Loading...
HomeMy WebLinkAbout20210062 Ver 1_Shoreline Stabilization_20210210Submission Form Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to viewthe form. Attach documentation of Pre -Filing Meeting Request here: DWR Pre -Filing Meeting Request Form.pdf 51.24KB Pre -fling Meeting or Request Date 1/9/2021 ID# 20210062 Version I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * merclarkl0@gmail.com Rease provide an email address for payrrent and requests for pure information here. Owner Information: Name:* Meredith Clark Email: * merclarkl0@gmail.com Phone Number:* (414)759-9449 (xxx)xxx-xxxx Mailing Address:* Street Address 4108 Stillbrook Lane Address Line 2 City State / Frovince / Region ITigh Point NC Fbstal / Zip Code Country 27265 United States Is there an agent working on the f Yes project?* r No Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* shoreline stabilization If your project has a formal name please use this. If your project does not hake a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. r Upload File r Lookup address Property Address Lookup:* Latitude:* 35.642309 Street Address 1025 Marvin Hedrick Rd Address Line 2 City Lexington Fbstal / Zip Code 27292 State / Province / Fbgion NC Country United States Longitude:*-80.283244 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* lot and shorehne.pdf 57.59KB shoreline.pdf 1.27MB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%2OLayout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* lot and shorehne.pdf 57.59KB 4. Location of the property (where work is to be conducted) Nearest Town:* Lexington County: * Davidson Lake/ river/ ocean adjacent to High Rock Lake property: Subdivisions name or site address:* 1025 Marvin Hedrick Lexington NC Include phase/lot number Directions to site:* Hwy I-85 South, take exit 91onto NC-8, right onto Wildlife Recreation Area, right on Marvin Hedrick Road, destination the left in 1.2 miles Pease include road narres and nunbers, landnaft etc. 5. Describe the existing land use or condition of the site at the time of this application:* building new home at this time, cleared lot Fbsidential, undeveloped, etc. 6. Property Size 1.84 Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): shoreline stabilization 8. How will the work be done?* PF From Land r From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 456 square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward:* (including all clearing, backfill, excavation, rip rap, retaining walls, etc.) 912 square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (nunber of trees, for instance) rock, clay, few trees Sketch: pictures shoreline.pdf 1.14MB Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): o $240.00 for impacts to lake (below normal water level) of less than 1 acre o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); 0 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Meredith Clark Signature: Initial Review Is this accepted into the review process?* Project Number:* 20210062 Select Reviewer:* Select Reviewing Office Has payment been received?* What amount is owed?* rYes allo Version:* 1 Sue Homewood:eads\slhomewood Winston-Salem Regional Office - (336) 776-9800 r No Payment Needed r Fee Received r Need Fee - send electronic notification r $240.00 f $570.00 5Z�}13% 1 LF I)E741C GXc5Tw(; WDOD PIER FOR: LOCATION: RESERVOIR: PROJECT: DRAWING TITLE: VEGETATION AND EROSION CONTROL FABRIC EXISTING GRADE 3 -� I 1 3' MAX I CLASS 2 RIP RAP 1 I 2 ! HIGH WATER ELEV. EROSION CONTROL FABRIC SAKE BOTTOM TYPICAL CONDITIONS 36" TO 72" ERODED CUT WAVE EXPOSURE MEREDITH CLARK 1025 MARVIN HEDRICK RD. HIGH ROCK LAKE SHORELINE STABILIZATION PROGRAM PHASE I SITE EVALUATION YADKIN, INC. - BADIN, NORTH CAROLINA DETAIL MODERATE RIP RAP STABILIZATION 1 3 14 rCUBE HYDRO 7, CAROLINAS Re: Shoreline Stabilization Dear Applicant: Cube Hydro Carollfnas LLC Highway 740 PO Box 575 Badin, NC 28009-0575 Please find enclosed Stewart Engineering's - Phase One Shoreline Evaluation and Plan for Stabilization. As you will note from the enclosed report, Stewart has recommended installation of shoreline erosion control measures for the shoreline adjacent to your property. Installation of such stabilization measures is optional. You should use the enclosed report to obtain estimates from qualified contractors for installing the recommended shoreline protection measures. Please note that estimates should be made based on the installation plan prepared by Stewart, as Cube will not permit the installation of alternative erosion control measures. After you have received the estimates, you can then decide whether you want to proceed to Phase Two of the permitting process. Phase Two of the permitting process involves obtaining the necessary permits from the U.S. Army Corps of Engineers (USACE) and the North Carolina Department of Water Quality (NCDWQ). Should you elect to continue, please forward the Phase Two fee of $1,075.001 to Cube Hydro Carolinas. Cube uses this fee to prepare applications and secure the required USACE and NCDWQ permits. In addition, The North Carolina Division of Water Quality charges a permit application fee of $240.00 for their certification. Please include a separate check for $240.001 payable to NC Department of Environment and Natural Resources. Yadkin will initiate the permitting process after it has received both of these payments. After Cube has received the required permits from the USACE and NCDWQ, Cube will issue you. an activity permit authorizing installation of the erosion control plan recommended by Stewart Engineering. Please keep in mind that installation of the shoreline erosion control measures may not begin until you have an activity permit from Cube. If you have questions about the report please feel free to contact me at (704) 422-5525. Karen C. Baldwin Property Compliance Supervisor "I 'A STEWARTAugust 12, 2020 REPORT — PHASE 1 SHORELINE EVALUATION Applicant — Meredith Clark 4108 St:librook Lane High Point, NC 27265 Location - 1025 Marvin Hedrick Road Reservoir — High Rack Lake Shoreline Evaluation A shoreline evaluation of the subject property was completed on 7/23/20. A copy of the field notes and shoreline map are attached to this report. A set of photographs of the shoreline taken during the site visit have been sent to Eagle Creek Renewable Energy (ECRE) for the permit file. The height of the eroded shoreline was observed to be approximately 6 feet in height with up to 24 inches of undercut. There was an existing wood pier located near the western property corner. Rip rap stabilization is already in place on the adjacent shoreline and under the existing pier. There were no lap trees observed during the site visit, but there was a significant amount of floating debris and tree branches. The shoreline has a significant exposure to open water. Recommendations for Stabilization Based on the site evaluation of the property, we recommend that stabilization be completed as follows: 1. The subject shoreline was observed to have several areas of significant erosion and undercut. 2. The contractor shall carefully grade and prepare the shoreline to receive the non -woven fabric and rip rap. The fabric should be buried into the lakebed and into the grade above the rip rap. Install stabilization as ind-cated on the enclosed site map, :n accordance with Detail 3, Moderate Rip Rap Stabilization, (copy attached). 101 NORTH TRYON ST. CHARLOTTE, Nv T 704.334.7925 SUTTE 1400 28202 F 704.334,7926 STEWART 3, The existing rip rap under the pier must be partially removed so that the applicant's non -woven filter fabric can be installed to overlap the existing fabric on the shoreline under the pier. The new rip rap would then be continuous with the existing under the pier. 4. The tree branches and debris that floated onto the shoreline can be removed during the installation of the shoreline stabilization. S, Upon completion of the shoreline stabilization, the owner will be required to revegetate the disturbed area above the rip rap slope with ECRE approved ground cover plant materials. Attachments — Field Notes Site Plan Detail 3 101 NORTH TRYON ST. CHARLOTTE, NC T 704.334.7925 SUITE 1400 28202 F 704.334.7926 YADKIN SHORELINE MANAGEMENT PROGRAM PHASE 1- SITE EVALUATION DATE: ILS4 A. APPLICANT NAME:,,-M6fz0)"T}4 6W F?K Lot No.: B. LAKE: 14i t Fck �akC Shoreline Length: (67- L,F- C. LOCATION/ORIENTATION: O�u w -Cove: N/A -Open Water Exposure: AY`N -Point NIA -Face Direction: N iS_E^W D. EXISTING VEGETATION: NvyZ • ob- t4,, V4 64,t uL "V Lap Trees: Y.LN E. SHORELINE CONDITIONS: -Rock: r -Ht. of eroded bank� -Slope above bank: L"_VLk F. CONSTRUCTION ACCEtt: , Usti a -Undercut depth: C7 -Lake bottom slope: -Lake bottom material: �, G. OTHER OBSERVATIONS: �Vz lul I l Vag : per . Sr.4�A-77iSZ j VEGETATION AND EROSION CONTROL FABRIC 3 —, I I CLASS 2 RIP RAP 2 1 I EROSION CONTROL FABRIC------W TYPICAL CONDITIONS 36" TO 72" ERODED CUT WAVE EXPOSURE EXISTING GRADE 3' MAX HIGH WATER ELEV. LAKE — BOTToM FOR: MEREDITH CLARK LOCATION: 1025 MARVIN HEDRICK RD. HIGH ROCK LAKE RESERVOIR: PROJECT: SHORELINE STABILIZATION PROGRAM PHASE I S;TE EVAI. UATION YADKIN, INC. - BADIN, NORTH CAROLINA DRAINING TITLE: DETA MODERATE RIP RAP STABILIAT ON 3 9 -1 - -- T.!AO 4 OF 4 - i�..l� 3 •�1 , yr. � _ 7: �� , ' "'•. , ' s• + '- li'4Z., t ,+ �f fT t t ID#* 20210062 Version* 1 Regional Office * Winston-Salem Regional Office - (336) 776-9800 Reviewer List* Sue Homewood Pre -Filing Meeting Request submitted 1/9/2021 Contact Name* Meredith Clark Contact Email Address* Merclarkl0@gmail.com Project Name* Shoreline stabilization Project Owner* Meredith Clark Project County* Davidson Owner Address: Street Address 4108 Stillbrook Lane Address Line 2 aty State / Province / Pegion High Point NC Postal / Zip axle Country 27265 United States Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: * 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express * Individual Permit F Modification W Shoreline Stabilization Does this project have an existing project ID#?* r Yes C No Please list all existing project ID's associated with this projects.* 15A NCAC 02H .0502(a) Do you know the name of the staff member you would like to request a meeting with? No Please give a brief project description below.* Shoreline stabilization at 1025 Marvin Hedrick Road Le)angton NC 27292 Please give a couple of dates you are available for a meeting. 1 /15/2021 1 /14/2021 1 /13/2021 Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. 1 also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Yvl C.k_� Submittal Date 1/9/2021