Loading...
HomeMy WebLinkAbout20201429 Ver 1_Photos_20210120Strickland, Bev From: Stefan Wilson <stefan@bennickgrading.com> Sent: Wednesday, January 20, 2021 6:54 PM To: Annino, Amy M Subject: [External] Re: photos needed Attachments: IMG_3330jpeg; IMG_3335jpeg; IMG_3333jpeg; IMG_3334jpeg Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Amy The Scanlan shoreline doesn't have what we would call erosion. In the original picture you notice the lot has a very slight slope. You could literally walk right into the water. Their whole property is this way. If I was to turn 180 degrees towards their house the rest of the property has rip rap stone laid up to what would be the 04' elevation. The last 70' or so is what I have pictured and is what they want rock placed on to finish out their property to match. Davis- I sent Carissa new photos of this property where I stood right across from it. I will attach the pictures at the bottom. Please feel free to email me back or call me. Thanks Stefan o,bennick rg ading com 828-334-9094 Y vow. OL P. 16 w ff M MIA IL A r2 ROL y! d 1�44 , dib IR -�. -,,W� pkw- " �. ,b � VF Mari;& - Nk Itdo `" .. mwa l vo #ram �#_ _ 00 e On Wed, Jan 20, 2021 at 5:42 PM Annino, Amy M <amy.anninokncdenr.gov> wrote: Stefan, I still need a photo that shows erosion along the shoreline for the following projects: Scanlan, 2250 Mallard Cove Dr Davis, 6113 Holiday Shores Ave Amy Annino Environmental Specialist —Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 828 296 4656 office 984 232 1222 mobile amy.anninoa-ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. Stefan Wilson- Shoreline Project Manager 828-334-9094 Stefan o,bennick rg ading com Bennick Grading 7836 Hwy 70 E Nebo, NC 28761 828-659-1000