HomeMy WebLinkAbout20210028 Ver 1_Shoreline Stabilization_20210210Submission Form
Pre -Filing Meeting Information
Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able
to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance
with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall
request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5)
all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying
authority at least 30 days prior to submitting the certification request. Click here to read more information on when this
form is needed prior to application submission or here to viewthe form.
Attach documentation of Pre -Filing Meeting Request here:
DWR Pre -Filing Meeting Request Form.pdf 52.13KB
Pre -fling Meeting or Request Date 2/19/2021
ID# 20210028 Version 1
I. Applicant Information [15A NCAC 02H .0502(a)]
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Primary Contact Email * blazinbl3@gmail.com
Rease provide an email address for payrrent and requests for pure information here.
Owner Information:
Name: * Benjamin Erese
Email: * blazinbl3@gmail.com
Phone Number:* (704)640-1976
(xxx)xxx-xxxx
Mailing Address:* Street Address
671 Scout Road
Address Line 2
City
State / Frovince / Region
Lexington
NC
Fbstal / Zip Code
Country
27292
United States
Is there an agent working on the f Yes
project?* r No
Project Information [15A NCAC 02H .0502(a) & (b)]
...............................................................................................................................................................................
Project Name:* Erese Family Shoreline Stabilization
If your project has a formal name please use this. If your project does not hake a formal name, please identify your project by
the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any
other names that have been used to identify the project in the past.
1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect
to local landmarks such as towns, rivers, and roads.
r Upload File
r Lookup address
Property Address Lookup:* Street Address
671 Scout Road
Address Line 2
Latitude:* 35.382951
City
State / Province / Region
Lexington
NC
Fbstal / Zip Code
Country
27292
United States
Longitude:* 80.155693
2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing,
structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging
below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the
diagram under section 12.normal pool lake level/normal water level*
Riprapstab.pdf 357.78KB
Please use the diagram at the link below:
https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%2OLayout.docx
3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a
yard stick, shovel handle, etc.)*
Shorelinescale.pdf 389.54KB
4. Location of the property (where work is to be conducted)
Nearest Town:* Lexington
County:* Davidson
Lake/ river/ ocean adjacent to High Rock
property:
Subdivisions name or site address:* Lot 5, Yachtsman Point
Include phasellot number
Directions to site:*
I-85 to Lexington exit for NC Hwy 8, go South on NC Hwy 8, Right on
Wildlife Recreation Access Rd, Right on Scout Rd, property is on Left
Side of Rd
Rease include road naves and numbers, landmarks etc.
5. Describe the existing land use or condition of the site at the time of this application:*
Single-family residential community
Residential, undeveloped, etc.
6. Property Size 1.27
Acres
7. Describe proposed work (include discussion as to how hardening of shoreline has been
avoided, or why it is necessary):
To stabilize an eroding shoreline and protect it from further erosion
8. How will the work be done?* I7 From Land
r From Water
9. Total amount of disturbance below the normal pool lake level/ normal water level:*
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
164
square feet
10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet
land -ward:*
(including all clearing, backfill, excavation, rip rap, retaining walls, etc.)
984
square feet
11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet
landward to be impacted:*
(number of trees, for instance)
8-10 trees will be removed in order to complete the stabilization project
Sketch: Shorelinecalcu.pdf 509.7KB
Application Fee:
Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The
application fee is as follows (pursuant to G.S. 143-215.3D):
a $240.00 for impacts to lake (below normal water level) of less than 1 acre
o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre
By digitally signing below, I certifythat:
a I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the
best of my knowledge and belief
a I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
a I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of
the NC General Statutes (the "Uniform Electronic Transactions Act');
a I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act');
a 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
o I intend to electronically sign and submit the Shoreline Stabilization online form.
Full Name:* Benjamin W Erese
Signature:
?�e
Initial Review
Is this accepted into the review
process?*
Project Number:* 20210028
Select Reviewer:*
Select Reviewing Office
Has payment been received?*
What amount is owed?*
rYes allo
Version:* 1
Sue Homewood:eads\slhomewood
Winston-Salem Regional Office - (336) 776-9800
r No Payment Needed
r Fee Received
r Need Fee - send electronic notification
r $240.00
f $570.00
n
1 tr^r�r w -rr r���-r� ��r�rr� • r�r
TYPICAL CONDITIONS
12" TO 36" ERODED CUT
WAVE EXPOSURE
FOR:
BENJAMIN ERESE
LOCATION: LOT 5, YACHTSMANS POINT
RESERVOIR: HIGH ROCK LAKE
PROJECT: SHORELINE STABILIZATION PROGRAM
PHASE I SITE EVALUATION
YADKIN, INC_ - RADIN, NORTH CAROLINA
DRAWING TITLE: I DETAIL
MINOR RIP RAP STABILIZATION 2
�cK
NCDEQ 401 WATER QUALITY CERTIFICATION
SHORELINE IMPACT AREA CALCULATIONS
APPLICANT: Benjamin Erese
Lot 5, Yachtsman Point
STABILIZATION IMPACT AREA CALCULATIONS
The attached shoreline site plan shows 132 LF of proposed shoreline stabilization measures.
Detail X indicates a proposed shoreline slope that is graded at 2:1 and reflects the estimated
normal pool level and the estimated height of the subject shoreline above the normal pool
level.
Calculation 1— Impact Area Below Normal Pool Level (Item 10 on NCDEQ Form)
Area of Impact = Shoreline Length x Depth* x Slope
=132'x1x2
= 164 sq. ft.
*For this calculation, an average water depth of 1 ft. has been assumed. This will
produce a conservative overestimate of the stabilization impact area.
Calculation 2 — Impact Area Above the Normal Pool Level (Item 11 on NCDEQ Form)
Height of Bank Above Normal Pool Varies Across the Shoreline
Estimate 102 LF of Shoreline = 1 ft. Above Normal Pool
Estimate 30 LF of Shoreline = 2 ft. Above Normal Pool
Area of Impact = Length x Height x Slope
= ( 102 x 1 x 2) + ( 30 x 2 x 2)
= 204 + 120
= 324 sq. ft_
Impact From Construction Above Shoreline Stabilization - Assume 5 ft. Wide Zone
Area of Impact = 132' x 5 ft.
= 660 sq. ft.
Tota► Area of Impact Above Normal Pool Level = 984 sq. ft.
ID#* 20210028 Version* 1
Regional Office * Winston-Salem Regional Office - (336) 776-9800
Reviewer List* Sue Homewood
Pre -Filing Meeting Request submitted 1/4/2021
Contact Name*
Benjamin W. Erese
Contact Email Address*
blaanbl3@gmail.com
Project Name*
Erese Family Shoreline Stabilization
Project Owner*
Benjamin W. Erese
Project County*
Davidson
Owner Address:
Street Address
671 Scout Road
Address Line 2
aty
Le)angton
Postal / Zip axle
27292
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
F 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
F- Individual Permit F- Modification
W Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes C No
Please list all existing project ID's associated with this projects.*
SAW-2020-02030
State / Province / Pegion
NC
Country
USA
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below.*
Shoreline Stabilization:
There is a significant amount of erosion. Orientation of shoreline has
significant exposure to wind driven waves and boat wakes.
I have attached the following reports:
-Stewart Engineering Report ( first 5 pages). (14 pages of pics not
included, but can be provided).
-U.S. Army Corps of Engineers (first 2 pages). (15 additional pages
not included, but can be provided).
Please give a couple of dates you are available for a meeting.
1 /15/2021
1 /18/2021
1 /22/2021
Please attach the documentation you would like to have the meeting about.
eresefamilystabilization.pdf 3.1 MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
1 also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
01�14Y� StIve
Submittal Date 1/4/2021