Loading...
HomeMy WebLinkAbout20210028 Ver 1_Shoreline Stabilization_20210210Submission Form Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to viewthe form. Attach documentation of Pre -Filing Meeting Request here: DWR Pre -Filing Meeting Request Form.pdf 52.13KB Pre -fling Meeting or Request Date 2/19/2021 ID# 20210028 Version 1 I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * blazinbl3@gmail.com Rease provide an email address for payrrent and requests for pure information here. Owner Information: Name: * Benjamin Erese Email: * blazinbl3@gmail.com Phone Number:* (704)640-1976 (xxx)xxx-xxxx Mailing Address:* Street Address 671 Scout Road Address Line 2 City State / Frovince / Region Lexington NC Fbstal / Zip Code Country 27292 United States Is there an agent working on the f Yes project?* r No Project Information [15A NCAC 02H .0502(a) & (b)] ............................................................................................................................................................................... Project Name:* Erese Family Shoreline Stabilization If your project has a formal name please use this. If your project does not hake a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. r Upload File r Lookup address Property Address Lookup:* Street Address 671 Scout Road Address Line 2 Latitude:* 35.382951 City State / Province / Region Lexington NC Fbstal / Zip Code Country 27292 United States Longitude:* 80.155693 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* Riprapstab.pdf 357.78KB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%2OLayout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* Shorelinescale.pdf 389.54KB 4. Location of the property (where work is to be conducted) Nearest Town:* Lexington County:* Davidson Lake/ river/ ocean adjacent to High Rock property: Subdivisions name or site address:* Lot 5, Yachtsman Point Include phasellot number Directions to site:* I-85 to Lexington exit for NC Hwy 8, go South on NC Hwy 8, Right on Wildlife Recreation Access Rd, Right on Scout Rd, property is on Left Side of Rd Rease include road naves and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application:* Single-family residential community Residential, undeveloped, etc. 6. Property Size 1.27 Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): To stabilize an eroding shoreline and protect it from further erosion 8. How will the work be done?* I7 From Land r From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 164 square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward:* (including all clearing, backfill, excavation, rip rap, retaining walls, etc.) 984 square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (number of trees, for instance) 8-10 trees will be removed in order to complete the stabilization project Sketch: Shorelinecalcu.pdf 509.7KB Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): a $240.00 for impacts to lake (below normal water level) of less than 1 acre o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certifythat: a I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief a I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. a I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); a I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); a 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Benjamin W Erese Signature: ?�e Initial Review Is this accepted into the review process?* Project Number:* 20210028 Select Reviewer:* Select Reviewing Office Has payment been received?* What amount is owed?* rYes allo Version:* 1 Sue Homewood:eads\slhomewood Winston-Salem Regional Office - (336) 776-9800 r No Payment Needed r Fee Received r Need Fee - send electronic notification r $240.00 f $570.00 n 1 tr^r�r w -rr r���-r� ��r�rr� • r�r TYPICAL CONDITIONS 12" TO 36" ERODED CUT WAVE EXPOSURE FOR: BENJAMIN ERESE LOCATION: LOT 5, YACHTSMANS POINT RESERVOIR: HIGH ROCK LAKE PROJECT: SHORELINE STABILIZATION PROGRAM PHASE I SITE EVALUATION YADKIN, INC_ - RADIN, NORTH CAROLINA DRAWING TITLE: I DETAIL MINOR RIP RAP STABILIZATION 2 �cK NCDEQ 401 WATER QUALITY CERTIFICATION SHORELINE IMPACT AREA CALCULATIONS APPLICANT: Benjamin Erese Lot 5, Yachtsman Point STABILIZATION IMPACT AREA CALCULATIONS The attached shoreline site plan shows 132 LF of proposed shoreline stabilization measures. Detail X indicates a proposed shoreline slope that is graded at 2:1 and reflects the estimated normal pool level and the estimated height of the subject shoreline above the normal pool level. Calculation 1— Impact Area Below Normal Pool Level (Item 10 on NCDEQ Form) Area of Impact = Shoreline Length x Depth* x Slope =132'x1x2 = 164 sq. ft. *For this calculation, an average water depth of 1 ft. has been assumed. This will produce a conservative overestimate of the stabilization impact area. Calculation 2 — Impact Area Above the Normal Pool Level (Item 11 on NCDEQ Form) Height of Bank Above Normal Pool Varies Across the Shoreline Estimate 102 LF of Shoreline = 1 ft. Above Normal Pool Estimate 30 LF of Shoreline = 2 ft. Above Normal Pool Area of Impact = Length x Height x Slope = ( 102 x 1 x 2) + ( 30 x 2 x 2) = 204 + 120 = 324 sq. ft_ Impact From Construction Above Shoreline Stabilization - Assume 5 ft. Wide Zone Area of Impact = 132' x 5 ft. = 660 sq. ft. Tota► Area of Impact Above Normal Pool Level = 984 sq. ft. ID#* 20210028 Version* 1 Regional Office * Winston-Salem Regional Office - (336) 776-9800 Reviewer List* Sue Homewood Pre -Filing Meeting Request submitted 1/4/2021 Contact Name* Benjamin W. Erese Contact Email Address* blaanbl3@gmail.com Project Name* Erese Family Shoreline Stabilization Project Owner* Benjamin W. Erese Project County* Davidson Owner Address: Street Address 671 Scout Road Address Line 2 aty Le)angton Postal / Zip axle 27292 Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: F 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express F- Individual Permit F- Modification W Shoreline Stabilization Does this project have an existing project ID#?* r Yes C No Please list all existing project ID's associated with this projects.* SAW-2020-02030 State / Province / Pegion NC Country USA Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below.* Shoreline Stabilization: There is a significant amount of erosion. Orientation of shoreline has significant exposure to wind driven waves and boat wakes. I have attached the following reports: -Stewart Engineering Report ( first 5 pages). (14 pages of pics not included, but can be provided). -U.S. Army Corps of Engineers (first 2 pages). (15 additional pages not included, but can be provided). Please give a couple of dates you are available for a meeting. 1 /15/2021 1 /18/2021 1 /22/2021 Please attach the documentation you would like to have the meeting about. eresefamilystabilization.pdf 3.1 MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. 1 also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature 01�14Y� StIve Submittal Date 1/4/2021