HomeMy WebLinkAbout20201429 Ver 1_Photos_20210120Strickland, Bev
From: Stefan Wilson <stefan@bennickgrading.com>
Sent: Wednesday, January 20, 2021 6:54 PM
To: Annino, Amy M
Subject: [External] Re: photos needed
Attachments: IMG_3330jpeg; IMG_3335jpeg; IMG_3333jpeg; IMG_3334jpeg
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Hi Amy
The Scanlan shoreline doesn't have what we would call erosion. In the original picture you notice the lot has a
very slight slope. You could literally walk right into the water. Their whole property is this way. If I was to turn
180 degrees towards their house the rest of the property has rip rap stone laid up to what would be the 04'
elevation. The last 70' or so is what I have pictured and is what they want rock placed on to finish out their
property to match.
Davis- I sent Carissa new photos of this property where I stood right across from it. I will attach the pictures at
the bottom.
Please feel free to email me back or call me.
Thanks
Stefan o,bennick rg ading com
828-334-9094
Y
vow.
OL
P.
16
w
ff
M MIA
IL
A
r2
ROL
y! d
1�44 ,
dib
IR
-�.
-,,W� pkw- "
�. ,b � VF Mari;&
- Nk
Itdo
`" ..
mwa
l vo
#ram
�#_
_
00
e
On Wed, Jan 20, 2021 at 5:42 PM Annino, Amy M <amy.anninokncdenr.gov> wrote:
Stefan,
I still need a photo that shows erosion along the shoreline for the following projects:
Scanlan, 2250 Mallard Cove Dr
Davis, 6113 Holiday Shores Ave
Amy Annino
Environmental Specialist —Asheville Regional Office
Water Quality Regional Operations Section
NCDEQ — Division of Water Resources
2090 U.S. Hwy. 70
Swannanoa, N.C. 28711
828 296 4656 office
984 232 1222 mobile
amy.anninoa-ncdenr.gov
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are
on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time.
Stefan Wilson- Shoreline Project Manager
828-334-9094
Stefan o,bennick rg ading com
Bennick Grading
7836 Hwy 70 E Nebo,
NC 28761
828-659-1000