Loading...
HomeMy WebLinkAbout20210054 Ver 1_401 Application_20210209Staff Review Does this application have all the attachments needed to accept it into the review process?* r Yes r No ID#* 20210054 Version* 1 Is this project a public transportation project?* r Yes r No Reviewer List:* Kaylie Yankura:eads\kyankura Select Reviewing Office:* Asheville Regional Office - (828) 296-4500 Submittal Type:* 401 Application Does this project require a request for payment to be sent?* r Yes r No How much is r $240.00 owed?* r $570.00 Oickthe upload button or drag and drop files here to attach document PCN Form - LOT 16, NWP 3 & 18.pdf 349.39KB C1.pdf 325.45KB C2.pdf 180.23KB C3.pdf 184.74KB C4.pdf 66.45KB C5.pdf 126.43KB C6.pdf 113.8KB C7.pdf 83.75KB C8. pdf 176.43KB C9.pdf 98.96KB C10.pdf 76.54KB C11.pdf 117.97KB C12.pdf 145.98KB Only pdf or lm7 files are accepted. Describe the attachments or comments: LOT 16; Construct a new Boathouse Foundation, and replace the existing Timber Seawall with a new concrete Segmental Block Seawall with stone veneer and with riprap toe apron. Sign and Submit W By checking the box and signing box below, I certify that: ■ I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. ■ I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. ■ I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); ■ 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND ■ I intend to electronically sign and submit the online form. Signature: Try t7. r ur, It Submittal Date: Is filled in autorratically. Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * r For the Record Only (Courtesy Copy) r New Project r Modification/New Project with Existing ID r More Information Response r Other Agency Comments r Pre -Application Submittal r Re-Issuance\Renewal Request r Stream or Buffer Appeal Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre -Filing Meeting Request here: LOT 16 - DWR Pre -Filing Meeting Request Form.pdf 50.68KB Date for Meeting Request 2/5/2021 ID# 20210054 Version 1 Project Contact Information Name: Terry E. Allen, PE who is submitting the information? Email Address: tealleneng@comporium.net Project Information Project Name: LOT 16 - CONSTRUCT NEW BOATHOUSE and REPLACE EXISTING SEAWALL Is this a public transportation project? r Yes r No Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown County (ies) Transylvania Please upload all files that need to be submited. Page 1 of 13 PCN Form – Version 1.3 December 10, 2008 Version Office Use Only: Corps action ID no. _____________ DWQ project no. _______________ Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: Section 404 Permit Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: NWP-18 to construct New Boathouse Foundation; NWP-3 to Replace existing Timber Seawall or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? Yes No 1d. Type(s) of approval sought from the DWQ (check all that apply): 401 Water Quality Certification – Regular Non-404 Jurisdictional General Permit 401 Water Quality Certification – Express Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. Yes No 1g. Is the project located in any of NC’s twenty coastal counties. If yes, answer 1h below. Yes No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No 2. Project Information 2a. Name of project: LOT 16 - CONSTRUCT NEW BOATHOUSE and REPLACE EXISTING SEAWALL 2b. County: Transylvania 2c. Nearest municipality / town: Brevard 2d. Subdivision name: Lake Toxaway 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Charles S Reyner, Trustee 3b. Deed Book and Page No. Date: 05/2018 Book: 00841 Page: 0514 Plat Book: F10 Page: 226 3c. Responsible Party (for LLC if applicable): 3d. Street address: LOT 16, East Shore Drive (B A L016 E SHORE DR) 3e. City, state, zip: Lake Toxaway, NC 28747 3f. Telephone no.: 864-270-7744 3g. Fax no.: 3h. Email address: Page 2 of 13 PCN Form – Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: Agent Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Terry Allen, PE 5b. Business name (if applicable): T.E. ALLEN ENGINEERING, PC 5c. Street address: P.O. Box 103 5d. City, state, zip: Rosman, NC 28772 5e. Telephone no.: 828-877-4883 5f. Fax no.: 5g. Email address: tealleneng@comporium.net Page 3 of 13 PCN Form – Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 8522-24-7262-000 (LOT 16) 1b. Site coordinates (in decimal degrees): Latitude: 35.126046 Longitude: - - 82.937951 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: 0.3514 (from Transylvania County GIS) acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Lake Toxaway 2b. Water Quality Classification of nearest receiving water: B, Trout 2c. River basin: Savannah Page 4 of 13 PCN Form – Version 1.3 December 10, 2008 Version 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: This home site located in Toxaway Estates, a private residential development in western Transylvania County, NC. The lot borders Lake Toxaway which has a classification of B: Trout. The general land use is residential. There is an existing seawall (Bulkhead) along the shoreline. A portion of the existing seawall will be removed as necessary to install the new boathouse foundation. 3b. List the total estimated acreage of all existing wetlands on the property: none 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: none 3d. Explain the purpose of the proposed project: This Project is to construct a New 240'x30' Boathouse Foundation. Replace the existing timber seawall with a new concrete Segmental Block Seawall with Stone Veneer and Riprap Toe Apron. New work to be in accordance with Sheets C1 through C12. The boathouse foundation work will be performed "IN THE DRY" using a coffer dam to create a dry work area. Where the work is performed during the upcoming Lake draw-down, temporary Compost Socks and Stone Check Dams shall be used for erosion control around the work area. All temporary Erosion Control Measures shall be in accordance with the latest edition of the NC EROSION and SEDIMENT CONTROL PLANNING and DESIGN MANUAL. A minimum of three (3) rows of temporary Compost Socks shall be provided to separate the work area from the dry Lake Bed. All temporary Erosion Control Measures shall be removed prior to impoudment refill or at the conclusion of Boathouse Foundation work. All Trout Buffer disturbance shall be repaired in accordance with the NCDEQ-DLR Trout Buffer and Riparian Area planting requirements. See attached Sheet C3 for location of work. Page 5 of 13 PCN Form – Version 1.3 December 10, 2008 Version 3e. Describe the overall project in detail, including the type of equipment to be used: BOATHOUSE FOUNDATION. W ork shall be performed "IN THE DRY" using a coffer dam to create a dry work area. Three (3) rows of Turbitidy Curtains shall be used in addition to the Coffer Dam. To comply with Water Quality requirements, the work will be performed in the dry. Where a coffer dam is used, the work area will be dewatered by pumping. All dewatering discharge shall have a turbidity of not more than 10 NTUs above background or as otherwise specified in DWQ’s Turbidity Standards (15A NCAC 02B.0211(3.)(k.)). To satisfy the required turbidity limit, the dewatering pump discharge shall be filtered through a Bag Filtration Unit equal to Model BF-400 from Rain-for-Rent with a 100 to 1 micron nominal rating (P.O.C. at Rain-for-Rent is Jeremy at 704-393-3345). The turbidity level of all discharge shall be monitored with calibrated turbidity meters and the filtration equipment shall be adjusted as necessary to insure compliance with Water Quality Standards. The water around the dredging areas shall likewise be monitored with calibrated turbidity meters and the turbidity curtains shall be adjusted as necessary to insure compliance with Water Quality Standards. Where the work is performed during the upcoming Lake draw-down, temporary Compost Sock and Stone Check Dams shall be used for erosion control around the work area. All temporary Erosion Control Measures shall be in accordance with the latest edition of the NC EROSION and SEDIMENT CONTROL PLANNING and DESIGN MANUAL. Uncured concrete shall not be allowed to come into direct contact with surface waters. This will be accomplished by establishing a “dry work area” as described above. “High Early” cementious material shall be in the ston e work to minimize curing time. Water Quality around the work areas shall be monitored with calibrated turbidity meters. The coffer dams and turbidity curtains shall be adjusted as necessary to insure compliance with Water Quality Standards. Furnish and install multiple layers of turbidity curtains as necessary to insure regulatory compliance. Permanent Fill (i.e., riprap toe protection) shall not exceed 25 cubic yards meeting the following requirements; (a) The quantity of discharged material and the volume of area excavated do not exceed 25 cubic yards below the plane of the ordinary high water mark or the high tide line; (b) The discharge will not cause the loss of more than 1/10-acre of waters of the United States; and (c) The discharge is not placed for the purpose of a stream diversion. No disturbance within existing Vegetated Trout Buffer. Provide Turbidity Curtains around work area to maintian water quality. See attached Sheet C3 for location of work. Water Quality around the work areas shall be monitored with calibrated turbidity meters. The coffer dams and turbidity curtains shall be adjusted as necessary to insure compliance with Water Quality Standards. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: Yes No Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? Preliminary Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Page 6 of 13 PCN Form – Version 1.3 December 10, 2008 Version 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes No Unknown 5b. If yes, explain in detail according to “help file” instructions. 6. Future Project Plans 6a. Is this a phased project? Yes No 6b. If yes, explain. TROUT BUFFER. All disturbance within the Trout Buffer shall be restored in accordance with the NCDEQ-DLR Trout Buffer and Riparian Area planting requirements. Page 7 of 13 PCN Form – Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): Wetlands Streams - tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number – Permanent (P) or Temporary (T) 2b. Type of impact 2c. Type of wetland (if known) 2d. Forested 2e. Type of jurisdiction (Corps - 404, 10 DWQ – non-404, other) 2f. Area of impact (acres) W1 P T Yes No Corps DWQ W2 P T Yes No Corps DWQ W3 P T Yes No Corps DWQ W4 P T Yes No Corps DWQ W5 P T Yes No Corps DWQ W6 P T Yes No Corps DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number - Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction (Corps - 404, 10 DWQ – non-404, other) 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P T PER INT Corps DWQ S2 P T PER INT Corps DWQ S3 P T PER INT Corps DWQ S4 P T PER INT Corps DWQ S5 P T PER INT Corps DWQ S6 P T PER INT Corps DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 8 of 13 PCN Form – Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number – Permanent (P) or Temporary (T) 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) O1 P T Lake Toxaway Temporary Coffer Dam for Boathouse Foundation 60 Linear Ft (+/-) Lake 0.02 Acres O2 P T Lake Toxaway Temporary Turbidity Curtain to Repair Seawall, 60 Linear Ft (+/-) Lake 0.02 Acres O3 P T Lake Toxaway Permanent Boathouse Foundation Lake 0.05 Acres O4 P T Lake Toxaway Permanent Riprap Toe Apron 0.01 Acres 4f. Total open water impacts 0.10 Acres 4g. Comments: The work may be performed while the lake is at normal pool elevation, or during the upcoming Lake Draw- down. 1.0 W ork will be accomplished "in the dry" by installing a temporary Coffer Dam around the proposed work area. Three (3) rows of Turbidity Curtains shall be installed in addition to the Coffer Dam. The dewatering discharge will be filtered to DWQ Water Quality Standards prior to release. Turbidity Curtains to remain in place untll work is complete and the turbidity in the work area is less than 10 NTUs above background. 2.0 Where the work is performed during the upcoming Lake draw-down, temporary Compost Socks and Stone Check Dams shall be used for erosion control around the work area. All temporary Erosion Control Measures shall be in accordance with the latest edition of the NC EROSION and SEDIMENT CONTROL PLANNING and DESIGN MANUAL. 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? Yes No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 9 of 13 PCN Form – Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? Neuse Tar-Pamlico Other: Catawba Randleman 6b. Buffer impact number – Permanent (P) or Temporary (T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet) B1 P T Yes No B2 P T Yes No B3 P T Yes No 6h. Total buffer impacts 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The work will be performed while the lake is at normal pool elevation. 1.0 W ork will be accomplished "in the dry" by installing a temporary Coffer Dam around the proposed work area. The dewatering discharge will be filtered to DWQ Water Quality Standards prior to release. 2.0 W ork will be accomplished "in the dry" by installing a temporary Coffer Dam around the proposed work area. Three (3) rows of Turbidity Curtains shall be installed in addition to the Coffer Dam. The dewatering discharge will be filtered to DW Q Water Quality Standards prior to release. Turbidity Curtains to remain in place untll work is complete and the turbidity in the work area is less than 10 NTUs above background. 3.0 Where the work is performed during the upcoming Lake draw-down, temporary Compost Sock and Stone Check Dams shall be used for erosion control around the work area. All temporary Erosion Control Measures shall be in accordance with the latest edition of the NC EROSION and SEDIMENT CONTROL PLANNING and DESIGN MANUAL. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. To minimize disturbance during construction, the work will be accomplished with the smallest mechanical equipment practicable. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If yes, mitigation is required by (check all that apply): DWQ Corps 2c. If yes, which mitigation option will be used for this project? Mitigation bank Payment to in-lieu fee program Permittee Responsible Mitigation Page 10 of 13 PCN Form – Version 1.3 December 10, 2008 Version 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: warm cool cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) – required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Should project exceed 10% or 100' in 1000', a trout buffer waiver will be sought from NCDENR - Div of Land Resources Page 11 of 13 PCN Form – Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No 1b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: Yes No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? Yes No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? Certified Local Government DWQ Stormwater Program DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government’s jurisdiction is this project? 3b. Which of the following locally-implemented stormwater management programs apply (check all that apply): Phase II NSW USMP Water Supply Watershed Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? Yes No 4. DWQ Stormwater Program Review 4a. Which of the following state-implemented stormwater management programs apply (check all that apply): Coastal counties HQW ORW Session Law 2006-246 Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? Yes No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? Yes No 5b. Have all of the 401 Unit submittal requirements been met? Yes No Page 12 of 13 PCN Form – Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 1b. If you answered “yes” to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? Yes No 1c. If you answered “yes” to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: Yes No 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 2B .0200)? Yes No 2b. Is this an after-the-fact permit application? Yes No 2c. If you answered “yes” to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered “yes” to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered “no,” provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N.A. Page 13 of 13 PCN Form – Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? Yes No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? Yes No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? CHARLES S. REYNER, TRUSTEE Applicant/Agent's Printed Name _______________________________ Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) Date C Copyright 2021 T.E.ALLEN ENGINEERING PC.All Rights ReservedWorldwide.%ORFN³$´(DVW6KRUH'ULYH.CMG6QZCYC[0%Charles S Reyner, Trustee Lot 16 Block "A", East Shore Drive Lake Toxaway, Transylvania County, NC PIN: 8522-24-7262-000 (Lot 16) PIN: 8522-24-8227-000 (Lot 17) C Copyright 2021 T.E.ALLEN ENGINEERING PC.All Rights ReservedWorldwide.Charles S Reyner, Trustee Lot 16 Block "A", East Shore Drive Lake Toxaway, Transylvania County, NC PIN: 8522-24-7262-000 (Lot 16) PIN: 8522-24-8227-000 (Lot 17) C Copyright 2021 T.E.ALLEN ENGINEERING PC.All Rights ReservedWorldwide.Charles S Reyner, Trustee Lot 16 Block "A", East Shore Drive Lake Toxaway, Transylvania County, NC PIN: 8522-24-7262-000 (Lot 16) PIN: 8522-24-8227-000 (Lot 17)LAKE TOXAWAY C Copyright 2021 T.E.ALLEN ENGINEERING PC.All Rights ReservedWorldwide.Charles S Reyner, Trustee Lot 16 Block "A", East Shore Drive Lake Toxaway, Transylvania County, NC PIN: 8522-24-7262-000 (Lot 16) PIN: 8522-24-8227-000 (Lot 17) C Copyright 2021 T.E.ALLEN ENGINEERING PC.All Rights ReservedWorldwide.Charles S Reyner, Trustee Lot 16 Block "A", East Shore Drive Lake Toxaway, Transylvania County, NC PIN: 8522-24-7262-000 (Lot 16) PIN: 8522-24-8227-000 (Lot 17) C Copyright 2021 TerryAllen PE, T.E. ALLENENGINEERING PC, TerryE. Allen Engineer. AllRights ReservedWorldwide.Charles S Reyner, Trustee Lot 16 Block "A", East Shore Drive Lake Toxaway, Transylvania County, NC PIN: 8522-24-7262-000 (Lot 16) PIN: 8522-24-8227-000 (Lot 17) C Copyright 2021 TerryAllen PE, T.E. ALLENENGINEERING PC, TerryE. Allen Engineer. AllRights ReservedWorldwide.Charles S Reyner, Trustee Lot 16 Block "A", East Shore Drive Lake Toxaway, Transylvania County, NC PIN: 8522-24-7262-000 (Lot 16) PIN: 8522-24-8227-000 (Lot 17) C Copyright 2021 Terry Allen PE, T.E.ALLEN ENGINEERING PC, Terry E. AllenEngineer. All Rights Reserved Worldwide.Charles S Reyner, Trustee Lot 16 Block "A", East Shore Drive Lake Toxaway, Transylvania County, NC PIN: 8522-24-7262-000 (Lot 16) PIN: 8522-24-8227-000 (Lot 17) C Copyright 2021 T.E.ALLEN ENGINEERING PC.All Rights ReservedWorldwide.Charles S Reyner, Trustee Lot 16 Block "A", East Shore Drive Lake Toxaway, Transylvania County, NC PIN: 8522-24-7262-000 (Lot 16) PIN: 8522-24-8227-000 (Lot 17) C Copyright 2020 T.E.ALLEN ENGINEERING PC.All Rights ReservedWorldwide.C Copyright 2020 TerryAllen PE, T.E. ALLENENGINEERING PC, TerryE. Allen Engineer. AllRights ReservedWorldwide.Charles S Reyner, Trustee Lot 16 Block "A", East Shore Drive Lake Toxaway, Transylvania County, NC PIN: 8522-24-7262-000 (Lot 16) PIN: 8522-24-8227-000 (Lot 17) C Copyright 2020 T.E.ALLEN ENGINEERING PC.All Rights ReservedWorldwide.Charles S Reyner, Trustee Lot 16 Block "A", East Shore Drive Lake Toxaway, Transylvania County, NC PIN: 8522-24-7262-000 (Lot 16) PIN: 8522-24-8227-000 (Lot 17) C Copyright 2020 T.E.ALLEN ENGINEERING PC.All Rights ReservedWorldwide.Charles S Reyner, Trustee Lot 16 Block "A", East Shore Drive Lake Toxaway, Transylvania County, NC PIN: 8522-24-7262-000 (Lot 16) PIN: 8522-24-8227-000 (Lot 17) DWR Pre-Fil ing Meeting Req u est Form Contact Name * Contact Email Addre ss * Proje ct Owne r * Proje ct Name * Proje ct County * Owne r Addre ss:* Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low.* Please give a couple of dates you are available for a meeting. Ple ase attach the docume ntation you would like to hav e the me e ting about. Terry E. Allen tealleneng@comporium.net Charles S Reyner LOT 16 - CONSTRUCT NEW BOATHOUSE, REPLACE EXISTING SEAWALL Transylvania City Lake Toxaway, State / Province / Region North Carolina Postal / Zip Code 28747 Country United States Street Address Lot 16 of Block “A” Address Line 2 East Shore Drive Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No Kaylie Yankura Construct new 24'x30' Boathouse Foundation. Replace the existing timber seawall with new concrete segmental block with stone veneer and riprap toe apron. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: Signature * Submittal Date · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.  You will receive notification regarding meeting location and time if a meeting is necessary.  You will receive notification when the thirty-day clock has expired, and you can submit an application. 1/7/2021