water Valve
Water Hydrant
4
I
H
a
TV:
TV Pedestal
TV Tower
U/G TV Cable Hand Hole
|
I
]
GAS:
Gas Valve
Gas Meter n
c
SANITARY SEWER:
Sanitary Sewer Manhole
Sanitary Sewer Cleanout
U/G Sanitary Sewer Line
d
o
A/G Water
Above Ground Gas Line
A/G Gas
Above Ground Water Line
Above Ground Sanitary Sewer A/G Sanitary Sewer
MISCELLANEOUS:
Utility Pole O
F
S
3
Utility Pole with Base
Utility Located Object
Utility Traffic Signal Box
?
CONC
CONC WW
vvDrainage Box: Catch Basin, DI or JB
Storm Sewer
Storm Sewer Manhole m
U/G Tank; Water, Gas, Oil
A/G Tank; Water, Gas, Oil
BOUNDARIES AND PROPERTY:
State Line
County Line
Township Line
City Line
Reservation Line
Property Line
Existing Iron Pin
Property Monument
Existing Fence Line
Proposed Woven Wire Fence
Proposed Chain Link Fence
Proposed Barbed Wire Fence
g
F
123
Existing Wetland Boundary
Proposed Wetland Boundary
Existing Endangered Animal Boundary
Existing Endangered Plant Boundary
BUILDINGS AND OTHER CULTURE:
Area Outline
Gas Pump Vent or U/G Tank Cap
Church
School
Dam
Sign
Small Mine
Well
V
M
WW
S
x
Foundation
S
Building
y
y
VEGETATION:
Single Tree X
Y
Vineyard
Single Shrub
Hedge
Woods Line
Orchard
Vineyard
RAILROADS:
Standard Gauge
RR Signal Milepost
Switch
RR Abandoned
RR Dismantled
S
FLOW
*S.U.E. = Subsurface Utility Engineering
WLB
EIP BECM
CONC HW
CB
CSX TRANSPORTATION
MILEPOST 35
SWITCH
Cemetery
EXISTING STRUCTURES:
Parcel / Sequence Number
E
AATUR
End of Information E.O.I.
SHEET NO.PROJECT REFERENCE NO.
1-B17BP.14.R.210
Abandoned According to Utility Records
WLB
EAB
EPB
R
W
R
W
R
W
C
A
E
TDE
PDE
PUE
S
P
P
T
T
TC
TC
T FO
T FO
W
W
TV
TV
TV FO
TV FO
G
G
SS
FSS
FSS
?UTL
Jurisdictional Stream JS
Buffer Zone 1
Buffer Zone 2
BZ 1
BZ 2
Wetland
TUE
DUE
AUE
CRProposed Curb Ramp
CONVENTIONAL PLAN SHEET SYMBOLS
Underground Storage Tank, Approx. Loc.
Geoenvironmental Boring
C
A
HPBExisting Historic Property Boundary
U/G Power Line LOS B (S.U.E.*)
U/G Power Line LOS C (S.U.E.*)
U/G Power Line LOS D (S.U.E.*)
P
U/G Telephone Cable LOS B (S.U.E.*)
U/G Telephone Cable LOS C (S.U.E.*)
U/G Telephone Cable LOS D (S.U.E.*)
T
U/G Telephone Conduit LOS B (S.U.E.*)
U/G Telephone Conduit LOS C (S.U.E.*)
U/G Telephone Conduit LOS D (S.U.E.*)
TC
U/G Fiber Optics Cable LOS B (S.U.E.*)
U/G Fiber Optics Cable LOS C (S.U.E.*)
U/G Fiber Optics Cable LOS D (S.U.E.*)
T FO
U/G Water Line LOS B (S.U.E*)
U/G Water Line LOS C (S.U.E*)
U/G Water Line LOS D (S.U.E*)
W
U/G TV Cable LOS B (S.U.E.*)
U/G TV Cable LOS C (S.U.E.*)
U/G TV Cable LOS D (S.U.E.*)
TV
U/G Fiber Optic Cable LOS B (S.U.E.*)
U/G Fiber Optic Cable LOS C (S.U.E.*)
U/G Fiber Optic Cable LOS D (S.U.E.*)
TV FO
U/G Gas Line LOS B (S.U.E.*)
U/G Gas Line LOS C (S.U.E.*)
U/G Gas Line LOS D (S.U.E.*)
G
SS Forced Main Line LOS B (S.U.E.*)
SS Forced Main Line LOS C (S.U.E.*)
SS Forced Main Line LOS D (S.U.E.*)
FSS
Utility Unknown U/G Line LOS B (S.U.E.*)
U/G Test Hole LOS A (S.U.E.*)
STATE OF NORTH CAROLINA, DIVISION OF HIGHWAYS
Note: Not to Scale
UST
Contaminated Site: Known or Potential
Known Contamination Area: Soil
Potential Contamination Area: Soil
Known Contamination Area: Water
Potential Contamination Area: Water
Primary Horiz Control Point
Primary Horiz and Vert Control Point
Secondary Horiz and Vert Control Point
Exist Permanent Easment Pin and Cap
New Permanent Easement Pin and Cap
Vertical Benchmark
New Right of Way Line
Concrete or Granite R/W Marker
New Right of Way Line with
Concrete C/A Marker
New Control of Access Line with
New Control of Access
New Temporary Construction Easement
New Temporary Drainage Easement
New Permanent Drainage Easement
New Permanent Drainage / Utility Easement
New Permanent Utility Easement
New Temporary Utility Easement
New Aerial Utility Easement12/2/2016Computed Property Corner
RIGHT OF WAY & PROJECT CONTROL:
New Right of Way Line with Pin and Cap
]
PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,
AT AN AVERAGE RATE OF 165 LBS. PER SQ. YD. IN EACH OF TWO
LAYERS.
C1
PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,
AT AN AVERAGE RATE OF 110 LBS. PER SQ. YD. PER 1" DEPTH. TO
BE PLACED IN LAYERS NOT TO EXCEED 2" IN DEPTH.
C2
P A V E M E N T S C H E D U L E
PROP. APPROX. 4" ASPHALT CONCRETE BASE COURSE, TYPE B25.0C, AT
E1
THAN 5•" IN DEPTH.
BE PLACED IN LAYERS NOT LESS THAN 3" IN DEPTH OR GREATER
AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH. TO
PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.0C,
AN AVERAGE RATE OF 456 LBS. PER SQ. YD.
E2
PAVEMENT EDGE SLOPES ARE 1:1 UNLESS OTHERWISE SHOWN.
R1 SHOULDER BERM GUTTER
T EARTH MATERIAL
U EXISTING PAVEMENT
W VARIABLE DEPTH ASPHALT PAVEMENT (SEE WEDGING DETAILS THIS SHEET)
MIN.
C SURVEY L
U
C1
E2
C2
MIN.
3"3"
E2
Detail Showing Method of Wedging
SHEET NO.PROJECT REFERENCE NO.
ROADWAY DESIGN
ENGINEER ENGINEER
2A-117BP.14.R.210
PAVEMENT DESIGN6/2/993/15/2019X:\NCDOT\Division 14 - 2017\Macon 550043\Roadway\Proj\550043_Rdy_typ.dgnUser:smelvinDOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
BRIDGE #550043
MACON COUNTY
GRADE
POINT
10'-0"
20'-0"
4:12:1 MAX2:1 MAX
FT/FT
0.02
3'-0"8'-0"
*
*
GROUND
EXIST.
FT/FT0.08
FT/FT
0.02
4:1FT
/FT
0
.08
GROUND
EXIST.
2:1 MAX
2:1 MAXGROUND
EXIST.
GROUND
EXIST.
1:
1 1:1SEE X-SECTIONS
W
U
GRADE TO THIS LINE
GRADE TO THIS LINE
7"
3'-0"*
7"
USE TYPICAL SECTION NO. 1
NOTE: TRANSITION BETWEEN EXISTING AND TYP. SECT. NO.1 AS FOLLOWS:
-L- STA. 17+90.16 TO -L- STA. 20+00.00
-L- STA. 11+05.00 TO -L- STA. 12+05.36
TYPICAL SECTION NO. 1
-L- STA. 20+00.00 TO -L- STA. 20+50.00
-L- STA. 10+55.00 TO -L- STA. 11+05.00
GRADE
POINT
20'-0"
4:12:1 MAX2:1 MAX
FT/FT
0.02
GROUND
EXIST.
FT/FT0.08
FT/FT
0.02
4
:1
FT
/FT
0
.08
GROUND
EXIST.
2:1 MAX
2:1 MAXGROUND
EXIST.
GROUND
EXIST.
1:
1 1:1GRADE TO THIS LINE
7"
TYPICAL SECTION NO. 2
USE TYPICAL SECTION NO. 2
-L- STA. 16+39.80 (END BRIDGE) TO 17+90.16
-L- STA. 12+05.36 TO -L- STA. 15+52.20 (BEGIN BRIDGE)
TYPICAL SECTION NO. 3
USE TYPICAL SECTION NO. 3
-L- STA. 15+52.20 TO -L- STA. 16+39.80
C1
E1
C1
E1
E1
C1
E1
C1
INSET B
INSET A OR
MATCHLINE
0' TO 18.4'
FT/FT
0.02
FT/FT
0.02
MIN.
"2
11 GRADE
POINT
30'-0" OUT TO OUT
1'-1"1'-1"
BARRIER
CONCRETE
42" VERTICAL
BARRIER
CONCRETE
42" VERTICAL
3'-11"
10 - 33" BOX BEAM UNITS = 30'
INSET B
INSET A OR
MATCHLINE
ADD 3' BEHIND FACE OF GUARDRAIL
*ADD 3' BEHIND FACE OF GUARDRAIL
CL -L- (SR 1365 - MIDDLE CREEK RD)
8'-0"10'-0"
-L- (SR 1365 - MIDDLE CREEK RD) CL
-L- (SR 1365 - MIDDLE CREEK RD) CL
3'-0"8'-0"*10'-0"10'-0"3'-0"*8'-0"
10'-0"10'-0"3'-11"
C2
USE INSET A
C1
T
FT/FT
0.08
1:18'-0"VARIES*
4
:1
2:1 MAXFT/FT
0.02
Exist. Ground
Exist. Ground
2:1 MAX
**
**
THIS LINE
GRADE TO
INSET A
7"
ADD 3' FOR GUARDRAIL LOCATIONS
LIMITS FOR ALL OTHER LOCATIONS
ADD MINIMUM 2' PAST PAVED SHOULDER *
E1
-L- STA. 16+58.53 (END APPROACH SLAB) TO -L- STA. 17+37.75 RT
-L- STA. 16+42.47 (END APPROACH SLAB) TO -L- STA. 17+21.68 LT
-L- STA. 14+64.00 TO -L- STA. 15+28.99 RT (BEGIN SBG)
-L- STA. 14+48.00 TO -L- STA. 15+12.92 LT (BEGIN SBG)
SHOWN OTHERWISE ON PLANS.
TO FACE OF GUARDRAIL UNLESS
AT GUARDRAIL LOCATIONS PAVE
NOTE:
0'-0" TO 4'-6"
INSET B
Exist. Ground
USE INSET B
R1 C1
3'-11"
6"
GRADE TO THIS LINE
E1 7"NO. 2TYP. SECT.MATCHLINE-L- STA. 15+28.99 TO -L- STA. 15+49.53 RT (BEGIN APPROACH SLAB)
-L- STA. 15+12.92 TO -L- STA. 15+33.47 LT (BEGIN APPROACH SLAB)NO. 2TYP. SECT.MATCHLINEPROFESSIONAL
E
NG INEERNORTHCAROLINA
SEAL
35018 YRRET .L YMMIJ
AAWOOD OFFSET BLOCKSYSTEM PARTS(FOR WOOD POSTS)STEEL TUBE6"8"7"6'-0"6"8"7"
1'-2"
7"TS 6"x8"x0.1875"LINE POSTSTANDARDBREAKAWAY POSTSHORT WOOD6 86 83'-8ƒ"
1'-8"DIA.ƒ"SLOT2•"xƒ"DIA.2…" ±„"7•"±„"5•"PANEL SPLICEW-BEAM MIDSPAN3'-1•"3'-1•"4‚"4‚"2"12‚"SPLICE BOLT SLOTS" X 1„" (TYP.)3229POST BOLT SLOTSƒ" X 2•" (TYP.)3'-1•"3'-1•"3'-1•"4‚"4‚"2"25'-0"862D02862D02J.HOWERTON 3-7-2018PRO
F
ESSIONALENGINEER NO
R
T
H CAROLINASEAL 022966 NOTREWOH .S LEOJSEE TITLE BLOCKCLCLCLCLCLGUARDRAIL INSTALLATIONGUARDRAIL INSTALLATION3"3"CL5'-0"1"CFRONTSIDEPLANCLCL"W6" STEEL POSTƒ" DIA.1'-3ƒ"8"1'-5"4"6"1„"1„"7"
W6x8.5x6'-0"CLCLCLSIDEPLANƒ"O‚"+ ˆ"FRONTCL1‰"+ ˆ"‡" DIA.OFFSET BLOCKROUTED - 0"2ƒ"+ ‰"
7ˆ"+ ‰" - 0"2‰"+ „"SOIL PLATE2'-0" X 1'-6" ON 6" SIDECENTERED‡" DIA HOLESL Ž" DIA. HOLESŽ" DIA. - ˆ"
7•"+ ‰"STANDARD W-BEAM GUARDRAILSHEET NO.PROJECT REFERENCE NO.CHECKED BY:FILE SPEC.:DATE:DATE:FAX 919-250-4119Office 919-707-6950DATE:ORIGINAL BY:MODIFIED BY:AND DEVELOPMENT UNITCONTRACTS STANDARDSRALEIGH, N.C.DIVISION OF HIGHWAYSDEPT. OF TRANSPORTATIONNORTH CAROLINASTATE OF RALEIGH, N.C.
DIVISION OF HIGHWAYS
DEPT. OF TRANSPORTATION
NORTH CAROLINA
STATE OFSHEET OFSHEET OFROADWAY DETAIL DRAWING FORROADWAY DETAIL DRAWING FOR DOCUMENT NOT CONSIDERED FINALUNLESS ALL SIGNATURES COMPLETED17BP.14.R.2102C-1
SEE TITLE BLOCKJ HOWERTON 06-22-121 7 1 7
862D03862D03
862D03 862D03
2 7 2 7
SHEET NO.PROJECT REFERENCE NO.CHECKED BY:FILE SPEC.:DATE:DATE:FAX 919-250-4119Office 919-707-6950DATE:ORIGINAL BY:MODIFIED BY:CONTRACT STANDARDSAND DEVELOPMENT UNIT14-DEC-2017 10:36S:\Contracts\Contracts\Special Details\jhowerton\Standard Drawings\2018 Standard Drawings\Details in Lieu of Standards\Division 8\0862d0301.dgnjhowerton AT CSD-292595
PRO
F
ESSIONALENGINEER
NO
R
T
HCAROLINASEALnotrewoH .S leoJ022966DOCUMENT NOT CONSIDERED FINALUNLESS ALL SIGNATURES COMPLETED1'-10"FINISH GRADECONCRETE BACKWALL FILL FACE
PLAN VIEW
SHOULDER BREAK POINT1'-10"GUARDRAIL POST3 SPACES @ 3'-1•"ELEVATION
`W' BEAM GUARDRAIL
WTR SECTIONSTRUCTURE ANCHOR UNITSSTRUCTURE ANCHOR UNITSOFFSET BLOCKSTD. 6'-3" SPACINGVAR.**STD. 6'-3" SPACING*1" 1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
PAY LIMITS WTR SECTIONAPPROACH SLAB
APPROACH SLAB
CONSTRUCTION JOINT
CONCRETE BACKWALL
AEXP. JOINT
ABRIDGE DECK A
BRIDGE END POST
BRIDGE RAIL SKEWFOR ATTACHMENT TO RAIL ON BRIDGEGUARDRAIL ANCHOR UNIT, TYPE III FOR ATTACHMENT TO RAIL ON BRIDGEGUARDRAIL ANCHOR UNIT, TYPE III FOR ATTACHMENT TO RAIL ON BRIDGE
GUARDRAIL ANCHOR UNIT, TYPE III
MIDSPAN SPLICE3'-1•"3'-1•" -SEE SHEET 3 FOR POST SECTIONS 1 THRU 9. -LAP JOINTS IN THE DIRECTION OF TRAFFIC FLOW. -MEASURE GUARDRAIL HEIGHT FROM THE TOP OF ADJACENT SURFACE (SHOULDER, BERM, OR GUTTER). -SHOULDER BERM GUTTER MUST BE INSTALLED TO THE LIMITS 8" x 4" LIP CURB IS SHOWN IF ANCHOR UNIT IS NOT ADJACENT TO AN APPROACH SLAB. *THE DISTANCE FROM END OF BRIDGE RAIL TO CENTER LINE OF THE FIRST POST SHOULD BE 11•" IF CONCRETE BACKWALL IS NOT PRESENT. **POST NOT REQUIRED FOR SKEW ANGLES GREATER THAN 150° OR LESS THAN 30° UNLESS OTHERWISE DIRECTED BY THE ENGINEER.NOTE:RALEIGH, N.C.DIVISION OF HIGHWAYSDEPT. OF TRANSPORTATIONNORTH CAROLINASTATE OF RALEIGH, N.C.DIVISION OF HIGHWAYSDEPT. OF TRANSPORTATIONNORTH CAROLINASTATE OFSHEET OF SHEET OFROADWAY DETAIL DRAWING FORROADWAY DETAIL DRAWING FOR1'-10"
FINISH GRADE
CONCRETE BACKWALL
FILL FACE
PLAN VIEW
SHOULDER BREAK POINT
@ 1'-6ƒ"
4 SPACES
1'-10"
GUARDRAIL POST
3 SPACES @ 3'-1•"
ELEVATION
`W' BEAM GUARDRAIL
WTR SECTIONSTRUCTURE ANCHOR UNITSSTRUCTURE ANCHOR UNITSGUARDRAIL
THRIE BEAM
OFFSET BLOCK
STD. 6'-3" SPACING
END SHOE
10 GA
VAR.
1'-6ƒ")
VAR. (MAX.
**
STD. 6'-3" SPACING
GRADE
FINISH
*
1"
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
PAY LIMITS
(ONE RAIL INSIDE ANOTHER)
THRIE BEAM GUARDRAIL 'NESTED'WTR SECTION
APPROACH SLAB
APPROACH SLAB
CONSTRUCTION JOINT
CONCRETE BACKWALL
AEXP. JOINT
ABRIDGE DECK A
BRIDGE END POST
SEE STRUCTURE PLANS
POINT FOR END SHOE ANCHORAGE,
VERTICAL PLANE AT THE ATTACHMENT
BRIDGE RAIL
SEE STRUCTURE PLANS
8" x 4" LIP CURB
SEE STRUCTURE PLANS
8" x 4" LIP CURB
SKEWRAIL ON BRIDGE - SUB REGIONAL TIERGUARDRAIL ANCHOR UNIT, TYPE III FOR ATTACHMENT TORAIL ON BRIDGE - SUB REGIONAL TIER
GUARDRAIL ANCHOR UNIT, TYPE III FOR ATTACHMENT TO RAIL ON BRIDGE - SUB REGIONAL TIERGUARDRAIL ANCHOR UNIT, TYPE III FOR ATTACHMENT TO3'-1•"3'-1•"
3'-1•"
MIDSPAN SPLICE
-SEE SHEET 3 FOR POST SECTIONS 1 THRU 9.
-LAP JOINTS IN THE DIRECTION OF TRAFFIC FLOW.
-MEASURE GUARDRAIL HEIGHT FROM THE TOP OF ADJACENT SURFACE (SHOULDER, BERM, OR GUTTER).
-SHOULDER BERM GUTTER MUST BE INSTALLED TO THE LIMITS 8" x 4" LIP CURB IS SHOWN IF ANCHOR UNIT IS NOT ADJACENT TO AN APPROACH SLAB.
*THE DISTANCE FROM END OF BRIDGE RAIL TO CENTER LINE OF THE FIRST POST SHOULD BE 11•" IF CONCRETE BACKWALL IS NOT PRESENT.
**POST NOT REQUIRED FOR SKEW ANGLES GREATER THAN 150° OR LESS THAN 30° UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
NOTE:RALEIGH, N.C.DIVISION OF HIGHWAYSDEPT. OF TRANSPORTATIONNORTH CAROLINASTATE OF RALEIGH, N.C.DIVISION OF HIGHWAYSDEPT. OF TRANSPORTATIONNORTH CAROLINASTATE OFSHEET OF SHEET OFROADWAY DETAIL DRAWING FORROADWAY DETAIL DRAWING FOR@ 1'-6ƒ"4 SPACES
GUARDRAIL
THRIE BEAMEND SHOE
10 GA
1'-6ƒ")VAR. (MAX.GRADEFINISH(ONE RAIL INSIDE ANOTHER)THRIE BEAM GUARDRAIL 'NESTED'SEE STRUCTURE PLANSPOINT FOR END SHOE ANCHORAGE,VERTICAL PLANE AT THE ATTACHMENT SEE STRUCTURE PLANS8" x 4" LIP CURBSEE STRUCTURE PLANS8" x 4" LIP CURB1'-9"2'-1"2'-1"
2'-1"2'-1"1'-9"17BP.14.R.2102C-2
--------------------------SHEET PILESH-PILES WITH TIMBER LAGGINGSLOPE OR SURCHARGE CASE WITH NO TRAFFIC IMPACT----------SURCHARGE CASE WITH TRAFFIC IMPACT< 6789101112< 67891011127.58.510.011.012.513.515.011.513.015.017.018.520.522.53.04.56.59.513.017.021.54.57.010.014.019.526.033.0HP 10x428.09.510.511.513.0HP 12x538.09.510.512.011.513.015.017.0HP 14x738.09.510.512.013.514.516.011.513.015.017.018.511.012.012.513.514.015.016.016.017.018.019.020.021.022.010.012.014.016.519.522.525.512.014.517.020.023.528.033.09.510.511.513.014.59.510.511.512.513.513.014.515.517.09.510.511.512.513.514.515.513.014.515.517.018.520.021.5HP 10x42HP 12x53HP 14x73SHEET PILES--------------------------STANDARD TEMPORARY SHORINGNOTES:TEMPORARY GUARDRAILSTANDARD TEMPORARY SHORINGBOTTOM OF SHORINGTOP OF SHORING2:1 (H:V) OR
F
L
A
T
T
E
R6:1 (H:V) OR FLATTEROR EXISTING GRADEBOTTOM OF EXCAVATIONBOTTOM OF SHORING6:1 (H:V) OR FLATTEROR EXISTING GRADEBOTTOM OF EXCAVATION(SEE NOTE 9)EXTENSIONMINIMUM REQUIREDEDGE OF NEAREST TRAFFIC LANEPILE TIPAND PILE TIPBOTTOM OF SHORINGELEVATION BEWTEENGROUNDWATERPILE TIPELEVATION BELOWGROUNDWATER
PILE TIPCLASS IV SELECT MATERIAL (ABC)(SEE NOTE 6)CONDITIONGROUNDWATERTOP OF SHORINGTRAFFIC SIDE OF SHORINGEMBEDMENTMINIMUM REQUIREDBOTTOM OF SHORING6:1 (H:V) OR FLATTEROR EXISTING GRADEBOTTOM OF EXCAVATION(SEE NOTE 9)EXTENSIONMINIMUM REQUIREDPILE TIPMIN24"AND TRAFFIC CONTROL PLANS)CLEAR DISTANCE (SEE NOTE 7TRAFFIC SIDE OF SHORINGPAVEMENT SECTIONEDGE OF PAVEMENT**TOP OF SHORING =EDGE OF PAVEMENT**GUARDRAIL FACE =6" MINEXTENSIONTRAFFIC LANEEDGE OF NEARESTH-PILES WITH TIMBER LAGGING**TOP OF SHORING**FACE GUARDRAIL(SEE NOTE 8)CLEAR DISTANCE12. 11. 10. 9. 8. 7. 6. 5. 4. 3. 2. 1. 3WITH TIMBER LAGGINGSHEET PILES OR H-PILES*SEE TABLE ABOVE.(SURCHARGE CASE)VARIES - 12' MAXH - SHORING HEIGHT
VARIES - 12' MAX
H - SHORING HEIGHT
VARIES - 12' MAX
H - SHORING HEIGHT*SEE TABLE ABOVE.(SLOPE CASE)MINIMUM REQUIRED EMBEDMENT AND SECTION MODULUS(FT)HEIGHTSHORINGH(FT)EMBEDMENTREQUIREDMINIMUM(IN /FT)SECTION MODULUSMINIMUM REQUIRED(FT)EMBEDMENTREQUIREDMINIMUM*WITH TIMBER LAGGINGSHEET PILES OR H-PILES*WITH TIMBER LAGGINGSHEET PILES OR H-PILES**
EMBEDMENT
MINIMUM REQUIRED
*
EMBEDMENT
MINIMUM REQUIRED
*** (SEE NOTE 10) (FT)MINIMUM REQUIRED EMBEDMENT (SEE NOTE 10) (FT)MINIMUM REQUIRED EMBEDMENT3(IN /FT)SECTION MODULUSMINIMUM REQUIREDSTANDARD SHORING PROVISION)(SEE PLANS ANDTEMPORARY GUARDRAILMIN24"PAVEMENT SECTIONSTANDARD SHORING PROVISION)(SEE PLANS ANDCONCRETE BARRIERCONCRETE BARRIER". --SIZE SHOWN IF MINIMUM REQUIRED EMBEDMENT IS "GROUNDWATER CONDITION, SHORING HEIGHT AND H-PILE*DO NOT USE H-PILES WITH TIMBER LAGGING FOR
DEPARTMENT OF TRANSPO
R
TAT
IO N
ST
A
TE
O
F NORTH CAROLINATEMPORARY SHORINGSTANDARDDIVISION OF HIGHWAYSDEPARTMENT OF TRANSPORTATIONNORTH CAROLINAENGINEERING UNITGEOTECHNICALSTANDARD DETAIL NO. 1801.01DATE: 11-19-13PROJECT REFERENCE NO. ENGINEER SIGNATUREDATESHEET NO.ENGINEERGEOTECHNICALSIGNATUREDATE PE # PRO
F
ESSIONALENGINEER
NO
R
T
HCAROLINASEAL
EMAN LAES EP DOCUMENT NOT CONSIDERED FINALUNLESS ALL SIGNATURES COMPLETEDCONTACT THE ENGINEER IF PILES DO NOT ATTAIN THE MINIMUM REQUIRED EMBEDMENT.connect.ncdot.gov/resources/Geological/Pages/Geotech_Forms_Details.aspxSTANDARD SHORING SELECTION FORMS ARE AVAILABLE FROM:TEMPORARY SHORING CONSTRUCTION. UP TO 3 SHORING LOCATIONS MAY BE INCLUDED ON EACH FORM.SUBMIT A "STANDARD TEMPORARY SHORING SELECTION FORM" AT LEAST 7 DAYS BEFORE STARTINGDRILLED-IN H-PILES.MAXIMUM 6' SPACING. AT THE CONTRACTOR'S OPTION, EMBEDMENT DEPTHS MAY BE REDUCED BY 25% FORMINIMUM REQUIRED EMBEDMENT FOR H-PILES WITH TIMBER LAGGING IS BASED ON DRIVEN H-PILES ATFOR "SURCHARGE CASE WITH TRAFFIC IMPACT".MINIMUM REQUIRED EXTENSION IS 6" FOR "SLOPE OR SURCHARGE CASE WITH NO TRAFFIC IMPACT" AND 32"CASE WITH TRAFFIC IMPACT".GUARDRAIL, ATTACH GUARDRAIL TO TRAFFIC SIDE OF PILES AS SHOWN IN THE PLANS AND USE "SURCHARGEAT THE CONTRACTOR'S OPTION OR IF AVAILABLE CLEAR DISTANCE IS LESS THAN 4' FOR TEMPORARY"SURCHARGE CASE WITH TRAFFIC IMPACT".FOR CONCRETE BARRIER, SET BARRIER NEXT TO AND UP AGAINST TRAFFIC SIDE OF PILES AND USEAT THE CONTRACTOR'S OPTION OR IF AVAILABLE CLEAR DISTANCE IS LESS THAN THE MINIMUM REQUIREDCONDITION. DO NOT USE STANDARD TEMPORARY SHORING IF GROUNDWATER IS ABOVE BOTTOM OF SHORING.PLANS, USE "GROUNDWATER ELEVATION BETWEEN BOTTOM OF SHORING AND PILE TIP" FOR GROUNDWATERUSE GROUNDWATER ELEVATION NOTED IN THE PLANS. IF NO GROUNDWATER ELEVATION IS SHOWN IN THEOR SOFT SOIL OR MUCK IS WITHIN THE EMBEDMENT DEPTH.DO NOT USE STANDARD TEMPORARY SHORING WHEN VERY LOOSEPARAMETERS ARE NOT APPLICABLE.DO NOT USE STANDARD TEMPORARY SHORING IF ASSUMED SOILCOHESION, c = 0 PSF = 30 DEGREESfFRICTION ANGLE, = 120 PCFgUNIT WEIGHT, IN-SITU ASSUMED SOIL PARAMETERS:STANDARD TEMPORARY SHORING IS BASED ON THE FOLLOWINGPROVISION.FOR STANDARD TEMPORARY SHORING, SEE STANDARD SHORINGSHORING AS NOTED IN THE PLANS.AT THE CONTRACTOR'S OPTION, USE STANDARD TEMPORARY250 PSF MAXTRAFFIC SURCHARGE250 PSF MAXTRAFFIC SURCHARGE17BP.14.R.2102G-1
COMPUTED BY: SGM DATE: 3/12/2019SHEET NO. CHECKED BY: JLT DATE:3/14/20193B-1LOCATIONStation Station Uncl. Embank. Borrow WasteStation Station LT/RT/CL REMOVAL REMOVALExcav. +%‐L‐ 10+55.00‐L‐ 15+52.20978 1035 57BRIDGE‐L‐ 16+39.80‐L‐20+50.0046 1707 16611024 2742 17181024 2742 1718EST. 5% TO REPLACE TOP SOIL ON BORROW PIT861024 2742 1804SAY:1,100 1,900EST. DDE = 540 CYEST. SHALLOW UNDERCUT = 100 CYSELECT GRANULAR MATERIAL = 400 CYGEOTEXTILE FOR SOIL STABILIZATION = 600 SYCLASS IV SUBGRADE STABILIZATION = 200 TONNG = NON-GATING IMPACT ATTENUATOR TYPE 350"N" DIST.TOTALFLAIR LENGTHLINEFROM SHLDR APPR.TRAIL.APPR. TRAIL.E.O.L.WIDTHENDENDENDENDEAGNG‐L‐‐L‐‐L‐‐L‐ADDITIONAL GUARDRAIL POSTS = 5 EA0Note: Invert Elevations indicated are for Bid Purposes only and shall not be used for project construction stakeout. COMPUTED BY: Zachary J. Richard, PE DATE: 7/12/2018 See "Standard Specifications For Roads and Structures, Section 300-5". CHECKED BY: David B. Petty, PE DATE: 3/9/2019PER GEOTECH RECOMMENDATION, ESTIMATED 450 CUBIC YARDS OF UNDERCUT TO BE USED IN THE DISCRETION OF THE RESIDENT ENGINEER.PAVEMENT REMOVAL SUMMARYNote: Earthwork quantities are calculated by the Roadway Design Unit. These earthwork quantities are based in part on subsurface data provided by the Geotechnical Engineering Unit.SAY:1,320IN SQUARE YARDSTOTAL:1,314.39ASPHALT ASPHALT CONCRETE CONCRETE‐L‐15+87 19+39LT 541.47BREAKUP BREAKUP‐L‐10+94 15+45LT 772.92LINESURVEYSHOP CURVEDSUB‐TOTALSLESS ANCHOR DEDUCTIONS56.2514+87.92 LTIMP. ATTEN. TYPE 350212.50GUARDRAIL SUMMARYIN FEETNote: Approximate quantities only. Unclassified Excavation, Borrow Excavation, Fine Grading, Clearing and Grubbing, and Removal of Existing Pavement will be paid for at the contract lump sum price for grading.SUMMARY OF EARTHWORK75.00"N" = DISTANCE FROM EDGE OF LANE TO FACE OF GUARDRAILTOTAL SHOULDER WIDTH = DISTANCE FROM EDGE OF TRAVEL LANE TO SHOULDER BREAK POINT. FLARE LENGTH = DISTANCE FROM LAST SECTION OF PARALLEL GUARDRAIL TO END OF GUARDRAIL.W = TOTAL WIDTH OF FLARE FROM BEGINNING OF TAPER TO END OF GUARDRAIL.G = GATING IMPACT ATTENUATOR TYPE 350IN CUBIC YARDS25' 0.5'LIST OF PIPES, ENDWALLS, ETC. (FOR PIPES 48 INCHES & UNDER)44PROJECT NO.WIIIGREUTL-2AT‐1ANCHORSREMOVE & RESET EXISTING GUARDRAILREMARKS1REMOVE EXISTING GUARDRAILIIISC1GREU TL‐2 4@25.00 ft175.004@18.75 ftGRAND TOTALS:TYPE III15+60.24END STA.15+44.17LOC.BEG. STA.TRAIL. ENDDOUBLE FACEDWARRANT POINTAPPR. ENDLENGTHSTRAIGHT15+44.17 6.92'3.92'6.92'25' 0.5'PROJECT TOTALS:STATE OF NORTH CAROLINA17BP.14.R.210TOTALS:37.5015+03.990.5'1115+60.24 RT 56.2516+31.76 16+81.76 LT 50.00 16+31.76 3.92'16+47.83 16+97.83 RT 50.00 16+47.83 3.92'3.92' 6.92'6.92'25' 0.5'1125'114444SAY37.5ANCHOR TOTALSGRAND‐TOTALS 100.00SIZETHICKNESSOR GAUGEEFG‐L‐ 15+20 LT 0401 2086.71110401 0402 2084.7 2084.6 12‐L‐ 15+36 RT 0403 2087.0 161110403 0404 2084.2 2084.1‐L‐ 12+75 CL 0405 2081.1 2080.74841‐L‐ 11+35 RT 04067258TOTALS10048 2 2 2 99CATCH BASINNARROW DROP INLETDROP INLETGRATED DROP INLET(NARROW SLOT)JUNCTION BOXMANHOLETRAFFIC BEARING DROP INLETTRAFFIC BEARING JUNCTION BOXPER EACH (0' THRU 5.0')LIN.FT.DROP INLETCATCH BASINCONC. & BRICK PIPE PLUG, C.Y. STD. 840.71 R.C. PIPE CLASS III 36''15" SIDE DRAIN PIPEQUANTITIESFOR DRAINAGESTRUCTURES*TOTAL L.F. FOR PAYQUANTITY SHALL BE COL.'A' + (1.3 X COL.'B')C.B. STD. 840.01 OR STD. 840.02FRAME, GRATES,AND HOODSTANDARD 840.03CONC. COLLARS CL. "B" C.Y. STD. 840.72PIPE REMOVAL LIN. FT.CU. YARDSAB42'' 48'' 12''18'' 24'' 30'' 18'' 24'' 30'' 36''STATIONSTRUCTURE NO..10912'' 15''FROMTOTOP ELEVATIONINVERT ELEVATIONINVERT ELEVATIONSLOPE CRITICAL C.S. PIPE 36'' 42''DRAINAGE PIPE(RCP, CSP, CAAP, HDPE, or PVC)DO NOT USE RCPDO NOT USE CSPDO NOT USE CAAPDO NOT USE HDPE.079LOCATION (LT, RT, OR CL)'30'' 36''.064.064.06424'' 48''42''.064.07948'' 12'' 15'' 18''.10912'' 15'' 18'' 24'' 30''REMARKSABBREVIATIONS R.C. PIPE CLASS IV42''15''R.C.P.C.S.P.5.0' THRU 10.0'***" RC PIPE CULVERTS, CONTRACTOR DESIGNSTD. 838.01838.11 ORSTD. 838.80(UNLESS NOTEDOTHERWISE) T.B.D.I STD. 840.35 ** " R.C. PIPE (CLASS V)***" RC PIPE CULVERTS, CONTRACTOR DESIGNCONCRETE TRANSITIONALSECTION10.0' AND ABOVETYPE OF GRATE FRAME AND NARROW FLAT GRATE STD. 840.29C.B.N.D.I.D.I.G.D.I.G.D.I.(N.S.)J.B.M.H.T.B.D.I.T.B.J.B.18" SIDE DRAIN PIPEENDWALLS48''
COMPUTED BY: ___JCK10/8/2018 CHECKED BY: ____SCC10/8/2018SD 200AST 18 100 200 400TOTAL LF:200TOTAL CY/TONS/SY:100 200** 400** 0 0*UD = Underdrain*BD = Blind Drain*ASU(1/2) = Aggregate Subgrade (Type 1 or 2)*SD = Subsurface Drain*AST = Aggregate Stabilization**Total tons of "Class IV Subgrade Stabilization" and total square yards of "Geotextile for Soil Stabilization" are only the estimated quantities for ASU(1/2)/AST and may only represent a portion of the subgrade stabilization and geotextile quantities shown in the Item Sheets of the Proposal.Aggregate Thickness INCHES[8" for ASU(2)]Shallow Undercut CYSUMMARY OF SUBSURFACE DRAINAGECONTINGENCYSUMMARY OF AGGREGATE SUBGRADE/STABILIZATIONCONTINGENCYStationLINE Station StationLocation LT/RT/CLDrain Type* UD/BD/SDLFGeotextile for Soil Stabilization SYAggregate Type* ASU(1/2)/ASTStation3G-1SHEET NO.PROJECT NO.17BP.14.R.210Stabilizer Aggregate TONSClass IV Aggregate Stabilization TONSClass IV Subgrade Stabilization TONS(5-15-18)STATE OF NORTH CAROLINADIVISION OF HIGHWAYSLINE
02TYPE-III
TYPE-IIITYPE-III
TYPE-III
REVISIONS DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
417BP.14.R.210
R/W SHEET NO.8/17/994/15/2019X:\NCDOT\Division 14 - 2017\Macon 550043\Roadway\Proj\550043_Rdy_psh.dgnUser:smelvinCORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
N
A
D 83/ 2011
BM-2
BM-1
BRIDGE #550043
MACON COUNTY
BRIDGE/ROADWAY RELATIONSHIP SKETCH
TYPE-III
10'
10'
SBG
PROP.
FDPS
PROP.
-L- STA. 16+50.50
END APPROACH SLAB
-L- STA. 15+41.50
BEGIN APPROACH SLAB
30'-0"TO OUTOUT27'-10"1'-1"
1'-1"02TYPE-III
TYPE-IIITYPE-III 023'-11"
3'-11"
2,070
2,080
2,090
2,100
2,110
2,120
2,070
2,080
2,090
2,100
2,110
2,120
2,1302,130
10 11 12 151413 16 17 18 19 20 21 22
(TYP.)W/ CLASS II RIP RAP
1.5:1 NORMAL SLOPE
KEY-IN 3.5' (TYP.)
CLASS II RIP RAP
TO BE REMOVED
EXISTING BRIDGE
LOW CHORD
LOW SIDE
PROP. EXCAVATION TO ELEV. 2081.0'PROP. EXCAVATION TO ELEV. 2083.0'
BRIDGE HYDRAULIC DATA
DESIGN DISCHARGE
DESIGN FREQUENCY
DESIGN HW ELEVATION
BASE DISCHARGE
BASE FREQUENCY
BASE HW ELEVATION
OVERTOPPING DISCHARGE
OVERTOPPING FREQUENCY
OVERTOPPING ELEVATION
APPROX. W.S. ELEVATION
=
=
=
=
=
=
=
=
=
=
1400 CFS
5 YRS*
2085.1 FT
3870 CFS
100 YRS
2087.4 FT
1800 CFS
10+/- YRS
2085.1 FT**
DATE OF SITE VISIT
ON DATE OF SITE VISIT
= 3/8/2018
2080.5 FT
*NOTE: DESIGN IMPROVES LEVEL OF SERVICE.
@ -L- STA. 12+62
WHICH OCCURS AT PROPOSED SAG
LOWEST HIGH POINT ON DECK/ROADWAY
**OVERTOPPING ELEVATION REPRESENTS
OF SITE VISIT =2080.5'
APPROX. W.S. ELEV. ON DATE
DRAINAGE AREA
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE
OVERTOPPING ELEVATION
PIPE HYDRAULIC DATA
AC
YRS
YRS
CFS
CFS
CFS
FT
FT
FT= 2085.1
= 30
= 100+
= 25
= 15.5
= 2083.3
= 18.8
= 2083.6
= 5.8
24" RCP @ -L- Sta. 12+75ROADWAYCLEARPROFESSIONALENGINEERNORTHCAROLINA
SEAL
35018 YRRET .L YMMIJPROFESSIONALENGINEER
N ORTH CARO
LINA
SEAL
038697 YTTEP .B DI
VA
D
FOR STRUCTURE PLANS, SEE SHEET S-1 THRU S-18
LT 74.14' OF -L- STA 15+96.32
NAIL IN 10" TREE BASE ROOT
BM#1 ELEV. 2092.91 04000402029.2'
9.2'8.7'8.3'02301701004803020100010201020304TYPE-III
TYPE-III
GREU TL-2
GREU TL-2
-L- CURVE DATA
DS = 35 MPH DS = 45 MPH
SE = 0.04
PI Sta 12+16.84
D
L = 294.76'
T = 147.46'
R = 3,730.00'
PI Sta 20+98.87
D
L = 125.03'
T = 62.59'
R = 1,050.00'
PI Sta 19+04.30
D
L = 266.90'
T = 134.92'
R = 740.00'
DS = 50 MPH
SE = 0.04SE = NC
-L- POT 10+00.00
-L- PC 10+69.39
-L- PT 13+64.15
-L- PC 17+69.38
-L- POT 22+17.88
-L- PT 21+61.32
-L- PCC 20+36.28
-L- STA 20+50.00
17BP.14.R.210
END PROJECT
-L- STA 16+39.80
END BRIDGE
-L- STA 15+52.20
BEGIN BRIDGE
DRIVE
ASPHALT
PROP. 26'
-L- STA. 14+48.00
BEGIN FDPS
-L- STA 10+55.00
17BP.14.R.210
BEGIN PROJECT
DRIVE
ASPHALT
PROP. 16'
-L- STA. 17+37.75
END FDPS
-L- STA. 17+21.68
END FDPS
-L- STA. 15+28.99
BEGIN SBG
-L- STA. 15+12.92
BEGIN SBG
10+0015+0020+0050' TAPER
TO EXIST.+05TYP
20'+7510'10'8:1
8:1
10'10'TO EXI
ST.50' TAPER+00TYP20'+1060'R
20'R
5'R
15'R
(BY OWNER)
FENCE
RELOCATE
20'
TYP
+56.05PAVEMENT REMOVAL
(BY OWNER)
FENCE
RELOCATE
TYPE-III
TYPE-III
GREU TL-2
GREU TL-2
8:1
8:1
-L- STA. 14+64.00
BEGIN FDPS
PI = 11+76.00
EL = 2,084.38'(-)4
.16
5
3%
(+)0.6893%
VC = 240'
K = 49
PI = 16+04.00
EL = 2,087.33'
(+)0.6893%
(+)5.8855%
VC = 260'
K = 50
PI = 19+36.00
EL = 2,106.87'
(+)5.8855%
(+)3.3421%
VC = 220'
K = 86
ELEV. 2,110.68
-L- STA. 20+50.00
END GRADE
-L- STA. 16+39.80
END BRIDGE
-L- STA. 15+52.20
BEGIN BRIDGEELEV. 2,089.42
-L- STA. 10+55.00
BEGIN GRADE
DS = 35 MPH
DS = 35 MPH DS = 50 MPH
EL = 2080.50'
-L- STA. 12+75 @75' LT
END STANDARD BASE DITCH
EL = 2080.70'
-L- STA. 12+75 @25' LT
BEGIN STANDARD BASE DITCH +0.60%
+6.4%
EL = 2100.00'
-L- STA. 18+50 LT
END LATERAL BASE DITCH
EL = 2082.53'
-L- STA. 15+77 LT
BEGIN LATERAL BASE DITCH
ELEV. 2,085.09
-L- STA. 12+61.92
LOW POINT
PROP. 24" RCP
T
T
SR 1635 20' BST
MIDDLE CREEK RD.12" CMP18" CMPWW
WW
A
S
PH
.MI
D
D
L
E
C
R
E
E
KSARAH COVE RD.
DB H-26 PG 2277
EXISTING R/W EX
IST
ING
R
/W
EX
IST
ING
R
/W30.00'PRI
VATE R/WPRI
VATE R/WPRI
VATE R/
W
19
6.3
0'
S
19°2
2'4
5" WS 18°30'22" W
163.40'
N 14°08'00" E
31.41'
N 34°36'06" W
50.59'N 21°35'06" W63.60'N 16°06'06" W98.89'N 19°49'06"
W77.72'N 17°37'06" W4
6.
4
5'N
1
1°
5
3'
0
6" W36.78'
N 00°41'06" W
40.00'
N 08°33'54" E
34.23'
N 13°46'24" E
40.00'
N 19°04'34" E
N 25°01'24" E
141.94'
N 23°36'06" W
125.98'N 65°09'06" W
58.71'S 64°19'54" W255.25'S 57°46'44" W6
6
.3
0'
S
29
°15'52
" E
135.50'S 19°34'12" EWOODS
WOODS
POLE #2025/20
FRONTIER TEL.
1
2
S
S S
S
S 10' GRAVELTO DEAD ENDELEV.=2102.61'
LOW WIRE
T
T
G
R
S 47°00'00" W370.00'TO SR 1634
60.00'EXISTING R/W
EXISTING R/W
15" CMP
5SBW
5SBW
BSTBST GRTS 83°24'06" E
215.00'S 33°04'00" WN 00°06'34" E
13.34'N 62°19'00" E150.41'GR 60.00'EXI
STI
NG R/WEXI
STI
NG R/W18" CM
PWWTERESA CABE SPEED
DB I-33 PG 1365
POLE #2025/25
FRONTIER TEL.
MIDDLE CREEK
BL-1
S 47°00'00" W
10.69'
EIP
DENNIS JAMES WALTON
DB G-36 PG 1614
LISA R. CRIADO
ALAN DAVID &
DB W-23 PG 545
WOODS
WOODS
WOODS
WOODS
DB P-22 PG 950
DB X-22 PG 1658
DB H-26 PG 2277
(GUY LOUIS CRAUWELS LIVING TRUST)
GUY LOUIS CRAUWELS, TRUSTEE
TIMMY JOEL PHILLIPS
DB K-37 PG 2296
WOODS THOMAS EDWARD JONES
DB M-37 PG 231
JAMES S MILLER
DB T-27 PG 1980
MILDRE JEANETTE CABE HOLLAND
DB O-32 PG 1912
0.20'EIP
R/W MON.
WOODS EIP 1.39'
GPS-100
GPS-101
S
1002
1003
EX. R/W
+50.40
30.00
+64.15
30.00
+69.38
58.00
+43.00
30.00
+02.00
49.00
+36.00 30.00
+94.00
52.00
+94.00
30.00
+20.00
EX. R/W
+90.00
01
02 03 04 05
30.00
+69.39 45.00
+39.00
73.00
+90.00
30.00
+50.00
30.00
+11.00
45.00
+11.00
50.00
+20.00 30.00
+80.00
50.00
+80.00
EX. R/W
+36.28
EX. R/W
+50.40 EX. R/W
+67.00
EX. R/W
+94.00
64.00
+01.00
EX. R/W
+15.35
30.00
+99.00
30.00
+39.00
EX. R/W
+79.21
EX. R/W
+68.92
EX. R/W
+27.41
EX. R/W
+92.97
EX. R/W
+63.99
EX. R/W
+29.28
0401
15"0403
0402
0404
TB 2GIREMOVE
15"
TO DRAIN
GRADE RETA
I
N
1 TON, 5 SY GEO
CLASS B RIPRAP
GRADE TO DRAIN24" RCP-IVSEE DETAIL A
STANDARD BASE DITCH
SEE DETAIL B
RIP RAP AT EMBANKMENT
( Not to Scale)
RIP RAP AT EMBANKMENT
FROM -L- STA 12+70 TO 12+80 LT
DETAIL B
Grade
Ditch
1.5'
GEOTEXTILE
Geotextile= 23 sy
Type of Liner= 17 TONS, Class I Rip-Rap
10'min.
1.0'min.
SEE DETAIL C
LATERAL BASE DITCH
15"TB 2GI-D
1 TON, 5 SY GEO
CLASS B RIPRAP
RETAIN5 TONS,14 SY GEO
CLASS B RIPRAP
( Not to Scale)
LATERAL BASE DITCH
2:1D
B
b
d
2:1 50:1
DETAIL C
b=Varies(see XSC)
B=5 Ft.
Min. d=1.5 Ft.
Min. D=1.5 Ft.
*When B is < 6.0'
Ground
Natural
Slope
Fill
GEOTEXTILE
0405
0406
Geotextile = Est. 350 sy
Class I Rip-Rap =Est. 260 TONS
Type of Liner=
FROM -L- STA 15+78 TO 18+50 LT (DDE=470 cy)
REMOVE
B
2:12:1D
( Not to Scale)
STANDARD BASE DITCH
FROM -L- STA 12+75@25'LT TO 12+75@59'LT
DETAIL A
B=3 Ft.
Min. D=1.5 Ft.
Ground
Natural
Ground
Natural
Est DDE=70 CY
GRADE TO DRAIN
F
F
F
C
F F F F
F F
C
F
C
F
F
F
F FFFF
C C
FF
F
C
FC
F
C
C
F
F
F C
C
C
C
C C
C
C
F
C
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS TMP-1
SHEET NO.User:smelvinX:\NCDOT\Division 14 - 2017\Macon 550043\Traffic\TrafficControl\TCP\Macon_550043_TC_TMP_01(TSH).dgn4/15/2019INDEX OF SHEETS
TRANSPORTATION MANAGEMENT PLAN
WORK ZONE SAFETY & M OBILITY
ONFOETATS
DEPARTMENT
OF TRANSPORTATIONANIL
ORACHTR
NFO
ETATSDEP
ART
ME
N
TOFRATNSPOR TATIONANILORA
C
HTRO
"from the M OUNTAINS to the COAST"
DEPARTE
N
OF ANSPORTA TIONTAE
OF NORT
H
ROL
NA
WORK
Z
ONE TRAFFIC
CONTROLDIVISION OF
HI
GHW
A
YS
T
S CAI
M
TTR
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PLAN PREPARED FOR N.C.D.O.T. BY:
PROJECT ENGINEER
DESIGN ENGINEER PROJECT:VICINITY MAP
APPROVED:
DATE:
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
SHEET NO.TITLE
MACON COUNTY
LOCATION
PROJECT
1636
1114
1635
1177
1684
1634
1633
1632
1109
1110
1727
1629
1629
1108
1167
1106
1635
1635
441
23
441
23 17BP.14.R.210JIMMY TERRY, PE
SANDRA MELVIN PROFESSION
A
LE
NG INEERNORTHCAROLINA
SEAL
35018 YRRET .L YMMIJ
TMP-4 PHASE II OVERVIEW
TMP-3 PHASE I OVERVIEW
TMP-2 PHASING NOTES
STRATEGIES, GENERAL NOTES, AND LOCAL NOTES)
TMP-1B TRANSPORTATION OPERATIONS PLAN: (MANAGEMENT
AND LEGEND
TMP-1A LIST OF APPLICABLE ROADWAY STANDARD DRAWINGS,
TMP-1 TITLE SHEET, VICINITY MAP, AND INDEX OF SHEETS
MiddleNCDOT CONTACT INFORMATION:
Phone: 828 488 0902
Division Bridge Program Manager
ADAM DOCKERY
SHEET NO.PROJ. REFERENCE NO.User:smelvinX:\NCDOT\Division 14 - 2017\Macon 550043\Traffic\TrafficControl\TCP\Macon_550043_TC_TMP_01A(STA & Legend).dgn4/15/2019TMP-1A
LEGENDROADWAY STANDARD DRAWINGS
TITLESTD. NO.
PROJECT SERVICES UNIT - N.C. DEPARTMENT OF TRANSPORTATION - RALEIGH, N.C.,
THE FOLLOWING ROADWAY STANDARDS AS SHOWN IN "ROADWAY STANDARD DRAWINGS" -
ARE CONSIDERED A PART OF THESE PLANS:
DATED JANUARY 2018 ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE HEREBY
DEPARTE
N
O
F ANSPORTA TIONTAE
OF NORT
H
ROL
NA
WORK
Z
ONE TRAFFIC
CONTROLDIVISION OF
HI
GHW
A
YS
T
S CAI
M
TTR
APPROVED:
DATE:
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
MARKING SCHEDULE
TEMPORARY PAVEMENT
DRAWINGS, LEGEND, &
ROADWAY STANDARD
FLAGGER
TRAFFIC CONTROL DEVICES
CONE
DRUM
STATIONARY SIGN
PORTABLE SIGN
CHANGEABLE MESSAGE SIGN
STATIONARY OR PORTABLE SIGN
SKINNY DRUM
BARRICADE (TYPE III)
TEMPORARY SIGNING
SIGNALS
PAVEMENT MARKERS
CRYSTAL/CRYSTAL
YELLOW/YELLOW
PAVEMENT MARKINGS
E
M
P
T
LAW ENFORCEMENT
TEMPORARY CRASH CUSHION
PAVEMENT MARKING SYMBOLS
EXISTING LINES
PAVEMENT MARKING SYMBOLS
EXISTING PROPOSED TEMPORARY
DIRECTION OF TRAFFIC FLOW
NORTH ARROW
GENERAL
EXIST. PVMT.
PROPOSED PVMT.
DIRECTION OF PEDESTRIAN TRAFFIC FLOW
TUBULAR MARKER
PAVEMENT REMOVAL
WORK AREA
FLASHING ARROW BOARD
TRUCK MOUNTED ATTENUATOR (TMA)
TEMP. SHORING (LOCATION PURPOSES ONLY)
E
M
P
T
1101.01 WORK ZONE ADVANCE WARNING SIGNS
1101.02 TEMPORARY LANE CLOSURES
1101.11 TRAFFIC CONTROL DESIGN TABLES
1110.01 STATIONARY WORK ZONE SIGNS
1110.02 PORTABLE WORK ZONE SIGNS
1130.01 DRUM
1150.01 FLAGGING DEVICES
1205.01 PAVEMENT MARKINGS - LINE TYPES AND OFFSETS
1205.02 PAVEMENT MARKINGS - TWO-LANE AND MULTI-LANE ROADWAYS
1261.01 GUARDRAIL AND BARRIER DELINEATORS - INSTALLATION SPACING
1261.02 GUARDRAIL AND BARRIER DELINEATORS - TYPES AND MOUNTING
17BP.14.R.210
1205.12 PAVEMENT MARKINGS - BRIDGES
PROPOSED LINES
1262.01 GUARDRAIL END DELINEATION
1101.04 TEMPORARY SHOULDER CLOSURES
1101.03 TEMPORARY ROAD CLOSURES
1135.01 CONES
1180.01 SKINNY-DRUM
TEMPORARY PAVEMENT MARKING
YELLOW DOUBLE CENTERPI
PAINT (4")
DESCRIPTIONSYMBOL
PROFESSION
A
LE
NG INEERNORTHCAROLINA
SEAL
35018 YRRET .L YMMIJ
YELLOW DOUBLE CENTERPI
1145.01 BARRICADES - TYPE III
Bridge #550043
Macon County
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
User:smelvinX:\NCDOT\Division 14 - 2017\Macon 550043\Traffic\TrafficControl\TCP\Macon_550043_TC_TMP_01B(TOP).dgn3/13/201917BP.14.R.210
SHEET NO.PROJ. REFERENCE NO.
TMP-1B
PLAN
OPERATIONS
TRANSPORTATION
DEPARTE
N
O
F ANSPORTA TIONTAE
OF NORT
H
ROL
NA
WORK
Z
ONE TRAFFIC
CONTROLDIVISION OF
HI
GHW
A
YS
T
S CAI
M
TTR
APPROVED:
DATE:
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETEDPROFESSIONALENGINEER
N ORTH CARO
LINA
SEAL
35018 YRRET .L YMMIJ
ENGINEER.
(W8-1) 100 FT IN ADVANCE OF THE UNEVEN AREA, OR AS DIRECTED BY THE
K) INSTALL BLACK ON ORANGE ''DIP'' SIGNS (W8-2) AND/OR "BUMP" SIGNS
TRAFFIC PATTERN.
J) ENSURE ALL NECESSARY SIGNING IS IN PLACE PRIOR TO ALTERING ANY
(3) DAYS PRIOR TO THE BEGINNING OF CONSTRUCTION.
40 FT FROM THE EDGE OF TRAVEL LANE AND NO MORE THAN THREE
I) INSTALL ADVANCE WORK ZONE WARNING SIGNS WHEN WORK IS WITHIN
SIGNING
PATTERN ALTERATION.
H) NOTIFY THE ENGINEER THIRTY (30) CALENDAR DAYS PRIOR TO ANY TRAFFIC
TRAFFIC PATTERN ALTERATIONS
OF EVERY HALF MILE THROUGHOUT THE UNEVEN AREA.
"UNEVEN LANES" SIGNS (W8-11) IN ADVANCE AND A MINIMUM
OF TRAFFIC FOR NOMINAL LIFTS OF 1.5 INCHES. INSTALL ADVANCE WARNING
G) DO NOT EXCEED A DIFFERENCE OF 2 INCHES IN ELEVATION BETWEEN OPEN LANES
ENGINEER, AT NO EXPENSE TO THE DEPARTMENT.
BACKFILL WITH SUITABLE COMPACTED MATERIAL, AS APPROVED BY THE
POSTED SPEED LIMITS LESS THAN 45 MPH.
BACKFILL DROP-OFFS THAT EXCEED 3 INCHES ON ROADWAYS WITH
POSTED SPEED LIMITS OF 45 MPH OR GREATER.
BACKFILL DROP-OFFS THAT EXCEED 2 INCHES ON ROADWAYS WITH
EDGE OF PAVEMENT DROP-OFF AS FOLLOWS:
PAVEMENT IN AREAS ADJACENT TO AN OPENED TRAVEL LANE THAT HAS AN
F) BACKFILL AT A 6:1 SLOPE UP TO THE EDGE AND ELEVATION OF EXISTING
PAVEMENT EDGE DROP OFF REQUIREMENTS
WITH GUARDRAIL OR BARRIER.
TRAVELWAY, RAMP, OR LOOP WITHIN THE SAME LOCATION UNLESS PROTECTED
E) DO NOT WORK SIMULTANEOUSLY WITHIN 15 FT ON BOTH SIDES OF AN OPEN
EQUIPMENT REMAIN WITHIN THE CLOSED TRAVEL LANE.
BY THE ENGINEER. CONDUCT THE WORK SO THAT ALL PERSONNEL AND/OR
THE TRAFFIC CONTROL PLANS, ROADWAY STANDARD DRAWINGS, OR AS DIRECTED
OF AN UNDIVIDED OR DIVIDED FACILITY, CLOSE THE LANE ACCORDING TO
D) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING WITHIN A LANE OF TRAVEL
BARRIER OR GUARDRAIL.
STANDARD DRAWING NO. 1101.02 UNLESS THE WORK AREA IS PROTECTED BY
OPEN TRAVEL LANE, CLOSE THE NEAREST OPEN TRAVEL LANE USING ROADWAY
ADJACENT TO AN UNDIVIDED FACILITY AND WITHIN 5 FT OF AN
C) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING ON THE SHOULDER
BARRIER OR GUARDRAIL OR A LANE CLOSURE IS INSTALLED.
STANDARD DRAWING NO. 1101.04 UNLESS THE WORK AREA IS PROTECTED BY
OPEN TRAVEL LANE, CLOSE THE NEAREST OPEN SHOULDER USING ROADWAY
B) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING WITHIN 15 FT OF AN
LONGER NEEDED OR AS DIRECTED BY THE ENGINEER.
PERFORMED BEHIND THE LANE CLOSURE OR WHEN A LANE CLOSURE IS NO
A) REMOVE LANE CLOSURE DEVICES FROM THE LANE WHEN WORK IS NOT BEING
LANE AND SHOULDER CLOSURE REQUIREMENTS
OR DIRECTED BY THE ENGINEER.
THE CONSTRUCTION PROJECT EXCEPT WHEN OTHERWISE NOTED IN THE PLAN
THE FOLLOWING GENERAL NOTES APPLY AT ALL TIMES FOR THE DURATION OF
ENGINEER.
SUPPLEMENTING, COVERING, OR REMOVAL OF DEVICES AS DIRECTED BY THE
OVERLAPPING OF DEVICES. MODIFICATION MAY INCLUDE: MOVING,
TO MEET FIELD CONDITIONS OR RESULT IN DUPLICATE OR UNDESIRED
DRAWINGS, STANDARD DETAILS, AND ROADWAY DETAILS ARE NOT ATTAINABLE
CHANGES MAY BE REQUIRED WHEN PHYSICAL DIMENSIONS IN THE DETAIL
GENERAL NOTES
MARKERS BY THE END OF EACH DAY'S OPERATION.
R) REMOVE/REPLACE ANY CONFLICTING/DAMAGED PAVEMENT MARKINGS AND
LINES.
Q) TIE PROPOSED PAVEMENT MARKING LINES TO EXISTING PAVEMENT MARKING
APPLICATION AND EVERY SIX MONTHS AS DIRECTED BY THE ENGINEER.
SECOND APPLICATION OF PAINT SIX (6) MONTHS AFTER THE INITIAL
P) PLACE ONE APPLICATION OF PAINT FOR TEMPORARY TRAFFIC PATTERNS. PLACE A
O) INSTALL PAVEMENT MARKINGS ON THE FINAL SURFACE.
MIDDLE CREEK RD PAINT NONE
ROAD NAME MARKING MARKER
ON INTERIM LAYERS OF PAVEMENT AS FOLLOWS:
N) INSTALL TEMPORARY PAVEMENT MARKINGS AND TEMPORARY PAVEMENT MARKERS
PAVEMENT MARKINGS AND MARKERS
ATTACHED, OF SUFFICIENT LENGTH TO CLOSE ENTIRE ROADWAY.
M) PLACE TYPE III BARRICADES, WITH "ROAD CLOSED" SIGN R11-2
REQUIREMENTS.
1130 (DRUMS), 1135 (CONES) AND 1180 (SKINNY DRUMS) FOR ADDITIONAL
REFER TO STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES SECTIONS
10 FT ON-CENTER IN RADII, AND 3 FT OFF THE EDGE OF AN OPEN TRAVELWAY.
AREAS NO GREATER IN FEET THAN TWICE THE POSTED SPEED LIMIT (MPH) EXCEPT,
L) WHEN LANE CLOSURES ARE NOT IN EFFECT SPACE CHANNELIZING DEVICES IN WORK
TRAFFIC CONTROL DEVICES
STRATEGIES
MANAGEMENT
USING A COMBINATION OF TEMPORARY ROAD AND LANE CLOSURES AND FLAGGERS AS NEEDED.
THE PROPOSED SR 1635 (MIDDLE CREEK RD) WILL BE CONSTRUCTED
LOCAL NOTES
UNLESS OTHERWISE NOTED MAINTAIN ACCESS TO DRIVEWAYS AND SIDE ROADS AT ALL TIMES
PHASINGPROFESSIONALE
NG INEERNORTHCAROLINA
SEAL
35018 YRRET .L YMMIJ
PHASING
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
17BP.14.R.210 TMP-2Bridge #550043
Macon County
SEE NCDOT RDY STD DRAWING 1101.02 SHT 1 OF 14
THE NEW ALIGNMENT TO THRU TRAFFIC.
TEMPORARY PAVEMENT MARKINGS AS SHOWN ON PLAN TMP-3 AND OPEN
USING TEMPORARY LANE CLOSURES AND FLAGGERS WHEN NEEDED PLACE
STEP 3:
CONSTRUCT THE DRIVE RT OF -L- STA 11+30.
PLACE THE GUARDRAIL AS SHOWN ON PLANS. (SEE TMP-3)
TO -L- STA. 16+39.80
CONSTRUCT THE NEW BRIDGE OVER MIDDLE CREEK FROM -L- STA. 15+52.20
-L- STA. 16+39.80 (END BRIDGE) TO -L- STA. 19+68
-L- STA. 10+91 TO -L- STA. 15+52.20 (BEGIN BRIDGE)
COURSE AS SHOWN ON PLAN (TMP-3):
FOLLOWING UP TO BUT NOT INCLUDING THE FINAL LAYER OF SURFACE
WITH THE EXISTING TRAFFIC IN ITS ORIGINAL PATTERN CONSTRUCT THE
STEP 2:
WITH NCDOT STD DRAWING 1101.01, SHEET 3 OF 3.
INSTALL ALL ADVANCE WORK ZONE WARNING SIGNS ON -L- IN ACCORDANCE
STEP 1:
Phase I
UNLESS OTHERWISE NOTED PROVIDE ACCESS TO ALL DRIVES AT ALL TIMES.
REMOVE ALL TRAFFIC CONTROL DEVICES AND OPEN ALL ROADS TO TRAFFIC.
SEE NCDOT STD DRAWING 1101.02, SHT 1 OF 14
PAVEMENT MARKING AS SHOWN IN PAVEMENT MARKING PLANS.
USING FLAGGERS AND TEMPORARY LANE CLOSURES PLACE THE FINAL
SEE NCDOT STD DRAWING 1101.02, SHT 1 OF 14
-L- STA 10+55 TO -L- STA 20+50
OF SURFACE COURSE AS FOLLOWS (SEE TMP-4):
USING FLAGGERS AND TEMPORARY LANE CLOSURES PLACE THE FINAL LAYER
STEP 3:
REMOVE EXISTING PAVEMENT (SEE TMP-4)
REMOVE THE EXISTING BRIDGE OVER MIDDLE CREEK (SEE TMP-4)
STEP 2:
19+50
BUILD THE CONNECTION TO THE EXISTING SARAH COVE RD LT OF -L- STA.
-L- STA. 17+76 TO -L- STA 20+50
-L- STA. 10+55 TO -L- STA 12+14
LAYER OF SURFACE AS SHOWN ON PLAN (TMP-4):
NEEDED CONSTRUCT THE FOLLOWING UP TO BUT NOT INCLUDING THE FINAL
THRU TRAFFIC AND USING TEMPOARY LANE CLOSURES AND FLAGGERS WHEN
WITH TRAFFIC ON THE NEW ALIGNMENT CLOSE EXISTING MIDDLE CREEK RD TO
STEP 1:
Phase II
User:smelvinX:\NCDOT\Division 14 - 2017\Macon 550043\Traffic\TrafficControl\TCP\Macon_550043_TC_TMP_02(Phasing).dgn3/15/2019
DEPARTE
N
O
F ANSPORTA TIONTAE
OF NORT
H
ROL
NA
WORK
Z
ONE TRAFFIC
CONTROLDIVISION OF
HI
GHW
A
YS
T
S CAI
M
TTR
SHEET NO.PROJ. REFERENCE NO.
APPROVED:
DATE:
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
User:smelvinX:\NCDOT\Division 14 - 2017\Macon 550043\Traffic\TrafficControl\TCP\Macon_550043_TC_TMP_03(Ph1).dgn4/15/2019
DEPARTE
N
O
F ANSPORTA TIONTAE
OF NORT
H
ROL
NA
WORK
Z
ONE TRAFFIC
CONTROLDIVISION OF
HI
GHW
A
YS
T
S CAI
M
TTR
APPROVED:
DATE:
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
-L-
SR 1635 M
IDDLE
CREEK
RD
MIDDLE CREEK SARAH COVE RD17BP.14.R.210
SHEET NO.PROJ. REFERENCE NO.
TMP-3
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
10+0015+0020+00-L- STA 10+91
BEGIN BRIDGE
-L- STA. 15+52.20
END BRIDGE
-L- STA. 16+39.80
-L- STA 19+68
TYPE III BARRICADE
SIGNS R11-2 & M4-10R
TYPE III BARRICADE W/
SIGNS R11-2 & M4-10L
TYPE III BARRICADE W/
TYPE III BARRICADE
M4-10L
R11-2
48'' x 30''
ROAD
CLOSED
DETOUR 48" x 18"
TYPE III BARRICADE
M4-10R
48" x 18"
R11-2
48'' x 30''
ROAD
CLOSED
DETOUR
TYPE III BARRICADETYPE III BARRICADE
DRUMS (10' SPACING TYP.)
-L-
SR 1635 M
IDDLE
CREEK
RD
MIDDLE CREEK SARAH COVE RD10+00-L- STA 10+78
BEGIN BRIDGE
-L- STA. 15+52.20
END BRIDGE
-L- STA. 16+39.80
-L- STA 19+68
TYPE III BARRICADE
SIGNS R11-2 & M4-10R
TYPE III BARRICADE W/
SIGNS R11-2 & M4-10L
TYPE III BARRICADE W/
DRUMS (10' SPACING TYP.)15+0020+00TIE TO EXISTING MARKINGS
PHASE I
PHASE I, STEP 2:
PHASE I, STEP 3:
DRUMS (10' SPACING TYP.)
DRUM
DRUMS (10' SPACING TYP.)
PI
PI
SEE TMP-1A FOR TEMPORARY PAVEMENT MARKINGS
PROFESSION
A
LE
NG INEER
N ORTH CARO
LINA
SEAL
35018 YRRET .L YMMIJ
TYPE III BARRICADE
AS DIRECTED BY THE ENGINEER
TEMPORARY SHORING
User:smelvinX:\NCDOT\Division 14 - 2017\Macon 550043\Traffic\TrafficControl\TCP\Macon_550043_TC_TMP_04(Ph2).dgn3/13/2019
DEPARTE
N
O
F ANSPORTA TIONTAE
OF NORT
H
ROL
NA
WORK
Z
ONE TRAFFIC
CONTROLDIVISION OF
HI
GHW
A
YS
T
S CAI
M
TTR
APPROVED:
DATE:
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
MIDDLE CREEK
17BP.14.R.210
SHEET NO.PROJ. REFERENCE NO.
TMP-4
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
10+0015+0020+00-L- STA 10+55
BEGIN BRIDGE
-L- STA. 15+52.20
END BRIDGE
-L- STA. 16+39.80
M4-10L
R11-2
48'' x 30''
ROAD
CLOSED
DETOUR 48" x 18"
TYPE III BARRICADE
M4-10R
48" x 18"
R11-2
48'' x 30''
ROAD
CLOSED
DETOUR
TYPE III BARRICADETYPE III BARRICADE
SR 1635
END BRIDGE
-L- STA. 16+39.80 PHASE II
-L- STA 12+14
-L- SARAH COVE RD-L- STA 20+50
MIDDLE CREEK RD
-L- STA 17+76
PHASE II, STEP 1 & 2:
MIDDLE CREEK10+00-L- STA 10+55
BEGIN BRIDGE
-L- STA. 15+52.20
SR 1635
-L- SARAH COVE RD-L- STA 20+50
MIDDLE CREEK RD15+0020+00PHASE II, STEP 3:
DRUM
PAVEMENT REMOVAL
DENOTES
BRIDGE REMOVAL
DENOTES
SIGNS R11-2 & M4-10R
TYPE III BARRICADE W/
SIGNS R11-2 & M4-10L
TYPE III BARRICADE W/
DRUMS (10' SPACING TYP.)
(10' SPACING TYP.)
DRUMS
PROFESSION
A
LE
NG INEERNORTHCAROLINA
SEAL
35018 YRRET .L YMMIJ
INDEX
ROADWAY STANDARD DRAWING
THE FOLLOWING ROADWAY STANDARDS AS APPEAR IN "ROADWAY STANDARD DRAWINGS" -
CONSIDERED A PART OF THESE PLANS:
PROJECT SERVICES UNIT - N.C. DEPARTMENT OF TRANSPORTATION - RALEIGH, N.C.,4/15/2019X:\NCDOT\Division 14 - 2017\Macon 550043\Traffic\Pavement Markings\Macon 550043_Sgn_PMP_01.dgnUser:smelvinGENERAL NOTES
STD. NO.TITLE
SHEET NO.DESCRIPTION
SHEET NO.
SEAL
DATE:
APPROVED:
PMP-1
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
PAVEMENT MARKING PLAN
SCHEDULE SHEET
PMP-1 PAVEMENT MARKING PLAN TITLE AND
1205.01 PAVEMENT MARKINGS - LINE TYPES AND OFFSETS
1262.01 GUARDRAIL END DELINEATION
1205.02 PAVEMENT MARKINGS - TWO-LANE AND MULTILANE ROADWAYS
1205.12 PAVEMENT MARKINGS - BRIDGES
1261.01 GUARDRAIL AND BARRIER DELINEATORS - INSTALLATION SPACING
1261.02 GUARDRAIL AND BARRIER DELINEATORS - TYPES AND MOUNTING
DATED JANUARY 2018 ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE HEREBY ARE
PMP-2 PAVEMENT MARKING DETAIL
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETEDPROFESSIONALENGINEER
N ORTH CARO
LINA
SEAL
35018 YRRET .L YMMIJ17BP.14.R.210
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
PROJECT.: 17BP.14.R.210PROJECT NO.
FINAL PAVEMENT MARKING SCHEDULE
PI YELLOW DOUBLE CENTER
PA WHITE EDGELINE
PAINT (4")
PAVEMENT MARKINGS
SYMBOL DESCRIPTION
DEPARTMEN
T
O
F TRA N SPORTATIONSTATEOFNORT
H
CAR
O
LI
NAPLAN PREPARED FOR N.C.D.O.T. BY:
PROJECT ENGINEER
DESIGN TECHNICIAN
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS JIMMY TERRY, PE
SANDRA MELVIN
MACON COUNTY
D) REMOVE/REPLACE ANY CONFLICTING/DAMAGED PAVEMENT MARKINGS AND MARKERS.
C) TIE PROPOSED PAVEMENT MARKING LINES TO EXISTING PAVEMENT MARKING LINES.
TIME OF THE FIRST.
SURFACE. PLACE THE SECOND APPLICATION OF PAINT UPON SUFFICIENT DRYING
B) PLACE TWO APPLICATIONS OF PAINT PAVEMENT MARKINGS ON THE FINAL WEARING
SR 1635 MIDDLE CREEK PAINT NONE
ROAD NAME MARKING MARKER
A) INSTALL PAVEMENT MARKINGS ON THE FINAL SURFACE AS FOLLOWS:
OR DIRECTED BY THE ENGINEER.
THE CONSTRUCTION PROJECT, EXCEPT WHEN OTHERWISE NOTED IN THE PLAN,
THE FOLLOWING GENERAL NOTES APPLY AT ALL TIMES FOR THE DURATION OF
LOCATION: BRIDGE #550043 OVER MIDDLE CREEK ON SR 1635 (MIDDLE CREEK RD)
SEE SHEET PMP-1 FOR FINAL PAVEMENT MARKING SCHEDULE
User:smelvinX:\NCDOT\Division 14 - 2017\Macon 550043\Traffic\Pavement Markings\Macon 550043_Sgn_PMP_02.dgn3/13/2019SHEET NO.
SEAL
DATE:
APPROVED:
PAVEMENT MARKING DETAIL
PMP-2
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.210
PROFESSION
A
LE
NG INE ERNORTHCAROLINA
SEAL
35018 YRRET .L YMMIJPROJECT NO.10+0015+0020+00-L- STA. 10+55.00
-L- STA. 20+50.00
TIE TO EXISTING MARKINGS
TIE TO EXISTING MARKINGS
10'
10'+0510'10'+00BEGIN BRIDGE
-L-STA. 15+52.20
END BRIDGE
-L-STA. 16+39.80
MIDDLE CREEK RD -L-SR 1635
MIDDLE CREEK
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
Bridge #550043
Macon County
PAPA PI
PI
for Special Considerations.
Refer To E. C. Special Provisions
ON THIS PROJECT
SENSITIVE AREA(S) EXIST
ENVIRONMENTALLY
STANDARDS.
SENSITIVE WATERSHED
BEEN DESIGNED TO
THIS PROJECT HAS
GRAPHIC SCALE
PLANS
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
4/14/2019X:\NCDOT\Division 14 - 2017\Macon 550043\Drainage\Erosion Control\Macon 550043_EC_dsn_TSH.dgnUser:acochrane0
PLAN FOR PROPOSED
HIGHWAY EROSION CONTROL
EROSION AND SEDIMENT CONTROL MEASURES
CONSTRUCTION.
GRUBBING PHASE OF
FOR CLEARING AND
EROSION CONTROL PLANS
THIS PROJECT CONTAINS
Temporary Silt Ditch
Temporary Silt Fence
Silt Basin Type B
Stilling Basin
TDTemporary Diversion
Temporary Rock Silt Check Type-B
Temporary Rock Silt Check Type-A
Temporary Rock Sediment Dam Type-A
Temporary Rock Sediment Dam Type-B
Type A
Type B
Type C
A
B
C
Temporary Silt Fence
TSD
Std. #Description Symbol
Temporary Berms and Slope Drains
Rock Inlet Sediment Trap:
1630.03
1630.05
1605.01
1622.01
1633.01
1634.01
1634.02
1635.01
1635.02
1630.04
1632.01
1632.02
1632.03
Rock Pipe Inlet Sediment Trap Type-A
Rock Pipe Inlet Sediment Trap Type-B
Temporary Rock Sediment Dam Type A
Temporary Rock Sediment Dam Type B
Temporary Silt Fence
Roadway Standard Drawings
The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design
revison thereto are applicable to this project and by reference hereby are considered a part of
these plans.
Rock Pipe Inlet Sediment Trap Type A
EC-1
1606.01 Special Sediment Control Fence
1634.01
1634.02
1635.01
1605.01
1630.01
Temporary Berms and Slope Drains
1606.01
1622.01
Special Sediment Control Fence
Riser Basin
1635.02 Rock Pipe Inlet Sediment Trap Type B
1604.01 Railroad Erosion Control Detail
1607.01 Gravel Construction Entrance
Skimmer Basin
Tiered Skimmer Basin
Infiltration Basin
Special Stilling Basin1630.06
Temporary Rock Silt Check Type-A with
Matting and Polyacrylamide (PAM)
Wattle/Coir Fiber Wattle
Wattle/Coir Fiber Wattle
with Polyacrylamide (PAM)
1630.02
1633.02
1630.05 Temporary Diversion
1630.04 Stilling Basin
1630.03 Temporary Silt Ditch
1630.02 Silt Basin Type B
1630.06 Special Stilling Basin
1631.01 Matting Installation
1632.02
1632.01
Rock Inlet Sediment Trap Type B
Rock Inlet Sediment Trap Type A
1632.03 Rock Inlet Sediment Trap Type C
1633.01
1633.02 Temporary Rock Silt Check Type B
Temporary Rock Silt Check Type A
1640.01
1645.01 Temporary Stream Crossing
EW
CFW
ROADSIDE ENVIRONMENTAL UNIT
Raleigh, NC 27611
1 South Wilmington St.
Prepared in the Office of:
NAME LEVEL III CERTIFICATION NO.
Reviewed by:
Reviewed in the Office of:
Designed by:
TGS ENGINEERS
VICINITY MAP
3015
CONTRACT:PROJECT:Andrew H. Cochrane, PE
SHELBY, NC 28150
804-C N. LAFAYETTE ST.
2018 STANDARD SPECIFICATIONS 2018 STANDARD SPECIFICATIONS
Unit - N. C. Department of Transportation - Raleigh, N. C., dated January 2018 and the latest
Coir Fiber Baffle
OF ENVIRONMENTAL QUALITY.
THE NORTH CAROLINA DEPARTMENT
AUGUST 1, 2016 AND ISSUED BY
CONSTRUCTION PERMIT EFFECTIVE
BY THE NCG-010000 GENERAL
THE REGULATIONS SET FORTH
CONTROL PLANS COMPLY WITH
THESE EROSION AND SEDIMENT
R/W & UTIL.
N/A
N/A
N/A CONST.
PE
15+00CREEK
TO SR 1634
-L- STA. 10+55.00
17BP.14.R.210
BEGIN PROJECT
-L- STA. 15+52.20
BEGIN BRIDGE
MIDDLE
SR 1635 -L-
-L- STA. 20+50.00
17BP.14.R.210
END PROJECT
-L- STA. 16+39.80
END BRIDGE TO DEAD ENDMIDDLE CREEK RD 20+00MACON COUNTY17BP.14.R.210 N
A
D 83/ 2011
17BP.14.R.210
17BP.14.R.210
17BP.14.R.210
17BP.14.R.210
Reid Whitehead, PE, CPESC
TYPE OF WORK: GRADING, DRAINAGE, PAVING, AND STRUCTURE
ON SR 1635 (MIDDLE CREEK ROAD)
LOCATION: BRIDGE NO. 550043 OVER MIDDLE CREEK
25 50
(106
VICINITY MAP
LOCATION
PROJECT
10617BP.14.R.210See Sheet 1A For Index of Sheets
PROJECT:MacDonald
Mill
Cr
eekMiddle
Evans
Cr
eekTessentee Creek
ShoalCreekOtto
1636
1635
1635
1633
1110
1114
1115
1118 1653
1684
1634
1635
1727
1632
1109
23
441
23
441
1108
1629
1106
1107
1726
1726
1104
1105
1102
1683
1683
1642
1641
1636
1636
1636
1637
1638
1731
1639
1722
1685
1622
1624
1623 1732
106
1625
1720
Scaly
Norton
FINAL PLANS SUBMITTAL
FLOW
A A
WIDTH
PLAN
SECTION A-A
SECTION B-B
B
B
2/3 CHANNEL
STRUCTURAL STONE
SEDIMENT CONTROL STONE
12"
MATTING
EXCELSIOR
MATTING
EXCELSIOR
CLASS B STONE
PAM
INSET A
See Inset A
USE EXCELSIOR FOR MATTING MATERIAL AND ANCHOR
MATTING SECTION AT TOP AND BOTTOM WITH CLASS B STONE.
TO TOP OF MATTING SECTION AND AFTER EVERY RAINFALL
EVENT THAT EQUALS OR EXCEEDS 0.50 INCHES.
MATTING
EXCELSIOR
CLASS B STONE
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
NOT TO SCALE
EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM)
TEMPORARY ROCK SILT CHECK TYPE 'A' WITH
TO BE APPLIED TO EACH ROCK SILT CHECK.
MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT
A SOIL SAMPLE FROM PROJECT LOCATION, AND FROM OFFSITE
PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN
INITIALLY APPLY 4 OUNCES OF POLYACRYLAMIDE (PAM)
(4 OZ.)
H = 2' MIN
1' MIN
1' MIN
ACCORDANCE WITH ROADWAY STANDARD DRAWING NO. 1633.01.
INSTALL TEMPORARY ROCK SILT CHECK TYPE A IN
NOTES:
17BP.14.R.210 EC-2
SHEET NO.PROJECT REFERENCE NO.
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
17BP.14.R.210
SITE DESCRIPTION
SOIL STABILIZATION TIMEFRAMES
STABILIZATION TIME
7 DAYS
TIMEFRAME EXCEPTIONS
PERIMETER DIKES, SWALES, DITCHES AND SLOPES
HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE
SLOPES STEEPER THAN 3:1 7 DAYS
IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE
NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED.
NONE
SLOPES 3:1 OR FLATTER 14 DAYS
14 DAYS
7 DAYS FOR SLOPES GREATER THAN 50' IN
LENGTH.
ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 NONE, EXCEPT FOR PERIMETERS AND HQW ZONES.
EC-3
04000402029.2'
9.2'8.7'8.3'02301701004803020100010201020304TYPE-III
TYPE-III
GREU TL-2
GREU TL-2
-L- CURVE DATA
DS = 35 MPH DS = 45 MPH
SE = 0.04
PI Sta 12+16.84
D
L = 294.76'
T = 147.46'
R = 3,730.00'
PI Sta 20+98.87
D
L = 125.03'
T = 62.59'
R = 1,050.00'
PI Sta 19+04.30
D
L = 266.90'
T = 134.92'
R = 740.00'
DS = 50 MPH
SE = 0.04SE = NC
-L- POT 10+00.00
-L- PC 10+69.39
-L- PT 13+64.15
-L- PC 17+69.38
-L- POT 22+17.88
-L- PT 21+61.32
-L- PCC 20+36.28
-L- STA 20+50.00
17BP.14.R.210
END PROJECT
-L- STA 16+39.80
END BRIDGE
-L- STA 15+52.20
BEGIN BRIDGE
DRIVE
ASPHALT
PROP. 26'
-L- STA. 14+48.00
BEGIN FDPS
-L- STA 10+55.00
17BP.14.R.210
BEGIN PROJECT
DRIVE
ASPHALT
PROP. 16'
-L- STA. 17+37.75
END FDPS
-L- STA. 17+21.68
END FDPS
-L- STA. 15+28.99
BEGIN SBG
-L- STA. 15+12.92
BEGIN SBG
10+0015+0020+0050' TAPER
TO EXIST.+05TYP
20'+7510'10'8:1
8:1
10'10'TO EXI
ST.50' TAPER+00TYP20'+1060'R
20'R
5'R
15'R
(BY OWNER)
FENCE
RELOCATE
20'
TYP
+56.05PAVEMENT REMOVAL
(BY OWNER)
FENCE
RELOCATE
TYPE-III
TYPE-III
GREU TL-2
GREU TL-2
8:1
8:1
-L- STA. 14+64.00
BEGIN FDPS
F
F
F
C
F F F F
F
F
C
F
C
F
F
F
F FFFF
C C
FF
F
C
FC
F
C
C
F
F
F C
C
C
C
C C
C
C
F
C
T
T
SR 1635 20' BST
MIDDLE CREEK RD.12" CMP18" CMPWW
WW
A
S
PH
.MI
D
D
L
E
C
R
E
E
KSARAH COVE RD.
EXISTING R/W EX
IST
ING
R
/W
EX
IST
ING
R
/W30.00'PRI
VATE R/WPRI
VATE R/WPRI
VATE R/
W
19
6.3
0'
S
19°2
2'4
5" W25.31'
S 18°30'22" W
28.51'S 42°45'01" W88.00'S 60°16'24" W24.55'
S 78°05'06" W
28.72'
S 40°07'20" W
25.83'
S 18°57'42" E
45.84'
S 26°06'30" E
261.69'N 60°57'27" W117.88'N 51°46'15" E193.90'N 15°58'45" W133.86'N 05°34'15" E
163.40'
N 14°08'00" E
31.41'
N 34°36'06" W
50.59'
N 21°35'06" W63.60'N 16°06'06" W98.89'N 19°49'06"
W77.72'N 17°37'06" W4
6.
4
5'N
1
1°
5
3'
0
6" W36.78'
N 00°41'06" W
40.00'
N 08°33'54" E
34.23'
N 13°46'24" E
40.00'
N 19°04'34" E
32.22'
N 25°01'24" E
30.33'
N 25°58'33" E
30.00'
N 37°54'24" E
141.94'
N 23°36'06" W
125.98'
N 65°09'06" W
58.71'S 64°19'54" W255.25'S 57°46'44" W6
6
.30'
S
29
°15'52
" E
135.50'S 19°34'12" EWOODS
WOODS
POLE #2025/20
FRONTIER TEL.
1
2 10' GRAVELTO DEAD ENDELEV.=2102.61'
LOW WIRE
T
T
G
R
S 47°00'00" W370.00'TO SR 1634
60.00'EXISTING R/W
EXISTING R/W
15" CMP
5SBW
5SBW
BSTBST GRTS 83°24'06" E
215.00'S 33°04'00" W481.88'
EIPS 33°04'00" W35.07'
N 00°06'34" E
13.34'N 62°19'00" E150.41'GR 60.00'EXI
STI
NG R/WEXI
STI
NG R/W18" CM
PWWTERESA CABE SPEED
POLE #2025/25
FRONTIER TEL.
MIDDLE CREEK
S 47°00'00" W
10.69'
EIP
DENNIS JAMES WALTON
LISA R. CRIADO
ALAN DAVID &
WOODS
WOODS
WOODS
WOODS
(GUY LOUIS CRAUWELS LIVING TRUST)
GUY LOUIS CRAUWELS, TRUSTEE
TIMMY JOEL PHILLIPS
WOODS THOMAS EDWARD JONES
JAMES S MILLER
MILDRE JEANETTE CABE HOLLAND
0.20'EIP
R/W MON.
WOODS EIP 1.39'
1001
1002
2080
2080
2
0
8
0 20802080
20802080
2080
2080
2080
20802080208020802080208020802080208020802080209020902090209020902090209020902090209020902090
20902090
2090
2090
2090
2
0
9
0
20
902090209020902090209020902090209020902090
209020902100210021002100
2
1
0
0
2100210021002100
2
10
021002100
2100
2100
2100
21002100
210021002100210021002100210021002100210021002100211021102110
211021
1
021102110
2
1
1
02110211021102110211021102110
2110
211021102110211021102110211021102110212021202120212021202120212021202120212021202
1
2
021202
1
2
0212021202
1
2
0212021202120
2
120
21202130213021302130213021302130213021302130213021302130
2
1
3
02130213021302130
2
1
3
0
2
1302130
21
40
2140
2140
2140
2
14
0
21402140
2140
2
14
0214021402
1
4
0
2
1
4
0
21402140214021402140214021402140214
0 2150215021502
15
0
2150
2150
2
15
02150215021502150
2
15
0
215021502150215021502150215021502150216021
60
216021602160
2160
2160
2160
216
0
2160
2160
216021602160216021602160216021602170
217021702170
217021702
17
0
2170
2170
21702170
2170217021702170217021702170
2180
2180
21802180
218021802180218021802180
21802180218021802180
2
1
8
0
2190
219021902190
2190219021902190
2
19
0
2
1
9
02190 2190219021902200
2
2
0
0
2200
2200
2200220022002200
22002200 220022002210
2
2
1
02210
2210
221022102210
2210222022202220
2220
2220
2220
2
2
3
0
2230
2230
2230223022302240
2
2
4
0
2250
0401
15"0403
0402
0404
TB 2GIREMOVE
15"
TO DRAIN
GRADE
DRAIN
GRADE TO RETAI
N1 TON, 5 SY GEO
CLASS B RIPRAP
GRADE TO DRAIN24" RCP-IVSEE DETAIL A
STANDARD BASE DITCH
SEE DETAIL B
RIP RAP AT EMBANKMENT
( Not to Scale)
RIP RAP AT EMBANKMENT
FROM -L- STA 12+70 TO 12+80 LT
DETAIL B
Grade
Ditch
1.5'
GEOTEXTILE
Geotextile= 23 sy
Type of Liner= 17 TONS, Class I Rip-Rap
10'min.
1.0'min.
SEE DETAIL C
LATERAL BASE DITCH
15"TB 2GI-D
1 TON, 5 SY GEO
CLASS B RIPRAP
RETAIN5 TONS,14 SY GEO
CLASS B RIPRAP
( Not to Scale)
LATERAL BASE DITCH
2:1D
B
b
d
2:1 50:1
DETAIL C
b=Varies(see XSC)
B=5 Ft.
Min. d=1.5 Ft.
Min. D=1.5 Ft.
*When B is < 6.0'
Ground
Natural
Slope
Fill
GEOTEXTILE
0405
0406
Geotextile = Est. 350 sy
Class I Rip-Rap =Est. 260 TONS
Type of Liner=
FROM -L- STA 15+78 TO 18+50 LT (DDE=470 cy)
REMOVE
B
2:12:1D
( Not to Scale)
STANDARD BASE DITCH
FROM -L- STA 12+75@25'LT TO 12+75@59'LT
DETAIL A
B=3 Ft.
Min. D=1.5 Ft.
Ground
Natural
Ground
Natural
Est DDE=70 CY
EX. R/W
+50.40
30.00
+64.15
30.00
+69.38
58.00
+43.00
30.00
+02.00
49.00
+36.00 30.00
+94.00
52.00
+94.00
30.00
+20.00
EX. R/W
+90.00
01
02 03 04 05
30.00
+69.39 45.00
+39.00
73.00
+90.00
30.00
+50.00
30.00
+11.00
45.00
+11.00
50.00
+20.00 30.00
+80.00
50.00
+80.00
EX. R/W
+36.28
EX. R/W
+50.40 EX. R/W
+67.00
EX. R/W
+94.00
64.00
+01.00
EX. R/W
+15.35
30.00
+99.00
30.00
+39.00
EX. R/W
+79.21
EX. R/W
+68.92
EX. R/W
+27.41
EX. R/W
+92.97
EX. R/W
+63.99
EX. R/W
+29.28
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
EC-4/CONST.4
SEE PROJECT SPECIAL PROVISIONS
ENVIRONMENTALLY SENSITIVE AREA
CONSTRUCTION SHEET 4
EROSION CONTROL FOR
CLEARING AND GRUBBING
NOTE:
PLACE TEMPORARY ROCK SEDIMENT DAMS TYPE - B
DRAINAGE OUTLETS.
AND TEMPORARY ROCK SILT CHECKS TYPE - A AT
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
WILL NOT BE PLATED WITH STONE.
EXPOSED SOIL UNDER BRIDGE WHICH
PLACE COIR FIBER MATTING ON
Bridge #550043
Macon County 17BP.14.R.210
N
A
D 83/ 2011
DIKE
IMPERVIOUS
NOTE:
STILLING BASIN WHERE APPLICABLE.
UTILIZE SPECIAL STILLING BASIN(S) AS
B
04000402029.2'
9.2'8.7'8.3'02301701004803020100010201020304TYPE-III
TYPE-III
GREU TL-2
GREU TL-2
-L- CURVE DATA
DS = 35 MPH DS = 45 MPH
SE = 0.04
PI Sta 12+16.84
D
L = 294.76'
T = 147.46'
R = 3,730.00'
PI Sta 20+98.87
D
L = 125.03'
T = 62.59'
R = 1,050.00'
PI Sta 19+04.30
D
L = 266.90'
T = 134.92'
R = 740.00'
DS = 50 MPH
SE = 0.04SE = NC
-L- POT 10+00.00
-L- PC 10+69.39
-L- PT 13+64.15
-L- PC 17+69.38
-L- POT 22+17.88
-L- PT 21+61.32
-L- PCC 20+36.28
-L- STA 20+50.00
17BP.14.R.210
END PROJECT
-L- STA 16+39.80
END BRIDGE
-L- STA 15+52.20
BEGIN BRIDGE
DRIVE
ASPHALT
PROP. 26'
-L- STA. 14+48.00
BEGIN FDPS
-L- STA 10+55.00
17BP.14.R.210
BEGIN PROJECT
DRIVE
ASPHALT
PROP. 16'
-L- STA. 17+37.75
END FDPS
-L- STA. 17+21.68
END FDPS
-L- STA. 15+28.99
BEGIN SBG
-L- STA. 15+12.92
BEGIN SBG
10+0015+0020+0050' TAPER
TO EXIST.+05TYP
20'+7510'10'8:1
8:1
10'10'TO EXI
ST.50' TAPER+00TYP20'+1060'R
20'R
5'R
15'R
(BY OWNER)
FENCE
RELOCATE
20'
TYP
+56.05PAVEMENT REMOVAL
(BY OWNER)
FENCE
RELOCATE
TYPE-III
TYPE-III
GREU TL-2
GREU TL-2
8:1
8:1
-L- STA. 14+64.00
BEGIN FDPS
F
F
F
C
F F F F
F
F
C
F
C
F
F
F
F FFFF
C C
FF
F
C
FC
F
C
C
F
F
F C
C
C
C
C C
C
C
F
C
T
T
SR 1635 20' BST
MIDDLE CREEK RD.12" CMP18" CMPWW
WW
A
S
PH
.MI
D
D
L
E
C
R
E
E
KSARAH COVE RD.
EXISTING R/W EX
IST
ING
R
/W
EX
IST
ING
R
/W30.00'PRI
VATE R/WPRI
VATE R/WPRI
VATE R/
W
19
6.3
0'
S
19°2
2'4
5" W25.31'
S 18°30'22" W
28.51'S 42°45'01" W88.00'S 60°16'24" W24.55'
S 78°05'06" W
28.72'
S 40°07'20" W
25.83'
S 18°57'42" E
45.84'
S 26°06'30" E
261.69'N 60°57'27" W117.88'N 51°46'15" E193.90'N 15°58'45" W133.86'N 05°34'15" E
163.40'
N 14°08'00" E
31.41'
N 34°36'06" W
50.59'
N 21°35'06" W63.60'N 16°06'06" W98.89'N 19°49'06"
W77.72'N 17°37'06" W4
6.
4
5'N
1
1°
5
3'
0
6" W36.78'
N 00°41'06" W
40.00'
N 08°33'54" E
34.23'
N 13°46'24" E
40.00'
N 19°04'34" E
32.22'
N 25°01'24" E
30.33'
N 25°58'33" E
30.00'
N 37°54'24" E
141.94'
N 23°36'06" W
125.98'
N 65°09'06" W
58.71'S 64°19'54" W255.25'S 57°46'44" W6
6
.30'
S
29
°15'52
" E
135.50'S 19°34'12" EWOODS
WOODS
POLE #2025/20
FRONTIER TEL.
1
2 10' GRAVELTO DEAD ENDELEV.=2102.61'
LOW WIRE
T
T
G
R
S 47°00'00" W370.00'TO SR 1634
60.00'EXISTING R/W
EXISTING R/W
15" CMP
5SBW
5SBW
BSTBST GRTS 83°24'06" E
215.00'S 33°04'00" W481.88'
EIPS 33°04'00" W35.07'
N 00°06'34" E
13.34'N 62°19'00" E150.41'GR 60.00'EXI
STI
NG R/WEXI
STI
NG R/W18" CM
PWWTERESA CABE SPEED
POLE #2025/25
FRONTIER TEL.
MIDDLE CREEK
S 47°00'00" W
10.69'
EIP
DENNIS JAMES WALTON
LISA R. CRIADO
ALAN DAVID &
WOODS
WOODS
WOODS
WOODS
(GUY LOUIS CRAUWELS LIVING TRUST)
GUY LOUIS CRAUWELS, TRUSTEE
TIMMY JOEL PHILLIPS
WOODS THOMAS EDWARD JONES
JAMES S MILLER
MILDRE JEANETTE CABE HOLLAND
0.20'EIP
R/W MON.
WOODS EIP 1.39'
1001
1002
0401
15"0403
0402
0404
TB 2GIREMOVE
15"
TO DRAIN
GRADE
DRAIN
GRADE TO RETAI
N1 TON, 5 SY GEO
CLASS B RIPRAP
GRADE TO DRAIN24" RCP-IVSEE DETAIL A
STANDARD BASE DITCH
SEE DETAIL B
RIP RAP AT EMBANKMENT
( Not to Scale)
RIP RAP AT EMBANKMENT
FROM -L- STA 12+70 TO 12+80 LT
DETAIL B
Grade
Ditch
1.5'
GEOTEXTILE
Geotextile= 23 sy
Type of Liner= 17 TONS, Class I Rip-Rap
10'min.
1.0'min.
SEE DETAIL C
LATERAL BASE DITCH
15"TB 2GI-D
1 TON, 5 SY GEO
CLASS B RIPRAP
RETAIN5 TONS,14 SY GEO
CLASS B RIPRAP
( Not to Scale)
LATERAL BASE DITCH
2:1D
B
b
d
2:1 50:1
DETAIL C
b=Varies(see XSC)
B=5 Ft.
Min. d=1.5 Ft.
Min. D=1.5 Ft.
*When B is < 6.0'
Ground
Natural
Slope
Fill
GEOTEXTILE
0405
0406
Geotextile = Est. 350 sy
Class I Rip-Rap =Est. 260 TONS
Type of Liner=
FROM -L- STA 15+78 TO 18+50 LT (DDE=470 cy)
REMOVE
B
2:12:1D
( Not to Scale)
STANDARD BASE DITCH
FROM -L- STA 12+75@25'LT TO 12+75@59'LT
DETAIL A
B=3 Ft.
Min. D=1.5 Ft.
Ground
Natural
Ground
Natural
Est DDE=70 CY
EX. R/W
+50.40
30.00
+64.15
30.00
+69.38
58.00
+43.00
30.00
+02.00
49.00
+36.00 30.00
+94.00
52.00
+94.00
30.00
+20.00
EX. R/W
+90.00
01
02 03 04 05
30.00
+69.39 45.00
+39.00
73.00
+90.00
30.00
+50.00
30.00
+11.00
45.00
+11.00
50.00
+20.00 30.00
+80.00
50.00
+80.00
EX. R/W
+36.28
EX. R/W
+50.40 EX. R/W
+67.00
EX. R/W
+94.00
64.00
+01.00
EX. R/W
+15.35
30.00
+99.00
30.00
+39.00
EX. R/W
+79.21
EX. R/W
+68.92
EX. R/W
+27.41
EX. R/W
+92.97
EX. R/W
+63.99
EX. R/W
+29.28
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
EC-4/CONST.4
WILL NOT BE PLATED WITH STONE.
EXPOSED SOIL UNDER BRIDGE WHICH
PLACE COIR FIBER MATTING ON
17BP.14.R.210
NOTE:
STILLING BASIN WHERE APPLICABLE.
UTILIZE SPECIAL STILLING BASIN(S) AS
EC-5/CONST.4
-L- Sta. 16+50 to 19+50 RT
on Slope as Work Allows.
Place Matting for Erosion Control
EST. 40 SY
-L- STA 12+75 TO 12+75 LT
PROPOSED DITCH LINE
INSTALL MATTING IN THE
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
C
C
B
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
SHEET
HEALING IN DIBBLE PLANTING METHOD
firming soil at top.
5. Push handle forward
PLANTING NOTES:
N.C.D.O.T. - ROADSIDE ENVIRONMENTAL UNIT
protected area.
1. Locate a healing-in site in a shady, well
the root collar is at ground level.
against the sloping end so that
4. Place a single layer of plants
as necessary and water thoroughly.
6. Repeat layers of plants and sawdust
correct depth.
and place seedling at
2. Remove planting bar
USING THE KBC PLANTING BAR
SEEDLING / LINER BAREROOT PLANTING DETAIL
PLANTING DETAILS
MIXTURE, TYPE, SIZE, AND FURNISH SHALL CONFORM TO THE FOLLOWING:
toward planter.
as shown and pull handle
1. Insert planting bar
root systems from drying.
container to prevent the
canvas bag or similar
shall be kept in a moist
During planting, seedlings
PLANTING BAG
soil at bottom.
toward planter, firming
4. Pull handle of bar
thoroughly.
hole open. Water
6. Leave compaction
12 in - 18 in BR
12 in - 18 in BR
12 in - 18 in BR
12 in - 18 in BR
25% BETULA NIGRA
25% FRAXINUS PENNSYLVANICA
25% PLATANUS OCCIDENTALIS
25% LIRIODENDRON TULIPIFERA
RIVER BIRCH
GREEN ASH
SYCAMORE
TULIP POPLAR
12 inches deep and provide drainage.
2. Excavate a flat bottom trench
a sloping angle.
sawdust over the roots maintaining
5. Place a 2 inch layer of well rotted
at one end of the trench.
well rotted sawdust at a sloping angle
rotted sawdust. Place a 2 inch layer of
3. Backfill the trench with 2 inches well
2 inch
from seedling.
2 inches toward planter
3. Insert planting bar
1 inch thick at center.
4 inches wide and
be 12 inches long,
cross section, and shall
blade with a triangular
Planting bar shall have a
KBC PLANTING BAR
root collar.
10 inches below the
no roots extend more than
pruned, if necessary, so that
All seedlings shall be root
ROOT PRUNING
REFORESTATION
AVERAGING 8 FT. ON CENTER, APPROXIMATELY 680 PLANTS PER ACRE.
TREE REFORESTATION SHALL BE PLANTED 6 FT. TO 10 FT. ON CENTER, RANDOM SPACING,
REFORESTATION
REFORESTATION DETAIL SHEET
RF-1N.C.17BP.14.R.210
N
A
D 83/ 2011
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS 09/08/9901-MAR-2019 05:12C:\Users\NCDOTuser1\Desktop\17BP.14.R.210\Utilities\Engineering\UBO\Proj\290_001_17BP.14.R.210_ut_tsh_UO01_psh.dgn$$$$USERNAME$$$$
INDEX OF SHEETS
SHEET NO.
17BP.14.R.210 UO-1STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
T.I.P. NO.
ON SR 1635 (MIDDLE CREEK RD)
LOCATION: BRIDGE #550043 OVER MIDDLE CREEK
TYPE OF WORK: TELEPHONE RELOCATION
MACON COUNTY
UTILITIES BY OTHERS PLANS
0
0
0
PROFILE (HORIZONTAL)
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
0
00
50 50
50 50
2010510
25 100
25 100
XX
DEPART
ME
NT
OF TRANSPORTATION STATE OF NORTH CARO
LI
NABRIAN BURCH
BOB GOLDING
VACANT
BILL GREEN
UTILITIES REGIONAL ENGINEER
UTILITIES ENGINEER
UTILITIES COORDINATOR
STEVE MODE
JAMES MELTON
UTILITY OWNERS WITH CONFLICTS
FAX (919) 250-4151
PHONE (919) 707-6690
RALEIGH NC 27699-1555
1555 MAIL SERVICES CENTER
DIVISION OF HIGHWAYS
UTILITIES UNIT
PREPARED IN THE OFFICE OF:
(A) COMMUNICATIONS - FRONTIER COMMUNICATIONS
UBO PLAN SHEET
TITLE SHEET
DESCRIPTION:
UO-2
UO-1
SHEET NO.:
UTILITY PROJECT MANAGER
PROJECT UTILITY COORDINATORTIP PROJECT: 17BP.14.R.210UTILITIES AREA COORDINATOR
SHOWN ON THIS SHEET.
THE CONTRACTOR FOR UTILITY WORK
NO PAYMENT WILL BE MADE TO
SHEET WILL BE DONE BY OTHERS.
ALL UTILITY WORK SHOWN ON THIS
NOTE:
UO-2
(106
15+0020+004
CREEK
TO SR 1634
-L- STA. 20+50.00
17BP.14.R.210
END PROJECT
-L- STA. 10+55.00
17BP.14.R.210
BEGIN PROJECT
-L- STA. 15+52.20
BEGIN BRIDGE
-L- STA. 16+39.80
END BRIDGE
VICINITY MAP
106
MIDDLE
TO DEAD ENDSR 1635 -L-MIDDLE CREEK RD
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
BRIDGE #550043 OVER MIDDLE CREEK
ON SR 1635 (MIDDLE CREEK RD)
GRADING, DRAINAGE, PAVING, AND STRUCTURE17BP.14.R.210See Sheet 1A For Index of Sheets
TOTAL LENGTH PROJECT 17BP.14.R.210 #550043
LENGTH STRUCTURE PROJECT 17BP.14.R.210 #550043
LENGTH ROADWAY PROJECT 17BP.14.R.210 #550043 PROJECT:1636
1635
1635
1633
1110
1114
1115
1118 1653
1684
1634
1635
1727
1632
1109
23
441
23
441
1108
1629
1106
1107
1726
1726
1104
1105
1102
1683
1683
1642
1641
1636
1636
1636
1637
1638
1731
1639
1722
1685
1622
1624
1623 1732
106
1625
1720
RIGHT OF WAY PLANS SUBMITTALSR 1635 20' BST
MIDDLE CREEK RD.
A
S
PH
.SARAH COVE RD.10' GRAVELG
R BSTBST
PHONE (704) 732-3241
LINCOLNTON, NC 28092
849 SOUTH LAUREL ST
TELICSShoalLOCATION
PROJECT
Evans
Cr
e
e
k
CreekScaly
Middle
CreekNorton
Tessentee CreekMacDonald
Mill
Otto
FRONTIER PED
REMOVED
FRONTIER PED
FRONTIER PED
UG FRONTIER
POLE
FRONTIER
FRONTIER
AERIAL
FRONTIER
AERIAL
FRONTIER PED
UG FRONTIER
TO REMAIN
UG FRONTIER
ABANDONED
UG FRONTIER
ABANDONED
UG FRONTIER REMOVED
FRONTIER POLES
TO REMAIN
UG FRONTIER
FRONTIER
AERIAL
TO REMAIN
UG FRONTIER
DOWN-GUY
POLE &
FRONTIER
DOWN-GUY
POLE &
FRONTIER
01-MAR-2019 05:35C:\Users\NCDOTuser1\Desktop\17BP.14.R.210\Utilities\Engineering\UBO\Proj\290_003_17BP.14.R.210_ut_rdy4_UO02_psh (2).dgn$$$$USERNAME$$$$5/14/99SHEET NO.PROJECT REFERENCE NO.
N
A
D 83/ 2011TYPE-III
N
A
D 83/ 2011
BM-2
BM-1
FOR STRUCTURE PLANS, SEE SHEET S-1 THRU S-??
BRIDGE/ROADWAY RELATIONSHIP SKETCH
SBG
PROP.
-L- STA. 16+50.50
END APPROACH SLAB
-L- STA. 15+41.50
BEGIN APPROACH SLAB
TYPE-III
PIPE HYDRAULIC DATA
24" RCP @ -L- Sta. 12+75
-L- STA 20+50.00
17BP.14.R.210
END PROJECT
-L- STA 16+39.80
END BRIDGE
-L- STA 15+52.20
BEGIN BRIDGE
-L- STA 10+55.00
17BP.14.R.210
BEGIN PROJECT
TYPE-IIIGREU TL-2
GREU TL-2 TYPE-III GREU TL-2TYPE-III
TYPE-III GREU TL-2
01
02 03 04 0515"REMOVE15"RETA
I
N
24" RCP-IV15"RETAINT
T
SR 1635 20' BST
MIDDLE CREEK RD.12" CMP18" CMPWW
WW
A
S
PH
.MI
D
D
L
E
C
R
E
E
KSARAH COVE RD.
DB H-26 PG 2277
EXISTING R/W EX
IST
ING
R
/W
EX
IST
ING
R
/W30.00'PRI
VATE R/WPRI
VATE R/WPRI
VATE R/
W
S 18°30'22" W
WOODS
WOODS
POLE #2025/20
FRONTIER TEL.
1
2
S
S S
S
S 10' GRAVELTO DEAD ENDELEV.=2102.61'
LOW WIRE
T
T
G
R
TO SR 1634
60.00'EXISTING R/W
EXISTING R/W
15" CMP
5SBW
5SBW
BSTBST GRTGR 60.00'EXI
STI
NG R/WEXI
STI
NG R/W18" CM
PWWTERESA CABE SPEED
DB I-33 PG 1365
POLE #2025/25
FRONTIER TEL.
MIDDLE CREEK
EIP
DENNIS JAMES WALTON
DB G-36 PG 1614
LISA R. CRIADO
ALAN DAVID &
DB W-23 PG 545
WOODS
WOODS
WOODS
WOODS
DB P-22 PG 950
DB X-22 PG 1658
DB H-26 PG 2277
(GUY LOUIS CRAUWELS LIVING TRUST)
GUY LOUIS CRAUWELS, TRUSTEE
TIMMY JOEL PHILLIPS
DB K-37 PG 2296
WOODS THOMAS EDWARD JONES
DB M-37 PG 231
JAMES S MILLER
DB T-27 PG 1980
MILDRE JEANETTE CABE HOLLAND
DB O-32 PG 1912
EIP
R/W MON.
WOODS EIP
S
UTILITIES BY OTHERS
THIS SHEET.
FOR PROPOSED UTILITY WORK SHOWN ON
PAYMENT WILL BE MADE TO THE CONTRACTOR
SHEET WILL BE DONE BY OTHERS. NO
ALL PROPOSED UTILITY WORK SHOWN ON THIS
THIS SHEET CORRESPONDS TO RDY-
17BP.14.R.210 UO-2
4
T
T
T
PROJ. REFERENCE NO. SHEET NO.17BP.14.R.210 X-1ANOTE: EMBANKMENT COLUMN DOES NOT INCLUDES BACKFILL FOR UNDERCUTStation Uncl. Exc. EmbtL (cu. yd.) (cu. yd.)10+55.00 0 011+00.00 1 411+45.00 22 512+05.00 86 3512+50.00 108 7412+75.00 98 6313+00.00 93 6713+50.00 123 12014+00.00 113 11714+50.00 114 12015+00.00 111 13715+52.20 109 157Station Uncl. Exc. EmbtL (cu. yd.) (cu. yd.)16+39.80 0 016+50.00 0 7117+00.00 0 30617+50.00 0 28117+90.00 1 24318+50.00 18 32619+00.00 14 16319+50.00 6 6620+00.00 6 2520+50.00 1 3CROSS-SECTION SUMMARYSTATE OF NORTH CAROLINADIVISION OF HIGHWAYSApproximate quantities only. Unclassified excavation, borrowexcavation, fine grading, clearing and grubbing, and removal of existing pavement will be paid for at the lump sum price for "Grading".
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
35'-0"3/13/2019X:\NCDOT\Division 14 - 2017\Macon 550043\Roadway\XSC\550043_Rdy_xpl.dgnUser:smelvinPROJ. REFERENCE NO.SHEET NO.0
6/23/162085 2085
2090 2090
2095 2095
2100 2100
2105 2105
2110 2110
2115 2115
2120 2120
2080 2080
2085 2085
2090 2090
2095 2095
2100 2100
2105 2105
2110 2110
2115 2115
2080 2080
2085 2085
2090 2090
2095 2095
2100 2100
2080 2080
2080 2080
2085 2085
2090 2090
2075 2075
2080 2080
2085 2085
2090 2090
2075 2075
X-117BP.14.R.210
-L-
5 10
BRIDGE #550043
MACON COUNTY
11+00.00
11+45.00
12+05.00
12+50.00
10+50.00
2089.67
2087.42
0.020 0.020
S.S. 2084.74 S.S. 2085.682:13:1
2085.85
0.020 0.020
S.S. 2085.76
PROP. ASPHALT DRIVE
4.3%4:1
2083.88
0.020 0.020
S.S. 2082.31
S.S. 2083.08
4:1
3:150:1
2082.80
0.020 0.020
S.S. 2082.57
4:1
3:150:1S.S. 2081.92
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
DITCH GRADE @+0.60%3/13/2019X:\NCDOT\Division 14 - 2017\Macon 550043\Roadway\XSC\550043_Rdy_xpl.dgnUser:smelvinPROJ. REFERENCE NO.SHEET NO.0
6/23/162080 2080
2085 2085
2090 2090
2075 2075
2080 2080
2085 2085
2090 2090
2075 2075
2080 2080
2085 2085
2090 2090
2075 2075
2080 2080
2085 2085
2090 2090
2075 2075
2080 2080
2085 2085
2090 2090
2075 2075
2080 2080
2085 2085
2090 2090
2075 2075
2080 2080
2085 2085
2090 2090
2095 2095
2075 2075
X-217BP.14.R.210
-L-
5 10
BRIDGE #550043
MACON COUNTY
15+00.00
14+00.00
13+00.00
15+50.00
14+50.00
13+50.00
12+75.00
2082.39
0.020 0.020
S.S. 2082.50
S.S. 2082.43
3:13:1
2082.66
0.020 0.020
S.S. 2082.65
S.S. 2082.08
4:1
3:150:1
2083.03
0.020 0.020
S.S. 2082.42
S.S. 2082.91
4:1
3:150:1
2083.38
0.020 0.020
S.S. 2082.78
S.S. 2083.41
4:1
3:150:1
2083.57
0.020 0.020
S.S. 2083.07
S.S. 2083.59
4:1
3:150:1
2083.83
0.020 0.020
S.S. 2083.55
S.S. 2083.663:150:1
4:1
2084.41 S.S. 2084.37
0.020 0.020
2:1
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
4/15/2019X:\NCDOT\Division 14 - 2017\Macon 550043\Roadway\XSC\550043_Rdy_xpl.dgnUser:smelvinPROJ. REFERENCE NO.SHEET NO.0
6/23/162075 2075
2080 2080
2085 2085
2090 2090
2095 2095
2100 2100
2105 2105
2070 2070
2080 2080
2085 2085
2090 2090
2095 2095
2100 2100
2105 2105
2110 2110
2115 2115
2120 2120
2075 2075
2085 2085
2090 2090
2095 2095
2100 2100
2105 2105
2110 2110
2115 2115
2120 2120
2080 2080
2085 2085
2090 2090
2095 2095
2100 2100
2105 2105
2110 2110
2115 2115
2120 2120
2080 2080
X-317BP.14.R.210
-L-
5 10
BRIDGE #550043
MACON COUNTY
END BRIDGE -L- STA 16+39.80END BRIDGE -L- STA 16+39.80
BEGIN BRIDGE -L- STA 15+52.20
17+00.00
16+00.00
17+50.00
16+50.00
2078.75
0.020 0.020
2:12:1
2084.00 2:1REMOVE EXISTING WING AND DAYLIGHT AT 2:1
2085.20
0.020 0.020
2087.20
S.S. 2089.42
S.S. 2084.45
4:1
2:12:12:1
50:1
2089.39
0.008 0.020
S.S. 2084.96
2090.402:14:1
S.S. 2092.60
2:1
50:1
3:12092.31
0.017 0.020
2093.60
S.S. 2095.89
S.S. 2086.582:14:1
3:12:1
50:1
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
3/13/2019X:\NCDOT\Division 14 - 2017\Macon 550043\Roadway\XSC\550043_Rdy_xpl.dgnUser:smelvinPROJ. REFERENCE NO.SHEET NO.0
6/23/162085 2085
2090 2090
2095 2095
2100 2100
2105 2105
2110 2110
2115 2115
2120 2120
2125 2125
2080 2080
2090 2090
2095 2095
2100 2100
2105 2105
2110 2110
2115 2115
2120 2120
2125 2125
2130 2130
2085 2085
2095 2095
2100 2100
2105 2105
2110 2110
2115 2115
2120 2120
2125 2125
2130 2130
2135 2135
2090 2090
X-417BP.14.R.210
-L-
5 10
18+50.00
19+00.00
17+90.00
BRIDGE #550043
MACON COUNTY
2095.77
0.037 0.037
2096.16
S.S. 2098.58
S.S. 2088.122:14:1
3:12:1
50:1
2101.51
0.040 0.040
2100.00
S.S. 2100.70
S.S. 2090.88
4:1
3:14
.9
:1
2104.16
0.040 0.040
S.S. 2103.58
S.S. 2094.83
4:1
3:1
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
5'-0"5'-0"3/13/2019X:\NCDOT\Division 14 - 2017\Macon 550043\Roadway\XSC\550043_Rdy_xpl.dgnUser:smelvinPROJ. REFERENCE NO.SHEET NO.0
6/23/162100 2100
2105 2105
2110 2110
2115 2115
2120 2120
2125 2125
2130 2130
2135 2135
2095 2095
2100 2100
2105 2105
2110 2110
2115 2115
2120 2120
2125 2125
2130 2130
2135 2135
2095 2095
2100 2100
2105 2105
2110 2110
2115 2115
2120 2120
2125 2125
2130 2130
2135 2135
2095 2095
X-517BP.14.R.210
-L-
5 10
BRIDGE #550043
MACON COUNTY
20+00.00
20+50.00
19+50.00
2106.58
0.040 0.040
S.S. 2099.11
10%
PROP. ASPHALT DRIVE
16
.2%3:12108.81
0.015 0.040
S.S. 2108.58
S.S. 2106.762.6:1SHOULDER
REDUCE
2:1
2106.84
2110.652109.31
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
3/13/2019X:\NCDOT\Division 14 - 2017\Macon 550043\Roadway\XSC\550043_Rdy_xpl.dgnUser:smelvinPROJ. REFERENCE NO.SHEET NO.0
6/23/162100 2100
2105 2105
2110 2110
2115 2115
2120 2120
2125 2125
2130 2130
2135 2135
2095 2095
X-617BP.14.R.210
-L-
5 10
21+00.00
BRIDGE #550043
MACON COUNTY
2112.39
MACON CO. #43
N
A
D 83/ 2011
CREEK
TO SR 1634
-L- STA. 20+50.00
17BP.14.R.210
END PROJECT
-L- STA. 10+55.00
17BP.14.R.210
BEGIN PROJECT
-L- STA. 15+52.20
BEGIN BRIDGE
-L- STA. 16+39.80
END BRIDGE
MIDDLE
TO DEAD ENDSR 1635 -L-MIDDLE CREEK RD
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PROJECT LENGTH
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
DESIGN DATA
LOCATION:
TYPE OF WORK:09/08/99DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$CONTRACT:ARTMEN
N ASO
H
DEPT
O
F TRA SPORTTIONTATEOFNRTCAR
O
LI
NALETTING DATE:
OF TRANSPORATION
DEPARTMENTNORTH CAROLINA
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
---
Bryson City, NC 28713
345 Toot Hollow Rd
DIVISION 14
=0.188
=0.017
=0.171
TOTAL LENGTH PROJECT 17BP.14.R.210 #550043
LENGTH STRUCTURE PROJECT 17BP.14.R.210 #550043
LENGTH ROADWAY PROJECT 17BP.14.R.210 #550043
T
V
=
=
=
6
35 MPH
ADT 2018
% *
* TTST =3%
FUNC CLASS =
LOCAL - RURAL
570PROJECT:ENGINEER STRUCTURES ARTMEN
N ASO
H
DEPT
O
F TRA S PORTTIONTATEOFNRTCAR
O
LI
NAADAM DOCKERY
ENGINEER
PROFESSIONAL
SEAL
NORTH CARO
LINA
20125
.gll
a
hsramcheek,jr.MARC G. CHEEK, PE
STRUCTURE
(106
VICINITY MAP
LOCATION
PROJECT
106
MacDonald
Mill
Cr
eekMiddle
Evans
Cr
eekTessentee Creek
ShoalCreekOtto
1636
1635
1635
1633
1110
1114
1115
1118 1653
1684
1634
1635
1727
1632
1109
23
441
23
441
1108
1629
1106
1107
1726
1726
1104
1105
1102
1683
1683
1642
1641
1636
1636
1636
1637
1638
1731
1639
1722
1685
1622
1624
1623 1732
106
1625
1720
Scaly
Norton
PLANS PREPARED FOR:PLANS PREPARED BY:
NCDOT CONTACT:
2018 STANDARD SPECIFICATIONS
PROJECT DESIGN ENGINEER
SECTION ALONG -L-
END BENT 1 END BENT 2
SECTION THROUGH END BENTS ARE TAKEN @ RIGHT ANGLES
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
SHEET OF
Drawing Scale : Placement Scale :
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
15+96.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.210
REPLACES BRIDGE NO. 580046
MACON
GENERAL DRAWING
REPLACES BR. NO. 0043
SR 1634 AND DEAD END
ON SR 1635 BETWEEN
FOR BRIDGE OVER MIDDLE CREEK
N
A
D 83/ 2011
OVERTOPPING FLOOD DATA:
OVERTOPPING FLOOD ELEVATION
FREQUENCY OF OVERTOPPING FLOOD
OVERTOPPING DISCHARGE
HYDRAULIC DATA:
*
BASE HIGH WATER ELEVATION
FREQUENCY OF BASE DISCHARGE
BASE DISCHARGE
DRAINAGE AREA
DESIGN HIGH WATER ELEVATION
FREQUENCY OF DESIGN DISCHARGE
DESIGN DISCHARGE
LOW CHORD ELEVATION
EB1 EB2
**
*
SEAL
ARE THE AS-BUILT PLANS.
I HEREBY CERTIFY THESE PLANS
2085.1'
10 YRS.+/-
1800 CFS
TO SR 1634
MI
D
D
L
E
C
R
E
E
K
{ BRIDGE
I.D. STA. 15+96.00-L-
(TYP.)
60°00'00"
WORK POINT 2
FILL FACE @ END BENT 2
STA. 16+39.80-L-
BEGIN FRONT SLOPE
STA. 16+51.30-L-
END APPROACH SLAB
STA. 16+50.50-L-
-L-
WORK POINT 1
FILL FACE @ END BENT 1
STA. 15+52.20-L-
BEGIN FRONT SLOPE
STA. 15+42.14-L-
BEGIN APPROACH SLAB
STA. 15+41.50-L-
PLAN
PILES NOT SHOWN IN PLAN VIEW FOR CLARITY.
43'-9†"43'-9†"
(FILL FACE TO FILL FACE)
(TYP.)
CLASS II RIP RAP
2087.4'
100 YRS.
3870 CFS
12.9 SQ. MI.
2085.1'
5 YRS.
1400 CFS
*
*NOTE: DESIGN IMPROVES LEVEL OF SERVICE.
WHICH OCCURS AT PROPOSED SAG @ STA. 12+62-L-
LOWEST HIGH POINT ON DECK/ROADWAY
OVERTOPPING ELEVATION REPRESENTS
TO DEAD END
EXISTING STRUCTURE
S-1
1'-0" EARTH BERM
1'-0" EARTH BERM
1'-0" EARTH BERM
1'-0" EARTH BERM
16+00 16+50 17+0015+5015+00
2,120
2,110
2,100
2,090
2,080
2,070 1'-0"(TYP.)(+)5.8855%
PI = 16+04.00
VC = 260'
(+)0.6893%
VERTICAL GRADE DATA -L-
EL = 2087.33'
SPAN A
FIX.
(TYP.)
EARTH BERM
1'-0"
1'-7" BERM
(TYP.)
1'-6" TO LIMITS OF
EXCAVATION
UNCLASSIFIED STRUCTURE
FIX.
FILL FACE @ END BENT 2
STA. 16+39.80-L-
G.P. EL. 2090.32
FILL FACE @ END BENT 1
STA. 15+52.20-L-
G.P. EL. 2087.58
(TYP.)
STEEL PILES
HP 12x53
(1.5 : 1 SLOPE) (TYP.)
(2'-0" THICK) (TYP.)
CLASS II RIP RAP
(3/8/18) = 2080.5'
ON DATE OF SITE VISIT
APPROX. W.S. ELEV.
(Q5)
EL. 2085.1'
(Q100)
EL. 2087.4'
EXCAVATION
STRUCTURE
UNCLASSIFIED
EL.
2
0
8
8|EL.
2
0
8
7|EL.
2
0
8
5|EL.
2
0
8
5|EL.
2
0
8
1|EL.
2
0
7
9|EL.
2
0
7
9|EL. 2079|EL. 2079|EL. 2084|EL. 2084|EL. 2084|EL. 2084|APPROX. NATURAL GROUND
BEGIN FRONT SLOPE
STA. 15+42.14-L-
G.P. EL. 2087.37
BEGIN FRONT SLOPE
STA. 16+51.30-L-
G.P. EL. 2090.80
(TYP.)
3'-6" KEY-IN
(GRADE TO DRAIN)
EXCAVATE TO EL. 2081.0
DRAIN)
(GRADE TO
EL. 2083.0
EXCAVATE TO
2083.87 (LT.)2086.47 (LT.)
EL. 2078.74
EL. 2079.38
EL. 2081.34
EL. 2081.98
18
SHEET 1 OF 4
87'-7‚" = LENGTH OF BRIDGE
REVISED PER MARC'S MARK-UPS NMW 1/19
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW
MGC
8/18
1/19
1/19 ENGINEER
PROFESSIONAL
SEAL
NORTH CARO
LINA
20125
.gll
a
hsramcheek,jr.ITEM & DETAIL)
(ROADWAY PAY
SHORING
TEMPORARY
FOUNDATION LAYOUTMACON CO. BR #43
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
SHEET OF
Drawing Scale : Placement Scale :
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
15+96.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.210
REPLACES BRIDGE NO. 580046
MACON
GENERAL DRAWING
SR 1634 AND DEAD END
ON SR 1635 BETWEEN
FOR BRIDGE OVER MIDDLE CREEK
SHEET 2 OF 4
BRIDGE ID STA.
STA. 15+96.00-L-
-L-
END BENT 1
FOUNDATION LAYOUT PLAN
END BENT 2
CENTERLINE OF PILES. ORIENT PILES AS SHOWN.
DIMENSIONS LOCATING PILES ARE SHOWN TO THE
ALL END BENT PILES ARE HP12x53 STEEL PILES.
STEEL PILES
{ HP 12x53
END BENT 1
FILL FACE @ (TYP.)
60°00'00"
STEEL PILES
{ HP 12x53
W.P. #2
STA. 16+39.80-L-
END BENT 2
FILL FACE @
W.P. #1
STA. 15+52.20-L-
BRACE PILE BATTER 3:12
9'-
6"
9'-
6"
9'-
6"
9'-
6"
9'-
6"
9'-
6"
9'-
6"
9'-
6"
9•
"
8'-
8•
"
8'-
8•
"
9•
"
STEEL BRACE PILES
{ HP 12x53
1'-4•"1'-4•"
STEEL BRACE PILES
{ HP 12x53
S-2
18
FOUNDATION RECOMMENDATION NOTES
129 TONS PER PILE.
PILES AT END BENT NO. 1 ARE DESIGNED FOR A FACTORED RESISTANCE OF
215 TONS PER PILE.
DRIVE PILES AT END BENT NO. 1 TO A REQUIRED DRIVING RESISTANCE OF
129 TONS PER PILE.
PILES AT END BENT NO. 2 ARE DESIGNED FOR A FACTORED RESISTANCE OF
215 TONS PER PILE.
DRIVE PILES AT END BENT NO. 2 TO A REQUIRED DRIVING RESISTANCE OF
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 9/18
1/19
1/19MGC
FOR STEEL PILE POINTS, SEE SECTION 450 OF THE STANDARD SPECIFICATIONS.
STEEL H-PILE POINTS ARE REQUIRED FOR STEEL H-PILES AT END BENT NO. 1
FOR STEEL PILE POINTS, SEE SECTION 450 OF THE STANDARD SPECIFICATIONS.
STEEL H-PILE POINTS ARE REQUIRED FOR STEEL H-PILES AT END BENT NO. 2
SUBARTICLE 450-3(d)(2) OF THE STANDARD SPECIFICATIONS.
RELEASE THE CONTRACTOR FROM PROVIDING EQUIPMENT IN ACCORDANCE WITH
PILES AT END BENT NO. 1 AND 2. THIS ESTIMATED ENERGY RANGE DOES NOT
THE RANGE OF 20,000 - 30,000 FT-LBS PER BLOW WILL BE REQUIRED TO DRIVE
IT HAS BEEN ESTIMATED THAT A HAMMER WITH AN EQUIVALENT RATED ENERGY IN
ADDED NOTES PER GEOTECH REPORT. NMW 1/19
FOR PILES, SEE SECTION 450 OF THE STANDARD SPECIFICATIONS.ENGINEER
PROFESSIONAL
SEAL
NORTH CARO
LINA
20125
.gll
a
hsramcheek,jr.
LOCATION SKETCH
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
SHEET OF
Drawing Scale : Placement Scale :
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
15+96.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.210
REPLACES BRIDGE NO. 580046
MACON
MACON CO. #43
GENERAL DRAWING
SR 1634 AND DEAD END
ON SR 1635 BETWEEN
FOR BRIDGE OVER MIDDLE CREEK
SHEET 3 OF 4
S-3
18
LOCATION SKETCH
PLANS AND SPECIAL PROVISIONS.
FOR UTILITY INFORMATION SEE UTILITY
WOODS
WOODS
WOODS
WOODS
STRUCTURE
EXISTING
BRIDGE I.D. STA.
STA. 15+96.00-L-
N
A
D 83/ 2011
(TYP.)
RIP RAP
CLASS II
PAY ITEM)
(ROADWAY
RIP RAP
CLASS B
PAY ITEM)
(ROADWAY
RIP RAP
CLASS B
TO DEAD END
TO SR 1634
SR 1635 MIDDLE CREEK RD.
-L-
WW
WW
MIDDLE CREEK
MI
D
D
L
E
C
R
E
E
K
& DETAIL)
(ROADWAY PAY ITEM
GUARDRAIL (TYP.)
PROPOSED
BENCH MARK #1: NAIL SET IN BASE OF 10" WHITE PINE TREE 74.0' LT. OF STA. 15+96-L- ELEV. = 2092.91'
(TYP.)
60°00'00" REVISED PER MARC'S MARK-UPS NMW 9/18
NOTES
ASSUMED LIVE LOAD = HL-93 OR ALTERNATE LOADING.
FOR EROSION CONTROL MEASURES, SEE EROSION CONTROL PLANS.
BRIDGE DESIGN SPECIFICATIONS.
THIS BRIDGE HAS BEEN DESIGNED IN ACCORDANCE WITH THE AASHTO LRFD
THIS BRIDGE IS LOCATED IN SEISMIC ZONE 1.
FOR GROUT FOR STRUCTURES, SEE SPECIAL PROVISIONS.
WITH ARTICLE 402-2 OF THE STANDARD SPECIFICATIONS.
DEMOLITION PLANS FOR REVIEW AND REMOVE THE BRIDGE IN ACCORDANCE
PREVENTS DEBRIS FROM FALLING INTO WATER. THE CONTRACTOR SHALL SUBMIT
REMOVAL OF THE EXISTING BRIDGE SHALL BE PERFORMED IN A MANNER THAT
SCOUR AT BRIDGES".
THIS STRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH HEC 18, "EVALUATING
THE PROJECT SITE.
BRIDGE SUBSTRUCTURE SHOWN ON THE PLANS AND THE ACTUAL CONDITIONS AT
ADDITIONAL COST INCURRED BASED ON DIFFERENCES BETWEEN THE EXISTING
WHATSOEVER AGAINST THE DEPARTMENT OF TRANSPORTATION FOR ANY DELAYS OR
CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR SHALL HAVE NO CLAIM
THE BEST INFORMATION AVAILABLE. THIS INFORMATION IS SHOWN FOR THE
THE SUBSTRUCTURE OF THE EXISTING BRIDGE INDICATED ON THE PLANS IS FROM
ACTIVITIES, SEE SPECIAL PROVISIONS.
FOR ASBESTOS ASSESMENT FOR BRIDGE DEMOLITION AND RENOVATION
BE REDUCED AS FOUND NECESSARY DURING THE LIFE OF THE PROJECT.
DURING CONSTRUCTION OF THE PROPOSED BRIDGE, THE LOAD LIMIT MAY
LIMIT. SHOULD THE STRUCTURAL INTEGRITY OF THE BRIDGE DETERIORATE
THE EXISTING BRIDGE IS PRESENTLY POSTED BELOW THE LEGAL LOAD
END BENTS TIMBER CAPS/POST AND TIMBER SILLS SHALL BE REMOVED.
CONSISTING OF 1 SPAN @ 40'-6" TIMBER DECK ON SALVAGED I-BEAMS,
AFTER SERVING AS A TEMPORARY STRUCTURE, THE EXISTING STRUCTURE
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 9/18
1/19
1/19MGC
FOR OTHER DESIGN DATA AND GENERAL NOTES, SEE SHEET SN (S-18).
SPECIFICATIONS.
FOR UNCLASSIFIED STRUCTURE EXCAVATION, SEE SECTION 412 OF THE STANDARD
ENGINEER. THIS WORK WILL BE PAID FOR AT THE CONTRACT LUMP SUM PRICE
AT END BENT 2 OF THE CENTERLINE OF THE BRIDGE AS DIRECTED BY THE
THE DISTANCE OF 55 FT. (LT.), 30' (RT.) @ END BENT 1 AND 35' (LT.), 35' (RT.)
THE MATERIAL SHOWN IN THE CROSS-HATCHED AREA SHALL BE EXCAVATED FOR
ASPHALT WEARING SURFACE IS INCLUDED IN ROADWAY QUANTITY ON ROADWAY PLANS.
FOR CRANE SAFETY, SEE SPECIAL PROVISIONS.
FOR SUBMITTAL OF WORKING DRAWINGS, SEE SPECIAL PROVISIONS.
FOR FALSEWORK AND FORMWORK, SEE SPECIAL PROVISIONS.ENGINEER
PROFESSIONAL
SEAL
NORTH CARO
LINA
20125
.gll
a
hsramcheek,jr.TRAFFIC, SEE ROADWAY PLANS.
CONTROL PLANS. FOR PAY ITEM FOR TEMPORARY SHORING FOR MAINTENANCE OF
FOR LIMITS OF TEMPORARY SHORING FOR MAINTENANCE OF TRAFFIC, SEE TRAFFIC
INASMUCH AS THE PAINT SYSTEM ON THE EXISTING STRUCTURAL STEEL
CONTAINS LEAD, THE CONTRACTOR'S ATTENTION IS DIRECTED TO ARTICLE 107-1 OF
THE STANDARD SPECIFICATIONS. ANY COSTS RESULTING FROM COMPLIANCE WITH
APPLICABLE STATE OR FEDERAL REGULATIONS PERTAINING TO HANDLING OF
MATERIALS CONTAINING LEAD BASED PAINT SHALL BE INCLUDED IN THE BID PRICE
FOR "REMOVAL OF EXISTING STRUCTURE AT STATION 15+96.00-L-."
McDOWELL CO. #19BILL OF MATERIAL
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
SHEET OF
Drawing Scale : Placement Scale :
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
15+96.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.210
REPLACES BRIDGE NO. 580046
MACON
240.0
GENERAL DRAWING
SR 1634 AND DEAD END
ON SR 1635 BETWEEN
FOR BRIDGE OVER MIDDLE CREEK
SHEET 4 OF 4
S-4
TOTAL BILL OF MATERIAL
ITEM
SUPERSTRUCTURE
END BENT 1
END BENT 2
TOTALS
LUMP SUM
LUMP SUM
LUMP SUM
LUMP SUM
(BRIDGE)
CONCRETE
CLASS "A"
C.Y.
EXCAVATION
STRUCTURE
UNCLASSIFIED
SLABS
APPROACH
BRIDGE
ASSESSMENT
SBESTOSA
LUMP SUM
LUMP SUM
LUMP SUM
LUMP SUM
STRUCTURE
EXISTING
REMOVAL OF
(BRIDGE)
STEEL
REINFORCING
LBS.
(2'-0" THK.)
CLASS II
RIP RAP,
TONS
DRAINAGE
FOR
GEOTEXTILE
BEARINGS
ELASTOMERIC
NO.LIN. FT.
10 850.00
10 850.00
LUMP SUMS.Y.
LUMP SUM
LUMP SUM
LIN. FT.NO.LIN. FT.
10
5
5
EA.
STEEL PILES
HP 12 x 53
SETUP FOR
EQUIPMENT
PILE DRIVING
5
5
10
PILES
STEEL
HP 12 x 53
EA.
5
5
10
65
170.00
170.00
105
125
115
140
230 255
RAIL
BARRIER
CONCRETE
VERTICAL
BOX BEAMS
CONCRETE
PRESTRESSED
3'-0" x 2'-9"
18
3,686
3,686
26.4
26.4
7,37252.8
EA.
TESTING
PDA
1
POINTS
PILE
STEEL
115
180
REVISED PER MARC'S MARK-UPS NMW 1/19
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 9/18
1/19
1/19MGC ENGINEER
PROFESSIONAL
SEAL
NORTH CARO
LINA
20125
.gll
a
hsramcheek,jr.
MACON CO. BR #43
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
SHEET OF
Drawing Scale : Placement Scale :
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
15+96.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.210
REPLACES BRIDGE NO. 580046
MACON
ASSEMBLED BY :
CHECKED BY :
DATE :
DATE :
DRAWN BY : TMG 11/11
CHECKED BY : AAC 11/11
STANDARD
(NON-INTERSTATE TRAFFIC)
1
2
3
LRFR SUMMARY
LOAD AND RESISTANCE FACTOR RATING (LRFD) SUMMARY FOR PRESTRESSED CONCRETE GIRDERS
STRENGTH I LIMIT STATE SERVICE III LIMIT STATE
MOMENT SHEAR MOMENT
LEVELVEHICLE(TONS) WEIGHT (W) LOAD RATING CONTROLLING (RF)RATING FACTORSMINIMUMTONS = W X RF FACTORS LIVELOADFACTORS (DF)DISTRIBUTIONRATING FACTOR SPANGIRDER LOCATIONSPAN (ft)LEFT END OFDISTANCE FROMFACTORS (DF)DISTRIBUTIONRATING FACTOR SPAN GIRDER LOCATIONSPAN (ft)LEFT END OFDISTANCE FROMFACTORS LIVELOADFACTORS (DF)DISTRIBUTIONRATING FACTORSPANGIRDER LOCATIONSPAN (ft)LEFT END OFDISTANCE FROMCOMMENT NUMBERRATING
LOAD
DESIGN
RATING
LOAD
LEGAL SVTTSTHL-93(Inv)N/A 1 1.117 --1.75 0.247 1.93 A EL 41.634 0.625 1.12 A EL 8.327 0.80 0.247 1.56 A EL 41.634
HL-93(Opr)N/A --1.448 --1.35 0.247 2.5 A EL 41.634 0.625 1.45 A EL 8.327 N/A ----------
HS-20(Inv)36.000 2 1.448 52.14 1.75 0.247 2.59 A EL 41.634 0.625 1.45 A EL 8.327 0.80 0.247 2.09 A EL 41.634
HS-20(Opr)36.000 --1.877 67.589 1.35 0.247 3.35 A EL 41.634 0.625 1.88 A EL 8.327 N/A ----------
SNSH 13.500 --4.378 59.102 1.4 0.247 7.48 A EL 41.634 0.625 4.38 A EL 8.327 0.80 0.247 4.84 A EL 41.634
SNGARBS2 20.000 --3.091 61.822 1.4 0.247 5.5 A EL 41.634 0.625 3.09 A EL 8.327 0.80 0.247 3.56 A EL 41.634
SNAGRIS2 22.000 --2.861 62.937 1.4 0.247 5.17 A EL 41.634 0.625 2.86 A EL 8.327 0.80 0.247 3.35 A EL 41.634
SNCOTTS3 27.250 --2.183 59.498 1.4 0.247 3.72 A EL 41.634 0.625 2.18 A EL 8.327 0.80 0.247 2.41 A EL 41.634
SNAGGRS4 34.925 --1.797 62.749 1.4 0.247 3.08 A EL 41.634 0.625 1.8 A EL 8.327 0.80 0.247 1.99 A EL 41.634
SNS5A 35.550 --1.812 64.409 1.4 0.247 3.01 A EL 41.634 0.625 1.81 A EL 8.327 0.80 0.247 1.95 A EL 41.634
SNS6A 39.950 --1.647 65.797 1.4 0.247 2.75 A EL 41.634 0.625 1.65 A EL 8.327 0.80 0.247 1.78 A EL 41.634
SNS7B 42.000 --1.61 67.634 1.4 0.247 2.62 A EL 41.634 0.625 1.61 A EL 8.327 0.80 0.247 1.70 A EL 41.634
TNAGRIT3 33.000 --1.965 64.845 1.4 0.247 3.35 A EL 41.634 0.625 1.97 A EL 8.327 0.80 0.247 2.17 A EL 41.634
TNT4A 33.075 --1.922 63.556 1.4 0.247 3.36 A EL 41.634 0.625 1.92 A EL 8.327 0.80 0.247 2.18 A EL 41.634
TNT6A 41.600 --1.701 70.755 1.4 0.247 2.74 A EL 41.634 0.625 1.7 A EL 8.327 0.80 0.247 1.77 A EL 41.634
TNT7A 42.000 --1.67 70.125 1.4 0.247 2.75 A EL 41.634 0.625 1.67 A EL 8.327 0.80 0.247 1.78 A EL 41.634
TNT7B 42.000 --1.578 66.274 1.4 0.247 2.83 A EL 41.634 0.625 1.58 A EL 8.327 0.80 0.247 1.83 A EL 41.634
TNAGRIT4 43.000 --1.53 65.773 1.4 0.247 2.7 A EL 41.634 0.625 1.53 A EL 8.327 0.80 0.247 1.75 A EL 41.634
TNAGT5A 45.000 --1.511 68.008 1.4 0.247 2.55 A EL 41.634 0.625 1.51 A EL 8.327 0.80 0.247 1.65 A EL 41.634
TNAGT5B 45.000 3 1.456 65.508 1.4 0.247 2.52 A EL 41.634 0.625 1.46 A EL 8.327 0.80 0.247 1.63 A EL 41.634
LIMIT STATE
STRENGTH I
DC
1.25
1.00
1.50
1.00
DWgg
SERVICE III
NOTES:
COMMENTS:
1.
2.
3.
4.
#
1
2
3
* * SEE CHART FOR VEHICLE TYPE
LEGAL LOAD RATING * *
CONTROLLING LOAD RATING
LOAD FACTORS:
I
EL
ER
- INTERIOR GIRDER
- EXTERIOR LEFT GIRDER
- EXTERIOR RIGHT GIRDER
GIRDER LOCATION
DESIGN LOAD RATING (HL-93)
DESIGN LOAD RATING (HS-20)
DESIGN
LOAD
RATING
FACTORS
REQUIRED FOR DESIGN.
ALLOWABLE STRESSES FOR SERVICE III LIMIT STATE ARE AS
SERVICE III LIMIT STATES.
MINIMUM RATING FACTORS ARE BASED ON THE STRENGTH I AND
60° SKEW
85' BOX BEAM UNIT
LRFR SUMMARY FOR
S-5
NMW 9/18
MGC
120.00
FOR SPAN `A'
18
1/19 ENGINEER
PROFESSIONAL
SEAL
NORTH CARO
LINA
20125
.gll
a
hsramcheek,jr.STD. NO. 33LRFR1_60S_85L
33 BOX BEAM SUPERSTRUCTUREMACON CO. #43
HALF SECTION
THROUGH VOIDS
HALF SECTION
AT INTERMEDIATE DIAPHRAGMS
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
SHEET OF
Drawing Scale : Placement Scale :
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
15+96.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.210
REPLACES BRIDGE NO. 580046
MACON
TYPICAL SECTION
``VERTICAL CONCRETE BARRIER RAIL SECTION'' DETAIL.
THE PROFILE OF THE GUTTERLINE. FOR RAIL HEIGHT DETAILS AND ASPHALT THICKNESS, SEE THE
BARRIER RAIL AND ASPHALT THICKNESS VARIES WHILE THE TOP OF THE BARRIER RAIL FOLLOWS
THE MAXIMUM BARRIER RAIL HEIGHT AND ASPHALT THICKNESS IS SHOWN. THE HEIGHT OF THE *
SECTION AT END BENT
SHEET FOR DETAILS
APPROACH SLAB''
SEE ``BRIDGE
9''2'-3''1'-0''1'-3''(SEE NOTES)
2•'' • DOWEL HOLES
& #8 DOWELS
À BEARING
SHEETS FOR DETAILS
SEE ``END BENT''
PREVENT BOND.
ROOFING FELT TO
2 LAYERS OF 30 LB.
BEARING PAD
ELASTOMERIC
VOID
BOX BEAM
SURFACE
WEARING
ASPHALT
1•"
2" ~ BACKER ROD
OPENING
4"THREADED INSERT DETAIL
BY CONTRACTOR.
DETERMINED
RECESSED …". SIZE TO BE
EXTERIOR UNIT AND
CAST IN OUTSIDE FACE OF
PERMITTED THREADED INSERT
MAA/TMGREV. 8/14
CHECKED BY :
DATE :
DATE :
ASSEMBLED BY :
DRAWN BY : DGE 8/11
CHECKED BY : TMG 11/11
INCLUDED IN THE PRICE BID FOR THE PRECAST UNITS.
THE COST OF THE PERMITTED THREADED INSERTS SHALL BE
CONTRACTOR IMMEDIATELY FOLLOWING REMOVAL OF THE FALSEWORK.
THE PERMITTED THREADED INSERTS SHALL BE GROUTED BY THE
MAY BE USED AS AN ALTERNATE.
STANDARD SPECIFICATIONS. STAINLESS STEEL THREADED INSERTS
AND GALVANIZED IN ACCORDANCE WITH SECTION 1076 OF THE
SHALL BE SIZED BY THE CONTRACTOR, SPACED AT 4'-0" CENTERS
THE PERMITTED THREADED INSERTS IN THE EXTERIOR UNITS
DURING CONSTRUCTION.
FOR THE CONTRACTOR TO ATTACH FALSEWORK AND FORMWORK
THE PERMITTED THREADED INSERTS ARE DETAILED AS AN OPTION
FOR GROUT FOR STRUCTURES, SEE SPECIAL PROVISIONS.
TRANSVERSE REINFORCING STEEL.
WHERE NECESSARY TO CLEAR PRESTRESSING STRANDS OR
THE LOCATION OF THE VOID DRAINS MAY BE SHIFTED SLIGHTLY
THOSE SEGMENTS LESS THAN 10 FEET IN LENGTH.
IN LENGTH AND NO CONTRACTION JOINTS ARE REQUIRED FOR
AT MIDPOINT OF BARRIER RAIL SEGMENTS LESS THAN 20 FEET
EXPANSION JOINTS. ONLY ONE CONTRACTION JOINT IS REQUIRED
LOCATED AT EACH THIRD POINT BETWEEN BARRIER RAIL
SPECIFICATIONS. A VERTICAL CONTRACTION JOINT SHALL BE
IN ACCORDANCE WITH ARTICLE 825-10(B) OF THE STANDARD
BE TOOLED IN ALL EXPOSED FACES OF THE BARRIER RAIL AND
VERTICAL GROOVED CONTRACTION JOINTS, •'' IN DEPTH, SHALL
APPLY EPOXY PROTECTIVE COATING TO BOX BEAM UNIT ENDS.
BEAM UNIT ENDS.
PRESTRESSING STRANDS SHALL BE CUT FLUSH WITH THE BOX
SHALL BE EPOXY COATED.
ALL REINFORCING STEEL IN VERTICAL CONCRETE BARRIER RAILS
A COMPRESSIVE STRENGTH OF NOT LESS THAN 6000 PSI.
BEAM UNIT SHALL BE DONE WHEN THE CONCRETE HAS REACHED
THE TRANSFER OF LOAD FROM THE ANCHORAGES TO THE BOX
SPECIFICATIONS.
TYPE M BOND BREAKER. SEE SECTION 1028 OF THE STANDARD
THE BACKER RODS SHALL CONFORM TO THE REQUIREMENTS OF
SHALL BE FILLED WITH NON-SHRINK GROUT.
THE 2•" ~ DOWEL HOLES AT FIXED ENDS OF BOX BEAM SECTIONS
THE TENSIONING OF THE STRANDS.
RECESSES FOR TRANSVERSE STRANDS SHALL BE GROUTED AFTER
IS NOT ALLOWED.
FLAME CUTTING OF THE TRANSVERSE POST-TENSIONING STRAND
PRICE BID FOR PRESTRESSED CONCRETE BOX BEAMS.
SHALL BE GRADE 60 AND SHALL BE INCLUDED IN THE UNIT
ALL REINFORCING STEEL CAST WITH THE BOX BEAM SECTIONS
ACCORDANCE WITH THE STANDARD SPECIFICATIONS.
EXCEPT FOR SAMPLING REQUIREMENTS WHICH SHALL BE IN
GRADE 270 STRANDS AND SHALL CONFORM TO AASHTO M203
ALL PRESTRESSING STRANDS SHALL BE 7-WIRE LOW RELAXATION
BOX BEAM UNIT
PRESTRESSED CONCRETE
3'-0" X 2'-9"
STANDARD
FIXED END
SHEET 1 OF 5
NMW
MGC
9/18
S-6
18
REVISED PER MARC'S MARK-UPS NMW 1/19
1/19
STD. NO. STD.33PCBB1_30ENGINEER
PROFESSIONAL
SEAL
NORTH CARO
LINA
20125
.gll
a
hsramcheek,jr.2'-9"15'-0"15'-0"
FINAL TENSIONING OF TRANSVERSE STRANDS
ALL ERECTION HAS BEEN COMPLETED AND AFTER
SHEAR KEYS TO BE FILLED WITH GROUT AFTER
GRADE POINT
-L-
0.02
3'-0"
0.02
10 PRESTRESSED CONCRETE BOX BEAM UNITS = 30'-0"(TYP.)(SEE ROADWAY PLANS)
ASPHALT WEARING SURFACE
(TYP.)
CONST. JT.
(TYP.)
CONCRETE BARRIER RAIL SECTION''
FOR DETAILS SEE ``VERTICAL
VERTICAL CONCRETE BARRIER RAIL (TYP.)
POST-TENSIONING STRANDS
L.R. TRANSVERSE
2•" ~ HOLES FOR 0.6" ~ 3'-11" EB24'-0•" EB1*
5" @ { BRG. @ EB2
6•" @ { BRG. EB1
9" @ { BRG.
6•" @ { BRG. @ EB2
5" @ { BRG. EB1
4'-0•" EB23'-11" EB1*
1"1"1'-0"1'-0"27'-10" (CLEAR ROADWAY)
13'-11"13'-11"
30'-0"
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
SHEET OF
Drawing Scale : Placement Scale :
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
15+96.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.210
REPLACES BRIDGE NO. 580046
MACON
1'-4"
6"
2'-5"
85'-0" BOX BEAM UNIT LENGTH
(TYP.)
MAT'L. IN RAIL
{ •'' EXP. JT.
GUTTERLINE10 PRESTRESSED CONCRETE BOX BEAM UNITS = 30'-0"1'-0"BARRIER RAIL (TYP.)VERTICAL CONCRETE1"(TYP.)27'-10" (CLEAR ROADWAY)FIX.FIX.
-L-
9" TO {
BRG. (TYP.)STRANDS (TYP.)
L. R. TRANSVERSE POST-TENSIONING
{ 2•" ~ HOLES FOR 0.6" ~
5•"5•"
6"
BOX BEAM UNIT)
VOID (TYP. EA.
2'-2" X 1'-9•"11"
#5 S6
&
#5 S5
#5 S6
&
#5 S5
(TYP.)
MAT'L. IN RAIL
{ •'' EXP. JT.
(TYP.)
60°-00'-00"
(TYP.)(TYP.)(TYP.)
PLAN OF UNIT
3'-5"
(TYP.)
SPLICE
VIEW FOR LOCATION) (TYP.)
(2'-2" SPLICE) (SEE BOX BEAM SECTION
6-#5 B3 IN BOX BEAM (2 BAR RUNS)
GUTTERLINE
CONCRETE BARRIER RAIL)
7-#5 S6 @ 6" CTS. (TYP. EA. VERTICAL
CONCRETE BARRIER RAIL)
7-#5 S6 @ 6" CTS. (TYP. EA. VERTICAL
EA. EXTERIOR BOX BEAM UNIT)
CONCRETE BARRIER RAIL AND
7-#5 S5 @ 6" CTS. (TYP. EA. VERTICAL
100-#5 S5 @ 9" CTS. (TYP. EA. VERTICAL CONCRETE BARRIER RAIL AND EA. EXTERIOR BOX BEAM UNIT)
EA. EXTERIOR BOX BEAM UNIT)
CONCRETE BARRIER RAIL AND
7-#5 S5 @ 6" CTS. (TYP. EA. VERTICAL
100-#5 S6 @ 9" CTS. (TYP. EA. VERTICAL CONCRETE BARRIER RAIL)
8'-0"23'-0"23'-0"23'-0"8'-0"
1'-4"2'-5"
BARRIER RAIL (2 BAR RUNS) (TYP.)
12-#5 B9 IN VERTICAL CONCRETE
BARRIER RAIL (2 BAR RUNS) (TYP.)
12-#5 B9 IN VERTICAL CONCRETE
28'-6"28'-6"28'-0"
85'-0"
21'-11Š"
23'-0"23'-0"23'-0"8'-0"
5'-2ƒ"
8'-0"
BOX BEAM UNIT)
VOID (TYP. EA.
2'-2" X 1'-9•"
(TYP.)
TRANSVERSE POST-TENSIONING STRANDS
{ 2•" ~ HOLES FOR 0.6" ~ L. R.
(TYP.)
VOIDS
2'-0"5'-2ƒ"21'-11Š"21'-11Š"
5•"
(TYP.)5•"
(TYP.)9‚"
3‹"
(TYP.)
(TYP.)11"
(TYP.)
DIAPHRAGM AND VOID LAYOUT
2'-0"
CHECKED BY :
DATE :
DATE :
ASSEMBLED BY :
DRAWN BY : DGE 8/11
CHECKED BY : TMG 11/11
REV. 8/14 MAA/TMG
2'-5Ž"
27'-10" CLEAR ROADWAY
PLAN OF 85' UNIT
60° SKEW
2'-6"2'-6"
SHEET 2 OF 5
S-7
NMW
MGC
9/18
(SIZE AND TYPE TO BE DETERMINED BY CONTRACTOR)
18
21 OPTIONAL THREADED INSERTS SPACED @ 4'-0" CTS. (EACH EXTERIOR BOX BEAM)
STD.NO.33PCBB_30_60S_85L
1/19 ENGINEER
PROFESSIONAL
SEAL
NORTH CARO
LINA
20125
.gll
a
hsramcheek,jr.
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Drawing Scale : Placement Scale :
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
15+96.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.210
REPLACES BRIDGE NO. 580046
MACON
SHEET 3 OF 5
S-8
3" 4" 5-#4 A2 7" 7"
DOWEL HOLES
{ OF 2•'' ~
END ELEVATION
STRAND LAYOUT NOT SHOWN.)
SECTION SIMILAR EXCEPT SHEAR KEY LOCATION.
(INTERIOR BOX BEAM SECTION SHOWN-EXTERIOR
AND LOCATION OF DOWEL HOLES.
SHOWING PLACEMENT OF #5 & #4 ``A'' BARS
INTERIOR BOX BEAM SECTION
(STRAND LAYOUT NOT SHOWN)
STRAND LAYOUT
0.6" ~ LOW RELAXATION
2•" CL.
CHAMFER (TYP.)
3" X 3" 1'-9•"
2'-2"
3"
3"
5"
6" 2'-9" 5•" 1" CL. #4 S2
#4 S4
#4 S1
3'-0"
#4 S3
3•"1'-0"1'-0"1•" CL.CL.1‚"5"
2" CL.
5"5"
SHEAR KEY DETAIL
NOTE: OMIT SHEAR KEY ON OUTSIDE FACE
…''
ƒ''ƒ''6''6''…''OF EXTERIOR BOX BEAMS. 8" 6" 6" 8"
4" 5-#5 A1 4"@ EQUAL SPACES3"
3"6"
#4 S1, S2 & S3
DETAIL ``B''
@ 6" MAX. CTS.
``B'' BARS AND ``A'' BARS NOT SHOWN.
SIMILAR EXCEPT OMIT #5 S5 BARS.
EXTERIOR UNIT SHOWN, INTERIOR UNIT
CHAMFER DETAIL
6"
CHAMFER
SHOWING 6" VOID CHAMFER
VOID
@ 3" MIN. CTS.
#4 ``S'' BARS
EXTERIOR BOX BEAM SECTION
(STRAND LAYOUT NOT SHOWN) 1'-9•"
2'-2"
5"
6"2'-9" 5•" 1" CL. #4 S2
#4 S4
#4 S1
#4 S3
5"
2" CL.
CHAMFER (TYP.)
3" X 3"
3'-0"
3…"
CL.
#5 S5
1‚" CL. #4 S12
2" CL.
#4 S13
(TYP.)
#4 S11
END VIEW 4‚" 1•"CL.11 SPACES
4'-3"
114-#5 S5 SEE ``PLAN OF1'-4"
UNIT'' FOR SPACING
(SHOWING #4 ``S'' BARS IN END OF BEAM)
#5 B3
#5 B3
#5 B3
#5 B3 #5 B3
#5 B3
#5 B3#5 B3
5'-11ƒ"
TYPICAL STRAND LOCATION
DEBONDING LEGEND
30( STRANDS REQUIRED)
FULLY BONDED STRANDS
STRANDS DEBONDED FOR 4'-0" FROM END OF GIRDER
STRANDS DEBONDED FOR 12'-0" FROM END OF GIRDER
ARTICLE 1078-7.
BOX BEAM. SEE STANDARD SPECIFICATIONS
THE SPECIFIED LENGTH FROM EACH END OF THE
BOND SHALL BE BROKEN ON STRANDS AS SHOWN FOR
2'-2" 3" 2" 3"
9 SPA. @4''4''2''2''1'-9•"2 SPA @
2'' CTS.2'-0"3"3"
2'' CTS.
3"
( SQUARE INCHES )
AREA
( LBS. PER STRAND )
ULTIMATE STRENGTH
( LBS. PER STRAND )
APPLIED PRESTRESS
0.217
58,600
0.6" • L.R.
GRADE 270 STRANDS
43,950
BAR TYPES
ALL BAR DIMENSIONS ARE OUT TO OUT
BAR NUMBER SIZE TYPE WEIGHT WEIGHTLENGTH
INTERIOR UNITEXTERIOR UNIT
LENGTH
S1
S2
S5*
REINFORCING STEEL LBS.
LBS.
CU. YDS.
No.
STR
3
3
#4
#4
#4
BILL OF MATERIAL FOR ONE BOX BEAM SECTION
A1
A2
S3
S4
#5 5
0.6" • L.R. STRANDS
#4
#4 4
3
#4
#4
#4
S11
S12
S13
2
10
#5
* EPOXY COATED REINF. STEEL
LBS.
CU. YDS.
No.
1 6'-8"6'-8"
4'-10"4'-10"
7'-6"7'-6"
5'-8"5'-8"
5'-10"5'-10"
----
1'-6"
1'-6"1'-6"2'-8"
1'-2"
TYP.
4TYP.2 3'-6"
10"
1 TOP OF UNIT
THIS LEG AT
2'-4"TYP.
2'-8"
3
1'-6"3"3"4"1'-1"6"6"
#52'-5"70 70
7
7
7S1S2S3
2'-5"
7
1'-6"1'-1"2'-5"S11S12S134'-10"4'-10"
3'-11"3'-11"
3'-6"3'-6"
K1
K2
6#4
#4
6'-2"6'-2"
STR
6
4•"4•"2'-4"9"
1'-0"
5
7"
32
75
8432
32 75
84
1'-5•"
34 5'-11"134 5'-11"134
B3 12 543 543
12 49 49
8 2'-10"15 2'-10"15
62 311 311
62 235 235
111 358 358
49 191 191
114
2168 2168
15.2 15.0
30 30
8000 P.S.I. CONCRETE
43'-5"43'-5"2'-11"103 103
VOID
#4 S3 & S4
VOID
#4 S3 & S4
7"#5 A1
6"
1•" CL. 7"#5 A1
6"
2'-0"
4'-3"
4'-3"
2'-0"#4 S1, S2 & S3
(SEE DETAIL ``B'')
(SEE DETAIL ``B'')
5-#4 A2
5-#4 A2
1•" CL.
DOWEL HOLES
À 2•" •
3"
3"9"
DOWEL HOLES
À 2•" •
3"
3"
9"3'-0"DOWEL HOLE
{ 2•" ~
9"9"4"4"5-#5 A1(TYP. EA. END)#4 S1, S2 & S3
50-#4 S1 & S2 @ 1'-6'' CTS.
49-#4 S4 @ 1'-6'' CTS.
99-#4 S3 @ 9" CTS.
PLAN OF BOX BEAM
{ BOX BEAM
(TYP.)(TYP.)11 SPACES @ 6" MAX. CTS.
@ 3" MIN. CTS.
@ 3" MIN. CTS.
11 SPACES @ 6" MAX. CTS.
#4 S11, S12 & S13 (IN PAIRS)#4 S11, S12 & S13 (IN PAIRS)
#4 ``S'' BARS
#4 ``S'' BARS
(TYP.)
60°-00'-00"
7†"7†"
1'-4"2'-5"114-#5 S5 IN VERTICAL CONCRETE BARRIER RAIL AND EXTERIOR BOX BEAM UNIT
(SEE PLAN OF UNIT FOR DETAILS)
#5 B3 #5 B3
#5 B3 #5 B3
5'-11ƒ"
FOR REINFORCING STEEL IN DIAPHRAGMS, SEE ``DOUBLE DIAPHRAGM DETAILS''.
FOR THREADED INSERTS, SEE ``THREADED INSERT DETAIL''.
FOR LOCATION OF DIAPHRAGMS, SEE ``PLAN OF UNIT''.
EXTERIOR UNIT SHOWN, INTERIOR UNIT SIMILAR EXCEPT OMIT #5 S5 BARS.
CHECKED BY :
ASSEMBLED BY :
DRAWN BY : DGE 11/11
CHECKED BY : TMG 11/11
REV. 4/15
DATE :
DATE :
MAA/TMG
85'-0"
S13 (IN PAIRS)
#4 S11, S12 &
STANDARD
BOX BEAM UNIT
PRESTRESSED CONCRETE
3'-0" X 2'-9"
NMW
MGC
9/18
181'-5"1'-9•"2'-6•"5'-11"704
704
1/19
STD. NO. 33PCBB4_60S_85LENGINEER
PROFESSIONAL
SEAL
NORTH CARO
LINA
20125
.gll
a
hsramcheek,jr.
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
SHEET OF
15+96.00-L-
Drawing Scale : Placement Scale :
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.210
REPLACES BRIDGE NO. 580046
MACON
PART SECTION AT RECESS
5•" DETAIL ``C''
SEE DETAIL ``C'' 8"1'-0"NON-SHRINK GROUT
FILL RECESS WITH
SECTION A-A 1'-0"9"10"7"8"#4 A2
2•"
CL.1'-1"1'-1"7"
8"
2•" CL.#4 K2
{ DIAPHRAGM
2•" CL.1'-0"SIDE)
(EACH
#4 A2 9" 7" 7"10"1'-1"#4 K1
SECTION D-D
(TYP.)
1" CL.
5•"5•"
11"
VOIDS NOT SHOWN
2-#4 K2
5"5"1'-1•" X 5•"(TYP.)
STRAND VISE
1'-2" X 6"(TYP.)
5" X 5" X †" }
1" MIN. CL.
(TYP.)
5•"
SHOWING PLAN VIEW OF GROUTED RECESS 8" 1'-0"1'-1"VIEW Y-Y
SHOWING ELEVATION VIEW OF GROUTED RECESS
5•"
6" 1'-1•" 1'-2"STRAND (TYP.)
POST-TENSIONING
FOR 0.6" ~
2•" ~ HOLE
X X
OF EXTERIOR BOX BEAM
END OF POST-TENSIONED STRANDS
GROUTED RECESS DETAIL AT
DOUBLE DIAPHRAGM DETAILS
2•" ~ HOLE)
#4 K1 (CENTER ABOUT STRAND
POST-TENSIONING
2•" ~ HOLE FOR 0.6" ~
3-#4 A2
#4 K2
#4 K2
3-#4 A2
PLAN
A A
D
D
11"5•"
5•"8"8"3-#4 K110"10"NON-SHRINK GROUT
FILL RECESS WITH
5•"
‚"
‚"
EXTERIOR BOX BEAM
OUTSIDE FACE OF
Y
Y
VISE
STRAND
5" X 5" X †" }
SECTION X-X
STRAND
POST-TENSIONING
{ 0.6" ~ L.R. TRANSVERSE
1"6"5•"9‚"3‹"
(TYP.)(TYP.)
STRAND (TYP.)
POST-TENSIONING
0.6" ~ L.R. TRANSVERSE
STRANDS
POST-TENSIONING
{ 2•" ~ HOLES FOR
STRAND
POST-TENSIONING
0.6" ~ L.R. TRANSVERSE
{ 2•" ~ HOLE FOR
#4 ``S'' BARS NOT SHOWN. #4 ``S'' BARS MAY BE SHIFTED SLIGHTLY TO CLEAR 2•" ~ HOLE.
(DIMENSIONS SHOWN ARE TYPICAL FOR EACH VOID)
SECTION B-B
VOID DRAIN DETAILS
10"10"
DRAIN
{ VOID
PART PLAN10"10"(TYP.)(TYP.)DIAPHRAGM
VOID
B
B
DRAIN
{ 1" ~ VOID
DRAIN
{ 1" ~ VOID
(TYP.)
DRAIN
VOID
VOID
VOID DRAIN
{ 1" ~
6"6"
6"6"
FINAL CAMBER
DEAD LOAD DEFLECTION AND CAMBER
CAMBER ( SLAB ALONE IN PLACE )
SUPERIMPOSED DEAD LOAD
DEFLECTION DUE TO
** INCLUDES FUTURE WEARING SURFACE
**
STRAND
0.6" • L.R.
3'-0" x 2'-9"
2ƒ"
ƒ"
85' BOX BEAM UNIT
CHECKED BY :
DATE :
DATE :
ASSEMBLED BY :
DRAWN BY : DGE 11/11
CHECKED BY : TMG 11/11
REV. 8/14 MAA/TMG
STANDARD
BOX BEAM UNIT
PRESTRESSED CONCRETE
3'-0" X 2'-9"
NMW
MGC
9/18
SHEET 4 OF 5
S-9
18
STD.NO.33PCBB5_60S
1ƒ"
1/19 ENGINEER
PROFESSIONAL
SEAL
NORTH CARO
LINA
20125
.gll
a
hsramcheek,jr.
EXTERIOR B.B.
TOTAL
LENGTH LENGTH
TOTAL
2 85'-0"170'-0"
8 85'-0"680'-0"
10 850'-0"
BOX BEAM UNITS REQUIRED
INTERIOR B.B.
NUMBER
BAR SIZE TYPE LENGTH WEIGHT
CLASS AA CONCRETE
LBS.
CU.YDS.
* EPOXY COATED REINFORCING STEEL
*#5
*#5 STR
LN. FT.
BARS PER PAIR OF EXTERIOR UNITS
BILL OF MATERIAL FOR VERTICAL CONCRETE BARRIER RAIL
TOTAL VERTICAL CONCRETE BARRIER RAIL
85' UNIT
228 7'-2"1704S6
B9
1
144
22.0
85' UNITS
@ MID-SPAN
ASPHALT OVERLAY THICKNESS
@ MID-SPAN
RAIL HEIGHT
GUTTERLINE ASPHALT THICKNESS & RAIL HEIGHT
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
SHEET OF
15+96.00-L-
Drawing Scale : Placement Scale :
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.210
REPLACES BRIDGE NO. 580046
MACON
À BEARING PAD
À 1‚'' • HOLES
4•"3Ž"4•"2'-9"9"3Ž"1"2'-1…"- TYPE II -
BEARING PAD
FIXED END
ELASTOMERIC BEARING DETAILS
ELASTOMER IN ALL BEARINGS SHALL BE 60 DUROMETER HARDNESS.
1"
2" CL.
3…"
SECTION THRU RAIL@ { BRG.@ MIDSPANRAIL HEIGHT'' TABLE)ASPHALT THICKNESS &VARIES (SEE ``GUTTERLINEVERTICAL CONCRETE BARRIER RAIL DETAILS3'-6"SLOPED FACE2"
(TYP.)VARIESFACEVERTICAL1'-0"
10"1"1"
10"
1'-0"
1"1"
CONST. JT.
2'-0"
6"
SIDE VIEWEND VIEW
``B'' BARS
FIELD BEND 6" CTS.
& S6 @
#5 S5
4-#5 S5 #5 S5 & S6
(TYP.)
#5 S5
#5 S6
FIELD CUT
#5 S6
#5 S6
CUT
FIELD
FIELD CUT
6" CTS.
& S6 @
END OF RAIL DETAILS
CHAMFER
CHAMFER
ƒ"
ƒ"
CONST. JT.
S
S
WHEN SLIP FORM IS USED)
(NOTE: OMIT EXP. JT. MAT'L.
PLACE WITH GALVANIZED NAILS.
À •" EXP. JT. MAT'L HELD IN
ELEVATION AT EXPANSION JOINTS
SECTION S-S 6"2•"
2"
2•"
2•"
WHEN SLIP FORM IS USED)
(THIS IS TO BE USED ONLY
AT DAM IN OPEN JOINT
#5 S5
#5 S6
3-#5 S5
#5 ``B'' BARS6"3"12-#5 ``B'' BARS10•"8"8"10"10"6"BAR TYPE
BAR DIMENSIONS ARE OUT TO OUT3'-4"6"
7ƒ"
1
BOX BEAM UNIT
PRESTRESSED CONCRETE
3'-0" X 2'-9"
CHECKED BY :
DATE :
DATE :
ASSEMBLED BY :
DRAWN BY : DGE 10/11
CHECKED BY : TMG 11/11
MAA/THCREV. 5/18
SHEET 5 OF 5
S-10
NMW
MGC
9/18
( TYPE II - 20 REQ' D )
18
STD. NO. 33PCBB8_60&120SVARIES (SEE TYPICAL SECTION)1'-5"1/19
3'-7ƒ"
16'-1"2416
4120
170.00
ENGINEER
PROFESSIONAL
SEAL
NORTH CARO
LINA
20125
.gll
a
hsramcheek,jr.1ƒ"
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
SHEET OF
Drawing Scale : Placement Scale :
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
15+96.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.210
REPLACES BRIDGE NO. 580046
MACON
* LOCATION OF GUARDRAIL ATTACHMENT
SKETCH SHOWING POINTS OF ATTACHMENT
*
**
*
@ EB 1
BOX BEAM
BEGIN
CHECKED BY :
DATE :
DATE :
ASSEMBLED BY :
DRAWN BY : MAA 5/10
CHECKED BY : GM 5/10
REV. 1/15 MAA/TMG
REV. 12/17 MAA/THC
REV. 5/18 MAA/THC
NMW 9/18
MGC
STANDARD
S-11
CONCRETE BARRIER RAIL
DETAILS FOR VERTICAL
GUARDRAIL ANCHORAGE
@ EB 2
BOX BEAM
END
PLAN
À GUARDRAIL
ANCHOR ASSEMBLY
1'-6"À 1ˆ" ~ HOLES (TYP.)
‚" HOLD-DOWN }3•"3Ž"3Ž"3•"11"
4"4"
ANCHOR ASSEMBLY
À GUARDRAIL
E
E
FOR LOCATION OF GUARDRAIL ANCHOR
ANCHOR ASSEMBLY
À GUARDRAIL
FINISH GRADE
ASSEMBLY, SEE ``PLAN'' BELOW
ELEVATION1'-9"4"
4"
TO THE SATISFACTION OF THE ENGINEER.
WILL NOT BE PERMITTED. ANY CONCRETE DAMAGED BY THIS WORK SHALL BE REPAIRED
THE 1 ‚'' ~ HOLES SHALL BE FORMED OR DRILLED WITH A CORE BIT. IMPACT TOOLS
CONCRETE BARRIER RAIL TO CLEAR ASSEMBLY BOLTS.
THE VERTICAL REINFORCING BARS MAY BE SHIFTED SLIGHTLY IN THE VERTICAL
CONTRACT PRICE BID FOR VERTICAL CONCRETE BARRIER RAIL.
THE COST OF THE GUARDRAIL ANCHOR ASSEMBLY SHALL BE INCLUDED IN THE UNIT
SHARP POINTED TOOL.
AFTER INSTALLATION, THE EXPOSED THREAD OF THE BOLT SHALL BE BURRED WITH A
ATTACHMENT, SEE SKETCH.
GUARDRAIL IS TO BE ATTACHED TO THE END OF BARRIER RAIL. FOR POINTS OF
THE GUARDRAIL ANCHOR ASSEMBLY IS REQUIRED AT ALL POINTS WHERE APPROACH
THE ENGINEER.)
REQUIREMENTS OF ASTM A307. THE USE OF THIS ALTERNATE SHALL BE APPROVED BY
NUTS AND WASHERS. THEY SHALL CONFORM TO OR EXCEED THE MECHANICAL
AND WASHERS MAY BE USED AS AN ALTERNATE FOR THE ‡'' ~ GALVANIZED BOLTS,
BE GALVANIZED. (AT THE CONTRACTOR'S OPTION, STAINLESS STEEL BOLTS, NUTS
CONFORM TO THE REQUIREMENTS OF AASHTO M291. BOLTS, NUTS AND WASHERS SHALL
BOLTS SHALL CONFORM TO THE REQUIREMENTS OF ASTM A307 AND NUTS SHALL
WITH AASHTO M111.
FABRICATION, THE HOLD-DOWN PLATE SHALL BE HOT-DIP GALVANIZED IN ACCORDANCE
THE HOLD-DOWN PLATE SHALL CONFORM TO AASHTO M270 GRADE 36. AFTER
7 - ‡'' ~ BOLTS WITH NUTS AND WASHERS.
THE GUARDRAIL ANCHOR ASSEMBLY SHALL CONSIST OF A ‚'' HOLD DOWN PLATE AND
NOTES
GUARDRAIL ANCHOR ASSEMBLY DETAILS
SECTION E-E
END BENT #1 SHOWN, END BENT #2 SIMILAR.
PLAN
ANCHORS FOR GUARDRAIL
LOCATION OF
ASSEMBLY
ANCHOR
À GUARDRAIL
WASHERS (TYP.)
WITH ROUND
{ ‡" ~ X 1'-2" BOLT
3•"3Ž"3Ž"3•"‚" HOLD-DOWN }1'-9"1'-10"
4"
4"
ANCHOR ASSEMBLY
{ GUARDRAIL
4"
4"
1'-10"
ANCHOR ASSEMBLY
{ GUARDRAIL
(TYP.)
1‚" ~ HOLE
UNIT
BOX BEAM
END OF
18
UNIT
BOX BEAM
END OF
STD. NO. GRA3
1/19
REVISED PER MARC'S MARK-UPS NMW 1/19
ENGINEER
PROFESSIONAL
SEAL
NORTH CARO
LINA
20125
.gll
a
hsramcheek,jr.
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
SHEET OF
15+96.00-L-
Drawing Scale : Placement Scale :
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.210
REPLACES BRIDGE NO. 580046
MACON
27.4287
END BENT No. 1
SUBSTRUCTURE
ELEVATION
DATE :
DATE :
60°-00'-00"
W1
41'-8"
(TYP.)
1'-
3"
16'-11‚"
9'-6"
{ HP 12 X 53 STEEL PILES
1 2
9'-6"9'-6"
3 5
9'-6"
(TYP.)
9"
(TYP.)
9"13-#4 S1 & S2
3" HIGH BEAM BOLSTER(TYP.)FILL FACE
8'-8•"9•"
@ 8" CTS. (TYP. EACH BAY)
(TYP.)
9"
(TYP. EA. END)
#4 S1 & S2
22'-5"19'-3"
2'-8•"1'-0"@ 5'-0" CTS.
SEE ``CORROSION PROTECTION FOR STEEL PILES DETAIL'', SHEET 4 OF 4.
CONCRETE COLLARS FOR STEEL PILES NOT SHOWN IN PLAN AND ELEVATION VIEWS FOR CLARITY.
FOR SECTION A-A, SEE SHEET 4 OF 4.
WINGS NOT SHOWN FOR CLARITY.
1
2
3
4
5
ELEVATIONS
TOP OF PILE
W.P.
-L-1'-9"2'-9"6'-6„"2'-0‚"BOTTOM OF CAP
& WING
POUR #1
CAP, LOWER
PART OF WINGS &
CONCRETE COLLARS 4'-0"(MIN.)A
A
4-#4 S3
(TYP. EA. PILE)
OVER PILES @ 4'-0" CTS.
#4 B3 UNDER #4 B2
(11 REQ'D)
2'-0" MIN.
EMBEDMENT
(TYP.)
4 NOTES
FOR WING DETAILS, SEE SHEET 3 OF 4.
FOR PILE SPLICE DETAILS, SEE SHEET 4 OF 4.
CAST IF SLIP FORMING IS USED.
VERTICAL CONCRETE BARRIER RAIL IS
THE WING SHALL BE POURED AFTER THE
THE CONCRETE IN THE SHADED AREA OF
NECESSARY TO CLEAR DOWELS.
STIRRUPS IN CAP MAY BE SHIFTED AS
1'-9"2'-9"5•"5•"CHAMFERCHAMFER2'-0‚"W2
1'-
0"(TYP.)
2'-8Ž"
6'-6„"11'-3Š"9'-6Š"13'-0‚"11'-0"9'-6Š"11'-3Š"13'-0‚"11'-0"1'-10•"& DOWELSTO { BRG. 1'-4•" TO{ PILESBACKWALL1'-0"(TYP.)
2'-1…"1'-4‰"
(TYP.)
4‡"
1'-8•"
1" EXP. JT.
MAT'L. (TYP)
SEE DETAIL ``A''
(SHEET 4 OF 4)
#4 K1 (TYP.)
(LEVEL)
TOP OF WING
TOP OF WING
(LEVEL)
CONST. JT.
(TYP.)
6"
6"
PLAN
(2'-5" MIN. SPLICE)
(2 BAR RUNS)
#4 B2 (EACH FACE)
(2'-5" MIN. SPLICE)
(2 BAR RUNS)
(OVER PILES)
4-#4 B2
4-#9 B1
WORKLINE
{ HP 12 X 53 STEEL BRACE PILES
(2'-5" MIN. SPLICE)
(2 BAR RUNS)
#4 K2 (EACH FACE)
17-#4 V2 @ 1'-0" CTS. (EA. FACE)17-#4 V2 @ 1'-0" CTS. (EA. FACE)
17-#4 U1 @ 1'-0" CTS.17-#4 U1 @ 1'-0" CTS.
& BACKWALL
OF WINGS
UPPER PART
POUR #2
REV. 4/15 MAA/TMG
16'-11‚"
ASSEMBLED BY :
CHECKED BY :
DRAWN BY : WJH 12/11
CHECKED BY : AAC 12/11
SHEET 1 OF 4
NMW
MGC
9/18
S-12
EL. 2087.24
EL. 2085.43
EL. 2083.74
EL. 2079.74
EL. 2086.08
EL. 2084.06
0.0154 SLOPE
EL. 2086.05
EL. 2087.88
EL. 2084.38
& WING
BOTTOM OF CAP
EL. 2080.38
2081.78
2081.93
2082.07
2082.22
2082.36
18
REVISED PER MARC'S MARK-UPS NMW 1/19
STD. NO. EB_30_60S4_33BB
1/19 ENGINEER
PROFESSIONAL
SEAL
NORTH CARO
LINA
20125
.gll
a
hsramcheek,jr.
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
SHEET OF
15+96.00-L-
Drawing Scale : Placement Scale :
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.210
REPLACES BRIDGE NO. 580046
MACON
27.4287
41'-8"
(TYP.)
1'-
3"
16'-11‚"16'-11‚"
PLAN
60°-00'-00"
22'-5"19'-3"
2'-8•"
W.P.
-L-
FILL FACE W1
1'-9"2'-9"6'-6„"2'-0‚"1'-9"2'-9"5•"CHAMFER2'-0‚"W2
1'-
0"(TYP.)
2'-8Ž"
6'-6„"5•"CHAMFER11'-3Š"9'-6Š"13'-0‚"11'-0"9'-6Š"11'-3Š"13'-0‚"11'-0"MAT'L. (TYP.)
1" EXP. JT.1'-10•"& DOWELSTO { BRG. { PILES1'-4•" TOBACKWALL1'-0"2'-1…"
(TYP.)
1'-4‰"
(TYP.)
1'-8•"
4‡"
(SHEET 4 OF 4)
SEE DETAIL ``A''
NOTES
NOTES
FOR WING DETAILS, SEE SHEET 3 OF 4.
FOR PILE SPLICE DETAILS, SEE SHEET 4 OF 4.
CAST IF SLIP FORMING IS USED.
VERTICAL CONCRETE BARRIER RAIL IS
THE WING SHALL BE POURED AFTER THE
THE CONCRETE IN THE SHADED AREA OF
NECESSARY TO CLEAR DOWELS.
STIRRUPS IN CAP MAY BE SHIFTED AS
1
2
3
4
5
ELEVATIONS
TOP OF PILE
A
9'-6"9'-6"9'-6"9'-6"
{ HP 12 X 53 STEEL PILES
1 3 5
8'-8•"9•"
(TYP.)
9"13-#4 S1 & S2
@ 8" CTS. (TYP. EACH BAY)(TYP.)
9"(TYP. EA. END)
#4 S1 & S2
(TYP.)
9"
2 4
CONCRETE COLLARS
PART OF WINGS &
CAP, LOWER
POUR #1
(MIN.)4'-0"(TYP.)1'-0"2'-0" MIN.
(TYP.)
EMBEDMENT
(TYP. EA. PILE)
4-#4 S3
{ HP 12 X 53 STEEL BRACE PILES
CONST. JT.
(TYP.)
(LEVEL)
TOP OF WING
3" HIGH BEAM BOLSTER
@ 5'-0" CTS.
4-#9 B1
#4 K1 (TYP.)
(11 REQ'D)
OVER PILES @ 4'-0" CTS.
#4 B3 UNDER #4 B2
WORKLINE
(2'-5" MIN. SPLICE)
(2 BAR RUNS)
#4 K2 (EACH FACE)
(2'-5" MIN. SPLICE)
(2 BAR RUNS)
(OVER PILES)
4-#4 B2
A
(2'-5" MIN. SPLICE)
(2 BAR RUNS)
#4 B2 (EACH FACE)
6"
6"
17-#4 V2 @ 1'-0" CTS. (EA. FACE)17-#4 V2 @ 1'-0" CTS. (EA. FACE)
17-#4 U1 @ 1'-0" CTS.17-#4 U1 @ 1'-0" CTS.
& BACKWALL
OF WINGS
UPPER PART
POUR #2
ELEVATION
SEE ``CORROSION PROTECTION FOR STEEL PILES DETAIL'', SHEET 4 OF 4.
CONCRETE COLLARS FOR STEEL PILES NOT SHOWN IN PLAN AND ELEVATION VIEWS FOR CLARITY.
FOR SECTION A-A, SEE SHEET 4 OF 4.
WINGS NOT SHOWN FOR CLARITY.
SHEET 2 OF 4
SUBSTRUCTURE
END BENT No. 2
CHECKED BY :
DATE :
DATE :
ASSEMBLED BY :
DRAWN BY : WJH 12/11
CHECKED BY : AAC 12/11
REV. 4/15 MAA/TMG
NMW
MGC
9/18
S-13
2084.36
2084.50
2084.65
2084.80
2084.94
(LEVEL)
TOP OF WING
EL. 2090.48
EL. 2088.65
EL. 2086.98
& WING
BOTTOM OF CAP
EL. 2082.98
0.0154 SLOPE
EL. 2086.66
EL. 2088.82
EL. 2088.03
EL. 2089.84
EL. 2086.34
& WING
BOTTOM OF CAP
EL. 2082.34
18
STD. NO. EB_30_60S4_33BB
1/19 ENGINEER
PROFESSIONAL
SEAL
NORTH CARO
LINA
20125
.gll
a
hsramcheek,jr.
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
SHEET OF
Drawing Scale : Placement Scale :
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
15+96.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.210
REPLACES BRIDGE NO. 580046
MACON
3"POUR #1POUR #2TOP OF WING
CONST. JT.
#4 V1 BARS (EA. FACE)
(SPACED AS SHOWN ABOVE)
(LEVEL)12-#5 H1 (FILL FACE)3"3" HIGH B.B.
@ 5'-0" CTS.
BOTTOM OF WING
(LEVEL)2 SPA. @8" CTS.5 SPA. @8" CTS.#4 K1 (EA. FACE)2 SPA. @8" CTS.ELEVATION OF WING W1 ELEVATION OF WING W2 POUR #1POUR #212-#5 H3 (EACH FACE)3"BOTTOM OF WING
(LEVEL)
3"
TOP OF WING
(LEVEL)
#4 V1 BARS (EA. FACE)
(SPACED AS SHOWN ABOVE)
#4 K1 (EA. FACE)5 SPA. @8" CTS.WING DETAILS
X
X 2 SPA. @8" CTS.2 SPA. @8" CTS.3" HIGH B.B.
@ 5'-0" CTS.
CONST. JT.
Y
Y
PLAN OF WING W1
#5 H2
#5 H1
2'-0‚"
#4 K1
2'-
8•
"
2" CL.2"(TYP.)11'-0"
13'-0‚"
8"
#4 V1
1'-0"2'-9"
1'-9"(TYP.)
2
S
P
A. @(
E
A.
F
AC
E)
1'-
0"
C
T
S.10-
#
4 V1
(
S
P
A. AS
S
HOWN)
3'-
10
Ž
"
2" CL.
10-#4 V1 @ 1'-0" CTS. (EA. FACE)1'-0"2" CL.2" CL.3"
11'-0"2'-0‚"
5•"
CHAMFER 5•"
CHAMFER
#4 K1
FACE
FILL2'-
8
Ž
"
2'-9"
2" CL.
PLAN OF WING W2
(TYP.)1'-0"
1'-9"2"(TYP.)#5 H3
13'-0‚"
10-
#
4 V1
(
S
P
A. AS
S
HOWN)
2
S
P
A. @(
E
A.
F
AC
E)
1'-
0"
C
T
S.
2" CL.1'-0"2" CL.2" CL.3'-
10•
"
10-#4 V1 @ 1'-0" CTS. (EA. FACE)12-#5 H2 (BACK FACE)FILL FACE
3"
MAT'L
1" EXP. JT.
MAT'L
1" EXP. JT.
SECTION X-X
#4 V1
CONST. JT.3"3" HIGH B.B.
FILL FACE
1'-0"
2" CL.2" CL.12-#5 H1 (FILL FACE)2 SPA. @8" CTS.5 SPA. @8" CTS.2 SPA. @8" CTS.#4 V1
CONST. JT.3"3" HIGH B.B.
1'-0"
2" CL.2" CL.12-#5 H3 (EACH FACE)2 SPA. @8" CTS.5 SPA. @8" CTS.2 SPA. @8" CTS.SECTION Y-Y
FACE
FILL12-#5 H2 (BACK FACE)CHECKED BY :
ASSEMBLED BY :
CHECKED BY : AAC 12/11
DRAWN BY : WJH 12/11
DATE :
DATE :
REV. 4/15 MAA/TMG
WING DETAILS
END BENT
SUBSTRUCTURE
SHEET 3 OF 4
NMW
MGC
9/18
S-14
18
STD. NO. EB_30_60S4_33BB
1/19 ENGINEER
PROFESSIONAL
SEAL
NORTH CARO
LINA
20125
.gll
a
hsramcheek,jr.
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
SHEET OF
15+96.00-L-
Drawing Scale : Placement Scale :
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.210
REPLACES BRIDGE NO. 580046
MACON
SUBSTRUCTURE
BAR TYPES
(TYP. EACH PILE)
PLAN
COLLAR
CONCRETE
BOTTOM OF CAP
ELEVATION
CONCRETE COLLARS
{ PILES &1'-4•"1'-6"2'-0"
STEEL PILE
{ HP 12 X 53
FILL FACE
2'-0" ~ CONCRETE COLLAR
BAGGED STONE SHALL REMAIN IN PLACE UNTIL THE ENGINEER DIRECTS THAT
ACCUMULATIONS AT BAGGED STONE WHEN SO DIRECTED BY THE ENGINEER.
BAGS SHALL BE REMOVED AND REPLACED WHENEVER THE ENGINEER DETER-
MINES THAT THEY HAVE DETERIORATED AND LOST THEIR EFFECTIVENESS.
NO SEPARATE PAYMENT WILL BE MADE FOR THIS WORK AND THE ENTIRE
COST OF THIS WORK SHALL BE INCLUDED IN THE UNIT CONTRACT PRICE
BID FOR THE SEVERAL PAY ITEMS.
TEMPORARY DRAINAGE AT END BENT
BAGGED STONE AND PIPE SHALL BE PLACED IMMEDIATELY AFTER COMPLETION
PIPE WILL NOT BE ALLOWED.
STEEL, CORRUGATED ALUMINUM ALLOY, OR CORRUGATED PLASTIC. PERFORATED
OF END BENT EXCAVATION. PIPE MAY BE EITHER CONCRETE, CORRUGATED
IT BE REMOVED. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF SILT
{ BEARING
FILL FACE
DETAIL ``A''
(END BENT No. 1 SHOWN, END BENT No. 2 SIMILAR BY ROTATION)
(END BENT No. 1 SHOWN, END BENT No. 2 SIMILAR BY ROTATION)
ALL BAR DIMENSIONS ARE OUT TO OUT.
HP 12 X 53 STEEL PILES
END BENT No. 1
NO: 5
HP 12 X 53 STEEL PILES
END BENT No. 2
NO: 5
END BENT No. 1 & 2
DETAILS
2'-1…"
45
60
4560
POSITION OF PILE DURING WELDING.
DETAIL B
0'' TO „''
0'' TO „''0'' TO „''0'' TO „''PILE SPLICE DETAILS+10°-0°10°
0°
BACK GOUGE
BACK GOUGE
DETAIL A
DETAIL B
DETAIL A
PILE VERTICAL
OR VERTICAL
PILE HORIZONTAL
(TYP.)
1'-3" ABOVE CAP
TO PROJECT
#8 D1 DOWELS1'-4•"1'-4•"
2'-9"4•"4•"9"1'-10•"PAD (TYPE II) (TYP.)
ELASTOMERIC BRG.
1" X 9" X 2'-9"
BILL OF MATERIAL
POUR #1
POUR #2
TOTAL CLASS A CONCRETE
OF WINGS & COLLARS
CAP, LOWER PART
5.6 C.Y.
26.4 C.Y.
(FOR ONE END BENT)
REINFORCING STEEL
(FOR ONE END BENT)
CLASS A CONCRETE BREAKDOWN
FOR ONE END BENT
BAR
B1
NO.
8
SIZE
#9
TYPE
1
LENGTH
43'-8"1188
B2 28 #4 STR 410
B3 11 #4 STR 2'-5"18
D1 20 #8 STR 2'-3"
H1 12 #5 2
K1 12 #4 STR 3'-3"26
S1 54 #4 4 10'-5"376
S2 54 #4 5 3'-2"
S3 20 #4 6 6'-6"87
V1 61 #4 STR 7'-2"292
11'-9"147
V2 68 #4 STR 5'-3"238
U1 34 #4 3'-7"7
120
K2 12 #4 STR 176
81
PART OF WINGS
BACKWALL & UPPER
1HK.HK.HK.1'-3'' LAP
HK.HK.
1'-3"1'-3"
4•"4•"4•"1'-8" ~
2'-5"
2'-5"
2
11'-1"
41'-2"8"
10'-8"
H1
H2
10'-2"
3
8"
4
5
6
H3
4"
4"3'-7•"8"
H2 12 #5 2 11'-4"142
H3 24 #5 3 27110'-10"
114
7
1'-0•"1'-0•"
21'-11"
21'-11"
{ BOX BEAM
MINIMUM OF 3- ONE CUBIC
FOOT BAGS OF #78M STONE.
BAGS SHALL BE OF POROUS
FOR DRAINAGE
GRADE TO DRAIN
TOE OF SLOPE
6" ( MIN.) PIPE FABRIC,SECURELY TIED.1'-5•"HP 12 X 53 STEEL PILES
SETUP FOR
PILE DRIVING EQUIPMENT
HP 12 X 53 STEEL PILES
SETUP FOR
PILE DRIVING EQUIPMENT
NO: 5 NO: 5
CORROSION PROTECTION FOR STEEL PILES DETAIL
SECTION A-A
SEE ``CORROSION PROTECTION FOR STEEL PILES DETAIL.'')
(CONCRETE COLLAR NOT SHOWN FOR CLARITY.
2'-9"
12
3
{ HP 12 X 53
STEEL BRACE PILE 4'-0"2'-3"2'-0"#4 S2
4-#9 B1
2-#9 B1
2-#9 B1
#4 S1
1'-2"11"{ HP 12 X 53
STEEL PILE
#4 B3
3" HIGH B.B.
8"2" CL. (TYP.)8"
8"
#4 S3
OVER PILES
4-#4 B2 @ 4" CTS.
1'-4•"1'-4•"
{ #8 D1 DOWEL
4 SPA. @ 7"EA. FACE
1-#4 B2
1'-10•"1'-3"CONST. JT.
#4 U1
#4 V2
EA. FACE
1-#4 K2
2" CL.
11"
FILL FACE
1'-0"5"6"6"6"7•"7•"1'-7•"SHEET 4 OF 4
CHECKED BY :
ASSEMBLED BY :
DRAWN BY : WJH 12/11
CHECKED BY : AAC 12/11
REV. 4/17 MAA/THC
DATE :
DATE :
3686 LBS.
20.8 C.Y.
WEIGHT
27.4287
NMW
MGC
9/18
S-15
18
STD. NO. EB_30_60S4_33BB
1/19
LIN. FT.= 115
NO: 5 NO: 5STEEL PILE POINTS STEEL PILE POINTS
LIN. FT.= 65
ENGINEER
PROFESSIONAL
SEAL
NORTH CARO
LINA
20125
.gll
a
hsramcheek,jr.
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
SHEET OF
Drawing Scale : Placement Scale :
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
15+96.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.210
REPLACES BRIDGE NO. 580046
MACON
NORMAL TO CAP
SLOPE LINE
FRONT
SHOULDER LINE
SHOULDER LINE
H
H
EL. 2080.74
EL. 2081.38
1'-0'' MIN. EARTH BERM
1 •: 1
1 ƒ: 1
1 •: 1
SQUARE YARDSTONS
ESTIMATED QUANTITIES
(2'-0" THICK)
CLASS II
RIP RAP
END BENT 1
END BENT 2
FOR DRAINAGE
GEOTEXTILE
FOR BERM WIDTH DIMENSIONS, SEE GENERAL DRAWING.
STA. 15+96.00-L-
BRIDGE @
1 •: 1
1 ƒ: 1 2: 11 •: 1
SHOULDER LINE
SHOULDER LINE
EL. 2083.98
C
C
C
C
SLOPE LINE
FRONT
1'-0'' MIN. EARTH BERM
NORMAL TO CAP
END BENT 1 END BENT 2
1'-0"
7'-0"
105
125
115
140
EL. 2083.342: 1-L-
NOTES :
SHOULDER
GROUND LINE
MIN.GROUND LINE
SECTION H-H MIN. NORMAL TO CAP
1'-0'' MIN. EARTH BERM
GEOTEXTILE
GEOTEXTILE
3'-6"2'-0"SHOULDER LINE
1'-0"NORMAL TO CAP
1'-7" MIN. BERM
SLOPE 1•: 1
2'-0"2'-0"3'-6" P
AY ARE
ASLOPE 2 : 1
EL. 2081.38 @ EB1 (RT.)
EL. 2080.74 @ EB1 (LT.)
EL. 2083.98 @ EB2 (RT.)
EL. 2083.34 @ EB2 (LT.)
CHECKED BY :
DATE :
DATE :
ASSEMBLED BY :
DRAWN BY : REK 1/84
CHECKED BY : RDU 1/84
REV. 5/1/06R TLA/GM
REV. 10/1/11 MAA/GM
REV. 12/21/11 MAA/GM
NMW
MGC
9/18
RIP RAP DETAILS
STANDARD
S-161 ƒ: 12: 11 ƒ: 12: 17'-0"
18
STD. NO. RR1
1/19
B
B
PLAN
SECTION B-B
REVISED PER MARC'S MARK-UPS NMW 1/19
EL. 2087.4
EL. 2087.4
ENGINEER
PROFESSIONAL
SEAL
NORTH CARO
LINA
20125
.gll
a
hsramcheek,jr.SHOULDER
GROUND LINE
MIN.SECTION C-C
GEOTEXTILE
3'-6"2'-0"P
AY ARE
ASLOPE 2 : 1
EL. 2087.4
MACON BR. 43NOTES
APPROACH SLAB GROOVING IS NOT REQUIRED.
FOR THE 4" ~ DRAINAGE PIPE OUTLET(S), SEE ROADWAY STANDARD DRAWINGS.
BE PAVED. SEE ROADWAY PLANS.
DRAIN THE WATER AWAY FROM THE FILL FACE OF THE BRIDGE AND SHALL
AREA BETWEEN THE WINGWALL AND APPROACH SLAB SHALL BE GRADED TO
BACKWALL FROM OUTSIDE EDGE TO OUTSIDE EDGE OF APPROACH SLAB.
SELECT MATERIAL BACKFILL IS TO BE CONTINUOUS ALONG FILL FACE OF
ACCORDANCE WITH STANDARD SPECIFICATIONS SECTION 1016.
SELECT MATERIAL BACKFILL (CLASS V OR CLASS VI) SHALL BE IN
SPECIFICATIONS SECTION 1056.
GEOTEXTILE SHALL BE TYPE 1 IN ACCORDANCE WITH THE STANDARD
AND SELECT MATERIAL BACKFILL, SEE ROADWAY PLANS.
FOR BRIDGE APPROACH FILL INCLUDING GEOTEXTILE, 4" • DRAINAGE PIPE,
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
SHEET OF
Drawing Scale : Placement Scale :
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
15+96.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.210
REPLACES BRIDGE NO. 580046
MACON
DIMENSIONS SHOWN ARE TYPICAL FOR BOTH APPROACH SLABS
APPROACH SLAB
BEGIN
SLAB)
(BOTT. OF
#4A2
SLAB)
(TOP OF
#4A1
N
N
#4A2
#4A1 OR
END BENT #1
FILL FACE @
END BENT #2
FILL FACE @
N
N
#4A2
#4A1 OR
SLAB)
(BOTT. OF
#4A2
SLAB)
(TOP OF
#4A1
APPROACH SLAB
END
-L-
(TYP.)
60°-00'-00"
(TYP.)
60°-00'-00"
PLAN @ END BENT #1 PLAN @ END BENT #2
12'-0"12'-0"13'-11"13'-11"9"9"58-#5B1 @ 6" CTS. (TOP OF SLAB)58-#6B2 @ 6" CTS. (BOTTOM OF SLAB)8"CURB27'-10" (CLEAR ROADWAY)8"CURB11-#4A2 @ 1'-0" CTS.
11-#4A1 @ 1'-0" CTS.
(TOP OF SLAB) (2 BAR RUN)
11-#4A1 @ 1'-0" CTS.
(TOP OF SLAB) (2 BAR RUN)
11-#4A2 @ 1'-0" CTS.
(BOTTOM OF SLAB) (2 BAR RUN)(BOTTOM OF SLAB) (2 BAR RUN)58-#5B1 @ 6" CTS. (TOP OF SLAB)58-#6B2 @ 6" CTS. (BOTTOM OF SLAB)1'-3"
1'-3"
3"
1'-3"
1'-3"
3"4"4"3'-0"(TYP.)29'-2"4"4"6" BEVEL
6" BEVEL
3"3"
9"9"
9"9"
BILL OF MATERIAL
BAR NO.SIZE TYPE LENGTH WEIGHT
A2
A1
B1
B2
STR
STR
STR
STR
*
*
*
LBS.
LBS.
C. Y.
REINFORCING STEEL
REINFORCING STEEL
EPOXY COATED
CLASS AA CONCRETE
BAR NO.SIZE TYPE LENGTH WEIGHT
A2
A1
B1
B2
STR
STR
STR
STR
*
*
*
LBS.
LBS.
C. Y.
REINFORCING STEEL
REINFORCING STEEL
EPOXY COATED
CLASS AA CONCRETE
APPROACH SLAB AT EB #1
APPROACH SLAB AT EB #2
#4
#5
#6
#4
#5
#6
#4
#4
26
26
11'-7"
307
305
1009
1314
11'-7"1009
26
26
17'-8"
17'-7"
58
58
58
58
17'-8"
17'-7"
307
305
1314
670
977
977
11'-1"
11'-1"
15.5
15.5
670
A NIARDOTEDRG
FLOW LINE
EPOLSFOMOTTOBOT
NOTE:IF THE APPROACH SLAB IS NOT CONSTRUCTED IMMEDIATELY
AFTER THE BACKFILLING OF THE END BENT EXCAVATION,
GRADE TO DRAIN TO THE BOTTOM OF THE SLOPE AND PROVIDE
EROSION RESISTANT MATERIAL, SUCH AS FIBERGLASS ROVING
OR AS DIRECTED BY THE ENGINEER TO PREVENT SOIL EROSION
AND TO PROTECT THE AREA ADJACENT TO THE STRUCTURE.
THE CONTRACTOR WILL BE REQUIRED TO REMOVE THESE
MATERIALS PRIOR TO CONSTRUCTION OF THE APPROACH SLAB.
TEMPORARY DRAINAGE DETAIL
CAP FLOW LINE ONLY WITH
EROSION RESISTANT MATERIAL
BACKFILL EXCAVATION HOLE
AND GRADE TO DRAIN
BRIDGE DECK
SLAB
APPROACH
12"FILL SLOPE
ELBOW
ELBOW
DRAIN
SLOPE
TEMPORARY
TOE OF FILL
SECTION S-S
SECTION R-R
EROSION RESISTANT MATERIAL
TO PIPE INLET
GRADE TO DRAIN
1'-6" MIN.
FLOW LINE
PLAN VIEW
TEMPORARY BERM AND SLOPE DRAIN DETAILS
R
TEMP. SLOPE DRAIN
1'-0"
MIN.
R
2'-0"MIN.2'-6" MIN.S
S
4'-0"
EARTH DITCH BLOCK
À
2'-0"MIN.
NOTE:
TEMPORARY DRAINAGE PIPE, 12 INCHES IN DIAMETER.
THE SLOPE DRAIN SHALL CONSIST OF A NON-PERFORATED
MAT, OR 3) CONCRETE, AS DIRECTED BY THE ENGINEER.
PLANT MIX, TYPE 1 OR TYPE 2, MIN. 2" DEPTH, 2) EROSION CONTROL
EROSION RESISTANT MATERIAL SHALL BE EITHER 1) ASPHALT
AND PROVIDE EROSION RESISTANT MATERIAL AS SHOWN. THE
DRAIN. CONTRACTOR SHALL GRADE TO PIPE INLET
THE CONTRACTOR SHALL PROVIDE TEMPORARY BERM AND SLOPE
IMMEDIATELY AFTER THE CONSTRUCTION OF THE APPROACH SLAB,MIN.2'-6"FOR EROSION CONTROL
CLASS ``B" STONE
FOR EROSION CONTROL
CLASS ``B" STONE
4'-0" MIN.
MATERIAL OVER PIPE
3" EROSION RESISTANT
(TO BE USED WHEN SHOULDER BERM GUTTER IS REQUIRED)
12" MIN.
SHOULDER
FUTURE
BLOCK
DITCH
EARTH
SLAB
APPROACH
END OF
STANDARD
FOR PRESTRESSED CONCRETE
BRIDGE APPROACH SLAB
BOX BEAM UNIT
(SUB-REGIONAL TIER)
60° SKEW
S-17
18
CURB DETAILS
SECTION N-N
8"4" 2"BOX BEAM1'-1•"
PREVENT BOND
ROOFING FELT TO
2 LAYERS OF 30 LB.
ROD
2" BACKER 1'-4"SECTION THRU SLAB
2 : 1 SLOPE
BARS
#4 ``A''
PROPOSED
PAVEMENT
ASPHALT
MIN.2"BARS
#4 ``A''BARS
#5 ``B''
BARS
#6 ``B''
NORMAL TO END BENT
APPROVED WIRE BAR
SUPPORTS @ 3'-0" CTS.
6"8"4" CL.1'-2''GEOTEXTILE
PVC PIPE
SCHEDULE 40
4" • PERFORATED
(TYPE II - MODIFIED APPROACH FILL)
BY THE CONTRACTOR)
(TO BE DETERMINED
1: 1 SLOPE
APPROXIMATE
MIN.OR CLASS VI)
(CLASS V
MATERIAL
SELECT
3'-0"6"1'-8"OPENING
1•"
ROADWAY
@ 3'-0" CTS. ACROSS SLAB(CHCU)
5‚" CONTINUOUS HIGH CHAIR UPPER
2" CL.CHECKED BY :
DATE :
DATE :
ASSEMBLED BY :
DRAWN BY : MAA 11/11
CHECKED BY : AAC 11/11
REV. 12-17 MAA/THC
NMW
MGC
9/18 2'-9"BAR
SIZE
#4
#5
#6
EPOXY
COATED UNCOATED
2'-0"
2'-6"
3'-10"
1'-9"
2'-2"
2'-7"
SPLICE LENGTHS
STD. NO. BAS_BB_30_60S
1/19 ENGINEER
PROFESSIONAL
SEAL
NORTH CARO
LINA
20125
.gll
a
hsramcheek,jr.
MACON CO. #43
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
SHEET OF
Drawing Scale : Placement Scale :
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
15+96.00-L-
17BP.14.R.210
REPLACES BRIDGE NO. 580046
MACON
STANDARD NOTES
BRIDGES SHALL BE BUILT ON THE GRADE OR VERTICAL CURVE SHOWN ON PLANS.
SLABS, CURBS AND PARAPETS SHALL CONFORM TO THE GRADE OR CURVE.
ALL DIMENSIONS WHICH ARE GIVEN IN SECTION AND ARE AFFECTED BY DEAD LOAD
ON PLANS. IN SETTING FORMS FOR STEEL BEAM BRIDGES AND PRESTRESSED CONCRETE
GIRDER BRIDGES, ADJUSTMENTS SHALL BE MADE DUE TO THE DEAD LOAD DEFLECTIONS
FOR THE ELEVATIONS SHOWN. WHERE BLOCKS ARE SHOWN OVER BEAMS FOR BUILDING
UP TO THE SLAB, THE VERTICAL DIMENSIONS OF THE BLOCKS SHALL BE ADJUSTED
ORDINATE, AND ACTUAL BEAM CAMBER. WHERE BOTTOM OF SLAB IS IN LINE WITH
BOTTOM OF TOP FLANGES, DEPTH OF SLAB BETWEEN BEARINGS SHALL BE ADJUSTED
TO COMPENSATE FOR DEAD LOAD DEFLECTION, VERTICAL CURVE ORDINATE, AND
ACTUAL BEAM CAMBER.
IN SETTING FALSEWORK AND FORMS FOR REINFORCED CONCRETE SPANS, AN
AND PERMANENT CAMBER WHICH SHALL BE PROVIDED FOR IN ADDITION TO THE
ELEVATIONS SHOWN. AFTER REMOVAL OF THE FALSEWORK, THE FINISHED STRUCTURES
SHALL CONFORM TO THE PROFILE AND ELEVATIONS SHOWN ON THE PLANS AND
CONSTRUCTION ELEVATIONS FURNISHED BY THE ENGINEER.
INDICATED ON THE PLANS. WHEN BAR SUPPORT PIECES ARE PLACED IN CONTINUOUS
LINES, THEY SHALL BE SO PLACED THAT THE ENDS OF THE SUPPORTING WIRES SHALL
BE LAPPED TO LOCK LEGS ON ADJOINING PIECES.
STRUCTURAL STEEL:
SUBSTITUTE FOR THE COVER PLATES DESIGNATED ON THE PLANS COVER PLATES OF THE
EQUIVALENT AREA PROVIDED THESE PLATES ARE AT LEAST 5/16" IN THICKNESS AND
DO NOT EXCEED A WIDTH EQUAL TO THE FLANGE WIDTH LESS 2" OR A THICKNESS
EQUAL TO 2 TIMES THE FLANGE THICKNESS. THE SIZE OF FILLET WELDS SHALL CONFORM
ELECTROSLAG WELDING WILL NOT BE PERMITTED.
ROUNDED BY SUITABLE MEANS TO A RADIUS OF APPROXIMATELY 1/16 INCH OR
ETC. IN CASTING SUPERSTRUCTURES:
ALLOWANCE FOR DEAD LOAD DEFLECTION, SETTLEMENT,
DEFLECTIONS ARE DIMENSIONS AT CENTER LINE OF BEARING UNLESS OTHERWISE NOTED
REINFORCING STEEL:
WIRE BAR SUPPORTS SHALL BE PROVIDED FOR REINFORCING STEEL WHERE
EXCEPT AT THE INTERIOR SUPPORTS OF CONTINUOUS BEAMS WHERE THE COVER
WITH THE SOLE EXCEPTION OF EDGES AT SURFACES WHICH BEAR ON OTHER
AT THE CONTRACTOR'S OPTION, HE MAY SUBSTITUTE 7/8" ~ SHEAR STUDS FOR THE
STUDS FOR 4 - 3/4" ~ STUDS. STUDS OF THE LENGTH SPECIFIED ON THE PLANS MUST
ALONG THE BEAM AS SHOWN FOR 3/4" ~ STUDS BASED ON THE RATIO OF 3 - 7/8" ~
BE PROVIDED. THE MAXIMUM SPACING SHALL BE 2'-O".
THE RATE OF 3 - 7/8" ~ STUDS FOR 4 - 3/4" ~ STUDS, AND STUD SPACING CHANGES
SHALL BE MADE AS NECESSARY TO PROVIDE THE SAME EQUIVALENT NUMBER OF 7/8" ~ STUDS
PLATE IS IN CONTACT WITH BEARING PLATE, THE CONTRACTOR MAY, AT HIS OPTION,
OR METALLIZING.
EQUIVALENT FLAT SURFACE AT A SUITABLE ANGLE PRIOR TO PAINTING, GALVANIZING,
STRESS IN EXTREME FIBER OF
IMPACT ALLOWANCE
LIVE LOAD - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - -
27,000 LBS. PER SQ. IN.
20,000 LBS. PER SQ. IN.
DESIGN DATA:
SPECIFICATIONS - - - - - - - - - - - - - - -
DOWELS WHEN INDICATED ON PLANS AS FOR CULVERT EXTENSIONS, SHALL
DOWELS:
MATERIAL AND WORKMANSHIP:
UNLESS OTHERWISE REQUIRED ON PLANS, CLASS A CONCRETE SHALL BE
CONCRETE:
1,800 LBS. PER SQ. IN.
EQUIVALENT FLUID PRESSURE OF EARTH - - - - -
(MINIMUM)
30 LBS. PER CU. FT.
375 LBS. PER SQ. IN.- - - -OF TIMBER
COMPRESSION PERPENDICULAR TO GRAIN
PROVISIONS, ALL MATERIAL AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH
TOP CORNERS OF CURBS MAY BE ROUNDED TO 1-1/2" RADIUS WHICH IS BUILT
INTO CURB FORMS; CORNERS OF TRANSVERSE FLOOR EXPANSION JOINTS
SHALL BE ROUNDED WITH A 1/4" FINISHING TOOL UNLESS OTHERWISE REQUIRED
ON PLANS; AND CORNERS OF EXPANSION JOINTS IN THE ROADWAY FACES
CONCRETE IN COMPRESSION
CONCRETE IN SHEAR - - - - - - - - - - - - -
- - - - - - - - - - 1,200 LBS. PER SQ. IN.
SEE A.A.S.H.T.O.
EXCEPT AS MAY OTHERWISE BE SPECIFIED ON PLANS OR IN THE SPECIAL
N. C. DEPARTMENT OF TRANSPORTATION.
USED FOR ALL PORTIONS OF ALL STRUCTURES WITH THE EXCEPTION THAT:
CLASS AA CONCRETE SHALL BE USED IN BRIDGE SUPERSTRUCTURES,
CONCRETE CHAMFERS:
UNLESS OTHERWISE NOTED ON THE PLANS, ALL EXPOSED CORNERS ON
STRUCTURES SHALL BE CHAMFERED 3/4" WITH THE FOLLOWING EXCEPTIONS:
AND TOPS OF CURBS AND SIDEWALKS SHALL BE ROUNDED TO A 1/4" RADIUS
WITH A FINISHING STONE OR TOOL UNLESS OTHERWISE REQUIRED ON PLANS.
BE EMBEDDED AT LEAST 12" INTO THE OLD CONCRETE AND GROUTED INTO
GRADE 60 24,000 LBS. PER SQ. IN.
REINFORCING STEEL IN TENSION
27,000 LBS. PER SQ. IN.
- -
SURFACES,ALL SHARP EDGES AND ENDS OF SHAPES AND PLATES SHALL BE SLIGHTLY
PLACE WITH 1:2 CEMENT MORTAR.
- - - - -
ALLOWANCE SHALL BE MADE FOR DEAD LOAD DEFLECTIONS, SETTLEMENT OF FALSEWORK,
TO THE REQUIREMENTS OF THE CURRENT ANSI/AASHTO/AWS " BRIDGE WELDING CODE".
BETWEEN BEARINGS TO COMPENSATE FOR DEAD LOAD DEFLECTIONS, VERTICAL CURVE
ƒ" ~ STUDS SPECIFIED ON THE PLANS. THIS SUBSTITUTION SHALL BE MADE AT
STRUCTURAL STEEL - AASHTO M270 GRADE 36 -
- AASHTO M270 GRADE 50W -
- AASHTO M270 GRADE 50 -
ABUTMENT BACKWALLS, AND APPROACH SLABS; AND CLASS B CONCRETE SHALL
BE USED FOR SLOPE PROTECTION AND RIP RAP.
ALL REINFORCING STEEL SHALL BE DEFORMED. DIMENSIONS RELATIVE TO
PLACEMENT OF REINFORCING ARE TO CENTERS OF BARS UNLESS OTHERWISE INDICATED
IN THE PLANS. DIMENSIONS ON BAR DETAILS ARE TO CENTERS OF BARS OR ARE OUT
TO OUT AS INDICATED ON PLANS.
SEE A.A.S.H.T.O.
SEE PLANS
A.A.S.H.T.O. (CURRENT)
UNTREATED - EXTREME FIBER STRESS
STRUCTURAL TIMBER - TREATED OR
BE HOT ROLLED.
STEEL SHEET PILING FOR PERMANENT OR TEMPORARY APPLICATIONS SHALL
FALSEWORK OR FORMS IS STARTED.
BE SUBMITTED TO THE ENGINEER FOR APPROVAL BEFORE CONSTRUCTION OF THE
AND ANY STRUCTURE OR PARTS OF A STRUCTURE AS NOTED ON THE PLANS SHALL
DETAILED DRAWINGS FOR FALSEWORK OR FORMS FOR BRIDGE SUPERSTRUCTURE
METAL HANDRAILS SHALL BE IN ACCORDANCE WITH THE PLANS. RAILS SHALL BE
RAIL SHALL BE SET NORMAL TO THE GRADE OF THE CURB, UNLESS OTHERWISE SHOWN
METAL STANDARDS AND FACES OF THE CONCRETE END POSTS FOR THE METAL
HANDRAILS AND POSTS:
SPECIFICATIONS ARTICLE 105-4.
OVER NOTES HEREON, AND SPECIAL PROVISIONS SHALL GOVERN OVER ALL. SEE
GOVERN OVER THE SPECIFICATIONS, BUT THE REMAINDER OF THE PLANS SHALL GOVERN
GENERALLY, IN CASE OF DISCREPANCY, THIS STANDARD SHEET OF NOTES SHALL
SPECIAL NOTES:
AS MANUFACTURED FOR BRIDGE RAILING. CASTINGS SHALL BE OF A UNIFORM APPEARANCE.
FINS AND OTHER DEFORMATIONS RESULTING FROM CASTING OR OTHERWISE SHALL BE
NOT BE ACCEPTED. CERTIFIED MILL REPORTS ARE REQUIRED FOR METAL RAILS AND POSTS.
ON PLANS. THE METAL RAIL AND TOPS OF CONCRETE POSTS USED WITH THE ALUMINUM
RAIL SHALL BE BUILT PARALLEL TO THE GRADE OF THE CURB.
BE OBTAINED. CASTINGS WITH DISCOLORATIONS OR OF NON-UNIFORM COLORING WILL
THE 2018 ``STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES" OF THE
STANDARD NOTES
S-18
18